Penfield Pavilion Status Report



Similar documents
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

REBUILDING BELMAR ABFE FLOOD MAPS &THE REBUILDING PROCESS

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Important Information for Owners of Buildings in Flood Zones

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

NY Rising Housing Recovery Program

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Estimated Cost of Repair

Elevating Your House. Introduction CHAPTER 5

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Notice to Property Owners

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee

Presenters. The Ups and Downs of Home Elevations 4/29/2016. Hazard Mitigation Grant (HMA) Programs

SECTION XI OPINION OF PROBABLE COST

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

Repairs, Remodeling, Additions, and Retrofitting

BRIDGES ARE relatively expensive but often are

Above the Flood: Elevating Your Floodprone House. FEMA 347/ May 2000 FEMA

Foundation Requirements and Recommendations for Elevated Homes Hurricane Sandy Recovery Fact Sheet

Above the Flood: Elevating Your Floodprone House. Federal Emergency Management Agency. Federal Emergency Management Agency

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

SECTION 3 ONM & J STRUCTURAL ANALYSIS

Flood Damage Mitigation And Insurance Costs

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Substantial Improvement/Damage Notice to Property Owners

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Chapter 3 Pre-Installation, Foundations and Piers

Facility Assessment for East Main Street, Huntley, IL

Residential Deck Safety, Construction, and Repair

Free-of-Obstruction Requirements

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

1. GENERAL ADVISORY BASE FLOOD ELEVATION (ABFE) QUESTIONS

Standard Operating Procedures for Flood Preparation and Response

Breakaway Walls

Summary of Coastal Construction Requirements and Recommendations

UPDATE: Contingency Requirements for Close Out of the RREM Program

Bernie Nimer, Dave Seton Mayfair Hotel Development Corporation

How To Repair A House

LOWEST FLOOR GUIDE I. LOWEST FLOOR DETERMINATION

ORDINANCE NO

Does Wall Township require an inspection by the building department on resale of a home?

Introduction: Analysis:


Safe & Sound Bridge Terminology

Introduction to the National Flood Insurance Program: A Guide for Coastal Property Owners

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

Reducing Flood Risk to Residential Buildings That Cannot Be Elevated

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.

Evaluating the Condition of Seawalls/Bulkheads

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

Residential Decks. Planning and Development Services Department

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

Uncovered Decks & Porches

780 CMR 120.G FLOOD-RESISTANT CONSTRUCTION AND CONSTRUCTION IN COASTAL DUNES Note that this Appendix is unique to Massachusetts

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

How To Get A Building Permit In Houston

PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA Telephone (805)

EAST LYME HIGH SCHOOL

ARTICLE 12 FLOOD DAMAGE PREVENTION

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

St. Louis County Department of Public Works Division of Code Enforcement. When is a Building Permit required for Residential Projects?

Residential Sheltering: In-Residence and Stand-Alone Shelters

CHAPTER 3 page 69 LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

ITEM 8(a) MANAGEMENT COMMITTTE 2 JUNE 2015

FLOOD HAZARD MANAGEMENT SPECIFIC PLAN GUIDELINES

The Florida Building Code

29 Broadway- 14 th Fl Tel: New York NY Fax: Due Diligence Report. New York, New York

Guernsey s Structural Engineering Experience

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

Patio Covers / Carports

CITY OF TRAIL MEMORANDUM

Elevations Certificates: Update 2009 Presented by Wendy Lathrop, PLS, CFM

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

Residential Building Permit Process

CITY OF BELLEAIR BEACH, FLORIDA

Region IV 1371 Peachtree Street. N.E. Suite 700 Atlanta, GA 30309

Building Foundation and Structure

FEMA Updates Flood Plain Information For 2006

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Managing Our Water Retention Systems

BUILDERS RISK / WRAP-UP LIABILITY APPLICATION

Transcription:

Penfield Pavilion Status Report October 30, 2014 Presented by: Penfield Building Committee - James Bradley, Chair Robert Bellitto, Vice Chair, Andrew Graceffa, Secretary Ian Bass, Jane Nelson, Ken Jones, Ellery Plotkin, Richard Speciale Kevin Chamberlain, DeStefano& Chamberlain

Presentation Agenda Committee Charge Pavilion History Research & Due Diligence, Considerations Background Repair Options Design Comparison Recommended Design Detail Bulkhead Improvements 2

Penfield Building Committee Formed by Board of Selectmen in December 2013 Committee Charge...review and recommend options and manage the repair.. be guided by the engineering analysis, coastal engineer s report, geo-technical report, FEMA standards and guidelines, flood mitigation plan, technical reports, comments for the public retain appropriate design professionals (architect, structural engineer, coastal engineer and geotechnical engineer retain a construction manager/owner s representative to facilitate and accomplish. 3

Pavilion History Original Penfield Pavilion was purchased in 1982 New Pavilion was built in phases on the same footprint of the old Pavilion Phase I East Wing (Lockers) Approved 12/2006 RTM vote: 36 in favor, 5 opposed, 3 abstentions Built 2007/2008 Phase II West Wing (Rental Hall/Kitchen/Restrooms, First Aid and Lifeguard Facility, etc) Approved 9/2010 RTM vote: 31 in favor, 9 opposed, 1 abstention Built 2010/2011 4

TropicalStormIrene-2011 High winds/astronomical high tides; Storm surge but low wave energy 5

TropicalStormIrene-2011 Impact to the Pavilion Erosion of sands underneath the building Several footings undermined Front entrance porch settled 6

Irene Restoration Restoration of the Pavilion Included: Underpinning performed Protective bulkhead designed and constructed Building structure repaired and reopened Certain recommended modifications not completed 7

Tropical Storm Sandy -2012 Category 2 Hurricane downgraded to a posttropical cyclone. High winds and storm surge. 8

Tropical Storm Sandy Damage Impact to the Pavilion Existing spread footings performed poorly Loss of beach Sand behind bulkhead liquefied Sands surrounding and under footings eroded/scoured Existing bulkhead opening provided a convenient channel for sand transport and funneled flood waters increasing velocity 9

Tropical Storm Sandy Damage Impact to the Pavilion Foundation settlement Structural damage Damaged building systems and finishes Building deemed unsafe by Town Building officials 10

2014 Site Protection Committee approved additional protection and make-safe safety measures: Additional security fencing Inspection of gas and electrical systems Installed alarm/security system Temporary Removal of Gathering Hall Glass In storage for reuse Permanent closure of openings in bulkhead 11

PBC Research and Due Diligence Original Penfield Phase I and Phase II construction documents Investigative engineering reports (Irene and Sandy) JM AlbaineEngineering Roberge Associates Coastal Engineers Heller and Johnsen Geotechnical Engineers Storm damage insurance claim, repair, scope and cost estimates Wakelee Associates Romano Construction Saugatuck Construction Group Engineer, Architect and Construction Manager interviews Competitive interview and selection April/May 2013 DeStefano& Chamberlain and Shawmut Design & Construction selected Public input 12

PBC Research and Due Diligence Presentations before the Committee: JM Albaine Engineering (including results of 8/2013 Public Forum) Roberge Associates Coastal Engineers Heller and Johnsen Geotechnical Engineers Fairfield DPW and Engineering Departments Building Department Conservation Department Parks and Recreation Director Town Plan and Zoning (including FEMA/Flood Zone requirements) Town Risk Manager (insurance settlement) Flood and Erosion Control Board Report regarding additional soil borings 13

PBC Factors Considered Extent of foundation damage Cause of damage/contributing factors Feasibilityof Repairs Existing site soil conditions Footing depths Alternate foundation designs and soil bearing quality/capacity Beach accretion and loss Existingtimber bulkhead location/performance Facility /site impact on neighborhood flooding Constructability and project safety Buildingheight and mass impact on neighborhood Project Cost Coastal Storm Impacts past and future Cost recovery funding resources Coastal Storm protection FEMA Flood Zone Requirements Insurance Claims Schedule 14

Repair Options PBC reviewed 11 repair options to varying degrees 8 options were reviewed during the 8/14 Committee meeting 3 options were added after the 8/14 meeting (two in response to public comment) 4 repair options given final consideration Repair &Protect (Option 1) Complete Demolition & Site Reconstruction (Option 8) Demolition & Construct Smaller Facility (Option 9) Modify & Raise Building (Option 7) 15

Background Pavilion Appraised Value: $5,400,000 (insurance settlement criteria) Current FEMA requirements must be followed if the value of the repair is greater then 50% of the estimated value of the building. Pavilion actual construction cost would need to be no greater than $2,650,000 Coastal and Structural Engineering Recommendation: the building should be re-supported on a new flood-resistant pile foundation system 16

Background (cont d) 17

Background (cont d) Site FEMA Flood Zone changed from an A zone(moderate wave action) to a V zone(high velocity wave action) Original construction was FEMA AE Zone A zone: Base Flood Elevation (BFE) of 11.0 finish floor V zone: Base Flood Elevation (BFE) of 13.0 (Note: measured to lowest horizontal structural element) 18

Background (cont d) 19

Repair & Protect Scope (Option 1) Building is repaired in place Repair structural and non-structural damage per insurance settlement scope Underpin only footings which were undermined and failed Place a layer (blanket) of surge stone underneath the West Wing Construct low bulkhead across north (parking lot) side of building Schematic Cost estimate: $3,222,044 20

Repair & Protect Pro/Con Pros: Low cost (if FEMA threshold not exceeded) No impact to Town programming (use of facilities) Operating income not impacted Cons: Shallow, spread footings remain Repaired building not FEMA compliant Risk of reoccurrence of the damage from Sandy. Final cost could exceed the FEMA threshold High cost risk for scope of work Engineer team, DeStefano& Chamberlain, Inc. does not recommend foundation repair or reconstruction that does not involve pile (deep) foundations and elevated building Committee s Conclusion: Not Recommended 21

Complete Demolition & Site Reconstruction Scope (Option 8) Demolish the pavilion, all footings, foundation and bulkhead Remove all site utilities Create a new, continuous reinforced berm connecting Durrell Pavilion to Rickards Beach Note: ADA and vehicular access to be maintained Conceptual Cost estimate: $808,631 22

Complete Demolition & Site Reconstruction Pro/Con Pros: Lowest cost option Site protection (beach erosion) Added flood mitigation Cons: Existing Town Asset (Pavilion) demolished Loss of Town programming space Creates safety and convenience issues: distance to first aid station, bathrooms and life guard station Committee s Conclusion: Not Recommended 23

Demolition & Construct Smaller Facility Demolish current building (both wings) and foundations Bulkhead to remain Scope (Option 9) Design and build a new smaller pavilion 6000 sq. feet total: 2500 sq. feet pavilion, 2500 sq. feet open and covered deck plus 1000 sqftramps Timber pile supported foundation at FEMA V Zone elevations. Create a continuous flood mitigation berm connecting Durrell Pavilion to Rickards Beach Facility will have basic beach public services Changing Rooms, Restrooms, Shower, Day Lockers, Life Guard/First Aid Station, Concession (kitchen). Conceptual Cost estimate: $2,860,246 24

Demolition & Construct Smaller Facility Pro/Con Pros: A low cost option Facility built to FEMA standards Stays within current footprint Low risk regarding future flood damage Cons: Existing Town asset (pavilion) not utilized Current Town programming is restricted with loss of revenue Additional schedule impacts Design new pavilion Town and Administrative approval Committee s Conclusion: Not Recommended 25

Modify & Raise Building Scope (Option 7) Committee Recommended Repair Demolish the East Wing Demolish Exterior decks Not financially practical to move tear off and reconstruct Lift/move the West Wing building into the parking lot Repair structural and non-structural damage Build new concrete and timber pile foundation New steel elements supporting floor structure Create a new, continuous berm connecting Durrell Pavilion to Rickards Beach 26

Modify & Raise Building Scope cont d Move West Wing back in place, 3.5 higher in elevation Repair any remaining damage Construct smaller East Wing with Rest rooms, Changing Area, Day Lockers and exterior decking Fill beneath and around the building Construct on grade decking New stairs and ramps Design and Development Cost estimate: $4,558,399 27

Modify & Raise Building Pro/Con Pro s: Minimal risk Existing Town Asset (Pavilion) is reused Original amenities are in place FEMA standards are met Increased parking Engineer s opinion: It is the recommended solution. The design will reduce the risk for future storm damage Con s: Higher cost Slight reduction in programming due to removal of 200 lockers Committee s Conclusion: Recommended 28

Modify & Raise Building (Option 7) Committee Recommended Design DesignDetail 29

Step 1 Partial Demolition Existing Locker Wing, decks and stairs to be Demolished Remove Existing Elevated Decks, Ramps and Stairs. Roofs To Remain 30

Step 2 Move Building Temporary building location 31

Step 3 Install Foundations Cut back existing floor joists Remove existing dropped wood beams Pier Grade beam Install galvanized steel beams with wood blocking Install galvanized steel stub column down to concrete pier Timber pile 32

Bulkhead Improvements Infill ALL openings in accordance with original design Riprap stone revetment on Long Island side of bulkhead 33