Corporate Standard. Contractor Management



Similar documents
Corporate Standard. Contractor Management

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

WHS CONTRACTOR MANAGEMENT PROCEDURE

WHS Contractor Management Procedure

Procedure. Work Health and Safety General construction. Document number: PRO Description Process Owner Approved for issue. Rev no.

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

Management of Contractors and Suppliers Procedure

Guide Document for Development of WHS Management Plans

Asbestos licensing and notification guide for applicants

Policy Number: 054 Work Health and Safety July 2015

ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS

Work Health and Safety (WHS) Policy

Procedure. Work Health and Safety Incident Notification. Document number: PRO Description Process Owner Approved for issue. Rev no.

HS307 Hazard & Incident Reporting Procedure

WORKING IN CONFINED SPACES GUIDELINES

4.05e WHS Guidelines for Incident Investigation Procedures Page 1 of 7

Revision: 5. Category: Contract Management CONTENTS

Asbestos Removal and Assessor Licensing Information

Drug & Alcohol Management Plan (DAMP)

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

Guide for applicants for asbestos removal and asbestos assessor licences and notifications

Managing health and safety in construction

The Construction (Design and Management) Regulations 2007

Asbestos removal and licensing

Management of Health and Safety for Work and Services Contractors Policy June 2010

OHSMS Implementation Guide

1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY

2007 No. 00 HEALTH AND SAFETY. The Construction (Design and Management) Regulations 2007

Contractor Environment, Health and Safety Management Plan

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

Construction and Civil Work Management

Confined Space Management Procedure

ABSOLUTE Education Pty. Ltd. CPCCOHS1001A Work Safely in the Construction Industry (White Card) Course Material

SAFETY and HEALTH MANAGEMENT STANDARDS

INTRODUCTION TO THE WORK HEALTH AND SAFETY ACT

Communication of Health and Safety Policy and Information

Asbestos Management Policy (Version 3)

WORK HEALTH AND SAFETY

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

This AGREEMENT made the... day of... between the HUNTER WATER CORPORATION (hereinafter called the Corporation ) and ...

OH&S Management Systems Audit Checklist (NAT, E3)

To establish a process to control all UON Health and Safety Management System Framework

HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM

WESTERN AUSTRALIA HEAVY VEHICLE ACCREDITATION SCHEME (WAHVAS) BUSINESS RULES (DRAFT)

WHS Contractor Management Procedure

Hazard/Incident Recording, Reporting and Investigation

Contractor Safety Management

Measuring your capabilities in Fleet Safety Management ACC Fleet Saver

Incident Investigation Procedure

SITE CONTRACTOR PROCEDURES

Health and safety in construction procurement

Work Health & Safety Policy Document Number: WH&S Ver 1

WHS CONTRACTOR MANAGEMENT PROCEDURE

Contractors and Suppliers Code of Conduct. June 2013

Effective Date: Expiry Date: STATEMENT OF FACT

Excavation & Trenching Procedure

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Accident/Incident Investigation & Reporting Procedure

Health & Safety Management System Manual

CCF Systems Gap Analysis Checklist. Civil Contractors Federation. Civil Construction Management Code

THE ELECTRICAL CONTRACTOR SAFETY PROGRAM GUIDE

ABN Mannum Road Phone: (08) PO Box 586 Fax: (08)

Corporate Health and Safety Policy

Work Health and Safety. Seven Steps for Small Business

APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS

2015 No. 51 HEALTH AND SAFETY. The Construction (Design and Management) Regulations 2015

The Management of Asbestos containing Materials

SUPPLY CHAIN PREQUALIFICATION PACKAGE

COMMONWEALTH CONSTRUCTION INDUCTION TRAINING CARDS. Guidance material

ACCIDENT/INCIDENT REPORTING AND INVESTIGATION

Guide for Contractors and Project Supervisors

INTRODUCTION Purpose Policy Exception for Short-Term Workplace Visits Relevant Legislation and Regulations...

WHS CONTRACTOR MANAGEMENT PROCEDURE

SafetyMAP Initial Level User Guide

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Information for a person conducting a business or undertaking

WHS LEGISLATIVE COMPLIANCE GUIDELINES

Contract Relationship Management DRAFT

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Event Management Guidelines. Month Event Management Guidelines (Month, 2011)

CONTRACTOR INDUCTION HANDBOOK

Contractor Connect Scheme Electrical Contractor and Worker Handbook

Jonathan Wilson. Sector Manager (Health & Safety)

CONTRACTOR MANAGEMENT SYSTEM

Printed Copies of this Document are Uncontrolled Refer to the Portal for the Latest Version TABLE OF CONTENTS

Health and safety policy

WHS Policies and Procedures Package

NHVAS Advanced Fatigue Management Spot Check Checklist

School or service safety advisor (SSA) role

Queensland COAL MINING SAFETY AND HEALTH ACT 1999

Please provide details of your claims within the last 5 years Date Incident details Amount paid Amount reserved

Work Health and Safety Act 2011

Occupational Health & Safety Policy Injury & Incident Reporting

PLDC ENVIRONMENTAL HEALTH & SAFETY (EHS) SPECIFICATION. Level Contractor 5

G2 Contract Management Plan Date: July 2014 Edition 1 / Revision 0

Transcription:

WORK HEALTH & SAFETY CORPORATE STANDARD Accountability Head of People and Culture Corporate Standard Contractor Management 14/6/12 TABLE OF CONTENTS Requirements\Controlled s - Restricted Access\5. Works Management and Date of Revision: 14/6/12 APPROVED BY CRMC 14/6/12 Uncontrolled if Printed Page 1 of 48

1.0 PURPOSE... 4 2.0 SCOPE... 4 3.0 DEFINITIONS... 4 4.0 BACKGROUND... 6 5.0 SPECIFIC REQUIREMENTS... 6 5.1 General... 6 5.2 CATEGORY A CONTRACTORS - Principal Contractors... 7 5.2.1 Requirements and process for approval... 7 5.2.2 Approved Status Expiry... 8 5.3 Permit to Work... 8 5.4 Contract Provisions... 10 5.5 Contractor Inductions... 10 5.6 Drug and Alcohol Management (Airside Principal Contractors only)... 11 5.7 WHS Reporting Requirements... 12 Monthly Reports... 12 Incident Reports... 12 5.8 WHS Monitoring and Review... 13 General... 13 Audit... 13 Non-conformances... 13 5.9 Sub-contractors... 13 5.10 Provision of information... 13 5.11 Responsibilities (Principal Contractor Works)... 14 6.0 CATEGORY B CONTRACTORS (Accredited WHSMS)... 16 6.1 Requirements and process for approval... 16 6.2 Approved Status Expiry... 16 6.3 Permit to Work... 17 Process... 17 6.4 Contract Provisions... 20 6.5 Contractor Inductions... 20 6.6 WHS Reporting Requirements... 20 Monthly Reports... 20 Incident Reports... 20 6.7 WHS Monitoring and Review... 21 General... 21 Audit... 21 Non-conformances... 22 6.8 Sub-contractors... 22 6.9 Provision of information... 22 6.10 Responsibilities... 23 7.0 CATEGORY C CONTRACTORS (BAC s WHSMS)... 24 7.1 Requirements and process for approval... 24 7.2 Approved Status Expiry... 25 7.3 Permit to Work... 25 Process... 25 7.4 Legal Provisions... 27 7.5 Contractor Inductions... 27 7.6 WHS Reporting Requirements... 28 Monthly Reports... 28 Incident Reports... 28 7.7 WHS Monitoring and Review... 29 General... 29 Non-conformances... 29 7.8 Sub-contractors... 29 7.9 Provision of information... 29 Requirements\Controlled s - Restricted Uncontrolled if Printed Page 2 of 48

7.10 Responsibilities... 30 8.0 CATEGORY D CONTRACTORS (Consultants)... 31 8.1 Application... 31 8.2 Requirements and process for approval... 32 8.3 Approved Status Expiry... 32 8.4 Legal Provisions... 32 8.5 Consultant Inductions... 32 8.6 WHS Reporting Requirements... 33 Incident Reports... 33 8.7 WHS Monitoring and Review... 34 General... 34 Non-conformances... 34 8.8 Sub-contractors... 34 8.9 Responsibilities... 34 8.10 CATEGORY E CONTRACTORS (Tenants)... 35 5.2.1 Requirements and process for approval... 35 5.2.2 Approved Status Expiry... 36 8.11 Permit to Work... 36 8.12 Lease Provisions... 39 8.13 WHS Reporting Requirements... 39 Incident Reports... 39 8.14 WHS Monitoring and Review... 40 General... 40 Non-conformances... 40 8.15 Sub-contractors... 41 8.16 Provision of information... 41 8.17 Responsibilities (Principal Contractor Works)... 41 General... 43 Process Principal Contractors... 43 8.18 Contract Provisions... 43 8.19 Contractor Inductions... 43 8.20 WHS Reporting Requirements... 44 Monthly Reports... 44 Incident Reports... 44 8.21 WHS Monitoring and Review... 44 General... 44 Audit... 44 Non-conformances... 45 8.22 Sub-contractors... 45 8.23 Provision of information... 45 9.0 TRAINING and AWARENESS... 46 9.1 BAC Inductions... 46 9.2 General Construction Induction... 46 9.3 WHS Competency... 46 9.3.1 BAC Employees and Category C Approved Contractors... 46 9.3.2 BAC Category B Approved Contractors... 47 9.3.3 Licences... 47 10.0 RESPONSIBILITIES... 47 10.1 BAC Senior Managers... 47 10.2 WHS Manager... 47 10.3 BAC Works Manager... 48 11.0 REVIEW DATE... 48 12.0 REFERENCES... 48 Requirements\Controlled s - Restricted Uncontrolled if Printed Page 3 of 48

1.0 PURPOSE Brisbane Airport Corporation (BAC) has established numerous business partnerships with contracting companies to deliver on project and maintenance activities critical to the sustainable operation of Brisbane Airport. The work activities of contractors have the potential to create a risk to BAC in terms of the health and safety of employees, other airport workers, members of the public and the contractors themselves as well as damage to Corporation assets and adverse impact on core business activities. Accordingly, this Standard establishes the framework of minimum work health and safety (WHS) expectations for BAC contractors in order to ensure the effective identification, assessment, control and monitoring of WHS hazards and risks. The development, implementation and maintenance of a contractor management program are critical elements of a sound WHS management system. 2.0 SCOPE This Corporate Standard applies to the engagement, approval and supervision actions associated with works activities undertaken for or on behalf of BAC by contracted workers. Importantly, this Standard applies to planned and known work undertaken by contractors throughout all BAC controlled areas as well as certain work activities undertaken by Principal Contractors and tenants. Immediate emergency response reactions and contingent responses are not addressed within the scope of this Corporate Standard. These are to be managed according to specific BAC emergency response management plans. 3.0 DEFINITIONS Term BAC Works Manager Definition A BAC representative (e.g. project manager, work coordinator) responsible for managing the work activities of contractors. Construction work As defined in the Work Health and Safety Regulation 2011 (Qld) construction work means any work carried out in connection with the construction, alteration, conversion, fitting-out, commissioning, renovation, repair, maintenance, refurbishment, demolition, decommissioning or dismantling of a structure This includes any work activities involving: Requirements\Controlled s - Restricted any installation or testing carried out in connection with the activities mentioned above; the removal from the workplace of any product or waste resulting from demolition; the prefabrication or testing of elements, at a place specifically established for the construction work, for use in construction work; Uncontrolled if Printed Page 4 of 48

the assembly of prefabricated elements to form a structure, or the disassembly of prefabricated elements forming part of a structure; the installation, testing or maintenance of an essential service in relation to a structure; any work connected with an excavation; any work connected with any preparatory work or site preparation (including landscaping as part of site preparation); that is carried out on, under or near water, including work on buoys and obstructions to navigation. Construction project Contractor Principal contractor BAC Permit Issuer Structure A project that involves construction work where the cost of the construction work is $250,000 or more. A person or company engaged to perform work or services with, or associated with BAC. Examples of a contractor include a person or company engaged: to build or improve buildings or facilities; to perform maintenance work to existing buildings or facilities; to provide expert advice in a specific area of expertise consulting services; or in a labour hire capacity. The contractor appointed by BAC for the purpose of performing construction work in accordance with the Work Health and Safety Act 2011 (Qld). Is a person who: reviews the scope of PTW requests; sights and clarifies relevant system controls relating to PTWs; and is authorised by BAC to issue and close PTWs. A structure is classed as: a roadway or pathway; foundations, earth retention works and other earthworks, including river works and sea defence works; formwork, falsework or any other structure designed or used to provide support, access or containment during construction work. an airfield; a dock, harbour, channel, bridge, viaduct, lagoon or dam; or a sewer or sewerage or drainage works. The term structure does not apply to plant unless: Requirements\Controlled s - Restricted Uncontrolled if Printed Page 5 of 48

the plant is: o a ship or submarine; o a pipe or pipeline; o an underground tank; o designed or used to provide support, access or containment during work in connection with construction work; work on the plant relates to work that is carried out in connection with construction work; the plant is fixed plant on which outage work or overhaul work that involves or may involve work being carried out by 5 or more persons conducting businesses or undertakings at any point in time. 4.0 BACKGROUND BAC recognises that there are a range of activities undertaken throughout its operations that require an increased level of documentation, notification, communication and/or authorisation to be undertaken to enable a safe system of work. To achieve these key characteristics BAC maintains a Permit to Work (PTW) system. The scope and range of activities that require a Permit to Work has been developed via: Analysis of BAC operations and WHS practices; Past incidents and events; Consultation with worker representatives from various operational areas; and Legislation and industry standards relating to specific WHS risk areas and work practices. 5.0 SPECIFIC REQUIREMENTS 5.1 General All contractors and consultants working for, or on behalf of, BAC must hold BAC Approved Contractor status. In addition, BAC tenants are required to be entered into the Approved Contractor database in order for works approvals to be granted. BAC has identified the following categories of contractor arrangements to address the differing nature of the work activities undertaken by BAC: Category A Contractors engaged for autonomous construction projects where the value of the construction work is greater than $250,000 and where the contractor has been contractually engaged as the principal contractor for the purposes of the Work Health and Safety Regulation 2011 (Qld) (WHS Regulation). Category B Requirements\Controlled s - Restricted Uncontrolled if Printed Page 6 of 48

Contractors directly engaged and managed by BAC for works within BACcontrolled areas and who have a WHS management system that has been externally accredited against recognised audit criteria (e.g. AS4801 or ISO18001). Category C Contractors directly engaged and managed by BAC for works within BACcontrolled areas and who work under BAC s accredited WHS management system. Category D Contractors engaged to provide professional consulting services and who will work under BAC s accredited WHS management system. Category E BAC tenants who will operate under their own WHS management system but may need to advise and/or seek approval from BAC for certain work activities carried out under the tenant s control. 5.2 CATEGORY A CONTRACTORS - Principal Contractors 5.2.1 Requirements and process for approval The approval requirements for Principal Contractors are as follows: 1. Contractor to complete Application Form for BAC Approved Contractor Status Category A. 2. Contractor to submit Application Form to BAC Works Manager, along with current Public Liability and WorkCover insurance certificates. (Note: Public Liability insurance certificates must be signed, dated and printed on insurer s or broker s letterhead). 3. Contractor to supply Work Health and Safety Management Plan for the construction project to the BAC Works Manager. 4. BAC Works Manager to complete relevant section of Application Form and provide all of the above to BAC s WHS team along with evidence of a completed review of the WHS Management Plan. 5. BAC WHS team will review the application and ensure minimum requirements are met. If successful, the contractor company will be granted Approved Contractor status and entered into the BAC Approved Contractor Database. The period of approval will be the duration of the construction project activity and any defects liability period as outlined in the contract scope. An email notification will be sent to the BAC Works Manager confirming this. 6. Where minimum requirements are not met, the BAC WHS team will notify the BAC Works Manager of the reasons for non-approval and will offer assistance in working with all parties to address the identified concerns or deficiencies. 7. Contractors who successfully complete the relevant application process will be granted approved status. Approved Contractor status is granted for the duration of construction project activity and any defects liability period as outlined in the contract scope. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 7 of 48

8. For the duration of the Category A approval, work controlled by a principal contractor at their site is primarily undertaken in accordance with their own internal WHS systems and documented WHS management plan for the construction project. Where BAC resumes management or control of a workplace follow the construction phase of a project (i.e. after practical completion), the Permit to Work process will ensure the work activities performed by the principal contractor do not present a risk to the health and safety of BAC employees, other airport workers or members of the public. 5.2.2 Approved Status Expiry BAC Approved Contractor status is granted subject to a number of conditions. The following table details the situations in which a Category A Contractor s Approval status will expire and the required action to regain approved status. Reason for Approval Expiry Notified end date of the project has passed. Public Liability insurance certificate has lapsed. WorkCover insurance certificate has lapsed. Requirements\Controlled s - Restricted Action Required BAC Works Manager to notify WHS team that project is not yet completed and nominates (in writing) new completion date. Provide current Public Liability certificate. Provide current WorkCover certificate. In addition, approved status may be temporarily suspended or permanently removed where WHS performance is deemed unacceptable, including compliance with Permit to Work processes, reporting requirements and contract provisions. Where a contractor s approved status is removed or suspended due to unsatisfactory WHS performance, the relevant BAC Works Manager will be notified in the first instance. Further communications regarding non-use of this contractor will be communicated to BAC staff via the fortnightly BACSafe newsletter. Detailed information on the suspension/removal, including any corrective actions taken by BAC and the contractor in order to reinstate approved status, will be collated on the WHS Suspended Contractors Register. 5.3 Permit to Work General Work controlled by a principal contractor at their site is primarily undertaken in accordance with their own internal WHS systems and documented WHS management plan for the construction project. Due to the nature of business operations and the close interaction between numerous parties, including contractors, tenants and members of the public, BAC recognises its duty to monitor and oversee the effectiveness of WHS controls and work interactions. Requirements For principal contractor works, a BAC Permit to Work is required in any of the following situations: Movement of powered mobile plant in a work area under BAC s management or control; Uncontrolled if Printed Page 8 of 48

Working in the vicinity of a traffic area under BAC s management or control; Work is required in a public access area; Work may result in the production of dust, smoke, fumes or other airborne contaminant that will circulate into an area under BAC s management or control; Work that may result in noise that will affect the quiet enjoyment of other airport workers or members of the public; Work that requires a BAC-controlled key to be issued; Work that requires BAC-owned plant to be supplied to the contractor for use; Work that requires isolation on a BAC-controlled asset (e.g. any fire system, water, sewer, drainage or electrical systems/networks); Work that requires any of the following activities in a BAC-controlled area: Confined space entry; Excavation >300mm; Work at height >2m; Work on or near asbestos; Hot work outside of a designated workshop area; HV access and switching; Work on or near radiation source/s; Demolition In addition, a BAC Permit to Work is required where permission is necessary for: Building Approvals under the Airports Act 1996; Use of a crane; Works within 25m of JUHI fuel infrastructure; Works within 5m of Airtrain infrastructure; Airside works; and Works within 6m of Energex underground high voltage lines. Process The PTW process is as follows: 1. Principal contractor identifies work activity for which a PTW is required under this Standard. 2. Principal contractor completes Permit to Work Application Form, attaches relevant system control documentation, including any required High Risk Activity Permit Forms, and submits to the BAC Permit Issuer for approval. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 9 of 48

3. Consultation occurs between the BAC Permit Issuer and principal contractors to ensure that BAC requirements have not been overlooked and that the health and safety of BAC workers, contractors and members of the public are not compromised. This consultation must include, as a minimum, a review of the work circumstances involved and the communication of any specific requirements or expectations in relation to health and safety. 4. The BAC Permit Issuer must check the PTW Register to determine if other works have been scheduled to occur, or are occurring, in the area or on affected systems, during the period covered by the PTW Application. Where other works have been scheduled that have the potential to overlap and/or impact on the ability for works to be carried safely, approval must not be given. 5. Where there are no overlaps identified, the BAC Permit Issuer must record the activity in the PTW Register prior to raising the PTW in the ToolBox database. 6. The PTW must be printed and all relevant signatures obtained prior to commencement of the work activity. 7. A signed copy of the PTW and all applicable control documentation must be retained at the location of the work activity and be presented at the request of any BAC authorised person. 8. The principal contractor is responsible for explaining, communicating and passing on specific BAC conditions, limitations and expectations to any third party/ies involved (e.g. sub-contractors). 9. Where a key to a BAC-controlled plant or equipment room is to be issued, a copy of the signed PTW must be presented, along with evidence of completion of relevant inductions, to the person issuing the BAC key. 10. As part of the Permit to Work process, the BAC Permit Issuer, BAC Works Manager or a WHS team member may undertake inspection or monitoring checks of the work scope and implementation of agreed controls, in order to ensure that the health and safety of BAC workers, contractors and members of the public is not compromised. 11. On completion of the PTW work activity, the principal contractor must notify the BAC Permit Issuer who will close out the PTW in the PTW Register. During any defects liability period, the work activities of principal contractors will also be controlled via BAC s Permit to Work process as outlined above. Defects liability periods will be covered by a principal contractor s Category A approval. 5.4 Contract Provisions The BAC works manager responsible for any contract should ensure all relevant mechanisms are incorporated in contract documentation to allow BAC to effectively and appropriately manage the WHS requirements of the contracted work activities. BAC precedent documents contain standard clauses for this purpose. 5.5 Contractor Inductions Although there is no requirement for principal contractors to complete BAC s contractor induction program, the information contained within this system may be used by principal contractors in their site-specific induction as desired. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 10 of 48

Where principal contractors (or their sub-contractors) will require keys to be issued in order to access BAC-controlled plant and equipment rooms, the relevant induction module must be completed to ensure contractors are aware of the hazards and risks in these work environments. Key Issue Where a key to a BAC-controlled plant or equipment room is to be issued, the contractor must produce a copy of the signed PTW, photo identification along with evidence of completion of relevant inductions and qualifications, to the person issuing the BAC key. 5.6 Drug and Alcohol Management (Airside Principal Contractors only) Under Civil Aviation Safety Regulation (CASR) Part 99 Subpart C, BAC is required to implement a Drug and Alcohol Management Program (DAMP) for all workers performing regular safety sensitive aviation activities (SSAA). This includes principal contractors appointed by BAC with sites located within the aerodrome testing area as well as subcontractors and visitors to these sites. All employees, sub-contractors and visitors to principal contractor sites within the aerodrome testing area that meet the definition of regular SSAA employee are required to comply with BAC s Drug and Alcohol Management Plan, including the specified training and testing requirements. Training is delivered via the online contractor induction program. Principal contractor employees, sub-contractors and visitors must complete the DAMP (Airside Principal Contractors) module. The certificate generated at the completion of this training, along with the results of a drug and alcohol screening test, must be collated by the principal contractor and forwarded (with a coversheet clearly identifying the principal contractor responsible for the site) to BAC s WHS team for processing. An induction card will be issued to the worker (with the principal contractor identified as the responsible employer) indicating that they are DAMP Approved. This card must be kept on the worker at all times and presented if requested by an authorised BAC or CASA representative. In addition to pre-deployment testing, drug and alcohol testing is required to be carried out post-incident and on reasonable suspicion. For this reason, all incidents must be reported to the BAC Works Manager. Where an incident triggers a testing requirement under BAC s DAMP, the BAC Works Manager will advise the principal contractor and testing must be conducted within the prescribed timeframe and evidence of such testing provided to BAC. In addition, random drug and alcohol testing is carried out by CASA representatives from time to time and principal contractors must ensure that workers comply with the instructions of CASA representatives in this regard. It is an offence to refuse testing. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 11 of 48

5.7 WHS Reporting Requirements Monthly Reports Principal contractors are contractually required to submit reports on WHS performance as part of the construction project management system. This information is to be forwarded to BAC s WHS team by the BAC Works Manager. Incident Reports All contractors are required to report WHS incidents to their BAC Works Manager. This includes: Notifiable incidents o Death of a person; o Serious injury or illness (e.g. requiring treatment as an in-patient in hospital or medical treatment within 48 hours of exposure to a substance); o Dangerous incident (e.g. incident that poses serious risk to health and safety from an immediate or imminent exposure to uncontrolled substance spill, or explosion, fire, gas/steam escape; electric shock, fall from height of plant, substance or thing; collapse of regulated plant or structure or excavation, etc); o Serious electrical incident (e.g. death of a person by electricity, shock or injury requiring treatment by a doctor or any shock or injury from electricity at high voltage); o Dangerous electrical event (e.g. any circumstance where a person is not, or would not have been, electrically safe); or o A workplace incident that arises out of a person performing SSAA resulting in death or serious harm, or potential for death or serious harm, to a person; or serious damage to an aircraft or property. Any injury involving any member of the public or other airport worker; Any injury resulting in emergency services being called to a BAC site; WHS regulator (e.g. Workplace Health and Safety Queensland, Electrical Safety Office) activities, such as: o Inspections carried out; o Improvement or prohibition notices issued; or o Enforceable undertakings. Any of the above must be reported to the responsible BAC Works Manager as soon as reasonably practicable. The BAC Works Manager must notify BAC s WHS team as soon as they are made aware of any of the above incidents occurring. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 12 of 48

5.8 WHS Monitoring and Review General WHS audits, inspections or observations may be undertaken during the life of a contract with BAC in accordance with any included WHS contract provisions. BAC will conduct WHS audits, inspections and/or observation activities deemed appropriate for contractor works in BAC-controlled areas, including the activities of Principal Contractors where these have the potential to impact on BAC areas of control. Further information on managing construction work is provided in the Construction Work Corporate Standard. Audit Depending on the nature of the construction project, BAC may require principal contractors to engage an independent party to conduct an audit to ensure that the principal contractor is complying with all contractual requirements relating to WHS. This audit may include a review of elements of site safety such as work practices, safe work method statements and permits as well as conformance with the relevant sections of the principal contractor s WHS management plan accepted by BAC. 5.6.3 Inspections and Observations Interface inspections involve physical inspections of all areas of the project that adjoin or impact on BAC-controlled areas and activities. It is undertaken by the BAC Works Manager and a representative from BAC s WHS team as well as any representative nominated by the principal contractor. Any identified areas of concern are documented and consultation between the BAC Works Manager, BAC WHS team representative and principal contractor will be undertaken to determine appropriate rectification actions. Where a serious risk is identified during the above activities, the BAC representatives conducting the inspection must take any necessary steps to ensure immediate cessation of the activity and commence appropriate measures to ensure the situation is remedied and/or made safe as soon as possible. Non-conformances Where system deficiencies are identified as a result of audits, inspections, observations or incident investigations, these will be reported to the BAC Works Manager responsible for the principal contractor by way of a non-conformance. Further detail on the management of non-conformances is provided in the BAC Nonconformance Procedure. 5.9 Sub-contractors Principal contractors are responsible for ensuring that any work conditions, limitations and expectations relating to WHS are communicated to all site workers and visitors. 5.10 Provision of information In circumstances where a principal contractor has modified plant and equipment, or repaired or installed electrical equipment, or laid underground cabling/services, there Requirements\Controlled s - Restricted Uncontrolled if Printed Page 13 of 48

is a need for relevant records, detailed drawings and other data and information to be provided to BAC to enable it to meet its ongoing obligations in the future for managing health and safety, as well as meeting compliance needs. This information may include, but is not limited to, the principal contractor providing: plant risk assessments; plant operating, maintenance and servicing instructions and manuals; design certificates and registrations, such for gantry cranes or other plant; plant compliance and commissioning certificates; hazardous chemical manifests; noise surveys; as built electrical installation drawings; services drawings, including depth and location of underground cables, etc; compaction certificates and ground stability information relating to excavated ground; work certificates/certifications from licensed persons, such as connection certificates from licensed electrical workers; and test and/or inspection certificates, such as safety line anchor points. Many of the requirements for the provision of drawings, certificates, risk assessments and other information are legislated within WHS regulations, advisory standards, codes of practice and Australian Standards etc. The BAC Works Manager must ensure that all relevant requirements for information to be provided by the principal contractor are identified and mechanisms in place to ensure these are obtained. 5.11 Responsibilities (Principal Contractor Works) BAC Works Manager Review Application Form and WHS Management Plan and ensure adequacy prior to recommending approval by BAC s WHS team. Liaise with principal contractors to address any identified concerns or deficiencies in the Application Form or WHS Management Plan. Liaise with BAC s WHS team and principal contractors in relation to expiry of approved status. Carry out responsibilities as BAC Permit Issuer unless otherwise delegated. Ensure contract documentation includes appropriate WHS requirements. Forward WHS performance information obtained via principal contractor reporting mechanisms to BAC s WHS team. Participate in WHS audits, inspections and observations. Liaise with BAC s WHS team and principal contractors in relation to the rectification of non-conformances. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 14 of 48

BAC Permit Issuer Review the content of completed documentation submitted as part of the PTW process; Clarify the scope of the work activity, location and timing and take this into consideration when reviewing the documentation; discuss, clarify and request the amendment of the documentation where reasonable; insert relevant details about the PTW into the PTW Register; ensure the PTW is formally issued, signed and dated by all relevant parties prior to works commencing; maintain ongoing consultation with the principal contractor. Principal Contractor Comply with the requirements of this Standard in relation to applying for approved status and permits to work. Communicate, cooperate and consult with BAC in relation to WHS matters, including participating in WHS audits, inspections and observations and liaising with BAC to address identified areas of concern and nonconformances. Provide relevant information from this Standard to sub-contractors and other site workers and visitors, including relating to BAC WHS and DAMP requirements. Provide WHS information as required, particularly in relation to reporting of WHS incidents. BAC WHS Team Review and approve applications for approved contractor status from principal contractors. Liaise with BAC Works Managers and principal contractors to address any identified concerns or deficiencies in the Application Form or WHS Management Plan. Liaise with BAC Works Managers and principal contractors in relation to expiry of approved status. Participate in WHS audits, inspections and observations. Liaise with BAC Works Managers and principal contractors in relation to the rectification of non-conformances. Provide advice and assistance to BAC Works Managers in relation to management of WHS requirements on principal contractor sites. Issue DAMP Induction cards to workers on principal contractor sites as required. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 15 of 48

6.0 CATEGORY B CONTRACTORS (Accredited WHSMS) 6.1 Requirements and process for approval The approval requirements for Category B contractors are as follows: 1. Contractor to complete Application Form for BAC Approved Contractor Status Category B. 2. Contractor to submit Application Form to BAC Works Manager, along with current Public Liability and WorkCover insurance certificates. (Note: Public Liability insurance certificates must be signed, dated and printed on insurer s or broker s letterhead). 3. Contractor to additionally submit evidence with Application Form that their WHS management system has been audited by an external auditor and holds current accreditation against a recognised standard (AS4801 or ISO18001). 4. BAC Works Manager to review Application Form and, if satisfied that the contractor has met the minimum requirements, recommend approval to the BAC WHS team. 5. Once the Application Form has been received and reviewed, the contractor will be invited to meet with the BAC Works Manager and a representative from BAC s WHS team to confirm information provided in the application process. 6. Where minimum requirements are not met, the BAC WHS team will notify the BAC Works Manager of the reasons for non-approval and will offer assistance in working with all parties to address the identified concerns or deficiencies. 7. Contractors who successfully complete the relevant application process will be granted approved status. Approved Contractor status is granted for a period of 3 years, subject to annual renewal of insurance certificates and submission of required monthly reports. 6.2 Approved Status Expiry BAC Approved Contractor status is granted subject to a number of conditions. The following table details the situations in which a Category B Contractor s Approval status will expire and the required action to regain approved status. Reason for Approval Expiry Three (3) year approval period has lapsed. Public Liability insurance certificate has lapsed. WorkCover insurance certificate has lapsed. Certification of Category B contractor WHS management system has been discontinued. Requirements\Controlled s - Restricted Action Required Re-apply completing all the necessary documentation for the relevant contractor category. Provide current Public Liability certificate. Provide current WorkCover certificate. Re-certification of contractor s WHS management system. Note: Where a contractor wishes to continue working with BAC but does not intend to continue with their certification, they will need to successfully apply for Category Uncontrolled if Printed Page 16 of 48

C approval status. In addition, approved status may be temporarily suspended or permanently removed where WHS performance is deemed unacceptable, including compliance with Permit to Work processes, reporting requirements and contract provisions. Where a contractor s approved status is removed or suspended due to unsatisfactory WHS performance, the relevant BAC Works Manager will be notified in the first instance. Further communications regarding non-use of this contractor will be communicated to BAC staff via the fortnightly BACSafe newsletter. Detailed information on the suspension/removal, including any corrective actions taken by BAC and the contractor in order to reinstate approved status, will be collated on the WHS Suspended Contractors Register. 6.3 Permit to Work Process Work undertaken by Category B contractors is considered BAC-controlled work for the purposes of WHS. Category B contractors may carry out these work activities in accordance with their own WHS management system. Due to the nature of business operations and the close interaction between numerous parties, including contractors, tenants and members of the public, BAC recognises its duty to monitor and oversee the effectiveness of WHS controls and work interactions. For Category B works, a Permit to Work is required in any of the following situations: Movement of powered mobile plant in a work area under BAC s management or control; Working in the vicinity of a traffic area under BAC s management or control; Work is required in a public access area; Work may result in the production of dust, smoke, fumes or other airborne contaminant that will circulate into an area under BAC s management or control; Work that may result in noise that will affect the quiet enjoyment of other airport workers or members of the public; Work that requires a BAC-controlled key to be issued; Work that requires BAC-owned plant to be supplied to the contractor for use; Work that requires isolation on a BAC-controlled asset (e.g. any fire system, water, sewer, drainage or electrical systems/networks); Work that requires any of the following activities in a BAC-controlled area: Confined space entry; Excavation >300mm; Work at height >2m; Requirements\Controlled s - Restricted Uncontrolled if Printed Page 17 of 48

Work on or near asbestos; Hot work outside of a designated workshop area; HV access and switching; Work on or near radiation source/s; Demolition In addition, a BAC Permit to Work is required where permission is necessary for: Building Approvals under the Airports Act 1996; Use of a crane; Works within 25m of JUHI fuel infrastructure; Works within 5m of Airtrain infrastructure; Airside works; and Works within 6m of Energex underground high voltage lines. The PTW process is as follows: 1. Contractor identifies work activity for which a PTW is required under this Standard. 2. Contractor completes Permit to Work Application Form, attaches relevant system control documentation, including any required High Risk Activity Permit Forms, and submits to the BAC Permit Issuer for approval. 3. Consultation occurs between the BAC Permit Issuer and contractor to ensure that BAC requirements have not been overlooked and that the health and safety of BAC workers, contractors and members of the public are not compromised. This consultation must include, as a minimum, a review of the work circumstances involved and the communication of any specific requirements or expectations in relation to health and safety. 4. The BAC Permit Issuer must check the PTW Register to determine if other works have been scheduled to occur, or are occurring, in the area or on affected systems, during the period covered by the PTW Application. Where other works have been scheduled that have the potential to overlap and/or impact on the ability for works to be carried safely, approval must not be given. 5. Where there are no overlaps identified, the BAC Permit Issuer must record the activity in the PTW Register prior to raising the PTW in the ToolBox database. 6. The PTW must be printed and all relevant signatures obtained prior to commencement of the work activity. 7. A signed copy of the PTW and all applicable control documentation must be retained at the location of the work activity and be presented at the request of any BAC authorised person. 8. The contractor is responsible for explaining, communicating and passing on specific BAC conditions, limitations and expectations to any third party/ies involved (e.g. sub-contractors). Requirements\Controlled s - Restricted Uncontrolled if Printed Page 18 of 48

9. Where a key to a BAC-controlled plant or equipment room is to be issued, a copy of the signed PTW must be presented, along with evidence of completion of relevant inductions, to the person issuing the BAC key. 10. As part of the Permit to Work process, the BAC Permit Issuer, BAC Works Manager or a WHS team member may undertake inspection or monitoring checks of the work scope and implementation of agreed controls, in order to ensure that the health and safety of BAC workers, contractors and members of the public is not compromised. 11. On completion of the PTW work activity, the contractor must notify the BAC Permit Issuer who will close out the PTW in the PTW Register. PTW Exempted Activities From time to time specific exemptions from the Permit to Work process outlined above may be granted to Category B contractors. These exemptions are subject to specific application and the approval of BAC s WHS team. In order to apply for an exemption, a current contract must exist for the work activities. The BAC Works Manager must have clearly identified all work activities covered by the contract, and a copy of the relevant sections of the contract will be required by BAC s WHS team. The process for applying for a PTW Exemption is as follows: 1. Contractor submits Application for PTW Exemption and Safety Management Plan, including all associated JSA s/ra s as well as any SWMS s required for high risk construction activities, to the BAC Works Manager for review. 2. BAC Works Manager reviews submitted documentation using the SMP Review Checklist and agrees a schedule of work activity inspections and observations with the contractor. 3. BAC Works Manager completes the relevant sections of the Application Form and recommends the granting of PTW Exemption to the BAC WHS team. 4. BAC WHS team ensures supplied documentation is appropriate to ensure that the work activity will be undertaken without risk to the health and safety of any person to whom BAC owes a WHS duty, including airport workers and members of the public. 5. If approval is granted, confirmation will be provided in writing to the contractor and BAC Works Manager. 6. Work activities for which a PTW exemption has been granted must still be notified to the nominated contact (e.g. BAC Works Manager, Duty Terminal Manager, etc) prior to commencing the activity. 7. The nominated contact must check the PTW Register and advise the contractor if other works have been scheduled to occur, or are occurring, in the area or on affected systems. 8. The nominated contact must record the activity in the PTW Register (as an exempted activity ). Requirements\Controlled s - Restricted Uncontrolled if Printed Page 19 of 48

Adherence to the above requirements will be strictly monitored and any noncompliance will be subject to corrective actions, which may include the removal of exempted status and removal of Category B approved status. Likewise, where the BAC Works Manager fails to adhere to the agreed schedule of inspections, observations and audits, PTW exemptions may be removed from the contractor. 6.4 Contract Provisions The BAC Works Manager responsible for any contract should ensure all relevant mechanisms are incorporated in contract documentation to allow BAC to effectively and appropriately manage the WHS requirements of the contracted work activities. BAC precedent documents contain standard clauses for this purpose. 6.5 Contractor Inductions All Category B contractors, and their sub-contractors, working for BAC must complete an induction before commencing work at Brisbane Airport. The induction program is available online and includes a number of profiles covering specific work areas and activities. As a minimum, all contractors must complete the BAC General profile. Detailed instructions on the use of the online induction program are available on the Work at Brisbane Airport website. Contractor induction cards are valid for a period of 12 months, must be worn at all times and must be produced along with photo identification if requested by any BAC Authorised Person. Key Issue Where a key to a BAC-controlled plant or equipment room is to be issued, the contractor must produce a copy of the signed PTW, photo identification along with evidence of completion of relevant inductions and qualifications, to the person issuing the BAC key. 6.6 WHS Reporting Requirements Monthly Reports After being granted approved status, Category B contractors are required to submit a monthly WHS report in the approved form to BAC. A reporting template is provided to contractors on approval. Incident Reports All contractors are required to report WHS incidents to their BAC Works Manager. This includes: Notifiable incidents o Death of a person; o Serious injury or illness (e.g. requiring treatment as an in-patient in hospital or medical treatment within 48 hours of exposure to a substance); Requirements\Controlled s - Restricted Uncontrolled if Printed Page 20 of 48

o Dangerous incident (e.g. incident that poses serious risk to health and safety from an immediate or imminent exposure to uncontrolled substance spill, or explosion, fire, gas/steam escape; electric shock, fall from height of plant, substance or thing; collapse of regulated plant or structure or excavation, etc); o Serious electrical incident (e.g. death of a person by electricity, shock or injury requiring treatment by a doctor or any shock or injury from electricity at high voltage); o Dangerous electrical event (e.g. any circumstance where a person is not, or would not have been, electrically safe); or o A workplace incident that arises out of a person performing SSAA resulting in death or serious harm, or potential for death or serious harm, to a person; or serious damage to an aircraft or property. Any injury involving any member of the public or other airport worker; Any injury resulting in emergency services being called to a BAC site; WHS regulator (e.g. Workplace Health and Safety Queensland, Electrical Safety Office) activities, such as: o Inspections carried out; o Improvement or prohibition notices issued; or o Enforceable undertakings. Any of the above must be reported to the responsible BAC Works Manager as soon as reasonably practicable. The BAC Works Manager must notify BAC s WHS team as soon as they are made aware of any of the above incidents occurring. 6.7 WHS Monitoring and Review General WHS audits, inspections or observations may be undertaken during the life of a contract with BAC in accordance with any included WHS contract provisions. BAC will conduct WHS audits, inspections and observation activities deemed appropriate for contractor works in BAC-controlled areas. Further information on managing construction work is provided in the Construction Work Corporate Standard. Audit Category B contractors are required to demonstrate the ongoing maintenance of their accredited WHS management system by providing evidence of successful completion of surveillance audits conducted by accrediting authorities. Inspections and Observations BAC Works Managers are to undertake regular inspections and observations of contractor work activities for which they are responsible; documenting any identified issues in accordance with the Works Manager WHS Observation Record. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 21 of 48

In addition, BAC s WHS team will conduct regular inspections and observations around BAC work locations. Any identified issues involving contractor activities will be notified to the BAC Works Manager. Consultation must occur between the BAC Works Manager and contractor to determine appropriate rectification actions to remedy the area of concern and ensure the contractor can continue to work to an appropriate standard. Where a serious risk is identified during the above activities, the BAC Works Manager or WHS team member conducting the inspection must take any necessary steps to ensure immediate cessation of the activity and commence appropriate measures to ensure the situation is remedied and/or made safe as soon as possible. Non-conformances Where system deficiencies are identified as a result of audits, inspections, observations or incident investigations, these will be reported to the BAC Works Manager responsible for the contractor by way of a non-conformance. Further detail on the management of non-conformances is provided in the BAC Non-conformance Procedure. 6.8 Sub-contractors Category B contractors may engage sub-contractors within the requirements of their own WHS management system. The Category B contractor is responsible for ensuring that any work conditions, limitations and expectations relating to WHS are communicated to all sub-contractors. 6.9 Provision of information In circumstances where a contractor has modified plant and equipment, or repaired or installed electrical equipment, or laid underground cabling/services, there is a need for relevant records, detailed drawings and other data and information to be provided to BAC to enable it to meet its ongoing obligations in the future for managing health and safety, as well as meeting compliance needs. This information may include, but is not limited to, the principal contractor providing: plant risk assessments; plant operating, maintenance and servicing instructions and manuals; design certificates and registrations, such for gantry cranes or other plant; plant compliance and commissioning certificates; hazardous chemical manifests; noise surveys; as built electrical installation drawings; services drawings, including depth and location of underground cables, etc; compaction certificates and ground stability information relating to excavated ground; work certificates/certifications from licensed persons, such as connection certificates from licensed electrical workers; and Requirements\Controlled s - Restricted Uncontrolled if Printed Page 22 of 48

test and/or inspection certificates, such as safety line anchor points. Many of the requirements for the provision of drawings, certificates, risk assessments and other information are legislated within WHS regulations, advisory standards, codes of practice and Australian Standards etc. The BAC Works Manager must ensure that all relevant requirements for information to be provided by the contractor are identified and mechanisms in place to ensure these are obtained. 6.10 Responsibilities BAC Works Manager Review Application Form and ensure adequacy prior to recommending approval by BAC s WHS team. Liaise with contractors to address any identified concerns or deficiencies in the Application Form. Liaise with BAC s WHS team and contractors in relation to expiry of approved status. Carry out responsibilities as BAC Permit Issuer unless otherwise delegated. Ensure contract documentation includes appropriate WHS requirements. Conduct WHS inspections and observations on the contractor s work activities. Liaise with BAC s WHS team and contractors in relation to the rectification of non-conformances. BAC Permit Issuer Review the content of completed documentation submitted as part of the PTW process; Clarify the scope of the work activity, location and timing and take this into consideration when reviewing the documentation; discuss, clarify and request the amendment of the documentation where reasonable; insert relevant details about the PTW into the PTW Register; ensure the PTW is formally issued, signed and dated by all relevant parties prior to works commencing; maintain ongoing consultation with the contractor. Category B Contractor Comply with the requirements of this Standard in relation to applying for approved status and permits to work. Communicate, cooperate and consult with BAC in relation to WHS matters, including participating in WHS audits, inspections and observations and liaising with BAC to address identified areas of concern and nonconformances. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 23 of 48

Provide relevant information from this Standard to sub-contractors and other workers, including relating to BAC WHS and DAMP requirements. Provide WHS information as required, particularly in relation to reporting of WHS incidents. BAC WHS Team Review and approve applications for approved contractor status from Category B contractors. Liaise with BAC Works Managers and contractors to address any identified concerns or deficiencies in the Application Form or WHS interview process. Liaise with BAC Works Managers and contractors in relation to expiry of approved status. Conduct WHS inspections and observations. Liaise with BAC Works Managers and contractors in relation to the rectification of non-conformances. Provide advice and assistance to BAC Works Managers in relation to WHS management of contractors. Issue induction cards to contractors as required. 7.0 CATEGORY C CONTRACTORS (BAC s WHSMS) 7.1 Requirements and process for approval The approval requirements for Category C contractors are as follows: 1. Contractor to complete online training on BAC s WHSMS. 2. Contractor to complete Application Form for BAC Approved Contractor Status Category C and Implementation Plan. 3. Contractor to submit Application Form and Implementation Plan to BAC Works Manager, along with current Public Liability and WorkCover insurance certificates. (Note: Public Liability insurance certificates must be signed, dated and printed on insurer s or broker s letterhead). 4. BAC Works Manager to review Application Form and Implementation Plan and, if satisfied that the contractor has met the minimum requirements, recommend approval to the BAC WHS team. 5. Where minimum requirements are not met, the BAC WHS team will notify the BAC Works Manager of the reasons for non-approval and will offer assistance in working with all parties to address the identified concerns or deficiencies. 6. Contractors who successfully complete the relevant application process will be granted approved status. Approved Contractor status is granted for a period of 3 years, subject to annual renewal of insurance certificates and submission of required monthly reports. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 24 of 48

7.2 Approved Status Expiry BAC Approved Contractor status is granted subject to a number of conditions. The following table details the situations in which a Category C Contractor s Approval status will expire and the required action to regain approved status. Reason for Approval Expiry Three (3) year approval period has lapsed. Public Liability insurance certificate has lapsed. WorkCover insurance certificate has lapsed. Action Required Re-apply completing all the necessary documentation for the relevant contractor category. Provide current Public Liability certificate. Provide current WorkCover certificate. In addition, approved status may be temporarily suspended or permanently removed where WHS performance is deemed unacceptable, including compliance with Permit to Work processes, reporting requirements and contract provisions. Where a contractor s approved status is removed or suspended due to unsatisfactory WHS performance, the relevant BAC Works Manager will be notified in the first instance. Further communications regarding non-use of this contractor will be communicated to BAC staff via the fortnightly BACSafe newsletter. Detailed information on the suspension/removal, including any corrective actions taken by BAC and the contractor in order to reinstate approved status, will be collated on the WHS Suspended Contractors Register. 7.3 Permit to Work Process Work undertaken by Category C contractors is considered BAC-controlled work for the purposes of WHS. Category C contractors may carry out these work activities only in accordance with BAC s WHS management system. Due to the nature of business operations and the close interaction between numerous parties, including contractors, tenants and members of the public, BAC recognises its duty to monitor and oversee the effectiveness of WHS controls and work interactions. For Category B works, a Permit to Work is required in any of the following situations: Movement of powered mobile plant in a work area under BAC s management or control; Working in the vicinity of a traffic area under BAC s management or control; Work is required in a public access area; Work may result in the production of dust, smoke, fumes or other airborne contaminant that will circulate into an area under BAC s management or control; Work that may result in noise that will affect the quiet enjoyment of other airport workers or members of the public; Requirements\Controlled s - Restricted Uncontrolled if Printed Page 25 of 48

Work that requires a BAC-controlled key to be issued; Work that requires BAC-owned plant to be supplied to the contractor for use; Work that requires isolation on a BAC-controlled asset (e.g. any fire system, water, sewer, drainage or electrical systems/networks); Work that requires any of the following activities in a BAC-controlled area: Confined space entry; Excavation >300mm; Work at height >2m; Work on or near asbestos; Hot work outside of a designated workshop area; HV access and switching; Work on or near radiation source/s; Demolition In addition, a BAC Permit to Work is required where permission is necessary for: Building Approvals under the Airports Act 1996; Use of a crane; Works within 25m of JUHI fuel infrastructure; Works within 5m of Airtrain infrastructure; Airside works; and Works within 6m of Energex underground high voltage lines. The PTW process is as follows: 1. Contractor identifies work activity for which a PTW is required under this Standard. 2. Contractor completes Permit to Work Application Form, attaches relevant system control documentation (using BAC s forms and templates as required), including any required High Risk Activity Permit Forms, and submits to the BAC Permit Issuer for approval. 3. Consultation occurs between the BAC Permit Issuer and contractor to ensure that BAC requirements have not been overlooked and that the health and safety of BAC workers, contractors and members of the public are not compromised. This consultation must include, as a minimum, a review of the work circumstances involved and the communication of any specific requirements or expectations in relation to health and safety. 4. The BAC Permit Issuer must check the PTW Register to determine if other works have been scheduled to occur, or are occurring, in the area or on affected systems, during the period covered by the PTW Application. Where other works Requirements\Controlled s - Restricted Uncontrolled if Printed Page 26 of 48

have been scheduled that have the potential to overlap and/or impact on the ability for works to be carried safely, approval must not be given. 5. Where there are no overlaps identified, the BAC Permit Issuer must record the activity in the PTW Register prior to raising the PTW in the ToolBox database. 6. The PTW must be printed and all relevant signatures obtained prior to commencement of the work activity. 7. A signed copy of the PTW and all applicable control documentation must be retained at the location of the work activity and be presented at the request of any BAC authorised person. 8. The contractor is responsible for explaining, communicating and passing on specific BAC conditions, limitations and expectations to any third party/ies involved (e.g. sub-contractors). 9. Where a key to a BAC-controlled plant or equipment room is to be issued, a copy of the signed PTW must be presented, along with evidence of completion of relevant inductions, to the person issuing the BAC key. 10. As part of the Permit to Work process, the BAC Permit Issuer, BAC Works Manager or a WHS team member may undertake inspection or monitoring checks of the work scope and implementation of agreed controls, in order to ensure that the health and safety of BAC workers, contractors and members of the public is not compromised. 11. On completion of the PTW work activity, the contractor must notify the BAC Permit Issuer who will close out the PTW in the PTW Register. 7.4 Legal Provisions The BAC Works Manager responsible for any contract, agreement or Purchase Order covering Category C contractor work activities should ensure all relevant mechanisms are incorporated in contract documentation to allow BAC to effectively and appropriately manage the WHS requirements of the contracted work activities. BAC precedent documents contain standard clauses for this purpose. 7.5 Contractor Inductions All Category C contractors, and their sub-contractors, working for BAC must complete an induction before commencing work at Brisbane Airport. The induction program is available online and includes a number of profiles covering specific work areas and activities. As a minimum, all contractors must complete the BAC General profile. Detailed instructions on the use of the online induction program are available on the Work at Brisbane Airport website. Contractor induction cards are valid for a period of 12 months, must be worn at all times and must be produced along with photo identification if requested by any BAC Authorised Person. Key Issue Where a key to a BAC-controlled plant or equipment room is to be issued, the contractor must produce a copy of the signed PTW, photo identification along with evidence of completion of relevant inductions and qualifications, to the person issuing the BAC key. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 27 of 48

7.6 WHS Reporting Requirements Monthly Reports After being granted approved status, Category C contractors are required to submit a monthly WHS report in the approved form to BAC. A reporting template is provided to contractors on approval. Incident Reports All contractors are required to report WHS incidents to their BAC Works Manager. This includes: Notifiable incidents o Death of a person; o Serious injury or illness (e.g. requiring treatment as an in-patient in hospital or medical treatment within 48 hours of exposure to a substance); o Dangerous incident (e.g. incident that poses serious risk to health and safety from an immediate or imminent exposure to uncontrolled substance spill, or explosion, fire, gas/steam escape; electric shock, fall from height of plant, substance or thing; collapse of regulated plant or structure or excavation, etc); o Serious electrical incident (e.g. death of a person by electricity, shock or injury requiring treatment by a doctor or any shock or injury from electricity at high voltage); o Dangerous electrical event (e.g. any circumstance where a person is not, or would not have been, electrically safe); or o A workplace incident that arises out of a person performing SSAA resulting in death or serious harm, or potential for death or serious harm, to a person; or serious damage to an aircraft or property. Any injury involving any member of the public or other airport worker; Any injury resulting in emergency services being called to a BAC site; WHS regulator (e.g. Workplace Health and Safety Queensland, Electrical Safety Office) activities, such as: o Inspections carried out; o Improvement or prohibition notices issued; or o Enforceable undertakings. Any of the above must be reported to the responsible BAC Works Manager as soon as reasonably practicable. The BAC Works Manager must notify BAC s WHS team as soon as they are made aware of any of the above incidents occurring. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 28 of 48

7.7 WHS Monitoring and Review General WHS audits, inspections or observations may be undertaken during the life of a contract with BAC in accordance with any included WHS contract provisions. BAC will conduct WHS audits, inspections and observation activities deemed appropriate for contractor works in BAC-controlled areas. Further information on managing construction work is provided in the Construction Work Corporate Standard. Inspections and Observations BAC Works Managers are to undertake regular inspections and observations of contractor work activities for which they are responsible; documenting any identified issues in accordance with the Works Manager WHS Observation Record. In addition, BAC s WHS team will conduct regular inspections and observations around BAC work locations. Any identified issues involving contractor activities will be notified to the BAC Works Manager. Consultation must occur between the BAC Works Manager and contractor to determine appropriate rectification actions to remedy the area of concern and ensure the contractor can continue to work to an appropriate standard. Where a serious risk is identified during the above activities, the BAC Works Manager or WHS team member conducting the inspection must take any necessary steps to ensure immediate cessation of the activity and commence appropriate measures to ensure the situation is remedied and/or made safe as soon as possible. Non-conformances Where system deficiencies are identified as a result of audits, inspections, observations or incident investigations, these will be reported to the BAC Works Manager responsible for the contractor by way of a non-conformance. Further detail on the management of non-conformances is provided in the BAC Non-conformance Procedure. 7.8 Sub-contractors Any sub-contractors to Category C contractors must apply for BAC Approved Contractor Status prior to commencing any work at Brisbane Airport. 7.9 Provision of information In circumstances where a contractor has modified plant and equipment, or repaired or installed electrical equipment, or laid underground cabling/services, there is a need for relevant records, detailed drawings and other data and information to be provided to BAC to enable it to meet its ongoing obligations in the future for managing health and safety, as well as meeting compliance needs. This information may include, but is not limited to, the principal contractor providing: plant risk assessments; plant operating, maintenance and servicing instructions and manuals; Requirements\Controlled s - Restricted Uncontrolled if Printed Page 29 of 48

design certificates and registrations, such for gantry cranes or other plant; plant compliance and commissioning certificates; hazardous chemical manifests; noise surveys; as built electrical installation drawings; services drawings, including depth and location of underground cables, etc; compaction certificates and ground stability information relating to excavated ground; work certificates/certifications from licensed persons, such as connection certificates from licensed electrical workers; and test and/or inspection certificates, such as safety line anchor points. Many of the requirements for the provision of drawings, certificates, risk assessments and other information are legislated within WHS regulations, advisory standards, codes of practice and Australian Standards etc. The BAC Works Manager must ensure that all relevant requirements for information to be provided by the contractor are identified and mechanisms in place to ensure these are obtained. 7.10 Responsibilities BAC Works Manager Review Application Form and Implementation Plan and ensure adequacy prior to recommending approval by BAC s WHS team. Liaise with contractors to address any identified concerns or deficiencies in the Application Form or Implementation Plan. Liaise with BAC s WHS team and contractors in relation to expiry of approved status. Carry out responsibilities as BAC Permit Issuer unless otherwise delegated. Ensure legal documentation includes appropriate WHS requirements. Conduct WHS inspections and observations on the contractor s work activities. Liaise with BAC s WHS team and contractors in relation to the rectification of non-conformances. BAC Permit Issuer Review the content of completed documentation submitted as part of the PTW process; Clarify the scope of the work activity, location and timing and take this into consideration when reviewing the documentation; discuss, clarify and request the amendment of the documentation where reasonable; insert relevant details about the PTW into the PTW Register; Requirements\Controlled s - Restricted Uncontrolled if Printed Page 30 of 48

ensure the PTW is formally issued, signed and dated by all relevant parties prior to works commencing; maintain ongoing consultation with the contractor. Category C Contractor Comply with the requirements of this Standard in relation to applying for approved status and permits to work. Communicate, cooperate and consult with BAC in relation to WHS matters, including participating in WHS audits, inspections and observations and liaising with BAC to address identified areas of concern and nonconformances. Provide relevant information from this Standard to sub-contractors and other workers, including relating to approval of sub-contractors and other BAC WHS and DAMP requirements. Provide WHS information as required, particularly in relation to reporting of WHS incidents. BAC WHS Team Review and approve applications for approved contractor status from Category C contractors. Liaise with BAC Works Managers and contractors to address any identified concerns or deficiencies in the Application Form or Implementation Plan. Liaise with BAC Works Managers and contractors in relation to expiry of approved status. Conduct WHS inspections and observations. Liaise with BAC Works Managers and contractors in relation to the rectification of non-conformances. Provide advice and assistance to BAC Works Managers in relation to WHS management of contractors. Issue induction cards to contractors as required. 8.0 CATEGORY D CONTRACTORS (Consultants) 8.1 Application Category D Contractors include, but are not limited to, consulting companies engaged by BAC to carry out specific work activities or a specific scope of work. The work must not include any construction work activities. Where construction work is to be performed, consultants will be required to obtain approval as Category A, B or C, as eligible. Individual consultants who are engaged directly by BAC and who are working solely for BAC for a period of six months or more are not required to obtain Approved Requirements\Controlled s - Restricted Uncontrolled if Printed Page 31 of 48

Contractor Status. Inductions undertaken by these individuals will be recorded against BAC s own database entry. 8.2 Requirements and process for approval The approval requirements for consultants (non-individual engagements) are as follows: 1. Consultant to complete Application Form for BAC Approved Contractor Status Category D and submit to BAC Works Manager. 2. BAC Works Manager to confirm engagement via a consultancy agreement, or similar, and recommend approval to the BAC WHS team. 3. Consultants who successfully complete the relevant application process will be granted approved status. Approved Contractor status is granted for the duration of the engagement. 8.3 Approved Status Expiry BAC Approved Contractor status is granted subject to a number of conditions. The following table details the situations in which a consultant s Approval status will expire and the required action to regain approved status. Reason for Approval Expiry Approved engagement period has lapsed. Action Required Re-apply completing all the necessary documentation for the relevant category. In addition, approved status may be temporarily suspended or permanently removed where WHS performance is deemed unacceptable, including compliance with WHS work processes, reporting requirements and contract provisions. Where a consultant s approved status is removed or suspended due to unsatisfactory WHS performance, the relevant BAC Works Manager will be notified in the first instance. Further communications regarding non-use of this consultant will be communicated to BAC staff via the fortnightly BACSafe newsletter. Detailed information on the suspension/removal, including any corrective actions taken by BAC and the consultant in order to reinstate approved status, will be collated on the WHS Suspended Contractors Register. 8.4 Legal Provisions The BAC Works Manager responsible for any contract, agreement or Purchase Order covering consultant work activities should ensure all relevant mechanisms are incorporated in contract documentation to allow BAC to effectively and appropriately manage the WHS requirements of the contracted work activities. BAC precedent documents contain standard clauses for this purpose. 8.5 Consultant Inductions All consultants working for BAC must complete an induction program as part of their engagement. Where the People and Culture team have been notified of the commencement of a new consultant, a formal induction program comprising face-toface and online training will be arranged. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 32 of 48

In addition to this, an online induction program is available that includes a number of profiles covering specific work areas and activities. Consultants who will be required to issue keys and/or oversee work activities as part of their work with BAC must complete all relevant modules of the online induction program. Detailed instructions on the use of the online induction program are available on the Working at Brisbane Airport website. 8.6 WHS Reporting Requirements Incident Reports All consultants are required to report WHS incidents to their BAC Works Manager. This includes: Notifiable incidents o Death of a person; o Serious injury or illness (e.g. requiring treatment as an in-patient in hospital or medical treatment within 48 hours of exposure to a substance); o Dangerous incident (e.g. incident that poses serious risk to health and safety from an immediate or imminent exposure to uncontrolled substance spill, or explosion, fire, gas/steam escape; electric shock, fall from height of plant, substance or thing; collapse of regulated plant or structure or excavation, etc); o Serious electrical incident (e.g. death of a person by electricity, shock or injury requiring treatment by a doctor or any shock or injury from electricity at high voltage); o Dangerous electrical event (e.g. any circumstance where a person is not, or would not have been, electrically safe); or o A workplace incident that arises out of a person performing SSAA resulting in death or serious harm, or potential for death or serious harm, to a person; or serious damage to an aircraft or property. Any injury involving any member of the public or other airport worker; Any injury resulting in emergency services being called to a BAC site; WHS regulator (e.g. Workplace Health and Safety Queensland, Electrical Safety Office) activities, such as: o Inspections carried out; o Improvement or prohibition notices issued; or o Enforceable undertakings. Any of the above must be reported to the responsible BAC Works Manager as soon as reasonably practicable. The BAC Works Manager must notify BAC s WHS team as soon as they are made aware of any of the above incidents occurring. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 33 of 48

8.7 WHS Monitoring and Review General WHS audits, inspections or observations may be undertaken during the life of a contract with BAC in accordance with any included WHS contract provisions. BAC will conduct WHS audits, inspections and observation activities deemed appropriate for the consultant s activities in BAC-controlled areas. Inspections and Observations BAC Works Managers are to undertake regular inspections and observations of consultant work activities for which they are responsible; documenting any identified issues in accordance with the Works Manager WHS Observation Record. In addition, BAC s WHS team will conduct regular inspections and observations around BAC work locations. Any identified issues involving consultant activities will be notified to the BAC Works Manager. Consultation must occur between the BAC Works Manager and consultant to determine appropriate rectification actions to remedy the area of concern and ensure the contractor can continue to work to an appropriate standard. Where a serious risk is identified during the above activities, the BAC Works Manager or WHS team member conducting the inspection must take any necessary steps to ensure immediate cessation of the activity and commence appropriate measures to ensure the situation is remedied and/or made safe as soon as possible. Non-conformances Where system deficiencies are identified as a result of audits, inspections, observations or incident investigations, these will be reported to the BAC Works Manager responsible for the consultant by way of a non-conformance. Further detail on the management of non-conformances is provided in the BAC Non-conformance Procedure. 8.8 Sub-contractors Any sub-contractors to consultants must apply for BAC Approved Contractor Status prior to commencing any work at Brisbane Airport. 8.9 Responsibilities BAC Works Manager Review Application Form and ensure consultancy agreement (or similar arrangement) is in place prior to recommending approval by BAC s WHS team. Liaise with consultants to address any identified concerns or deficiencies in the Application Form. Liaise with BAC s WHS team and consultants in relation to expiry of approved status. Ensure legal documentation includes appropriate WHS requirements. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 34 of 48

Conduct WHS inspections and observations on the consultant s work activities. Liaise with BAC s WHS team and consultants in relation to the rectification of non-conformances. Consultant (Category D Contractor) Comply with the requirements of this Standard in relation to applying for approved status. Communicate, cooperate and consult with BAC in relation to WHS matters, including participating in WHS audits, inspections and observations and liaising with BAC to address identified areas of concern and nonconformances. Provide relevant information from this Standard to sub-contractors and other workers, including relating to approval of sub-contractors and other BAC WHS and DAMP requirements. Provide WHS information as required, particularly in relation to reporting of WHS incidents. BAC WHS Team Review and approve applications for approved contractor status from consultants. Liaise with BAC Works Managers and consultants to address any identified concerns or deficiencies in the Application Form. Liaise with BAC Works Managers and consultants in relation to expiry of approved status. Conduct WHS inspections and observations. Liaise with BAC Works Managers and consultants in relation to the rectification of non-conformances. Provide advice and assistance to BAC Works Managers in relation to WHS management of consultants. Issue induction cards to consultants as required. 8.10 CATEGORY E CONTRACTORS (Tenants) 5.2.1 Requirements and process for approval The approval requirements for Tenants are as follows: 1. BAC Property Manager to complete Notification Form for BAC Approved Contractor Status Category E. 2. BAC WHS team will enter the tenant into the BAC Approved Contractor Database. The period of approval will be the duration of the lease. An email notification will Requirements\Controlled s - Restricted Uncontrolled if Printed Page 35 of 48

be sent to the BAC Property Manager confirming the tenant s entry into the database. 3. Work controlled by a tenant at their lease premises is primarily undertaken in accordance with their own internal WHS systems. 5.2.2 Approved Status Expiry BAC Approved Contractor status is granted subject to a number of conditions. The following table details the situations in which a tenant s Approval status will expire and the required action to regain approved status. Reason for Approval Expiry Notified end date of the lease has passed. Action Required BAC Property Manager to notify WHS team of new lease end date. 8.11 Permit to Work General Work controlled by a tenant at their leased premises is primarily undertaken in accordance with their own internal WHS systems. Due to the nature of business operations and the close interaction between numerous parties, including contractors, neighbouring tenants and members of the public, BAC recognises its duty to monitor and oversee the effectiveness of WHS controls and work interactions. Requirements For tenant works where a principal contractor has been engaged by the tenant, a BAC Permit to Work is required in any of the following situations: Movement of powered mobile plant in a work area under BAC s management or control; Working in the vicinity of a traffic area under BAC s management or control; Work is required in a public access area; Work may result in the production of dust, smoke, fumes or other airborne contaminant that will circulate into an area under BAC s management or control; Work that may result in noise that will affect the quiet enjoyment of other airport workers or members of the public; Work that requires a BAC-controlled key to be issued; Work that requires BAC-owned plant to be supplied to the contractor for use; Work that requires isolation on a BAC-controlled asset (e.g. any fire system, water, sewer, drainage or electrical systems/networks); Requirements\Controlled s - Restricted Uncontrolled if Printed Page 36 of 48

Work that requires any of the following activities in a BAC-controlled area: Confined space entry; Excavation >300mm; Work at height >2m; Work on or near asbestos; Hot work outside of a designated workshop area; HV access and switching; Work on or near radiation source/s; Demolition In addition, a BAC Permit to Work is required where permission is necessary for: Building Approvals under the Airports Act 1996; Use of a crane; Works within 25m of JUHI fuel infrastructure; Works within 5m of Airtrain infrastructure; Airside works; and Works within 6m of Energex underground high voltage lines. Process (tenant works where principal contractor has been engaged) The PTW process is as follows: 1. Tenant or their authorised representative (e.g. principal contractor) identifies work activity for which a PTW is required under this Standard. 2. Tenant or principal contractor completes Permit to Work Application Form, attaches relevant system control documentation, including any required High Risk Activity Permit Forms, and submits to the BAC Permit Issuer for approval. 3. Consultation occurs between the BAC Permit Issuer, tenant and principal contractor to ensure that BAC requirements have not been overlooked and that the health and safety of BAC workers, contractors and members of the public are not compromised. This consultation must include, as a minimum, a review of the work circumstances involved and the communication of any specific requirements or expectations in relation to health and safety. 4. The BAC Permit Issuer must check the PTW Register to determine if other works have been scheduled to occur, or are occurring, in the area or on affected systems, during the period covered by the PTW Application. Where other works have been scheduled that have the potential to overlap and/or impact on the ability for works to be carried safely, approval must not be given. 5. Where there are no overlaps identified, the BAC Permit Issuer must record the activity in the PTW Register prior to raising the PTW in the ToolBox database. 6. The PTW must be printed and all relevant signatures obtained prior to commencement of the work activity. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 37 of 48

7. The PTW will be issued in the name of the tenant (i.e. the person with whom BAC has a contractual relationship). 8. A signed copy of the PTW and all applicable control documentation must be retained at the location of the work activity and be presented at the request of any BAC authorised person. 9. The tenant is responsible for explaining, communicating and passing on specific BAC conditions, limitations and expectations to any third party/ies involved (e.g. sub-contractors). 10. As part of the Permit to Work process, the BAC Permit Issuer, BAC Works Manager or a WHS team member may undertake inspection or monitoring checks of the work scope and implementation of agreed controls, in order to ensure that the health and safety of BAC workers, contractors and members of the public is not compromised. 11. On completion of the PTW work activity, the tenant must notify the BAC Permit Issuer who will close out the PTW in the PTW Register. Process (tenant works) The PTW process is as follows: 1. Tenant identifies work activity for which a PTW is required under this Standard. 2. Tenant completes Permit to Work Application Form, attaches relevant system control documentation, including any required High Risk Activity Permit Forms, and submits to the BAC Permit Issuer for approval. 3. Consultation occurs between the BAC Permit Issuer, tenant and their contractor (if applicable) to ensure that BAC requirements have not been overlooked and that the health and safety of BAC workers, contractors and members of the public are not compromised. This consultation must include, as a minimum, a review of the work circumstances involved and the communication of any specific requirements or expectations in relation to health and safety. 4. The BAC Permit Issuer must check the PTW Register to determine if other works have been scheduled to occur, or are occurring, in the area or on affected systems, during the period covered by the PTW Application. Where other works have been scheduled that have the potential to overlap and/or impact on the ability for works to be carried safely, approval must not be given. 5. Where there are no overlaps identified, the BAC Permit Issuer must record the activity in the PTW Register prior to raising the PTW in the ToolBox database. 6. The PTW must be printed and all relevant signatures obtained prior to commencement of the work activity. 7. The PTW will be issued in the name of the tenant (i.e. the person with whom BAC has a contractual relationship). 8. A signed copy of the PTW and all applicable control documentation must be retained at the location of the work activity and be presented at the request of any BAC authorised person. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 38 of 48

9. The tenant is responsible for explaining, communicating and passing on specific BAC conditions, limitations and expectations to any third party/ies involved (e.g. sub-contractors). 10. As part of the Permit to Work process, the BAC Permit Issuer, BAC Works Manager or a WHS team member may undertake inspection or monitoring checks of the work scope and implementation of agreed controls, in order to ensure that the health and safety of BAC workers, contractors and members of the public is not compromised. 11. On completion of the PTW work activity, the tenant must notify the BAC Permit Issuer who will close out the PTW in the PTW Register. Key Issue Where a key to a BAC-controlled plant or equipment room is to be issued, the tenant must provide the contractor with a completed BAC Access Request form. This form, a copy of the signed PTW, photo identification along with evidence of completion of relevant inductions and qualifications, must be provided by the contractor to the person issuing the BAC key. 8.12 Lease Provisions The BAC property manager responsible for any lease should ensure all relevant mechanisms are incorporated in lease documentation to allow BAC to effectively and appropriately manage BAC s WHS obligations. BAC precedent documents contain standard clauses for this purpose. 8.13 WHS Reporting Requirements Incident Reports All tenants are required to report WHS incidents to their BAC Property Manager. This includes: Notifiable incidents o Death of a person; o Serious injury or illness (e.g. requiring treatment as an in-patient in hospital or medical treatment within 48 hours of exposure to a substance); o Dangerous incident (e.g. incident that poses serious risk to health and safety from an immediate or imminent exposure to uncontrolled substance spill, or explosion, fire, gas/steam escape; electric shock, fall from height of plant, substance or thing; collapse of regulated plant or structure or excavation, etc); o Serious electrical incident (e.g. death of a person by electricity, shock or injury requiring treatment by a doctor or any shock or injury from electricity at high voltage); o Dangerous electrical event (e.g. any circumstance where a person is not, or would not have been, electrically safe); or Requirements\Controlled s - Restricted Uncontrolled if Printed Page 39 of 48

o A workplace incident that arises out of a person performing SSAA resulting in death or serious harm, or potential for death or serious harm, to a person; or serious damage to an aircraft or property. Any injury involving any member of the public or other airport worker; Any injury resulting in emergency services being called to a BAC site; WHS regulator (e.g. Workplace Health and Safety Queensland, Electrical Safety Office) activities, such as: o Inspections carried out; o Improvement or prohibition notices issued; or o Enforceable undertakings. Any of the above must be reported to the responsible BAC Property Manager as soon as reasonably practicable. The BAC Works Manager must notify BAC s WHS team as soon as they are made aware of any of the above incidents occurring. 8.14 WHS Monitoring and Review General WHS audits, inspections or observations may be undertaken during the life of a contract with BAC in accordance with any included WHS contract provisions. BAC will conduct WHS audits, inspections and/or observation activities deemed appropriate for works in BAC-controlled areas, including the activities of tenants where these have the potential to impact on BAC areas of control. 5.6.3 Inspections and Observations Interface inspections involve physical inspections of areas of the project that adjoin or impact on BAC-controlled areas and activities. It is undertaken by the BAC Works Manager and a representative from BAC s WHS team as well as any representative nominated by the principal contractor. Any identified areas of concern are documented and consultation between the BAC Works Manager, BAC WHS team representative and principal contractor will be undertaken to determine appropriate rectification actions. Where a serious risk is identified during the above activities, the BAC representatives conducting the inspection must take any necessary steps to ensure immediate cessation of the activity and commence appropriate measures to ensure the situation is remedied and/or made safe as soon as possible. Non-conformances Where system deficiencies are identified as a result of audits, inspections, observations or incident investigations, these will be reported to the BAC Works Manager responsible for the principal contractor by way of a non-conformance. Further detail on the management of non-conformances is provided in the BAC Nonconformance Procedure. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 40 of 48

8.15 Sub-contractors Principal contractors are responsible for ensuring that any work conditions, limitations and expectations relating to WHS are communicated to all site workers and visitors. 8.16 Provision of information In circumstances where a principal contractor has modified plant and equipment, or repaired or installed electrical equipment, or laid underground cabling/services, there is a need for relevant records, detailed drawings and other data and information to be provided to BAC to enable it to meet its ongoing obligations in the future for managing health and safety, as well as meeting compliance needs. This information may include, but is not limited to, the principal contractor providing: plant risk assessments; plant operating, maintenance and servicing instructions and manuals; design certificates and registrations, such for gantry cranes or other plant; plant compliance and commissioning certificates; hazardous chemical manifests; noise surveys; as built electrical installation drawings; services drawings, including depth and location of underground cables, etc; compaction certificates and ground stability information relating to excavated ground; work certificates/certifications from licensed persons, such as connection certificates from licensed electrical workers; and test and/or inspection certificates, such as safety line anchor points. Many of the requirements for the provision of drawings, certificates, risk assessments and other information are legislated within WHS regulations, advisory standards, codes of practice and Australian Standards etc. The BAC Works Manager must ensure that all relevant requirements for information to be provided by the principal contractor are identified and mechanisms in place to ensure these are obtained. 8.17 Responsibilities (Principal Contractor Works) BAC Works Manager Review Application Form and WHS Management Plan and ensure adequacy prior to recommending approval by BAC s WHS team. Liaise with principal contractors to address any identified concerns or deficiencies in the Application Form or WHS Management Plan. Liaise with BAC s WHS team and principal contractors in relation to expiry of approved status. Carry out responsibilities as BAC Permit Issuer unless otherwise delegated. Ensure contract documentation includes appropriate WHS requirements. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 41 of 48

Forward WHS performance information obtained via principal contractor reporting mechanisms to BAC s WHS team. Participate in WHS audits, inspections and observations. Liaise with BAC s WHS team and principal contractors in relation to the rectification of non-conformances. BAC Permit Issuer Review the content of completed documentation submitted as part of the PTW process; Clarify the scope of the work activity, location and timing and take this into consideration when reviewing the documentation; discuss, clarify and request the amendment of the documentation where reasonable; insert relevant details about the PTW into the PTW Register; ensure the PTW is formally issued, signed and dated by all relevant parties prior to works commencing; maintain ongoing consultation with the principal contractor. Principal Contractor Comply with the requirements of this Standard in relation to applying for approved status and permits to work. Communicate, cooperate and consult with BAC in relation to WHS matters, including participating in WHS audits, inspections and observations and liaising with BAC to address identified areas of concern and nonconformances. Provide relevant information from this Standard to sub-contractors and other site workers and visitors, including relating to BAC WHS and DAMP requirements. Provide WHS information as required, particularly in relation to reporting of WHS incidents. BAC WHS Team Review and approve applications for approved contractor status from principal contractors. Liaise with BAC Works Managers and principal contractors to address any identified concerns or deficiencies in the Application Form or WHS Management Plan. Liaise with BAC Works Managers and principal contractors in relation to expiry of approved status. Participate in WHS audits, inspections and observations. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 42 of 48

Liaise with BAC Works Managers and principal contractors in relation to the rectification of non-conformances. Provide advice and assistance to BAC Works Managers in relation to management of WHS requirements on principal contractor sites. Issue DAMP Induction cards to workers on principal contractor sites as required. General BAC recognises that there are a range of activities undertaken throughout its operations that require an increased level of documentation, notification, communication and/or authorisation to be undertaken to enable a safe system of work. To achieve these key characteristics BAC maintains a Permit to Work (PTW) system. The scope and range of activities that require a Permit to Work has been developed via: Analysis of BAC operations and WHS practices; Past incidents and events; Consultation with worker representatives from various operational areas; and Legislation and industry standards relating to specific WHS risk areas and work practices. Process Principal Contractors Work controlled by a principal contractor at their site is primarily undertaken in accordance with their own internal WHS systems and documented WHS management plan for the construction project. Due to the nature of business operations and the close interaction between numerous parties, including contractors, tenants and members of the public, BAC recognises its duty to monitor and oversee the effectiveness of WHS controls and work interactions. 8.18 Contract Provisions The BAC works manager responsible for any contract should ensure all relevant mechanisms are incorporated in contract documentation to allow BAC to effectively and appropriately manage the WHS requirements of the contracted work activities. BAC precedent documents contain standard clauses for this purpose. 8.19 Contractor Inductions All contractors working for or on behalf of BAC must complete an induction before commencing work at Brisbane Airport. The induction program is available online and includes a number of profiles covering specific work areas and activities. As a minimum, all contractors must complete the BAC General profile. Detailed instructions on the use of the online induction program are available on the Working At Brisbane Airport website. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 43 of 48

Principal Contractors may use the information contained in the BAC induction program in their site-specific induction as desired. Contractor induction cards are valid for a period of 12 months, must be worn at all times by Category B and C contractors and must be produced along with photo identification if requested by any BAC-authorised person. 8.20 WHS Reporting Requirements Monthly Reports After being granted approved status, Category B and C contractors are required to submit a monthly WHS report in the approved form to BAC. A reporting template is provided to contractors on approval. Category A contractors are contractually required to submit reports on WHS performance as part of the construction project management system. Incident Reports All contractors are required to report WHS incidents to their BAC Works Manager. This includes: Notifiable incidents; Any injury involving any member of the public or other airport worker; Any injury resulting in emergency services being called to a BAC site; WHS regulator (e.g. Workplace Health and Safety Queensland, Electrical Safety Office) activities, such as: o Inspections carried out; o Improvement or prohibition notices issued; or o Enforceable undertakings. Any of the above must be reported to the responsible BAC Works Manager as soon as reasonably practicable. 8.21 WHS Monitoring and Review General WHS audits, inspections or observations may be undertaken during the life of a contract with BAC in accordance with any included WHS contract provisions. BAC will conduct WHS audits, inspections and/or observation activities deemed appropriate for contractor works in BAC-controlled areas, including the activities of Principal Contractors where these have the potential to impact on BAC areas of control. Audit WHS audit para for pc s. 5.6.3 Inspections and Observations Requirements\Controlled s - Restricted Uncontrolled if Printed Page 44 of 48

BAC Works Managers undertake regular inspections and observations of contractor work activities for which they are responsible; documenting any identified issues in accordance with the Works Manager WHS Observation Record. Consultation must occur between the Works Manager and contractor to determine appropriate rectification actions to remedy the area of concern and ensure the contractor can continue to work to an appropriate standard in accordance with the minimum requirements of BAC s WHS management system. Where a serious risk is identified during the above activities, the BAC representative conducting the inspection must take any necessary steps to ensure immediate cessation of the activity and commence appropriate measures to ensure the situation is remedied and/or made safe as soon as possible. Non-conformances Where system deficiencies are identified as a result of audits, inspections, observations or incident investigations, these will be reported to the BAC Works Manager responsible for the contract/contractor by way of a non-conformance. Further detail on the management of non-conformances is provided in the BAC Nonconformance Procedure. 8.22 Sub-contractors Category A contractors are responsible for ensuring that WHS processes accepted by BAC Category B contractors are to ensure that their audited WHS management system and relevant procedures accepted through the approval process are implemented and followed by all contracted workers on site. Category C contractors are required to adhere to all 8.23 Provision of information In circumstances where a contractor has modified plant and equipment, or repaired or installed electrical equipment, or laid underground cabling/services, there is a need for relevant records, detailed drawings and other data and information to be provided to BAC to enable it to meet its ongoing obligations in the future for managing health and safety, as well as meeting compliance needs. This information may include, but is not limited to, the contractor providing: Plant risk assessments; Hazardous substance manifests; Noise surveys; Plant operating, maintenance and servicing instructions and manuals; as built electrical installation drawings; services drawings, including depth and location of underground cables, etc; compaction certificates and ground stability information relating to excavated ground; Requirements\Controlled s - Restricted Uncontrolled if Printed Page 45 of 48

work certificates/certifications from licensed persons, such as connection certificates from licensed electrical workers; test and/or inspection certificates, such as safety line anchor points; design certificates and registrations, such for gantry cranes or other plant; and plant compliance and commissioning certificates. Many of the requirements for the provision of drawings, certificates, risk assessments and other information are legislated within WHS regulations, advisory standards, codes of practice and Australian Standards etc. The BAC works manager must ensure that all relevant requirements for information to be provided by the contractor is identified and mechanisms in place to ensure these are obtained. 9.0 TRAINING and AWARENESS Detailed information on training and awareness requirements for BAC is contained in the BAC WHS Training and Competency Procedure. 9.1 BAC Inductions All contractors working for and on behalf of BAC must complete an induction before commencing work at Brisbane Airport. The induction program is available online and there are a number of profiles covering specific areas and activities. As a minimum, all contractors must complete the BAC General profile. Detailed instructions on the use of the online induction program are available on the working at Brisbane Airport website. Principal Contractors may use the information contained in the BAC induction program in their site-specific induction as desired. Contractor induction cards are valid for a period of 12 months and must be worn at all times and must be produced along with photo identification if requested by any BAC employee. 9.2 General Construction Induction Any work must have completed general construction induction training to carry out construction work under the WHS Regulations. General construction induction training provides basic knowledge of construction work, the work health and safety laws that apply, common hazards likely to be encountered in construction work, and how the associated risks can be controlled. All BAC workers (this includes contractors) that may need to enter a construction workplace must have completed the course CPCCOHS1001A Work safely in the construction industry and received a White Card. BAC requires employees to refresh this induction every 5 years. 9.3 WHS Competency 9.3.1 BAC Employees and Category C Approved Contractors The BAC WHS Manager in consultation with the relevant BAC Work Unit Managers and workers will identify the WHS specific competencies relevant to worker s roles. When determining these competency requirements the following considerations are to be made: WHS risks applicable to work being performed; Requirements\Controlled s - Restricted Uncontrolled if Printed Page 46 of 48

relevant existing industry competency standards; results and findings of inspections, audits and incident reports; any applicable legislative requirements and obligations; and any responsibilities/accountabilities detailed in WHSMS policies, procedures or standards. 9.3.2 BAC Category B Approved Contractors Category B approved contractors have certified WHS management systems which will include the identification and assessment of competency of workers. The contractor s nominated BAC Works Manager must ensure that the contractor has identified the competencies required for the work to be conducted and is using workers who have attained those identified competencies. 9.3.3 Licences BAC must not direct or allow a person to carry out work at a workplace if the person is not licensed in accordance with the WHS Regulations. Construction work can include a range of classes of high risk work. For example, the following plant can only be operated by a person holding a current High Risk Work Licence: any tower crane, including self-erecting tower cranes; non-slewing mobile cranes with a lifting capacity of more than 3 tonnes; any slewing mobile cranes; any concrete placing boom; boom-type elevating work platforms, where the length of the boom is 11 metres or more; personnel and/or materials hoists; and forklift trucks. Other construction work that requires a person with a high risk work licence includes: the erection and maintenance of a scaffold that exceeds 4 metres in height; and any rigging and dogging work. For detailed information on communication and consultation refer to the WHS Training and Competency Procedure. 10.0 RESPONSIBILITIES 10.1 BAC Senior Managers Ensure adequate resources (time, equipment and personnel) are allocated for the effective implementation of this Corporate Standard. 10.2 WHS Manager Maintain the currency and accuracy of this corporate standard, reflective of legislative requirements and BAC needs. Ensure all relevant BAC workers receive training to enable them to undertake their responsibilities as outlined in this Standard. Ensure that the performance of BAC and contracted personnel are reviewed with respect to this Corporate Standard. Requirements\Controlled s - Restricted Uncontrolled if Printed Page 47 of 48

Provide and maintain frameworks for keeping of records in relation to WHS activities associated with use of contractors by BAC. 10.3 BAC Works Manager Ensure contractors are approved in accordance with the Contractor Management Corporate Standard Review applicable contractor documentation (WHS Management Plans, Safe Work Method Statements, Safe Work Plans For construction projects ensure the appointment of a principal contractor, for the purposes of the WHS Act. Monitor and review the WHS performance of contractors in accordance with this Corporate Standard. Monitoring contractor construction activities through audits, inspections and observations. 11.0 REVIEW DATE This Corporate Standard will be reviewed and updated as required to reflect changes in legislation, BAC s risk profile or operational needs. 12.0 REFERENCES Work Health and Safety Act 2011 (Qld) Work Health and Safety Regulation 2011(Qld) BAC Construction Work Corporate Standard BAC Construction Work Health and Safety Plan Review Checklist BAC PTW Application form BAC Non-conformance Reporting Procedure BAC WHS Records Management and Control Procedure Requirements\Controlled s - Restricted Uncontrolled if Printed Page 48 of 48