Simulating construction planning in a bridge project by. using virtual prototyping, integrated design and. resource allocation



Similar documents
Applications of Building Information Modeling (BIM) to Real Estate Projects of Ahmedabad

INTRODUCTION OF CONSTRUCTION MANAGEMENT INTEGRATED SYSTEM USING BIM IN THE HONAM HIGH-SPEED RAILWAY LOT NO. 4-2

AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS

Automated construction schedule creation using project information model

How To Implement Lean And Bim On An Infrastructure Project

BIM Extension into Later Stages of Project Life Cycle

Abstract: BIM: A Technological Advancement in the Field of Architecture. Introduction:

Integrating BIM and Safety: An Automated Rule-Based Checking System for Safety Planning and Simulation

Synergy: Building Information Modeling and

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

Working Paper #3 THE APPLICATION OF CONSTRUCTION PROJECT MANAGEMENT TOOLS AN OVERVIEW OF TOOLS FOR MANAGING AND CONTROLING CONSTRUCTION PROJECTS

Safe & Sound Bridge Terminology

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Keywords: Programming, planning, linear work, civil engineering, time chainage, 4D, virtual reality.

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

4D-BIM for Construction Safety Planning

ESTIMATION AND PLANNING TOOL FOR INDUSTRIAL CONSTRUCTION SCAFFOLDING. *C. Kumar, S. M. AbouRizk, and Y. Mohamed

PS.12. 4D Scheduling A Case Study

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

Feasibility Analysis of Initiating Building Information Modeling (BIM) for HVAC systems by General Contractors

NAPCS Product List for NAICS 54134: Drafting Services

An Automatic Scheduling Approach: Building Information Modeling-Based Onsite Scheduling for Panelized Construction

Introduction to Minimal Excavation Foundations

Automated Micro-Planning and Real-time Tracking of Precast Building Components

Building Information Modeling (BIM): A New Paradigm for Visual Interactive Modeling and Simulation for Construction Projects

Constraint-Directed Scheduling for Multi-Storey Building Projects

CHAPTER 2 QUANTITY TAKE-OFF

Interoperable Learning Leveraging Building Information Modeling (BIM) in Construction Management and Structural Engineering Education

Towards the Exchange of Parametric Bridge Models using a Neutral Data Format

MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT Timo Hartmann

Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

INTERACTIVE VISUAL LEAN SYSTEM FOR RESOURCE PLANNING OF EARTHWORK OPERATIONS

Steel construction. Miscellaneous steel. Industrial structures.

TechnicalNotes. Terramodel Software for Construction

Technical Analysis and High-End Structural Design

PROSPECTIVE VALIDATION OF VIRTUAL DESIGN AND CONSTRUCTION METHODS

BIM and Lean Construction Can BIM remove waste from construction processes?

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

Structural Performance of Highway Bridges under Given Foundation Settlements

Enhancing Building Quality With 6D BIM

Dynamic Change Management for Fast-tracking Construction Projects

Hybrid Model for Developing BIM Software Extensions

Civil Engineering Design

Tall Building Form Generation by Parametric Design Process

Linear Schedules for Tunnel Projects

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Teaching Using 3D Laser Scans

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

Res. J. Appl. Sci. Eng. Technol., 7(1): 1-8, 2014

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No May 15, 2013

BIM.03. Leveraging the Power of 4D Models for Analyzing and Presenting CPM Schedule Delay Analyses

How To Build A Luxury Apartment Complex In London

A 3D Point-cloud-based Verification of As-built Construction Progress

d e n v e r a r t m u s e u m

BUILDING INFORMATION MODELING (BIM) AND THE CONSTRUCTION MANAGEMENT BODY OF KNOWLEDGE

Virtual Reality Applications in Project Management Scheduling

Ontology-Based Semantic Modeling of Safety Management Knowledge

Development of Resource-Driven Scheduling Model for Mass Housing Construction Projects

Integration of radio frequency identification and building information modelling for decentralised information management

Remote Monitoring of Soil Pressures on Bridge Footings

MEMORANDUM West Swann Avenue, Suite 225 Tampa, Florida Phone (813) Fax (813)

Evaluation of photogrammetry for monitoring settlement of building adjacent to foundation jobsite

How To Write An Analysis System For Bridge Test

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

3D SCANNING: A NEW APPROACH TOWARDS MODEL DEVELOPMENT IN ADVANCED MANUFACTURING SYSTEM

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

Olilo's AEC Design Services. SrinSoft Inc, Partners of

National Archives and Record Administration

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

PROJECT COST ESTIMATES & FEASIBILITIES

King Post Wall Information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Knowledge-based geometric modeling in construction

Design/Construction Integration thru Virtual Construction for Improved Constructability Walid Thabet, Virginia Tech

REHABILITATION PACKAGE 1-a

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

Geospatial Technologies integrated with Building Information Modelling on Large Construction Site for Health and Safety Management

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load

Requirements for Building Application Submission

Mobile 2D Barcode/BIM-based Facilities Maintaining Management System

ENGINEERING AND TECHNOLOGY DEPARTMENT

ALGORITHM FOR DETERMINING CONTROLLING PATH CONSIDERING RESOURCE CONTINUITY

BIM and API Extensions

SU Qiang Professor

HOUSE BUILDING DIGEST

Elevated Roads for Sri Lanka

Virginia Approach Spans

TRACKING HAULING TRUCKS FOR CUT-FILL EARTHMOVING OPERATIONS

Transcription:

Building and Real Estate Workshop Paper, The Hong Kong Polytechnic University Simulating construction planning in a bridge project by using virtual prototyping, integrated design and resource allocation Heng Li and Neo Chan Department of Building and Real Estate The Hong Kong Polytechnic University November 2009 Hong Kong Please do not quote or circulate this paper without prior consent from the authors

Simulating construction planning in a bridge project by using virtual prototyping, integrated design and resource allocation Abstract 4D simulation, building information modeling, virtual construction and virtual prototyping are emerging topics within building construction. These techniques relate not only to buildings themselves, but also apply to other forms of construction, including bridges. Since bridge construction is a complex process involving multiple types of machinery, applying such virtual methods benefits understanding of all parties in construction practice. This paper describes the use of virtual prototyping integrated parametric 3D modeling and construction machinery with embedded mechanisms to simulate different construction planning processes. A case study is presented to demonstrate the use of virtual prototyping integrated with 3D model design and resource allocation to find optimal construction planning processes. Keywords: virtual prototyping, parametric 3D model, construction machinery 1. Introduction A review of literature from the building construction industry indicates that many researchers are already applying emerging technologies such as 4D simulation [1-5], building information modeling [6-10], virtual construction [11] and virtual prototyping

[12-16] to optimize the construction planning of building construction projects. However, there is limited knowledge on how these techniques are used in bridge or highway projects. Liapi [17] applied 4D CAD to an actual project to provide a better understanding of the aspects and spatial constraints of the project compared with the traditional 2D format. Zhou and Wang [18] applied 4D simulation to bridge construction to provide the user with a forecast of construction schedule and resource consumption over time. Compared with building construction projects, bridge and highway construction involves fewer activities and crew. However, the degree of complexity in constructing a bridge or highway is similar to that of building construction projects. Also, the construction of bridge and highway projects of any magnitude has become increasingly difficult due to the highly competitive environment and complexity of the management process [19]. Bridge construction involves complex geometric configurations that render communication of project information among interested parties very difficult and prone to errors [17]. Applying these innovative techniques to bridge construction projects for construction planning and scheduling would assist project planners in making more appropriate planning decisions. In bridge and highway construction, there already exist approaches that attempt to optimize construction planning. For example, Askew et al [20] have developed a computer-based system to generate earthwork activity through a knowledge-base and by simulating the earthwork processes; El-Rayes [21] and Hassanein and Moselhi [22] have

developed an object-oriented model for planning and scheduling highway construction; El-Rayes and Kandil [23] created a multi-objective genetic algorithm using a threedimensional time-cost-quality trade-off analysis to identify optimal resource utilization plans and Said et al. [24] have applied computer simulation to optimize the planning of bridge construction and associated resources involved. However, even when 4D CAD is applied [17, no existing model can optimize construction planning by allowing for potential collisions between construction machinery and space conflict among activities. Virtual construction [11] and virtual prototyping (VP) [15], on the other hand, are effective tools to avoid such collisions while the value of virtual simulation [11, 25] and VP [15] is in helping to simulate various construction methodologies. Furthermore, VP technology can assist project planners in optimal construction planning through parametric 3D models and construction machinery in addition to appropriately allocating resources. The aim of the research described in this paper was to apply VP technology integrated parametric 3D modeling and resource allocation to bridge projects to enable optimal construction planning. The paper first describes the theory of parametric 3D modeling and modeling construction machinery and resource allocation in bridge construction. Next, a case study is presented to demonstrate how optimal construction planning is possible. Future improvements to VP technology are discussed and concluded in the final section.

2. The characteristics of bridge projects Bridge construction involves multiple recurring activities, such as building foundations, piers and decks [21], processes which are comparatively straightforward in comparison with building projects.. While constructing bridges involves less working activities than building construction, it does not necessarily follow that bridge construction is an easy task. Problems and uncertainties are always likely to occur during the working process. Some factors are especially critical, including the relationship between the terrain and proposed bridge and the various designs of working platforms, determining the number of resources and duration of the project. A bridge project is a continuous linear project [22, 27], characterized by a geometrically linear layout and no clearly identifiable units. Highway and bridge projects involve an intensive period of earthwork and the topography often changes with the filling and cutting work involved. While building construction projects contain discrete time-linked objects such as columns and slabs 27], bridge project activities cannot be clearly identified and linked with discrete schedule activities. 3. Applying the concept of virtual prototyping to bridge projects Virtual prototyping, which originated in the manufacturing industry, has considerable potential for the design of 3D models [30], helping to build a parametric 3D model and construction machinery. Also, virtual prototyping can help assign the construction equipment in planning for resource analysis [15].

3.1. Parametric 3D modeling Parametric 3D modeling is applied to building construction projects worldwide [12, 28-29]. Huang, for instance, has applied this form of modeling to temporary work elements [17] and Sacks et al. have used a parametric 3D model to design precast concrete [28]. The model is based on operations and constraints, with constraints maintained as an integral part of the model geometry during editing. The design of our parametric 3D model is based on fundamental constraints, user requirements and safety issues. This model provides a user-friendly platform for sketching and modifying the basic 2D design. The parametric 3D model will automatically generate various levels of detail. Fig.1 shows the model of a steel platform created through the application of this technology, with the user designing the shape and inputting external dimensions. Such application assists users in realistically illustrating their ideas. Fig. 1. Generated parametric 3D model from horizontal design 3.2. The model of construction machinery The model of construction machinery is an enhanced equipment-based model [15] which is applied to construction planning. The specifications of the construction machinery are

embedded in the model. This includes the turning and working radius, lifting capacity, etc. The construction machinery model simulates real-life working processes. If the plan is not constructible in reality (eg., there is not enough space for driving or not enough distance from the target), these problems will be highlighted by the VP technology based on the specification data. Furthermore, the VP technology can detect a potential collision course between the machinery involved. 3.3. Resource allocation In VP technology, the resource amount can be adjusted by the user. The user can apply different working platform designs to allocate different machinery when simulating the construction process. Such variables, including different machinery types and resource amounts generate varying results and durations relating to the construction planning process. 4. Case Study 4.1. Introduction The case study involves the widening of a section of Ting Kau Viaduct, which is a part of the Tuen Mun Road, a road link between Tuen Mun and Kowloon, Hong Kong. The total length of the road is 15 km and it has been in service for more than 30 years, having a long history of traffic congestion and accidents. The road was designed and constructed in the mid-1970s and there was a need to raise the road to current standards as far as

practicable. In addition, reconstructing the road was planned to minimize repair works, traffic congestion and accidents, and therefore create less disturbance for road users. The main contract scope of work included widening sections of the existing carriageways and vehicular bridges and highway structures, including Tsing Lung Tau Bridge, Telford Bridge, Ting Kau Viaduct and Yau Kom Tau Bridge. The work also included widening the eastern end of Sham Tseng Viaduct eastbound carriageway to meet current expressway standards, with the associated provision of hard-shoulders and verges. The work of widening the section of Ting Kau Viaduct included the construction of viaduct foundations, piers, deck and finishes. Ting Kau Viaduct is supported by numerous piers that are placed on a hillside, and twenty-eight new piers required for the widening of the Tuen Mun road. The work concerned involved a complex site topography, localized site formation work, foundation, superstructure and stitching work to existing road works. The project planners encountered several types of problems relating to construction planning and constructability, including potential risks to road users in the construction area, and a number of key concerns were incorporated at this stage, including site safety, site access, temporary work design, cranes and machinery deployment. A central issue for the project planners concerned the working platform to be used in the construction process. This involved choosing one of three different platform designs. However, the choice is not easy, due to:

1. Difficulties in imagining the site environment. 2. Difficulties in determining the best platform for foundation and pier construction. 3. Difficulties in estimating the maximum resources involved in different platform designs. 4.2. Building the virtual terrain contours, existing viaduct and proposed widening of viaduct structures To increase the precision of results, the research team obtained topographical survey data of the project site from the land surveyors involved. This included terrain contours and details of the existing Tin Kau Viaduct and was built into 3D model. The 3D virtual terrain contours provided a clear and detailed view for the project planners, allowing them to imagine the relationship between the terrain contours and existing viaduct and to predict safety issues and potential accidents during construction. The proposed widening of the viaduct structure was modeled to include geometric configurations after construction, based on the 2D drawings (Fig. 2).

Fig. 2. Virtual terrain contours, existing viaduct, Castle Peak Road and the proposed widened section of viaduct structures 4.3. Parametric 3D modeling for temporary work The choice of platform design was influenced by two main considerations: 1. The haul road - an access road from Castle Peak Road to the construction site for construction machinery to be transported. 2. The platform itself. The haul road Most of the critical construction work was situated under the existing viaduct and on the hillside. However, the hillside was not a suitable situation for workers and construction machinery and the construction machinery had to be driven from Castle Peak Road to the

proposed construction site through a haul road (Fig. 3). The essential requirements of the haul road was that the slope was not larger than 1/10 and had a minimum width of 5m and these two requirements were built into the haul road model. Fig. 3. The haul road from castle peak road to construction site The platform The function of the steel platform was to provide a working space from which the construction machinery could drive pilings. This would have proved difficult for the project planner to confirm a platform design because of its importance to the success of the project. Using the parametric 3D model however, the design of steel platform could be drawn or modified easily and quickly. The platform safety designs remained fixed

throughout the modeling process, and the railings of the platform were generated automatically in each of the three model designs produced by the research team. 4.4. Construction machinery models All the construction machinery (Fig.4) were modeled in detail, including the external dimensions, working radii, moving and working space requirements and lifting capacity. For example, a 3D model of crawler crane CCH50T was built which included its external dimensions based on the specifications, degrees of low and high limit of turning radius, rear-end swing and working radius (Fig. 5). The various lifting capacities were based on the length of working radius. Crawler Crane CCH50T Crawler Crane HS873HD Hydraulic Crawler Drill HD90 Pile driving machine 325L Excavator Concrete Mixer

Steel Gantry Crane Lorry Lorry Fig. 5. The models of all construction machinery Fig. 5. The crawler crane CCH50T with embedded specification 4.5. Construction planning The construction planning involved temporary work design and resource allocation. Through the parametric 3D modeling, the precision and reliability of the temporary work design can be increased. The project planner allocated varying amounts of construction machinery into the three different working platform designs. Using the model of construction machinery, any potential collision between construction machinery can be

detected in the simulation. The different feasible construction planning processes can be simulated according to the fundamental construction sequence, as shown in Table 1. Order* Activity Duration 1 Haul Road Construction 13 days 2 Timber Platform Erection 14 days 3 Minipile for Steel Platform Driving 27 days 4 Footing for Steel Platform Construction 10 days 5 Timber Platform Removal 7 days 6 Steel Platform Removal 21 days 7 Pre-bored H-Pile Works 12 days 8 Pipepile Wall Driving 20 days 9 Pile Cap Excavation 7 days 10 Pile Cap Concreting 7 days 11 Pier Construction 24 days 12 Pier Head Construction 12 days 13 Launching of Precast Beam** 2 days 14 Deck Construction 7 days * Fundamental construction sequence is set in an order from 1 to 14. **Precast beam should be launched after two piles of head construction. Table 1. The duration of each activity for one pair of piers The three different designs of steel platform as shown in Fig. 6. These comprised:

Design A - Each platform overlapped two piers, with the entrance was connected to the haul road. Design B - Each platform fully overlapped all piers but with only one entrance connected to the haul road. Design C - Each platform is similar to that of design B but each pair of piers provided one entrance connected to the haul road. (Design A) (Design B) (Design C) Fig 6. Three different designs of steel platform Construction machinery was assigned to different activities in the construction sequence (Table 2). Eight types of construction machinery and two types of platforms were

involved. The user can assign varying amounts of construction machinery to the three platform designs. Based on different designs and different resource allocations, the VP technology was used to simulate the construction planning. Order Activity Construction Machinery Other Resources 1 Haul Road Construction Lorry a large number of crew 2 Timber Platform Erection Lorry a large number of crew 3 Minipile for Steel Platform Driving Crawler Crane CCH50T Hydraulic Crawler Drill HD90 4 Footing for Steel Platform Construction Crawler Crane CCH50T 5 Timber Platform Removal Lorry a large number of crew 6 Steel Platform Erection Crawler Crane CCH50T 7 Pre-bored H-Pile Works 8 Pipepile Wall Driving Pile driving machine 325L Crawler Crane HS873HD Pile driving machine 325L Crawler Crane HS873HD Crawler Crane CCH50T 9 Pile Cap Excavation Excavator Lorry 10 Pile Cap Concreting 11 Pier Construction 12 Pier Head Construction Crawler Crane CCH50T Concrete Mixer Crawler Crane HS873HD Concrete Mixer Crawler Crane HS873HD Concrete Mixer Steel formwork Steel formwork

13 Launching of Precast Beam Steel Gantry 14 Deck Construction Crane Lorry Table 2. Different construction machinery assigned in different activities In design A, based on the existing viaduct and platform design, it was found that the crawler crane HS873HD could not be driven from one platform to the next due to the limited height available. Some parts of the crawler crane had to be dismantled and reassembled after the crawler crane was driven to the next platform, a process which would take 30 days. Other construction machinery did not have such problems. In design B, there is one access road for transportation. Pier construction therefore would be undertaken one by one. One construction machine was the maximum allocation. The reassembly time of the crawler crane HS873HD from design A could be eliminated as the crawler crane did not need to pass the haul road from the one platform to another. In design C, each platform is connected to the haul road and the next steel platform. The crawler crane can move across the connection between two steel platforms. Once again, dismantling and reassembly of the crawler crane HS873HD can be eliminated. Design 3 provides the best transportation model for the construction machinery. Through the VP system, therefore, the project planners were able to investigate several practical and precise construction plans involving different resource allocations. This allowed the optimal construction plan to be selected based on project duration, cost of resources and cost of temporary work.

5. Future improvements to construction virtual prototyping The critical issue of construction planning in bridge or highway construction is the nature of the working platform design. As the case study shows, the VP system can be useful in testing the feasibility of the platform in conjunction with the practical experience of project planners. Feedback from project planners indicated that it might be better to have a fully automated VP platform design process in future, which opens the way for futher research in this application. 6. Conclusion One use of VP technology in the construction process is to assist project planners to better understand the relation between designing working platforms and allocating resources. This paper describes how a parametric 3D model and a model of construction machinery can be utilized by VP in support of the construction planning process. The case study demonstrates an application in which the VP system enabled the user to validate the design of working platform by allocating different resources. This shows that the VP system can be used for such a purpose and can simulate construction planning to avoid any collisions between construction machinery and construction elements. It can help the project planner imagine construction planning in relation to varying working platform designs. According to the feedback received, the VP system is a useful tool to test the feasibility of working platform designs in the construction process. However, there is still room for of improvements to the VP system, including the opportunity for

automatic working platform designs. The authors are currently investigating the application of other emerging technologies to bridge and highway projects in order to optimize construction planning and prevent planning mistakes during construction.

References [1] B. Koo, M. Fischer, Feasibility study of 4D CAD in commercial construction, Journal of Construction Engineering and Management 126(4) (2000) 251-260. [2] H.J. Wang, J.P. Zhang, K.W. Chau, M. Anson, 4D dynamic management for construction planning and resource utilization, Automation in Construction 13 (2004) 575-589. [3] K. McKinney, M. Fischer, Generating, evaluating and visualizing Construction Schedules with 4D CAD Tools, Automation in Construction 7(6) (1998) p. 433-437. [4] N. Dawood, E. Sriprasert, Z. Mallasi, B. Hobbs, Development of an integrated information resource base for 4D/VR construction processes simulation. Automation in Construction 12 (2002) 123-131. [5] Z. Hu, J. Zhang, Z. Deng, Construction process simulation and safety analysis based on building information model and 4D technology, Tsinghua Science & Technology 13(S1) (2008) 26-272. [6] A. Dace Campbell, Building Information Modeling: The Web3D Application for AEC, ACM Web3D, Perugia, Italy, 2007.

[7] A. Khanzode, M. Fischer and D. Reed, Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project, Special Issue Case studies of BIM use vol. 13, ITcon (2008), 324 34. [8] C.M. Eastman, P. Teicholz, R. Sacks and K. Liston, BIM Handbook: A guide to building information modeling for owners, managers, architects, engineers, contractors, and fabricators, John Wiley and Sons, Hoboken, NJ. 2008. [9] D. Zuppa, R.R.A. Issa P.C. Suermann, BIM's Impact on the success measures of construction projects, Proceedings of the 2009 ASCE International Workshop on Computing in Civil Engineering, 2009. [10] J.D. Goedert, P. Meadati, Integrating construction process documentation into building information modeling, Journal of Construction Engineering and Management 134(7) (2008) 509-517. [11] A.F. Waly, W.Y. Thabet, A virtual construction environment for preconstruction planning, Automation in Construction 12 (2002) 139-154.

[12] T. Huang, C.W. Kong, H.L. Guo, A. Baldwin, H. Li, A virtual prototyping system for construction processes, Automation in Construction 16 (2007) 576-585. [13] A. Baldwin, H. Li, T. Huang, C.W. Kong, H.L. Guo, N. Chan, J. Wong, Supporting pre-tender construction planning with virtual prototyping, Engineering, Construction and Architectural Management 16 (2) (2009) 150-161. [14] H. Li, H.L. Guo, M.J. Skibniewski, M. Skitmore, Using the IKEA model and virtual prototyping technology to improve construction process management, Journal of Construction Engineering and Economics 26 (2008) 991-1000. [15] H. Li, N. Chan, T. Huang, H.L. Guo, W. Lu, M. Skitmore, Optimizing construction planning schedules by virtual prototyping enabled resource analysis resource analysis, Automation in Construction 18 (2009) 912-918. [16] H. Li, T. Huang, C.W. Kong, H.L. Guo, A. Baldwin, N. Chan, J. Wong, Integrating design and construction through virtual prototyping, Automation in Construction 17 (2008) 915-922. [17] K. A. Liapi, 4D visualization of highway construction projects, Proceedings of the 7 th International Conference on Information Visualization (IV 03) (2003) 1093 9547/03.

[18] C. Zhou, W. Wang, Highway bridge construction process simulation base on 4D visualization, GeoHunan International Conference 2009, 2009 [19] R. K. Shah, N. Dawood, S. Castro, Automatic generation of progress profiles for earthwork operations using 4D visualization model, ITcon 13 (2008) 491-506. [20] W.H. Askew, S.H. Al-jibouri, M.J. Mawdesley, D.E. Patterson, Planning linear construction projects: automated method for the generation of earthwork activities, Automation in Construction 11 (2002) 643-653. [21] K. El-Rayes, Object-oriented model for repetitive construction scheduling, Journal of Construction Engineering and Management 127(30) (2001) 199-205. [22] A. Hassanein, O. Moselhi, Planning and scheduling highway construction, Journal of Construction Engineering and Management 130(5) (2004) 638-446. [23] K. El-Rayes A. Kandil, Time-cost-quality trade-off analysis for highway construction, Journal of Construction Engineering and Management 131(4) (2005) 477-486. [24] H. Said, M. Marzouk, M. El-Said, Application of computer simulation to bridge deck construction: Case study, Automation in Construction 18 (2009) 377-385.

[25] K. Lai, S. Kang, Collision detection strategies for virtual construction simulation, Automation in Construction 18 (2009) 724-736. [26] W. Liu, I. Flood, R.R.A. Issa, Simulation and optimization of linear construction projects, Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering, 2005. [27] A. Platt, 4D CAD for highway construction projects, Technical report no. 54, Computer integrated construction research program, Pennsylvania State University, PA, 2007. [28] E.S. Slaughter, M. Eraso, 1997 Simulation of structural steel erection to assess innovations. IEEE Transactions on Engineering Management, 44(2), p. 196 207. [29] R. Sacks, C. M. Eastman, G. Lee, Parametric 3D modeling in building construction with examples from precast concrete, Automation in Construction, 13 (2004) 291-312. [30] G. Lee, R. Sacks, C. M. Eastman, Specifying parametric building object behavior (BOB) for a building information modeling system, Automation in Construction, 15 (2006) 758-776.