C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures



Similar documents
APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

Stormwater Design Guidelines Frequently Asked Questions:

Costs for Green Infrastructure and Stormwater Retention Practices

URBAN DRAINAGE CRITERIA

Costs for Green Infrastructure and Stormwater Controls

Selection of Stormwater Treatment Facilities For Maximum Extent Practicable Treatment Effectiveness in Compliance with NPDES Provision C.

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Stanford Graduate School of Business Knight Management Center Campus

Computing Stormwater Runoff Rates and Volumes

Operation & Maintenance Document Templates

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Permeable Interlocking Concrete Pavements

MODULE 2 RULES RELATING RULES RELA

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Permeable Pavement Treatment Capacity

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Planning, Health and Environment Division

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

CASFM Stormwater Quality Field Trip June 23rd, 2011

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Commercial Rainwater and

Riprap-lined Swale (RS)

CITY OF ESCONDIDO SUSMP Standard Urban Stormwater Mitigation Plan Requirements for Development Projects

Dave Laurie, CTR. Sales Manager, Commercial Sales DESIGNED TO CONNECT

Stormwater Best Management Practices (BMP) Performance Analysis

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Permeable Interlocking Concrete Pavements. The Stormwater Problem

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

CITY UTILITIES DESIGN STANDARDS MANUAL

Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012

Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation. Presenters:

Augmenting Rainwater Harvesting to Offset Potable Water for Irrigation and Indoor Use within the Tampa Bay Region A Best Management Practice

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University

Individual Residential Property Credit

Green Infrastructure for Single Family Residences

Permeable Paving System with StormAbsorb Technology

6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing.

Stormwater Drainage Design for Parking Lots

Table 4.9 Storm Drain Inlet Protetion Applicable for

BMP 6.4.6: Dry Well / Seepage Pit

Basic Hydrology. Time of Concentration Methodology

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

User s Manual for the BMPTRAINS Model

STORMWATER MANAGEMENT CHECKLIST

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE

A Developer s Guide: Watershed-Wise Development

Pervious Concrete Pavements: How to Reduce Demand on Your Stormwater System

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

City of Beverly Hills Construction Stormwater Requirement Checklist

Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

Making San Francisco a Water Sensitive City. Sarah Minick SFPUC Urban Watershed Management Program June 2009

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

Appendix A: BMP Fact Sheets

UNIFIED FACILITIES CRITERIA (UFC) LOW IMPACT DEVELOPMENT

Shooks Run Drainage Study Basic Terminology

BMP #: Dry Wells / French Drains

Appendix A: BMP Fact Sheets

Field Performance of Two Stormwater Bioretention Filtration Design Configurations

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS

Water Conservation and the State s New Green Building Code for Residential Construction

H. Khalid Jamil 9367 Verain Street San Diego, CA, (858)

Water LA. capture conserve reuse. California Adaptation Forum 2014 From Watershed to Coast: Adapting to Rising Seas & Prolonged Drought

Permeable Interlocking Concrete Pavements

Burnsville Stormwater Retrofit Study

Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng.

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

PP-1. Introduction Permeable Pavement (PP) Permeable Pavement (PP)

DRAFT Pervious Pavement. Description

Post Construction Stormwater Management Checklist Program

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

SECTION 5: SANITARY SEWER SYSTEM DESIGN

Permeable Interlocking Concrete Pavements

Green Infrastructure in Arid and Semi-Arid Climates

CHAPTER 2 HYDRAULICS OF SEWERS

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Sustainable Site Pavement Systems

Transcription:

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program

Presentation Overview Determining Water Quality Design Flow and Volume ( Q BMP and V BMP ) Sizing Bioretention and Flow-Through Planters Sizing Pervious Paving and Infiltration Trenches Sizing Rainwater Harvesting Cisterns Sizing Non-LID Components

C.3.d Sizing Criteria Volume-based sizing criteria: URQM Method - use formula and volume capture coefficients in Urban Runoff Quality Management, WEF/ASCE MOP No. 23 (1998), pages 175-178 CASQA BMP Handbook Method - Determine volume equal to 80% of the annual runoff, using methodology in Appendix D of the CASQA BMP Handbook (2003) using local rainfall data Sizing curves specific to Santa Clara Valley provided in Appendix B of C.3 Handbook

Unit Basin Storage Volume for 80% Capture (inches) San Jose Rain Gage, 1% Slope Percent Imperviousness

C.3.d Sizing Criteria Flow-based sizing criteria: Factored Flood Flow - 10% of the 50-year peak flow rate, determined using Intensity-Duration-Frequency curves published by the local flood control agency Percentile Rainfall Intensity - Flow of runoff produced by a rain event equal to two times the 85th percentile hourly rainfall intensity Data for Santa Clara Valley rain gages in Sizing Worksheets (Appendix B of C.3 Handbook) Uniform Intensity - Flow of runoff resulting from a rain event equal to 0.2 inches per hour intensity

Intensity-Duration-Frequency Curve (50-Year Return Period)

C.3.d Sizing Criteria 85 th Percentile Rainfall Intensity Data: Reference Rain Gages 85 th Percentile Hourly Rainfall Intensity (in/hr) Design Rainfall Intensity (in/hr)* San Jose Airport 0.087 0.17 Palo Alto 0.096 0.19 Morgan Hill 0.12 0.24 *Design rainfall intensity = 2 X 85 th percentile hourly rainfall intensity By comparison, Uniform Intensity = 0.2 in/hr

C.3.d Sizing Criteria Flow-based sizing criteria: Simplified Sizing Approach Variation of Uniform Intensity Method (0.2 in/hr) The surface area of a biotreatment measure is sized to be 4% of the contributing impervious area Based on a runoff inflow of 0.2 in/hr (assume equal to the rainfall intensity), with an infiltration rate through the biotreatment soil of 5 in/hr (0.2 in/hr 5 in/hr = 0.04) Conservative approach because does not account for surface ponding good for planning purposes

C.3.d Sizing Criteria Combination Flow & Volume Design Basis: Treatment systems can be sized to treat at least 80% of total runoff over the life of the project Option 1: Use a continuous simulation hydrologic model (typically not done for treatment measures) Option 2: Show how treatment measure sizing meets both flow and volume-based criteria Used for bioretention and flow-through planters Appropriate where drainage area is mostly impervious

Flow- or Volume-Based Sizing for Treatment Measures? Table 5-1 Flow and Volume Based Treatment Measure Sizing Criteria Type of Treatment Measure LID? Hydraulic Sizing Criteria Bioretention area Yes Flow- or volume-based or combination Flow-through planter box Yes Flow- or volume-based or combination Tree well filter Yes Flow-based Infiltration trench Yes Volume-based Subsurface infiltration system Yes Volume-based Rainwater harvesting and use Yes Volume-based Media filter No Flow-based Extended detention basin No Volume-based

Sizing Criteria Worksheets Appendix B of SCVURPPP C.3 Handbook Worksheets for determining water quality design flow and volume Figure B-1: Soil Texture and Mean Annual Precipitation (MAP) Depths Figures B-2 B-7: Unit Basin Storage Volume for 80% Capture (3 gages, 1% and 15% slopes) Figure B-8: Intensity-Duration-Frequency Curves for 50-year Return Period (4 gages)

Figure B-1: Soil Texture and Mean Annual Precipitation (MAP) Depth

Sizing Example #1 Parking lot in Santa Clara Area = 35,000 sq. ft. (0.80 acres) 100% impervious Slope = 1% Mean annual precipitation (MAP) = 15 inches 35,000 sq. ft. Use the sizing worksheets to determine Q BMP and V BMP Answer: V BMP = 1,819 cu. ft.; Q BMP = 0.103 cfs

Sizing Bioretention Facilities Simplified Sizing Approach Surface area is 4% of contributing impervious area Does not consider storage in surface ponding area Volume Based Approach Store V BMP in just surface ponding area Store V BMP in ponding area, soil media & drain rock Combination Flow and Volume Approach Compute both Q BMP and V BMP Route through facility, allowing ponding

Sizing Bioretention Facilities: Volume-Based Approach V 1 V 2 V 3

Sizing Bioretention Facilities: Volume-Based Approach Method 1: Store entire volume in surface ponding area V 1 Depth (ft) Porosity Volume per sq. ft. (cubic feet) 0.5 1.0 0.5 Surface Area = V BMP (cu.ft.) 0.5 cu.ft./sq.ft.

Sizing Bioretention Facilities: Volume-Based Approach Method 2: Store volume in ponding area and media V 1 V 2 Depth (ft) Porosity Volume per sq. ft. (cubic feet) 0.5 1.0 0.5 1.5 0.30 0.45 V 3 0.5* 0.40 0.20 Total 1.15 *Depth below bottom of underdrain Surface Area = V BMP (cu.ft.) 1.15 cu.ft./sq.ft.

Sizing Bioretention Facilities: Flow & Volume Approach Hydrograph Approach Runoff is routed through the treatment measure Assume rectangular hydrograph that meets both flow and volume criteria

Sizing Bioretention Facilities: Flow & Volume Approach 5 in/hr Determine V BMP Assume constant rainfall intensity of 0.2 in/hr continues throughout the storm (rectangular hydrograph) Calculate the duration of the storm by dividing the Unit Basin Storage by the rainfall intensity Calculate the volume of runoff that filters through the biotreatment soil at a rate of 5 in/hr over the duration of the storm and the volume that remains on the surface

Sizing Bioretention Facilities: Flow & Volume Approach 5 in/hr To start the calculation, you have to assume a surface area A S -- use 3% of the contributing impervious area as a first guess Determine volume of treated water V T during storm: V T = A S x 5 in/hr x duration (hrs) x 1 in/12 ft Determine volume remaining on the surface V S : V S = V BMP V T Determine depth D of ponding on the surface: D = V S A S Repeat until depth is approximately 6 inches

Sizing Example #1, continued Parking lot in Santa Clara Area = 35,000 sq. ft. (0.8 acres) 100% impervious V BMP = 1,819 cu. ft. UBS Volume = 0.63 in. 35,000 sq. ft. Use the combination flow and volume sizing worksheet to determine the bioretention surface area Answer: 1,000 sq. ft. (depth of 0.5 ft.)

Sizing Bioretention Facilities: Comparison of Methods Example: 35,000 sq. ft. parking lot in Santa Clara MAP= 15 inches, 100% impervious V BMP = 1,819 cu. ft. (80% of annual runoff) Sizing Method Surface Area (sq. ft.) Simplified Method (flow-based) 1,400 Volume ponded on surface 3,638 Volume stored in unit (V 1 +V 2 +V 3 ) 1,580 Combination flow & volume 1,000

Sizing Pervious Paving and Infiltration Trenches General Principles Store the WQD Volume in void space of stone base/subbase and infiltrate into subgrade Surface allows water to infiltrate at a high rate Any underdrains must be placed above the void space needed to store and infiltrate the WQD volume

Sizing Pervious Paving and Pervious Paving Infiltration Trenches May be self-treating area or self-retaining area (accept runoff from other areas) Can only be considered a pervious area if stone base/subbase sized to store the WQD volume Can work where native soils have low infiltration rates (stored water depths are relatively small) Surface area is usually predetermined Base and subbase thickness usually determined by expected traffic load and saturated soil strength Slope should be 1% (or use cutoff trenches)

Pervious Paving Typical Section Paving surface Bedding No. 8 stone 4 in. Base No. 57 stone Thickness varies Subbase No. 2 stone Base and subbase layers available for water storage Both typically have 40% void space

Pervious Paving Approach to Sizing Pervious Paving Self-Treating Check the depth of the WQD volume in base/subbase: UBS volume (in.) 0.40 = Depth (in.) Example: UBS volume = 1.0 in., depth = 2.5 in. (Minimum depth for vehicular traffic is 10 in.) Check the time required for stored water to drain: UBS Vol. (in.) Infiltration rate (in/hr) = Drain time (hrs) ( recommend < 48 hrs)

Pervious Paving Approach to Sizing Pervious Paving Self-Retaining Check the depth of the WQD volume in base/subbase: UBS volume (in.) 0.40 = Depth (in.) Example: UBS volume = 1.0 in., depth = 2.5 in. (Minimum depth for vehicular traffic is 10 in.) Check the time required for stored water to drain: UBS Vol. (in.) Infiltration rate (in/hr) = Drain time (hrs) ( recommend < 48 hrs)

Sizing Rainwater Harvesting Cisterns Rainwater Harvesting and Use Types of Demands Irrigation Toilet flushing Other non-potable Volume based sized criteria in C.3.d is 80% capture of the annual runoff Key concept is drawdown time Barriers: lack of plumbing codes, treatment, recycled water preference

Storage values are per one acre of impervious surface

Estimate Actual Demand Daily Use Rates for Toilets and Urinals 1 Land Use Type User Unit User Unit Factor 2 Residential Resident 2.9 residents per dwelling unit Daily Use/Unit (gal/day/unit) 8.6 Office or Retail Employee (non-visitor) 200 SF per employee 6.9 Schools Employee (not including students) 50 SF per employee 33.9 1 References: CCCWP Stormwater C.3 Guidebook, 6 th edition, 2012; BASMAA LID Feasibility Report, 2011; California Plumbing Code, 2010. 2 Use project-specific data if available

Example: 2-story Office Building 3,000 SF 10,000 SF (Interior floor area = 20,000 SF) 4,000 SF

Screening Worksheet Results Potential rainwater capture area = area of one building roof = 10,000 SF Convert to acres: 10,000 SF 43,560 SF/acre = 0.23 acres Demand for commercial building: Interior floor area = 20,000 SF Minimum floor area to meet toilet flushing demand = 70,000 SF per acre of impervious surface Minimum floor area for this project to meet demand = 70,000 SF/ac X 0.23 acres = 16,100 SF 20,000 SF > 16,100 SF Building will have minimum toilet flushing demand

Determine Building Toilet Flushing Demand Building interior floor area = 20,000 SF Estimate no. of employees: 200,000 SF 200 SF/employee = 100 employees 100 employees 6.9 gpd/employee = 690 gpd Convert to equivalent demand per impervious acre (to allow use of sizing curves): 10,000 SF roof area 43,560 SF/ac = 0.23 ac. 690 gpd 0.23 = 3,000 gpd per impervious acre

Determine Required Cistern Size From sizing curves, find right combination of drawdown time, tank size and required demand: 480-hr (20-day) drawdown 49,000 gallon tank 2,450 gpd 360-hr (15-day) drawdown 40,000 gallon tank 2,667 gpd 240-hr (10-day) drawdown 32,000 gallon tank 3,200 gpd 288-hr (12-day) drawdown 36,000 gallon tank 3,000 gpd Adjust tank size back to actual impervious area: 36,000-gallon tank per 1 acre impervious area 36,000 0.23 acres = 8,300-gallon tank

Sizing Non-LID Components Media Filters (cartridge type) Flow-based Treatment Measure Determine Q BMP From manufacturer s specifications, determine the design flow rate per cartridge Divide Q BMP by the cartridge flow rate to calculate the number of cartridges required (round up)

Sizing Non-LID Components High Flow Rate Tree Box Filters Flow-based Treatment Measure Determine Q BMP From manufacturer s specifications, determine the appropriate size of unit or combination of units A tree box filter that uses biotreatment soil can be sized like a bioretention area or flow-through planter

Sizing Non-LID Components Detention Basin Volume-based Treatment Measure (can only be used in treatment train) Determine V BMP Design outlet for 48-hour detention time If sizing for hydromodification management, use Bay Area Hydrology Model to determine size to meet HM standards

??? Questions??? Contact Information: Jill Bicknell 408-720-8811, X 1 jcbicknell@eoainc.com www.scvurppp.org