Wärtsilä modular power plant comprised of multiple ICE generating units provides output flexibility.



Similar documents
VS. INTERNAL COMBUSTION ENGINE GAS TURBINE WÄRTSILÄ TECHNICAL JOURNAL. Defining true flexibility. security. More power with less money

The Lodi Energy Center, owned

Fast cycling and rapid start-up: new generation of plants achieves impressive results

Low Load Operational Flexibility for Siemens G-class Gas Turbines

Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht

Natural Gas Conversions of Existing Coal-Fired Boilers

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

Steam Power Plants as Partners for Renewable Energy Systems

White paper Combustion engine power plants

SGT5-8000H SCC5-8000H 1S. Experience of Commercial Operation at Irsching 4. ANIMP-ATI, Sesto San Giovanni 26 June 2012

Applicazione di tecniche di controllo predittivo multivariabile ad impianti di produzione a Ciclo Combinato

Gas-Fired Power HIGHLIGHTS

Description of Thermal Oxidizers

HOW TO SELECT A LOW VOLUME (L.V ) BOILER

Source: EIA Natural Gas Issues and Trends 1998

GENERATION TECHNOLOGY ASSESSMENT

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

GE Energy LMS100. Flexible Power

Miglioramenti nella flessibilità dei cicli combinati: esperienze recenti di Ansaldo Energia. Alice Pesenti Federico Calzolari

SGT5-4000F Trusted Operational Excellence

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN

PI System O&M Management Tool in Power Generation Industry. 27 October Barış Başer O&M Group Manager

The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Combined Cycle Control Overview

Power Island. Industrial Power Plants. / energy

Continuous flow direct water heating for potable hot water

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Laws and price drive interest in LNG as marine fuel

GAS HEATING IN COMMERCIAL PREMISES

O&M and Lifecycle Management for CCGT Power Plants Flex Power Services Enhancing a plant s market capability

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

Tips for burner modulation, air/fuel cross-limiting, excess-air regulation, oxygen trim and total heat control

Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future

GLOBACON 05 HVAC Systems for Cogen

UNIT COMMITMENT AND ECONOMIC DISPATCH SOFTWARE TO OPTIMISE THE SHORT-TERM SCHEDULING OF ELECTRICAL POWER GENERATION

Energy Storage for Renewable Integration

DURR Thermal Oxidizer Research. 4/27/2004 Intel Corporation Community Meeting

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

Emissions from Traditional & Flywheel Plants for Regulation Services

The SGT5-8000H proven in commercial operation

QUADRANT SR- Thermal Oxidizer Process Design & Environmental Control Benefits for the Sand Coating Industries

Combined Heat & Power. Discussion with Connecticut Energy Advisory Board. February 23, 2010

Top Technology for Industry, Agriculture, Business and Communities

OVERVIEW OF GENERAL ELECTRIC S ADVANCED TURBINE SYSTEMS PROGRAM

Ansaldo Energia: la flessibilità operativa dei cicli combinati coniugata all efficienza energetica

Alain Nifenecker - General Electric Manager Controls Engineering

The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine

Technical Specification. Generating Set with Waukesha engine burning natural gas

OROT RABIN POWER STATION UNITS x 350 MW

SGT5-4000F Gas Turbine and Combined Cycle Power Plant Evolution reflecting the changing Market Requirements

HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS

Building Energy Systems. - HVAC: Heating, Distribution -

10 Nuclear Power Reactors Figure 10.1

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

Overview of Green Energy Strategies and Techniques for Modern Data Centers

Technologies for an Economic Low-Carbon Nuclear Renewables Grid: The Case of Firebrick Resistance-Heated Energy Storage (FIRES)

Half the cost Half the carbon

Princeton University Microgrid

INDEX GENERAL

Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards

Vogt Power Emission Control Solutions

Houweling s Greenhouse CHP Case Study

Concepts and Experiences with Capacity Mechanisms

Backup Fuel Oil System Decommissioning & Restoration Plan

F ox W hi t e Paper. Reduce Energy Costs and Enhance Emissions Monitoring Systems

Electricity Supply. Monthly Energy Output by Fuel Type (MWh)

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

Hybrid Power Generations Systems, LLC

Siemens Gas Turbines over 100 MW

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System

Rule EMISSIONS OF OXIDES OF NITROGEN FROM LARGE WATER HEATERS AND SMALL BOILERS

CHP Strategies and Options / Stored Energy ENERGY SYMPOSIUM April8, 2014 Reading Country Club

Ancillary Services and Flexible Generation

THERMAL POWER PLANTS Vol. III - Gas Turbines For Electric Power Generation - H.I.H. Saravanamuttoo GAS TURBINES FOR ELECTRIC POWER GENERATION

How To Evaluate Cogeneration

Making power plants energy efficient

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Power Generation Industry Economic Dispatch Optimization (EDO)

Senoko Power Station CCP2 performance increase with focus on efficiency. Answers for energy.

ELECTRICAL ENERGY REDUCTION IN REFRIGERATION AND AIR CONDITIONING Ken Landymore, Director of Operations, Smartcool Systems Inc.

Performance Monitoring For Gas Turbines

USBR PLEXOS Demo November 8, 2012

Originators of the Flexible Water Tube design

Gas Turbine Power COMPACT, EFFICIENT, RELIABLE

THM Gas Turbines Heavy duty gas turbines for industrial applications

Comparison of CO 2 Abatement Costs in the United States for Various Low and No Carbon Resources. Total System Levelized Cost Based on EIA LCOE

Industrial Waste Heat to Power Solutions

Steam turbines for solar thermal power plants. Industrial steam turbines. Answers for energy.

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

ABSTRACT DCMCCT PROJECT OVERVIEW

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

Transcription:

[ ENERGY / IN DETAIL ] [ ENERGY / IN DETAIL ] Wärtsilä modular power plant comprised of multiple ICE generating units provides output flexibility. Defining true flexibility a comparison of gas-fired power generating technologies AUTHOR: Dawn Santoianni Power plant flexibility the ability to rapidly adjust output up or down as demand and system loads fluctuate is recognized as a vital tool to manage variable renewable energy production and provide grid support services. Wärtsilä power plants set the standard for true flexibility due to their rapid startup time, fast ramping capability and modular design. 10 in detail Increasing penetration of variable renewable energy sources presents challenges for transmission grid operators to maintain electric reliability. The intermittency in wind and solar loads is managed with redundant generating capacity that can quickly respond to these fluctuations, and has predominately been served by coal and gas-fired units that are synchronized to the grid but operating at part load. Flexible power generation that can be rapidly brought online reduces the inefficiency of relying on part load operation. Two primary measures of flexibility are startup time and ramp rate. Transmission system operators define such quick-start or non-spinning reserve as generation capacity that can be synchronized to the grid and ramped to capacity within 10 minutes [1]. Whereas conventional steam cycle generators (based on the Rankine cycle) can take more than 12 hours to reach full load, gas turbines and internal combustion engines (ICEs) can be dispatched in

WÄRTSILÄ TECHNICAL JOURNAL 01.15 Load % Min. up-time: 0 min 100 100 90 90 80 80 70 2 min to full load 1 min full unloading 70 60 60 50 Non-spinning reserves Available in 30 sec & full output in 2 min Spinning reserves Ramp rate > 100%/min 50 40 No fuel consuption & no emissions No wear Frequency balancing 40 30 30 10 0.5 min to full Min. down-time: 5 min Min. load per genset: 30% (*) 10 syncronisation 1 2 3 / 0 1 2 3 5 5 6 7 8 mins Load % Cycle #1 Cycle #2 Wärtsilä 34 gas power plant (*) A power plant with e.g. 10 gensets can correspondlingly operate at 3% of its total nominal output. Fig. 1 Loading and unloading of a Wärtsilä 34 gas power plant. minutes. Startup time is a significant metric for flexibility, but comparison of different technologies and designs is complicated by the way startup time is measured by different manufacturers. The startup time quoted can be from push of the start command or from ignition. In the case of gas turbines, this difference in start definition can be as much as minutes. Further, it is important to differentiate between the ramp time to full load versus partial load. Gas turbine startup During startup, a gas turbine undergoes a sequence of increasing compressor spin to reach firing speed, ignition, turbine acceleration to self-sustaining speed, synchronization, and loading. There are numerous thermo-mechanical constraints during startup of the gas turbine, including limits on airflow velocity through the compressor blades to prevent stall, vibrational limits, and combustion temperature limits to prevent turbine blade fatigue, with the significant parameter being the turbine inlet temperature. In combined cycle operation, the heat recovery steam generator (HRSG) imposes additional thermal limitations, as the high temperature environment subjects HRSG components to thermal stress [2]. The HRSG is directly coupled to the gas turbine, so changes in turbine exhaust gases induce flow, temperature, and pressure gradients within the HRSG. These gradients must be carefully controlled to prevent adverse impacts such as material fatigue, creep (damage caused by high temperatures) and corrosion [3]. In addition, the steam turbine can restrict the gas turbine loading rate if the steam temperature leaving the HRSG exceeds steam turbine limits. To avoid this, the gas turbine is ramped to hold points (held at steady load) to allow steam temperatures and pressures to rise slowly within allowable material limits. It takes longer to start the HRSG and steam turbine from cold conditions than from hot conditions. The definition of hot conditions varies by manufacturer, but is generally defined as within eight (8) to 16 hours of HRSG shutdown. As a result, the amount of time elapsed since last shutdown greatly influences startup time. Once-through HRSGs are used by some manufacturers to overcome the startup thermal and pressure limitations that exist with steam drums. Combined cycle gas turbines (CCGTs) are also subject to purge requirements to prevent auto-ignition from possible accumulation of combustible gases in the gas turbine, HRSG and exhaust systems. The purge is required before the unit is restarted. Purge times depend on the boiler volume and air flow through the HRSG, and are typically set to about 15 minutes. This purge time adds to the overall start time. In order to enable faster startup and ramping, CCGT manufacturers have attempted to decouple the gas turbine startup from the HRSG and steam turbine warm-up. Bypass systems are used to isolate the steam turbine, ultra-low nitrogen in detail 11

[ ENERGY / IN DETAIL ] [ ENERGY / IN DETAIL ] oxides (NOx) combustion systems are used to reduce emissions while ramping, and attemperators maintain steam temperatures within appropriate limits [4]. A purge credit allows the system purge to be completed at shutdown, eliminating the requirement for a redundant purge at next startup [5]. The purge credit can only be used in some HRSGs that have no duct burners and where the gas turbine is fired on natural gas only. These improvements have resulted in higher CCGT ramp rates and startup times of about 30-35 minutes, about half the time for conventional hot start that would require purge and gas turbine holds. However, rapid cycling imposes increased CCGT maintenance costs [6]. In simple cycle, published start times for gas turbines are about 10 to 15 minutes. ICE startup An ICE power plant can start and ramp to full load very quickly due to rapid ignition of fuel within the cylinders and the coordinated starting of multiple generating sets. Wärtsilä ICE power plants employ high efficiency lean-burn technology that can reach full load in as little as two (2) minutes under hot start conditions. To meet hot start conditions, cooling water is preheated and maintained above 70 C, engine bearings are continuously prelubricated, a jack up pump supplies prelubrication to the generator bearings, and the engine is slow turning (cycling). The Wärtsilä 34SG power plant requires only 30 seconds to complete startup preparations, speed acceleration, and synchronization to the grid. Loading to full power occurs rapidly in just 90 seconds. Startup time is not affected by the amount of time the unit had been previously shut down. The Wärtsilä 50SG power plant takes seven (7) minutes to reach full load. Under cold startup conditions, the Wärtsilä 34SG power plant can reach full load in 10 minutes and the Wärtsilä 50SG in 12 12 in detail minutes. Flexicycle TM power plants offer advantages over CCGTs as sufficient steam pressure can be generated with only a subset of the engines operating. Rapid startup for flexible power generation Figure 2 shows a startup time comparison of the Wärtsilä 34SG and Wärtsilä 50SG power plants with simple cycle and combined cycle gas turbine plants from manufacturers GE, Alstom, and Siemens. All startup times are measured from operator initiation of the start sequence. As can be seen from the graph, Wärtsilä power plants provide quick start ability under 10 minutes, which meets system operator requirements. Unlike CCGTs, hot start conditions in a Wärtsilä power plant can be maintained regardless of how long the engines had previously been inactive. Ramp rate: how fast is fast? Because solar and wind generation can change within minutes, electric grid operators rely on dispatchable units that can provide additional load (or curtail load) on the same timescale as variations in renewable output. The increase or reduction in output per minute is called the ramp rate and is usually expressed as megawatts per minute (MW/min). Ramp rates of most industrial frame gas turbine models are advertised as 10 MW/min up to 100 MW/ min, with an average of about 25 MW/ min. Ramp rate depends on generating unit capacity, operating conditions (whether unit is just starting up or operating at a minimum load hold point) and optional technologies for reducing startup time and increasing ramp rate. The ramp rate of a gas-fired power plant also depends on the number of units and configuration. For example, a ramp rate of 100 MW/min is based on multi-turbine plant designs, such as a 2x1 CCGT (net power output of 750 MW) where each gas turbine is rated to ramp at 50 MW/min. While ramp rate in MW/ minute is a valuable metric, it is important to understand the operating conditions under which advertised ramp rates can be achieved. Starting loading capability versus ramp rate The starting loading capability is often quite different than the advertised ramp rate for gas turbines. Gas turbine ramp rates of 35 50 MW/min are achievable only after the unit has reached self-sustaining speed. The fastest loading gas turbine models produce 30 percent load delivery after 7 minutes and take nearly 30 minutes to reach full output under hot start conditions [7]. Wärtsilä 34SG engines have true quick start capability an effective ramp rate of 50 percent per minute, reaching full load within 2 minutes. For a 0 MW plant, this equates to 100 MW/min. The starting load delivery of Wärtsilä power plants and gas turbines is compared in Figure 3, showing the percentage of load delivered 7 minutes after startup. This assumes optional gas turbine technology for enabling fast loading and is based on manufacturer-published ramp rates. The fast startup time of Wärtsilä ICE provides a significant operational advantage over gas turbines. As gas turbines are just producing output, both the Wärtsilä 34SG and Wärtsilä 50SG engines have already reached full load. Operational ramp rates of Wärtsilä engines and the most popular industrial frame gas turbine models of similar size (0 MW) are compared in Figure 4, with ramp rate expressed in two metrics MW/ minute and percent of full load per minute. Once running and at nominal operating temperatures, Wärtsilä power plants can adjust output up or down rapidly. Wärtsilä power plants can ramp from 10 percent to 100 percent load (or down) in just 42 seconds. This means that a power plant comprised of 12 Wärtsilä 50SG engines has an effective operational ramp rate of 288

WÄRTSILÄ TECHNICAL JOURNAL 01.15 90 80 Percent (%) of full load 70 60 50 40 30 10 0 2 4 6 8 10 12 14 16 18 22 24 26 28 30 32 34 36 38 40 Time (minutes) Wärtsilä 34SG power plant under hot start conditions: 70 C cooling water temp, prelubrication of the engine and gen bearings Wärtsilä 50SG power plant under hot start conditions: 70 C cooling water temp, prelubrication of the engine and gen bearings Simple cycle industrial (heavy duty) gas turbine under hot start conditions: GE, Alstom GE FlexEffiency CCGT under hot start conditions: purge credit, Rapid Reaponse, startup within 8 hours of shutdown Siemens F-class CCGT under hot start conditions: auxiliary steam, stack dampers maintain HRSG temperature and pressure Fig. 2 - While combined cycle gas turbines can take over 30 minutes to start, Wärtsilä ICE power plants can start and reach full load in less than 10 minutes. 100 Starting loading rate Percent (%) of full load at 7 minutes 80 60 40 Wärtsilä V34SG Wärtsilä 32x18V50SG GE 7F-5 CCGT GE 7F-5 Simple Cycle Siemens F-Series CCGT Siemens F-Series Simple Cycle 0 Fig. 3 - Wärtsilä power plants have a rapid starting capability, delivering full load in 7 minutes or less. The effective starting ramp rate of gas turbines is much lower, delivering only partial load in that time. in detail 13

[ ENERGY / IN DETAIL ] [ ENERGY / IN DETAIL ] Operational ramp rate (% per minute) 140 00 80 60 40 Ramp rate Nominal 0 MW power plant Wärtsilä 22xV34SG Wärtsilä 12x18V50SG GE 7F-5 Siemens SGT6-5000F 0 100 0 300 400 Loading rate (MW/minute) Fig. 4- Wärtsilä engines have a significantly higher operational ramp rate than gas turbines of similar size. MW/minute significantly faster than a comparably sized gas turbine. Economies of numbers provides greater flexibility Over the course of a century, the trend in the electric power industry had been toward ever increasing generating unit sizes and plant capacities. Centralized power plants were built using custom-engineered technology of massive size. Conventional wisdom was that bigger is better as the capital costs per unit of capacity and production costs declined with increasing unit size, delivering economies of scale driven in part by improved steam turbine efficiencies. The push for higher outputs and efficiencies directly led to the development of combined cycle, necessitating larger gas turbines with higher firing temperatures that enabled exhaust gas heat recovery to drive a steam turbine. While in the 1950s the firing temperature of gas turbines was about 800 C and average turbine size was around 10 MW, by the 1990s advanced gas turbines averaged over 100 MW and had firing temperatures exceeding 1300 C. However, large gas turbines required considerable on-site construction and assembly, and could not easily adjust load to meet fluctuating demand. Modularized smaller-scale generating units operated in parallel and deployed as needed to match the 14 in detail changing power requirements began to serve an important function for the stability of electric transmission grids. This shift toward economies of numbers provides reliability, construction, and efficiency benefits. ICEs are ideally suited to modular use, as sets of 4 30 MW engine units can provide a range of incremental part load power without sacrificing efficiency. For example, a Wärtsilä power plant that has 28 modular Wärtsilä 34SG engine units, each sized at approximately 10 MW, can deliver a range of output from just a few MW to over 270 MW. Due to the modular design of Wärtsilä power plants and rapid startup, the engines can be loaded and unloaded individually. By operating only a subset of the engines at full load to produce the desired output, high efficiency is maintained. Modularity offers simplified maintenance features and quality benefits, as components are prefabricated in a factory-controlled environment and tested. Prefabricated power generation modules are selfcontained components of the system that are designed to interface with auxiliary power plant systems. As a result, the timeframe to plan, engineer and construct a power plant is shortened. Because generating units are incrementally sized, a wide range of plant capacities and fuel options including multi-fuel use can be designed. Expanding power needs in the future can be met with the addition of more engine units and ancillary modules, rather than the construction of a new power plant. Wärtsilä ICE modularity provides built-in redundancy in case of unit outages or maintenance without significantly affecting overall full plant output. Limitations to gas turbine flexibility Gas turbine power plants, which have traditionally required significant on-site assembly, have begun to be designed in a modular fashion to shorten construction time. Modularity in architecture provides limited operational flexibility for gas turbines, however. This is due to the size of units, small number of units, and efficiency tradeoffs for simple cycle versus combined cycle. Industrial gas turbines for power generation may be 100 350 MW apiece and have limits on the lower range of output at which they can operate. This minimal load, or turndown percentage, is bounded by emissions limits. When the gas turbine operates at low load, the compressor airflow may not be enough to support conversion of carbon monoxide (CO) into carbon dioxide (CO2) in the combustion chamber. Gas turbines are generally constrained to a turndown of 30 to 40 percent of full load to meet emissions regulations [8]. A simple cycle power plant with two gas turbines can

WÄRTSILÄ TECHNICAL JOURNAL 01.15 Load Coal power plants Gas generation Wind generation Plains End 1 & 2 power plants Flexible generation Fig. 5 - Screen shot from a dispatch center shows the drop off in wind generation (green line) and rapid ramp up of Plains End power plant to compensate. Compared to the fast ramping of the Wärtsilä plant, gas turbine output (purple line) increases more slowly (Source: Colorado Dispatch Center, Xcel Energy, USA). adjust plant output down to about 15 to percent of full load by operating only one turbine, but efficiency is limited to about 30 percent. Combined cycle operation introduces more complexity into the operating parameters of the gas turbine plant. Modular architecture for CCGT power plants consists of one to four gas turbines, HRSGs for each gas turbine, and a common proportionally-sized steam turbine. The lower load limit is affected by the turbine exhaust temperature, which must be high enough to generate sufficient steam pressure in the HRSG to power the steam turbine. Emissions-compliant turndown for CCGT plants is usually 40 to 50 percent of full load. For example, a combined cycle power plant design based on 0 MW gas turbines (in a 2x1 configuration) has a rated output of over 600 MW, limiting turndown ability to about 300 MW. In comparison, a Flexicycle power plant based on Wärtsilä ICEs does not have similar restrictions on load turndown because sufficient steam pressure can be developed by operating only 25 percent of the engines. Actual performance demonstrates true flexibility Wärtsilä ICEs are perfectly suited to cycling, as the ability to quickly startup and ramp up or down in load does not affect the maintenance schedule. In addition to a fast startup time, Wärtsilä engines can stop within one minute and have lower emissions due to lean-burn technology. The difference in performance between gas turbines and Wärtsilä power plants is evident in Figure 5, which presents a screen shot from an actual dispatch center in Colorado, U.S. The Plains End power plant units (red and white load curves) were used to compensate for a sudden drop off in wind output, rapidly starting and ramping to full load within minutes. By contrast, gas turbines (purple load curve) ramped up at a much slower rate from a low load. This underscores that advertised ramp rates and startup times do not always reflect operational capability, and illustrates the true flexibility provided by Wärtsilä power plants. References [1] Ellison, James F., Leigh S. Tesfatsion, Verne W. Loose, and Raymond H. Byrne. Project Report: A Survey of Operating Reserve Markets in U.S. ISO/ RTO-managed Electric Energy Regions. Rep. no. SAND12-1000. Sandia National Laboratories, Albuquerque NM. [2] Pasha, Akber, and Darryl Taylor. HRSGs for Next Generation Combined Cycle Plants. Power Engineering. PennWell Corporation, 01 July 10. Web. 27 Jan. 15. <http://www.power-eng.com/ articles/print/volume-114/issue-7/features/hrsgsfor-next-generation-combined-cycle-plants.html>. [3] Taylor, Darryl, and Akber Pasha. Economic Operation of Fast-Starting HRSGs. POWER Magazine. Access Intelligence, 01 June 10. Web. 27 Jan. 15. <http://www.powermag.com/ economic-operation-of-fast-starting-hrsgs>. [4] Strebe, Martin-Jan, and Arvo Eilau. The Evolution of Steam Attemperation. POWER Magazine. Access Intelligence, 01 Nov. 12. Web. 27 Jan. 15. <http://www.powermag.com/theevolution-of-steam-attemperation/>. [5] Moelling, David S., and Peter S. Jackson. Startup Puge Credit Benefits Combined Cycle Operations. POWER Magazine. Access Intelligence, 01 June 12. Web. 27 Jan. 15. <http://www.powermag.com/startup-purge-creditbenefits-combined-cycle-operations/>. [6] Lefton, Steven, Nikhil Kumar, Doug Hilleman, and Dwight Agan. The Increased Cost of Cycling Operations at Combined Cycle Power Plants. Tech. no. TP3. Sunnyvale, CA: Intertek, 12. [7] 7HA Gas Turbine (60 Hz). GE Power Generation. General Electric, n.d. Web. 27 Jan. 15. <https://powergen.gepower.com/plan-build/ products/gas-turbines/7ha-gas-turbine.html>. [8] Probert, Tim. Fast Starts and Flexibility: Let the Gas Turbine Battle Commence. Power Engineering International. PennWell Corporation, 06 Jan. 11. Web. 27 Jan. 15. <http://www. powerengineeringint.com/articles/print/volume-19/ issue-6/features/fast-starts-and-flexibility-let-thegas-turbine-battle-commence.html in detail 15