Using the Proxy NPV Model for Value-Based Strategic Decisions



Similar documents
Upstream Project Value, Farm-in, Farm-out, Data Room

Improving the Predictability of the CapEx Portfolio

OTC Managing the Cost & Schedule Risk of Offshore Development Projects Richard E. Westney Westney Project Services, Inc.

Buy-back Contract Risk Modeling Using System Dynamics

The Four Planes of Capital Projects

Technology based Project Management Consulting (T-PMC): Innovate to Reduce Costs

Subsea Market Review. Subsea 2011 February 9 10, Quest Offshore Resources, Inc. 1

Finance & Management. p. 79 to 84

How To Play Subsalt

Reliability Modeling Software Defined

There is a crisis in CAPEX management in the

Capital Project Execution Risk and Mitigating Strategies

Corporate Portfolio Management

OFFSHORE FIELD DEVELOPMENT

Total Subsea Solutions

Optimizing Mega Project Execution with Integrated Interface Management and Project Scheduling

EST.491. Cost Estimation Challenges and Uncertainties Confronting Oil and Gas Companies

Guidelines for FEASIBILITY STUDY

Acompany that consistently selects the right projects and

Contractual Allocation Of Risks / Insurance Requirement FPSO Projects Presentation Lillehammer Energy Claims Conference 2012

Industry Solution. Integrated Upstream Asset Management

Industry Solutions Mining Engineering Document Control and Project Collaboration Solutions for the Mining Industry Provide Flexibility and Simplicity

Industry Solutions Oil and Gas Engineering Document Control and Project Collaboration Solutions for Oil and Gas

EXAM EXEMPLAR QUESTIONS

Session #5 Capital Budgeting - II Damodaran - Chapter 9: 6,12,16,18 Chapter 10: 2,10,16(a&b) Chapter 11: 6,12,14

Risk Analysis and Quantification

Business Success through Excellence in Project Management (Better, Cheaper, Faster and Safer Projects)

Capital efficiency and execution. London, 7 February 2014 Margareth Øvrum, EVP, Technology, projects and drilling

Your asset is your business. The more challenging the economy, the more valuable the asset becomes. Decisions are magnified. Risk is amplified.

Project Management Professional PMP PMBOK 5

STOCHASTIC ANALYTICS: increasing confidence in business decisions

Economics Analysis on the Development of Nigerian Offshore Marginal Fields Using Probabilistic Approach

Commodity Price Risk Management (CPRM) - Trends and Challenges for Corporates

PROJECT RISK MANAGEMENT

These functionalities have been reinforced by methodologies implemented by several of our customers in their own portfolio optimization processes.

A Strategy for Driving Step Change. Richard E. Westney, Westney Consulting Group

Oil & Gas Valuation Methods with a focus onmonte Carlo Analysis

QlikView for Supply Chain. Chemical and Mill Products

ENERGY INC. Investment Project Analysis. Fisoye Delano

How To Calculate Discounted Cash Flow

The Value of Optimization in Asset Management

Industry Solutions Process Manufacturing Flexible and Agile Engineering Document Control for Efficient, Safe and Compliant Plants

SUPPLEMENTARY GREEN BOOK GUIDANCE

Capital Budgeting continued: Overview:(1) Estimating cash flows (2) CB examples (3) Dealing with uncertainty of cash flows

How To Make A High Co 2 Gas Blend

Oil and Gas Company Valuations

Tapping the benefits of business analytics and optimization

Competitive Edge through System Engineering

Strategy. Øivind Tangen. Group Strategy Director September 19, SBM Offshore All rights reserved.

In the business world, the rearview mirror is always clearer than the windshield. - Warren Buffett

Pandora FLNG Wison Offshore & Marine

Phase Separation Solutions Inc.

The Total Economic Impact Of SAS Customer Intelligence Solutions Intelligent Advertising For Publishers

DPL. Portfolio Manual. Syncopation Software, Inc.

Building Business Case for the Enterprise From Vision to Outcomes IIBA Boston Sept. 20, 2012 Joseph Raynus ShareDynamics, Inc.

To enable transport of wellstream over long distances. Compressor located by the wellheads.

Offshore Megaprojects - Why we fail and how to fix it

MODEC, Inc. Mid-term Business Plan May 2015

Strategy and Analysis in Using NPV. How Positive NPV Arises

Innovation Portfolio Management Process

Ten Steps to Comprehensive Project Portfolio Management Part 1 An Introduction By R. Max Wideman Introduction Project

CE2451 Engineering Economics & Cost Analysis. Objectives of this course

SSP Offshore. Well Containment. April 2011

Send your directly to

Module 10: Assessing the Business Case

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS

Course 3: Capital Budgeting Analysis

PRIVATE EQUITY INSIGHTS

Risk Management approach for Cultural Heritage Projects Based on Project Management Body of Knowledge

Frank P.Saladis PMP, PMI Fellow

5-Day Mini MBA for the Oil and Gas Industry

Executive Summary...2. Introduction...3. Definitions...3. Why Operational Performance Optimization...4

Project Risk Management Basics: Cost and Schedule Impacts

Engineering and Construction

INTEREST RATE RISK IN THE BANKING BOOK

Much attention has been focused recently on enterprise risk management (ERM),

CRM for Real Estate Part 2: Realizing the Vision

How To Profit From Oil And Gas

ORACLE S PRIMAVERA RISK ANALYSIS

Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) ext. 8779; FAX (514) ;

FRC Risk Reporting Requirements Working Party Case Study (Pharmaceutical Industry)

Combining decision analysis and portfolio management to improve project selection in the exploration and production firm

Project Management Plan Template

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

Transparency Market Research

IBM Algo Asset Liability Management

U.S. Shale Plays. After The Gold Rush: A Perspective on Future U.S. Natural Gas Supply and Price. Arthur E. Berman

Course Brochure. New York. Doha

Grabbing Value from Big Data: Mining for Diamonds in Financial Services

Options Are Good. A Treasury Perspective on Driving Value from Payments. Jody L. Lutz Senior Vice President PNC Treasury Consulting Group

Valuation of Your Early Drug Candidate. By Linda Pullan, Ph.D. Toll-free USA Worldwide

Transcription:

Using the Proxy NPV Model for Value-Based Strategic Decisions January 2011 Westney Consulting Group, Inc. www.westney.com

The Importance of Value-Based Development Decisions The Influence Curve has long been the foundation of best practice thinking for project development and the source of the industry s adherence to the concept of Front-End Loading (FEL). The best example of how operators make effective use of the early stages is the definition of alternative development schemes during FEL 2 (often called the select stage ), and the selection of the optimum scheme for definition during FEL 3 and eventual sanction. Although everyone knows the importance of defining and selecting the optimum development alternative, few operators do this well. Some spend too much time ( analysis paralysis ), some too little ( just pick a scheme and run with it.) Both are likely to end up with a less valuable asset (i.e., lower NPV) than might have been the case if the optimum development alternative had been selected. As projects have become larger and more complex, so too has the difficulty of the selection process. Maximizing value is clearly the goal, yet the way the variables that drive value interact under different development scenarios is not always intuitive or self-evident. Making the selection process more difficult still is the fact that different alternatives carry different levels of risk and uncertainty. A value-based approach is the only way to integrate all the project variables and provide a quantitative basis for decision-making. Using Net Present Value (NPV) as the metric for asset value, a value-based analysis can be applied to the evaluation of development alternatives so that the optimal development scheme can be selected. A Value-Based Approach to Decision-Making Mapping Value Assets and Drivers An upstream development typically has assets in the form of: Commercial and Financial Agreements Reservoir and Wells Production Facilities The value (NPV) of these assets is determined by the value drivers: costs, revenues, and timing. This is illustrated by the Value Matrix below. 2 Westney Consulting Group, Inc. www.westney.com

VALUE DRIVERS COSTS REVENUES TIMING AGREEMENTS ASSETS RESERVOIR & WELLS FACILITIES Each development alternative will have a unique Value Matrix. The project s NPV for each alternative is determined by how each of these assets impacts each of the value drivers. For example, Certain agreements might specify how costs and revenues are shared, as well as the required timing for first oil, or the expiration of a lease. The size, composition, and potential flow rates of the reservoir, as well as the number of wells, impact both development costs and revenues. The size of the facilities, and the timing of their engineering and installation, impact both cost and revenues. One can add value by improving the terms of agreements, increasing the definition or performance of the reservoir, or optimizing the facility design. Assessing Risks to Value Assets and Impacts on Value Drivers Development alternatives differ in another significant way: the sources and extent of the risks they present. These risks act upon the various assets and impact the value drivers of costs, revenues and timing. While there are many ways to categorize risks, Westney Risk Resolution uses the taxonomy shown below. These risk categories are described as follows: 1. Location Risks a) Geo-Political Risks these can be local or regional b) Regulatory Risks c) Local Conditions this addresses location related risks such as logistics, weather, labor supply etc. 2. Economic & Market Risks a) Project Cost Risks - this addresses how market conditions impact the capital cost of the facilities and drilling. b) Product Price this addresses how variations in the price of product impact project economics 3. Technical Risks a) Technology risks associated with new or significantly improved technology, or an existing technology being used under new conditions b) Completeness risks associated with how well the project scope and design has considered everything that could potentially be required Westney Consulting Group, Inc. www.westney.com 3

c) Definition risks associated with how well the expected facilities have been defined. 4. Organizational Risks: Governance & Competencies a) Owner s organization risks associated with the owner organization s ability to execute all aspects of the project. In JVs, this includes partner organizations as well. b) Owner team risks associated with the specific project team s (operator and partner) ability to execute all aspects of the project. c) Contractor risks associated with ability of the various contractors, selected or potentially selected, to execute the engineering, procurement, installation, and commissioning. Assessing Value Using the Proxy NPV Model How do risks interact with assets to determine value/npv and enable development alternatives to be accurately compared? The answer is with the Proxy NPV Model. The Proxy NPV Model, as the name indicates, is a project economic model built for use in making project decisions in which alternatives are compared based on their relative, riskinformed, NPV. It is a proxy model in that: It DOES NOT replace, duplicate or in any way substitute for the more complex and formal models the company s planning and economics function uses to determine the true value of the investment to the company. It DOES provide project organizations with: o A valid way to measure the relative value/npv of various development alternatives o A modeling capability so that all manner of planning and development decisions can be made based on their potential impact on value and risk o A planning capability to develop an accelerated path to sanction by knowing the most important areas to work on in order to maximize value and reduce risk. The Proxy NPV Model works on the principles illustrated below. $ + NPV REVENUES Production Availability Pricing TIMING Time to Sanction Time to Full Production Production Profile Cash flow COSTS ($) COSTS CapEx DrillEx OpEx REVENUES TIMING NPV 4 Westney Consulting Group, Inc. www.westney.com

On the left, we see a classic NPV curve showing the Value Drivers of Costs, Revenues, and Timing. These are inputs to the model, for each alternative. The chart on the right illustrates the fact that each of these Value Drivers has a risk profile which varies with each alternative. The combined effect of these risk profiles is a probabilistic view of NPV for each alternative. This probabilistic view is very important when decisions are being made as is illustrated by the chart below. Downside risk exposure Alternative A 0 Most Hurdle likely rate outcome $ NPV Alternative B 0 Hurdle rate Most likely outcome In the absence of a probabilistic view, Alternative A would appear to be preferred as it clearly has the higher most likely NPV. However, the probabilistic view shows that, Alternative A also has considerable downside risk, whereas Alternative B is almost certain to at least meet the hurdle rate. Which of these alternatives is the best choice? While there is no right answer, one might use the results of the analysis to develop ways to improve Alternative A so that its downside risk is reduced. The primary purpose of the model is a comparative analysis of alternatives. The illustration below shows how modeling results will be used to indicate how each alternative creates value and how the value created compares. Note how the band around each base value indicates the level of uncertainty; the wider the band, the greater the uncertainty. Note that the analysis is not intended to determine the correct choice; it is intended to provide value- and risk-informed information for executive decision-making. Alternative A Alternative B Alternative C Total CapEX($ billion) Notes: 1. Each alternative will be defined by: a. Reservoir Assumptions b. Field development parameters such as: Number of wells Wet or dry trees Type of floating production facility (e.g., SPAR, semi, FPSO) Production capacity Subsea production facilities (e.g., wells, manifolds, tie-back to host by others) Ancillary facilities such as pipelines or onshore processing c. Commercial, Financial, Operating Agreements Time to Full Production (months) Legend: Base P50 value for cost, time or NPV at given rate Range of possible outcomes left edge is P25, right edge is P75 NPV ($ billion) @ 10% Notes: 1. NPV can be calculated at WACC, hurdle rate, or any other rate 2. Input variables to Proxy NPV Model can be deterministic (single value assumptions) or stochastic (range of values with a probability distribution). Westney Consulting Group, Inc. www.westney.com 5

The second type of output from the model is an indication, for each alternative, of the relative contribution of each of the input variables to value and risk. The purpose is to indicate what areas need to be focused on in order to increase the Major Value Components vs. Impact on NPV value and reduce the risk of that alternative. This is illustrated by sample output shown here. Value Drivers (commercial, technical, etc.) This NPV tornado chart is very valuable in re-focusing the team; our experience indicates that the information is often not what the team had expected, and useful re-direction of effort occurs. It provides the basis for Westney s Front-End LEAN process, developing a plan for the balance of FEL 2 (Pre-FEED) and FEED that focuses on the main drivers of value and predictability. Mean PV10 Value P25 P75 Range for PV10 0 50 100 150 200 250 300 350 PV10, $MM Summary Strategic decisions are seldom self-evident or intuitively obvious for large, complex projects. The Proxy NPV Model provides a means to decide between alternatives by comparing a fully risked assessment of the economic value each one is likely to create. About Westney Consulting Group, Inc. Founded in 1978, Westney Consulting Group is internationally recognized for thought leadership in the risk management, strategic planning, and organizational effectiveness of large, complex engineering and construction projects. Based in Houston, Texas, the company advises owner/operator, developer, and financial executives in the energy, chemicals, mining & minerals industries. For more information visit our website at www.westney.com or call us at 713-861-0800 6 Westney Consulting Group, Inc. www.westney.com