Summary of Modifications/Changes in this Update



Similar documents
ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

Commissioning of Fire Protection and Life Safety Systems. Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA

Alexandria National Cemetery SECTION NETWORK ANALYSIS SCHEDULE

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Guide Specification SECTION COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

Building Commissioning

Energy Design Resources Commissioning Plan Outline Template

COMMISSIONING OF FIRE ALARM SYSTEMS

COUNTY OF EL PASO, TX REQUEST FOR BIDS Bus and Fleet Vehicle Maintenance and Repair Services (Supplement)

Project Closeout Module 1 Construction Closeout Checklist

SECTION MORTUARY REFRIGERATORS

SUBCONTRACTOR PRE-QUALIFICATION APPLICATION

ITEM DOCUMENT CONTROL MANAGEMENT DESCRIPTION:

ACG Commissioning Guideline

2015 CANADIAN ELECTRICAL CODE UPDATE TRAINING PROVIDER PROGRAM Guidelines

COMMISSIONING SUMMARY TEMPLATE

Commissioning of Mission Critical Facilities

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Guide to the Installer Application

B1 Project Management 100

APPENDIX B - Forms for Implementing EDI

Denver International Airport Data Center Commissioning Plan

Memorandum. Department of Veterans Affairs. Acting Deputy Senior Procurement Executive

Spec. Standard: 11/27/ Revision: 11/27/06

[Project Name] Project Human-Resource Management Plan. [Sub-Project, phase, etc.] [Company] [Company Address]

Section 100 Contractor Quality Control Program

Fire Alarm Systems Certification

PERFORMANCE AGREEMENT AND SURETY PROCESS FOR SUBDIVISIONS AND SITE PLANS

Maintenance quoting software with multi-point inspection integration and Appointment Scheduling

Certified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll

Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds

U.S. Department of Labor

Design Guidelines for Facilities Construction:

All other provisions of the contract documents, plans and specifications shall remain unchanged.

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

Request for Qualifications

Attachment 5 Electrical Engineering

HUMAN RESOURCES MANAGEMENT POLICY EMPLOYMENT PROCEDURE

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Notice: CAP publications and forms are available digitally on the National CAP website at: regulations/

What methods are used to conduct testing?

THIS IS NOT AN ORDER INVITATION TO QUOTE (ITQ) ITQ NO.: IQ9800-0/20 GOLF BALL RETRIEVAL SERVICES

Health Insurance Coverage, Poverty, and Income of Veterans: 2000 to 2009

SECTION SHEETING, SHORING AND BRACING

CalMod Design-Build Electrification Services

Department of Veterans Affairs

GREENBURGH CENTRAL SCHOOL DISTRICT No. 7 REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES

VDOT GOVERNANCE DOCUMENT

Peer Review Process Description

CITY OF BONITA SPRINGS, FLORIDA RFP #

RECORDS COMMISSION[671]

CSC-DIVISION 1-MASTER SECTIONS Description

1 RCNY CHAPTER 100

North American Electric Reliability Corporation. Compliance Monitoring and Enforcement Program. December 19, 2008

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

THE POLICY MYNIC BERHAD. All rights reserved.

Senior Security Analyst

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

Final Construction Quality Control Plan Non-Public Properties Newhall Street Neighborhood Site Hamden, Connecticut

AARP Medicare Supplement Program. Information Guide. Alabama Launch. 1 For internal use only

COUNTY OF PRINCE WILLIAM

maguilar\h:\agenda Items\2012\ CH Plumbing RFQ.doc\1-7

State of Ohio Model Bid/Quote Template for General Goods & Services (Non-IT)

Pricing of Construction Contract Change Order Documentation

Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

REQUEST FOR PROPOSAL

Developing a Proper Scope of Work, Request for Proposal & Commissioning Specification

NEW YORK CITY FALSE CLAIMS ACT Administrative Code through *

REQUEST FOR PROPOSALS For. Kelowna and Vernon Hospitals Project

SECTION WEB-BASED POWER MONITORING COMMUNICATIONS SYSTEM

GRAFIK 5000TM/6000 /7000TM System Onsite Startup

BOARD of TRUSTEES, Warwick Public Library, Warwick RI BIDS REQUESTED FOR. Bid #2015L-02 Security Services

Expedited Dispute Resolution Bond (P3 Form)

Agreement between Owner and Architect

Contractor Use of GSA Federal Supply Schedules

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

Summary of Changes. Throughout. Chapter 1

Peer Review Process Description

2015 PSEG Long Island Technical Assistance Program Partner Agreement:

14-ITN-001-KH Workforce Services IT Procurement Project Questions and Answers

What s the deal with all of these required price lists? *I-FSS-600 Amended 12/2/2013

The Life-Cycle of Commissioning for New Construction

Purchasing and Contracts Request for Proposal Procedure

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

MS ENVIRONMENTAL SCIENCE GRADUATE PROGRAM GUIDELINES FLORIDA GULF COAST UNIVERSITY DEPARTMENT OF MARINE AND ECOLOGICAL SCIENCES

Transcription:

Summary of Modifications/Changes in this Update This Summary of Changes is for information only. It is not a part of the referenced document, and should not be used for project documentation. U.S. Department of Veterans Affairs Office of Construction & Facilities Management DATE OF THIS VERSION (new) June 1, 2013 TITLE OF DOCUMENT (new title if applicable): DATE OF VERSION BEING SUPERSEDED (old): July 1, 2010 DESCRIPTION OF DOCUMENT (previous title, number, other identifying data): Commissioning of Electronic Safety and Security Systems, 28 08 00 SUMMARY OF CHANGES IN THIS VERSION: 1. Paragraph 1.5 changed to delete list of commissioned systems and make reference to list of commissioned systems in spec section 019100 General Commissioning Requirements. This was done to prevent confusion between two similar lists of systems. 2. Added Paragraph 3.1 Construction Inspections. Other paragraphs have been renumbered accordingly.

SECTION 28 08 00 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS SPEC WRITER NOTES: Delete between // --- // if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. The spec writer shall review the Physical Security Design Manual for VA Facilities to determine and include in this section any Mission Critical or Life Safety requirements called out. PART 1 - GENERAL 1.1 DESCRIPTION A. The requirements of this Section apply to all sections of Division 28. B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process. 1.2 RELATED WORK A. Section 01 00 00 GENERAL REQUIREMENTS. B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. 1.3 SUMMARY A. This Section includes requirements for commissioning the Facility electronic safety and security systems, related subsystems and related equipment. This Section supplements the general requirements specified in Section 01 91 00 General Commissioning Requirements. B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members. 1.4 DEFINITIONS A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions. 28 08 00-1

1.5 COMMISSIONED SYSTEMS A. Commissioning of a system or systems specified in Division 28 is part of the construction process. Documentation and testing of these systems, as well as training of the VA s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 and of Division 28, is required in cooperation with the VA and the Commissioning Agent. B. The Facility exterior closure systems commissioning will include the systems listed in Section 01 19 00 General Commissioning Requirements: 1.6 SUBMITTALS A. The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details. B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION 3.1 CONSTRUCTION INSPECTIONS A. Commissioning of Electronic Safety and Security systems will require inspection of individual elements of the electronic safety and security systems throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 19 00 and the Commissioning plan to schedule electronic safety and security systems inspections as required to support the Commissioning Process. 3.2 PRE-FUNCTIONAL CHECKLISTS A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot 28 08 00-2

check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents. 3.3 CONTRACTORS TESTS A. Contractor tests as required by other sections of Division 28 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days notice of testing. The Commissioning Agent will witness selected Contractor tests at the sole discretion of the Commissioning Agent. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing. 3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details. 28 08 00-3

3.5 TRAINING OF VA PERSONNEL A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 19 00. The instruction shall be scheduled in coordination with the VA Resident Engineer after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and Division 28 Sections for additional Contractor training requirements. ----- END ----- 28 08 00-4