Douglas Dangerfield. PE Chief Engineer NAVFAC Southeast douglas.dangerfield@navy.mil NAVFAC SE Naval Facilities Engineering Command Design Build Program
NAVFAC Facilities Engineering Command (FEC) Structure Europe/SWA NAVFAC EU & SWA Japan/ Far East NAVFAC NW NAVFAC MW Guam NAVFAC FE NAVFAC Marianas NAVFAC Wash NAVFAC Mid-Lant Hawaii NAVFAC Hawaii NAVFAC SW NAVFAC SE Caribbean 10 ECH IV Commands 2 NAVFAC SE
NAVFAC Southeast AOR IPT South Central Amarillo Lubbock Abilene El Paso Laredo Legend Austin IPT South Central IPT Gulf Coast IPT South Atlantic Reserve Centers Wichita Falls Austin San Antonio Fort Worth Harlingen Dallas/Ft. Worth Tyler Ingleside Corpus Christi Kingsville Orange Houston Galveston Huntsville Tuscaloosa Rome Columbus Shreveport Jackson Montgomery Albany IPT South Central Meridian Mobile Marietta Athens Atlanta Milton Stennis Baton Rouge Pensacola Panama City Gulfport Pascagoula Keesler New Orleans Tallahassee Greenville Augusta St. Petersburg Columbia Savannah Kings Bay Blount Island Mayport Jacksonville Tampa Sumter Charleston Beaufort Cape Canaveral Orlando Ft. Lauderdale IPT South Central Miami Key West West Palm Beach Andros GTMO Puerto Rico Isnor s Functional Maps 3 NAVFAC SE
PROGRAMS BY FEC Southwest, $1,184,332 Washington, $105,240 FarEast, $0 Hawaii, $49,207 Marianas, $947,042 Southeast, $202,176 Northwest, $241,052 MidWest, $7,957 Includes full cost of incrementally funded projects ($000) Mid-Atlantic, $1,143,706 4 NAVFAC SE
MILCON MCON/MCNR PNO APPROP Activity Name UIC INSTALLATION AUTH AMT STRATEGY 105 MCNR NAS CORPUS CHRISTI TX N00216 PARACHUTE & SURVIVAL EQUIPMENT SHOP $2,210,000 Design Build - One Step 196 MCNR HDQTRS 4TH MAW NEW ORLEANS LA M67021 VEHICLE MAINTENANCE FACILITY $4,240,000 Design Build - 8A MACC 006 MCON MCSF BLOUNT ISLAND M67695 PORT OPERATIONS FACILITY $3,760,000 Design Build - MACC 092 MCON NAVAL WEAPONS STATION CHASN N69214 MARITIME PRE-POSITIONING FLEET (MPF) SITE $920,000 Design Bid Build - 8A MACC 187 MCON NAVSTA MAYPORT FL N60201 CHANNEL DREDGING $46,303,000 Design Bid Build - MACC 273 MCON NAS WHITING FLD MILTON FL N60508 T-6B JPATS TRAINING OPS PARALOFT FACILITY $4,120,000 Design Build - MACC 360 MCON MCRD/BEAUFORT PI SC M00263 ELECTRICAL SUBSTATION AND SYSTEM UPGRADE $6,972,000 Design Build - Two Step 437 MCON NAS CORPUS CHRISTI TX N00216 OPERATIONAL FACILITIES FOR T-6, GOLIAD OLF $19,764,000 Design Build - Two Step 441 MCON MCAS BEAUFORT SC M60169 WIDE BODY AIRCRAFT FUEL LANE $1,280,000 Design Bid Build - 8A MACC 630 MCON NAS JACKSONVILLE FL N00207 P-8A (MMA) FACILITIES MODIFICATION $5,917,000 Design Build - MACC 724 MCON NAS PENSACOLA FL N00204 CORRY 'A' SCHOOL BACHELOR ENLISTED QUARTERS $22,950,000 Design Build - Two Step 777 MCON NAVSTA MAYPORT FL N60201 WHARF CHARLIE REPLACEMENT $29,682,000 Design Build - Two Step 782 MCON NAS PENSACOLA FL N00204 SIMULATOR ADDITION FOR UMFO PROGRAM $3,211,000 Design Build - 8A Sole Source 902F MCON NAS WHITING FLD MILTON FL N60508 F-35 HYDRANT REFUELING SYS, PH 1 (EGLIN AFB) $6,208,000 Design Bid Build - MACC 905F MCON NAS WHITING FLD MILTON FL N60508 F-35 JP8 WEST SIDE BULK TANK UPGRADES (EGLIN AFB) $621,000 Design Bid Build - MACC 906F MCON NAS WHITING FLD MILTON FL N60508 POL OPERATIONS FACILITY (EGLIN AFB) $2,056,000 Design Bid Build - MACC 907F MCON NAS WHITING FLD MILTON FL N60508 F-35 JP8 FLIGHTLINE FILLSTANDS (EGLIN AFB) $3,492,000 Design Bid Build - MACC 909F MCON NAS WHITING FLD MILTON FL N60508 F-35 PARALLEL TAXIWAY LADDER (EGLIN AFB) $931,000 Design Bid Build - MACC 918F MCON NAS WHITING FLD MILTON FL N60508 F-35 A/C PARKING APRON (EGLIN AFB) $11,252,000 Design Bid Build - MACC 925 MCON NAS WHITING FLD MILTON FL N60508 BEQ EOD SCHOOL, PHASE 2 $26,287,000 Design Build $202,176,000 OTHER APPROPIATIONS PNO APPROP Activity Name UIC INSTALLATION AUTH AMT STRATEGY 300V BRAC V NAVAL WEAPONS STATION CHASN N69214 CONSOLIDATED BRIG ADDITION $9,790,000 Design Build - Two Step 301V BRAC V NAVAL WEAPONS STATION CHASN N69214 SPAWAR DATA CENTER $9,670,000 Design Build - Two Step 521 DLA NAVSTA GUANTANAMO BAY N60514 REPLACE FUEL STORAGE TANK $12,500,000 Design Bid Build 0092 MCA NAVAL WEAPONS STATION CHASN N69214 (ARMY)-DEPLOYMENT STAGING AREA PAVING, FENCING AND LIGHTING $4,100,000 Design Bid Build - MACC 1492 MCA NAVAL WEAPONS STATION CHASN N69214 (ARMY)-RAILROAD TRACKS $12,000,000 Design Bid Build 1493 MCA NAVAL WEAPONS STATION CHASN N69214 (ARMY)-EXPAND FINGER PIER AND CONSTRUCT RAMPS $5,700,000 Design Bid Build - MACC 2557 MCA TAC SHAW AFB SUMTER SC J28100 HEADQUARTERS BUILDING, THIRD US ARMY-Incr 2 $55,000,000 Design Build - Incr 2 NULL MCAF BARKSDALE AFB LA J67100 Military working Dog Kennel $1,700,000 Design Build - 8A Sole Source 0003 MCAFR AFI KEESLER AFB BILOXI MS J25100 AERIAL PORT FACILITY $9,800,000 Design Bid Build - MACC $ 120,260,000 https://portal.navfac.navy.mil/portal/page/portal/navfac/navfac_forbusinesses_pp/smallbusiness/contract_listings/tab 5 NAVFAC SE
NAVFAC & Design Build *Why it s our default acquisition strategy* (DB=75%;DBB=25%) Single Source Accountability - Risk Fast delivery (award to occupancy) Cost - performance driven solutions offer savings; less cost growth after award Innovation allow DB to solve the problem; multiple solutions to choose from; doesn t restrict solution to preconceived notion Allows qualifying of contractors Administration cost less to administer contract 6 NAVFAC SE
Design Build - Concerns Minimize Cost of Proposals Multiple Award Construction Contracts Project Selection Limit Technical Proposal Requirements New Sustainable Design Requirements More technical analysis req d upfront Clients who want to maintain total control Requirements must be identified in RFP 7 NAVFAC SE
NAVFAC SE Headquarters, NAS Jacksonville Contractor: Haskell Construction 61,000 SF Administration Bldg Designed to LEED- NC Certified Level by Design-Builder Project is currently registered with USGBC to obtain Certification Certification being pursued by NAVFAC in-house team Raised Access Flooring; HVAC, Power, Data Grid-distributed power/communications Demountable Office Partitions, flexibility for future renovations Underfloor Air Distribution; maintain good IAQ, highly efficient ventilation, high level of thermal comfort Water efficient landscaping Day lighting of interior spaces 8 NAVFAC SE
P-8 (MMA) Hangar, NAS Jacksonville FL Contractor: Mortenson Construction / HNTB 277,000 SF w/1,126,000 SF of parking apron One of the largest hangars in the Navy Will initially house P-3 s and C-130 s until MMA;s (P-8 s) replace P-3 s Vertical lift fabric doors Translucent panels for walls/doors to increase natural light 9 NAVFAC SE
BIM Overview BIM = Building Information Modeling (3D Modeling) Process of generating and managing building data during the life cycle Covers geometry, spatial relationships, geographic information, quantities and properties of building components Facilitates exchange and interoperability of information in digital format NAVFAC BIM Solution for Design and Construction MUST be useable by Public Works for Operations and Maintenance, and feedback to Asset Management for full life-cycle functionality. Building Information Model (BIM) Roadmap Tri-Service CAD/BIM Technology Center assisting development Lessons learned from USACE BIM Roadmap experiences Much more work to implement this initiative! 10 NAVFAC SE
Early Contractor Involvement Federal Agencies: USACOE GSA DHS NAVFAC CM @ Risk = Early Contractor Involvement (ECI) Rule of Thumb: Use ECI when DB and DBB won t work Design-Bid-Build: If you have time to develop detailed design and you want to get it at the lowest price, use DBB (actually, the FAR demands it) Design-Build: If you know what you want (by at least the 35% design), you want it fast, and you re willing to take what is delivered in the end, use DB ECI: If you don t know what you want and you need it fast, ECI might be best 11 NAVFAC SE
Technical Evaluation Factors Corporate Experience and Qualifications Relevant Corporate Experience Narratives (minimum of two; maximum of five) Key Personnel Resumes (Design PM, Mechanical Engineer, Architect, Construction PM & Construction Superintendent). Design PM & Construction PM must have Design Build Experience. LEED Accreditation w/design Build Experience a plus. Past Performance Awards, letters of commendation, or evaluations for the same projects submitted under Corporate Experience. Must provide copy of award, letter or evaluation. Safety Safety Awards for past 5 yrs Safety Citations for past 5 yrs w/explanation Experience Modification Rate (EMR) from insurance agent If EMR unavailable, explain why, and submit OSHA DART rate for past 5 yrs Conceptual Drawings Floor Plan, Elevations, Site Plan, Bldg Perspective, Space Tabulation Design Build to Budget If necessary, exercise Feature and/or Square Footage Reductions based on RFP direction to ensure Proposed Price is within Budget Sustainable Design Scorecard to meet USGBC LEED Silver Requirement EPact 2005 Energy Efficiency Narrative Whole Bldg Energy Simulation per Option 1 of LEED Reference Manual Emphasis: Energy Efficiency and Reduced Environmental Impacts 12 NAVFAC SE
3 rd Army Command and Control Facility Shaw AFB Contractor: Caddell Construction / LS3P 321,230 GSF Two story Planned occupancy: 1477 Operation of facility: 24 hours / day 7 days / week Steel Frame; Precast panel exterior; TPO roof LEED Silver Date of occupancy: March 2011 13 NAVFAC SE
3 rd Army Command and Control Facility Shaw AFB Contractor: Caddell Construction / LS3P Essentially square footprint Covered entry portico accents the primary entries Central energy plant and service access at the back portion of the building Interior is organized by a framework of sky lighted atria which provide for circulation and natural light. The atria are to provide a front door to each department There are six passenger elevators plus 1 freight elevator the roof) Natural light supplements lighting in work areas 14 NAVFAC SE
3 rd Army Command and Control Facility Shaw AFB 15 NAVFAC SE
Questions 16 NAVFAC SE