This example of a completed sampling plan worksheet has been included to illustrate the information



Similar documents
New Jersey Sludge Sampling and Analytical Guidance Document

DATA QUALITY OBJECTIVES

1 Quality Assurance and Quality Control Project Plan

Biosolids 101 Roadmap of Oregon s Biosolids Program

Worksheet for Calculating Biosolids Application Rates in Agriculture

Biosolids Management Plan Template

GUIDELINES FOR USE BY CLASS A LICENSEES IN MEETING SNP REQUIREMENTS JULY 1996

QUALITY ASSURANCE / QUALITY CONTROL POLICY BREG SOIL AND WATER QUALITY LABORATORY UNIVERSITY OF DELAWARE

Cambridge Wastewater Treatment Facility

Water and Wastewater. Sample Collection and Analysis

Appendix D lists the Field Services Standard Operating Procedures. Appendix E lists the Biological Monitoring Standard Operating Procedures.

Sample Management SOP 2v8 Page 1 STANDARD OPERATING PROCEDURE NO. 2 SAMPLE MANAGEMENT REVISION LOG. Revision Number Description Date

RESIDENTIAL TREATMENT SYSTEMS

Laboratory analysis for wastewater treatment, industrial monitoring, and environmental protection

Environmental Technology March/April 1998

WASTEWATER TREATMENT OBJECTIVES

ST. CLOUD TECHNICAL AND COMMUNITY COLLEGE HAZARDOUS WASTE PROCEDURE

Introducing an All New Line of Cleaning Chemicals

Dimethylglyoxime Method Method to 6.0 mg/l Ni TNTplus 856

When Completed - Fax to (410)

Standard Operating Procedure for Total Kjeldahl Nitrogen (Lachat Method)

The ECN Concept for Quality Assurance of Compost

Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009

FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS

Wastewater(Solids(Management(( 2(Atlantic(Canada(Perspective( Dwayne(Doucette,(MASc.(P.Eng.((( June(19,(2013(

MUNICIPAL NPDES PERMIT. issued to. Facility ID: Permit ID: CT Permit Expires: September 20, 2011

Composition of Fecal Waste from Commercial Trout Farms in Ontario: Macro and Micro Nutrient Analyses and Recommendations for Recycling

Removing Heavy Metals from Wastewater

Metal Ion + EDTA Metal EDTA Complex

NPDES Permit No. IL Notice No. AAH: ajo. Public Notice Beginning Date: April 28, Public Notice Ending Date: May 30, 2011

NPDES Permit No. IL Notice No. IL TTL. Public Notice Beginning Date: June 15, Public Notice Ending Date: July 16, 2012

NEVADA CITY WASTEWATER TREATMENT INQUIRY

NPDES Permit No. IL Notice No. SKT: bah. Public Notice Beginning Date: April 9, Public Notice Ending Date: May 9, 2014

FACT SHEET STATEMENT OF BASIS HARLEY DOME 1 PRODUCED WATER TREATMENT FACILITY UPDES PERMIT NUMBER: UT NEW PERMIT MINOR INDUSTRIAL

Determining the Quantity of Iron in a Vitamin Tablet. Evaluation copy

UNITED STATES CONSUMER PRODUCT SAFETY COMMISSION DIRECTORATE FOR LABORATORY SCIENCES DIVISION OF CHEMISTRY 5 RESEARCH PLACE ROCKVILLE, MD 20850

WATER EFFLUENT AND SOLID WASTE CHARACTERISTICS IN THE PROFESSIONAL CAR WASH INDUSTRY. A Report for the International Carwash Association

Application Form 2E. Facilities Which Do Not Discharge Process Wastewater

Town of New Castle Utility Department Introduction

SCP SCIENCE Certified Reference Materials. Materials

Rapid Thermophilic Digestion Technology

Texas Commission on Environmental Quality

APPLICATION OF ICP-MS TECHNOLOGY FOR TRACE METALS ANALYSIS

To meet our acceptance criteria, we may require you to partially treat your wastewater before it discharges to sewer.

TEST REPORT Job No./Report No TR Date:12 June 2014 Page 1 of 5

CHAPTER 5 - WASTEWATER TREATMENT FACILITIES

Target Mole Lab. Mole Relationships and the Balanced Equation. For each student group Hydrochloric acid solution, HCl, 3 M, 30 ml

EXISTING WASTEWATER TREATMENT FACILITIES

Description of the Water Conserv II Facility

Here are some hazardous wastes commonly generated by the marina industry:

PROPAK AquaBio Complete Water Restoration Systems

EXISTING WASTEWATER TREATMENT FACILITIES

Characterizing Beauty Salon Wastewater for the Purpose of Regulating Onsite Disposal Systems

A Guide to Analytical Laboratory Services

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN SLUG CONTROL PLAN

A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER

Determination of a Chemical Formula

Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key

CALL FOR OFFER. Győr Distillery Co. Ltd. (H-9027 Győr, Budai u. 7.) hereinafter referred to as Investor calls for offers in subject matter below

Heavy Metal Analysis for the Toy Industry by Inductively Coupled Plasma Optical Emission Spectroscopy

Importance of Proper Sampling and Preservative Techniques Analysis dependent upon quality of sampling procedure Eliminate contamination Poor sampling

A Low Cost Chemical Remediation Technology for Heavy Metals in Shipyard Stormwater. SBIR Topic N06 133

Operation and Maintenance of Onsite Waster Systems in Maryland. A growing challenge for the industry and regulators

Beware that ordinary prescription glasses do not provide adequate protection. This is also true with poorly fitting safety glasses.

Cadmium Reduction Method Method to 30.0 mg/l NO 3 N (HR) Powder Pillows or AccuVac Ampuls

Iron and Steel Manufacturing

ANALYTICAL REPORT LABORATORY DETAILS. Telephone Facsimile . SGS Reference Report Number Date Reported Date Received

Lead Testing and On Site Calibration for Water Testing Detection Range: 2 100ppb

GUIDELINES FOR LEACHATE CONTROL

Minnesota. BMI Project No. M

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and

Nutrient Removal at Wastewater Treatment Facilities. Nitrogen and Phosphorus. Gary M. Grey HydroQual, Inc X 7167

William E. Dunn Water Reclamation Facility. Facility Overview & Information

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

AP ENVIRONMENTAL SCIENCE 2007 SCORING GUIDELINES

The Texas A&M University System Environmental, Health & Safety Special Thanks to Koch Industries, Wichita, KS

OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY WATER POLLUTION CONTROL FACILITY PERMIT EVALUATION. July 12,2012

Solid Waste Treatment Facility Solid Waste Permit Application

OPTIMIZING BIOLOGICAL PHOSPHORUS REMOVAL FROM AN SBR SYSTEM MIDDLEBURY, VT. Paul Klebs, Senior Applications Engineer Aqua-Aerobic Systems, Inc.

The Analytical Balance

NPDES Permit No. IL Notice No. JCH: bah. Public Notice Beginning Date: November 27, Public Notice Ending Date: December 27, 2012

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM

Particularly Hazardous Substances (PHS) Standard Operating Procedure (SOP)

Quality requirements and quality assurance of digestion residuals in Germany


Water Quality Protection Guidelines No. 5. Mining and Mineral Processing. Minesite water quality monitoring

Ion Selective Electrodes

PRETREATMENT TECHNICAL DATA SHEET WATER EMULSIFIABLE RUST PREVENTATIVE PRODUCT DESCRIPTION

State Water Resources Control Board Environmental Laboratory Accreditation Program

Household Acids and Bases

Brewery Wastewater: 2010 Water and Wastewater Conference Page 1

Transcription:

APPENDIX B EXAMPLE OF A COMPLETED SAMPLING PLAN WORKSHEET This example of a completed sampling plan worksheet has been included to illustrate the information necessary to document a sampling program for demonstrating compliance with the federal 503 land application requirements. In this example, Attachment A has been developed from information contained in Appendix D and Attachment B has been developed from information in Appendix H.

This page is intentionally blank.

The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans 1. General Facility Information: SAMPLING PLAN WORKSHEET (Please provide attachments as needed) Facility Name: Example Wastewater Treatment Facility Phone: (123) 456-7891 Street Address: 10 Example Road City: Example State: EX Zip: 12345 2. Contact Person: John Example Name: John Example Title: Chief Operator Phone: (123) 456-7891 Street Address: 10 Example Road City: Example State: EX Zip: 12345 3. Sampling Plan Objective(s): (For explanation, see Chapter 3) Provide a statement that describes the goals of the sampling program. To demonstrate compliance with Federal Part 503 requirements for the land application of sewage sludge. 4. Facility Information: (See Chapter 4) A. Provide a brief general description of your facility. (Example: conventional activated sludge treatment with anaerobic digestion) Extended aeration facility B. Design Flow (MGD): 1.0 Average daily flow (MGD): 0.75 Previous Year s Annual Sludge Production (dry metric tons): 175 C. Briefly describe the screening, grit removal, and flow equalization process employed at your facility. Pretreatment includes a bar rack and comminutor B-1

Appendix B: Example of a Completed Sampling Plan Worksheet D. Describe the industrial pretreatment program, including a list of permitted facilities, the nature of their discharge, and the local limits to which they are subject. Permittee s Name Example Plating, Inc. Example Foods, Inc. Permitted Pretreatment Facilities, Flow, Monitoring, and Local Limits Type of Discharge Electroplating Food processing Avg. Daily Discharge (gal.) 3,000 10,000 Monitoring Frequency Quarterly Quarterly Local Limits Avg. Max Daily Analyte (mg/l) (mg/l) Total CN Cu Ni Cr Zn Pb Cd Total Metals TTO BOD 5 TSS ph (SIU) 1.9 4.5 4.1 7.0 4.2 0.6 1.2 10.5 4.57 500 50 9.0 1.0 2.7 2.6 4.0 2.6 0.4 0.7 6.8 -- 200 30 7.5 E. Describe any treatment processes (such as advanced treatment for nutrient removal) that may affect sludge quality. No advanced treatment or special processes that influence sludge quality or quantity F. Describe the source and generation of solids. Does the sludge contain primary solids? What is the schedule and rationale for wasting of secondary sludge? How are solids stored? What is the dewatering method and what chemicals are used in the dewatering process? The only source of solids is from the final clarifiers. There is no primary sludge. Sludge is wasted to a sludge holding tank on a daily basis. About 10,000 gallons are wasted from the system once per day to maintain a MLSS of 2000 mg/l. in the aeration basins. The sludge holding tank is used to store and thicken sludge prior to dewatering. Sludge is dewatered on a 1.5-meter belt filter press using polymer and lime. Dewatering is done during an 8-hour shift, five days per week. G. How is the sludge treated to achieve pathogen reduction and vector attraction reduction? To achieve pathogen reduction, this facility uses EPA Class B alternative 2, Processes to Significantly Reduce Pathogens (PSRP), specifically 40 CFR Part 503.32(b)(3) Appendix B, A.5. Lime stabilization. Vector attraction reduction (VAR) is accomplished by VAR alternative 6, specifically 40 CFR Part 503.33(b)(6), lime stabilization. H. How will the material be used or disposed of? Land application to corn and hay fields B-2

The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans 5. Data Quality Objectives: (See Chapter 5 and Appendix D) A. List the analytes for which testing is required. For land application under Part 503, testing would include the analytes in Attachment A B. What analytical methods are required? See Attachment A C. Specify the required quality assurance and quality control for each analytical. For the metals shown in Attachment A, SW-846 Method 7000A specifies the QA/QC requirements. These requirements should be met along with any QA/QC requirements imposed by the specific analytical. D. What type of samples will be collected (grab or composite)? If a composite sample is collected, how many grab samples will be collected and what will be the interval between grabs? What will be the sample size? For each sampling event involving metals and nitrogen, 8 grab samples (approximately 200 ml) collected 1 hour apart will be mixed to form a composite sample. Based on federal requirements, this facility must test for metals at least once per year. To ensure compliance and public acceptance, metals samples will be collected quarterly. Also, one duplicate sample will be collected each quarter. For ph analysis, two grab samples will be collected. One sample will be collected at the beginning of a dewatering shift and the other at the end. Both samples will be analyzed in the following manner. A portion of the sample will be analyzed immediately after collection to establish an initial ph. After two hours, a second portion of the sample will be tested for ph to document that pathogen reduction has been achieved. A final portion will be analyzed 22 hours later to demonstrate VAR. B-3

Appendix B: Example of a Completed Sampling Plan Worksheet 6. Sampling Points: (See Chapter 6) Provide a detailed description of all sampling points along with the rationale for their selection. Samples will be collected as sludge falls from the belt filter press into roll-off container below. Please see pictures below. Picture 1. Belt Filter Press/Sampling Point Picture 2. Closer View of Sampling Point Picture 3. Close-up of Sampling Point B-4

The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans 7. Sample Collection Procedures: (See Chapter 7 and Appendix H) Please provide a detailed standard operating procedure (SOP) describing the process used for collecting samples. The step-by-step description should include all details pertaining to sample collection, including a description of the cleaning and preparation procedures for sampling equipment and sample containers. See Attachment B 8. Sampling Handling Procedures: (See Chapter 8 and Appendix D, H, and J) Describe the post-collection sample handling procedures employed to maintain sample integrity. This description should explain how the samples will be preserved and transported, what the appropriate hold-time is for each analysis, and whether a chain-of-custody is required. See Attachment B 9. Evaluation for Completeness: (See Chapter 9) Describe the process to be used for evaluating the completeness of the sampling effort. Criteria for evaluation might include: Were the goals of the sampling program met? Were data quality objectives achieved? Do the data quality objectives or SOPs need to be revised? In January of each year in preparation for reporting under Part 503, the previous year s sampling efforts will be evaluated. The following criteria will be evaluated: 1) Was all required sampling performed? 2) Were data quality objectives met? a) analytical protocols b) detection limits c) reporting units d) Analytical QA/QC e) Field QA/QC 3) Were required sample handling and preservation procedures followed? 4) Were the SOPs used and followed? 5) Were SOPs adequate or are revisions necessary? 6) Were record-keeping and reporting procedures adequate? B-5

Appendix B: Example of a Completed Sampling Plan Worksheet 10. Record-Keeping and Reporting: (See Chapter 10) Provide a description of record-keeping procedures. The description should explain what information will be retained and for how long, how the information will be stored, and what records are required to be reported. The facility has developed a database that includes the following data: Date of sample Sample Tracking for Metals and Nitrogen Samples Time of Collection for Each Grab Time of Collection of Composite Date Received by Lab Date Analyzed Date Reported by Lab 1. 2. 3. 4. 5. 6. 7. 8. Date of sample Sample Tracking for ph Samples (In-house testing) Time of Collection Time of Analysis Initial ph ph after 2 hrs. ph after 22 hrs. ph Time of Analysis ph Time of Analysis ph The following analytical records will be kept. Concentration Sample Date As Cd Cu Pb Hg Mo Ni Se Zn TKN NH 3 NO 3 The above records along with the individual sample custody sheets will be kept for five years. B-6

The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans ATTACHMENT A FEDERAL SLUDGE ANALYTICAL REQUIREMENTS Required Analytical Sample Handling Analyte Methods Required Detection Limits Required QA/QC Container Preservation Arsenic AA Furnace SW-846 Method 7060 AA Gaseous Hydride SW-846 Method 7061 At a minimum 20 mg/kg, 6 mon. hold time Inductively Coupled Plasma SW-846 Method 6010 Cadmium AA Furnace SW-846 Method 7131 AA Direct Aspiration SW-846 Method 7130 At a minimum 20 mg/kg, 6 mon. hold time Inductively Coupled Plasma SW-846 Method 6010 Copper AA Furnace SW-846 Method 7211 AA Direct Aspiration SW-846 Method 7210 At a minimum 200 mg/kg, 6 mon. hold time Inductively Coupled Plasma SW-846 Method 6010 ATTACHMENT A FEDERAL SLUDGE ANALYTICAL REQUIREMENTS Page 1 B-7

Appendix B: Example of a Completed Sampling Plan Worksheet ATTACHMENT A FEDERAL SLUDGE ANALYTICAL REQUIREMENTS Required Analytical Required Sample Handling Analyte Methods Detection Limits Required QA/QC Container Preservation Lead AA Furnace SW-846 Method 7421 AA Direct Aspiration SW-846 Method 7420 At a minimum 100 mg/kg, 6 mon. hold time Inductively Coupled Plasma SW-846 Method 6010 Mercury Cold Vapor (manual) SW-846 Method 7470 SW-846 Method 7471 At a minimum 5 mg/kg, 28 days hold time AA Furnace SW-846 Method 7481 Molybdenum AA Direct Aspiration SW-846 Method 7480 Inductively Coupled Plasma SW-846 Method 6010 At a minimum 35 mg/kg, 6 mon. hold time Nickel AA Direct Aspiration SW-846 Method 7520 Inductively Coupled Plasma SW-846 Method 6010 At a minimum 50 mg/kg, 6 mon. hold time ATTACHMENT A FEDERAL SLUDGE ANALYTICAL REQUIREMENTS Page 2 B-8

The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans ATTACHMENT A FEDERAL SLUDGE ANALYTICAL REQUIREMENTS Required Analytical Required Sample Handling Analyte Methods Detection Limits Required QA/QC Container Preservation Selenium AA Furnace SW-846 Method 7740 AA Gaseous Hydride SW-846 Method 7741 At a minimum 10 mg/kg, 6 mon. hold time Inductively Coupled Plasma SW-846 Method 6010 Zinc AA Direct Aspiration SW-846 Method 7950 Inductively Coupled Plasma SW-846 Method 6010 At a minimum 100 mg/kg, 6 mon. hold time ph EPA-9045 SM-4500-H + Not applicable Per 24-hours Total Kjeldahl Nitrogen (TKN) SM-4500-N org EPA-351.3 Not applicable Per 28-day hold time Ammonia Nitrogen (NH 3 -N) SM-4500-NH3 SW-846 Method 9200 Not applicable Per 28-day hold time Nitrate Nitrogen (NO 3 -N) SM-4500- Not applicable Per 28-day hold time ATTACHMENT A FEDERAL SLUDGE ANALYTICAL REQUIREMENTS Page 3 B-9

Appendix B: Example of a Completed Sampling Plan Worksheet ATTACHMENT B SLUDGE SAMPLING PROCEDURE 1. A week to several days prior to the proposed sampling, confirm or schedule sludge processing (dewatering and treatment) to ensure that sludge in the appropriate form (liquid versus dewatered, untreated cake versus treated biosolids) is available for sampling at the proposed date, time, and sampling point. 2. A week to several days prior to the proposed sampling date, schedule/confirm that contract lab performing the analyses is ready and willing to accept samples on the proposed sampling date. 3. At least one day before collecting samples, assemble the equipment necessary to accomplish the proposed sampling. Ensure that all equipment is clean and in good working order (see attached checklist and cleaning procedure). 4. On the day of sampling, obtain ice for sample storage and transportation and place in sample coolers. 5. After arrival in the dewatering room, evaluate dewatering operations. Any observable deviations from normal operation should be noted prior to collecting samples. 6. Put on nitrile gloves and any other required/desired personal safety equipment. For Metals and Nitrogen: 7. To collect a composite sample for metals, TKN, NH 3, and NO 3 analyses, take the first of 8 grab samples from the belt filter press as biosolids fall into the roll-off container. All grab samples should be collected using a 500 ml Teflon beaker and a stainless steel trowel, and should be approximately 200 ml in volume. After collecting each grab sample, place the sample in the stainless steel bucket and record the time of collection. Wait one hour and collect the next grab sample. Repeat the process until all eight grab samples are collected. Between collecting of grab samples, the previously collected material should be kept cool (at or around 4 degrees Celsius). Ensure that any required or planned field duplicates or blanks are also collected. 8. Once the last grab sample has been collected, thoroughly mix all material accumulated in the stainless steel bucket using a stainless steel trowel. The goal of the mixing process is to produce a homogeneous sample. After the material is completely mixed, record the current time as the composite sample collection time. 9. After mixing, label all sample containers with the following information: a) Sample Identification (ID) Number b) Date and time of collection c) Sample location d) Person collecting sample e) Preservative f) Required test(s) B-10

The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans 10. After labeling, fill each individual sample container with portions of the homogenized sample within the stainless steel bucket. 11. After each sample container is filled, seal it with a signed custody seal and place on ice in a cooler for transportation to the laboratory. 12. Prior to delivering the samples to the lab, complete a chain-of-custody form to document proper sample handling. 13. After sample delivery, clean all equipment according to established procedures and store in a clean, dry area (see below). For ph sampling: 14. To collect ph samples, collect one grab sample of about 400 ml in a glass beaker at the beginning of a dewatering shift and another grab sample at the end of the shift. A field duplicate should be collected for every twenty samples. 15. Record the time of collection for each sample and label each beaker with the date and collection time. 16. Analyze each sample three times to demonstrate pathogen reduction and vector attraction reduction (VAR). Samples should be stored at 4 degrees Celsius between analyses. B-11

Appendix B: Example of a Completed Sampling Plan Worksheet 1) Protective Gear a. Nitrile gloves b. Tyvek sleeves EQUIPMENT CHECKLIST 2) Sample handling and collection a. Stainless steel bucket b. 500 ml Teflon beaker c. Stainless steel trowel d. 500 ml glass beaker (2) 3) Transporting and preservation a. Sample containers 1) For metals and nitrogen: use containers provided by the contract lab. 2) For ph: use beakers prepared in-house according to established cleaning procedures. b. Sample cooler Obtain sample cooler from contract lab. Ice can be purchased locally. 4) Sample ID and Documentation a. Markers and pens b. Sample container labels c. Custody seals d. Chain of custody/sample submittal form e. Field notebook/sample log/data sheet 5) Cleaning equipment a. Disposable towels b. Soap c. Scrub brush d. Rinse water e. Deionized water d. 10% hydrochloric acid solution e. Rinse water f. Deionized water g. Aluminum foil or plastic wrap B-12

The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans EQUIPMENT PREPARATION AND CLEANING PROCEDURE The following cleaning procedure is used to clean all plastic, glass, or stainless steel equipment used to collect sludge samples: 1) Rinse equipment with warm tap water to remove the majority of solids. 2) Using a brush and a low-phosphate lab detergent, scrub the equipment to remove all residues. 3) After scrubbing, rinse the equipment three times with tap water. 4) Next, rinse the equipment with a 10% hydrochloric acid solution - allow at least 30 seconds of contact time. 5) Perform a final rinse, which should be a triple rinse with deionized water. 6) After cleaning, allow the equipment to air-dry. To store, cover beakers and buckets with clean aluminum foil or plastic wrap. Sampling implements should also be wrapped in foil or plastic wrap to keep them clean while in storage. Note: This cleaning procedure is applicable only when sampling for metals, nitrogen, and ph. To sample for other analytes, especially organic contaminants, these procedures should be modified. B-13

This page is intentionally blank.