UK regional peering Northern Ireland. Mike Higgins
5NINES Global LLP
NORTHERN IRELANDS FIRST MAJOR CARRIER NEUTRAL DATA CENTRE Total 100M Investment Total Investment Investment level ~ 100M; Dual Data Centre Sites Each site housing 2,000 racks Data centres 25km+ apart Diverse fibre for business continuity 5 Carriers Europe s Greenest Data Centre Longterm Investment Direct link to Trans-atlantic fibre Highly secure & resilient Meets Government standards LINX possible pops making this data centre the best connected in Ireland
NORTHERN IRELANDS FIRST MAJOR CARRIER NEUTRAL DATA CENTRE Total 25M Investment 1st Phase Investment 2,000 sqm data centre on Ulster University Campus, Coleraine Purpose built to be clean & green The most efficient in Europe. Funding secured for initial 1,000 racks Already significant client commitment First data halls available 4th Qtr 2013 Racks available from 3KW to 25KW Total 3MW IT load phase 1 12MW IT load day ultimate
VALUE IN A NUT SHELL WHY 5NINES CARRIER NEUTRAL DATA CENTRES Northern Irelands first major Carrier Neutral Data Centres Lowering the cost of IT Infrastructure (25% cheaper than Dublin & 50% cheaper than London.) Exceptional High Speed Network to USA & Europe EU Jurisdiction for Global Companies Highly resilient and Secure (IL3 & 5; Tier 3+) Housing racks from 3KW to 25KW; Phase 1 total 6MVA. Highly efficient design saves and CO 2 An excellent place to do business Come and Join Us Racks available from 4th Quarter 2013
Atlas Communications
Atlas Communications Atlas focus upon the hosting needs of local companies in the 10U 10 rack space Atlas model is based upon -Small space -High Power Density -Virtual Private Server Provision All Atlas locations are designed to operate on a carrier neutral basis
Atlas Communications Current & Planned Footprint Existing 22 rack Belfast centre servicing co-location and increasingly virtual services - 3 racks spaces left available, 24 amps per rack with options up to 64amps Option on a 36 rack centre on a 12 week lead-time in Belfast, 64 amps per rack capacity 36 rack centre in Derry City planned for early 2015 launch, 64amp per rack capacity
Atlas Communications A True Carrier Neutral Approach Atlas does not penalise 3 rd party carrier access to its data centres, providing low costs of cross connect All the main local retail carriers are present or on the doorstep of our existing facility Present: BT Cable & Wireless Virgin Media On our Doorstep: Eircom
Bluebox NWE Group
BlueBox NWE Group Established in 1992 Constructing Networks for major Blue chip clients 2004 started to provide BlueBox Broadband services BlueBox own and operate Northern Irelands Next Generation Wimax network delivering upto 50Mbit services from over 200 points and offer Network & Wireless co-location which currently cover 92% of the population across NI and Co. Donegal. BlueBox Next Generation Network Derry-Londonderry Fibre Network Diverse connections with Cisco Metro Ethernet Nodes located in Telehouse North London, Telecity Dublin and Hibernia Clonshaugh and Coleraine Cable Landing stations Diverse connection to LINX and INEX internet exchanges BlueBox Carrier Neutral Infrastructure supports Hibernia Networks, BT, Eircom, Everything Everywhere, O2 Telefonica, ESB Telecom, UPC, Airspeed, Digiweb, Meteor, HEAnet, Interfusion Vodafone and Magnet Networks
BlueBox - Infrastructure BlueBox Carrier Neutral Datacentre Communications House, Skeoge Industrial Park, Derry - Londonderry Data centre Floor space - 4000 Sq Ft (1750 currently developed) 120 Rack footprint (70 currently developed) 4 KVA Rack power design, Higher Power densities available on request 4 No. 10 Rack Pods available for current projects Carrier MeetMe Facility with Diverse incoming Carrier Neutral Duct network 250Kva Incomer (11Kv ring to NIE Primary Substation on Site Boundary), Dual UPS Dual Country Grid NIE/ESB Option Innovative Ambient air heat exchanger cooling with A/C Backup Diverse Dark Fibre and Managed Ethernet to Hibernia Networks Project Kelvin, BT 21CN, Eircom, Virgin Media, Everything Everywhere and O2
BT Ireland Datacentre
Infrastructure Location City Centre location with easy access to air, road, rail and sea BT Telephone House key strategic facility for BTNI one of the most secure exchanges in the UK Core Network managed from Telephone House Colossus Part of 21 st Century Network.
Accommodation Infrastructure 11,000 sq. ft in total in Telephone House 2 Separate halls providing hosting services and staging/storage facilities 350 Footprints NOC and SMC located in secure wings (SC Status) ~50 footprints currently available Modular fitout options on additional 250 rack areas on site 6KV Substation with 1000KVA transformer providing power to the Data Centre located on NIE main Belfast ring. Existing power capacity 1.2MW Carrier Neutral
Data City Exchange
Data City Exchange DCE are building datacenter campus sites which deploy the Evo- POD modular datacenters Our pods can be either air or water cooled and rack densities can range from 2-24 kw. Belfast 8 pods x 96 racks, 6 pods x 48 racks, 15 meg Power, Build Stat June 2013, Open July 2014 All sites will have fibre rings and will be dark fibre inter-connected, providing a total Carrier Neutral meshed network