GREPECAS Project G3. Implementation of the Quality Management System in AIM units. (Presented by the Secretariat) SUMMARY



Similar documents
Implementation of the Quality Management System in AIM units PROJECT G3 IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM IN AIM UNITS

Update of the NOTAM Contingency Plan. (Presented by the Secretariat) Summary

Follow-up to the activities of Project D2 - Ground-ground and air-ground applications in the SAM Region. (Presented by the Coordinator) SUMMARY

Project G3: Development of quality specifications applicable to the AIM digital environment (SAM) (Presented by the Secretariat) Summary

CAR/SAM REGIONAL PLANNING AND IMPLEMENTATION GROUP (GREPECAS)

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

PROJECT ATN GROUND-GROUND AND AIR GROUND APPLICATIONS IN THE SAM REGION

Cooperation Agreements for SAR Service and COSPAS-SARSAT STATUS OF SAR AGREEMENTS IN THE NAM/CAR/SAM REGIONS. (Presented by the Secretariat) Summary

TRANSITION TO THE NEW ORGANISATION OF GREPECAS. (Presented by the Secretariat)

ICAO/LACAC NAM/CAR/SAM

Strengthening of the medicines quality control laboratories in the region of the Americas and the support of AMI/RAVREDA

International Civil Aviation Organization South American Regional Office

(Presented by the MEVA/TMG Coordinator)

REPORT OF THE KNOWLEDGE TRANSFER NETWORK*

ICAO State Safety Programme (SSP) Introduction

STEP BY STEP 1. DEADLINE

Preventing through education

FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE

Requirements-Based Testing Ambiguity Reviews. Gary E. Mogyorodi, B.Math., M.B.A. Principal Consultant

Table of Contents. Introduction 9. Argentina 18. Brazil 31

Open access policies: What can we learn from Latin America? Roxana Barrantes Instituto de Estudios Peruanos

The remainder of this handbook is divided into the following sections: Getting Started (p. 2); Beginner Mode (pp. 3 5); Expert Mode (pp. 5 11).

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, November 2011

Grupo PRISA Overview An integrated media and education company

ICAO Regional Workshop. Implementation of Safety Management System in French ANSP. Patricia LEZIN

INTEGRATION AND TRADE CAPACITY BUILDING PROGRAM. Joaquim Tres and Alvaro Garcia Integration and Trade Sector Vice President of Sectors and Knowledge

European AIS Database - EAD 10+ years of EAD. Guido HAESEVOETS Gaston LIEGEOIS EAD Client Management 28/01/2016

in the CARIBBEAN Margarita Astralaga UNEP ROLAC February 2015

Public Sector Enterprises (Combined Use of IPSAS and IFRS) Marcia Maurer August 2, 2013

GUIDE TO SUPPORT THE IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM AERONAUTICAL METEOROLOGY SERVICES (MET/QMS) IN THE CAR/SAM REGIONS.

Table 1. Growth of Latin American and Caribbean Medical Schools

Regional References on solution/ mitigation of FPL problems. (Presented by Secretariat) EXECUTIVE SUMMARY

Supplier's Registration on the Supplier Portal of the Telefónica Group

Environmental Impact Assessment Systems in Latin America and the Caribbean 1,2

OF THE INTERGOVERNMENTAL WORKING GROUP ON THE MULTILATERAL EVALUATION MECHANISM (MEM)

Esteban Pérez Caldentey Development Studies Section Economic Commission for Latin America and the Caribbean (ECLAC)

Technische Universität Berlin Germany Undergraduate. Université François- Rabelais de Tours France Undergraduate

Achieve Universal primary education

Sub- Regional Workshop and Consulta;ons on Capacity- Building in Travel Document Security: Colombia, 2013

Quality Management System Manual. CAD Order

NFPL IMPLEMENTATION ATS OPERATIONAL ASPECTS

When replying please quote: Ref.: NT-N EMX October 2015

APEC Information Privacy Principles in the Development of Outsourcing Business: Contact Center in Peru

Review of the conclusions formulated by the CAR/SAM AIS/ATM/CNS 02/00 Informal Meeting

Certification Body Quarterly Data Submission Instructions QFE-016 Version 1.0

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

SIGNATURES AND CURRENT STATUS OF RATIFICATIONS AMERICAN CONVENTION ON HUMAN RIGHTS "PACT OF SAN JOSE, COSTA RICA"

Congreso Internacional Geomática Andina y 5 de junio, Bogotá, D. C., Colombia

Module B0-DATM: Service Improvement through Digital Aeronautical Information Management

ICAO and the Safe Transport of Dangerous Goods by Air

Agenda. Company Overview. IT Industry in Latin America. Comprehensive Offering. Financial Performance. Strategic Plan. Conclusions

In accordance with risk management best practices, below describes the standard process for enterprise risk management (ERM), including:

10th ANIVERSARY SULAMERICA INVESTIMENTOS

INTERNATIONAL FACTORING

PA (Process. Areas) Ex - KPAs

Trends in Aeronautical Information Management

FAMILY INDEPENDENCE ADMINISTRATION Seth W. Diamond, Executive Deputy Commissioner

CURRICULUM VITAE. Name: Florencia Licastro Job Title: Director, Training and Development. Summary of experience

EIGHT MEETING OF THE INTER-AMERICAN COMMITTEE ON PORTS FOUTHTEEN MEETING OF THE EXECUTIVE BOARD OF THE INTER-AMERICAN COMMITTEE ON PORTS

Admission to UNICAMP. 1. The Undergraduate Program Regular students The vestibular examination

Volunteering Australia

General Report SASE2014

How To Help People From Latain To European

352 UNHCR Global Report 2010

Cedar Crest College. Spanish 102: Introduction to Spanish II Monday & Wednesday 11:00 am 12:15 pm CURTIS HALL 354 Spring 2010

UNITED KINGDOM/ BRITISH PASSPORT SERVICE for Adults Ages 16 & Over

MOBILE ADS. HUNT Mobile Ads Traffic Q2-2011

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

INTERNATIONAL CIVIL AVIATION ORGANIZATION. Meeting/workshop of Air Traffic Management (ATM) Authorities and Planners (Lima, Peru, 18 to 21 July 2000)

LOCAL CORS Network Scene

BS EN Energy Management Systems VICTORIA BARRON, PRODUCT MARKETING MANAGER, BSI

Ecuador Official visa Application

Goal 4. Reduce child mortality

Formato de Checklist de Auditoría a Entidad de Formación Basado en EN TPAB AUDIT. Ref. EN

When replying please quote: Ref.: NT-N E.OSG - NACC March 2016

Inter-American Institute for Cooperation on Agriculture. Performance. Evaluation. Missions

Capacity building for non communicable disease prevention and control in Latin America and Caribbean

Transcription:

International Civil Aviation Organization SAM/AIM/7-WP/05 South American Regional Office 05/02/15 Seventh Multilateral Meeting of the SAM Región for the transition from AIS to AIM (SAM/AIM/7) Lima,, 23 to 27 March 2015 Agenda Item 3: Implementation of the Quality Management System in AIM units GREPECAS Project G3 Implementation of the Quality Management System in AIM units (Presented by the Secretariat) SUMMARY This working paper presents, for consideration of the Meeting, the status of implementation of GREPECAS Project G3 for the implementation of the quality in aeronautical information services. It also requires the update of the implementation data of the States. References: Annex 15 to the Convention of International Civil Aviation SAM/AIM Multilateral Meetings ICAO Strategic Objetives: A - Safety B - Air navigation capacity and efficiency E Environmental protection 1 Background 1.1 SAM/AIM meetings have developed a robust and well-founded quality implementation Project in which all the deliverables of the Project have been accomplished. 1.2 States have received all the deliverables, including the six documented procedures of standard ISO 9001:2008, which were developed under the administration of Mr. and the SAM/AIM meeting team, and that represent the essential guidance material for the preparation for the certification. 1.3 The delays of some States adversely impact in the Region for the conclusion of Phase 1 of the Roadmap for the Transition from AIS to AIM. 2 Analysis 2.1 Project G3 - Implementation of the Quality Management System in AIM units : As presented in Appendix A, significant progress has been achieved with regard to the completion of all the deliverable results of the Project. Only one activity is pending for the certifications report.

SAM/AIM/7-WP/05-2 - Analysis of goals achievement based on G3 Project indicators/metrics States certified with QMS ISO 9001:2008 2012 = 4 Estados 2014 = 5 Estados 2.2 Currently, there are five certified States with QMS within the SAM Region: Brazil, Chile, Ecuador, French Guiana and Paraguay. The last update on April 2014 and the progress of each State since 2012 can be observed in the following table: State % of Implementation April 2014 Implementation date % Progress Argentina 50% Sep/2014 20% Bolivia 30% Jul/2015 0% Brazil CERTIFIED ------------- ------------ Chile CERTIFIED ------------- ------------ Colombia 90% Sep/2014 20% Ecuador CERTIFIED ------------- ------------ French Guiana CERTIFIED ------------- ------------ Guyana 25% Dec/2015 25% Panama 50% Aug/2015 10% Paraguay CERTIFIED ------------ ------------ 60% Aug/2015 20% Suriname 45% Aug/2014 15% Uruguay 95% Mar/2015 5% Venezuela 70% Nov/2014 20% 2.3 Currently, from the States that have informed the implementation date for August, September and November 2014, no communication regarding their certification has been received, neither of the status of the implementation plan, nor of the problems encountered during the implementation process. 2.4 More emphasis in the management is required by the experts in order to complete the Certification, which is too far from being a complex process. 2.5 Considering the above, in order to inform the authorities in the meetings of GREPECAS Programmes and Projects Committee, the information regarding the implementation dates should be updated and the reasons for the delay in the programming should be informed, since GREPECAS works under a project management methodology based on results. The latest information received from the States is presented in Appendix B to this working paper. 2.6 States that have not certified QMS in the AIM should present a detailed Action Plan. The experts responsible of the implementation within the AIM Units should consider a detailed description of the tasks, but so far this planning has not been received.

- 3 - SAM/AIM/7-WP/05 3. Suggested action: 3.1 The Meeting is invited to: a) update the information regarding the implementation status of the quality system in each State, presented in Appendix B; b) presente a brief report of the reasons for the delay in the implementation; c) present the action plans of the States that have not yet certified the quality and their implementation is under the 80%. - - - - - -

SAM/AIM/7-WP/05 -A1- APPENDIX A PROJECT DESCRIPTION (DP) DP N G3 SAM Region Programme Title of the Project Start End AIM Implementation of the quality management systems in the AIM units of SAM States (ICAO Programme Coordinator: Roberto Arca Jáurena) Project coordinator: Experts contributing to the Project: () SAM/AIM IG David Díaz () 03/10/11 01/09/14 Objective Scope Implement guides applicable to the quality management system in a digital/electronic AIM environment in the SAM Region, based on the regional performance objectives of the SAM performance-based implementation plan. The scope of the project contemplates the assessment and identification of implementation levels associated to quality management in AIM services in the Region. Drafting of an action plan and guides for the implementation of QMS in a digital/electronic AIM environment. Metrics Percentage of States with ISO 9001:2008 QMS certification. Goals 50% of States with the ISO standard 9001:2008 implemented by 2013, and certified by 2014. Strategy Project activities will be coordinated through communications among project members, the Project Coordinator, and the Programme Coordinator, mainly through teleconferences (GoToMeeting application) and meetings that may be held within other scheduled events, based on the activities of the work programme. The Project Coordinator will coordinate with the Programme Coordinator for the inclusion of additional experts, if warranted by the tasks and work to be performed. The results of the work done will be submitted to the consideration and review of State experts in the form of a final consolidated document for analysis, review, and approval, and for presentation to the GREPECAS PPRC by the Programme Coordinator.

-A2- SAM/AIM/7-WP/05 Rationale Related projects The quality management system in AIM services must provide users the required guarantee and assurance that the aeronautical information/data distributed meets quality requirements in terms of accuracy, resolution and integrity. There needs to be a close relationship with other projects in order to collect the operational requirements of the aforementioned applications and their respective tentative dates of implementation. This project is related to Projects G1 Implementation of the provision of electronic terrain and obstacle data e-tod and G2 Implementation of Aeronautical Information Exchange Systems (AIXM). Project deliverables Relationship with the performancebased regional plan (PFF) Responsible party Status of implementation* Delivery date Comments Prepare surveys to establish the levels of compliance and implementation of AIM-QMS based on ICAO guides ICAO coordinator 25/11/11 Finalised as scheduled. Circulate surveys to the States ICAO coordinator 17/02/12 Finalised as scheduled. Collect and tabulate the information of the States ICAO coordinator 13/04/12 Finalised on 30/03/12. Description of steps for QMS implementation. SAM/AIM/WG 30/03/12 Finalised as scheduled. QMS selfassessment questionnaire David Diaz RLA/06/901 30/03/12 Finalised as scheduled.

SAM/AIM/7-WP/05 -A3- Template with QMS assessment results David Diaz RLA/06/901 30/03/12 Finalised as scheduled. QMS implementation plan David Diaz RLA/06/901 QMS procedures and preventive actions. QMS internal audit procedure. Procedure for controlling AIS service management system records Procedure for drafting QMS documents. Service control procedure QMS non-conforming products. Procedures for controlling the documents of the AIS service management system. SLA with service providers to ensure the quality of the information and the AIM data exchange. Juan J. González Uruguay 19/10/12 Finalised as scheduled.

-A4- SAM/AIM/7-WP/05 Collect certifications and produce report on the status of ISO 9001:2008 certifications in the SAM Region ICAO coordinator SAM/AIM Meeting Resources required Designation of experts in the execution of some of the deliverables. More commitment by States to support the designated coordinators and experts. *Grey Green Yellow Red Task not started Activity underway as scheduled Activity started with some delay but expected to be completed on time It has not been possible to implement this activity as scheduled; mitigating measures are required

Appendix B to the Report on Agenda Item 3 SAM/AIM/7-NE/05-WP/05 Apéndice B al Informe sobre la Cuestión 3 del Orden del Día 3B-1 APÉNDICE / APPENDIX B ESTADO DE IMPLANTACIÓN DEL QMS EN LA REGIÓN SAM / STATUS OF QMS IMPLEMENTATION IN THE SAM REGION ESTADO/ STATE EN PROCESO/ IN PROCESS IMPLANTADO/ IMPLEMENTED AUDITADO/ AUDITED CERTIFICADO/ CERTIFIED % DE EJECUCIÓN/ % OF EXECUTION FECHA FINAL/ FINAL DATE OBSERVACIONES/ REMARKS Argentina X 50 SEP 2014 Se están identificando y describiendo procesos. / Processes are being identified and described. ARO/AIS Sep 2014. Bolivia X 30 JUL 2015 Brasil/ Brazil X X X X 100 ------- NOTAM, AIP y MAP certificado / certified y ARO en proceso / in process. 85% completado / completed. 2014. Colombia X X X 90 SEP 2014 Actualmente se efectúan auditorías internas de control de la implantación y se ajustan los procedimientos y registros inherentes al proceso AIM. / Currently internal control audits are carried out to control implementation and registrations inherent to AIM are adjusted. Chile X X X 100 ------- ISO 9001:2008

Appendix B to the Report on Agenda Item 3 3B-2 Apéndice B al Informe sobre la Cuestión 3 del Orden del Día SAM/AIM/7-NE/05-WP/05 ESTADO/ STATE EN PROCESO/ IN PROCESS IMPLANTADO/ IMPLEMENTED AUDITADO/ AUDITED CERTIFICADO/ CERTIFIED % DE EJECUCIÓN/ % OF EXECUTION FECHA FINAL/ FINAL DATE Ecuador X X X 100 ------- OBSERVACIONES/ REMARKS ISO 9001:2008. En proceso de recertificación para los años 2014 al 2016. / ISO 9001:2008. In process of re-certification by 2014 to 2016 Guyana X 25 DIC / DEC 2015 Algo de entrenamiento recibido. / Some training received. Personal temporal. / Temporary Staff. Guayana Francesa / French Guiana X Panamá / Panama X 50 AGO / AUG 2015 Con adquisición de nuevos sistemas automatizados se están efectuando cambios en los procesos y procedimientos. / With the acquisition of new automated systems changes in processes and procedures are being made. Paraguay X X X 100 ------- ISO 9001:2008. Paraguay Re- Certificado 2013 / Paraguay Recertificated 2013. Perú / X 60 Suriname X 45 AGO / AUG 2015 AGO / AUG 2014 Se estableció un equipo de trabajo para QMS en el AIM / A work team for QMS has been established at AIM.

Appendix B to the Report on Agenda Item 3 SAM/AIM/7-NE/05-WP/05 Apéndice B al Informe sobre la Cuestión 3 del Orden del Día 3B-3 ESTADO/ STATE EN PROCESO/ IN PROCESS IMPLANTADO/ IMPLEMENTED AUDITADO/ AUDITED CERTIFICADO/ CERTIFIED % DE EJECUCIÓN/ % OF EXECUTION FECHA FINAL/ FINAL DATE OBSERVACIONES/ REMARKS Uruguay X 95 MAR 2015 Venezuela X 70 NOV 2014 Información por correo electrónico. / Information through e-mail. Fecha de actualización / Date updated: 07/11/2014