RTP s NUCLEAR QUALITY ASSURANCE PROGRAM



Similar documents
CORPORATE QUALITY MANUAL

Surgi Manufacturing Quality Manual

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility

QUALITY POLICY MANUAL Document: Revision: E Effective Date: January 15, 2010

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

DEC STD ISO Quality Systems - Model for Quality Assurance in Production and Installation

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

ISO 9001:2008 Audit Checklist

UNCONTROLLED COPY FOR REFERENCE ONLY

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

GLOBAL AEROSPACE PROCEDURE

SUPPLIER QUALITY SYSTEM AUDIT

Supplier Quality Assurance

Quality Assurance QUALITY ASSURANCE PLAN

Revision Date Author Description of change Jun13 Mark Benton Removed Admin. Manager from approval

Contents. Management Policy Manual SEM USA Page 2 of 12

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G A, Appendix A, )

Quality Agreement Template

AS9100 Quality Manual

Helical Products Co., Inc.

Example of a food company quality

Quality Management System Manual

ISO/IEC QUALITY MANUAL

Supplier Quality Assurance Requirements Manual

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of )

Checklist. Standard for Medical Laboratory

MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

Purchase Order Clauses and Conditions

Tronair Quality Manual

Quality Management System Manual

ISO 9001:2008 QUALITY MANUAL. Revision B

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

Rockwell Automation Quality Management System

Cartel Electronics. AS 9100 Quality Systems Manual

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Camar Aircraft Products Co. QUALITY MANUAL Revision D

How To Ensure Quality Assurance

Supplier Quality Agreements

Technical Manufacturing Corporation (TMC) Quality Manual

Quality Manual. DuraTech Industries, Inc Commerce Street La Crosse, WI MANUAL SERIAL NUMBER 1

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history.

Testing Facility Laboratory Manual

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

Bogue Machine Company, Inc. Business Instruction

US EPA REGION III QUALITY MANAGEMENT PLAN REVIEW CHECKLIST

ISO 9001 Quality Systems Manual

Quality Management System Manual

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1

STEEL fabrication quality SySTEmS guideline

The President of Inductors Inc. is the senior executive responsible for operations.

Supplier Quality Assurance Requirements Manual

Quality Management System Manual Revision L

QUALITY MANUAL REVISION RECORD

Quality Manual ISO9001:2008

QUALITY MANUAL ISO Quality Management System

PERFORMANCE EXCELLENCE Procurement Standards

PRODUCT CERTIFICATION REQUIREMENTS

Quality at GE Energy

Quality Management System-A Revision 7 (NRC-approved Version)

ALL PRODUCTS MFG & SUPPLY

Quality Management System General

fin DULLES CORRIDOR METRORAIL PROJECT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Quality Program Plan Revision 6, June 2008

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632

ONTIC UK SUPPLIER QUALITY SURVEY

Generic CMMS Quality Assurance Plan

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc.

Section i POLICY AND AUTHORITY STATEMENT

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

BASE CONSTRUCTION INC

GE Power Electronics Business Total Quality Management for Suppliers

May 9, 2013 SUBJECT: FINAL SAFETY EVALUATION FOR TECHNICAL REPORT NEI 11-04, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 0

Eagle Machining, Inc. Quality Management System

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

ISO 9001:2000 AUDIT CHECKLIST

Quality Management Systems Manual

ABB Inc. Quality Manual

AVNET Logistics & EM Americas. Quality Manual

This Business Management System Manual is based on ISO 9001:2008 requirements

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Product Liability Risk Control Checklist

CENTRIS CONSULTING. Quality Control Manual

Table of Contents 1. SCOPE APPLICABLE DOCUMENTS TERMS AND DEFINITIONS QUALITY MANAGEMENT SYSTEM...4-8

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc Business Park Drive, Suite A-1 Costa Mesa, CA 92626

Quality Management System and Procedures

OPERATIONAL STANDARD

QUALITY MANAGEMENT SYSTEMS

Self-Audit Checklist

ED FAGAN INC. QUALITY SYSTEM MANUAL

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Quality Assurance Manual

Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

Recertification CARD No. 22 Quality Assurance

Transcription:

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508). Our quality assurance program complies with the Code of Federal Regulation, Title 10, Part 50, Appendix B (10 CFR 50 Appendix B), Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants. Below are highlights of how our program meets the sections of 10 CFR 50 Appendix B. Organization RTP management is responsible for establishment and proper execution of our quality assurance program. The program is under the direct control of the President of the company as assisted by our Director of Safety Products, our Quality Assurance Associate, and the many people who perform the in-process inspections of the products. All persons performing quality assurance functions have the required authority and organizational freedom, including sufficient independence to ensure that safety considerations are a priority over cost and schedule. Quality Assurance Program Our program meets all requirements of 10 CFR 50 Appendix B and is documented by written implementing procedures. These procedures document the major organizations participating in the program, together with the functions of each organization. The program provides control over activities affecting the quality of the products including verification of quality by inspection and test. Design Control RTP s engineers ensure that regulatory and specific customer requirements are Engineering PRODUCT REQUIREMENTS correctly translated into specifications, drawings, PRODUCT DESIGN procedures, and instructions for each product we make. These engineers select and review the suitability of application of materials, and processes that are used. They ensure that design verification tests are VALIDATION TESTING Instructions, Procedures and Drawings RELEASE TO MANUFACTURING performed to verify or check the adequacy of all designs and that qualifications testing of Document Control Design Control Test Control prototype units are performed under the most adverse design conditions. Our engineers also review and approve the initial release and any revision of design documents including securing customer approval if there are to be any deviations from a requirement.

Document Control The managers of our engineering and manufacturing departments control the documents that are used. Any changes to the documentation must first be approved through our design control process (ECO), which includes review and approval of our President, before being released for use by the company. Test Control Once manufactured, all products are tested in accordance with approved, written test procedures, which incorporate the requirements, and acceptance limits contained in applicable design documents. Documentation of the test results is provided along with all nuclear safety-related orders. Operations CUSTOMER ORDER Instructions, Procedures and Drawings Procurement Document Control PROCURE RECEIVE Control of Purchased Materials MANUFACTURE Identification and Control of Materials Handling, Storage and Shipping TEST and Test Results Control of Measurement and Test Equipment Non-Conforming Materials would require specialized training, procedures or certifications. Corrective Actions Engineering is tasked with ensuring that quality requirements are included on the design drawings and test procedures, including the acceptance criteria for all products. These drawings and test procedures are used throughout the manufacturing processes and are under revision control via our Engineering Change Order (ECO) process. RTP has no Special Processes that Procurement Document Control Our purchasing manager is primarily responsible for assuring that applicable regulatory requirements, design bases, and other necessary requirements established by our engineering and quality personnel are included or referenced in purchase orders for materials or services. Any special requirements for nuclear safety-related purchase orders are documented in our purchasing procedures. Our President approves all purchase orders for items or services supplied as nuclear safety-related.

Control of Purchased Material, Equipment and Services Suppliers are qualified and placed on our Approved Vendors List (AVL) so that we can ensure that only high quality materials are used in our products. Our suppliers provide Certificates of Conformance, referencing the appropriate materials and quality standards for the items being purchased. As we do business with these qualified suppliers, we monitor their quality performance and the level of monitoring that we use is consistent with the importance and complexity of the materials being purchased. s are carried out on all purchased materials and once the materials are in our factory, our personnel control them. Identification and Control of Materials, Parts, and Components RTP uses a work order routing traveler system as one of the product control and tracking tools during our manufacturing process to prevent the use of incorrect or defective material, parts, and components. As the product moves from stage to stage, the product and the traveler are stamped with a unique permanent mark indicating that it has successfully met the requirements of each stage. Nuclear safety-related products are also marked with a NEQ prefix to differentiate them from our commercial grade products. To ensure traceability, we also serialize all nuclear safety-related products. As an example of the level of traceability we employ for metals, all solder used in our nuclear safety related products could be traced back to the supplier lot number. Furthermore, to ensure that the quality of the solder remains good as it is being applied to our printed circuit boards and electronic components during manufacturing, we sample the solder during use and send those samples to an independent lab for analysis. The sample number is also noted on the work order traveler for the products that were produced with that solder thus ensuring traceability. Our quality program includes provisions for inspection of all activities affecting quality to verify conformance with our documented instructions, procedures, and drawings. In the manufacturing area, a second person inspects each person s work operation and the supervisors and managers and our quality personnel monitor the work of all in the manufacturing area. Control of Measuring and Test Equipment Measuring and test equipment are used throughout our manufacturing operations and procedures are in place to ensure that these items are controlled and calibrated at the required intervals to maintain accuracy within the necessary limits. Measurement and test equipment are sent to a qualified third-party lab for calibration. This lab is audited on a regular schedule to ensure that they are performing their calibration work in accordance with their quality procedures and that the measurement standards that are being used are traceable to a recognized standards bearer such as National Institute of Standards and Technology (NIST) or American Association for Laboratory Accreditation (A2LA).

Overview of RTP implementation of 10 CFR 50 Appendix B. QUALITY ASSURANCE PROGRAM Organization Engineering Design Instructions, Procedures, Drawings Document Control Procurement Document Control Test Control Control of Measuring and Test Equipment Operations Control of Purchased Material, Equipment and Services Identification and Control of Material, Parts and Components and Test Status Nonconforming Materials, Parts or Components Handling, Storage and Shipping Corrective Action Quality Assurance Records

Handling, Storage and Shipping RTP carries out its manufacturing work in a controlled clean factory environment. In addition, our personnel employ appropriate anti-static techniques in handling our electronic products to prevent damage or deterioration. Care is taken to ensure that foreign materials are not introduced at any point in any of our processes. and Test Status As noted earlier in Identification and Control of Materials, Parts, and Components, RTP utilizes a work order traveler tool, which documents the required manufacturing, inspection and test processes for each product. The traveler follows the product throughout each process. Markings are applied to the product and traveler as they pass through the manufacturing, inspection and test stages. Nuclear Safety Related products are also given a unique serial number to link the product to its traveler and Quality Control (QC) activities. In addition to the in-process quality checks, our QC personnel review the stamps on the finished product and its travelers to ensure that the product has satisfactorily passed the required inspections and tests. Nonconforming Materials, Parts or Components Our procedures prevent nonconforming items from being inadvertently used in the manufacturing process. In addition, there are various inspection and testing points in our manufacturing process and at any of these points, non-conforming work-in-progress can be identified, documented, segregated, dispositioned (rejected, repaired, or reworked) and the appropriate persons or organizations notified. As part of our compliance with Code of Federal Regulations, Title 10, Part 21 (10 CFR 21), non-conforming conditions are reviewed as to their impact on safety and if a defect is found, the regulators and those affected can be quickly notified. Corrective Action Our quality program not only includes provisions for identifying conditions adverse to quality such as non-conformances, but it also includes measures to determine the cause of the condition and to put corrective actions in place to prevent the condition from re-occurring. These reviews are documented and reported to the appropriate levels of management. Quality Assurance Records RTP maintains sufficient records to provide evidence of our activities related to product quality. These quality records are retained for various time durations depending on their importance to safety as per our records retention program. Records are maintained in printed and electronic forms. Internal Audits RTP carries out periodic audits to verify compliance with all aspects of our quality assurance program and to determine the effectiveness of the program.

About RTP Founded in 1968, RTP Corp. is a developer and manufacturer of high-performance critical control and safety systems. Markets for RTP Corporation's products include process control and safety systems, and nuclear power plant systems. RTP offers a wide range of rugged hardware and a complete suite of software for industrial control solutions that include seamlessly redundant and triplicated systems for mission-critical applications.