EMBRAER Perspective on SHM Introduction into Commercial Aviation Programs



Similar documents
WE HAVE DEVELOPED OUR BUSINESS IN THE AREAS OF:

Capabilities at a glance

2 nd QUARTER 2014 EARNINGS RESULTS

Approved Versus Acceptable Repair Data: How to Make Sure You Have What You Need

[Docket No. FAA ; Directorate Identifier 2014-CE-012-AD; Amendment ; AD ]

operating services group a Bombardier Preferred Provider

Basics of Aircraft Maintenance Programs for Financiers

CAMP Maintenance Tracking - Benefits KEVIN RYAN NOVEMBER 2 ND, 2012

Schedule for Masters Core

ENGINEERING RELEASE MODEL: LEARJET MODEL 20 AND 35/36 SERIES DRAWING. NO.: SHEET: 1 OF 1

[Docket No. FAA ; Directorate Identifier 2010-NM-146-AD; Amendment ; AD ]

Optimizing Human Capital Development

CAUSES OF AIRCRAFT ACCIDENTS

Advanced MRO Solutions

FedEx HUD/EFVS Update Aviation New Technology Workshop June 7th, 2012, Beijing, China

Quality training to suit your needs

Benefits of Optimizing Maintenance Intervals

Training Catalogue. Training Catalog WE QUALIFY! PART-147 APPROVED TRAINING CENTER

2015 IMRBPB Meeting Agenda

2. APPLICABILITY. This AC provides information for any person who engages in public aircraft operations (PAO) as defined by the statute.

Case Based Model to enhance aircraft fleet management and equipment performance

Subject: AIRCRAFT ELECTRICAL Date: 11/20/07 AC No WIRING INTERCONNECTION

Limited Ratings of Airframe Maintenance

Project Management Tools and Techniques

Analysis One Code Desc. Transaction Amount. Fiscal Period

IN-FLIGHT CATERING MANAGEMENT SOFTWARE. Powerful, simple and flexible cloud based solution for in-flight catering management.

For the purpose of see-and-avoid, visual observers must be utilized at all times

FAA Unmanned Aircraft Systems (UAS)

[Docket No. FAA ; Directorate Identifier 2008-NM-171-AD; Amendment ; AD ]

Citation 560XL/XLS (CE-560XL) Maintenance Review Board Report 560XL/XLS MRBR-02

Mechanic Questions and Answers

Luiz F. Fuchs President Embraer Aviation Europe

Basic Training. Modern training concepts in accordance with the EASA requirements

Syllabus - Fatigue Risk Management (FRM) Training

Integrating maintenance & engineering IT systems with the OEMs Original equipment

How To Get A 9001 Certified

AI R C R AF T M AI N T E N AN C E S P E C I AL I S T Schematic Code 17801

Swedavia s Consultation Process Airport Charges 2014 Price Lists. Charges & Regulations Manager January 2 nd 2014

Analysis of Impact of Aircraft Age on Safety for Air Transport Jet Airplanes. Professor R. John Hansman

[Docket No. FAA ; Directorate Identifier 2008-NM-190-AD; Amendment ; AD ]

Critical Systems and Software Solutions

Student Academic Achievement Committee (SAAC) Standardized Report Form

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

General Aviation Airplane Shipment Report

An Introduction To: Maintenance Management Information exchange Model (MMIXM)

Advisory Circular. Subject: DAMAGE TOLERANCE INSPECTIONS FOR REPAIRS AND ALTERATIONS. Date: 11/20/07 Initiated by: ANM-100.

Chartering An Aircraft A Consumers Guide

S1000D Implementation In Civil Aviation

Analysing the 737NG s first base checks The first 737NGs were delivered

Repair Design Approval

[Docket No. FAA ; Directorate Identifier 2015-NM-034-AD; Amendment ; AD ]

AMC Aeroplane Electrical Wiring Interconnection System Training Programme

[Docket No. FAA ; Directorate Identifier 2015-NE-20-AD] Airworthiness Directives; CFM International S.A. Turbofan Engines

Unmanned Aircraft Systems (UAS)

DISMANTLING OF AIRCRAFT WITHDRAWN FROM SERVICE

How To Implement Itil V3

Post-Accident Life Cycle. The Role of Your Aviation Insurance and Lawyer

JEPPESEN ACADEMY - TRAINING SERVICES 2016 GLOBAL COURSE SCHEDULE

[Docket No. FAA ; Directorate Identifier 2014-NM-251-AD; Amendment ; AD ]

RPAS Stakeholder Hearing Third-party liability insurance requirements

Date: 8/25/06. Initiated by: AFS-350

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION SUBJ: PROCEDURES TO ACCEPT INDUSTRY-DEVELOPED TRAINING FOR LIGHT-SPORT REPAIRMEN

INSTALLATION OF MODE 'A' / 'C' AND MODE S TRANSPONDERS.

Bermuda Advisory Circular BAC-AW-03 INSTALLED AIRCRAFT COMPONENTS REMOVED TO SERVICE ANOTHER AIRCRAFT (ROBBERY)

FACT SHEET UNMANNED AIRCRAFT SYSTEMS (UAS)

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Fiscal Year 2015 First Quarter Conference Call

[Docket No. FAA ; Directorate Identifier 2014-NM-194-AD; Amendment ; AD ]

Section 2 - Airline Fleet Information

Methods, techniques, and practices contained in manufacturer s Instructions for Continued Airworthiness (ICA),

ESTABLISHMENT AND OVERSIGHT OF A RELIABILITY PROGRAM AND MAINTENANCE PROGRAM ESCALATION

ITS Implementation Strategy

Executive Roundtable: MRO IT: Building the Business Case for Data Harmonization

Federal Aviation Administration FAA William (Bill) O Brien Aviation Maintenance Technician Awards Program AMT Individual Program

Page 1/.. USA / Canada - South Africa Schedule No. 4 / 2011-Jan-24

Fatigue: The Flight Attendant Perspective

The need for Safety Intelligence based on European safety data analysis

County of Santa Clara Roads & Airports Department Airport Operations

High-value, affordable, sustainable special missions solutions.

Summary of Changes to Part 65 (proposed Part 66)

Rethink Convention. CUSTOMER SUPPORT

[Docket No. FAA ; Directorate Identifier 2010-NM-117-AD; Amendment ; AD ]

Asset Management Contingency Planning

Repair Station Training Program

Dash 8 Series 400, DOT, Master Minimum Equipment List, PSM A.

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

Emergency Department Directors Academy Phase II. The ED is a Business: Intelligent Use of Dashboards

Type Certification Procedures Manual 9. Costing Type Certification 9.1 Introduction to Costing

Transcription:

ervices & upport EBRAER Perspective on Introduction into Commercial Aviation Programs Luís G. dos antos ervice & upport Development

Agenda Introduction EBRAER applications on maintenance programs aintenance Program Development tatus of on the G-3 ethodology Introduction into cheduled aintenance Programs RB process / G-3 ethodology Familiarization cheduled (-) applications - Ground upport Equipment - as provisions for initial Automated applications

Embraer Business Areas Defense ystems Executive Aviation arket Commercial Aviation arket

Introduction - Embraer Defense ystems uper Tucano KC-390 AX/A-1 EB 145 ulti Intel Airborne Ground urveillance and trategic Intelligence EB 145 P aritime Patrol EB 145 AEW&C Airborne Early Warning & Control

Introduction - Embraer Executive Aviation Phenom 100 Phenom 300 Legacy 450/500 Legacy 600/650 Lineage 1000

Introduction - Embraer Commercial Aircraft ERJ 145 Family (37 to 50 Pax) E-Jets Family (70 to 122 Pax)

Introduction - Embraer E-Jets Program tatus: 60 Airlines from 40 Countries June 23, 2011

Introduction - Embraer Brazil ão José dos Campos

Introduction

Introduction WAT DO WE NEED? Technical Feasibility Consistent Business Case Approved in a Certification Process Compatible with Continued Airworthiness Requirements UCCEFUL OLUTION Acceptability by Operators [1] Derriso,..,.E. Olson,.P. Deimio, D.. Pratt, Why are there few fielded for tructural. ealth onitoring 6th International Workshop on tructural ealth onitoring, tanford CA, ept 11, p55, 2007 [2] unns, Thomas E., R.E. Beard, A.. culp, D.A. urphy, R.. Kent, 2000. Analysis of Regulatory Guidance for ealth onitoring. NAA / CR-2000-210643, 6: 56.

aintenance Program Development OURCE DOCUENT G-3 ETODOLOGY FAA AC 121-22A EBRAER POLICY & PROCEDURE ANDBOOK (PP) PROPOAL RB REPORT PUBLIING & DITRIBUTION INDUTRY TEERING COITTEE PP APPROVAL AINTENANCE TAK & INTERVAL APPROVAL WORKING GROUP DEVELOPENT OF G-3 ANALYE & TAK AINTENANCE REVIEW BOARD RB REPORT APPROVAL

aintenance Program Development ection 1 ystem & Powerplant ainten. Requirem. ection 4 Corrosion Prev. & Control tx Req. ection 2 tructural ainten. Requirem. Appendix 2 Airworth. Limitation Items (ALI) ection 3 Zonal ainten. Requirem. Other ections & Appendixes

tatus of on the G-3 ethodology A- approval on PP ATA Working Group eeting ep 29th to Oct 1st, 2009 Toronto, Canada Detail P/C- ethodology Proposal aintenance Programs Industry Group (PIG) eeting Nov 3rd to 5th, 2009 Bordeaux, France Present A- and ystem G-3 Revision Proposals International RB Policy Board eeting April 2010 ingapore Final review and acceptance of A- and ystem G-3 Proposals G-3 2009.1 Approval International RB Policy Board eeting ar 31st to Apr 03rd, 2009 ão José dos Campos, Brazil Review and final acceptance - Proposal aintenance Programs Industry Group (PIG) Nov 18th to 20th, 2008 Washington, UA Conclusion of - ethodology Proposal ATA Working Group meeting ep 16th to 18th, 2008 amburg, Germany Detailing of - proposal and Introduction of P/C- general concepts ATA Working Group activity kick off meeting ep 12th to 13th, 2007 tanford - UA Initial G-3 Revision Proposal for - aintenance Programs Industry Group (PIG) eeting Jan 8th to 10th, 2008 emphis UA Defined Industry accepted ethodology International RB Policy Board eeting Apr 22nd to 25th, 2008 Cologne Germany Requested further review of G-3 structure procedure steps

tatus of on the G-3 ethodology G-3 ethodology Revision 2009.1 (current) cheduled (-) - the act to use/run/read out a device at an interval set at a fixed schedule. - as new maintenance task category: alternative for current inspections International RB Police Board Issue Paper 105 Automated (A-) - any technology, which does not have a pre-determined interval at which maintenance action much takes place, but instead relies on the system to inform maintenance personnel that action must take place. technology types i. Damage onitoring ystem It uses sensors to directly monitor the structure for deterioration conditions. ii. Operation onitoring ystem - It uses sensors, which do not directly check the structure for damage, but instead correlate various measurements (e.g. environment conditions, loads) to make an inference to the probability or likelihood of damage. Once a system design is demonstrated to be applicable and effective, it may be used to ensure inherent airworthiness of the item being monitored and traditional inspection task selection may not be appropriate. When an A- system is used to monitor structure which has maintenance/inspection requirements, appropriate transfer policies should be used to show that the intent of the damage detection (ED/AD/FD) requirement is being satisfied by the monitoring system. This process takes place after the development of the tructures Requirements described previously in this section.

tatus of on the G-3 ethodology Evaluation of Automated tructural ealth onitoring ystems Logic Diagram

Introduction of on cheduled aintenance - Inspection of Elevator tructure, L/R, by using tructures ealth onitoring equipment Internal ide of Elevator T: XX O I: YY O

Introduction of on cheduled aintenance - Example 1 Internal Visual Inspections of rear passenger and service doors cutout structures What is the issue with current maintenance requirements for this region? Galley, Lavatory and linings removal Current tx Requirement To inspect every 5000 FC for fatigue damage (threshold of 20000 FC) & every 12000 FC for corrosion With (fatigue) To inspect every 12000 FC for corrosion BENEFIT Reduction of 120 an-hours () every 12000 FC If also covers corrosion, reduction every 12000 FC would be >250 hours Elimination of maintenance induced problems igher aircraft availability (lower downtime means more revenue flights)

20,000 FC 30,000 FC 40,000 FC 45,000 FC 50,000 FC Operation tart 72 O 144 O 216 O 288 O 18,000 F 36,000 F 54,000 F 55,000 FC 60,000 FC 360 O 72,000 F Introduction of on cheduled aintenance - Example 1 Damage onitoring Corrosion onitoring 25,000 FC 35,000 FC ALI (FC) CPCP (O) ZONAL (F)

Introduction into cheduled aintenance Programs FAILIARIZE YOURELF WIT G-3 RB AINTENANCE RULE

Introduction into cheduled aintenance Programs cheduled (-) applications TART WIT IPLE - OLUTION

Introduction into cheduled aintenance Programs AFFORDABLE LIGT REITENT IPLE GE

Introduction into cheduled aintenance Programs - A PROVIION FOR INITIAL A- 6,000 FC 12,000 FC 18,000 FC 24,000 FC 30,000 FC 36,000 FC 42,000 FC A- - GVI

Thank You