Appendix A Contractor Quality Control Plan The Contractor Quality Control Plan is the Contractor s management plan for executing the contract.



Similar documents
Chapter 4: Contractor Quality Control

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

Quality Management Plan Template

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ENGINEERING AND CONSTRUCTION BULLETIN

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Designer Quality Control Plan Guidelines

Professional Engineers Using Software-Based Engineering Tools

UNIFIED FACILITIES GUIDE SPECIFICATIONS

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES)

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.

Review Plan. F-4 Channel Rehabilitation. Tropicana and Flamingo Washes, Clark County, Nevada for Plans and Specification

APPLIED SCIENCE COOPERATIVE AGREEMENT STANDARD OPERATING PROCEDURES FOR PTRs, GRANTS & TECHNOLOGY TRANSFER STAFF

Position Classification Flysheet for Grants Management Series, 1109

8. Master Test Plan (MTP)

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

Texas Department of Transportation

Change Management Plan Template

COST SAVINGS INITIATIVE PROPOSAL

To create a new request, click on the New Request link, this opens the Data Entry Dialog.

Project Plan for <project name>

Sample Quality Management Plan

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date:

REVIEW PLAN For FLOOD RISK MANAGEMENT FOR DICKENSON COUNTY PUBLIC SCHOOLS LEVISA FORK BASIN DICKENSON COUNTY, VIRGINIA SECTION 202 NONSTRUCTURAL

Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents

Quality Assurance QUALITY ASSURANCE PLAN

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

The PMP Application Process

SAMPLE ACCOUNTS PAYABLE. Policies & Procedures FOR. Version Edited By Edited Dates Comments 1.0 Irene Bushnell November 2015 Baseline

Minnesota Health Insurance Exchange (MNHIX)

Manage Deliverables - Construction Step 6. July 12, 2012

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM. Quality Assurance Checklist

ISO 14001:2004 Environmental Management System Manual

Printshop Workflow Automation System

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

TIER II STANDARD FOR FINANCIAL MANAGEMENT SPECIALISTS

Software Project Management Plan (SPMP)

SUPERVISORY OFFICERS. Certification, Appointment and Notice of Suspension / Dismissal. A Guide to Legislative Requirements and Ministry Procedures

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

Project QA and Collaboration Plan for <project name>

NABL NATIONAL ACCREDITATION

<Company Name> <Project Name> Software Development Plan. Version <1.0>

Request for Qualifications for Program Management Support Services for The Greenville-Spartanburg International Airport Terminal Improvement Program

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June d Page 1 of 7

Lesson 10: IT Project and Program Management

Project Management Plan for

Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201

QUALITY MANAGEMENT SYSTEM (QMS) PROGRAM MANAGEMENT DIVISION

Assistant Project Management - Training Program A 3-year Program Beginning strategy places the new employee into a three-year program that provides

Project Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997

APPOINTED ACTUARY QUESTIONNAIRE FOR FINANCIAL REPORTING OF LIFE AND HEALTH INSURANCE ORGANIZATIONS IN CANADA 2001 YEAR-END PART II

LabChip GX/GXII with LabChip GxP Software

Design Consultant Project Management Requirements

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of )

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-CE Washington, DC

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

EXHIBIT A SCOPE OF SERVICES CONSTRUCTION MANAGEMENT TEAM POSITIONS AND REQUIREMENTS

New Jersey Administrative Code. Encumbrance Accounting and Certifications of Availability of Funds

PERFORMANCE EVALUATION AUDIT CHECKLIST EXAMPLE. EIIP Volume VI

California Department of Public Health Drinking Water Program. TMF Assessment Form. ASSESSMENT TYPE: Funding Project New System Change of Ownership

Section 100 Contractor Quality Control Program

<name of project> Software Project Management Plan

RHODE ISLAND ECONOMIC DEVELOPMENT CORPORATION SMALL BUSINESS LOAN FUND CORPORATION Request for Proposals Grant Compliance Audit Services

<Project Name> Quality Assurance Plan

Energy Design Resources Commissioning Plan Outline Template

Aeries Student Information System Attendance Notes October 3, 2008

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT PAYROLL AUDIT PROGRAM

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

IT Baseline Management Policy. Table of Contents

Draft Copy. Change Management. Release Date: March 18, Prepared by: Thomas Bronack

HANDBOOK for INDIVIDUAL SERVICE PROVIDERS

DRY CLEANING PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN

Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds

DIVISION OF INFORMATION SECURITY (DIS) Information Security Policy IT Risk Strategy V0.1 April 21, 2014

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

PITTSBURG UNIFIED SCHOOL DISTRICT

Quality System: Design Control Procedure - Appendix

Appendix P-0a: Suggested Implementation for All Performance Management Guidelines

Organization. Project Name. Project Overview Plan Version # Date

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

NEW CHANGE ORDER ERRORS & OMISSION PROCEDURES

Position Classification Standard for Medical Records Administration Series, GS-0669

ELECTRONIC SIGNATURES AND ELECTRONICALLY SIGNED RECORDS

Request for Proposal Bond Issue Financial Advisor

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT PROFESSIONAL SERVICES. Part I: Qualifications Information

Practical experience component achieved. Principal. Principal. Principal. Total

The purpose of this document is to define the Change Management policies for use across UIT.

Transcription:

Appendix A Contractor Quality Control Plan The Contractor Quality Control Plan is the Contractor s management plan for executing the contract. The Contractor QCP describes the way in which the Contractor will produce the deliverables, and the step-by-step approach that will be taken to ensure the quality of the engineering and design services and the products derived from those services. The Contractor is required to submit a Contractor QCP as the first item of work in each delivery order or may submit a Contractor QCP as the first item of work in his contract and, at a minimum, a Quality Control supplement for each delivery order for an indefinite delivery contract. The following items are key components of the Contractor QCP: 1. The Quality Control Plan will describe the following: a. Management Philosophy. The Contractor QCP will discuss the organization s technical management philosophy relative to its commitment to quality. The Contractor s Quality Control Program will include Quality Production, Internal Quality Checks and Reviews, and Technical Review. b. Management Structure. The Contractor QCP will identify the management of the firm that is responsible for quality. c. Management Approach. The Contractor QCP will define the specific management methodology to be followed during the performance of the work, including such aspects as, documentation management and control, communications, design coordination procedures, design checks and reviews, technical review, and managerial continuity and flexibility. i) Design checks and reviews should include a comprehensive evaluation of: correct application of methods adequacy of basic data and assumptions correctness of calculations completeness of documentation testing, modeling, assumptions, calculations, text, and graphic presentations in all documents for completeness and to satisfy appropriate design criteria and use of sound engineering practice compliance with guidance, standards, regulations, and laws biddability, constructibility, operability, and environmental issues ii) Technical reviews will ensure that: the concepts, assumptions, features, methods, analyses, and details are appropriate, fully coordinated, and correct an appropriate range of feasible alternatives was evaluated the problems, opportunities, and issues are properly defined and scoped the analytical methods used are appropriate and yield reliable results the results and recommendations are reasonable, within policy guidelines, and supported by the presentation any deviations from policy, guidance, and standards are appropriately identified and have been properly approved the products are biddable, constructible, operable, environmentally sound, and cost effective the products meet the customers' needs

d. Documentation. All internal review documents and associated comments and responses will be retained in the Contractor's files in auditable condition and submitted to the Government upon request. Note: If a Contractor QCP is submitted for each delivery order the QCP will also include the components for the QC supplement. See below. 2. The Quality Control Supplements for Work Orders will include the following: a. Organizational Structure. The Quality Control Supplement will clearly show the interrelationships of management, design team components, and the agency technical review team, including all consultants. An organizational chart identifying by name the key design and agency technical review team members, showing their specific responsibilities related to the work order, will be included. b. Scheduling. A design schedule will be included showing the sequence of events involved in carrying out specific tasks within the specified period of service. The design review, technical review, and revision periods scheduled prior to submittals will be clearly shown.

Instructions to complete Statement of Technical Review form. Information in Blue brackets and text is required. Once the input is provided, text should be formatted in black and the brackets should be deleted. Add appropriate additional signatures (Operations, Construction, AE principal for ATR solely conducted by AE, etc). 1 Only needed if some portion of the design/study was contracted 2 Decision Documents Only

Appendix C STATEMENT OF TECHNICAL REVIEW [Project Name and Location] [Product Type] [Date] COMPLETION OF AGENCY TECHNICAL REVIEW The Agency Technical Review (ATR) has been completed for the [product type & short description of item] for [project name and location]. The ATR was conducted as defined in the project s Review Plan to comply with the requirements of EC 1165-2-214. During the ATR, compliance with established policy principles and procedures, utilizing justified and valid assumptions, was verified. This included review of: assumptions, methods, procedures, and material used in analyses, alternatives evaluated, the appropriateness of data used and level obtained, and reasonableness of the results, including whether the product meets the customer s needs consistent with law and existing US Army Corps of Engineers policy. The ATR also assessed the District Quality Control (DQC) documentation and made the determination that the DQC activities employed appear to be appropriate and effective. All comments resulting from the ATR have been resolved and the comments have been closed in DrChecks sm. ATR Team Leader [Home District] Project Manager [Name] [Date] Architect Engineer Project Manager 1 [Company, Location] Review Management Organization Representative

CERTIFICATION OF AGENCY TECHNICAL REVIEW Significant concerns and the explanation of the resolution are as follows: [Describe the major technical concerns and their resolution] As noted above, all concerns resulting from the ATR of the project have been fully resolved. Chief, Engineering Division or Equivalent Chief, Planning Division 2 Printouts of this document may be out of date and should be considered uncontrolled. To accomplish work, the online document should be used. Revision: #14, dtd 9/24/2014 1:55:12 PM Document ID: 4921