1 ETCS Level 1 Limited Supervision for a Fast and Cost Effective Migration of Legacy Train Control Systems to ETCS Bernhard Stamm Siemens Schweiz AG page 1 Wildenrath, 17 February 2012
2 Contents What ETCS is Introducing ETCS on a network Limited Supervision Mode ETCS Rollout in Switzerland Summary / Conclusions page 2 Wildenrath, 17 February 2012
3 Contents What ETCS is Introducing ETCS on a network Limited Supervision Mode ETCS Rollout in Switzerland Summary / Conclusions page 3 Wildenrath, 17 February 2012
4 What ETCS is The European Train Control System ETCS supervises train movement in regards to speed and distance travelled, based on information provided by an underlying signalling system ETCS consists of onboard and trackside subsystems performing standardised functions and are communicating via Eurobalise, Euroloop and GSM-R using standardised protocols ETCS provides full cab signalling and can be used either as an overlay onto classical signalling systems with lineside signals or without them The term ERTMS is used when referring to ETCS and GSM-R as one system ETCS has been developed to replace all existing mainline train control systems in Europe page 4 Wildenrath, 17 February 2012
5 What ETCS is ETCS is fairly complex, as it has to deliver at least the functionality and performance of all systems it shall replace Some requirements have been pushed even higher, e.g. the operating speed to 500 km/h ETCS has to comply with the newest safety standards, and has been designed to achieve SIL 4 (Safety Integrity Level), the highest safety level As a result of all these requirements ETCS is significantly more expensive than most existing legacy systems that only provide basic functionality (e.g. TPWS, Crocodile, TBL) page 5 Wildenrath, 17 February 2012
6 What ETCS is not ETCS does not cover the aspects of interlocking and traffic management ETCS is also lacking some function found in more advanced systems, especially CBTC systems, such as automatic train operation or remote diagnostics. ETCS will however evolve over the years, and some of these functions are already planned to be included in future baselines. page 6 Wildenrath, 17 February 2012
7 Goals of ETCS Goals of users Reduction of the number of required systems for cross border traffic Simplification of cross border operation (e.g. no change of locomotive at border, operating rules) Increase of line capacity Increase of safety Political goals of European Union Improving competitiveness of rail transport Opening of national networks to outside operators (free access) Competition between suppliers page 7 Wildenrath, 17 February 2012
8 Contents What ETCS is Introducing ETCS on a network Limited Supervision Mode ETCS Rollout in Switzerland Summary / Conclusions page 8 Wildenrath, 17 February 2012
9 Introducing ETCS Today each country in Europe has between one and three train control systems in use With the introduction of ETCS these systems shall be eliminated to allow seamless operation of trains across Europe A solution has therefore to be found how to introduce ETCS across Europe and how to eliminate existing national systems page 9 Wildenrath, 17 February 2012
10 Introducing ERTMS Today there are at least 18 different train control system in use in Europe Ebicab 700 Ebicab 900 AWS, TPWS, TBL ZUB 123 ATB-EG, ATB-NG, TBL Indusi (IATC), LZB, GNT TBL, Crocodile SHP TVM, KVB, Crocodile LVZ, LSD ASFA, LZB, Ebicab 900 EVM Ebicab 700 Ebicab 700 Signum, ZUB 121 / 262 Indusi, also in RO, HR, YU, SI BACC, RSDD, SCMT page 10 Wildenrath, 17 February 2012 Indusi, LZB
11 Introducing ETCS Goal of ERTMS/ETCS: Only one train control system all over Europe ERTMS/ETCS page 11 Wildenrath, 17 February 2012
12 Introducing ETCS Example of antenna arrangement on a vehicle for cross border traffic Switzerland France Germany prior to introducing ETCS KVB Balise antenna Integra receiver Integra permanent magnet ZUB 121 LZB transmission aerial Crocodile brush Indusi PZB 90 LZB receiver aerial page 12 Wildenrath, 17 February 2012
13 Introducing ETCS Typical antenna arrangement on a vehicle for cross border traffic (what it should look like): ETCS balise / loop reader page 13 Wildenrath, 17 February 2012
14 Introducing ETCS Key question is: ERTMS/ETCS how to get there in a reasonable time and at affordable cost page 14 Wildenrath, 17 February 2012
15 Introducing ETCS To simplify migration to ETCS a concept has been developed as part of the ETCS standard to allow ETCS equipped trains to run on lines equipped with legacy systems, using Specific Transmission Modules (STMs) The STM concept is an onboard concept, as trains are made to be compatible with tracks where either national systems or ETCS is used page 15 Wildenrath, 17 February 2012
16 Introducing ETCS with STMs Introducing ETCS with STM s (Note: 3 countries have full ETCS rollout strategies): ETCS + Ebicab 700 ETCS + Ebicab 900 ETCS + AWS, TPWS, TBL ETCS only ETCS + ATB-EG, ATB-NG, TBL ETCS + Indusi (IATC), LZB, GNT ETCS only ETCS + SHP ETCS + TVM, KVB, Crocodile ETCS + LVZ, LSD ETCS + ASFA, LZB, Ebicab 900 ETCS + EVM ETCS + Ebicab 700 ETCS + Ebicab 700 ETCS only ETCS + Indusi, also in RO, HR, YU, SI ETCS + BACC, RSDD, SCMT page 16 Wildenrath, 17 February 2012 ETCS + Indusi, LZB
17 Introducing ETCS with STMs Example of antenna arrangement on a vehicle for cross border traffic Switzerland France Germany with STM s KVB Balise antenna Integra receiver Integra ETCS permanent Balise magnet ZUB 121 antenna LZB transmission aerial Crocodile brush Indusi PZB 90 LZB receiver aerial page 17 Wildenrath, 17 February 2012
18 Introducing ETCS with STMs Issues with STMs Cost Complexity Installation space Energy consumption Availability Maintenance Operating rules Note: cost figures from SBB study page 18 Wildenrath, 17 February 2012
19 Introducing ETCS with STMs Goals of users Reduction of the number of required systems for cross border traffic Simplification of cross border operation (e.g. no change of locomotive at border, operating rules) Increase of line capacity Increase of safety Political goals of European Union Improving competitiveness of rail transport Opening of national networks to outside operators (free access) Competition between suppliers page 19 Wildenrath, 17 February 2012
20 Introducing ETCS with STMs, Conclusion The STM concept does not seem to solve most issues of the ETCS migration It rather leads to a life extension of existing systems due to the significant investment necessary onboard Better transition strategies are therefore needed to eliminate national system within a reasonable time after introducing ETCS. page 20 Wildenrath, 17 February 2012
21 Contents What ETCS is Introducing ETCS on a network Limited Supervision Mode ETCS Rollout in Switzerland Summary / Conclusions page 21 Wildenrath, 17 February 2012
22 Introducing ETCS As shown the installation of multiple onboard system according to the STM concept can be costly Better transition strategies than the STM concept are therefore required for the introduction of ETCS in many cases Parallel installation of ETCS and national systems trackside to allow both ETCS and national system equipped trains to run is costly too, in addition the potential of ETCS can not be fully utilised if another system is used in parallel (capacity / safety) The aim should therefore be to eliminate national system when introducing ETCS page 22 Wildenrath, 17 February 2012
23 Introducing ETCS Important cost savings can only be achieve if existing infrastructure can be retained / reused both trackside and onboard during the introduction of ETCS, protecting existing investments A lower cost variant of ETCS compared to full SIL 4 Cab Signalling should also be available, as the additional benefits of full ETCS (e.g. safety, capacity, high speed, cab signalling) are not required on many lines The Limited Supervision Mode has therefore been defined to achieve these goals page 23 Wildenrath, 17 February 2012
24 Limited Supervision Mode The Limited Supervision Mode can be described as follows: The Limited Supervision Mode provides a scalable version of ETCS in regards to safety and functionality The Limited Supervision Mode is a fully standardised ETCS mode, like any other of the modes (e.g. Full Supervision, Shunting, On Sight Mode) The Limited Supervision Mode is not a national solution SRS = system requirements specifications page 24 Wildenrath, 17 February 2012
25 Limited Supervision Mode The Limited Supervision Mode can be described as follows: Cab signalling has been eliminated in a first step This makes it possible to use existing trackside information that is not sufficient for cab signalling from either a safety or functional point of view (data not SIL 4 or incomplete) Supervision is then performed in the background, and the driver is operating the train according to the lineside signals The level of supervision is scalable, from full braking curve supervision to simple stop / warning / proceed functionality SRS = system requirements specifications page 25 Wildenrath, 17 February 2012
26 Limited Supervision Mode v=f(s) Interlocking ETCS LEU Eurobalises) Dual channel supervision Driver is following lineside signals LEU = lineside electronic unit Background supervision through ETCS on-board equipment Standard ETCS on-board equipment according to baseline 3 / 2.3.0d w/ CR 637 page 26 Wildenrath, 17 February 2012
27 Full Supervision vs. Limited Supervision Mode Data engineering Movement authority Speed profile Linking Information Gradients Safety level Indications On-board Trackside ETCS L1 FS Detailed engineering: - Completeness of data - Individual / specific telegrams - Considerable effort for verification, validation, testing Exactly measured Detailed Exact distance between balises Detailed gradient profile SIL4 Full cab signaling Standard ETCS EVC LEU with Eurobalise ETCS L1 LS Simplified engineering: - Data as far as required / available - Use of a standard set of telegrams - Minimum effort for verification, validation, testing Simplified, e.g. supervision of speed reduction Simplified SSP / permitted braking dist. Not required (optional) Simplified gradient SIL1 to SIL4 (depends on trackside data) Limited indications, use of lineside signals Standard ETCS EVC LEU with Eurobalise LS allows flexible and scalable ETCS implementation LS allows fast ETCS rollout by using standardized / pre-defined ETCS telegrams page 27 Wildenrath, 17 February 2012
28 Full Supervision vs. Limited Supervision Mode Comparison of DMI indications DMI for Full supervision DMI for Limited supervision Permitted speed Planning area Actual speed Actual speed Target speed Mode information Target speed Mode information Target distance page 28 Wildenrath, 17 February 2012
29 Full Supervision vs. Limited Supervision Mode Scalability of supervision functions and trackside equipment: Degree of supervision can be adapted according to the demands of the national signaling system (safety, performance) Range from simple train stop or warning functions up to FS functionality Not mandatory to equip all signals of a line to allow LS operation Examples for scalability: Line section with high potential risk: continuous speed monitoring + automatic brake application Line section with lower potential risk: warning information + speed supervision after a defined distance Line section with low potential risk : warning information and triggering of emergency brake when passing red signal FS = full supervision page 29 Wildenrath, 17 February 2012
30 Limited Supervision Mode DP = Danger Point page 30 Wildenrath, 17 February 2012
31 Introducing ETCS with STMs Goals of users Reduction of the number of required systems for cross border traffic Simplification of cross border operation (e.g. no change of locomotive at border, operating rules) Increase of line capacity Increase of safety Political goals of European Union Improving competitiveness of rail transport Opening of national networks to outside operators (free access) Competition between suppliers page 31 Wildenrath, 17 February 2012
32 Contents What ETCS is Introducing ETCS on a network Limited Supervision Mode ETCS Rollout in Switzerland Summary / Conclusions page 32 Wildenrath, 17 February 2012
33 ETCS Rollout in Switzerland Level 1 Limited Supervision The following basic requirements have been defined for the ETCS rollout in Switzerland: Enable trains equipped with only ETCS onboard system to operate on the entire Swiss network, eliminating the need STM s or national systems onboard, by 2017 Elimination of the existing national systems ZUB an Signum trackside by 2017 Allow existing trains with national systems ZUB an Signum onboard to continue to operate on all lines except ETCS Level 2 lines beyond 2017 Significant cost savings compared to a full ETCS Level 1 or 2 rollout page 33 Wildenrath, 17 February 2012
34 ETCS Rollout in Switzerland Steps of the L1 LS rollout National Systems National Systems with ETCS-Components National & ETCS Systems SIGNUM ZUB ETM SIGNUM ZUB ETM ETCS SIGNUM ZUB ETM SIGNUM ZUB ETM ETCS SIGNUM ZUB ETM SIGNUM ZUB ETM ETCS ETCS inkl. LS Phase 1 Standardisation / Increase of safety Replacement of ZUB / SIGNUM with ETCS-Components All mainline rolling stock equipped with Eurobalise- /Euroloop reader (ETM) Shunting and maintenance equipment still to be equipped 550 vehicles equipped with ETCS Level 2 by end 2006 ZUB and SIGNUM onboard antennas not required anymore Multiple onboard systems still required for unlimited network access (ZUB, SIGNUM, ETM, ETCS) Phase 2 Interoperability ETCS Upgrade L1LS 2017 Only ETCS required onboard for unlimited network access Existing rolling stock still able to run with national systems (including Eurobalise-/Euroloop readers) page 34 Wildenrath, 17 February 2012
35 ETCS Rollout in Switzerland Steps of the L1 LS rollout National Systems National Systems with ETCS-Components National & ETCS Systems Phase 1 Standardisation / Increase of safety Replacement of ZUB / SIGNUM with ETCS-Components Today s SBB-Standard gauge network consists of approx Signals equipped with: ca with SIGNUM ca with ZUB & SIGNUM Trackside installations of ZUB and SIGNUM will be replaced with ETCS components, but programmed with ZUB and SIGNUM data. Such installations are called : EuroZUB EuroSIGNUM Phase 2 Interoperability ETCS Upgrade L1LS 2017 The ETCS-Components will be reprogrammed with additional ETCS information. This will be based on: Level 1 Limited Supervision Priority will be on the North South Corridor until page 35 Wildenrath, 17 February 2012
36 Level 1 LS Implementation in Switzerland Long term development Interoperability Increase of capacity 2005 Onboard Trackside Conventional lines ETCS Level 2 ETCS Level SIGNUM ZUB ETM SIGNUM ZUB ETM ETCS GBT CBT Rhonetal Zuläufe GBT Rückbau RFE ETCS Netz ETCS N/S-Korridore ETCS Tessin! ETCS only Korridor ETCS only TILO (2014!) Schattenfahrten ETCS only Netz ETCS inkl. LS page 36 Wildenrath, 17 February 2012 SBB Infrastruktur Projekte PJ-NEP-SLT
37 Level 1 LS Implementation in Switzerland Challenges of the L1 LS rollout Genéve Aeroport S La Plaine Satigny Vernier-Meyrin-Cargo Versoix Coppet GENEVE La Praille Nyon Vallorbe Le Pont Gilly-Bursinel Gland 2017 Pontarlier Le Day Les Verrières Rolle Croy-R Perroy Boveresse Onnens-B Arnex Allaman Los 9 TRN Grandson St. Prex Renan BE Le Creux La Chaux-de-Fonds Travers Yverdon La Sarraz Morges - Noiraigue Le Locle Vaumarcus La Lance Lausanne Triage Chambrelien Gorgier-St-A. Yvonand Ependes Chavornay Eclépens Daillens Cossonay Vufflens-l.-Ville Bussigny RENENS VD Malley (D) Montmollin LAUSANNE Bevaix Pully St-Imier Sonvilier LS-Sébeillon Lutry 2016/17 Corcelles-P. St-Gingolph Cully Courtelary Les Hauts- Geneveys. Les Geneveyssur-Coffrane Colombier Boudry Estavayer le Lac La Conversion Bouveret Cormoret Villeret Sonceboz-S. Corgémont Cortébert Granges-M. Neuchâtel Neuchâtel-S. Lucens Moudon Ecublens-R. Rivaz Auvernier Cugy Fr Grandvaux Vevey Clarens Delle Boncourt Courtemaiche Châtillens Vouvry St-Maurice Evionnaz Tavannes La Neuveville Dompierre Palézieux Mahlenwald BIEL/BIENNE Tüscherz Twann Cornaux St.Blaise CFF Domdidier Oron Aigle Reuchenette-P. Brügg BE Chavannes Le Landeron Faoug Avenches Siviriez Vauderens Puidoux-Chexbres Montreux Villeneuve Roche VD St.Triphon Bex Vernayaz Porrentruy Courgenay Neuchâtel Vauseyon Monthey Payerne TPF Corcelles Nord Grolley Les Paluds (D) St.Ursanne Martigny Romont Glovelier Murten TPF Laupen Givisiez Reconviller Galmiz Muntelier-L. Rosé Cottens Chénens Villaz-St.-Pierre Saxon BLS Neuenegg TPF RB Kerzers Studen Aarberg Kallnach Bern-Ausserholligen Bern-Wey.-haus Bern Bümpliz Süd Düdingen FRIBOURG Matran Ardon Riddes Bassecourt Courfavre Malleray Thörishaus Sion Courtélle Biel-M. Pieterlen Fräschels BLS Flamatt Schmitten St. Leonard Delémont Court Lengnau Soyhières-B Lyss Grenchen N Bettlach Grenchen S Busswil BERN HB Courrendlin Lüsslingen Bern-Wylerfeld St Johann Büren aa Dotzigen Suberg-G Münchenbuchsee Granges-Lens Liesberg Basel Dreispitz Ruchfeld Choindez Gümligen BASEL PB Roches BE Leuzigen Arch Schüpfen Zollikofen Sierre-Sieders Bärschwil BLS Selzach Bellach Schwarzenburg Zweisimmen Laufen Solothurn West Moutier Bern Wankdorf Ostermundigen Rubigen Münsingen BLS Salgesch Münchenstein Solothurn Zwingen Luterbach BLS Schönbühl Hindelbank Bern Löchligut Wichtrach Leuk Deitingen Wangen aa Grellingen Worb SBB Uttigen Turtmann Basel GB Aesch Niederbipp Konolfingen Oensingen Derendingen Muttenz Burgdorf Gampel-Steg Oberbuchs. Subingen Basel-Kh. BLS Zäziwil Gellert Thun Pratteln Läufelfingen Wynigen Raron Egerkingen Wanzwil BLS Basel-Bad RBF. Bowil Härkingen Post Murgenthal Rothrist Langenthal GB Simplon Brig Iselle Varzo Preglia Domodossola Basel DB Frenkendorf Langenthal PB Herzogenbuchsee Riedtwil Signau Hägendorf BLS Spiez Visp Trubschachen Emmenmatt BLS 2014 Wangen b O Olten Hammer Obermatt Olten RB Roggwil Liestal Lausen Sissach Sch'werd Mumpf Gelterkinden Rupperswil Tecknau OLTEN Brittnau Reiden Zofingen Dagmersellen Escholzmatt Wiggen Nebikon Wauwil Doppleschwand-R. Entlebuch Hasle Schüpfheim Langnau BLS Däniken Aarburg Möhlin Aarau Olten Nord Safenwil Sursee Schachen LU Wolhusen Laufenburg Eiken Däniken RB Wildegg H'schwil Suhr Lenzburg Seon Hallwil Oberentfelden Boniswil Kölliken Nottwil Sempach 2014/15 Frick Rothenburg Birrwil Baldegg Hochdorf Emmenbrücke Malters Hornussen Ballwil E'bach Littau Effingen Gütsch Etzgen Schinznach Dorf Spitzk. Beinwil Villnacheren Lupfig Leibstadt Brugg AG Mägenwil Othmarsingen Hendschiken Wohlen Waltenschwil Boswil Muri Hitzkirch Benzenschwil Sins Oberrüti Gisikon-Root Ebikon Waldibr. Luzern VH LUZERN Meggen Dottikon Dättwil Koblenz Dottikon USA Döttingen-K. Siggenthal-W. Turgi Baden Oberstadt Küssnacht Waldshut Mellingen-H Mellingen Steinhausen Zug Zug Schutzengel Zug Chollermüli Schlieren Zürich- Seebach Altstetten ZCH-Herdern Champdu-Molin Châteauneuf- Conthey Charrat- Fully Cham Alpenbl. Hünenberg Immensee Luino Cham Rotkreuz Brunnmatt D Zurzach Baden Walchwil Arth Goldau Steinen RBL Birmensdorf ZH Knonau 2013/14 Maccagno Hedingen Mettmenstetten Pino-Tronzano Wettingen Fildern Rekingen Würenlos Schwyz Baar Brunnen Flüelen Altdorf Erstfeld Amsteg-S. Gurtnellen Wassen Göschenen Gotthard Nord Gotthard Süd Airolo Locarno Sordo (D) Tenero Ambri-P. Riazzino Rodi-F. L Vedeggio Faido Lavorgo Zweidlen Biasca Claro ZUERICH HB Osogna-C. Castione-A. BELLINZONA Giubiasco Vigana D Rivera-B. Mezzovico D Taverne-T. Lugano Lottstetten Dachsen Meder D Rielasingen Ramsen Schaffhausen GB Schaffhausen 2015 Neuhausen 2015/16 Etzwilen Altenburg-R. Killwangen-Spreitenb. Zch.-Mülligen Urdorf Affoltern am Albis Baar Lindenp. Ranzo Baar Neufeld Zug Postplatz Zug Fridbach Zug Oberwil Rynächt San Nazzaro SZU Zgraggen (D) Pfaffensprung Eggwald Otelfingen Dietikon Shilbrugg Giornico Magadino-V ZCH-Wiedikon Niederweningen Buchs-D. Dielsdorf Regensdorf-W. Thal- Wil ZCH-Vorbhf ZCH-Enge ZCH-Wollishofen Bodio Rüschlikon Horgen-Oberdorf Pollegio Cadenazzo SOB Weiach-K Oberrieden Horgen Au ZH Bonstetten- Wettswil Kaiser- Rheinfelden Eglisau Steinmaur Hard Oerlikon Bülach Oberglatt Rümlang Embrach-R. Z.Flughafen Wipkingen Wallisellen Stadelh. Zollikon Stettbach ZH-Tiefenbrunnen Küsnacht ZH Erlenbach Herrliberg-F. Meilen Männedorf Richterswil Uetikon Stäfa Jestetten Rafz Wädenswil Freienbach Einsiedeln Niedergl. Glattbrugg Opfikon Pfäffikon SZ Uerikon Feldbach Lachen Pfungen-N. W- Wülfl. Kloten Andelfingen WINTERTHUR Nänikon-G. Uster Aathal Wetzikon Bubikon Rüti ZH Siebnen Henggart Seuzach Hettlingen W-Töss Bassersdorf Feuerthalen Langwiesen Marthalen Dietlikon Dübendorf Rapperswil Kemptthal Hüntwangen- Wil Schwerzenbach ZH Bollingen Schübelbach-B Wald Schlatt W-Grüze Effretikon Hinwil Dinhard Oberwinterthur Illnau Kempten Schmerikon Reichenburg St.Kathar. Diessenh. Uznach Mitlödi Schwanden Nidfurn-H. Luchsingen-H. Diesbach-B. Rüti GL Linthal Stammheim Ossingen Thalheim-A. UA Elgg Räterschen Fehraltorf Pfäffikon ZH Gibswil Bilten Nieder- u. Oberurnen Näfels-M. Netstal Glarus Ennenda 2012/13 Stein am Rhein Rickenbach Eschenz Winterthur-Seen Steg Fischenthal Mammern Benken Schänis Frauenfeld Weinf. Süd Islikon Bussnang Aadorf Steckborn Kollbrunn Bauma Rikon Wila Kaltbrunn Berlingen Felben-W Eschlikon Saland Ziegelbrücke Bazenheid Rämismühle-Z. Turbenthal Wattwil Weesen Mannenbach Mühlheim-W Sirnach Ermatingen Mühlehorn Lütisburg Bütschwil Lichtensteig Murg Märstetten Wil Triboltingen Tägerwilen Dorf Kreuzlingen Bernrain Lengwil Siegershausen Tägerwilen-Gottl. Tobel Schwarzenbach Uzwil Unterterzen Walenstadt Mels Kreuzlingen Altishausen Berg Kehlhof Weinf. Bürgl. Flawil Flums Sargans Sulgen Märwil Bettwiesen Bronschhof. Gossau Bad Ragaz Maienfeld Landquart Zizers Trimmis Konstanz Kreuzlingen Hafen Chur Kurzrickenbach Seepark Erlen Bottighofen Oberaach Kradolf Le Locle-Coldes-Roches Basel Bad Birs-Hafen Sisseln Birsfelden Stein- Au-Hafen Säckingen RB2014 Schweizerhalle Bischofszell Nord Bischofszell Stadt Hauptwil Arnegg St. Gallen-W SOB Münsterlingen St. Gallen-B Münsterlingen Spital Landschlacht Amriswil Trübbach Altnau Güttingen Kesswil St. Gallen Uttwil Romanshorn St. Gallen -St.F Gübsensee Herisau Egnach Arbon Goldach Mörschwil BUCHS SG BUCHS SG RB Sevelen 2016 Horn Horchental Haag-G. Rorschach Hafen Rorschach Staad Salez-S. Rheineck St.Margrethen Au SG Heerbrugg Rebstein-M. Altstätten SG Oberriet Rüthi SG Paradiso Melide Maroggia-M. page 37 Wildenrath, 17 February 2012 Capolago R.S.V. Mendrisio Balerna Varese CHIASSO Sm CHIASSO Vg SBB Infrastruktur Projekte PJ-NEP-SLT
38 Level 1 LS Implementation in Switzerland General concept is quite straight forward ZUB-Signal Adapter replaced by LEU SIGNUM / ZUB removed Eurobalises installed page 38 Wildenrath, 17 February 2012
39 Level 1 LS Implementation in Switzerland The reality is quite complex In reality the complexity is quite significant due to historically grown variety of interlocking types and of technical implementations Signalling Systems Do55 Do67 SpDrS LWL MSTT Signalling Interfaces Do55 Do67 Do69 SpDrS Simis- C Simis- IS Simis- W Interlockings of var.generations page 39 Wildenrath, 17 February 2012
40 Level 1 LS Implementation in Switzerland The reality is quite complex page 40 Wildenrath, 17 February 2012
41 Level 1 LS Implementation in Switzerland Small number of variants to interface to signals ETCS L1 LS Network Wide Rollout Relay-interlockings and electronic interlockings without MSTT type element controllers Electronic nterlockings with MSTT type element controllers MiniLEU S11 approx signals LEU S21MS approx signals ULK approx signals Eurobalise S11 Eurobalise S21 Euroloop S21 page 41 Wildenrath, 17 February 2012
42 Level 1 LS Implementation in Switzerland This result in two basic signal installations LEU S21 cabin LEU signal circuit power supply Balise S 21 Balise S 21 Balise S 21 Balise S 21 minileu MiniLEU S 11 Signal circuit Balise S 21 Balise S 21 LP - Balise S 11 page 42 Wildenrath, 17 February 2012 LP - Balise S 11
43 Level 1 LS Implementation in Switzerland Optimized solution for stop / warning / proceed A special LEU has been developed for the large number of signals where only a stop / warning / proceed supervision is required (MiniLEU S11) with the following advantages: No external power supply required, zero power consumption Connects to existing relay contacts that control the SIGNUM, nor requiring any changes to the signal interface As a consequence very fast installation and commissioning, minimizing impact on operation Significantly higher safety level compared to existing SIGNUM through failure detection and self testing page 43 Wildenrath, 17 February 2012
44 Level 1 LS Implementation in Switzerland Optimized solution for braking curve supervision An improved version of the already proven LEU, the S21 MS has been developed to cope with some of the issues of the L1 LS rollout: Engineered data stored in external cartridge Reduced time for programming Extended diagnostics supports paperless commissioning page 44 Wildenrath, 17 February 2012
45 Level 1 LS Implementation in Switzerland Optimized engineering processes and tools SBB and Siemens have jointly optimized the whole engineering process, redefining the work split to minimize the number of both engineering and verification steps. Based on that Siemens optimized the whole tool chain used for engineering, installation, commissioning and verification. page 45 Wildenrath, 17 February 2012
46 Level 1 LS Implementation in Switzerland Optimized engineering tools The whole tool chain used by both SBB and Siemens has also been optimized and based on a common database. This allows to at least partially automate the engineering steps. Also many verification and validation steps can be automated. As a result the amount of work required for engineering can be minimized and the number of errors reduced. page 46 Wildenrath, 17 February 2012
47 Level 1 LS Implementation in Switzerland Standardized installation variants Standardized variants have been defined to replace the existing train control systems with LEU s where braking curve is required Where only stop/warning/proceed is required no changes to the existing infrastructure are required as the MiniLEU interfaces directly to the existing SIGNUM relay contacts Obsolete components are being removed during installation These measures help reducing installation cost, but also life cycle cost as maintenance is simplified page 47 Wildenrath, 17 February 2012
48 Installation of L1 LS MiniLEU Installation of one of the L1 LS MiniLEU prototypes used for extended field trials Key element of the Swiss ETCS rollout is the very fast conversion of all existing installations of ZUB and Signum to ETCS L1 LS page 48 Wildenrath, 17 February 2012
49 Installation of L1 LS MiniLEU :15 Start of installation of VORTOK Balise Mounting System, mounting of MiniLEU to signal mast page 49 Wildenrath, 17 February 2012
50 Installation of L1 LS MiniLEU :29 Installation of VORTOK balise mounting system, Eurobalises and MiniLEU finished page 50 Wildenrath, 17 February 2012
51 Installation of L1 LS MiniLEU :49 Cabling of MiniLEU in progress page 51 Wildenrath, 17 February 2012
52 Installation of L1 LS MiniLEU :01 The new cable between the MiniLEU and the junction box at the signal mast is prepared for a fast switchover during commissioning. page 52 Wildenrath, 17 February 2012
53 Installation of L1 LS MiniLEU :22 Installation and cabling of all components finished, signal ready for commissioning after 1 hour and 7 minutes page 53 Wildenrath, 17 February 2012
54 Installation of L1 LS MiniLEU :00 to 13:08 Switchover from the existing Signum magnets to the MiniLEU including test and commissioning takes between 5 and 8 minutes. This can be done in regular traffic between train passages. page 54 Wildenrath, 17 February 2012
55 Installation of L1 LS MiniLEU The short installation and commissioning times are only possible due to the engineering and logistics concept applied. All components are prepared per signal in the factory, including programming of the MiniLEU, programming of the Eurobalises labelling of all components. page 55 Wildenrath, 17 February 2012
56 Contents What ETCS is Introducing ETCS on a network Limited Supervision Mode ETCS Rollout in Switzerland Summary / Conclusions page 56 Wildenrath, 17 February 2012
57 Level 1 LS Implementation in Switzerland Summary / Conclusions Only by using the Limited Supervision mode can the entire Swiss rail network be converted to ETCS within a few years The cost compared to ETCS L1 Full Supervision is significantly lower, as existing signal interfaces can be reused, minimizing the impact on the existing infrastructure The safety level will be significantly higher than with the existing legacy systems due to higher availability and improved functionality Full interoperability is achieved with Limited Supervision with any ERTMS equipped train page 57 Wildenrath, 17 February 2012
58 ETCS Level 1 Limited supervision Summary / Conclusions Limited Supervision is an integrated feature of the ETCS baseline 3 (or baseline 2 with SRS 2.3.0d and CR 637) It has been defined to provide a possibility of introducing ETCS at lower cost, mostly by reducing the engineering effort and by allowing reusing of existing interfaces and data that might not be sufficient for full cab signalling The effort required for verification, validation, testing and acceptance is also significantly reduced, and existing operational principles and rules can be kept The Swiss case proves that these goals can be met Limited Supervision can be the ideal first step when introducing ETCS on a network page 58 Wildenrath, 17 February 2012
59 Thank you for your attention! page 59 Wildenrath, 17 February
SEARCH AND RESCUE CO-ORDINATION CENTRE (RCC) SAR Centre Zurich
07 JAN 06 GEN 3.6-07 JAN 06 GEN 3.6 SEARCH AND RESCUE. Responsible service The SAR service is under the responsibility of FOCA. The execution of SAR is delegated to the KAPO ZH (RCC) and the Swiss Air
More informationDr. Donald A. Keller, Direktor Regionalplanung Zürich und Umgebung RZU
METREX in Wroclaw, SEP19, 2009: Switzerland and Zurich Dr. Donald A. Keller, Direktor Overview 1. Introduction 2. The political conception of spatial planning in Switzerland 3. The Swiss federal policy
More informationFahrzeuge im Einsatz auf dem BLS-Liniennetz A
Fahrzeuge im Einsatz auf dem BLS-Liniennetz A s without steps ) Aarberg Aefligen Ausserberg Avenches RegioEpress with lowfloor RegioEpress without lowfloor B s without steps ) Bargen Belp Belp Steinbach
More informationpresented by Michael Schürch, Train Path Management
Increasing capacity through efficient timetabling - a practical experience presented by Michael Schürch, Train Path Management SBB Infrastructure Train Path Management Timetabling and network developing
More informationDelivery Zip Code City name pre 10:30
DOMESTIC EXPRESS 10:30 available cities in Switzerland Status August 2016 1000 LAUSANNE YES 1000 LAUSANNE 1 DEPOT YES 1000 LAUSANNE 12 YES 1000 LAUSANNE 14 YES 1000 LAUSANNE 16 YES 1000 LAUSANNE 17 YES
More informationSiL and Swisscom join forces on fibre-optic network in Lausanne. Press conference, Lausanne, 4 July 2012
SiL and Swisscom join forces on fibre-optic network in Lausanne Press conference, Lausanne, 4 July 2012 Fibre to the Home (FTTH) 2 Fibre-optic cable is significantly more effective than copper- and coaxbased
More informationProfile. A brief portrait of BLS. Well on track.
Profile A brief portrait of BLS Well on track. Contents Group 4 BLS: the company 4 BLS: the public limited company 5 2011 financial review 6 2011 key figures 7 Employees 8 Passenger transport 10 Railway
More informationsiemens.com/mobility Trainguard Full interoperability for rail traffic
siemens.com/mobility Trainguard Full interoperability for rail traffic Siemens we offer our customers optimized ETCS solutions One of the major challenges faced by society is to ensure mobility. To remain
More information1,433 in Switzerland. 2004 Annual Report of the Coop Group
1,433 in Switzerland Pronto Tankstelle Telli Aarau Tankstelle Bahnhofstrasse Aarberg Aarberg Pronto Tankstelle Aarburg Aarburg Lumimart Aarburg Pronto Tankstelle Abtwil Airolo Allaman Allaman Brico+Loisirs
More informationTrain Timetabling New Approach
Tran Tmetablng New Approach Tomáš Robenek CUSO Doctoral Programme n Operatons Research Sprng Semnar January 13, 2015 1 / 27 Lberalsaton 01.01.2010 2 / 27 Lberalsaton Overvew 3 / 27 Publc Sector Accessblty/Moblty
More informationTickets & prices. Valid from 13.12.2015 to 10.12.2016 GET ON BOARD. GET AHEAD.
Tickets & prices Valid from 13.12.2015 to 10.12.2016 GET ON BOARD. GET AHEAD. Networked and interconnected Get in, get around, get there Find your bearings Table of contents The Zürcher Verkehrsverbund
More informationCTCS Chinese Train Control System
CTCS Chinese Train Control System B. Ning, T. Tang, K. Qiu, C. Gao & Q. Wang Department of Control Engineering, School of Electronics and Information Engineering, Northern Jiaotong University, P. R. China
More informationAER Summer School 2010 W E L C O M E
DISPATCHING and OPERATION ST.GALLEN. AER Summer School 2010 W E L C O M E at the location of the rail control center DOSGA in St.Gallen SBB Infrastruktur Betrieb Region Ost Betriebsleitstelle DOSGA St.Gallen
More informationWhite Paper European Railway Traffic Management System - ERTMS
Kapsch CarrierCom White Paper European Railway Traffic Management System - ERTMS always one step ahead ERTMS: A common signaling and communication system. Railways operate in a competitive environment
More informationWith the power of the sun
With the power of the sun The power of the sun Protection from the sun while utilising its power Schenker Storen has been exploring ways of utilising the sun s energy for over 130 years. At the start of
More informationDominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail
MAXIMIZING THE RETURN ON INVESTMENT FROM ETCS OVERLAY Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail SUMMARY ETCS Level 2 offers many benefits to rail from reduced infrastructure costs, through
More informationATLAS. Proven Technology & Partnership For interoperability
ATLAS Trainborne ETCS solution Proven Technology & Partnership For interoperability TECHNOLOGY AND INTEGRATION EXPERTISE YOU CAN RELY ON The ERTMS (European Rail Traffic Management System) standard aims
More informationContents 2006/2007 Page
Contents 2006/2007 Page The duties of the Swiss Federal Roads Office (FEDRO) 2 Classification of motorways 3 Redistribution of financial responsibility: a reform project with significant consequences 4/5
More informationEuropean Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R
European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R Basis for interoperability European Rail Traffic Management System from Siemens Transportation Systems and Nokia Siemens
More informationprojects since 2000 health care 3 planning and consulting in health care 6
reference list projects since 2000 health care 3 planning and consulting in health care 6 2 health care Conversion and extension hospital, Meyriez GNS Gesundheitsnetz See, Murten Collaboration with Winkelmann
More informationSBB Facts and Figures.
SBB Facts and Figures. 2014 SBB 2014. SBB keeps Switzerland moving but how does it actually do that? These company statistics answer that question with a wide range of facts and figures. In addition to
More informationComplementary Tests: the key of the successful ERTMS deployment in Spain.
Complementary Tests: the key of the successful ERTMS deployment in Spain. M. Cambronero 1, A.. Arranz 1,, C. de la Roza 1, B. Domingo 1, J. Gómez 1 ; J. Iglesias 1, J. Santiago 2, C. Arias 3 1 ADIF. Spanish
More informationTickets & prices. Valid from 14.12.2014 to 12.12.2015 GET ON BOARD. GET AHEAD.
Tickets & prices Valid from 14.12.2014 to 12.12.2015 GET ON BOARD. GET AHEAD. Networked and interconnected Get in, get around, get there Find your bearings Table of contents The Zürcher Verkehrsverbund
More informationPress Release Swiss Arbeitgeber Award 2015
Press Release Swiss Arbeitgeber Award 2015 Occasion: Presentation of the Swiss Arbeitgeber Award 2015 Thursday, 17 September 2015, 6:30 pm, Hotel Marriott Zurich Organiser: icommit GmbH, Poststrasse 35,
More informationsiemens.com/mobility Trainguard LEU S21 Central trackside equipment component
siemens.com/mobility Central trackside equipment component cross-border safety with ETCS Level 1 Ensuring mobility is one of the big challenges in our society. To ensure our mobility in future, we need
More informationFacts & Figures. TUI Suisse Ltd Corporate Communications CH-8036 Zurich pr@tui.ch. June 2014
Facts & Figures 2014 TUI Suisse Ltd Corporate Communications CH-8036 Zurich pr@tui.ch June 2014 A Brief Portrait Key Figures TUI Suisse Ltd is the third largest tourism company operating in the Swiss market.
More informationMaking life more colourful
Colour range Making life more colourful Let colours speak Colours liven up your everyday life and with colourful blinds you can add individuality to a building. Whether you select blinds that are coloured
More informationSTRC. TMP-CH: Traffic Management Plans, a pilot study for western Switzerland. André Robert-Grandpierre, RGR SA Jeff Konnen, INSER SA
TMP-CH: Traffic Management Plans, a pilot study for western Switzerland André Robert-Grandpierre, RGR SA Jeff Konnen, INSER SA Conference paper STRC 2003 Session ITS STRC 3 rd Swiss Transport Research
More informationCertification Case: Locomotives for Corridor A (and more)
Certification Case: Locomotives for Corridor A (and more) Dr.ir. L. (Lieuwe) Zigterman MIRSE Inhoud Lieuwe Zigterman DoorZigt B.V. Casus: certificering ES64F4: Gebaseerd op ervaringen opgedaan bij KEMA
More informationDelivery Zip Code City name pre 12:00
DOMESTIC EXPRESS 12:00 available cities in Switzerland Status August 2016 1000 LAUSANNE YES 1000 LAUSANNE 1 DEPOT YES 1000 LAUSANNE 12 YES 1000 LAUSANNE 14 YES 1000 LAUSANNE 16 YES 1000 LAUSANNE 17 YES
More informationAn Introduction to Intermittent and Continuous ATP
An Introduction to Intermittent and Continuous ATP ir. WJ Coenraad FIRSE Version 2c dated February 13th, 2012 Introduction In contrast to road traffic, where the driver of the individual vehicle has the
More informationERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges
ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges J. Iglesias 1, A. Arranz 1, M. Cambronero 1,C. de la Roza 1, B. Domingo 1, J. Tamarit 2, J. Bueno 2, C. Arias
More informationMarshalling yards Infrastructure Operations. Offer Catalogue 2012.
Marshalling yards Infrastructure Operations. Offer Catalogue 2012. April 2012 Contents. 1. Central point of contact for general questions. 4 3 2. Marshalling yards. 4 2.1 Basel SBB. 4 2.2 Buchs SG. 7 2.3
More information3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND
RBC INTERFACE TO CURRENT INTERLOCKINGS IN FINLAND Laura Järvinen, M.Sc (Tech), VR Track Oy Lassi Matikainen, M.Sc. (Tech), VR Track Oy SUMMARY The signalling systems in Finland originate from many decades
More informationTECHNOLOGICAL MATURITY OF ERTMS ON THE READINESS OF ERTMS BASED SIGNALLING
Intended for Ministerie van Infrastructure en Milieu Document type Report Date August 2013 TECHNOLOGICAL MATURITY OF ERTMS ON THE READINESS OF ERTMS BASED SIGNALLING CONTENTS Executive Summary 1 1. INTRODUCTION
More informationThe Gotthard Base Tunnel
The Gotthard Base Tunnel The tunnel On 11 December 2016, the Gotthard Base Tunnel will come into scheduled operation. At 57 kilometres in length, it is the longest rail tunnel in the world. It has virtually
More informationERTMS/ETCS Configuration Management
ERTMS/ETCS Configuration Management Bernhard Stamm Siemens Transportation Systems Nick Cory Bombardier Transportation 1 Configuration Management What is it? What to? Why? How? When? Who does it? 2 Configuration
More informationTrainguard Sirius CBTC
siemens.com/mobility Trainguard Sirius CBTC For efficient mass transit operation Trainguard Sirius CBTC Trainguard Sirius communication based train control (CBTC) is Siemens Rail Automation s solution
More informationTarget areas, products, and prices 2016 Exposure digital and analog
Edition: Februar 2016 Update (prices, location, etc.): see website Pocket Planner Target areas, products, and prices 2016 Exposure digital and analog The key launches at a glance NEW Shopping epanel Portfolio
More informationEuropean Post-Merger Integration Survey February 2010
European Post-Merger Integration Survey February 2010 Survey purpose and approach The purpose of this survey is to show drivers and barriers as well as keys to success in the post-merger integration process
More informationERTMS for a competitive railway
ERTMS for a competitive railway A joint cross-border traffic management system for railways Sweden and Europe need a competitive railway system. With the focus on this, EU decided in 1996 that a standardized
More informationHow Can we Profit from Data Analytics? [B4] Uetliberg, 15.09.2015 www.boak.ch
[B4] Uetliberg, 15.09.2015 www.boak.ch OUTLINE Data science in business environment o o o o o Why? Areas People Process Tools and algorithms Applications o o o o Forecasting Production planning Geo-Fingerprint
More information«THE GENERALISTS AND SPECIALISTS FOR COMPLEX PROJECTS FROM DESIGN TO HANDOVER.»
Profile «THE GENERALISTS AND SPECIALISTS FOR COMPLEX PROJECTS FROM DESIGN TO HANDOVER.» ARCHITECTS AND GENERAL PLANNERS. SINCE 1922. PROJECT MANAGEMENT We plan, monitor and control the entire process from
More informationThe future is our responsibility. Axpo delivers energy
The future is our responsibility Axpo delivers energy Working for society, owned by the cantons The Axpo Group, comprising Axpo Power AG, Axpo Trading AG and Central schweizerische Kraftwerke AG (CKW AG),
More informationTrainguard Full Interoperability for European Railways
Siemens AG Transportation Systems Rail Automation P.O. Box 3327 D-38023 Braunschweig Germany Phone: (+ 49) (5 31) 2 26 28 88 Fax: (+ 49) (5 31) 2 26 48 88 Trainguard Full Interoperability for European
More informationTitel. Swiss Accident Investigation Board SAIB 2012 Annual Report
Titel Swiss Accident Investigation Board SAIB 2012 Annual Report Imprint Swiss Accident Investigation Board SAIB Bundeshaus Nord, Kochergasse 10, 3003 Berne Tel. +41 31 322 33 62 Fax +41 31 324 26 92 www.sust.admin.ch
More informationExtract from the 2014 annual report Vaudoise Insurance Group
Extract from the 2014 annual report Vaudoise Insurance Group 2 Vaudoise Insurance Group Extract from the 2014 annual report 3 Registered office Vaudoise Insurance Place de Milan P.O. Box 120 1001 Lausanne
More information15 February 2012, Zurich. Swisscom. Annual Results Press Conference 2012
15 February 2012, Zurich Swisscom Annual Results Press Conference 2012 On call for Switzerland Carsten Schloter CEO Switzerland: Price erosion reduces revenue Growth areas: Swisscom TV and mobile data
More informationSuccess with three networks: SBB Infrastructure. InnoTrans 2012.
Success with three networks: SBB Infrastructure. InnoTrans 2012. 2 SBB is playing a central role in the success for Swiss economy. The efficient rail network and reliable transport services facilitate
More informationERTMS/ETCS. Functional Requirements Specification FRS
ERTMS/ETCS Functional Requirements Specification FRS Version 5.00 Dated 21 June 2007 Filing number ERA/ERTMS/003204 Version No. Amendments Date Not known The amendments of this document have 08/11/94 been
More informationOnline. in the train
Online in the train We drive you surf. Swisscom and SBB are joining forces to offer the online train service for firstclass passengers. Passengers travelling in first-class InterCity carriages with a business
More informationzug : transportation
zug :transportation Bild «kreuzende Buse» nicht vorhanden Canton of Zug mobility guaranteed The canton of Zug is in acentral position. Short distances to work, to schools, to shops, to restaurants and
More informationDiplomandinnen und Diplomanden 2015 der Hochschule für Life Sciences FHNW
Kanton Aargau Albiez Maik Frick Bachelor in Life Science Technologies Brockmüller Sonja Laufenburg Bachelor in Life Science Technologies Gugger Nathanael Eiken Bachelor in Life Science Technologies Mittner
More informationSIMULATION OF TRAIN CONTROL SYSTEMS IN THREE DIMENSIONAL ENVIRONMENT
SIMULAION OF AIN CONOL SYSEMS IN HEE DIMENSIONAL ENVIONMEN B. Vincze 1, G. arnai 1 Budapest University of echnology and Economics, Dept. of Control and ransport and Automation Address: Bertalan L. u..,
More informationBiking your way through Switzerland Taking your bike with you on Postbuses
Belpstrasse 37 3030 Berne Biking your way through Switzerland Taking your bike with you on Postbuses Issued by Issue date Replace the issue from December 2011 August 2011 Planning on discovering Switzerland
More informationHanzelijn Technical solution for the signalling system Ronald Doeleman, MIRSE 25 november 2011 TRANSPORT
Hanzelijn Technical solution for the signalling system Ronald Doeleman, MIRSE 25 november 2011 TRANSPORT Hanzelijn : Context New line Lelystad-Zwolle (50 km) Hanzelijn - Technical solution - 25 November
More informationDiplomandinnen und Diplomanden 2014 der Hochschule für Life Sciences FHNW
Kanton Aargau Bosshart Sonja Bremgarten Master of Advanced Studies in Umwelttechnik und - Chiorazzo Tanja Kerstin Aarau Bachelor in Molecular Life Sciences Gasser Sascha Wallbach Bachelor in Life Science
More informationAbschlüsse an der Rechtswissenschaftlichen Fakultät vom 1. Januar bis 30. Juni 2015
Corporate Communication Medieninformation / Personalia 16. September 2015 Abschlüsse an der Rechtswissenschaftlichen Fakultät vom 1. Januar bis 30. Juni 2015 Nachname Vorname Ort Abschlussgruppe Ahadova
More informationAdvice for Liverpool Football Club supporters, Europa League Final. Liverpool FC v Sevilla FC Wednesday 18 th May 2016
Advice for Liverpool Football Club supporters, Europa League Final. Liverpool FC v Sevilla FC Wednesday 18 th May 2016 Turnstiles Open 17:45 - Kick off 20:45 Liverpool Football Club appreciates the dedication
More informationGSM-R Projects. Realized with GSM900
GSM-R Projects Realized with GSM900 GSM-R The System Solution The MORANE test and validation project Railway companies in Europe and all over the world have various different communication requirements
More informationDirect Democracy: a distinctive feature
12 Direct Democracy: a distinctive feature of Switzerland National Council elections every four years, plus four annual dates for popular votes, and it is not uncommon for additional votes to be held at
More informationSAT.VALID - A NEW DATA VALIDATION TOOL FOR COMMUNICATION BASED TRAIN CONTROL SYSTEMS (SUCH AS ETCS) SUMMARY 1 INTRODUCTION
SAT.VALID - A NEW DATA VALIDATION TOOL FOR COMMUNICATION BASED TRAIN CONTROL SYSTEMS (SUCH AS ETCS) Benedikt Wenzel, Dresden University of Technology Alexander Wolf, Dresden University of Technology Jörg
More informationEnergy efficiency in drivers training
D. of Security, Organization and Human Resources D. of Organization Training Division Energy efficiency in drivers training RENFE RESOURCES OVERVIEW Workforce Rolling stock Environment WORKFORCE. PROFESSIONAL
More informationBOMBARDIER INTERFLO*550 for ERTMS Regional
BOMBARDIER INTERFLO*550 for ERTMS Regional An application of ERTMS technology for Regional lines *Trademark of Bombardier Inc. and its subsidiaries What is Regional ERTMS? A UIC initiative, originally
More informationBegin using tomorrow s security features today.
Begin using tomorrow s security features today. Advantage Services : Life Cycle for Security Systems Building Technologies Software Update/Upgrade Technology Strategy Documentation System Modernization
More informationsiemens.com/mobility/vectron How to transform borders into connections? Vectron. The locomotive that s forging new paths. Creating Corridors
siemens.com/mobility/vectron How to transform borders into connections? Vectron. The locomotive that s forging new paths. Creating Corridors Creating Corridors With liberalized markets, widely varying
More informationSignaling Programme. Signaling Programme - Laboratory Test. 05.05.2015 Gitte Oberbossel
Signaling Programme Signaling Programme - Laboratory Test 05.05.2015 Gitte Oberbossel 1 Agenda F-Banen signaling programme and migration strategy Simple solution overview of signaling programme and scope
More informationLandside Accessibility - Report from Zurich Airport
3rd Airport Planning Seminar Landside Accessibility - Report from Zurich Airport Tina Wagner, European Centre of Transport and Logistics, TU Hamburg-Harburg The presentation is based on a study about the
More informationHow To Write A Train Control System
di Base tesi di laurea magistrale Model Driven Engineering of railway control systems with the openetcs process Anno Accademico 2013-2014 relatore Ch.mo Prof. Stefano Russo correlatori Ch.mo Dr. Domenico
More informationFit for the European Rail Market Training Competence - Certification
SIAFI Europe Seminar Paris, 29 September 2008 Fit for the European Rail Market Training Competence - Certification European Railway Agency Interoperability Unit n 1 EU Rail Policy: The Core Aim To adapt
More information_Talenture SA s structure and activities. Company INFO SHEET 2016
_Talenture SA s structure and activities Company INFO SHEET 2016 Talenture SA TAX, CORPORATE & ADMINISTRATIVE SERVICES 6900 LUGANO Riva Albertolli 1 Switzerland Phone: +41 91 9126480 info@talenture.org
More informationMiTraC Train ConTrol and ManaGeMenT system. Propulsion & Controls. This is a running title
MiTraC Train ConTrol and ManaGeMenT system 1 Propulsion & Controls The Brain of the Train A train speeding across the landscape at over 350 km/h is an impressive sight. So impressive it is, easy to forget
More informationHSL Zuid. Phase II Implementation Concept. Final Report. Study for alternative transport system on HSL Zuid
HSL Zuid Phase II Implementation Concept Final Report Study for alternative transport system on HSL Zuid DB International GmbH Central Germany and Western Europe Oskar-Sommer-Straße 15 D-60596 Frankfurt
More information2008 Profile. BLS AG in Facts & Figures
2008 Profile BLS AG in Facts & Figures Contents BLS AG Company 4 Organisation 6 Financial Review 8 Infrastructure Infrastructure 10 Railway network and operational control 12 Lötschberg NRLA 14 Infrastructure
More informationFINANCIAL SERVICES Audit and Advisory. Audit Accounting Tax Consulting
FINANCIAL SERVICES Audit and Advisory Audit Accounting Tax Consulting BDO SWITZERLAND History Visura Accounting Services Company; established in 1932 in Zurich and Solothurn Since 1992 member of the International
More informationAUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS
AUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS Benoit Bienfait and Patrick Zoetardt, Alstom Transport, Belgium Bob Barnard, Signalling Solutions Ltd, UK SUMMARY European Main
More informationA hybrid model-driven approach for development and testing of an ETCS component
tesi di laurea A hybrid model-driven approach for development and testing of an ETCS component Anno Accademico 2014/2015 relatore Ch.mo Prof. Dr. Stefano Russo correlatori Ch.mo Ing. Baseliyos Jacob DB
More informationTAX I NFO. Lump-sum taxation. Taxation based on costs
TAX Lump-sum taxation Taxation based on costs Introduction In this world, nothing is more certain than death and taxes (Benjamin Franklin) If Benjamin Franklin was right, the question arises as to how
More informationSelf-driving transport, On rails. SimTrans-IDA RISK Seminar June 6 th 2016
Self-driving transport, On rails SimTrans-IDA RISK Seminar June 6 th 2016 siemens.dk Agenda q Introduction q Grade of Automation definition q Concept q Safety Aspects q What are the benefits? q What are
More informationBanedanmark. TØF Jernbane i vækst. Signalprogrammet. Morten Søndergaard, Programme Director
Banedanmark TØF Jernbane i vækst. Signalprogrammet Juni 2010 Morten Søndergaard, Programme Director Agenda 1. Background 2. Total renewal principles 3. Roll out plans and time schedule 4. Procurement and
More informationAuthorised banks and securities dealers
Authorised banks and securities s Name City Licensing Bank type Securities type Aargauische Kantonalbank Aarau Bank / securities Cantonal banks acrevis Bank AG St. Gallen Bank / securities Regional banks
More informationThameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division
Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion Siemens Rolling Stock Portfolio in Great Britain We have some of the most reliable trains in UK.. Over 350 trains
More informationNetwork Statemen NETWORK STATEMENT. Annex A.1 Glossary. 1. Definitions
NETWORK STATEMENT Annex A.1 Glossary 1. Definitions Applicant (article 3, 11 of the Rail Code) Branch lines Dedicated lines Directory of track possessions (total line cuts - CTL) on the main network Framework
More informationIQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa
IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa July 2006 (Initial Document) August 2008 (Update) The action plan has been decided upon by the Ministries of Transport from Germany,
More informationAlstom in Switzerland
Over 120 years of experience in power generation and transport Alstom s Presence Neuhausen Bogie factory Engineering and maintenance platform Center for static and dynamic testing of bogies Commercial
More informationRail Automation. What is ACSES? usa.siemens.com/rail-automation
Rail Automation What is ACSES? usa.siemens.com/rail-automation What is ACSES? Siemens, a specialist in the area of US Cab Signal design, offers a carborne product that provides both Civil Speed Enforcement
More informationC a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s
C a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s High Speed Line (HSL) Zuid The Netherlands - Siemens project Dedicated 100 km high speed rail line between Antwerp (Belgium)
More information7. Infrastructure and logistics
tourism, (canton of ) 7. Infrastructure and logistics Table of contents 7.1 Transportation 7.2 Telecommunications 7.3 Energy 7.4 Customs clearance 7.5 Customs duties 7.6 Free ports (tax-free areas or bonded
More informationReferences: Fully automated metro lines worldwide
References: Fully automated metro lines worldwide Automation projects Paris, France, Metro Line 1 Siemens has equipped one of the oldest and most popular Paris Metro lines for driverless operation with
More informationCloud computing for maintenance of railway signalling systems
Cloud computing for maintenance of railway signalling systems Amparo Morant, Diego Galar Division of Operation and Maintenance Engineering Luleå University of technology Luleå, 97 817, Sweden Amparo.morant@1tu.se
More informationRailway Simulation & Timetable Planning
Your Local Partner for Railway Projects Anywhere in South East Asia Railway Simulation & Timetable Planning Engineering & Maintenance CONSULTING SIMULATION PLANNING ENGINEERING PRODUCTS TECH SUPPORT Simulation
More informationAgenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll Agenda 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
More informationEGNOS for rail applications
EGNOS for rail applications ERSAT project EGNOS Service Provision Workshop Copenhagen, 28-30 September 2015 Francesco Rispoli About us: Ansaldo STS Ansaldo STS is a leading technology company operating
More informationRail Line Radio Systems
Rail Line Radio Systems 1 Basic and substitute rail line connection Appendix F 1.1 Radio equipment units 1 ) on the railway infrastructure operated by SŽDC are used for basic, substitute or emergency rail
More informationThe train-path pricing system. Who pays how much to rail infrastructure?
The train-path pricing system. Who pays how much to rail infrastructure? SBB Infrastructure, July 2015 The train-path price covers 40 percent of infrastructure costs. SBB Infrastructure receives CHF 1.1
More informationThales: World leader in signalling technology and the worldwide ETCS infrastructure leader with the most successful track record in the industry
Thales: World leader in signalling technology and the worldwide ETCS infrastructure leader with the most successful track record in the industry TABLE OF CONTENTS The European perspective...3 The three
More informationRailway Safety and Infrastructure Management
NETWORK STATEMENT Annex A.1 Glossary 1. Definitions Applicant (article 3, 11 of the Rail Code) Branch lines Dedicated lines Department of Rail Safety and Interoperability (DVIS) Directory of track possessions
More informationAuthorised asset managers of collective investment schemes
1875 Finance SA 3V Asset Management AG Abaris Investment Management AG SZ Active Niche Funds SA Adveq Management AG AgaNola AG /SZ ALATUS CAPITAL SA Albin Kistler AG ALEXANDRE STUCKI INVESTMENT MANAGEMENT
More information2015 FISA TOUR PRESENTATION Updated to 10th July
2015 FISA TOUR PRESENTATION Updated to 10th July www.canottieriluino.it info@canottieriluino.it LAKE MAGGIORE Lake Maggiore is one of the largest Italian lakes with an area of 220 square kilometers; 20%
More informationReporting»» 8723-1 7266-2 35545-3 79633-23 5212-1 3912 +2 5587 +188 4566-1 9471-15 7233-2 41139 +222 18755-7 665 +18 76552-1 5862 +91 7458-1 115-1
International Train Monitoring Reporting Data Exchange 8723-1 5212-1 57452-1 7266-2 57452 79633-1 35545-3 15003 54403-14 57452-23 5212-14 -1 8612 +1 8965-8 7548 79633-1 -23-1 103-18 15003-14 74522-1 3912
More information