Final Report. Comparison among different decommissioning funds methodologies for nuclear installations. Country Report Italy
|
|
|
- Valerie Jackson
- 10 years ago
- Views:
Transcription
1 Science Centre North Rhine-Westphalia Institute of Work and Technology Institute for Culture Studies Wuppertal Institute for Climate, Environment and Energy Comparison among different decommissioning funds methodologies for nuclear installations Country Report Italy on behalf of the European Commission Directorate-General Energy and Transport, H2 Final Report Service Contract TREN/05/NUCL/S Wuppertal, 2007 Editor: Wuppertal Institut für Klima, Umwelt, Energie GmbH im Wissenschaftszentrum Nordrhein-Westfalen
2
3 TREN/05/NUCL/S Comparison among different decommissioning funds methodologies for nuclear installations Final Country Report (WP 1/WP 3) Italy Wolfgang Irrek, Lars Kirchner, Lutz Jarczynski, Wuppertal Institute Wuppertal, 31 October 2006
4 Italy TREN/05/NUCL/S Decommissioning Funding Contents Summary 1 1 Introduction and overview 2 2 Decommissioning strategies and costs Current and past decommissioning activities Future decommissioning strategies 8 3 Funds and fund management Setting aside funds Management of funds Special cases: Fall-back option and transfer of ownership 12 4 Transparency of the funding schemes to the public 18 5 Stakeholder analysis 19 6 Conclusions and recommendations 20 7 References 21 II Wuppertal Institute
5 TREN/05/NUCL/S Decommissioning Funding Italy Summary In Italy, the only operating nuclear facilities today are research and waste management facilities which do not set up any decommissioning plans, cost estimates or provisions. For the already shut down JRC facilities at Ispra, decommissioning cost estimates and EC budget lines exist. Italy has had four operating nuclear power plants, all of different technologies, but shut the last two down following the Chernobyl accident. Furthermore, other plants of the nuclear fuel chain were shut down, too. Decommissioning of the NPPs and of the fuel cycle installations will be completed by 2024, if a repository is available on time. With regard to financing of decommissioning, there is the special situation of an early shut down of these plants. In the context of privatisation and liberalisation, between 2000 and 2005, liabilities of former ENEL, FN and ENEA facilities were transferred to the company SOGIN which in turn has been transferred 100% to the Italian Ministry of Treasury. This means that today the state, respectively a state-owned organisation is responsible for decommissioning of these plants. Only one pilot fuel fabrication facility has been already completely dismantled. Total costs of decommissioning of all the facilities SOGIN is responsible for sum up to 4.03 billion Euro. Until 1999, i. e., before liabilities and funds were transferred to SOGIN, ENEL had accumulated provisions amounting to about 800 million Euro. FN and ENEA had not set up any provisions at all. About 80% of total decommissioning costs have to be paid by today s and future generations and not by the former generations who were benefiting from the nuclear power produced. Funds for these payments are collected by the electricity distribution companies via a surcharge on the electricity price to be paid by some of the customer groups. The distribution companies transfer the money to CCSE, which is an internal unrestricted fund of the state. CCSE then distributes funds to SOGIN according to SOGIN s needs to cover decommissioning expenditures. Uncertainties and intransparent methodologies with regard to decommissioning costs and financing include: Costs and dates of final disposal of high level waste and spent fuel are unknown and not really calculated yet. In how far the surcharges on the electricity price are sufficient to pay for future decommissioning costs, and in how far the total sum of surcharges will be equal, less or more than total decommissioning costs, remains intransparent and unclear. These intransparent methodologies and uncertainties should be reduced as soon as possible. Wuppertal Institute 1
6 Italy TREN/05/NUCL/S Decommissioning Funding 1 Introduction and overview Italy has had four operating nuclear power plants, all of different technologies, but shut the last two down following the Chernobyl accident. Furthermore, other plants of the nuclear fuel chain were shut down, too. The only operating nuclear facilities today are research and waste management facilities (cf. Table 1). The decision to shut down the plants was taken by the Interministerial Committee for the Econmical Planning (CIPE), a governmental body in charge of the strategic decisions on NPPs. CIPE then instructed the licensee at this time, i.e. the national electricity company ENEL, to start decommissioning actions according to the safe enclosure strategy. In 2004, Italy has changed its decommissioning strategy due to several reasons (cf., e.g., OECD/NEA 2006). Decommissioning of the NPPs and of the fuel cycle installations will now be completed by 2024, if a repository is available on time. With regard to financing of decommissioning, there is the special situation that the above-mentioned CIPE decision, in fact, meant an early shut down of some of the NPPs and nuclear fuel chain plants. In the context of privatisation and liberalisation, between 2000 and 2005, liabilities of former ENEL, FN and ENEA facilities were transferred to the company SOGIN which in turn has been transferred 100% to the Italian Ministry of Treasury. The Italian legislation regulating nuclear safety and radiation protection is centered on the following laws and regulations (OECD/NEA 2006): Law no issued in 1962, which is the Basic Act on the peaceful uses of nuclear energy, amended in 1965 and Excluded from the scope of the law are the nuclear installations for the generation of electricity, which are governed by the procedure laid down in Legislative Decree no. 230/95. Legislative Decree no. 230, issued in 1995 and amended in 2000, applies to all practices involving an ionising risk, including the construction, operation and decommissioning of nuclear power plants. In addition, the safety authority publishes technical guidelines. Decree no. 230/95, particularly article 55 to 57, describes the licensing procedures for decommissioning. The applicant has to present a global decommissioning plan and a detailed one for the first decommissioning phase. The licenses are granted by the Ministry for Productive Activities (MAP, basically the Ministry of Industry), looking for compliance with existing strategic guidelines, after consultation with the Ministries of Environment, Internal Affairs, Labour, and Health, together with the interested Regional Government, and on the basis of technical positions of the National Agency for Environmental Protection and Technical Services (APAT, previous ANPA). APAT carries out technical and scientific, regulatory and inspection activities related to environmental and resource matters. It has operational and administrative autonomy under the directives and the control of the Ministry of Environment. The advisory body of APAT is the Technical Commission for Nuclear Safeety and Health Protection from Ionising Radiations (Technical Commission). The advisory body of the Ministry of Environment is the 2 Wuppertal Institute
7 TREN/05/NUCL/S Decommissioning Funding Italy EIA Commission (Commissione VIA), giving technical advices on the environmental compatability of the projects. For the decommissioning of NPPs, the implementation of an EIA procedure including an Environmental Impact Study is required. In fact, every year SOGIN has to submit to the National Authority for the Electricity and Gas an updated report on the technical and economic plan of the global decommissioning project. The present inventory of Italian radioactive waste can be summarised as follows (OECD/NEA 2006): Low and Intermediate Level Wastes: - about 25,000 m3, stored at the sites of origin, and mainly not conditioned; - about 500 ton/year, annual generation; - about 50,000 to 60,000 m3 to be shipped to the national repository, including waste from dismantling. High level wastes: - about 9,000 m3 produced by dismantling; - about 75 to 150 m3 vitrified wastes back from the reprocessing of spent fuel; - about 60 to 70 dry storage casks. Until now, there is neither any site for final waste disposal nor a centralised interim storage facility for spent fuel and high level waste. After the political decision to stop nuclear power activities, shipments of spent fuel to reprocessing facilities abroad were practically suspended. At present, the inventory of spent fuel present in Italian nuclear installations, can be summarised as follows: about 230 ton U-Pu from NPPs; about 60 ton U-P from ENEL s participation to Superphenix ; about 4 ton U-Pu-Th from ENEA installations of various origins. The remaining fuel will be covered by a new reprocessing contract currently under negotiation. The only fuel that will not be reprocessed is the Uranium/Thorium fuel which has been shipped from the US NPP Elk River in the 1970s. SOGIN is looking to its transfer abroad or, as an alternative, to store it on-site in dry casks. Wuppertal Institute 3
8 Italy TREN/05/NUCL/S Decommissioning Funding Table 1 Overview on nuclear installations in Italy (Status: February 2006) Nuclear facility Short name Country Kind of facility * Output (Power in MW el for NPP) Garigliano IT NPP 150 MWe Latina IT NPP 153 MWe Caorso IT NPP 860 MWe Trino IT NPP 260 MWe Bosco Marengo FN IT Industrial scale plant for LWR Saluggia EUREX IT Pilot reprocessing facility Saluggia IFEC IT Pilot fuel fabrication facility Trisaia ITREC IT Pilot reprocessing facility Operational period Operating company Name of quoted companies holding shares in the nuclear facitlity, if any ** First criticality (in case of reactors) Percentage of shares held *** [%] Decomm. started in year Decomm. stage **** ENEL -> SOGIN -2 x ENEL -> SOGIN -2 x ENEL -> SOGIN -1 x ENEL -> SOGIN -1 x FN -> SOGIN x Early 1960s late 1980s ENEA -> SOGIN ENEA 3 Analysed in this report 1970s ENEA -> SOGIN x x 4 Wuppertal Institute
9 TREN/05/NUCL/S Decommissioning Funding Italy Cassacia Plutonio IT Pilot MOX fuel fabrication facility Cassacia OPEC 1 IT Hot cells Ispra-1 (EU; JRC site) Essor Ispra (EU) ENEA -> SOGIN x ENEA -> SOGIN IT RR x IT RR x LENA Triga II IT RR 250 kw 1965 today University of Pavia Tapiro, Casaccia Triga RC-1, Casaccia AGN Constanza Avogadro Compes Galileo Galilei, Pisa IT RR 5 kw 1971 today ENEA IT RR 1 MW 1960 today ENEA IT RR 1960 today IT Small reactor plant CISAM IT Small reactor plant University of Pisa 2 This list might not be exhausted since there might be further small research facilities not on the lists of installation collected in the course of this project. * Kind of facility: NPP = Nuclear Power Plant RR = Research Reactor ** Quoted: quoted on the stock exchange. Quoted companies directly or indirectly owning the nuclear installation or at least a part of it. *** Percentage of direct or indirect shares held by companies quoted on the stock exchange. **** Decomm. = Decommissioning. Decommissioning stages: Operating: Still in operation; not shut down yet 0 Decommissioning announced 1 Decommissioning to stage 1 2 Decommissioning to stage 2 3 Decommissioning to stage 3 3* Decommissioning to stage 3 without civil engineering x x Wuppertal Institute 5
10 Italy TREN/05/NUCL/S Decommissioning Funding -x Decommissioning in progress towards stage x Complementary information: a partly converted into a museum b converted into a spent fuel facility c Equipment dismantled, building to be reused d Contains damaged fuel elements e Chimney being partly dismantled f used as radioactive waste store Source: Diverse sources, among others, (7 May 2006), (14 July 2006), SOGIN, the Colenco/Iberinco questionnaire, and OECD/NEA 6 Wuppertal Institute
11 TREN/05/NUCL/S Decommissioning Funding Italy 2 Decommissioning strategies and costs 2.1 Current and past decommissioning activities IFEC, a pilot fuel fabrication facility located at Saluggia, which was operated by ENEA, is the only facility completely dismantled. All other facilities besides the still operating research facilities mentioned in Table 1 are in the process of decommissioning. When CIPE decided the definitive closure of all NPPs and the other facilities of the nuclear process chain, and to start decommissioning according to the safe enclosure strategy, consequent acts to support this strategy, clearance levels for the management and disposal of very low level waste, and specifically funding mechanisms were not in place. In this situation, decommissioning operations underwent significant delays (OECD/NEA 2006). Due to the lack of significant occupational dose advantages in further deferring decommissioning, the risk of losing the necessary specific competences, and the possibility of site reuse for industrial purposes a change in strategy occurred. At the end of 2004, SOGIN mission and technical directives issued by MAP have been updated and currently cover, among others, the decommissioning of the NPPs and of the fuel cycle installations by Since the end of 2004, it is furthermore possible to choose between the reprocessing option and interim storage of spent fuel. All decommissioning programmes and cost estimates have been revised by SOGIN respectively, and with a view to optimise societal costs and resources of the whole nuclear system. As it can be seen in Table 2, total costs of decommissioning of all the nuclear facilities SOGIN is liable for sum up to 4,029 million Euro 2003 (estimate was made in 2004). Between 1 Jan 2001 and 31 Dec 2004, 514 million Euro of these total decommissioning costs already occurred. The more than 4 billion Euro do not yet include final disposal costs relevant to high level waste and spent fuel, which are still uncertain as well as the date of the actual availability of a final disposal site. About 10,000 Euro per cubic meter has been considered as costs for a final disposal site (OECD/NEA 2006). However, the mentioned 4 billion Euro include final disposal costs relevant to low and intermediate level waste, as well as the interim storage costs of HLW and spent fuel waiting for the availability of an appropriate geological repository. It has to be noticed that at the time of closure of the plants, total decommissioning costs were estimated at 2 billion Euro for the four NPPs and 1 billion Euro for the four nuclear fuel cycle pilot plants. The National Authority for Electricity and Gas, regularly examines the overall adequacy of cost and controls the economic efficiency of the decommissioning activities and their project management. Wuppertal Institute 7
12 Italy TREN/05/NUCL/S Decommissioning Funding The cost estimates are carried out using deterministic methods and with the help of a specific tool, the Primavera Enterprise software for specific projects. Cost estimates are constantly updated, on the basis of design features and relative cost analyses for each of the nuclear installations, including spent fuel management. Budgetary estimates are used for calculating overheads. For the JRC facilities at Ispra, decommissioning cost estimates and EC budget lines exist (European Commission 2004). Several decommissioning activities have been carried out already, main activities are expected to take place between 2005 and 2010, further activities until reaching green field status in Discussions with the Italian authorities, mainly MAP and APAT, are ongoing, mainly focusing on reaching an agreement on the specifications for the conditioning of waste intended to be stored in the future Italian interim storage facility and on the transfer of the ultimate ownership of the waste and of the interim storage facility to a public entity. Between 1999 and 2003, decommissioning expenditures for the JRC facilities at Ispra amounted to 42 million Euro. In recent years, there have been different evaluations of expected total decommissioning costs, partly based on studies by external companies. While the JRC s 1998 evaluation based on two studies by external German and French consultants, estimated total decommissioning costs at 236 million Euro, the latest evaluation made in 2003 by a consortium of four companies arrived already at 595 million Euro (645 million Euro including the green field option; not including JRC s staff costs)(all figures in Euro 2003). The latter cost estimate was initiated by the Court of Auditors. 2.2 Future decommissioning strategies According to information by the University of Pavia (LENA Triga II), for the operating research facilities neither a decommissioning plan, nor any estimate of decommissioning costs or any provision for these costs exists. The research facilities expect the government to pay from its current budget when decommissioning activities have to be carried out. 8 Wuppertal Institute
13 TREN/05/NUCL/S Decommissioning Funding Italy Table 2 Expected total costs of future decommissioning of nuclear installations in Italy (in prices of 2004) Short name of nuclear facility Kind of facility: NPP = nuclear power plant RR = Research reactors Others: please specify Years decommissioning activities are expected to take place Total decommissioning costs estimated Annuity of estimated decommissioning costs in relation to output over lifetime [ct/kwh for NPP; 4%] Remarks Garigliano NPP < Costs of closure of the fuel chain and costs of final disposal of high level waste and spent fuel are not yet included here. Latina NPP Costs of closure of the fuel chain and costs of final disposal of high level waste and spent fuel are not yet included here. Caorso NPP Costs of closure of the fuel chain and costs of final disposal of high level waste and spent fuel are not yet included here. Trino NPP Costs of closure of the fuel chain and costs of final disposal of high level waste and spent fuel are not yet included here. New reprocessing procedure 322 Storage of irridiated fuel, which was previously placed in temporary dry storage, but which is now to be sent to reprocessing plants abroad under new contracts that have yet to be finalised, with the return of the resulting by-products to the not yet existing national repository not before Creys-Malville 139 Storage of part of the fuel from the Creys-Malville plant allocated to SOGIN, which calls for direct transfer of the fuel from France to the not yet existing national repository. Former reprocessing procedure FN EUREX Industrial scale plant for LWR Pilot reprocessing facility 432 Storage of irridiated fuel which, under previously negotiated contracts, has already been sent for reprocessing in the UK and whose by-products will be transferred directly to the not yet existing national repository Wuppertal Institute 9
14 Italy TREN/05/NUCL/S Decommissioning Funding ITREC OPEC 1 Pilot reprocessing facility Hot cells 280 Plutonio Pilot MOX fuel fabrication facility SOGIN Decommissioning Programme Management Costs SOGIN FACILITIES TOTAL COSTS 4,029 Not yet including costs of final disposal of high level waste and spent fuel. Between 1 Jan 2001 and 31 Dec 2004, 514 million Euro of these total decommissioning costs already occurred. Ispra-1 (EU; JRC site) Essor Ispra (EU) RR RR Until about LENA Triga II RR Not known yet Not calculated yet Uncertainties because costs of conditioning and final disposal in Italy can increase since a solution for this part of the back-end has not been found yet and since it is not clear when there will be a repository and how much JRC s contribution to its costs will be. Source: European Commission 2004; Ministry of Economy; SOGIN; University of Pavia. 10 Wuppertal Institute
15 TREN/05/NUCL/S Decommissioning Funding Italy 3 Funds and fund management 3.1 Setting aside funds During NPP operation, ENEL accumulated internal, unrestricted funds, but the early closure of these plants has prevented the reaching of the total amount of money necessary for the decommissioning. According to information by the Ministry of Industry, in total, decommissioning funds available to ENEL before SOGIN was created in 1999 amounted to around 800 million Euro, which were part in cash and assets and part in credits from CCSE, and which were totally transferred to SOGIN when liabilities were transferred, too. ENEA has not accumulated any fund for decommissioning. A Decree of the Ministry of Industry issued on 26 January 2000 states that decommissioning funds shall be complemented by a levy on the price of the sold kwh. This levy is the component A2 of the electricity tariff, which is one of several surcharges, of which only its sum is visible on the electricity bill. Figure 1: How today s and future electricity customers pay for remaining future decommissioning costs which cannot be covered by SOGIN on its own means in order to appropriately decommission its already shutdown facilities in Italy. Source: (11 July 2006), translated by Wuppertal Institute. Figure 4 shows how the levy is allocated by the distribution companies, and bimonthly transferred to a national fund called La Cassa conguaglio per il settore elettrico (CCSE). CCSE pays for all decommissioning costs which occur at SOGIN. SOGIN s Wuppertal Institute 11
16 Italy TREN/05/NUCL/S Decommissioning Funding accounting of payments from CCSE and decommissioning expenditures, of assets and liabilities follows national and international accounting standards. SOGIN has to regularly set up decommissioning programmes, which have to be approved by the national authority for electricity and gas. The authority also decides on the size of the component A2 of the electricity price: Currently, depending on the customer type, electricity customers in Italy pay between 0.00 and 0.05 ct/kwh electricity sold and between 0.00 and ct for each point of supply to CCSE to cover remaining decommissioning costs of SOGIN. The decommissioning programmes as well as the size of the levy are reviewed every three years. How much money has been paid to CCSE in total is not transparent. CCSE does not separate budgets for the different kind of surcharges. It is an internal, unrestricted fund of the state. The state is free in using the money being paid to CCSE for any purpose. According to the Ministry of Industry, the money has been partly used for other purposes of public interest that are not possible to identify analytically. However, the state remains responsible for guaranteeing the pertinent cost coverage during all phases of decommissioning. Until now, all needed activities for which SOGIN is called to fulfil on the basis of its mandate, have been executed in the appropriate time, the Ministry of Industry claims. Between 2001 and 2004, distribution of funds from CCSE to SOGIN has been around 568 million Euro in total. For the JRC facilities, and for the operating research facilities, no provisions are set up. For the JRC facilities, budget planning of the European Commission exists (European Commission 2004). 3.2 Management of funds While there is not more information available on the management of funds by CCSE, management of funds at SOGIN is well-documented in SOGIN s annual report. However, since SOGIN has already partly used the funds transferred to them from ENEL, and since the yearly contributions from CCSE, on average, will not be more than needed for yearly decommissioning activities, the funds which have to be managed are limited in size. Table 6 presents some information on the investment of the funds at SOGIN: About 74% have been invested into secure (mostly short-term) state bonds or other financial assets with fixed interest rates; Interest received before taxes was about 3.0% in Special cases: Fall-back option and transfer of ownership The Italian situation is characterised by an early shut down of nuclear facilities, followed by a transfer of ownership of liabilities from ENEL and ENEA to the company SOGIN which is now 100% state-owned. Therefore, except for the still operating re- 12 Wuppertal Institute
17 TREN/05/NUCL/S Decommissioning Funding Italy search facilities and the JRC facilities, the government is finally responsible and paying for all decommissioning activities. Of the 4.03 billion Euro estimated costs of decommissioning the nuclear installations SOGIN is liable for, 2.66 billion Euro (i. e. about two thirds) have to be paid by future generations who do not directly benefit from operation of the plants (via a surcharge on the electricity bill), and 568 million Euro (i. e. about 14%) have been paid by electricity customers in the years 2001 to This means, that, in total, about 20% of decommissioning costs have been paid by the generation who did directly benefit from operation of the plants. Wuppertal Institute 13
18 Italy TREN/05/NUCL/S Decommissioning Funding Table 3 Base for decommissioning funds required in Italy Short name of nuclear facility Kind of facility: NPP = nuclear power plant RR = Research reactors Others: please specify Please check if decommissioning funds are based on overnight / undiscounted decommissioning costs Please check if decommissioning funds are based on net present value / discounted decommissioning costs Discount rate used for discounting, if any Reference date used for discounting Remarks SOGIN facilities Diverse X ISPRA JRC facilities RR X LENA Triga II RR Not calculated yet Source: European Commission 2004; Ministry of Economy; SOGIN; University of Pavia. 14 Wuppertal Institute
19 TREN/05/NUCL/S Decommissioning Funding Italy Table 4 Decommissioning funds accumulated in relation to expected total costs of future decommissioning of nuclear installations in Italy (in prices of 2004) Short name of nuclear facility Kind of facility: NPP = nuclear power plant RR = Research reactors Others: please specify Total decommissioning costs estimated SOGIN facilities Diverse 4,029 (w/o costs of final disposal) Provisions accumulated by still in the balance sheet, 800 in total transferred from ENEL (SOGIN) n.a. (CCSE) Provisions accumulated in relation to expected costs [%] ca. 20% (ENEL->SOGIN) n.a. (CCSE) Years of operation until in relation to total expected lifetime [%] Remarks 100.0% For ENEA facilities, ENEA had not made any provisions. In 1999, ENEL transferred assets to SOGIN representing the provisions made by ENEL for its facilities ( nuclear-related allowances/advances ). In order to cover remaining future decommissioning costs of SOGIN facilities, electricity customers in Italy pay between 0.00 and 0.05 ct/kwh electricity sold and between 0.00 and ct for each point of supply to CCSE. This surcharge is collected by the distribution companies and transferred to CCSE. Every year, out of these provisions, SOGIN receives from CCSE as much money as needed to cover its cost, so that SOGIN will neither make any profit nor any loss. ISPRA JRC facilities RR 645 Paid out of the EC budget, therefore 0 0.0% 100.0% LENA Triga II RR No decommissioning plan, no cost calculations, no provisions yet. The government is expected to pay for decommissioning in the end. Source: European Commission 2004; Ministry of Economy; SOGIN; University of Pavia. Wuppertal Institute 15
20 Italy TREN/05/NUCL/S Decommissioning Funding Table 5 Management of decommissioning funds in Italy Short name of nuclear facility SOGIN facilities ISPRA JRC facilities Kind of facility: NPP = nuclear power plant RR = Research reactors Others: please specify Diverse RR Provisions accumulated by n.a. (ENEL/SOGIN+ CCSE) Paid out of the EC budget, therefore 0 of which has been accumulated within the own assets of the operator of the facility or its mother company 570 still in the balance sheet, 800 in total transferred from ENEL (SOGIN) Paid out of the EC budget, therefore 0 of which has been accumulated by the operator of the facility or its mother company within a separated account / segregated fund of which has been accumulated in an external fund under public control n.a. (CCSE) of which has been accumulated in an external fund under mixed privatepublic control LENA Triga II RR Share of funds the operator of the facility can access for other activities until the funds are needed for their original decommissioning purpose [%] as much as needed to SOGIN neither making any loss nor any profit Remarks Source: European Commission 2004; Ministry of Economy; SOGIN; University of Pavia. 16 Wuppertal Institute
21 TREN/05/NUCL/S Decommissioning Funding Italy Table 6 Investment of decommissioning funds until they are used for their original purpose Short name of nuclear facility Kind of facility: NPP = nuclear power plant RR = Research reactors Others: please specify Provisions accumulated by of which have been invested in secure state bonds of which have been invested in other assets with fixed interest rates of which have been lent to associated or joined companies or to third parties of which have been invested in other means (shares, mergers & acquisitions, etc.) Interest on invested financial means from decommissioning funds in 2004 [%] Interest on invested financial means from decommissioning funds in period [%] Remarks SOGIN facilities ISPRA JRC facilities Diverse RR 570 still in the balance sheet, 800 in total transferred from ENEL (SOGIN) n.a. (CCSE) Paid out of the EC budget, therefore 0 ca. 423 (including receivables from SICN) ca. 2 ca. 145 ca. 3.0% (before taxes) LENA Triga II RR % 0% Rough own estimate based on SOGIN s balance sheet: Definite links between assets on the left side and liabilities/provisions on the right side of the balance sheet cannot be drawn Source: European Commission 2004; Ministry of Economy; SOGIN; University of Pavia. Wuppertal Institute 17
22 Italy TREN/05/NUCL/S Decommissioning Funding 4 Transparency of the funding schemes to the public In principle, the funding scheme is transparent to the public. SOGIN regularly publishes annual reports including decommissioning cost estimates, expenditures and provisions. For the decommissioning of NPPs, the implementation of an EIA procedure including a Public Inquiry is required, whose comments are taken into account by the EIA Commission in making its advice. However, what is hidden to the customer is the exact surcharge A2 paid as part of the electricity bill, and the funds accumulated by the state or used already for other purposes at CCSE. 18 Wuppertal Institute
23 TREN/05/NUCL/S Decommissioning Funding Italy 5 Stakeholder analysis Main stakeholders are the Italian ministries, particularly the Ministry of Productive Affairs (Ministry of Industry) and the Ministry of Environment, the Regional Governments where the sites are located, the Parliament, the National Authority for the Electricity and Gas (AEEG), the National Agency for Environmental Protection and Technical Services (APAT, previous ANPA), the Technical Commission for Nuclear Safety and Health Protection from Ionising Radiations (Technical Commission) advising APAT, the EIA Commission (Commissione VIA) as the advisory body of the Ministry of Environment, the CCSE, the state-owned decommissioning company SOGIN, the not-for-profit organisation Associaziona Italiana Nucleare (AIN, Italian Nuclear Association), the National Agency for New Technology, Energy and Environment (ENEA), environmental NGOs, consumer organisations, the universities still operating research facilities, and the European Commission s JRC. In general, when the A2 levy is definied or modified, there are different stakeholders taking an attitude for complaining about supposed negative consequences for their interests. Except such kind of debate, according to the Ministry of Industry, there is not any pending contentious or formal objection about the present decommissioning financing system in Italy. The Italian government sees the need for European level harmonisation of decommissioning financing insuring that the single nuclear installation operators are responsible for collecting the needed financial amounts to be accumulated in segregated funds. Wuppertal Institute 19
24 Italy TREN/05/NUCL/S Decommissioning Funding 6 Conclusions and recommendations Due to the stop of nuclear activities after Chernobyl besides some research activities, the Government has taken over responsibility for decommissioning via SOGIN. However, although plants are shut down and decommissioning activities are ongoing, there are still some uncertainties and intransparent methodologies with regard to decommissioning costs and financing: Costs and dates of final disposal of high level waste and spent fuel are unknown and not really calculated yet. In how far the A2 surcharges are sufficient to pay for future decommissioning costs, and in how far the total sum of A2 surcharges will be equal, less or more than total decommissioning costs, remains intransparent and unclear. These intransparent methodologies and uncertainties should be reduced as soon as possible. Furthermore, it has to be stated that the early shut down meant a clear cross-subsidy from today s and future generations paying for about 80% of the decommissioning costs of nuclear installations to former generations who were benefiting from the nuclear power produced. 20 Wuppertal Institute
25 TREN/05/NUCL/S Decommissioning Funding Italy 7 References Annual company reports and balance sheets. Oral and written information by stakeholders. Questionnaire filled-in by the Italian government in the course of the DG TREN project Analysis of the factors influencing the selection of strategies for decommissioning of nuclear installations (Contract Number TREN/04/NUCL/S ) carried out by Colenco and Iberinco. --- European Commission (2004): Nuclear liabilities arising out of the activities of the Joint Research Centre (JRC) carried out under the Euratom Treaty, SEC(2004) 621 final, Brussels Ministro dell` Industria dell Commercio e dell`artigianato (2000): Decreto Ministeriale: Individuazione degli oneri generali afferenti al sistema elettrico OECD/NEA (2001): Nuclear Legislation in OECD Countries. Regulatory and Institutional Framework for Nuclear Activities: Italy, Paris, France OECD/NEA (2005): Workshop Conclusions/Final Stocktaking. Working Party on Decommissioning and Dismantling (WPDD): Safe, Efficient, and Cost-Effective Decommissioning September 2004, Rome, Italy OECD/NEA (2006): Decommissioning of Nuclear Installations in Italy Wuppertal Institute 21
Final Report. Comparison among different decommissioning funds methodologies for nuclear installations. Country Report Slovenia
Science Centre North Rhine-Westphalia Institute of Work and Technology Institute for Culture Studies Wuppertal Institute for Climate, Environment and Energy Comparison among different decommissioning funds
Final Report. Comparison among different decommissioning funds methodologies for nuclear installations. Country Report Bulgaria
Science Centre North Rhine-Westphalia Institute of Work and Technology Institute for Culture Studies Wuppertal Institute for Climate, Environment and Energy Comparison among different decommissioning funds
Final Report. Comparison among different decommissioning funds methodologies for nuclear installations. Final Report
Science Centre North Rhine-Westphalia Institute of Work and Technology Institute for Culture Studies Wuppertal Institute for Climate, Environment and Energy Comparison among different decommissioning funds
New legislation in the nuclear field in Sweden
1 New legislation in the nuclear field in Sweden A presentation at INLA Congress 2012 (Manchester) - 11 October 2012 by Ingvar Persson, Swedish National Council for Nuclear Waste and PP 1 Presentation
RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND
RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND 1. NATIONAL FRAMEWORK FOR MANAGEMENT AND REGULATION OF RADIOACTIVE WASTE AND DECOMMISSIONING 1.1 National framework 1.1.1 Overview of national
Estimation of Nuclear Fuel Cycle Cost and Accident Risk Cost (Statement)
Estimation of Nuclear Fuel Cycle Cost and Accident Risk Cost (Statement) November 10, 2011 Japan Atomic Energy Commission On September 27, the Japan Atomic Energy Commission (JAEC) established the Technical
Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation. G.. d Amored
Sino-Italian Cooperation Project Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation G.. d Amored Environmental Protection Agency of Piedmont Region (ARPA
Financing Nuclear Power Projects: Challenges and IAEA Assistance in Capacity Building
Financing Nuclear Power Projects: Challenges and Assistance in Capacity Building International Framework for Nuclear Energy Cooperation Finance Workshop London, 9-10 May 2012 Nadira Barkatullah International
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
EUROPEAN COMMISSION Brussels, 3.3.2015 COM(2015) 78 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the work under the nuclear decommissioning assistance
International Action Plan On The Decommissioning of Nuclear Facilities
International Action Plan On The Decommissioning of Nuclear Facilities A. Introduction Decommissioning is defined by the International Atomic Energy Agency (the Agency) as the administrative and technical
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations December 2011 Contents Contents... i Introduction... 1 Executive Summary... 1 Background...
Nuclear third-party insurance and liability.
ROADMAP TITLE OF THE INITIATIVE Nuclear third-party insurance and liability. LEAD DG RESPONSIBLE UNIT DG ENER.D.1 DATE OF ROADMAP 08 / 2013 This indicative roadmap is provided for information purposes
MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR)
MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR) Counterpart: Ministry of Economy 18 to 22 March 2013 Warsaw, Poland CONTENTS 1. EXECUTIVE SUMMARY... 3 2. INTRODUCTION... 5 3. OBJECTIVES
Japan s current Nuclear Energy Policy
Japan s current Nuclear Energy Policy Hirobumi Kayama Agency for Natural Resources and Energy, METI December, 2014 Evaluation and Policy Timeframe of Nuclear Power
Outlook for RWE s nuclear operations. Prof. Dr. Gerd Jäger London, 16 January 2012
Outlook for RWE s nuclear operations Prof. Dr. Gerd Jäger London, 16 January 2012 Overview of German nuclear power plants Power plant Net capacity MW Commercial commissioning Shutdown German nuclear power
nuclear science and technology
EUROPEAN COMMISSION nuclear science and technology The European Nuclear Decommissioning Training Facility II (EUNDETRAF II) Contract N o FI6O-CT2003-509070 Final report Project co-funded by the European
Cost Comparison of Spent Fuel Storage and Deep Geological Disposal
Unstable, Carbon Constrained dworld Cost Comparison of Spent Fuel Storage and Deep Geological Disposal GMS Abingdon Ltd [email protected] Two Assertions That the costs of storing spent fuel above
The Electricity Supply Bill 1
Bill no. 234 Folketinget (Danish Parliament) 1998-99 Unauthorised translation 30 June 1999 Submitted on 29 April 1999 by the Minister for Environment and Energy (Svend Auken) Adopted by Folketinget on
Decommissioning situation of Nuclear Power Plant in Japan
Decommissioning situation of Nuclear Power Plant in Japan April, 2015 The Japan Atomic Power Co. The Kansai Electric Power Co., Inc. General Description 1 Operational years of commercial NPP in Japan 40
Standardised Decommissioning Cost Estimating of WWER-440 Nuclear Power Plants (SCE)
COMMISSION OF THE EUROPEAN COMMUNITIES (5th Framework Programme) Standardised Decommissioning Cost Estimating of WWER-440 Nuclear Power Plants (SCE) Topical Information Meeting on Decommissioning of Nuclear
Status, responsibilities and missions of ANDRA (France)
Status, responsibilities and missions of ANDRA (France) Marie-Claude DUPUIS ANDRA - CEO Contents 1. Legal framework, organization and general information 2. ANDRA today: An Industrial Operator An Innovating
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
Provisional Translation Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report of Japan for the Second Review Meeting October 2005 Government
Experiences and Techniques in the Decommissioning of Old Nuclear Power Plants
Experiences and Techniques in the Decommissioning of Old Nuclear Power Plants Maurizio Cumo 1 University of Rome "La Sapienza," Department of Nuclear Engineering and Energy Conversion, Rome, Italy Lectures
List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page
List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page Overview 1 The Radiation Protection (Medical Exposures) Directive 11 The Public Information (Radiological Emergency)
Spanish Scenario for Spent Fuel Management
ENSA (Grupo SEPI) Spanish Scenario for Spent Fuel Management INMM Spent Fuel Management Seminar XXIX Arlington, VA January 14, 2014 David Garrido Design & Licensing Manager. Spent Fuel Cask Div. Equipos
RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT
RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT Commercial utilisation of nuclear power in Mexico started in 1990 and by 2002 there were
COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /..
EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XX/XX/2007 COM(2006) XXX COMMISSION REGULATION (EC) No /.. of [ ] implementing Council Regulation (EC) No 1085/2006 establishing an instrument
Radioactive Waste Management the French case
Radioactive Waste Management the French case Dr Gérald OUZOUNIAN ANDRA, Director [email protected] ATOMEXPO 2012 Content General policy principles and rules in France Status of radioactive waste
Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope.
Republic of Turkey Unofficial Translation 1 of the Turkish Law No. 5710 2 Concerning the Construction and Operation of Nuclear Power Plants and the Sale of Energy Generated from Those Plants Date of acceptance:
Guide to nuclear decommissioning
Guide to nuclear decommissioning Contents: What is decommissioning? Stages of decommissioning Site restoration Waste management The UK decommissioning industry The international picture What is decommissioning?
PRIORITY RULES ON COMPENSATION FOR NUCLEAR DAMAGE IN NATIONAL LEGISLATION
PRIORITY RULES ON COMPENSATION FOR NUCLEAR DAMAGE IN NATIONAL LEGISLATION (As of December 2009) The OECD Nuclear Energy Agency attempts to maintain the information contained in the attached table in as
A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division
A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose
RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay
RC-17 Radiation Protection in Waste Management and Disposal Implementing the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Alejandro V. Nader
ENSREG Conference Programme 2015
ENSREG Conference Programme 2015 Day 1 29 June 2015 Time Session Session Title number 8:45 9:30 Registration Suggested Moderator Topics Proposed speakers 9:30 10:30 Opening The EU approach to Nuclear Safety
Decommissioning of Nuclear Facilities in Sweden
Report 2007:7e from the Swedish National Council for Nuclear Waste Decommissioning of Nuclear Facilities in Sweden A report from the Council s hearing on December 2007 Swedish National Council for Nuclear
Safely delivering excellence in decommissioning, waste management and reprocessing
Sellafield site overview Safely delivering excellence in decommissioning, waste management and reprocessing www.nda.gov.uk www.sellafieldsites.com www.nuclearmanagementpartners.com People, partnerin Under
RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN THE NETHERLANDS 1. NATIONAL AND REGULATORY FRAMEWORK
RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN THE NETHERLANDS 1. NATIONAL AND REGULATORY FRAMEWORK 1.1 National framework 1.1.1 Overview of national policy One of the leading principles in the Dutch
Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system
French Domestic Safeguards inspections with regard to quality management system of the operators, in the field of nuclear material control and accountancy Julie LASNEL-PAYAN, Flavien LEMOINE, Bruno AUTRUSSON,
Nuclear Energy of Ukraine - History
Nuclear Energy of Ukraine - History 1950-s Uranium Industry was started 1962 Ministry of Energy and Electrification of Ukraine was established(ukraine a Republic of Soviet Union) 1965 Unique Energy System
IAEA Safety Standards for Regulatory Activities
Safety Standards for Regulatory Activities April 2010 Gustavo Caruso Regulatory Activities Section Division of Nuclear Installation Safety International Atomic Energy Agency Content Safety Standards and
NUCLEAR OPERATOR LIABILITY AMOUNTS & FINANCIAL SECURITY LIMITS
NUCLEAR OPERATOR LIABILITY AMOUNTS & FINANCIAL SECURITY LIMITS AS OF DECEMBER 2009 The OECD Nuclear Energy Agency attempts to maintain the information contained in the attached table in as current a state
Germany's renewable energy sector in the context of energy transition.
Oliver Frank Germany's renewable energy sector in the context of energy transition. May 11 th, Hong Kong 1 Agenda. About dena Energy transition / main trends in the German energy sector Renewable Energies
NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT
International Conference Nuclear Energy for New Europe 2002 Kranjska Gora, Slovenia, September 9-12, 2002 www.drustvo-js.si/gora2002 NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT
NUCLEAR OPERATOR LIABILITY AMOUNTS & FINANCIAL SECURITY LIMITS
NUCLEAR OPERATOR LIABILITY AMOUNTS & FINANCIAL SECURITY LIMITS AS OF JUNE 2011 The OECD Nuclear Energy Agency attempts to maintain the information contained in the attached table in as current a state
Re-assessing Costs in the European Power Sector. July 2013
Re-assessing Costs in the European Power Sector July 2013 The rise in non-conventional energy production in the United States along with the need to rebuild Europe s economy has led to a new focus and
Defining Energy Efficiency
Defining Energy Efficiency Wolfgang Irrek (Co-ordination) / Stefan Thomas with support from: Susanne Böhler, Meike Spitzner Introduction The term energy efficiency is interpreted differently in national
TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT
TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT 0 75 75 150 km Kocaeli (İzmit) BOSBORUS 0 İzmir Konya ANKARA 150 mi İçel (Mersin) REPUPLIC OF CYPRUS Iskenderun Adana SYRIA
UNOFFICIAL TRANSLATION. Explanatory Memorandum
UNOFFICIAL TRANSLATION Explanatory Memorandum Article 1, paragraphs 491 to 500, of Law No 228 of 24 December 2012, hereinafter referred to the Law, has introduced a tax on financial transactions applying
THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES
THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES Introduction 1. This statement of the UK Government and devolved administrations policy on the decommissioning of nuclear facilities updates
The Working Group (GECES) Of EU
EUROPEAN COMMISSION Directorate General Internal Market and Services Single market policy, Relation with the Council Brussels, 22.02.2012 1. Background COMMISSION EXPERT GROUP ON SOCIAL BUSINESS "GROUPE
Q1 2015 Earnings Presentation May 6, 2015
Q1 2015 Earnings Presentation May 6, 2015 1 Safe Harbor Statement Certain statements in the Business Update and Order Backlog sections contain forward-looking statements within the meaning of the safe
EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) 1. Online services on the Participant Portal
EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) PROCESSING OPERATIONS OF APPLICANTS DATA 1. Online services on the Participant Portal The Participant Portal offers online electronic services
Official Journal of the European Union
L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an
Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities. IAEA Headquarters Vienna, Austria
1 J7-TM-44883 Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities IAEA Headquarters Vienna, Austria 1 5 July 2013 INFORMATION SHEET 1. Background
ST. JAMES S PLACE UNIT TRUST GROUP
ST. JAMES S PLACE UNIT TRUST GROUP SUPPLEMENTARY INFORMATION DOCUMENT PARTNERS IN MANAGING YOUR WEALTH This document sets out terms and conditions which summarise how we will manage your investment. Words
ACT ON LIABILITY FOR NUCLEAR DAMAGE
ACT ON LIABILITY FOR NUCLEAR DAMAGE Published in the Official Gazette of the Republic of Slovenia - International Treaties, No. 77/2010 UNOFFICIAL TRANSLATION I. GENERAL PROVISIONS Article 1 (Contents)
APPENDIX CC NUCLEAR WASTE STORAGE
APPENDIX CC NUCLEAR WASTE STORAGE APPENDIX CC NUCLEAR WASTE STORAGE MICHIEL P.H. BRONGERS 1 SUMMARY Nuclear wastes are generated from spent nuclear fuel, dismantled weapons, and products such as radio
R A I S I N G F U N D S I N SWEDEN
R A I S I N G F U N D S I N SWEDEN Raising funds in Sweden Sweden can offer good opportunities and many ways to raise finance for businesses. The costs of establishing a Swedish limited company are low
THE DECOMMISSIONING OF THE TRINO NUCLEAR POWER PLANT
THE DECOMMISSIONING OF THE TRINO NUCLEAR POWER PLANT L.Brusa Eur.Eng R.DeSantis Eur.Eng P.L.Nurden I.Eng MIMgt MAPM Director, Plant Activities Co-ordination, Sogin, Italy. Decommissioning Planning Manager,
BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES
FINANCIAL INSTITUTIONS ENERGY INFRASTRUCTURE, MINING AND COMMODITIES TRANSPORT TECHNOLOGY AND INNOVATION PHARMACEUTICALS AND LIFE SCIENCES
Nuclear Finance Basics FINANCIAL INSTITUTIONS Offtakers Regulators Developers People International Stakeholders Government Operators Suppliers Public Legacy Managers Financers Insurers 2 NEPIO Government
The Price-Anderson Act and the Three Mile Island Accident
The Price-Anderson Act and the Three Mile Island Accident OECD/NEA Workshop Nuclear Damages, Liability Issues, and Compensation Schemes Overview Overview of Nuclear Liability in U.S. Three Mile Island
Feasibility Study for a EU Pension Fund for Researchers. European Commission Research Directorate-General
Feasibility Study for a EU Pension Fund for Researchers European Commission Research Directorate-General Executive Summary n RTD/DirC/C4/2009/026879 1 Executive Summary This report covers the main results
Management of spent fuel and radioactive waste in Finland national programme in accordance with Article 12 of the Council Directive 2011/70/Euratom
Management of spent fuel and radioactive waste in Finland national programme in accordance with Article 12 of the Council Directive 2011/70/Euratom 1 Contents Preface... 4 Introduction... 5 1 Overall objectives
THE CONSTRUCTION OF. Natural Gas 11% Coal 12% Industry 49% Nuclear 18%
THE CONSTRUCTION OF OLKILUOTO 3 IN FINLAND ND A CASE STUDY Summary The recent publication of the energy review and CoRWM s findings have ensured nuclear is currently top of the news agenda. With new build
The Risk Prevention Management System of the European Commission's staff
The Risk Prevention Management System of the European Commission's staff Calvo Alonso-Cortés, Antonio Directorate-General "Human Resources and Security" 200, Rue de la Loi, B-1049- Brussels, Belgium Phone:
NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012
NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012 Tanhua Jarmo Teollisuuden Voima Oyj 2 EU ENERGY ROADMAP 2050 NUCLEAR POWER IN ALL SCENARIOS Consumption of electricity
Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014
the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed
The Role of Nuclear Knowledge Management
The Role of Nuclear Knowledge Management A. Introduction The Agency has been a focal point for nuclear knowledge and information since its establishment in 1957. Nuclear knowledge management (NKM) came
The Kansai Electric Power Company, Incorporated and Subsidiaries
The Kansai Electric Power Company, Incorporated and Subsidiaries Consolidated Financial Statements for the Years Ended March 31, 2003 and 2002 and for the Six Months Ended September 30, 2003 and 2002 The
Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014
Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway
Security of electricity supply
Security of electricity supply Definitions, roles & responsibilities and experiences within the EU Thomas Barth Chairman of Energy Policy & Generation Committee EURELECTRIC Outline Security of Supply a
The consolidated financial statements of
Our 2014 financial statements The consolidated financial statements of plc and its subsidiaries (the Group) for the year ended 31 December 2014 have been prepared in accordance with International Financial
COMMISSION STAFF WORKING DOCUMENT. Elements of the Union greenhouse gas inventory system and the Quality Assurance and Control (QA/QC) programme
EUROPEAN COMMISSION Brussels, 12.8.2013 SWD(2013) 308 final COMMISSION STAFF WORKING DOCUMENT Elements of the Union greenhouse gas inventory system and the Quality Assurance and Control (QA/QC) programme
THE AMENDED RENEWABLE ENERGY SOURCES ACT 2014 (EEG 2014)
THE AMENDED RENEWABLE ENERGY SOURCES ACT 2014 (EEG 2014) 18.08.2014 Energy Regulatory & Governmental Affairs The Amended Renewable Energy Sources Act 2014 (EEG 2014) With the most recent amendment of the
Hinkley Point Nuclear Power Point
Hinkley Point Nuclear Power Point MEGAPROJECT Case Study Case compiled by: Naomi Brookes Contact details: [email protected] Basic Project Information Project Title Location Purpose Scope Contractual
Billions of euro 2013 2015 2017 EBITDA ~16.0 ~ 16.0 17-18 Net Ordinary Income ~ 3.0 ~ 3.3 4-5
Disclosures supplementing the Annual Report for the year ended December 31, 2012 requested by CONSOB pursuant to the provisions of Article 114, paragraph 5, of Legislative Decree 58 of February 24, 1998
UK Strategy for the Management of Solid Low Level Radioactive Waste from the Nuclear Industry
UK Strategy for the Management of Solid Low Level Radioactive Waste from the Nuclear Industry August 2010 Executive Summary The UK strategy for the management of solid low level radioactive waste from
Danish-German Energy Efficiency Summit. Cost effective policy instruments Obligations on Energy Companies
Danish-German Energy Efficiency Summit Cost effective policy instruments Obligations on Energy Companies Eoin Lees Senior Advisor RAP Europe 8 th February 2012 The Regulatory Assistance Project 48 Rue
Code of Conduct on Data Centre Energy Efficiency. Endorser Guidelines and Registration Form. Version 3.0.0
1 EUROPEAN COMMISSION DIRECTORATE-GENERAL JRC JOINT RESEARCH CENTRE Institute for Energy Renewable Energies Unit Ispra, 1 st January 2015 Code of Conduct on Data Centre Energy Efficiency Endorser Guidelines