1 Process retrofitting Davide Manca Lesson 5 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano L5
2 Process retrofitting Retrofitting refers to the addition of new technology or features to older systems. Process retrofitting consists in adding/modifying/revisiting/revising an existing process by introducing alternative ways of producing or exploiting some production issues so to enhance its operation, improve its efficiency, increase its economic appeal, reduce its impact, increase its sustainability, improve its flexibility. Retrofitting an existing industrial plant, by using the latest technology, usually allows increasing the production capacity and reducing the limitations and inefficiencies that were intrinsic to the original design. After retrofitting, the plant operation is usually more stable and can be operated more easily and with higher efficiency. Some examples: new profiles in the blades of wind turbines, new heat exchangers with improved efficiency, lower emission engines, more resistant building materials, more efficient mixers and separators, Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 2
3 Retrofitting the HDA process The design procedure should answer the following questions: What are the most important solutions to increase the productivity of new plants or to enhance the efficiency of existing ones? What are the process alternatives (i.e. Process Subsections, PSs) capable of retrofitting the existing plant? Is the PS a viable solution to cope with plant retrofitting? Is the PS economically viable in terms of revenues, installation costs, and working capital? If the PS is the optimal solution, how long should it run? Are there some suitable time intervals in the day, week, season, and even year when the designed PS should be run? Are there distinct PSs that should be operated in an alternating way by switching between them? D. Manca, R. Grana. Computers and Chemical Engineering 34 (2010) Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 3
4 A case study The proposed case-study allows tackling the retrofitting of a well-known process where the design activity is supported by the methodological approach to dynamic conceptual design. We focus on the hydrodealkylation process, HDA, that converts toluene to benzene. By observing the HDA process we can highlight a significant enthalpic content of the outlet stream from the reactor. Such stream is quenched to block any further side conversion of toluene to biphenyl and its enthalpic content is exploited to preheat the inlet stream to the reaction section (although it is not sufficient and some further heating is provided in the furnace to comply with the process specification). The questions are: is it possible to exploit the enthalpic content of the reactor outlet by a different equipment setup? are there any process units that could extract more value from the reactor outlet stream? Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 4
5 Stabilizer Product column Recycle column Flash The Feed-Effluent Heat Exchanger Purge Quench Gas recycle Furnace Compressor Cooler Reactor Heat exchanger Hydrogen feed Fuel Methane Toluene feed Benzene Toluene Biphenyl Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 5
6 Retrofitting the HDA process Some hints to the process retrofitting deal with a better exploitation of the energy content of the outlet stream from the reactor. Is it physically possible and economically viable to produce electric energy from the steam obtained by recovering the outlet enthalpic flux from the reactor? Is a power generation subsection feasible? We define the energy production section: EPS. It is the plant section where electric energy may be produced. Consequently, if we install the EPS it will also be necessary to preheat the inlet stream to the reactor by means of additional heat provided by the furnace. We have two alternatives with a further branch: Install the EPS Run the EPS continuously (i.e. 24/7) Run the EPS discontinuously when its revenues are higher then the additional expenditures due to the increased use of the furnace (i.e. a portion of the daily 24 hours) Not install the EPS Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 6
7 Retrofitting the HDA process In case of discontinuous operation of the EPS and FEHE alternatives, we are in front of a process alternative that could be operated at specific time intervals: D. Manca, R. Grana. Computers and Chemical Engineering 34 (2010) Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 7
8 Retrofitting the HDA process The alternating operation of the FEHE and the EPS requires switching between the exploitation of the energy flux from the reactor to preheat its inlet stream through the FEHE: Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 8
9 Retrofitting the HDA process and operating the EPS by bypassing the FEHE: We can suppose that the EPS is operated when the revenues from selling the electric energy are high whilst it could be more economically viable operating the FEHE when the price of electric energy is low, thus saving money by burning a smaller amount of fuel in the furnace. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 9
10 Retrofitting the HDA process This is a more in depth detail of the HDA plant running with the EPS layout: Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 10
11 Retrofitting the HDA process The EPS layout calls for new pieces of equipment such as: Evaporator/superheater Steam turbine Steam condenser Water recycle pump These process units must be designed and economically assessed in terms of CAPEX and OPEX terms. The OPEX terms should also take into account the increased demand of energy required by the furnace to heat the inlet stream to the reaction section since, when the EPS is running, the contribution from the FEHE is missing (actually the FEHE is bypassed and it is in standby). Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 11
12 Retrofitting the HDA process The EPS design undergoes a rather simplified approach that does not go into the mechanical and electrical details (where the support of both mechanical and electrical engineers is absolutely mandatory). By assuming an overall thermodynamic efficiency of the EPS equal to 35% we can appraise the amount of electric energy produced as a function of the enthalpic flux of the outlet stream from the reactor. We get the following thermal and electrical powers of the EPS: Evaporator Turbine Condenser Water pump 2.191E8 kj/h 0.767E8 kj/h 1.439E8 kj/h 0.015E8 kj/h Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 12
13 Retrofitting the HDA process According to the previous estimates, we can determine that: the turbine supplies an electric power of kw the furnace consumes more fuel equal to a thermal power of E8 kj/h If we burn fuel oil in the furnace, whose price was modeled as a function of the CO quotation, we have the following properties: Oil density: 900 kg/m 3 Heat of combustion: kj/kg We can deduce that, when the EPS is running, there is an additional request of 5964 kg/h of burning oil to operate the furnace according to the specifications for the inlet stream to the reactor. N.B.: the additional amount of fuel oil to the furnace could lead to an increased capacity of that process unit, thus increasing its investment cost. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 13
14 Economic assessment of the retrofitted HDA By using the simulated scenarios for the economic assessment of the conventional HDA plant we can determine the dynamic contribution of the economic potential of the EPS: Revenues k,, i j $ h F F ueloilstd max 0, C W W C F C 2 2 cond EE, k, i, j turb pump H O H O FuelOil, k, i FuelOilEPS F IC [$] IC IC IC IC IC IC tot turb evap cond pump furnaceeps furnacestd nweeks nhours DEPEPS, k $ Revenuesk, i, j ndaysperweek i 1 j 1 k 1,..., nscenarios IC tot Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 14
15 Economic assessment of the retrofitted HDA Since the model of the CO quotation was developed on a weekly basis then the price of EE will be averaged on the same weekly basis for each of the 24 time bands of the day. N.B.: the EPS and STD subscripts for the FuelOil and Furnace contributions refer respectively to the different costs of the equipment and operating expenses in presence or absence of the EPS. N.B.: the investment/installation costs, IC, of the additional equipment for the EPS can be evaluated by means of the Guthrie s formula (Guthrie, 1969). N.B.: the investment costs, IC, are not annualized. Conversely, they are considered as a whole since the very beginning of the EPS operation. By doing so, it is possible to determine the pay back period and the following economic feasibility of the EPS. N.B.: the EPS Revenues, by formalizing the max function contribution, translate the decision to operate that plant section only when the profit is positive. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 15
16 Economic assessment of the retrofitted HDA N.B.: the proposed economic assessment is quite simplified. No transients are taken into account when evaluating the DEP EPS. The absence of transients assumes that the plant can instantaneously switch from the FEHE to the EPS layout and back. In addition, no investigation about mechanical and thermal stresses on the involved equipment (furnace refractory, furnace pipes, turbine shaft, turbine blades, FEHE, evaporator, superheater, condenser) has been performed. N.B.: the unavoidable transients produced by switching between the FEHE and EPS alternatives may also produce some off-specs on the production quality thus introducing further elements to be discussed and possibly quantified. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 16
17 Economic assessment of the retrofitted HDA The cumulative revenues for 50 distinct scenarios show the following trend: US$ -10,013,000 Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 17
18 Economic assessment of the retrofitted HDA A five year period is on average not sufficient to recover from the initial investment, as it is shown in the fan diagram reporting 3,000 distinct scenarios: Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 18
19 Economic assessment of the retrofitted HDA as also shown in the following diagram of the probability density function: Only 33% of the scenarios allow reaching the break-even point between the expenses and revenues over a payback period of only five years. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 19
20 Economic assessment of the retrofitted HDA Equally, the cumulative distribution of the probability function over the same five-year horizon shows that only 1/3 of the economic scenarios have a positive return from the initial capital investment of US$ 10,013,000, whilst 2/3 have still a negative return. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 20
21 Economic assessment of the retrofitted HDA For longer time horizons the probability of not recovering from the investment decreases as shown in the following table: 5 years 66.5% 10 years 45.4% 15 years 27.5% 20 years 19.4% Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 21
22 About switching on and off the EPS It is quite interesting studying the distribution of the hours in the day and of the days/weeks in the year when the EPS should be operated. By picking just one forecasting economic scenario, for the five-year period, we can observe how the EPS should be operated only by daylight (i.e. in the 8:00 am - 9:00 pm band). Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 22
23 About switching on and off the EPS By considering the real market quotations of EE in the period, we would obtain: The hole in year 2008 corresponds to the high CO quotations. We can also observe that according to the period of the year the EPS should be switched on a different number of times in the day. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 23
24 About switching on and off the EPS The distribution of the times when switching on the EPS during a single day is the following: It is worth observing how the EPS should be switched on (and consequently off) a maximum of 3 times per day. In addition there is a good agreement between the historical data (yellow bars) and the five-year simulations (orange bars). Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 24
25 About switching on and off the EPS Further constraints can be introduced in the economic assessment of the retrofitted HDA plant so to reduce to a maximum of 1 or 2 operations per day the EPS. A further constraint can also be the definition of the minimum time both EPS and FEHE sections should be operated (once again to reduce the mechanical and thermal stresses on the equipment). Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 25
26 References Fini, E., Oliosi, M. (2010). Dynamic Conceptual Design. Tesi di Laurea specialistica. POLIMI. Guthrie, K. M. (1969). Capital cost estimating. Chemical Engineering, 76 (6), 114. Manca, D., Grana, R. (2010). Dynamic Conceptual Design of Industrial Processes. Comp. & Chem. Eng. 34 (5), Manca D. (2013). Modeling the Commodity Fluctuations of Opex Terms, Computers and Chemical Engineering, 57, 3-9. Manca D. (2013). A Methodology to Forecast the Price of Electric Energy, Computer Aided Chemical Engineering, 32, Mazzetto, F., Ortiz-Gutiérrez, R.A., Manca, D., Bezzo, F. (2013). Strategic Design of Bioethanol Supply Chains Including Commodity Market Dynamics, Industrial & Engineering Chemistry Research, 52, Rasello, R., Manca, D. (2014). Stochastic Price/Cost Models for Supply Chain Management of Refineries, Computer Aided Chemical Engineering, 33, Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 26
Dynamic Conceptual Design
Dynamic Conceptual Design Davide Manca Lesson 4 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano L4 Feasibility study of industrial processes The feasibility study
Conceptual Design. Davide Manca. Lesson 2 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano
Conceptual Design Davide Manca Lesson 2 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano Introduction The purpose of engineering is to create new material wealth.
Energy Savings in Methanol Synthesis : Use of Heat Integration Techniques and Simulation Tools.
Page 1 Energy Savings in Methanol Synthesis : Use of Heat Integration Techniques and Simulation Tools. François Maréchal a, Georges Heyen a, Boris Kalitventzeff a,b a L.A.S.S.C., Université de Liège, Sart-Tilman
Study Plan. MASTER IN (Energy Management) (Thesis Track)
Plan 2005 T Study Plan MASTER IN (Energy Management) (Thesis Track) A. General Rules and Conditions: 1. This plan conforms to the regulations of the general frame of the programs of graduate studies. 2.
Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin
Drying of Woody Biomass BioPro Expo & Marketplace / Atlanta, GA / March 14-16, 2011 Drying of Woody Biomass Conventional Direct Fired Dryer Technology Proprietary work of the Copyright Owner Issues with
Applicazione di tecniche di controllo predittivo multivariabile ad impianti di produzione a Ciclo Combinato
MPC of Combined Cycle Power Plants Torna al programma Applicazione di tecniche di controllo predittivo multivariabile ad impianti di produzione a Ciclo Combinato C. Aurora, P. Colombo, F. Pretolani - CESI
ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)
Claudio Cavandoli, Alessandro Crippa EDISON S.p.A., Engineering Department ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) 1 ANCILLARY SERVICES SUPPLIED TO THE GRID:
Zero Emission Engine. An Economic and Environmental Benefit
Zero Emission Engine An Economic and Environmental Benefit Saskia Scherfling Registration number: 731805 Department: VIII Course of studies: Process and Environmental Engineering September 2007 Table of
Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle
INL/CON-05-00740 PREPRINT Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle Geothermal Resources Council Annual Meeting Greg Mines October 2005 This is a preprint of a paper intended for publication
Natural Gas Conversions of Existing Coal-Fired Boilers
White Paper MS-14 Natural Gas Conversions of Existing Coal-Fired s Authors: F.J. Binkiewicz Jr., P.E. R.J. Kleisley B.E. McMahon J.E. Monacelli D.A. Roth D.K. Wong Babcock & Wilcox Power Generation Group,
Modelling and Simulation of the Freezing Systems and Heat Pumps Using Unisim Design
Modelling and Simulation of the Freezing Systems and Heat Pumps Using Unisim Design C. Patrascioiu Abstract The paper describes the modeling and simulation of the heat pumps domain processes. The main
GAS HEATING IN COMMERCIAL PREMISES
ENERGY EFFICIENCY OFFICES GAS HEATING IN COMMERCIAL PREMISES www.energia.ie www.energia.ie Typically, energy reductions of 10% or more can be made easily through maintenance and low cost improvements.
Hydrogen from Natural Gas via Steam Methane Reforming (SMR)
Hydrogen from Natural Gas via Steam Methane Reforming (SMR) John Jechura [email protected] Updated: January 4, 2015 Energy efficiency of hydrogen from natural gas Definition of energy efficiency From
The. Brendan P. Sheehan, Honeywell Process Solutions, USA, and Xin Zhu, UOP, a Honeywell Company, USA, explore energy optimisation in plant processes.
The Brendan P. Sheehan, Honeywell Process Solutions, USA, and Xin Zhu, UOP, a Honeywell Company, USA, explore energy optimisation in plant processes. The global trends and challenges driving the need for
OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW
ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management
How To Prevent Corrosion In A Steam Electric Power Plant
Keeping corrosion at bay Analysis in ultra-supercritical power plants Corrosion is the natural enemy of steam-electric power plants, eating away at pipes, turbine blades, and rotors. The lack of a separation
SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany
SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA Matthias Fränkle Siemens Power Generation (PG), Germany Page 1 of 11 1 Introduction Deregulation and competition are further
Reliability Modeling Software Defined
Reliability Modeling Software Defined Using Titan Reliability Modeling Software May 30, 2014 Prepared by: The Fidelis Group 122 West Way, Suite 300 Lake Jackson, TX 77566 Fidelis Group, LLC All Rights
Advanced gas turbine cycles: new solutions for the near future needs
Accordo di Programma MiSE-ENEA Advanced gas turbine cycles: new solutions for the near future needs Giuseppe Messina ENEA, Sustainable Combustion Processes Laboratory Roma, 24 June 2015 Sustainable Combustion
12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS
The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority
The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority 1 2 What is Efficiency? Efficiency: What you get divided by what you pay for Heatrate is a measure of plant efficiency
Balance of Fuel Cell Power Plant (BOP)
Balance of Fuel Cell Power Plant (BOP) Docent Jinliang Yuan December, 2008 Department of Energy Sciences Lund Institute of Technology (LTH), Sweden Balance of Fuel Cell Power Plant In addition to stack,
COMPARISON CONCERNING TO THE COGENERATION SYSTEMS DEVELOPMENT
COMPARISON CONCERNING TO THE COGENERATION SYSTEMS DEVELOPMENT Radu-Cristian DINU, Ion MIRCEA, Emilia-Marinela DINU University of Craiova, Faculty of Electrotechnique, Electroputere S.A., Craiova [email protected],
Optimization of Natural Gas Processing Plants Including Business Aspects
Page 1 of 12 Optimization of Natural Gas Processing Plants Including Business Aspects KEITH A. BULLIN, Bryan Research & Engineering, Inc., Bryan, Texas KENNETH R. HALL, Texas A&M University, College Station,
Energy consumption and heat recovery of refrigeration system in modern Arena
Energy consumption and heat recovery of refrigeration system in modern Arena By Alexander Cohr Pachai Johnson Controls Building Efficiency Christian X s Vej 201 8270 Hoejbjerg Denmark [email protected]
Evaluation of mobile storage systems for heat transport. G. Storch, A. Hauer, A. Krönauer ZAE Bayern, Walther-Meißner-Str. 6, 85748 Garching, Germany
Evaluation of mobile storage systems for heat transport G. Storch, A. Hauer, A. Krönauer ZAE Bayern, Walther-Meißner-Str. 6, 85748 Garching, Germany Outline Introduction Mobile Storage Units Case Studies:
CCS in the Oil refining Industry System Solutions and Assessment of Capture Potential
CCS in the Oil refining Industry System Solutions and Assessment of Capture Potential Daniella Johansson (PhD student) Supervisors: Prof. Thore Berntsson & Dr. Per-Åke Franck Division of Heat and Power
Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district
PLANT TORINO NORD Iren Energia is the company in the Iren Group whose core businesses are the production and distribution of electricity, the production and distribution of thermal energy for district
FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN
FULL ELECTRICAL LN PLANTS: HIHEST AVAILABILITY AND ENERY EFFICIENCY THROUH OVERALL SYSTEM DESIN Dr. Edwin Lerch Siemens A Infrastructure and Cities Sector, IC S SE PTI, ermany Phone: 49-9131-7-34052 Fax:
GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS
GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS by Kevin Rafferty Geo-Heat Center January 2000 REALITY CHECK Owners of low-temperature geothermal resources are often interested
Petroleum Refinery Hydrogen Production Unit: Exergy and Production Cost Evaluation
Int. J. of Thermodynamics ISSN 1301-9724 Vol. 11 (No. 4), pp. 187-193, December 2008 Petroleum Refinery Hydrogen Production Unit: and Production Cost Evaluation Flávio E. Cruz 1 and Silvio de Oliveira
How To Make A High Co 2 Gas Blend
ECONOMICAL OPTION FOR CO 2 / METHANE SEPARATION IN PRODUCED GAS CONTAINING A HIGH CO 2 FRACTION F. Patrick Ross, P.E. TPR Consulting 9907 Sagecourt Drive Houston, Texas 77089 (713) 870-9208 [email protected]
The soot and scale problems
Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications
The Second Law of Thermodynamics
Objectives MAE 320 - Chapter 6 The Second Law of Thermodynamics The content and the pictures are from the text book: Çengel, Y. A. and Boles, M. A., Thermodynamics: An Engineering Approach, McGraw-Hill,
How To Calculate The Performance Of A Refrigerator And Heat Pump
THERMODYNAMICS TUTORIAL 5 HEAT PUMPS AND REFRIGERATION On completion of this tutorial you should be able to do the following. Discuss the merits of different refrigerants. Use thermodynamic tables for
OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS
UNIT 61: ENGINEERING THERMODYNAMICS Unit code: D/601/1410 QCF level: 5 Credit value: 15 OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS 2 Be able to evaluate
HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS
HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS William K. Scullion, Application Engineering Leader, MEGTEC Systems, De Pere, WI Introduction Competitive pressures continuously motivate us to examine our
PERFORMANCE ANALYSIS OF VAPOUR COMPRESSION REFRIGERATION SYSTEM WITH R404A, R407C AND R410A
Int. J. Mech. Eng. & Rob. Res. 213 Jyoti Soni and R C Gupta, 213 Research Paper ISSN 2278 149 www.ijmerr.com Vol. 2, No. 1, January 213 213 IJMERR. All Rights Reserved PERFORMANCE ANALYSIS OF VAPOUR COMPRESSION
B0401 Abstract 029 Oral Presentation Session B04 Innovative Applications and Designs - Tuesday, July 1, 2008 16:00 h
Reference System for a Power Plant Based on Biomass Gasification and SOFC Richard Toonssen, Nico Woudstra, Adrian H.M. Verkooijen Delft University of Technology Energy Technology, Process & Energy department
1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.
Sample Questions REVISED FIRST CLASS PARTS A1, A2, AND A3 (NOTE: these questions are intended as representations of the style of questions that may appear on examinations. They are not intended as study
Financing Hydrogen Projects Business cases and political support
Financing Hydrogen Projects Business cases and political support Pierre Etienne Franc l Air Liquide, Technologies of the Future Director Chairman of the FCH JU Governing Board Sevilla, November, 16th 2012
How To Power A Power Plant With Waste Heat
Power Generation Siemens Organic Rankine Cycle Waste Heat Recovery with ORC Answers for energy. Table of Contents Requirements of the Future Power Supply without extra Fuel Siemens ORC-Module Typical Applications
Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems
Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems Sandra Scalari Enel Ingegneria e Ricerca SpA Copenhagen, May 27-28 th 2014 Enel Presentation Generation Shift & Market in Europe Enel
DE-TOP User s Manual. Version 2.0 Beta
DE-TOP User s Manual Version 2.0 Beta CONTENTS 1. INTRODUCTION... 1 1.1. DE-TOP Overview... 1 1.2. Background information... 2 2. DE-TOP OPERATION... 3 2.1. Graphical interface... 3 2.2. Power plant model...
Process Integration of Chemical Looping Combustion with Oxygen Uncoupling in a Coal-Fired Power Plant
Process Integration of Chemical Looping Combustion with Oxygen Uncoupling in a Coal-Fired Power Plant Petteri Peltola 1, Maurizio Spinelli 2, Aldo Bischi 2, Michele Villani 2, Matteo C. Romano 2, Jouni
Chapter 3.4: HVAC & Refrigeration System
Chapter 3.4: HVAC & Refrigeration System Part I: Objective type questions and answers 1. One ton of refrigeration (TR) is equal to. a) Kcal/h b) 3.51 kw c) 120oo BTU/h d) all 2. The driving force for refrigeration
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain
Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
RecoPhos Bench Scale Reactor
RecoPhos Bench Scale Reactor Design and Modelling Andreas Schönberg, Daniel Hariri RecoPhos Demonstration Event February 24th 2015 Content Basic of Development Setup and Design Modelling and Simulation
10 Nuclear Power Reactors Figure 10.1
10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of
Latest developments in ammonia production technology
By Svend Erik Nielsen Presented at "FAI International Conference in Fertiliser Technology" 12-13 April, 2007, New Delhi Latest developments in ammonia production technology Latest developments in ammonia
Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant
Supercritical CO2 Power Cycle Symposium September 9-10, 2014 Pittsburg, Pennsylvania USA Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant Dr. Leonid Moroz, Dr. Maksym
MICRO-COGENERATION AND DESALINATION USING ROTARY STEAM ENGINE (RSE) TECHNOLOGY
MICRO-COGENERATION AND DESALINATION USING ROTARY STEAM ENGINE (RSE) TECHNOLOGY Kari Alanne, Kari Saari, Maunu Kuosa, Md. Mizanur Rahman* Andrew Martin** Heikki Pohjola*** *Aalto University, Espoo, Finland
The Second Law of Thermodynamics
The Second aw of Thermodynamics The second law of thermodynamics asserts that processes occur in a certain direction and that the energy has quality as well as quantity. The first law places no restriction
Introduction to Process Engineering Economics. based on size of major equipment items allow to decide whether to invest in a detailed study
Reliability of estimates Accuracy versus cost Cost structure for building a new plant Typical plant cost evaluation methods Lang's factors Happel's method Chauvel-Guthrie's method Examples and applications
Basics of Kraft Pulping & Recovery Process. Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology
Basics of Kraft Pulping & Recovery Process Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology Outline History Goals Process Overview Kraft Pulping Process Kraft
GT2011 46090 ANALYSIS OF A MICROGASTURBINE FED BY NATURAL GAS AND SYNTHESIS GAS: MGT TEST BENCH AND COMBUSTOR CFD ANALYSIS
ASME Turbo Expo 2011 June 6 10, 2011 Vancouver, Canada GT 2011 46090 ANALYSIS OF A MICROGASTURBINE FED BY NATURAL GAS AND SYNTHESIS GAS: MGT TEST BENCH AND COMBUSTOR CFD ANALYSIS M. Cadorin 1,M. Pinelli
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11.
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions Nici Bergroth, Fortum Oyj FORS-seminar 26.11.2009, Otaniemi Loviisa 3 CHP Basis for the Loviisa 3 CHP alternative Replacement
Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:
31 Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: Construction of Group 1 of the Tokyo Electric Power Company s Kawasaki Thermal Power Station KIYOSHI KAWAKAMI
GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications
GE Oil & Gas Air cooled heat exchangers Robust and reliable for all loads and applications What it is Air cooled heat exchangers are commonly used in industrial applications where a reliable source of
Low grade thermal energy sources and uses from the process industry in the UK
Low grade thermal energy sources and uses from the process industry in the UK Yasmine Ammar, Sharon Joyce, Rose Norman, Yaodong Wang, Anthony P. Roskilly Sustainable Thermal Energy Management in the Process
HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3
HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- BY MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 SYNOPSIS JP Steel Plantech Co. has developed Hybrid system for EAF off-gas heat recovery, with EAF
Continuous flow direct water heating for potable hot water
Continuous flow direct water heating for potable hot water An independently produced White Paper for Rinnai UK 2013 www.rinnaiuk.com In the 35 years since direct hot water systems entered the UK commercial
ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES
ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES by Kazuhiro Takeda Research Manager, Research and Development Center and Kengo Hirano Instrument and Control Engineer,
Comparative Economic Investigation Options for Liquefied Petroleum Gas Production from Natural Gas Liquids
American Journal of Chemical Engineering 2015; 3(2-1): 55-69 Published online June 29, 2015 (http://www.sciencepublishinggroup.com/j/ajche) doi: 10.11648/j.ajche.s.2015030201.17 ISSN: 2330-8605 (Print);
Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines
Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Content Introduction...5 Standard ambient matched engine...5 Operating at high seawater with standard matched engine...6 Non-standard
BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author
BIOPOWER 5 CEX 1 Wärtsilä 10 January 2012 Presentation name / Author GENERAL INFORMATION ELECTRICAL OUTPUT 4.3 5.5 MWe HEAT OUTPUT Up to 10 MWth (16 t/h steam 1,3 bara) FUEL TYPE Wood chips, bark, saw
5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.
413 POWER PLANT ENGINEERING PART-A 1. Define Power. Power is the rate at which energy is used (or) Energy/time. 2. What are the types of fuels? Solid fuel Liquid fuel Gaseous fuel (Any one among the above
Steam Turbine Concepts for the Future Volatile Power Market
Steam Turbine Concepts for the Future Volatile Power Market Power-Gen Europe June 12 14, 2012 Michael Wechsung Thomas Loeper Radim Znajda Siemens AG - Energy Sector Fossil Power Generation Agenda Situation
Value of storage in providing balancing services for electricity generation systems with high wind penetration
Journal of Power Sources 162 (2006) 949 953 Short communication Value of storage in providing balancing services for electricity generation systems with high wind penetration Mary Black, Goran Strbac 1
12.5: Generating Current Electricity pg. 518
12.5: Generating Current Electricity pg. 518 Key Concepts: 1. Electrical energy is produced by energy transformations. 2. Electrical energy is produced from renewable and non-renewable resources. 4. Electrical
The Sustainability Revolution Research, innovation and optimal solutions for environmental sustainability
The Sustainability Revolution Research, innovation and optimal solutions for environmental sustainability Bjørn Kj. Haugland Chief Technology and Sustainability Officer, DNV Group The Sustainability Revolution
GENERATION TECHNOLOGY ASSESSMENT
SPO PLANNING ANALYSIS GENERATION TECHNOLOGY ASSESSMENT Technology Cost & Performance Milestone 2 Public Technical Conference OCTOBER 30, 2014 NOTE: ALL IRP MATERIALS ARE PRELIMINARY & SUBJECT TO CHANGE
Energy Efficiency in Steam Systems
Energy Efficiency in Steam Systems Fundamentals of Energy Efficiency: An Introductory Workshop April 2008 John S. Raschko, Ph.D. Mass. Office of Technical Assistance www.mass.gov/envir/ota (617) 626-1093
How To Make A Mine Guard Fosil Process
UOP Amine Guard TM FS Technology for Acid Gas Removal 2009 UOP LLC. All rights reserved. UOP 5241B-01 Agenda Overview of the Amine Guard FS process UCARSOL TM Solvent characteristics Amine Guard FS flow
TERMOSOLAR BORGES: A THERMOSOLAR HYBRID PLANT WITH BIOMASS
TERMOSOLAR BORGES: A THERMOSOLAR HYBRID PLANT WITH BIOMASS A. COT*, A. AMETLLER*, J. VALL-LLOVERA*, J. AGUILÓ* AND J.M. ARQUÉ* * COMSA EMTE MEDIO AMBIENTE, ITG, Av. Roma 25, 08029 Barcelona, Spain SUMMARY:
Fact Sheet Technology. Bergius-Pier Process (1)
tec Energy Technology Projects Subject: Bergius 1: 1924 1945 Rev: April 2006 Fact Sheet Technology The information included in this document is property of. Use and reproduction of this document, without
IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1. Abstract. 1. Introduction
IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1 Copyright 2010, Brazilian Petroleum, Gas and Biofuels Institute - IBP This Technical Paper was prepared
6 18 A steam power plant receives heat from a furnace at a rate of 280 GJ/h. Heat losses to the surrounding air from the steam as it passes through
Thermo 1 (MEP 261) Thermodynamics An Engineering Approach Yunus A. Cengel & Michael A. Boles 7 th Edition, McGraw-Hill Companies, ISBN-978-0-07-352932-5, 2008 Sheet 6:Chapter 6 6 17 A 600-MW steam power
Energy saving technology to deliver the fastest returns. Top 10 energy saving options
Energy saving technology to deliver the fastest returns Top 10 energy saving options How can you increase efficiency, reduce costs and cut your carbon emissions? Unstable energy prices, increased costs,
Directorate for the Built Environment Building Standards Division
Directorate for the Built Environment Building Standards Division Energy Management Solutions Ltd Investigation of measures to improve the energy performance of a existing building: Retail JUNE 2009 Report
This is a Master s degree level apprenticeship which includes academic learning combined workplace learning and training.
Power Engineer Degree Apprenticeship The UK s energy sector is integral to the prosperity and stability of the UK economy as a whole, delivering an absolutely fundamental service for all its citizens.
From solid fuels to substitute natural gas (SNG) using TREMP
From solid fuels to substitute natural gas (SNG) using TREMP Topsøe Recycle Energy-efficient Methanation Process Introduction Natural gas is a clean, environmentally friendly energy source and is expected
Putting a chill on global warming
Carbon capture and storage Putting a chill on global warming SABINE SULZER SULZER PUMPS MARKUS DUSS SULZER CHEMTECH Whenever fuel is burned, carbon dioxide (CO ) is emitted into the atmosphere. The subsequent
Last update: January 2009 Doc.: 08A05203_e
Last update: January 2009 Doc.: 08A05203_e Organic Rankine Cycle (ORC) modules ORC is a commercial technology for distributed production of combined heat and power from various energy sources. TURBODEN
Making Coal Use Compatible with Measures to Counter Global Warming
Making Use Compatible with Measures to Counter Global Warming The J-POWER Group is one of the biggest coal users in Japan, consuming approximately 2 million tons of coal per year at eight coal-fired power
Conventional Energy Sources
9.2 Conventional Energy Sources Key Question: What benefits and problems come with common sources of energy? Hints The word plant here is not the kind that grows out of the ground. In this section, plants
Waste Heat Recovery through Air Conditioning System
International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn : 2278-800X, www.ijerd.com Volume 5, Issue 3 (December 2012), PP. 87-92 Waste Heat Recovery through Air Conditioning
Thermal Coupling Of Cooling and Heating Systems
This article was published in ASHRAE Journal, February 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not
Committed to make a better world
Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to
Siemens Steam Turbine SST-600
Power and Gas Siemens Steam Turbine SST-600 This PDF offers an advanced interactive experience. This symbol indicates interactive content. For the best viewing experience, please use Acrobat Reader X or
THE DASH FOR GAS WHY UK BUSINESS CONSUMERS OF HEAVY FUEL OIL NEED TO CONSIDER CONVERTING TO NATURAL GAS
THE DASH FOR GAS WHY UK BUSINESS CONSUMERS OF HEAVY FUEL OIL NEED TO CONSIDER CONVERTING TO NATURAL GAS CONTENTS 3 Executive summary 4 Introduction 5 Key points to consider when converting from heavy fuel
ALONE. small scale solar cooling device Project No TREN FP7EN 218952. Project No TREN/FP7EN/218952 ALONE. small scale solar cooling device
Project No TREN/FP7EN/218952 ALONE small scale solar cooling device Collaborative Project Small or Medium-scale Focused Research Project DELIVERABLE D5.2 Start date of the project: October 2008, Duration:
Energy savings in commercial refrigeration. Low pressure control
Energy savings in commercial refrigeration equipment : Low pressure control August 2011/White paper by Christophe Borlein AFF and l IIF-IIR member Make the most of your energy Summary Executive summary
Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas
Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Mark Schiffhauer, ATSI Engineering Services Cameron Veitch, Combustion and Energy Systems Scott Larsen, New York State Energy
Development of a model for the simulation of Organic Rankine Cycles based on group contribution techniques
ASME Turbo Expo Vancouver, June 6 10 2011 Development of a model for the simulation of Organic Rankine ycles based on group contribution techniques Enrico Saverio Barbieri Engineering Department University
VAD. Variable Area Desuperheaters
Desuperheater overview Steam used in process plants can be superheated, that is, heated to a temperature above saturation. The excess of temperature above its saturation is called 'superheat'. Desuperheated
Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin
Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin Introduction Deep geothermal energy relates to the heat-energy stored