1 Associated General Contractors of California January 22, 2015
2 California Department of Corrections and Rehabilitation -Facility Planning, Construction and Management Deborah Hysen, FPCM Director Dean Borg, FPCM Deputy Director Keith Beland, FPCM/PMB Associate Director
3 CDCR At a Glance Total Square Feet: 43,000,000, Sq. Ft.+ Total Facilities: 33 Adult Prisons 1 New Prison Health Care Facility 3 Juvenile Facilities 43 Adult Fire Camps 1 Juvenile Fire Camp Total Acreage: 24,000 Acres+ Total Inmates as of Dec. 2014: 134,000+ Total Employees as of Dec. 2014: 66,000+
4 CDCR s Facility Planning, Construction and Management Division Full-Service Departmental Real Estate Firm. Oversees all leasing, architectural/engineering work, new construction, renovation, regulatory/code compliance, and maintenance Employees Director / Deputy Director: Deborah Hysen / Dean Borg Project Management Branch -Associate Director: Keith Beland
5 Why Work With CDCR?
6 Why CDCR? All projects are pre-planned with the institutions. All projects have approved phasing and sequencing agreements. We are a responsive Owner. We promote partnering. We pay promptly. We pay on PCOs. We process COs in a timely manner. We have many challenging projects.
7 CDCR Construction Program
8 Current CDCR Design and Construction Efforts Current Projects in Design: $972 Million Current Projects in Construction: $984 Million Five Year Forecast of New Projects: $500 Million (identified)
9 Current CDCR Project Delivery Models Design-Bid-Build id ild Design-Build Inmate/Ward Labor Construction
10 Design-Build Authority SBX2-4 (2009). SB 785 5( (2014). To date, CDCR has completed or is in process of completing 5 Design-Build projects.
11 Constructing to LEED Standard 8 LEED Gold Certified Projects 5 LEED Silver Certified Projects CMF 64-Bed CIW 45-bed SQ Central Health Services Building SVSP 64-bed
12 Recent Projects
13 California Health Care Facility, Stockton Cost: $1.1 billion Size: 1.1 million square feet Acreage: 144 acres Contractors: 3 Design-Build Teams (Granite/Hensel Phelps, p, Clark/McCarthy, Hensel Phelps) CM Firm: URS/Lend Lease Joint Venture
14 Kern Valley State Prison, Delano Arsenic Removal Water Treatment Plant Cost: $4.4 million Contractor: Preston Pipelines CM Firm: ARCADIS
15 California Medical Facility, Vacaville Enhanced Outpatient Program Treatment and Office Space Cost: $23.7 million Contractor: Roebbelen Contracting, Inc. CM Firm: gkkworks
16 R.J. Donovan Correctional Facility, Level II Dorm Facility Cost: $168.7 million Contractor: Sundt Layton CM Firm: Jacobs
17 Mule Creek State Prison, Level II Dorm Complex Cost: $332.3 million Contractor: Hensel Phelps CM Firm: Gilbane/Kitchell
18 Health Care Facility Improvement Program (HCFIP)
19 HCFIP Improvements Physical Plant Upgrades Renovation of Existing Space New Additions and Buildings Site Infrastructure Upgrades ADA Improvements Approximately 750, Sq. Ft. of Improvements
20 HCFIP Design Concepts Use Shared Support Spaces when Feasible Accommodate Accessibility requirements Standardize Medical Spaces Exam Rooms TTA Bays LVN Alcoves Nurse Stations Standardize di Medical lequipment Exam Room Nurse Station
21 HCFIP Design Concepts Health Care Environment Improved Work Flow Privacy Compliance with HIPAA Cleanable Surfaces Proper Hand Washing Facilities Proper Storage Facilities Information Technology Telemedicine and Electronic Health Records TTA Urgent Bay
22 New Buildings Types of new building construction include: Clinics Pharmacies and Laboratories Clinical Administration Space Approx. 55% New Construction Approx. 45% Renovation
23 Facility Wide Construction Bulk of the work is inside the secure perimeter Concurrent activities in multiple yards General lconditions i allow for 45 minutes to process through secure perimeter (30/15) Inside and outside lay down areas Custody escorts assigned at each prison Statewide memo to address security clearances, communications, equipment, debris and tools Mule Creek State Prison
24 Logistics and Sequencing Phasing and sequencing of work is critical Ensure safe prison operations and medical continuity of care Built in activation and deactivation timeframes IWL delivery is phased and coordinated with GC work
25 Capital Outlay & Infrastructure Projects
26 Capital Outlay & Infrastructure Projects Physical Plant Upgrades Electrical Upgrades Site Infrastructure Upgrades ADA Upgrades
27 Capital Outlay & Infrastructure Projects WWTP Upgrades
28 Capital Outlay Projects HVAC Upgrades
29 Upcoming Opportunities i
30 Upcoming Opportunities
31
32 Why CDCR? All projects are pre-planned with the institutions. i i All projects have approved phasing and sequencing agreements. We are a responsive Owner. We promote partnering. We pay promptly. We pay on PCOs. We process COs in a timely manner. We have many challenging projects.
California Department of Corrections and Rehabilitation California Health Care Facility (CHCF)
California Department of Corrections and Rehabilitation California Health Care Facility (CHCF) Stockton, CA project details Project Cost $900 million (total project) $512.9 million (DB-2 Package) Square
NMSU Alamogordo. (1) 2013 NM Higher Education Department New Mexico State University
NMSU Alamogordo Dr. Debra Teachman, Vice President for Academic Affairs Mr. Tony Salinas, Vice President for Business and Finance Ms. Nancy Montgomery, Director of Facilities (1) 2013 NM Higher Education
REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office
REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield
DESIGN-BUILD IN CALIFORNIA
DESIGN-BUILD IN CALIFORNIA 1. Why Design-Build Design Build Drivers, Goals and Challenges (see Reed Construction Data and DGS handouts) 2. Who Can Do Design-Build Design-Build Authorizing Statutes for
Business Information System Project
Business Information System Project Maintain Crosswalk Tables for TPA Claims Processing Page 1 of 12 Table of Contents 1 GENERAL INFORMATION... 3 2 BUSINESS NEEDS & REQUIREMENTS... 4 3 STARTING CONDITION
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS 2015 ENGINEERING DESIGN SERVICES AND CONSTRUCTION FORECAST CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS 2079 EAST 9 TH STREET, CLEVELAND, OH 44115 216-348-3800
CALIFORNIA CORRECTIONAL HEALTH CARE SERVICES CAREER EXECUTIVE ASSIGNMENT EXAMINATION ANNOUNCEMENT
CALIFORNIA CORRECTIONAL HEALTH CARE SERVICES - Bulletin ID: 08062015_7 Page 1 of 7 CALIFORNIA CORRECTIONAL HEALTH CARE SERVICES CAREER EXECUTIVE ASSIGNMENT EXAMINATION ANNOUNCEMENT The State of California
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. Terri Mestas Program Director
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Terri Mestas Program Director CMAA Southern California Chapter February 13, 2015 1 LACCD Overview Established in 1969 Governed by seven-member
Angelo State University Construction Report
May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning
California Department of Corrections and Rehabilitation
California Department of Corrections and Rehabilitation 1. Projected Program Budget $ 2,898,675 2. Projected Program Impacts MWh 6,912 MW (Summer Peak) 1.46 3. Program Cost Effectiveness TRC 1.98 PAC 2.01
TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM
GB3 Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 For Meeting of July 21, 2015 DISCUSSION ITEM PRELIMINARY PLANS FUNDING, MISSION BAY EAST CAMPUS PHASE 1 (BLOCK 33) BUILDING,
Flexible Office Space Up to 66,240 Ft 2
Flexible Office Space Up to 66,240 Ft 2 Building Description: Wide Open Large Office Complex Numerous Perimeter Offices, Conference & Break Rooms and Wide Open Office Space Throughout Can Be Modified to
Thank you for the opportunity to testify before the Review Panel on Prison Rape,
Testimony of James E. Tilton, Secretary C alifornia Department of Corrections and Rehabilitation Review Panel on Prison Rape Hearings on Sexual Assault and Victimization in Prisons Thank you for the opportunity
Central California Women s Facility (CCWF) Main Line (559) 665-5531
Avenal State Prison (ASP) Main Line (559) 386-0587 1 Warden s Office - Ext. 5000 2 PIO - Ext. 5028 3 Litigation Office - Ext. 6074 Litigation Administrative Asst. - Ext. 5036 4 Case Records - Ext. 5100
WHY MORE PUBLIC SECTOR OWNERS ARE CONSIDERING LEAN PROJECT DELIVERY BASED ON DATA-DRIVEN METRICS. Presented to LCI San Diego CoP January 15, 2015
WHY MORE PUBLIC SECTOR OWNERS ARE CONSIDERING LEAN PROJECT DELIVERY BASED ON DATA-DRIVEN METRICS Presented to LCI San Diego CoP January 15, 2015 Current State Future State What s Going On Elsewhere in
CAPITAL PROJECT COSTS!!! UNIVERSITY OF CALIFORNIA SANTA CRUZ
INTRODUCTION All Capital Project Budgets have 2 basic components: Construction Fees, Project Management, and Administration This presentation looks at COST DRIVERS that impact these 2 components and COST
Renewable Solid Fuel Boiler Project
22nd Annual IDEA Campus Energy Conference Northern Michigan University Renewable Solid Fuel Boiler Project Presented By: Robert Ryan, P.E. Northern Michigan University Randy Russell, P.E. HDR Cummins &
Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living
Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living York State College Pittsburgh www.ba-inc.com Barton
TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM AMENDMENT OF THE BUDGET AND SCOPE, JACOBS MEDICAL CENTER, SAN DIEGO CAMPUS
Office of the President GB4 TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For Meeting of July 17, 2014 ACTION ITEM AMENDMENT OF THE BUDGET AND SCOPE, JACOBS MEDICAL CENTER, SAN DIEGO CAMPUS EXECUTIVE
Program Management for School Construction
Program Management for School Construction Presented to: Pasadena Unified School District Board of Education January 13, 2009 Project Delivery Options Design Bid Build Design/Build Construction Management
Public Building Commission of Chicago. Board Meeting August 20, 2013
Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting
Assembly Bill No. 900 CHAPTER 7
Assembly Bill No. 900 CHAPTER 7 An act to add Chapter 3.2.1 (commencing with Section 15819.40), Chapter 3.2.2 (commencing with Section 15819.41), Chapter 3.11 (commencing with Section 15820.90), and Chapter
STATEMENT OF QUALIFICATIONS. Healthcare
STATEMENT OF QUALIFICATIONS Healthcare PROJECT LIST / Healthcare Facilities Huffman Builders West, Corona, CA Corona South Main Medical Plaza Office Building Kaiser Permanente, Del Mar, CA Carmel Valley
County of Los Angeles Consolidated Correctional Treatment Facilities June 09, 2015
June 09, 2015 1 Presenters Jim McDonnell, Sheriff, Los Angeles Sheriff s Dept. Dr. Mark Ghaly, Dept. of Health Services Dr. Marvin J. Southard, Dept. of Mental Health Dr. Wesley Ford, Dept. of Public Health
Agreement Number 5600001033 California Department of Corrections and Rehabilitation SCOPE OF WORK
SURVEY DESIGN AND ANALYSIS, GRANT AND PROGRAM EVALUATION I. INTRODUCTION/STATEMENT OF WORK Purpose/Goal The CDCR has been given the responsibility by the California Legislature in assisting the California
2015 CAMPUS STATEMENT
STATE UNIVERSITY OF NEW YORK UNIVERSITY AT STONY BROOK 2015 CAMPUS STATEMENT The University at Stony Brook got its start in 1957 at a temporary location on the Planting Fields estate in Oyster Bay, Long
Sullivan County Jail: Cost Analysis of Boarding Out vs. Building New
Sullivan County Jail: Cost Analysis of Boarding Out vs. Building New Two options are available to address the issue of the Jail: Boarding out prisoners to neighboring County Jails OR Construction of a
CITY OF EL PASO: SUN METRO Legislative Update Briefing
CITY OF EL PASO: SUN METRO Legislative Update Briefing Updated March 2014 OUR VISION The mission of Sun Metro is to provide a first-class public transportation service to all El Pasoans and visitors so
SAN FRANCISCO AIRPORT COMMISSION MINUTES
SAN FRANCISCO AIRPORT COMMISSION MINUTES July 19, 2011 9:00 A.M. Room 400 - City Hall #1 Dr. Carlton B. Goodlett Place (400 Van Ness Avenue) City and County of San Francisco EDWIN M. LEE, MAYOR COMMISSIONERS
OPERATOR - FACILITY ADDRESS - DATE
. Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.
REZONING 16-000009 & PRELIMINARY PLAT 16-000005
REZONING 16-000009 & PRELIMINARY PLAT 16-000005 REZONING REQUEST AND REVISED PRELIMINARY PLAT FOR THE BLUFFS AT WINDCASTLE - 4165 FAREDALE LANE Application: Engineer: Developer: Property Owner: Current
Los Angeles Community College District
Los Angeles Community College District BLUE AND GREEN TOGETHER Developing Sustainable Integrated Approaches to Green Technologies and Water Usage Green California Schools and Community Colleges October
How To Calculate Cost Of An Eco-Friendly Building
THE ECONOMICS OF LEED FOR EXISTING BUILDINGS FOR INDIVIDUAL BUILDINGS 2008 EDITION A WHITE PAPER BY LEONARDO ACADEMY INC. Revised February 2, 2009 APRIL 21, 2008 THIS WHITE PAPER SPONSORED BY JOHNSON CONTROLS
REBUILDING THE CTA FORREST CLAYPOOL, PRESIDENT CHRIS BUSHELL, SVP, INFRASTRUCTURE
REBUILDING THE CTA FORREST CLAYPOOL, PRESIDENT CHRIS BUSHELL, SVP, INFRASTRUCTURE Our Commitment: Increasing Investment Despite Lean Times Even while facing a $277M deficit, we are finding ways to rebuild
NFPA 1616 Mass Evacuation and Sheltering. Starting a Standard 101 NFPA 1616 5/1/2014. Orlando P. Hernandez. Dean Larson. NFPA must follow ANSI rules
NFPA 1616 Mass Evacuation and Sheltering Orlando P. Hernandez Dean Larson Starting a Standard 101 NFPA must follow ANSI rules For writing For revising standards Important Balanced representation on technical
APPEAL RECOMPUTATION OF THE AUDIT REPORT
APPEAL RECOMPUTATION OF THE AUDIT REPORT CREEKSIDE CONVALESCENT AND MENTAL REHAB. PROGRAM SANTA ROSA, CALIFORNIA PROVIDER NUMBER: ZZR06090J AND NPI NUMBER: 1760496566 FISCAL PERIOD ENDED DECEMBER 31, 2009
DIVISION OF HEALTH PLANNING AND RESOURCE DEVELOPMENT AUGUST 2014
DIVISION OF HEALTH PLANNING AND RESOURCE DEVELOPMENT AUGUST 2014 CON REVIEW HR-RC-0514-006 THE MISSISSIPPI METHODIST HOSPITAL AND REHABILITATION CENTER, INC. D/B/A METHODIST REHABILITATION CENTER RENOVATION
COUNTY OF LOS ANGELES PROBATION DEPARTMENT OPEN COMPETITIVE JOB OPPORTUNITY
COUNTY OF LOS ANGELES PROBATION DEPARTMENT OPEN COMPETITIVE JOB OPPORTUNITY Bulletin No. 964 Posting Date: January 18, 2011 JOB TITLE EXAM NUMBER DEPUTY PROBATION OFFICER I (RESIDENTIAL TREATMENT/DETENTION
REQUEST FOR QUALIFICATIONS for SURREY PRETRIAL SERVICES CENTRE EXPANSION PROJECT RFQ #3225 VOLUME 1 PROJECT BRIEF
Ministry of Public Safety and Solicitor General Ministry of Citizens Services Shared Services BC REQUEST FOR QUALIFICATIONS for SURREY PRETRIAL SERVICES CENTRE EXPANSION PROJECT RFQ #3225 VOLUME 1 PROJECT
Community Health Center Loan Application
(CHC) For financing community health center facilities (FQHCs, FQHC look-alikes, and on a case by case basis other health centers/ programs) - acquisition, renovation, construction and leasehold improvements
Water Conservation and the State s New Green Building Code for Residential Construction
Water Conservation and the State s New Green Building Code for Residential Construction Silver Sponsors Media Sponsors Certified Sponsors Solano County Water Agency Zone 7 Water Agency Founding Partners
NEVADA CITY WASTEWATER TREATMENT INQUIRY
NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
Place of Service Codes
Place of Service Codes Code(s) Place of Service Name Place of Service Description 01 Pharmacy** A facility or location where drugs and other medically related items and services are sold, dispensed, or
LEED PRESENTATION OUTLINE
16902 BOLSA CHICA STREET, SUITE 101 HUNTINGTON BEACH, CA 92649 TELEPHONE (714) 840-8230 FACSIMILE (714) 840-2490 LEED PRESENTATION OUTLINE I. Overview of Green Building and Risks Involved with Sustainability
END TO END HEALTHCARE SOLUTIONS
END TO END HEALTHCARE SOLUTIONS FRANKLIN SQUARE HOSPITAL CENTER EMERGENCY DEPARTMENT & PATIENT TOWER EXPANSION, BALTIMORE, MD FOCUSED ON HEALTH Lend Lease is one of the world s leading fully integrated
63rd Legislature AN ACT RECOGNIZING HOSPITAL ACCREDITATION GRANTED BY ENTITIES OTHER THAN THE JOINT
63rd Legislature SB0103 AN ACT RECOGNIZING HOSPITAL ACCREDITATION GRANTED BY ENTITIES OTHER THAN THE JOINT COMMISSION; AND AMENDING SECTIONS 50-5-101 AND 50-5-103, MCA. BE IT ENACTED BY THE LEGISLATURE
California Department of Corrections and Rehabilitation Enterprise Information Services. Business Information System Project
California Department of Corrections and Rehabilitation Enterprise Information Services Business Information System Project Initiation: January 2001 Completion: December 2012 2013 NASCIO Recognition Award
The Convergence of Healthcare and IT
The Convergence of Healthcare and IT UNDERSTANDING DATA CENTER OPTIONS IS A LOT LIKE BUYING BEER. By Hamilton Espinosa, Mark Thompson, and David Ibarra Introduction What does buying beer have to do with
LEAN PROJECT DELIVERY THROUGH DESIGN-BUILD
LEAN PROJECT DELIVERY THROUGH DESIGN-BUILD Presented to Arizona State University DBIA Student Chapter Co-sponsored by DBIA Arizona Chapter and LCI Arizona CoP February 24, 2015 In the Beginning + 80 percent
ROUTINE (NON-EMERGENCY) GROUND AMBULANCE SERVICES
California Department of Corrections and Rehabilitation (CDCR)/ (CPHCS) Scope of Work ROUTINE (NON-EMERGENCY) GROUND AMBULANCE SERVICES 1. INTRODUCTION/SERVICES A. Contractor shall provide on an as-needed
REQUEST FOR PROPOSAL ELECTRONIC MEDICAL RECORD PROJECT #12-009-ITS. Addendum #5
REQUEST FOR PROPOSAL ELECTRONIC MEDICAL RECORD PROJECT #12-009-ITS Addendum #5 May 8, 2012 BACKGROUND The California Department of Corrections and Rehabilitation (CDCR), California Correctional Health
20,000 s.f. office space available for lease
20,000 S.F. OFFICE SPACE Highlights: 20,000 s.f. office space available for lease 638 Bloomfield Avenue, Montclair, New Jersey Limited office space in new mixed-use development in downtown Montclair Highly
AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX. 46,000 + to 1,200,000 + SF Available
exclusively marketed by AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX 46,000 + to 1,200,000 + SF Available Aircraft Hangar, Maintenance Facilities and Support Office on USAF Base Tarmac
NUMBER 107-011-100 EFFECTIVE DATE. July 23, 2003
STATEWIDE POLICY NUMBER 107-011-100 EFFECTIVE DATE SUPERSEDES Policy 125-6-100 July 23, 2003 PAGE NUMBER Division Enterprise Asset Management July 23, 2003 Pages 1 of 9 REFERENCE ORS 276.004 and other
CoreNet Global Las Vegas Summit. LEED Unlocked: Keys to a Successful Sustainability Transformation
CoreNet Global Las Vegas Summit LEED Unlocked: Keys to a Successful Sustainability Transformation KeyBank and Johnson Controls Overview HEADQUARTERS Cleveland, Ohio HEADQUARTERS Milwaukee, Wisconsin ASSETS
GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR 2007-2008
GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR 2007-2008 GSA Mission Statement The General Services Agency assists in providing the foundation upon which County Government is
Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement
Guideline for Construction Reimbursement Rates 160-5-4-.16 (a) 7 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: 05-30-12 NEW CONSTRUCTION REIMBURSEMENT
GREEN JOBS STUDY U.S. GREEN BUILDING COUNCIL. U.S. Green Building Council 2101 L Street, NW, Suite 500 Washington, DC 20037
U.S. GREEN BUILDING COUNCIL GREEN JOBS STUDY Prepared for U.S. Green Building Council 2101 L Street, NW, Suite 500 Washington, DC 20037 Prepared by Booz Allen Hamilton 8283 Greensboro Drive McLean, VA
A SNAPSHOT OF JUVENILE FACILITIES IN ORANGE COUNTY
A SNAPSHOT OF JUVENILE FACILITIES IN ORANGE COUNTY SUMMARY All juvenile correctional facilities in Orange County are operated by the County Probation Department. Each facility is routinely inspected by
Brownfields Redevelopment Fund Asbestos and Lead Paint Abatement Application
Brownfields Redevelopment Fund Asbestos and Lead Paint Abatement Application Please fill in all applicable information in the spaces provided. If additional space is required to answer any question, please
ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning
Understanding the Hospital Planning, Design, and Construction Process Introduction California s acute care hospitals are an essential health care resource that serve a wide range of patients during times
Michael W. Ruth, LEED AP 34 Atherton Road Lutherville, Maryland 21093 (443) 722-7622 [email protected]
, LEED AP 34 Atherton Road Lutherville, Maryland 21093 (443) 722-7622 [email protected] CORE COMPETENCIES Cost Estimating Value Engineering Project Management Constructability Review Building Commissioning