1 Introduction Scope of Work Microsoft Infrastructure Upgrade The University of Texas M. D. Anderson Cancer Center (M. D. Anderson) in Houston, Texas, celebrating six decades of Making Cancer History, is one of the world s most respected institutions devoted exclusively to cancer patient care, research, education and prevention. Created by the Texas Legislature in 1941 as a component of The University of Texas System, M. D. Anderson continues to rank among the nations top cancer hospitals in U. S. News and World Reports America s Best Hospitals survey since its inception 15 years ago. M. D. Anderson s Division of Information Services currently operates an institution-wide network infrastructure comprised of wired and wireless network services. Network assets under management include, fiber and copper cable infrastructure, network switches and routers, SAN switches, wireless access points, terminal servers, uninterruptible power supplies (UPS), network sniffers and probes, as well as Wintel, Unix and Macintosh servers. It is also responsible for managing and maintaining systems related to Domain Name Service (DNS), Dynamic Host Control Protocol (DHCP), IP and Cable Record databases, Network Management systems, Authentication Servers, Remote Access (dial-in and VPN), and the Mail (SMTP) Hub. The current infrastructure supports well over 500 (Wintel, Novell, Macintosh, and other) servers, many of which are clustered. As part of ongoing enhancements to our information technology infrastructure, M. D. Anderson began implementing Microsoft Corporation s Active Directory (AD) as a replacement for the installed Novell Directory Services (NDS) schema. To date, between 3,000 and 4,000 clients (out of close to 20,000 workstations) have been migrated to eight AD systems, including those supporting such key areas as Human Resources, Diagnostic Imaging, and Radiation Oncology. M. D. Anderson began implementing Lotus Notes as a solution for electronic mail, calendaring, and collaboration in the mid-1990s. To date, the Institution has undergone three version release Notes upgrades and is now faced with another costly upgrade (to Release 6), as well as significantly increased per user licensing costs. Finally, we are unable to effectively leverage usage volumes across the State of Texas government and/or The University of Texas System due to the very low prevalence of this platform across other state agencies and universities. RFP for Microsoft Infrastructure Upgrade Page 1 of 15
2 At present, there are over 15,000 Lotus Notes end users with over 1,500 Notes applications and databases across the M. D. Anderson enterprise. Of those applications, as many as 80 are considered to support critical workflow processes (e.g., personnel evaluations). Section I. Purpose of the RFP M. D. Anderson has prepared this Request for Proposal (RFP) document to facilitate the selection of a Contractor to complete the following key activities: 1. Development of a design for the campus-wide rollout of Microsoft Corporation s Active Directory (AD) architecture, 2. Development of a design for the campus-wide rollout of a Microsoft Exchange based infrastructure as a replacement for Lotus Notes electronic mail and calendar functions, 3. Development and execution of an integrated project plan that implements AD, file and print services and Exchange during a single visit to a client workstation, and 4. Campus-wide implementation of AD, Microsoft file and print services, and Microsoft Exchange based mail and calendar functions as replacements for the current infrastructural components. Finally, only proposals from firms familiar with the current M. D. Anderson infrastructure (including the current AD and Novell Directory Services as well as Lotus Notes implementation, along with our mission critical ClinicStation application) will be considered. Section II. RFP Design and Implementation Intention M. D. Anderson intends to issue this RFP in order to select a single vendor to develop the designs requested in this RFP. Additionally, the selection of this vendor will be based on their experience in successfully implementing these types of solutions. The following are the steps and options which will be followed: 1. Responses to this RFP shall provide pricing and detailed approach for the specified design activities, deliverables and timeline/milestones. The RFP response must provide references and qualifications. 2. M. D. Anderson will select a vendor and negotiate an agreement for the specified design activities and deliverables. RFP for Microsoft Infrastructure Upgrade Page 2 of 15
3 3. The selected vendor shall complete the activities within the scope of this RFP, including developing a proposal for implementation of the integrated project plan that includes the pricing, timeline/milestones, and approach. 4. M. D. Anderson will evaluate the design, proposed pricing, timeline/milestones and scope from the vendor engaged for this RFP. M. D. Anderson may take one of the following actions based on the results of this evaluation: a. Complete the implementation developed in the initial phase with internal resources. b. Negotiate the design implementation scope, price, and schedule with the vendor and continue the implementation based on the revised agreement. This may include removing deliverables, or changing the timeline to meet the available budget, staffing, or other needs of M. D. Anderson. c. Failing to negotiate an acceptable agreement for implementation with the design vendor, M. D. Anderson will prepare a new RFP to select another vendor based on the design created from the initial phase. Section III. Engagement Scope M. D. Anderson has identified the following scope components as being essential to the success of the contract service engagement. Each of these scope areas are detailed in the sections that follow: 1. Section IV. Active Directory Design (below) 2. Section V. Microsoft Exchange Design (on page 5) 3. Section VI. Microsoft File and Print Services Project Plan (page 7) 4. Section VII. Integrated Conversion Project Plan (on page 8), and 5. Implementation of Microsoft Infrastructure Conversion Solution (page 8). Section IV. Active Directory Design M. D. Anderson Goals M. D. Anderson has identified the following fundamental expectations for this engagement component: 1. Assessment of the current infrastructure environment as well as the design of the enterprise-wide AD architecture must be conducted in a highly collaborative forum that relies on consensus focused team meetings as opposed to interviews with selected individuals. Specifically, we expect to engage between seven (7) RFP for Microsoft Infrastructure Upgrade Page 3 of 15
4 and ten (10) representatives from key AD constituent organizations as part of the assessment and design activities. 2. As part of this engagement, M. D. Anderson is seeking baseline training for the M. D. Anderson design team regarding AD technology and best practice based design and implementation. 3. Within the context of collaboration with key AD participants, M. D. Anderson requires that this engagement provide an opportunity for understanding all issues and decisions that need to be made in order to produce a successful AD implementation. This is to include a discussion of the options and capabilities of group policies. 4. This engagement must provide a venue for group discussions of potential designs and associated trade-offs, leading to a consensus regarding the AD conceptual design that would best meet enterprise-wide core needs. Key Activities Assessment The Assessment phase of this engagement component shall include (at minimum) the following, along with any other activities needed to assess the current M. D. Anderson infrastructure and the potential impact of migrating the entire campus to use of Active Directory (AD): 1. Gather information about the current AD environment at M. D. Anderson 2. Build an understanding about the (campus-wide) operational environment that is to be supported by AD 3. Identify the potential (customer) impact of AD as a new architecture upon support delivery functions 4. Identify any gaps, major issues and risks associated with deploying AD on a campus-wide basis Design The Design phase of this engagement component shall result in a comprehensive design for deployment of Active Directory (AD) technology across the M. D. Anderson campus. Specific activities that must occur within this engagement phase include: 1. Development of the preferential future state including features and functionality of AD to be deployed at M. D. Anderson, RFP for Microsoft Infrastructure Upgrade Page 4 of 15
5 2. Identification of design component integration or interactions that must occur in order to deploy the needed AD framework across the Institution, 3. Development of a high-level AD design, along with any corresponding deployment options, 4. Development of group policies for an enterprise implementation, 5. Cost estimation for hardware and software needed to implement the developed AD design (across the M. D. Anderson enterprise), 6. Preparation of an overall cost estimate for the implementation of AD based on the developed high-level design and set of assumptions, and 7. Development of a formal Active Directory Component Project Plan for the implementation of the campus-wide Active Directory solution. Section V. Microsoft Exchange Design M. D. Anderson Goals M. D. Anderson has identified the following fundamental expectations for this engagement component: 2. Determination of the high-level strategy for migrating from Notes to Microsoft Exchange, including selection of the appropriate version (e.g., Microsoft Exchange 2003, 2007, etc.) 3. Determination of the overall cost of migrating from Notes to Microsoft Exchange, including messaging, applications, and ongoing operations 4. Assessment of the current Notes environment as well as the design of the enterprise-wide Exchange architecture must be conducted in a highly collaborative forum that relies on consensus focused team meetings as opposed to interviews with selected individuals. Specifically, we expect to engage between seven (7) and ten (10) representatives from key Notes constituent organizations as part of the assessment and design activities. 5. Incorporation of the following into the proposed Exchange design: a. Equivalent or higher service levels as a result of the migration b. Lowered hardware footprint and bandwidth usage c. Documented and agreed upon migration path d. Operation of proposed Exchange environment as a utility RFP for Microsoft Infrastructure Upgrade Page 5 of 15
6 6. Delivery of baseline training regarding Microsoft Exchange technology and best practice based design and implementation. 7. Provide an opportunity for collaboratively communicating and understanding all issues and decisions that need to be made in order to produce a successful Exchange implementation. 8. Facilitation of group discussions of potential designs and associated trade-offs, leading to a consensus regarding the Exchange conceptual design that would best meet enterprise-wide core needs. Key Activities Assessment The Assessment phase of this engagement component shall include (at minimum) the following, along with any other activities needed to assess the current M. D. Anderson infrastructure and the potential impact of migrating the entire campus to use of Microsoft Exchange: 1. Gather information about the current Lotus Notes environment at M. D. Anderson and any related strategic directions established by management: a. Strategic direction including application architecture and technologies, enterprise directory, and messaging/collaboration, b. Current messaging environment including architecture (centralized, distributed), current products (Exchange, Lotus Notes), as well as any other collaboration solutions, c. Current Notes/Domino application environment including number of applications, geographic distribution of applications and users, number of users, and number of key, heavily developed, custom developed solutions, 2. Build an understanding about the (campus-wide) operational environment that is to be supported by Microsoft Exchange 3. Identify the potential (customer) impact of Exchange as a new architecture upon support delivery functions 4. Identify any gaps, major issues and risks associated with deploying Exchange on a campus-wide basis 5. Prepare a high-level Microsoft Exchange migration strategy that includes the specific Microsoft Exchange version (e.g., 2003, 2007, etc.) RFP for Microsoft Infrastructure Upgrade Page 6 of 15
7 Design The Design phase of this engagement component shall result in a comprehensive design for deployment of Microsoft Exchange technology across the M. D. Anderson campus. Specific activities that must occur within this engagement phase include: 1. Development of the preferential future state including features and functionality of Exchange to be deployed at M. D. Anderson: a. Active Directory infrastructure (including migration of current Notes Name and Address Book), b. Exchange messaging environment, c. Microsoft collaboration services (i.e., Windows SharePoint Services), d. Application infrastructure to support.net applications (i.e., SharePoint Portal Server), and e. Deployment of any client software (if required), 2. Identification of design component integration or interactions that must occur in order to deploy the needed Exchange framework across the Institution, 3. Development of a high-level Exchange design, along with any corresponding deployment options, 4. Plan for continuing support or migration of the current Notes applications. Based on the design analysis a plan must be developed for customer access to all applications. Migration plans and schedules will be based on the estimated cost and budget allocation. This may be a multi-year migration. 5. Cost estimation for hardware and software needed to implement the developed Exchange design (across the M. D. Anderson enterprise), 6. Preparation of an overall cost estimate for the implementation of Exchange based on the developed high-level design and set of assumptions, and 7. Development of a formal Exchange Component Project Plan for the implementation of the campus-wide Exchange solution. Section VI. Microsoft File and Print Services Project Plan M. D. Anderson Goals M. D. Anderson has identified the following fundamental expectations for this engagement component: RFP for Microsoft Infrastructure Upgrade Page 7 of 15
8 1. Determination of the overall cost of migrating from Novell Netware based file and print services to those provided within the proposed Microsoft file and print infrastructure, 2. Delivery of baseline training regarding current Microsoft file and print services technology and best practice based design and implementation, 3. Collaboratively communication and understanding of all issues and decisions that need to be made in order to produce a successful Microsoft file and print services implementation, and 4. Development of a File and Print Services Component Project Plan for the replacement of Novell file and print services with that based in industry standard, Microsoft networking technology across the M. D. Anderson campus. Key Activities This engagement component shall result in a File and Print Services Component Project Plan for deploying of Microsoft file and print services technology across the M. D. Anderson campus (as a replacement for the current Novell Netware based infrastructure). Specific activities that must occur within this engagement phase include: 1. Review and confirmation of the preferential future state including features and functionality of Microsoft file and print services to be deployed at M. D. Anderson, 2. Preparation of a plan for integration and synchronization with the installed Novell Identity Manager application. This process will be done in coordination with the Identity Management application team. 3. Cost estimation for hardware and software needed to implement the developed Microsoft file and print services design (across the M. D. Anderson enterprise), 4. Preparation of an overall cost estimate for the (campus-wide) implementation of Microsoft file and print services based on the developed high-level design and set of assumptions, and 5. Development of a formal File and Print Services component project plan for the implementation of the campus-wide Microsoft file and print services solution. Section VII. Integrated Conversion Project Plan M. D. Anderson Goals M. D. Anderson has identified the following fundamental expectations for this engagement component: RFP for Microsoft Infrastructure Upgrade Page 8 of 15
9 1. Development of an Integrated Microsoft Infrastructure Conversion Solution Project Plan that addresses needed server infrastructure and client workstation migration and is based on a single visit to a client workstation for purposes of implementing Microsoft Active Directory (AD), file and print services and Exchange, that includes: a. Internal (M. D. Anderson) staffing resources, b. Training requirements (end users, technical support staff) c. Contract services d. Hardware e. Software / tools f. Other expenses g. Migration schedule h. Testing requirements (end users, technical support staff) i. Communication plans (end users, technical support staff, others) j. Other plan components as defined by the applied project management methodology Section VIII. Implementation of Microsoft Infrastructure Conversion Solution M. D. Anderson Goals M. D. Anderson has identified the following fundamental expectations for this engagement component: 1. Establishment of a fully funded capital information technology project for the Microsoft Infrastructure Conversion Solution, as approved by M. D. Anderson s Technology Infrastructure and IS Standards IS Steering Committee (based on the established M. D. Anderson Project Management Methodology) 2. Complete, campus-wide execution of the Integrated Conversion Project Plan, and 3. Formal post implementation review of the project, as guided by the Project Management Methodology, along with communicating the outcome of the review to appropriate M. D. Anderson stakeholders. RFP for Microsoft Infrastructure Upgrade Page 9 of 15
10 Key Activities This engagement component shall result in the deployment of Microsoft Active Directory (AD), Exchange, and file and print services technology across the M. D. Anderson campus. Specific activities that must occur within this engagement phase include: 1. Submission of the Integrated Conversion Project Plan to M. D. Anderson s information technology (IT) governance bodies 1 for review, approval and funding 2. Execution of the approved Integrated Conversion Project Plan resulting in the implementation of the prescribed Microsoft infrastructure as a replacement for the current Novell edirectory, Novell file and print services, and Lotus Notes messaging and collaboration 3. Execution of the approved Integrated Conversion Project Plan resulting in the implementation of the prescribed Microsoft infrastructure at client workstations across the campus 4. Completion of a formal post-implementation review of the Microsoft Infrastructure Conversion Project, that addresses: a. Planned budget to actual expenditures variance analysis, b. Planned scope to actual delivered scope variance analysis, c. Planned schedule to actual implementation timeframe variance analysis, and d. Lessons learned from the project. Section IX. Timetable M. D. Anderson is requiring that this engagement be completed within a three-month time frame after the execution of an agreement. The following is a tentative timeline for the RFP. M. D. Anderson reserves the right to revise this timeline at anytime. August 7, 2006 Request for Proposal posted on M.D. Anderson s website. All questions with regard to the SOW must be submitted via or in an MS Word document to Garmond Joe at gjoe@mdanderson.org no later than August 18, 2006, 12:00PM CST. 1 M. D. Anderson s information technology governance bodies, for purposes of this RFP include (1) the Technology Infrastructure and IS Standards IS Steering Team and (2) the Technical Review Committee. Other governance bodies, such as a project steering team, etc. may also be applicable for this project. RFP for Microsoft Infrastructure Upgrade Page 10 of 15
11 August 21, 2006 September 6, 2006 September 29, 2006 Responses to questions will be posted via an addendum to the RFP at by 4:00PM CST. Request for Proposal closing date at 2:00 PM CST - proposal opening to follow at M.D. Anderson Supply Chain Services/Procurement Department located at 1020 Holcombe Blvd., Suite 230, Houston, TX (Located in the Bank of America Building between Main and Fannin Streets). Attendance is not required. Completion of proposal evaluations and finalist notified. Section X. Decision Criteria The final selection of a vendor for this engagement will be made by the decision making team based on the following criteria: Cost of Proposal Firm experience with large-scale infrastructure-level implementation engagements at large, diverse academic medical centers and/or other similar enterprises, Methodology to be used for (1) performing any assessments included within the scope of this engagement, (2) developing any component project plans, (3) developing the consolidated project plan for all infrastructural changes covered by the scope of this project, and (4) executing and controlling the implementation effort. Firm and individual expertise in referenced Microsoft infrastructural components such as Active Directory, Exchange, and file and print services, including applicable certifications held, based on provided resumes of proposed team members, Firm and individual experience with (1) the current M. D. Anderson infrastructure that includes both (a partial implementation of) Microsoft Active Directory as well as Novell Directory Services and Lotus Notes, and (2) some of the most key applications in use at M. D. Anderson, including ClinicStation. Other items which may benefit M. D. Anderson that will be provided through the proposed methodology that have not been specifically requested by the Institution. Section XI. Acceptance or Rejection of Proposals The RFP is not an offer to contract. Acceptance of a proposal neither commits M. D. Anderson to award a contract to any Respondent nor limits M. D. Anderson s rights to 1) RFP for Microsoft Infrastructure Upgrade Page 11 of 15
12 accept or reject any or all proposals in part or whole; 2) request clarification on any specific response, omission, or claim made in a response to the RFP; 3) to further evaluate one or more proposals via additional interviews/presentations, site visits, reference checks, and other additional criteria; and 4) to further negotiate the terms submitted in a proposal, including price, prior to final award of an agreement in order to provide an optimum solution. Section XII. Response Requirements 1. Corporate a. Provide an overview of your firm s services both in general and specific to Microsoft infrastructure migration and deployment. b. Provide a list of applicable references regarding engagements of this type. c. Provide an overview of your firm s experience with the governmental, academic and healthcare sectors. d. Provide an overview of your firm s experience and expertise in the following key activities of this engagement: i. Conducting a Microsoft Active Directory (AD) design effort in a highly collaborative manner, with participants from several key (technical) stakeholder groups ii. Reviewing an organization s current directory services environment iii. Determining the optimal AD design for an organization iv. Developing the AD road map by which an organization can implement the optimal design v. Developing a project plan for implementing Microsoft Active Directory technology in a large enterprise vi. Conducting a Microsoft Exchange design effort in a highly collaborative manner, with participants from several key (technical) stakeholder groups vii. Reviewing an organization s current electronic mail, calendar and collaboration environment viii. Determining the optimal Microsoft Exchange design for an organization ix. Developing the Exchange road map by which an organization can implement the determined optimal design x. Developing a project plan for implementing Microsoft Exchange technology in a large enterprise (i.e., 15,000 or more seats) RFP for Microsoft Infrastructure Upgrade Page 12 of 15
13 xi. Reviewing an organization s current file and print services environment xii. Developing the Microsoft file and print services road map by which an organization can migrate from the Novell Netware platform xiii. Developing a project plan for implementing Microsoft file and print services in a large enterprise xiv. Developing a consolidated project plan for implementing the three specific components of Microsoft infrastructure by which a given client workstation is visited one time xv. Preparing a post-implementation review of the project e. Provide a listing of health care, academic, and governmental organizations with which your firm has previously engaged for purposes of Microsoft infrastructure conversions of this type. f. List any certifications your firm has been granted, related to (1) Active Directory design and implementation, (2) Microsoft Exchange design and implementation, (3) Microsoft file and print services implementation, as well as (4) project management. g. Describe your firm s internal plans for the deployment and use of Microsoft infrastructural technologies to be implemented as part of this engagement, including Active Directory, Exchange and file/print services. 2. Service Team a. Describe how your firm will staff the project, both in terms of the individual key engagement phases, as well as the overall migration project as a whole. Address the use of any use of subcontractors to fulfill this engagement. b. Provide an organizational chart showing the structure and specific personnel for the team that you propose will serve M. D. Anderson. Include the resumes of these team members in an appendix to your response. Resumes should include a brief discussion of each individual s proposed responsibilities at M. D. Anderson, the estimated percentage of their time dedicated to M. D. Anderson, and any unique skills they bring to the engagement. (Note: Only provide resumes for personnel who will be active on the engagement.) c. Describe the proposed staff s knowledge about Microsoft Active Directory, Exchange, and file and print services, along with project management. RFP for Microsoft Infrastructure Upgrade Page 13 of 15
14 d. Describe the proposed staff s experience in working within (1) large academic healthcare and (2) highly distributed computing environments. e. Describe any certifications held by the proposed staffing team, including Microsoft Certified Architect 3. Process and Delivery a. Describe your firm s approach for: i. Conducting an assessment of directory services and developing a design for Microsoft Active Directory implementation, ii. Conducting an assessment of electronic messaging, calendar and collaboration technology and developing a design for Microsoft Exchange implementation, iii. Developing a plan for migration from Novell to Microsoft based file and print services, and iv. Implementing the planned migration. b. Describe your firm s approach for monitoring and controlling an implementation project of this type so that specified budget, scope and schedule are achieved. c. Describe the policies and practices your firm utilizes in order to ensure accuracy, consistency and confidentiality of the work performed. d. Describe the process for identification and resolution of any issues encountered during the course of the engagement. e. Provide a proposed timeline for this project. Use the specific assumptions you utilized to develop this proposal to identify the key activities and/or milestones, along with the length of time and provide a proposed timeline from the award to the completion of the deliverable documentation. f. Describe the participation of M. D. Anderson in performing the project tasks. Include an estimate of the required staff participation and the percentage of their time that will be required, based on you experience with engagements of this type. 4. Documentation a. Provide documentation of one or more AD design and implementation engagements. Include such sample documentation in an appendix to your response. RFP for Microsoft Infrastructure Upgrade Page 14 of 15
15 5. Tools b. Provide documentation of one or more Microsoft Exchange design and implementation engagements. Include such sample documentation in an appendix to your response. c. Provide documentation of one or more Microsoft file and print services implementation engagements. Include such sample documentation in an appendix to your response. d. Provide documentation of one or more engagements for implementing multiple Microsoft infrastructural components across a large enterprise. Include such sample documentation in an appendix to your response. a. Describe any (hardware, software) tools that will be used in support of completing this engagement b. Will such tools be available for use by M. D. Anderson after the project is completed? c. Will there be any cost associated with acquiring or using such tools? Section XIII. Pricing Schedule 1. Respondents shall itemize and provide pricing for all costs associated with this RFP below. RFP for Microsoft Infrastructure Upgrade Page 15 of 15
RFP for Documentation and Development of Governance Process for Services Oriented Architecture
RFP for Documentation and Development of Governance Process for Services Oriented Architecture Section I RFP Process Introduction The University of Texas M. D. Anderson Cancer Center (M. D. Anderson) in
More informationIntroduction. Acknowledgments Support & Feedback Preparing for the Exam. Chapter 1 Plan and deploy a server infrastructure 1
Introduction Acknowledgments Support & Feedback Preparing for the Exam xv xvi xvii xviii Chapter 1 Plan and deploy a server infrastructure 1 Objective 1.1: Design an automated server installation strategy...1
More informationPROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM
PROPOSALS REQUESTED BY THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM The Town of Old Orchard Beach will receive sealed bids for an IP based phone system. The project
More informationProject Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
More informationCONNECTICUT HOUSING FINANCE AUTHORITY REQUEST FOR PROPOSAL FOR Development of Strategic Information Technology Plan
Overview The Connecticut Housing Finance Authority (CHFA) was created in 1969 as a public instrumentality by the State Legislature. As a quasi-public agency and political subdivision of the State of Connecticut,
More informationApple Pro Training Series. OS X Server. Essentials. Arek Dreyer. and Ben Greisler
Apple Pro Training Series OS X Server Essentials Arek Dreyer and Ben Greisler Table of Contents Configuring and Monitoring OS X Server Lesson 1 About This Guide 3 Learning Methodology 4 Lesson Structure
More informationCreating the Conceptual Design by Gathering and Analyzing Business and Technical Requirements
Creating the Conceptual Design by Gathering and Analyzing Business and Technical Requirements Analyze the impact of Active Directory on the existing technical environment. Analyze hardware and software
More informationAPPENDIX 8 TO SCHEDULE 3.3
APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE
More informationREQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES
REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES The City of Palmer, AK (hereinafter City) is issuing a Request for Proposal (hereinafter RFP) to obtain the services of a qualified firm to
More informationOracle RAC Services Appendix
1 Overview Oracle RAC Services Appendix As usage of the Blackboard Academic Suite grows and the system reaches a mission critical level, customers must evaluate the overall effectiveness, stability and
More informationADDENDUM 2 REQUEST FOR PROPOSAL (RFP)
ADDENDUM 2 REQUEST FOR PROPOSAL (RFP) UPDATED Proposal Closing: October 28, 2005 at 2:00 PM (Local Time) Page 1 of 5 RFP No. 273467/GJ Date: October 14, 2005 PROPOSAL MUST BE SUBMITTED ON OR ATTACHED TO
More informationMINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator
MINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator Job Number: 07229P Date Finalized: 7/14/11 Service Department: Information Accountable To: Director, Information
More informationAPPENDIX 8 TO SCHEDULE 3.3
EHIBIT Q to Amendment No. 60 - APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT EHIBIT Q to Amendment No.
More informationMicrosoft Active Directory Project
Microsoft Active Directory Project Simcoe County District School Board Project Kick-off Meeting Rami Wehbe (Solution Architect) January 18, 2012 Agenda Introductions Project objectives and drivers Approach
More informationCITY OF WICHITA FALLS
CITY OF WICHITA FALLS RFP #09-09 LASERFICHE DOCUMENTS MANAGEMENT SOLUTION PROPOSAL DUE DATE DECEMBER 17, 2009 2:00PM REQUEST FOR ADDITIONAL INFORMATION NOVEMBER 24, 2009 2:00PM ADDENDUM ISSUED DECEMBER
More informationREQUEST FOR PROPOSALS (RFP) Redesign and Development of the Town of Tarboro Website www.tarboro-nc.com
REQUEST FOR PROPOSALS (RFP) Redesign and Development of the Town of Tarboro Website www.tarboro-nc.com Introduction I. Purpose The Town of Tarboro ( the Town ) is issuing this Request for Proposal (RFP)
More informationDISTRICT OF COLUMBIA SUPERIOR COURT OFFICE OF CONTRACTS AND PROCUREMENT REQUEST FOR PROPOSALS (RFP) FROM GSA FEDERAL SUPPLY SCHEDULE CONTRACTORS FOR
DISTRICT OF COLUMBIA SUPERIOR COURT OFFICE OF CONTRACTS AND PROCUREMENT REQUEST FOR PROPOSALS (RFP) FROM GSA FEDERAL SUPPLY SCHEDULE CONTRACTORS FOR INFORMATION AND TECHNOLOGY PENETRATION TESTING AND INFORMATION
More informationCITY OF HIGHLAND PARK
REQUEST FOR PROPOSALS CONSULTING SERVICES FOR THE PROCUREMENT OF AN ELECTRONIC DOCUMENT MANAGEMENT SYSTEM CITY OF HIGHLAND PARK PLEASE COMPLETE ATTACHMENT 1 RFP ACKNOWLEDGEMENT FORM AND RETURN TO THE CITY
More informationRequest for Proposal RFP No. IT-2015-101. Phone System Replacement
Request for Proposal RFP No. IT-2015-101 November 23 rd 2015 Phone System Replacement Deadline for Receipt of Proposals: January 18 th, 2016 at 4:30pm Proposals to be submitted by e-mail to Morgan Calvert
More informationOVERVIEW. We seek consultative services that would deal with the following objectives:
Massachusetts College of Art and Design - Framingham State University CISO and Managed Information Security Services RFP 13-07 Attachment #1 - Specifications and Descriptions of Services OVERVIEW In an
More informationTHE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business
More informationMCSE SYLLABUS. Exam 70-290 : Managing and Maintaining a Microsoft Windows Server 2003:
MCSE SYLLABUS Course Contents : Exam 70-290 : Managing and Maintaining a Microsoft Windows Server 2003: Managing Users, Computers and Groups. Configure access to shared folders. Managing and Maintaining
More informationTimeline for MPLS Deployment
Timeline for MPLS Deployment What to Expect for Design, Implementation, and Support of SMB Customer MPLS Network Services Get Started Now: 877.611.6342 to learn more. www.megapath.com What to Expect for
More information211 LA County. Technology Infrastructure Assessment. Request for Proposals. August 2012 Request for Proposals- 211 LA County 1
211 LA County Technology Infrastructure Assessment Request for Proposals August 2012 Request for Proposals- 211 LA County 1 1. General conditions and proposers directions 1.1. Overview 1.1.1. 211 LA County
More informationMICROSOFT CERTIFIED SYSTEMS ENGINEER Windows 2003 Track
MICROSOFT CERTIFIED SYSTEMS ENGINEER Windows 2003 Track In recent years Microsoft s MCSE programs has established itself as the premier computer and networking industry certification. For the Windows 2003
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Exchange 2010 Migration Project Solution Design and Implementation July 6, 2011 This Request for Proposal (RFP) is being sent to consulting firms to act as the Consultant in the completion
More informationLDAP Authentication Configuration Appendix
1 Overview LDAP Authentication Configuration Appendix Blackboard s authentication technology is considered a focal point in the company s ability to provide true enterprise software. Natively, the Blackboard
More informationREQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES) Consultancy services for Systems Integration and IT project management Client: Central Bank of Yemen Country: Republic of Yemen Project: Financial
More informationVVC Technology & Information Resources Catalog of Services
1. Information Technology a. Accounts i. Account Management (1) Credential Management (a) Your IT Department manages system credentials on all systems excepting Financial 2000, SnowWhite, Charming and
More informationCity of Casper, Wyoming. Request for Proposals. for. Food Service Point of Sale Solution
City of Casper, Wyoming Request for Proposals for Food Service Point of Sale Solution The City of Casper, Wyoming (hereinafter referred to as City ) is seeking qualification statements and service proposals
More informationAssumptions. It is assumed that:
It is assumed that: Assumptions 1. The State will establish a MICAM project steering committee to oversee the progress of the project. This steering committee will have representation from Contractor.
More informationCity of Rolling Meadows
City of Rolling Meadows REQUEST FOR PROPOSALS Consulting Services for an Enterprise Resource Planning System including project management, needs assessment, RFP development, vendor selection and ERP implementation
More informationRequest for Proposal for VoIP System Poolville Independent School District 1/28/2014
Request for Proposal for VoIP System Poolville Independent School District 1/28/2014 RFP Definition Organizational Background Poolville Independent School District, to be referred to as PISD, is a K through
More informationMicrosoft Windows Server 2008: MS-6435 Designing Network and Applications Infrastructure MCITP 6435
coursemonster.com/au Microsoft Windows Server 2008: MS-6435 Designing Network and Applications Infrastructure MCITP 6435 View training dates» Overview This course will provide students with an understanding
More informationOur Systems Experience, Specifically:
Our Systems Experience, Specifically: This list is not all encompassing; if you are looking for something in particular that is not listed, we hope you please call or email. Windows Server 2003/XP/Vista
More informationDesigning a Windows Server 2008 Applications Infrastructure
Designing a Windows Server 2008 Applications Infrastructure Course 6437A : Three days; Instructor-Led Introduction This three day course will prepare IT professionals for the role of Enterprise Administrator.
More informationElectronic Medical Record (EMR) Request for Proposal (RFP)
Electronic Medical Record (EMR) Request for Proposal (RFP) SAMPLE Proposal Due: [INSERT DESIRED DUE DATE] Table of Contents SECTION 1 RFP INFORMATION... 2 I. Introduction... 2 A. Purpose and Background...
More informationCity of Cotati Sonoma County, California
REQUEST FOR PROPOSALS FOR PREMISE BASED IP TELEPHONE SYSTEM REPLACEMENT SERVICES Introduction The City of Cotati (City) is requesting proposals for a premise based IP telephony system to support and satisfy
More information5053A: Designing a Messaging Infrastructure Using Microsoft Exchange Server 2007
5053A: Designing a Messaging Infrastructure Using Microsoft Exchange Server 2007 Course Number: 5053A Course Length: 3 Days Course Overview This three-day instructor-led course provides students with the
More informationICT PROGRAMMES AND PERFORMANCE QUARTER 3 2013-14
Report to Finance and Property Committee 24 February 2014 Agenda Item: 5 REPORT OF THE SERVICE DIRECTOR, ICT ICT PROGRAMMES AND PERFORMANCE QUARTER 3 2013-14 Purpose of the Report 1. To provide the Finance
More informationExchange Server. Microsoft UNLEASHED SAM. Guy Yardeni. Technical Edit by Ed Crowley. Rand Morimo io Michael Noel. Chris Amaris.
Rand Morimo io Michael Noel Guy Yardeni Chris Amaris Andrew Abbate Technical Edit by Ed Crowley Microsoft Exchange Server 201 UNLEASHED SAM 800 East 96th Street, Indianapolis, Indiana 46240 USA Table of
More information6437A: Designing a Windows Server 2008 Applications Infrastructure (3 Days)
www.peaksolutions.com 6437A: Designing a Windows Server 2008 Applications Infrastructure (3 Days) Introduction This course will prepare IT professionals for the role of Enterprise Administrator. Students
More informationProject Portfolio Management System (PPMS) RFI 13-2387
Project Portfolio Management System (PPMS) RFI 13-2387 Metro Project Management Department 600 NE Grand Ave. Portland, OR 97232 503-797-1700 Procurement Analyst Julie Hoffman bidsandproposals@oregonmetro.gov
More informationMicrosoft Premier Deployment. Office 365 Service Description
Microsoft Premier Deployment Office 365 Service The information contained in this document represents the current view of Microsoft Corporation on the issues discussed as of the date of publication and
More informationVMWARE VSPHERE 5.0 WITH ESXI AND VCENTER
VMWARE VSPHERE 5.0 WITH ESXI AND VCENTER CORPORATE COLLEGE SEMINAR SERIES Date: April 15-19 Presented by: Lone Star Corporate College Format: Location: Classroom instruction 8 a.m.-5 p.m. (five-day session)
More informationLEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN
LEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN Version Number: 1.0 Version Date: October 1, 2014 VERSION HISTORY Version Number Implemented By Revision Date Approved By Approval Date 1.0
More informationCounselorMax and ORS Managed Hosting RFP 15-NW-0016
CounselorMax and ORS Managed Hosting RFP 15-NW-0016 Posting Date 4/22/2015 Proposal submission deadline 5/15/2015, 5:00 PM ET Purpose of the RFP NeighborWorks America has a requirement for managed hosting
More informationBUSINESS PROCESSING GIANT TURNS TO HENSON GROUP TO ENHANCE SQL DATA MANAGEMENT SOLUTION
BUSINESS PROCESSING GIANT TURNS TO HENSON GROUP TO ENHANCE SQL DATA MANAGEMENT SOLUTION Overview Country or Region: United States Industry: Business Processing Customer Profile Cynergy Data provides electronic
More informationDesigning a Windows Server 2008 Network Infrastructure
Designing a Windows Server 2008 Network Infrastructure MOC6435 About this Course This five-day course will provide students with an understanding of how to design a Windows Server 2008 Network Infrastructure
More informationKMS Implementation Roadmap
KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5
More informationRequest for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018
Request for Expressions of Interest On a contract to perform: Renewal of Information Technology Strategic Plan 2013-2018 for City of Pitt Meadows Table of Contents Table of Contents... 2 General Information...
More informationMicrosoft SharePoint 2010 Administration
Microsoft SharePoint 2010 Administration Real-World Skills for MCITP Certification and Beyond Tom Carpenter James Pyles WILEY Wiley Publishing, Inc. Contents Introduction xxiii Chapter 1 Planning the Logical
More informationDesigning and Implementing a Server Infrastructure MOC 20413
Designing and Implementing a Server Infrastructure MOC 20413 Course Outline Module 1: Planning a Server Upgrade and Migration This module explains how to plan a server upgrade and migration strategy. Upgrade
More informationWEBSITE MAINTENANCE & SUPPORT
Consulting and Technical Services (CATS) Task Order Request for Proposals (TORFP) WEBSITE MAINTENANCE & SUPPORT CATS TORFP PROJECT NUMBER T00P9200025 DEPARTMENT OF BUSINESS AND ECONOMIC DEVELOPMENT ISSUE
More informationCARMEL UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSALS - VOIP SYSTEMS
CARMEL UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSALS - VOIP SYSTEMS Carmel Unified School District ( District ) hereby invites qualified telecommunication specialists to submit proposals ( Proposals )
More informationLANDesk Professional Services
LANDesk Professional Services Service Description For G-Cloud Background Drawing upon 25 years of experience, LANDesk today is recognized as a leading provider of systems and endpoint security management,
More informationNETWORK ADMINISTRATOR
JOB DESCRIPTION Title: NETWORK ADMINISTRATOR Department: Information Systems Class Code: 1821 FLSA Status: Exempt Effective Date: February 13, 1997 (Rev. 07/2012) Grade Number: 26 GENERAL PURPOSE Under
More informationHIPAA SECURITY RISK ANALYSIS FORMAL RFP
HIPAA SECURITY RISK ANALYSIS FORMAL RFP ADDENDUM NUMBER: (2) August 1, 2012 THIS ADDENDUM IS ISSUED PRIOR TO THE ACCEPTANCE OF THE FORMAL RFPS. THE FOLLOWING CLARIFICATIONS, AMENDMENTS, ADDITIONS, DELETIONS,
More informationREQUEST FOR PROPOSAL FOR TECHNICAL ASSISTANCE CONSULTING SERVICES FOR
REQUEST FOR PROPOSAL FOR TECHNICAL ASSISTANCE CONSULTING SERVICES FOR Denver Shared Spaces, a collaborative project supported by the Denver Office of Strategic Partnerships CITY AND COUNTY OF DENVER DENVER
More informationDepartment of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
More informationImplementing a Microsoft Windows 2000 Network Infrastructure
Course Outline Implementing a Microsoft Windows 2000 Network Infrastructure Other Information MS2153 Days 5 Starting Time 9:00 Finish Time 4:30 Lunch & refreshments are included with this course. Implementing
More informationModule 1: Overview of Network Infrastructure Design This module describes the key components of network infrastructure design.
SSM6435 - Course 6435A: Designing a Windows Server 2008 Network Infrastructure Overview About this Course This five-day course will provide students with an understanding of how to design a Windows Server
More informationBid/Proposal No. P15/9888 Business Intelligence Management
Answers to Vendor Questions Questions are in black, Answers are in red 1. Who is the Executive Sponsor(s) for this project Information not available at this time 2. Will PCC provide the selected consultant
More informationOTSEGO COUNTY REQUEST FOR PROPOSALS WEBSITE DEVELOPMENT BID 2008-4
OTSEGO COUNTY REQUEST FOR PROPOSALS WEBSITE DEVELOPMENT BID 2008-4 Part 1: Introduction, Background and General Information Otsego County has maintained a presence on the World Wide Web since early 2005.
More informationRand Morimoto, Ph.D., MCITP. Michael Noel, MVF? MCITP. Omar Droubi, MCSE. Ross Mistry, MVF? MCITP
Rand Morimoto, Ph.D., MCITP Michael Noel, MVF? MCITP Omar Droubi, MCSE Ross Mistry, MVF? MCITP Chris Amaris, MCSE, CISSP Technical Edit by Guy Yardeni Windows Server 2008 R2 U 800 East 96th Street, Indianapolis,
More informationT141 Computer Systems Technician MTCU Code 50505 Program Learning Outcomes
T141 Computer Systems Technician MTCU Code 50505 Program Learning Outcomes Synopsis of the Vocational Learning Outcomes * The graduate has reliably demonstrated the ability to 1. analyze and resolve information
More informationGlendale Community College Microsoft Office SharePoint Server 2007 Initiative Vision/Scope Document. Version 1.0
ware Architects, Inc. Proposal to XXXXX Date Glendale Community College Microsoft Office SharePoint Server 2007 Initiative Vision/Scope Document Software Architects, Inc. Proposal to XXXXX Date Version
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL RFP ISSUE DATE: September 26 th, 2001 TITLE: RFP NUMBER: San José State University Website Redesign F-WR00001181-AL PURCHASING OFFICE CONTACT: DEPARTMENT OFFICIAL: Alex Lebedeff, Mary
More informationDesigning and Implementing a Server Infrastructure
Course 20413C: Designing and Implementing a Server Infrastructure Course Details Course Outline Module 1: Planning Server Upgrade and Migration This module explains how to plan a server upgrade and migration
More informationACADEMIC PROGRAM REVIEW PC AGE 145 TALMADGE ROAD EDISON, NJ 08817 REVIEW DATE. Report Amended October 2011
ACADEMIC PROGRAM REVIEW of PC AGE 145 TALMADGE ROAD EDISON, NJ 08817 REVIEW DATE May 12-13, 2011 Report Amended October 2011 Table of Contents PC AGE Organizational Profile... 3 Academic Program Review
More informationNetwork Security Policy
Network Security Policy Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS
More informationwww.novell.com/documentation Installation Guide Identity Manager 3.6.1 August 31, 2012
www.novell.com/documentation Installation Guide Identity Manager 3.6.1 August 31, 2012 Legal Notices Novell, Inc. makes no representations or warranties with respect to the contents or use of this documentation,
More informationIT Sample Duties and Responsibilities Statements BAND B POSITION CONCEPT: JOURNEYWORKER / WORKING SUPERVISOR / LEAD WORKER
BAND B POSITION CONCEPT: JOURNEY / WORKING SUPERVISOR / LEAD Multi-user System Administration Systems & Services Administration Installs, configures, and optimizes operating systems. Installs, tests, and
More informationREQUEST FOR INFORMATION (RFI)
City of Philadelphia Office of Innovation and Technology (OIT) and the Philadelphia Water Department (PWD) 1101 Market St. Philadelphia, PA 19104 REQUEST FOR INFORMATION (RFI) This document contains a
More informationSENIOR SYSTEMS ANALYST
CITY OF MONTEBELLO 109 DEFINITION Under general administrative direction of the City Administrator, provides advanced professional support to departments with very complex computer systems, programs and
More informationAdditional services are also available according to your specific plan configuration.
THIS SERVICE LEVEL AGREEMENT (SLA) DEFINES GUARANTEED SERVICE LEVELS PROVIDED TO YOU BY THE COMPANY. I. Service Definition SMS (Company) will provide You with Hosted Exchange and other Application Services
More informationMCITP MCITP: Enterprise Administrator on Windows Server 2008 (5 Modules)
MCITP Windows 2008 Enterprise Edition is considered as Microsoft s most reliable, scalable and high-performing server operating system. It has been designed to simplify the process of Migration from the
More informationDesign Specification for IEEE Std 1471 Recommended Practice for Architectural Description IEEE Architecture Working Group 0 Motivation
Design Specification for IEEE Std 1471 Recommended Practice for Architectural Description IEEE Architecture Working Group 0 Motivation Despite significant efforts to improve engineering practices and technologies,
More informationStatement of Work. Exchange Online Migration. Prepared for University of Arizona Wednesday, 26 May 2010 Version 1.0 Final.
Statement of Work Exchange Online Migration Prepared for University of Arizona Wednesday, 26 May 2010 Version 1.0 Final Prepared by Richard Wakeman Program Manager rwakeman@microsoft.com Contributors Richard
More informationREQUEST FOR PROPOSALS (RFP) FOR RECORDKEEPING MODERNIZATION PROJECT MANAGEMENT OVERSIGHT
REQUEST FOR PROPOSALS (RFP) FOR RECORDKEEPING MODERNIZATION PROJECT MANAGEMENT OVERSIGHT Issue Date: January 5, 2015 Proposal Deadline: Monday, February 2, 2015, 4 p.m. ET Written Question Deadline Monday,
More informationRTM CONSULTING CANDIDATE RESUME
1 PROFESSIONAL SUMMARY Twelve years of experience in business strategy, strategic marketing, consulting and operations. Proven track record of leading high-profile strategic projects in fast-paced environments.
More informationHuman Services Department Active Directory & Exchange Upgrade. Request for Proposals (RFP)
COUNTY OF SONOMA Human Services Department Active Directory & Exchange Upgrade Request for Proposals (RFP) The County of Sonoma is pleased to invite you to respond to a Request for Proposal for Human Services
More informationHow to Write the Construction Management RFQ/RFP
2011-06-07 How to Write the Construction Management RFQ/RFP Setting Up a Project for Success Today's Objectives The Art of RFQ/RFP writing First things first Determining the optimum Project Delivery Method
More informationAvanade Helps City of San Diego Avoid USD $250,000 Licensing Costs and Boost Collaboration with Messaging Platform Upgrade
AVANADE CASE STUDY Avanade Helps City of San Diego Avoid USD $250,000 Licensing Costs and Boost Collaboration with Messaging Platform Upgrade San Diego Data Processing Corporation Achieves Improved Productivity
More informationCourse 6437A: Designing a Windows Server 2008 Applications Infrastructure
Course 6437A: Designing a Windows Server 2008 Applications Infrastructure Length: 3 Days Audience(s): IT Professionals Level: 400 Technology: Windows Server 2008 Type: Course Delivery Method: Instructor-led
More informationRequest for Proposal Implementation Agents of Health Information Technology: Behavioral Health, Primary Care, and other Specialty Healthcare Providers
Request for Proposal Implementation Agents of Health Information Technology: Behavioral Health, Primary Care, and other Specialty Healthcare Providers ISSUE DATE: April 26 th, 2013 RESPONSE DUE DATE: May
More informationRequest for Proposal for. Marketing Project Management Software
Request for Proposal for Marketing Project Management Software 1503 Sealed Proposals will be received until October 10, 2014 at 10am PROPOSALS TO BE DELIVERED, MAILED TO: Jessica Chavira, CTPM TEXAS STATE
More informationEHR Readiness Assessment
EHR Assessment Overview This tool is designed to help physicians assess where they are in their readiness to implement an EHR. With a more accurate portrait of their readiness, their practice will be better
More informationTitle of Nomination: Montana Statewide Directory Implementation Project/System Manager: Mike Boyer Title: Computing Technology Services Bureau Chief
Title of Nomination: Montana Statewide Directory Implementation Project/System Manager: Mike Boyer Title: Computing Technology Services Bureau Chief Agency: Information Technology Services Division Department:
More informationChabot Las Positas Community College District
Chabot Las Positas Community College District Information Technology Services Disaster Recovery Plan Supplement to August 1, 2014 Plan (General Version) Note: Selected charts and tables are blanked out
More informationMaster Service Agreements Statement of Work (SOW)
Master Service Agreements Statement of Work (SOW) Service Category: System/Business Analyst Project: Infrastructure Evaluation & Documentation I. Master Service Agreements Statement of Work Defined. The
More informationRequest for Resumes (RFR) CATS II Master Contract. All Master Contract Provisions Apply
Section 1 General Information RFR Number: (ADPICS PO Number) Functional Area (Enter One Only) N00B1400375 Functional Area 10 IT Management Consulting Services Position Title/s or Service Type/s (Short
More informationContents. Intended Audience for This Book How This Book Is Structured. Acknowledgements
Preface Intended Audience for This Book How This Book Is Structured xvii xviii xix Acknowledgements xxi 1 Open Source Software: Definitions and History 1 1.1 Definition of Terms 1 1.1.1 What Is Free Software?
More informationDesigning and Implementing a Server Infrastructure
MS20413 Length: 5 days Designing and Implementing a Server Infrastructure This 5-day instructor-led course provides you with the skills and knowledge needed to plan, design, and deploy a physical and logical
More informationVoice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview
Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview 1/1 Table of Contents 1. Introduction...3 2. Executive Summary...4 3. Program Definition...5 3.1. Program
More informationLearn AX: A Beginner s Guide to Microsoft Dynamics AX. Managing Users and Role Based Security in Microsoft Dynamics AX 2012. Dynamics101 ACADEMY
Learn AX: A Beginner s Guide to Microsoft Dynamics AX Managing Users and Role Based Security in Microsoft Dynamics AX 2012 About.com is a Rand Group Knowledge Center intended to provide our clients, and
More informationMonitoring and Troubleshooting Microsoft Exchange Server 2007 (5051A) Course length: 2 days
Monitoring and Troubleshooting Microsoft Exchange Server 2007 (5051A) Course length: 2 days Who Should Attend: This workshop is intended for experienced enterprise-level messaging professionals who have
More informationSecurity Information/Event Management Security Development Life Cycle Version 5
Security Information/Event Management Security Development Life Cycle Version 5 If your enterprise is like most, you are collecting logs from most every device with security relevance. The flood of events
More informationMCSE Objectives. Exam 70-236: TS:Exchange Server 2007, Configuring
MCSE Objectives Exam 70-236: TS:Exchange Server 2007, Configuring Installing and Configuring Microsoft Exchange Servers Prepare the infrastructure for Exchange installation. Prepare the servers for Exchange
More informationCity of Bismarck, ND Maintenance and Support for Mitel 3300 Voice System. Request for Proposal (RFP)
City of Bismarck, ND Maintenance and Support for Mitel 3300 Voice System Request for Proposal (RFP) May 11th, 2010 Request for Proposal Maintenance and Support for: Mitel 3300 Voice System Date Issued:
More information