Firstgreen Solar Credentials
|
|
- Charity Young
- 8 years ago
- Views:
Transcription
1 Firstgreen Solar Credentials 2015 First Green Consulting Private Limited Gurgaon: U 28A/3 FF DLF Phase III, Gurgaon , India Tel: sanjay@firstgreen.co WEB:
2 Contents 1. About First Green Consulting Our Services...6 Bid/ Bid Process advisory...7 Feasibility and Detailed Project Report preparation...7 Project Financing Services...7 Project management Consultancy...8 Detail Engineering & Design...8 Project quality inspection...8 Plant performance audit services...8 Lender s Engineer...9 Strategy & Policy Advisory...9 Techno-commercial due diligence...9 Transaction Advisory Services Third Party Inspection Key Projects Solar Project Management Consulting MW Rooftop Solar PV system at Amity University Campus by IL&FS Project Management Consulting to 400 KW Solar Rooftop project by India Habitat Centre Solar Project Management Consulting for 70 MW solar project of Today Homes and Infrastructure Project Management Consulting & Detailed Engineering and Design for 30 MW Solar Power Project of KP Energy Group Gujarat Solar PV Power Project Management Consultancy Services of 6 MW, Rajasthan - JK Lakshmi Cement Limited;... 12
3 Solar PV Power Project Management Consultancy Services for 6 MW of Arhyama Solar Power (P) Ltd., Andhra Pradesh; Project Management Consulting for 4 MW solar project for Bharat Petroleum Corporation Limited Lender s Engineer Projects Ganeshvani Merchandise Pvt Limited 5 MW Solar Photovoltaic Project in Upleta (Gujarat) Moserbaer 20 MW Solar Photovoltaic Project in Rajkot Welspun Energy Ltd 50 MW Solar power project in the state of Rajasthan Hiraco Renewable Energy Private Limited 20 MW Solar Power Project Lenders Engineer for the Renewable Projects funded by REC 5MW Solar PV Project of Sai Sudhir Energy - Rural Electrification Corporation; ; Other Projects Developing a web based portal Solar Guidelines to help investors and developers for solar projects in ten states in India-Team Leader Loan Assessment of Solar PV power projects on behalf of Rural Electrification Corporation Techno-Commercial due-diligence of solar PV plants Fortum India Limited Renewable Energy Master Plan for Sri Lanka; An assignment funded by Asian Development Bank Accelerating Sustainable Private Investments in Renewable Energy (ASPIRE) Program-Team Leader Blueprint for grid integration of variable renewable power in short and medium term and way forward for southern in India, a Project funded by Shakti Sustainability foundation Development of RPO (Renewable Portfolio Obligation) framework for promoting the renewable energy in Indian states... 18
4 Five-Year ( ) Strategic Plan for the development of the renewable energy sector in India - Ministry of New and Renewable Energy (MNRE), Government of India (GOI) Solar PV Power Project Management Consultancy Services of 20 MW under JNNSM Policy - PR Group Energy Efficiency Initiatives in Commercial Buildings of DLF group on pan India basis Key Personals Dr. Sanjay Vashishtha -Founder & CEO Raghvendra Kaushik- Director- Business development Sandeep Mittal- Associate Director -Solar Power Projects/Electrical Renu Kaushik- Director-HR & Finance Vipin Vella -Manager-Solar Power Projects A. R. Tripathi- Senior Consultant- Solar & DG Expert Sheelam Khare- Consultant- Solar PV Design engineering Gaurav Kumar Sharma- Consultant- Solar Projects Ankit Agarwal- Consultant-Solar Projects Rakesh Kumar - Manager Contracts- Sales & Marketing Kapildev Sharma- Consultant- Solar Expert Site Engineer Our Clients Some Capacity Building Initiatives... 24
5 1. About First Green Consulting FirstGreen is a specialised consulting company in the field of Renewable Energy, Building Energy Efficiency and Climate change. This document is for the solar corporate credential. We have provided our services to more than 250 MW on pan India Basis. We offer a wide range of services to our client s right starting from project conceptualization to post commissioning performance assessment. Some of our prestigious clients are Solar Energy Corporation of India (SECI), Uttarakhand Jal Vidyut Nigam limited (UJVNL), JK Lakshmi cement limited, Today Green Energy Pvt. Ltd, IL&FS, Moserbaer, Refex Energy, India Habitat centre, KP Energy and many more. We have team of highly qualified and experienced engineering and MBAs which is proficient to execute the solar project. We are also knowledge partner of National Solar Energy federation of India (NSEFI). Market identifies us as knowledge rich company. Our workshops and webinars are heavily attended by industries top management professionals. We take very proud on our blog which contains more than 1000 articles on solar PV and have readership of over 1.5 lacs in 72 countries.
6 2. Our Services As we states, we provide diversified services to our solar clients, we would like to share typical services list of FirstGreen. Bid/ Bid process advisory Feasibility and Detailed Project Report preparation Project Financing Services Project Management consulting Detailed Engineering Design Project quality inspection Plant performance audit services Lender s engineer Strategy & Policy Advisory Techno-commercial due diligence Transaction Advisory Services
7 Bid/ Bid Process advisory One side we assist our clients to participate in JNNSM or state level bids and other side we also advise companies to perform the bidding. Typically, this service includes business modal preparation, project budgeting, bid documentation, financial modelling and bid evaluation. Our team work closely with the management and understand their needs and strengths. On the basis of our analysis we propose the best solutions. Feasibility and Detailed Project Report preparation Typical scope of report is site assessment for solar radiation resource and meteorology, solar PV technology assessment and evaluation, annual yield estimation, tentative SPV plant layout, overall System description, power evacuation arrangements and single line diagram (SLD), Clean Development Mechanism (CDM), Clearances and permits, Financial analysis, Bill of Quantity (BOQ) and Risk Assessment. Project Financing Services Our deep market understanding helps us to offer multiple options and various financing structures to the clients. Our team has extensive experience in earning financing to the projects and we have close relationship with private equity funds, individual investors, domestic banks, domestic banks, domestic financial institutions and various infrastructure financing companies
8 Project management Consultancy Project Management consulting services also known as Turnkey project consultancy. The scope of work starts right from the inception stage of the project and goes upto the post commission performance test. Major activities in this are selection of suitable land, equipments, EPC partner, negotiation with all the vendors (equipment- EPC), quality inspection during installation work, post commissioning performance assessment, documentation, and support in debt arrangement. Detail Engineering & Design We have fine a team of engineers from various engineering disciplines from prestigious institutes including IITs. Our team ensure that equipments are integrated optimally and plant run smoothly for 25 year. We also work with EPC contractors for solar plant design review. Project quality inspection Solar is modular in nature and small defect during implementation can lead to a massive mess. This will reduce the generation-the only commodity which can be monetized. Hence, we deployed our specialized team at the site during implementation phase to point eagle eye on every activity and ensure the implementation is as per approved designed. Plant performance audit services Our solar plant performance audit services assist the project developers as an independent owner's engineer and lender's engineering services for the power project installations. We have conducted several solar plant audits and have done the root cause analysis during the
9 operational phase of solar projects. Our clients call us to validate the plant performance independently and seek our help to identify and resolve issues when underperformance is suspected. Lender s Engineer Our deep knowledge helps us to provide the lender s engineering services to our clients. In the services we review all the documents related to the project planning, business development, DPR, site irradiation data, PPA, feasibility of project financing, covering compliance / readiness status, reasonableness of the cost incurred, adequacy of the insurance. Strategy & Policy Advisory FGC has in depth knowledge of renewable energy policy and regulations. Our team members are actively working as policy adviser in various working groups of MNRE. We have advised various private organization, government institutions and banks on policy and regulatory aspects of renewable and energy efficiency technologies. We help our clients in developing their business plans and technology road-map. Our policy advisory helps the clients in achieving profitability of their renewable energy and energy efficiency investments. Techno-commercial due diligence FGC has expertise for carry out techno-commercial due diligence for better decision making on solar PV investment. We identify various technical, policies, regulatory, operational risk associated with the solar projects and ensure high financial return on solar PV
10 investments. We provide techno commercial due diligence services for private equity investor s & Lender s. Transaction Advisory Services FGC helps the solar project developer in sale and purchase of their solar assets. Once getting a clear mandate from the buyer or seller side, our team work closely with the clients throughout the transaction process. FGC prepares the information memorandum (IM) which serves as a base document throughout the transaction process and this document is shared with the potential clients and negotiation takes place on the basis of the base document prepared in the form of IM. Third Party Inspection FGC provides the third party inspection services to the clients. In this, we do the examination of project location, assessment of solar radiation data, energy yield, various losses, power evacuation infrastructure, System sizing, layout planning. besides this, assessment of major components and systems with regard to their suitability and adequacy to perform with respect to project capacity, review and comment on the selection and design of the equipment with respect to their effect on the anticipated service life of the plant.
11 3. Key Projects Solar Project Management Consulting 1 P S 1 MW Rooftop Solar PV system at Amity University Campus by IL&FS IL&FS group has signed a PPA for 1 MW solar rooftop project with Amity University. The project is being implemented at the various roofs of Amity University campus. FGC provides his project management consultancy services for the assignment. The scope of work included the site analysis, technology selection, detailed project report preparation, Support in procurement, project monitoring, inspection and quality assurance, commissioning and post Project Management Consulting to 400 KW Solar Rooftop project by India Habitat Centre India Habitat Centre is installing 400 kw solar project at its various roofs. Firstgreen Consulting was appointed as bid advisory and project management consultant for the implementation of this solar rooftop project under the RESCO model. The successful bidder will sign a 20 year PPA with India Habitat Centre. Solar Project Management Consulting for 70 MW solar project of Today Homes and Infrastructure Today Homes & Infrastructure Pvt. Ltd is in the process of implementation of 70 MW solar projects in the states of Rajasthan and Madhya Pradesh. Firstgreen Consulting was appointed as project management consultant. The brief scope of work included the bid advisory, detailed engineering and design, and project management services.
12 P S Project Management Consulting & Detailed Engineering and Design for 30 MW Solar Power Project of KP Energy Group Gujarat KP Energy Group is in the process of developing a 30 MW solar power project in the state of Gujarat. Firstgreen Consulting has been appointed as the project management consultant. In the project, FGC give his consultancy services for detailed engineering and design, planning for the array layouts, solar PV system sizing, AC and DC system design, Cost optimisation, solar resource assessment, techno-economic feasibility, site evaluation, power off-take study, regulatory compliance and environmental stipulations, modules and BoS (Balance of Systems). Drafting RFP, EPC / non EPC / package contracts and selection of vendors, Review project progress, covering compliance / readiness status, reasonableness of the cost incurred, adequacy of the insurance contracts, contracts for evacuation facilities, associated facilities, reasonability of the contract prices, O&M arrangements and agreement Solar PV Power Project Management Consultancy Services of 6 MW, Rajasthan - JK Lakshmi Cement Limited; JK Lakshmi Cements has installed a 6 MW solar project in the state of Rajasthan at Baap, Jodhpur District. Firstgreen Consulting was appointed as the project management consultant. The scope of work included the solar resource assessment, techno-economic feasibility, site evaluation, power off-take study, regulatory compliance and environmental stipulations, modules and BoS (Balance of Systems), selection of vendors, review project progress, reasonableness of the cost incurred, contracts for evacuation facilities, O&M arrangements and agreement.
13 S P Solar PV Power Project Management Consultancy Services for 6 MW of Arhyama Solar Power (P) Ltd., Andhra Pradesh; Arhyama Solar has installed a 6 MW solar project in the state of Andhra Pradesh at Aler, Nalgonda District, Andhra Pradesh. Firstgreen Consulting was appointed as the project management consultant. The scope of work included the site identification, preparation of DPR, regulatory compliance assessment, technical specifications, preparation of RFP, selection of vendors, project tie up for third party sale of electricity, cash flow preparation, contracts for evacuation facilities, reasonability of the contract prices, O&M arrangements and agreement Project Management Consulting for 4 MW solar project for Bharat Petroleum Corporation Limited FGC is doing complete project management for the captive 4 MW solar power plant of Bharat Petroleum Corporation limited (BPCL). Said plant is going to be developed near the Bina Refinery. BPCL is sufficient amount of land near the refinery and also has huge electricity demand which is presently met through grid. The scope of work included the solar resource assessment, techno-economic feasibility, site evaluation, power off-take study, regulatory compliance and environmental stipulations, modules and BoS (Balance of Systems), selection of vendors, review project progress, reasonableness of the cost incurred, contracts for evacuation facilities, O&M arrangements and agreement.
14 Lender s Engineer Projects G M W H Ganeshvani Merchandise Pvt Limited 5 MW Solar Photovoltaic Project in Upleta (Gujarat) FGC has worked as lender s engineer on the project. The typical scope of work included the assessment of cconceptual design, power purchase agreements, turnkey / package contracts including non EPC items for Engineering, Procurements, Construction and Start up. Review the adequacy of the insurance contracts, O&M plan and contracts. Moserbaer 20 MW Solar Photovoltaic Project in Rajkot The typical scope of work included the assessment of cconceptual design, power purchase agreements, and turnkey. Identification of key risks in each of the above stage, Review the adequacy of the insurance contracts, O&M plan and contracts, Review the reasonableness of the cost incurred for preliminary and preoperative expenses Welspun Energy Ltd 50 MW Solar power project in the state of Rajasthan FGC has worked as lender s engineer on several projects. The typical scope of work included the assessment of cconceptual design, power purchase agreements, turnkey / package contracts including non EPC items for Engineering, Procurements. Identification of key risks in each of the above stage, Review the adequacy of the insurance contracts, Review the reasonableness of the cost incurred for preliminary and preoperative expenses Hiraco Renewable Energy Private Limited 20 MW Solar Power Project The typical scope of work included the assessment of cconceptual design, power purchase agreements, turnkey / package contracts including non EPC items for Engineering, Procurements, Construction and Start up. Identification of key risks in each of the above stage, Review the adequacy
15 of the insurance contracts, O&M plan and contracts, Review the reasonableness of the cost incurred for preliminary and preoperative expenses L Lenders Engineer for the Renewable Projects funded by REC 5MW Solar PV Project of Sai Sudhir Energy - Rural Electrification Corporation; ; FGC has worked as lender s engineer on the project. The typical scope of work included the assessment of cconceptual design, power purchase agreements, turnkey / package contracts including non EPC items for Engineering, Procurements, Construction and Start up. Identification of key risks in each of the above stage, Review the adequacy of the insurance contracts, O&M plan and contracts, Review the reasonableness of the cost incurred for preliminary and preoperative expenses
16 4. Other Projects- D Developing a web based portal Solar Guidelines to help investors and developers for solar projects in ten states in India-Team Leader SOLAR GUIDELINES is a web-based platform for encouraging rapid development of the solar power sector in India. This work is available at for reference. GIZ/SECI has engaged FGC and KPMG as National Consultants in order to further update the existing information for Rajasthan and extend the database to cover 10 more states that include Andhra Pradesh, Karnataka, Madhya Pradesh, Tamil Nadu, Odisha, Gujarat, Maharashtra, Delhi, Uttar Pradesh and Uttarakhand. L T Loan Assessment of Solar PV power projects on behalf of Rural Electrification Corporation. FGC was engaged for this assignment from Rural Electrification Corporation. The scope of work included the technical review of the project System Design and Agreements covering Conceptual Design, Power Purchase Agreement, Turnkey / Package/ Sub package Contracts including non-epc items for Engineering, Procurement, Construction, Start-up, solar radiation data study, Adequacy of power evacuation arrangements, Infrastructure availability & adequacy, appraisal of borrower, company, business and management analysis of promoter companies Techno-Commercial due-diligence of solar PV plants Fortum India Limited Fortum India acquired a 5 MW solar project of Amrit Solar power (Moserbaser Group) in Rajasthan. Firstgreen Consulting was the transaction advisory consultant and the scope of work included the review of project location, assessment of solar radiation data, power
17 evacuation infrastructure near site, System sizing, layout planning. Assessment of major components and systems with regard to their suitability and adequacy to perform with respect to project capacity, review and comment on the selection and design of the equipment with respect to their effect on the anticipated service life of the plant. R A Renewable Energy Master Plan for Sri Lanka; An assignment funded by Asian Development Bank. This is a comprehensive study on renewable energy resource availability, and on the technical limitations of the national grid which are causing barriers for integrating renewable resource-based power generation. The major activities included the preparation of a renewable energy development master plan for Sri Lanka, a wind park master plan for Mannar, and a business model for Mannar wind parks for the Ministry of Power & Energy of Sri Lanka with financial assistance provided by Asian Development Bank. The study includes the development of a comprehensive Master Plan for wind power development in the Mannar district in northern Sri Lanka, and the development of a business model to attract investments for wind power development. Accelerating Sustainable Private Investments in Renewable Energy (ASPIRE) Program-Team Leader The proposed ASPIRE project is based on the Scaling-up Renewable Energy Program s Investment Plan (SREP-IP) that was duly approved by the Maldives government in 2012 after extensive government and stakeholder consultations. The proposed project aims in promoting solar PV rooftop systems in Maldives so that it can lead to a significant reduction of the government subsidy on the diesel based generation. A change to greater use of solar based PV will also result in decreasing exposure to fuel price volatility, and hence predictability of foreign exchange outflows.
18 B D F Blueprint for grid integration of variable renewable power in short and medium term and way forward for southern in India, a Project funded by Shakti Sustainability foundation. FGC provides his services as a RE policy expert in this assignment to Shakti Sustainability Foundation. The scope of work in this assignment included the assessment of demand and supply situation, assessment of variability of supply side sources specially wind power. Assessment of demand profiles and impact of various factors influencing the demand, Balancing reserve requirement assessment, strategy to optimise the balancing reserve capacities, impact of demand response on the system load curve, scheduling requirement for renewable sources. Development of RPO (Renewable Portfolio Obligation) framework for promoting the renewable energy in Indian states FGC develop the RPO for the Forum of Regulators, India. The scope of work included the assessment of supply side options for Renewable capacities in different states, analysis of RE resource rich states and RE deficit states, impact of renewable on the state grids, REC price trajectories. Five-Year ( ) Strategic Plan for the development of the renewable energy sector in India - Ministry of New and Renewable Energy (MNRE), Government of India (GOI) FGC was engaged for this assignment from MNRE to prepare the strategic plan. The scope of work included the preparation of vision of MNRE to meet the GOI targets in terms of NAPCC, development of five year strategy to meet the strategic position of GOI internationally, resource availability assessment, technology forecasting, resource requirements to meet the MNRE targets, etc.
19 S B E Solar PV Power Project Management Consultancy Services of 20 MW under JNNSM Policy - PR Group FGC is assisting the PR group for the activities-registration of Project, Bankable DPR, Formulation of guidelines for Third party assessment, advisory services for obtaining the permits / clearances and licenses, selection of major components and systems with regard to their suitability and adequacy, regulatory compliance and environmental stipulations. Building Integrated Photovoltaic (BIPV) & LEED: NC (IGBC) Certification fir Ansal Properties and Infrastructure Ltd. Ansal group is developing their new corporate headquarter, Ansal Experience Center in Lucknow, India. The project incorporates some unique architectural features like central open atrium to maximize day lighting, efficient U value façade glazing, Building Integrated Photo Voltaics and others. FGC is responsible for BIPV design to successfully integrate and install the Solar PV modules with the building façade. Energy Efficiency Initiatives in Commercial Buildings of DLF group on pan India basis DLF limited is one of the biggest real estate group in India. The group promotes and develops residential and commercial buildings on pan India basis. The group provides high quality rental spaces for commercial offices, retails and restaurants. The services provided in the project include the energy efficiency Policy & Program Development, Energy Benchmarking, Energy Audits, Solid Waste Management & Sustainable Purchase Development, End-use energy & water use breakdown, Identification of energy conservation measures. This is the First project in India to achieve the LEED: EBOM certification for existing buildings from USGBC under a volume program.
20 5. Key Personals Dr. Sanjay Vashishtha -Founder & CEO He has around 18 years of experience and specializes in the area of Renewable energy, policy, regulation and technical aspects. He has undertaken various projects for the Government of India, Asian Development Bank, The World Bank and many other public and private sector entities. He has extensive experience in the solar project development, solar resource assessment, project planning, feasibility assessment, techno-economic viability, and project management. He has worked as a project management consultant on various solar PV projects and has commissioned over 350 MW capacities of wind, solar, and biomass projects in India. Raghvendra Kaushik- Director- Business development He is a postgraduate in Business administration with specialization in Marketing and Finance and has 16 years of diversified experience in the area of Sales and Marketing. He majorly takes care of the FirstGreen rooftop segment. Sandeep Mittal- Associate Director -Solar Power Projects/Electrical He has around 24 years of experience and specializes in the area of Renewable project development. He has undertaken various projects for the Rajasthan Government and many other private sector entities. He has extensive experience in the solar project development, solar resource assessment, and project handling. He has worked as a project manager on various solar PV projects. Previously, he was associated with Welspun Energy Limited
21 Renu Kaushik- Director-HR & Finance She is a postgraduate in Business administration with specialization in Finance. She has 10 years of diversified experience in the area of human resource & finance. Vipin Vella -Manager-Solar Power Projects Mr. Vipin Vella is a Mechanical Engineer with specialization in Design Engineering. He has around 18 years of experience and specializes in the area of Industrial production and solar power plant handling. He has expertise in plant operation and maintenance. A. R. Tripathi- Senior Consultant- Solar & DG Expert He is an Electrical Engineer. He has 20 years of diversified experience in the area of energy efficiency, and its technical aspects. Besides this he is also proficient in DG system synchronization and plant performance assessment. He has executed many projects govern by Government of India Sheelam Khare- Consultant- Solar PV Design engineering He is a Mechanical Engineer with specialization in Energy Engineering form Malaviya National Institute of Technology, Jaipur. He has around 3 years of experience and specializes in the area of Building energy efficiency, Renewable energy, and technical aspects. He has sound knowledge of energy simulation and modelling. Also he has hand on experience of auditing solar station. Gaurav Kumar Sharma- Consultant- Solar Projects He is a postgraduate Electrical Engineer with specialization in Power Systems & Electric Drives. He has 3 years of diversified experience in the area of Renewable energy, and its technical aspects. Besides this he is also proficient in financial modelling, and plant performance assessment
22 Ankit Agarwal- Consultant-Solar Projects He is a Mechanical Engineer from Indian Institute of Technology, Roorkee. He has worked as a consultant for 3 years in primarily a design and construction company. His expertise is in designing heating, ventilation and air conditioning systems. Besides this, his interest includes renewable energy and zero energy buildings. Rakesh Kumar - Manager Contracts- Sales & Marketing He is a postgraduate in Science with specialization in law. He has 10 years of diversified experience in the area of Sales and Marketing. He has experienced in rural sales and distribution management. Kapildev Sharma- Consultant- Solar Expert Site Engineer He is an Electrical Engineer from Poornima Engineering College, Jaipur. He has 2 years of diversified experience in the area of Renewable energy. He is also proficient in project management activities
23 6. Our Clients
24 7. Some Capacity Building Initiatives
Presentation Title ( Arial, Font size 28 )
Presentation Title ( Arial, Font size 28 ) Acquisition of 1,140 MW Welspun Renewable Portfolio Date, Venue, etc..( Arial, Font size 18 ) June, 2016 Message Box ( Arial, Font size 18 Bold) Disclaimer Certain
More informationGrid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India
Grid Connected Solar Power in India Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India Indian Power Sector (31 March 2012) Thermal Hydro Nuclear Renewable 1,31,353 MW
More informationTamil Nadu WiNd ENErgy ProfilE
Tamil Nadu WiNd ENErgy ProfilE Wind energy in Tamil Nadu has witnessed tremendous growth propelling the State to the number one position in India in terms of renewables. However the challenge that remains
More informationRenewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading
Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Target Clients v Renewable Energy Generators in India v RPO mandated entities in India v Investors seeking
More informationTHE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE
THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE PRESENTATION BY : MR KESHAV PRASAD MEMBER, DELEGATION OF THE CONFEDERATION OF INDIAN INDUSTRY (CII) & CHIEF OPERATING OFFICER, IL&FS ENERGY
More informationWind Power Programme in India
Wind Power Programme in India Ministry of New & Renewable Energy 1 st August 2012, New Delhi 1 Renewable Power Sector in INDIA Share of Installed Renewable Capacity 13% 4% 13% 70% Wind Solar Hydro Biomass
More informationRenewable Energy Certificate Mechanism
Opportunities in Financing Renewable Energy Projects focusing on FiT and RECs Balawant Joshi Director, balawant@gmail.com, balawant.joshi@abpsinfra.com In this presentation.. Investment Potential for Renewable
More informationIn Focus. India s Renewable Energy Certificate Market
2011 1 India s Renewable Energy Certificate Market In Focus India s Renewable Energy Certificate Market Carbon Credit Capital LLC 561 Broadway New York, NY 10012 Tel: 212-925-5697 (Main Office) www.carboncreditcapital.com
More informationRenewable Energy in Telecom 2nd India Specific working group: Green Power for Mobile
Renewable Energy in Telecom 2nd India Specific working group: Green Power for Mobile Sairam Prasad CTO, Bharti Infratel Ltd Agenda Indian Carbon Footprint Scenario Energy Management Opportunities in Energy
More informationTWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR
TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR A) Renewable Energy Development in India 2009 B) Biofuels in India (For details, see overleaf) Two New Reports on Renewable Energy and
More informationSolar City Master Plan - Executive Summary
Solar City Master Plan - Executive Summary Meeting the growing energy demand is one of the biggest challenges that the world is facing today. Rising population and depleting fossil fuel resources are compelling
More informationAnalysis of state-wise RPO Regulation across India
The Renewable Purchase Obligations (RPO) has been the major driving force in India to promote the renewable energy sector. But the State Electricity Regulatory Commissions (SERCs) have defined their respective
More informationEnhancing the corporate energy performance
www.pwc.com/india Enhancing the corporate energy performance Energy efficiency and Renewable energy, GRID Emerging Energy Markets Some Concerns in the Indian energy scenario India faces formidable challenges
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Shri. K.J.Mathew, Chairman Shri. C. Abdulla, Member Shri. M.P.Aiyappan, Member Petition No. CT/SOLAR JNNSM/KSERC/2010 August 4,
More informationSolar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com
Draft ver2 Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com 1 TABLE OF CONTENTS S.No Contents Page No 1. PREAMBLE 3 2. OBJECTIVES 3 3. OPERATIVE
More informationRenewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background
Renewable Energy Certificate Mechanism for India Background ABPS Infrastructure Advisory India is abundantly gifted with a variety of renewable energy (RE) sources. However, not all states are endowed
More informationReport On Development of Conceptual Framework For Renewable Energy Certificate Mechanism for India
Report On Development of Conceptual Framework For Renewable Energy Certificate Mechanism for India Submitted to Ministry of New and Renewable Energy (Government of India) Prepared by ABPS Infrastructure
More informationHow KASIKORNBANK Plans to Support Green Projects
How KASIKORNBANK Plans to Support Green Projects Clean Power Asia 29-30 April 2013, Bangkok Thongchai Kangvanchai KASIKORNBANK Pcl. 1 Content Government s Policy of Promoting Green Energy KBank s Green
More informationFinancing Solar Energy for Affordable Housing Projects. May 2009
Financing Solar Energy for Affordable Housing Projects May 2009 Overview Photovoltaic Systems. Installations of photovoltaic systems on the customer side (as opposed to the utility side) of the meter have
More informationKARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore-560 001
KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore-560 001 Present: Shri M.R.Sreenivasa Murthy Chairman Shri Vishvanath Hiremath Shri K. Srinivasa
More informationCorporate Presentation December 2013
SUSTAINABLE ENERGY CONSULTANTS Corporate Presentation December 2013 ABOUT US Company Profile Sustainable Energy Consultants is a Business Consultancy Firm specializing in Renewable Energy with a focus
More informationCompany Profile CONSULT DESIGN BUILD
Company Profile CONSULT DESIGN BUILD About Endura Endura Energy designs, builds and consults on the development of medium and large-scale solar energy systems. Since 2009, we have been responsible for
More informationPilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation
Pilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation Solar Energy Corporation of India (A Govt. of India Enterprise) NBCC Plaza, Tower-1, 4 th Floor, Pushp Vihar Sector-V,
More informationFinancing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency
RENEWABLE ENERGY INDUSTRIAL ENERGY EFFICIENCY BUILDING ENERGY EFFICIENCY Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency A RANGE OF FINANCIAL SUPPORT
More informationGovernment of India Ministry of New and Renewable Energy MNRE
Government of India Ministry of New and Renewable Energy MNRE 2 Renewable Power Installed Capacity (As on 11.6% 30.09.2015) 11.9% Wind 11.1% Small Hydro Bio mass 65.4% Solar Wind Small Hydro Solar Biomass
More informationESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential
ESBI Carbon Solutions Partnering with Countries to Achieve their Full Carbon Credit Potential ESB International ESB International (ESBI) is a growing international energy company and one of Europe s leading
More informationPPPs in Renewable Energy: IFC Advisory Perspective. April 2012
PPPs in Renewable Energy: IFC Advisory Perspective April 2012 IFC s Role Financing IFC is the world s largest multilateral provider of financing for private enterprises with over US$26 billion in outstanding
More informationRenewable Energy Technology Diffusion to Mitigate Climate Change Impact
Renewable Energy Technology Diffusion to Mitigate Climate Change Impact *Rajesh Kumar **Arun Agarwala, * Kumar Rajesh, IDDC, IIT Delhi, New Delhi- 110016 **Agarwala A.K. IDDC, IIT Delhi- 110016 Abstract
More informationATCAVE 2012. Expo February 29, 2012
Renewable Energy Sources for Water and Wastewater Facilities ATCAVE 2012 Annual Technical Conference and Vendor Expo February 29, 2012 Presented by Sebastian Amenta PE Regional Program Director Comprehensive
More informationRenewable Energy Certificate Mechanism in India
16th NATIONAL POWER SYSTEMS CONFERENCE, 15th-17th DECEMBER, 2010 92 Renewable Energy Certificate Mechanism in India S.K.Soonee, CEO*, Minaxi Garg, DGM #, and Satya Prakash, Engineer # Abstract India has
More informationOverview of Solar Guidebook and Knowledge Management Project Sustainable Business Advisory
Overview of Solar Guidebook and Knowledge Management Project Sustainable Business Advisory April 2012 Knowledge Management Project - the Aim to build capacity, capture lessons learned and disseminate and
More informationIndian Telecommunication Equipment Market- Opportunities for US Companies
Indian Telecommunication Equipment Market- Opportunities for US Companies Overview With more than 638 million-line telephone network (fixed plus cellular) India is among the top 4 networks in the world.
More informationCLEAN ENERGY CREATES JOBS FOR INDIA
international: INDIA february 215 INTERIM REPORT Increasing energy access, clean energy development, and job creation are national priorities for Prime Minister Narendra Modi s government. As India faces
More informationAnalysis of Solar Energy Industry in India & Its Future Prospects
Brochure More information from http://www.researchandmarkets.com/reports/1285411/ Analysis of Solar Energy Industry in India & Its Future Prospects Description: The Indian solar energy sector has been
More informationRenewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency
Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters
More informationFinancing Renewables and Energy Efficiency Projects in Developing Countries
Mobilising Private Capital to reduce Climate Change Instruments and Policies to mobilise International Green Energy Investment Berlin June 29-30, 2010 Financing Renewables and Energy Efficiency Projects
More informationMinistry of Power & Energy
Ministry of Power & Energy Institutional Frame work Power sector overview Renewable energy policy Major issues and barriers Institutional Framework Sustainable Energy Authority The Sri Lanka Sustainable
More informationFull Scale Program for Renewable Energy in Egypt
Full Scale Program for Renewable Energy in Egypt Contents Evolution of Egypt Needs of Electricity and its supply mix Renewable Energy Policy and Targets Renewable Energy Program Components Conclusions
More informationSolar PV and Project Financing
Solar PV and Project Financing Global Workshop on Grid Connected Renewable Energy USEA / USAid Washington, DC September 1 st 2009 January 2009 1 The Company Solarpack is a Solar Photovoltaic developer
More informationUttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014 Table of Contents 1- PREAMBLE - 1 2- OBJECTIVES - 1 3- OPERATIVE PERIOD - 1 4- IMPLEMENTATION PLAN - 2 5- ELIGIBLE ENTITIES - 2 6- TARGETS
More informationSubject: Draft Scheme for development of Solar Parks and Ultra Mega Solar power projects circulation for comments reg.
MOST IMMEDIATE No.30/18/2014-15-NSM भ रत सरक र/ Government of India नव न और नव करण य ऊर म त र लय / Ministry of New & Renewable Energy (NSM Coord. Group) ***** Block 14, CGO Complex, Lodi Road, New Delhi-03,
More informationRooftop Solar PV Power : Potential,Growth and Issues related to
177 th Capacity Building Program for Officers of the Regulatory Commissions IIT Kanpur Rooftop Solar PV Power : Potential,Growth and Issues related to B D Sharma Connectivity and Metering 30 th January
More informationCurriculum Vitae Nicolas Brizard
Curriculum Vitae Nicolas Brizard Name : Brizard, Nicolas Email : N.Brizard@sqconsult.com Date of Birth : October, 6th, 1967 Place of Birth : France Nationality : French KEY QUALIFICATIONS Nicolas Brizard
More informationDraft Jharkhand State Solar Power Policy 2015
Draft Jharkhand State Solar Power Policy 2015 Government of Jharkhand Department of Energy Notification No. ------ Date:./2015 Preamble: In order to reduce the dependence on fossil fuel based generation,
More informationEnergy Solutions with Powerful Results. Energy Industry Team
Energy Solutions with Powerful Results Energy Industry Team Overview Experience. Kilpatrick Townsend s Energy Team serves clients who develop and finance solar, biomass, clean fuels, and energy storage
More informationPG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation
PG&E and Renewable Energy Chuck Hornbrook Senior Manager Solar and Customer Generation PG&E and our Business What we do: Deliver safe, reliable, and environmentally responsible gas and electricity to approximately
More informationFor companies that own or lease commercial property whether retail, industrial or office buildings
Solar Analytics and Procurement Making the Business Case for Commercial Solar This paper provides a straightforward process to make the business case for specific cost-effective solar projects in your
More informationSolar Purchase Power Agreements Brief Sheet
Solar Purchase Power Agreements Brief Sheet The Essentials A Power Purchase Agreement is a contract between multiple parties, one who generates electricity for the purpose of sale (the seller) and one
More informationACCELERATING RE DEPLOYMENT ON SIDS Accessing Financing for Projects
SAIREC October 05, 2015 ACCELERATING RE DEPLOYMENT ON SIDS Accessing Financing for Projects - Mónica Arévalo Calsina - GEEREF in a nutshell Unique strategy Fund of Funds, investing in specialised private
More informationFeasibility studies - for successful tendering. Felix Eichhorn CEO Solarpraxis Engineering GmbH
Feasibility studies - for successful tendering Felix Eichhorn CEO Solarpraxis Engineering GmbH HistoryofSolarpraxis Milestones 1998 FoundedbyKarl-Heinz Remmers andkay Neubert assolarpraxis GbR in Berlin
More informationPUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.2010 In the matter of : Determination of generic levellised generation
More informationSolar Energy Update. Transportation & Environment Committee Presentation June 11, 2012
Solar Energy Update Transportation & Environment Committee Presentation June 11, 2012 1 Background Purpose: Update from February 13, 2012 briefing Feasible Projects Convention Center Solar Farm(s) DPD/DFD
More informationa) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?
Summary of the comments and suggestions received on Approach Paper on Terms and Conditions of Tariff Regulations for the tariff period 1.4.2014 to 31.3.2019 ( Ref No. 20/2013/CERC/Fin(Vol-I)/Tariff Reg/CERC
More informationFinancial Analysis of Solar Photovoltaic Power plant in India
Financial Analysis of Solar Photovoltaic Power plant in India M. Ganga Prasanna, S. Mahammed Sameer, G. Hemavathi Department of Management Studies MadanapalleInstitute of Technology& Science Post Box No:
More informationRequest for Proposal. Solar Power Purchase Agreement
Request for Proposal Solar Power Purchase Agreement Solicitation The Town of Carbondale, Colorado is soliciting proposals from a qualified Contractor/Vendor to design, fabricate, deliver, install, operate,
More informationGovernment of Jharkhand Department of Energy. Notification
Draft Jharkhand State Solar Power Policy 2015 Government of Jharkhand Department of Energy Notification No. ------ Date:./2015 Preamble: In order to reduce the dependence on fossil fuel based generation,
More informationU.S. EPA s Green Power Partnership
Innovative Procurement Models for Renewable Electricity U.S. EPA s Green Power Partnership Tuesday, March 31, 2015 Smart & Sustainable Campus Conference Baltimore, Maryland Speakers & Agenda Speakers Agenda
More informationRepublic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Presentation Outline COUNTRY PROFILE KEY POWER SECTOR PLAYERS OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA ZAMBIA ENERGY SITUATION PRESENTLY RESULT
More informationSuccess in Scaling-up Solar Energy in Rajasthan, India
Success in Scaling-up Solar Energy in Rajasthan, India Shreemat Pandey Principal Secretary to Chief Minister Rajasthan, India 1. Introduction Solar power is attractive because it is abundant and offers
More informationPFS Web Conference Frequently Asked Questions
PFS Web Conference Frequently Asked Questions 1. About PFS and its performance Q: Kindly brief about PTC India Financial Services? A: PTC India Financial Services Limited, also known as PFS, is one of
More informationPublic sector financing for wind power development in India
Asia-Pacific Environmental Innovation Strategies (APEIS) Research on Innovative and Strategic Policy Options (RISPO) Good Practices Inventory Public sector financing for wind power development in India
More informationRenewable Energy. and Renewal Energy Certificates in Indian Context
Renewable Energy and Renewal Energy Certificates in Indian Context With the increasing demand of energy and growing depletion of resources for energy generation, a global movement towards production of
More informationPUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 52 of 2013 Date of Order: 14.11.2013 In the matter of: Petition under Section 86 (1) (b) and 86 (1)
More informationGridParity TM Finance Open Access to Financing + Solar Hosting Ivan La Frinere-Sandoval Ted Feierstein Robert Metcalf Stefan Kratz
GridParity TM Finance Open Access to Financing + Solar Hosting Ivan La Frinere-Sandoval Ted Feierstein Robert Metcalf Stefan Kratz The GridParity TM Finance Era Has Arrived The Dawn of Grid Parity Stanford
More informationMarketing Methodology of Solar PV Power Packs
Marketing Methodology of Solar PV Power Packs Somasekhar. G, Bharathi.G, and GirijaEureka.M* Department of Management Studies Madanapalle Institute of Technology & Science Post Box No: 14, Angallu, Madanapalle-
More informationConsultative Paper on Comprehensive Tariff Order on Solar Power. (Comments/Suggestions are invited on or before 31.08.2013)
TAMIL NADU ELECTRICITY REGULATORY COMMISSION Consultative Paper on Comprehensive Tariff Order on Solar Power (Comments/Suggestions are invited on or before 31.08.2013) 1. Introduction 1.1 The importance
More informationTax Credits The Lynchpin for Federal Renewable Energy Financing Policy. Kathy Parker
Tax Credits The Lynchpin for Federal Renewable Energy Financing Policy Kathy Parker Partner Rodman and Rodman CPA Environmental Business Council of New England Energy Environment Economy GREEN ENERGY TAX
More informationHandy Tips For Community Renewable Energy Groups
Handy Tips For Community Renewable Energy Groups Who we are Choice of System Naturesave Insurance specialises in the provision of community-owned renewable energy insurance. Our charitable arm, The Naturesave
More informationSustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Welcome to SREDA Siddique Zobair Member (EE & C) Sustainable & Renewable Energy Development Authority
More informationCertified Renewable Energy Project Developer
Certified Renewable Energy Project Developer Project planning and financing with a technology-specific focus Online training on economic indicators, support mechanisms and bankability. Focus on: Photovoltaic,
More informationTWO NEW RESEARCH REPORTS ON RENEWABLE ENERGY IN INDIA
NOW AVAILABLE TWO NEW RESEARCH REPORTS ON RENEWABLE ENERGY IN INDIA A) Solar Power in India B) Wind Power in India TABLE OF CONTENTS LIST OF TABLES ORDER FORM SOLAR POWER IN INDIA Table of Contents: Release
More informationShort Term Training Courses
INDIAN INSTITUTE TECHNOLOGY OF ROORKEE Short Term Training Courses Regulatory Regime - Challenges and Constraints, April 30-May 1, 2007 Technical Regulations in Electricity Sector, May 21-23, 2007 Economic
More informationInitiatives by TEDA and
Initiatives by TEDA and Tamil Nadu Solar Policy 2012 1 POWER SECTOR AT A GLANCE (AS ON 30.09.12) INDIA TAMIL NADU Nuc2% Nuc3% RES 12% Hydro 19% RES 44% Thermal 41% Thermal 67% Hydro 12% Thermal Hydro 138806.18
More informationEnergy Strategic Plan Los Angeles Community College District Community College League Conference
Energy Strategic Plan Los Angeles Community College District Community College League Conference Larry Eisenberg Executive Director, Facilities Planning and Development November 16,2006 West Los Angeles
More informationDBSA RENEWABLE ENERGY FINANCING
DBSA RENEWABLE ENERGY FINANCING Development Bank of Southern Africa Presented by Madalo Minofu Project Preparation Specialist: DBSA Project Preparation Funds Division 2 June 2014 1 DBSA s Product Offering
More informationAlternative Energy Made in Florida. Solar Power Plants for Commercial, Government, and Utility
Alternative Energy Made in Florida Solar Power Plants for Commercial, Government, and Utility L a w r e n c e H e f l e r C a r l o s G o n z a l e z I d put my money on the sun and solar energy. What
More informationENERGY EFFICIENCY AND RENEWABLE ENERGY ESCOs INNOVATIVE FINANCING SOLUTIONS. Helping you to cut the cost of your energy and secure its supply
ENERGY EFFICIENCY AND RENEWABLE ENERGY ESCOs INNOVATIVE FINANCING SOLUTIONS Helping you to cut the cost of your energy and secure its supply THE PROBLEM A challenging energy landscape THE SOLUTION BDO
More informationSolar Resource Measurement Importance. Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015
Solar Resource Measurement Importance Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015 1 Overview of SCE Large service territory 14 million residents 4.9
More informationSOLARRESERVE, KENSANI AND INTIKON COMPLETE $260 MILLION SOLAR PROJECT FINANCING WITH KEY INVESTMENT FROM GOOGLE AND THE PIC
FOR IMMEDIATE RELEASE SOLARRESERVE, KENSANI AND INTIKON COMPLETE $260 MILLION SOLAR PROJECT FINANCING WITH KEY INVESTMENT FROM GOOGLE AND THE PIC Consortium will build, own and operate the 96 megawatt
More informationElectricity in Egypt
T: (+20) 2 3760 4592 F: (+20) 2 3760 4593 A: 16 Hussein Wassef Street, Messaha Square Dokki, Giza, Egypt 12311 www.ide.com.eg Electricity in Egypt Policy and Regulatory Reform November 2015 Electricity
More informationDRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014
DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014 Drafted by Goa Energy Development Agency (GEDA) team for the approval by the State Govt. of Goa
More informationNew business segments for the energy saving industry Energy efficiency and decentralised energy systems in the building & housing sector
New business segments for the energy saving industry Energy efficiency and decentralised energy systems in the building & housing sector Workshop on ESCOs Energy Service Companies March 28-29, 2012, Ramat
More informationGREEN ENGINEERING TECHNOLOGIES (PVT) LTD.
GREEN ENGINEERING TECHNOLOGIES (PVT) LTD. At Green Engineering Technologies (PVT) Ltd, we are making the world a cleaner, safer place and also it is our primary concern and the business. We are committed
More informationDelhi Solar Energy Policy, 2015
DRAFT VERSION FOR PUBLIC COMMENT Delhi Solar Energy Policy, 2015 GOVERNMENT OF NCT OF DELHI DELHI SECTRETARIAT, I.P. ESTATE, NEW DELHI- 110002 10 September 2015 NOTIFICATION The Government of NCT of Delhi
More informationAlfa Business Advisors Company Profile
Alfa Business Advisors Company Profile Project Finance M&A Renewable Energy Infrastructure February 2014 www.alfaba.com 8300 Greensboro Drive, Suite 800, McLean, VA 22102 About Us Alfa Business Advisors,
More informationClean State Energy Actions 2011 Update. connecticut
Energy Efficiency Appliance/Equipment Efficiency Standards Building Energy Codes Utility Demand-Side-Management Utility Rate Realignment Energy Savings Targets/Energy Efficiency Resource Standards Public
More informationWind Energy Sector: Re-introduction of Accelerated Depreciation benefit remains a key Fver
Wind Energy Sector: Re-introduction of Accelerated Depreciation benefit remains a key positive Fver for the sector, though concerns on RPO compliance continue Summary February 2015 ICRA RESEARCH SERVICES
More informationRegulation for Renewable Energy Development: Lessons from Sri Lanka Experience
Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience Priyantha D C Wijayatunga Asian Development Bank, Manila, Philippines * Corresponding author. Tel: +6326326131, Fax: +6326362338,
More informationCHARCOAL PRODUCTION AND COMMERCIALIZATION IN KENYA. Robert Pavel Oimeke Ag. Director Renewable Energy Energy Regulatory Commission, Kenya
CHARCOAL PRODUCTION AND COMMERCIALIZATION IN KENYA Robert Pavel Oimeke Ag. Director Renewable Energy Energy Regulatory Commission, Kenya Joint UN Habitat / IRENA workshop: Renewables for Growing Cities
More informationOFF-GRID POWER FORUM at Intersolar Europe 2014. Summary of experiences from Myanmar Dipl. Ing- Richard Schlicht
OFF-GRID POWER FORUM at Intersolar Europe 2014 Summary of experiences from Myanmar Dipl. Ing- Richard Schlicht The Company Founded in 2011 by Dipl.-Ing. Richard Schlicht, 20 years experience in solar industry,
More informationDRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT No. Dated: -12-2011 NOTIFICATION In exercise of powers conferred under sections 61, 66, 86(1)(e)
More informationBASEL DISCLOSURES DOCUMENT AS ON 31 st December 2014 TABLE DF-3 CAPITAL ADEQUACY
BASEL DISCLOSURES DOCUMENT AS ON 31 st December 2014 Qualitative Disclosures (a) A summary discussion of the Bank s approach to assessing the adequacy of its capital to support current and future activities.
More informationSolar Provider Group LLC, 453 South Spring Street, Suite 804 Los Angeles, CA 90013 Phone: (805) 410-2571 Toll Free: 1 (888) 989-4677 Fax:
OVERVIEW This document outlines a proposed 630 kw system on the Overland parking structure for Sony Pictures Entertainment ("SPE") as part of Southern California Edison's ("SCE") Solar Photovoltaic Program
More informationLeader in investment management and engineering in the Renewable Energy Industry
Leader in investment management and engineering in the Renewable Energy Industry Index of contents 1. About us 2. Why Vector Cuatro? 3. Services lines 4. Business track record 2 1 About us Introduction
More informationSOLAR PROJECT FINANCING: Case Studies & Emerging Market Trends Rory Lonergan, Director Corporate and Project Finance. CEFC Mission
SOLAR PROJECT FINANCING: Case Studies & Emerging Market Trends Rory Lonergan, Director Corporate and Project Finance Clean Energy Finance Corporation CEFC Mission Accelerate Australia's transformation
More informationTransaction Advice Corporate Finance
Transaction Advice Corporate Finance Introduction Transaction Advice Transaction Advice Our Corporate Finance Services Arup s Transaction Advice team integrates financial, technical and commercial expertise,
More informationIndonesia Solar Loan (ISL) Programme: Lessons learned for Solar PV project development
Lessons learned for Solar PV project development Marjan Stojiljkovic FS-UNEP Collaborating Centre for Climate and Sustainable Energy Finance GIZ Workshop, March 7th, 2012 Berlin, Germany F r a n k f u
More information