Urban Tunneling in Settlement Risk Areas. *Ruben Duhme 1)
|
|
|
- Leslie Evans
- 7 years ago
- Views:
Transcription
1 Urban Tunneling in Settlement Risk Areas *Ruben Duhme 1) 1), Herrenknecht Asia Headquarters, Singapore 1) ABSTRACT The paper introduces technology and methods for tunneling in urban areas with strong control of settlements. This includes the choice of TBM type, design of the face support system as well as application of support pressure with EPBs and Mixshield TBMs. Other topics covered are the sensor control of the excavation. The paper will introduce state of the art developments and case studies from recently completed TBM projects in Korea. 1. INTRODUCTION More and more tunneling projects are executed in densely populated urban areas. Compared to early metro developments, this leads to new challenges to be met. Especially low overburden, sensitive infrastructure at the surface and difficult geological conditions increase the need for sophisticated machinery and operations control. Herrenknecht has developed and refined a number of technologies that have become the backbone of many modern tunneling projects. The first step in a TBM project is the machine selection. This paper highlights the recommended application ranges for different TBM types and explains recent technical developments. EPB machines, slurry TBMs and innovative machine types such as Variable Density TBM or convertible machines are covered. Furthermore, the application of an EPB TBM in the Seoul Metro Line 9 C919 project and a Mixshield TBM in the Wonju project in Korea are introduced. Project background, TBM technology and project highlights are discussed in detail. Both projects are showcasing the technological advances in the Korean tunneling industry.
2 2. TBM Selection in different Ground Conditions Tunnel boring machines have to be designed to match the geological conditions of a project. Basically, there are three different shielded machine types: a) Open single shield for stable and usually non water-bearing ground conditions with excavation under atmospheric pressure and dry muck removal with belt conveyor. b) Closed earth pressure balance machine for fine-grained and usually unstable and water-bearing soils with excavation under controlled positive face support pressure and thick-matter-type muck removal from the excavation chamber with screw conveyor. c) Closed slurry machine for coarse-grained and usually unstable and waterbearing soils with excavation under controlled positive face support pressure and muck removal from the excavation chamber with slurry circuit and above ground slurry treatment plant. Generally, all three types have distinct, separate application fields. However, there are increasing overlaps between the possible geologies where these shields technically can be used which can be attributed to technical advance. Nonetheless, even if different methods are technically applicable, there are still economic boundary conditions that in different situations strongly favor one or the other method. Today, also more and more multi-mode machines with features of several types are built. 2.1 EPB Machines Fig. 1 Components of EPB tunneling machines
3 A major factor for TBM selection is the grain size distribution of the geology. EPB machines depend on two mechanisms, which can only function in a certain geological range. Firstly, the soil must create a plug within the screw conveyor, which dissipates the pressure. Only plastic soils with sufficient fines can achieve this property. If the soil does not contain enough fines to create this plug, material will gush out of the screw conveyor in an uncontrolled manner and the machine is not able to keep the desired support pressure. Settlements and sinkholes can be the consequence. The second important mechanism in EPB machines is the transfer of support pressure from the TBM to the tunnel face. To achieve this, the soil inside the excavation chamber should behave like a cushion. Conditioning agents such as foam, polymer and bentonite can be injected into the excavation chamber to adjust the soil conditions to the right properties. The EPB principle can be used in cohesive soil with certain minimum fine content. That means in ground consisting of clay, silt (in various grades) and fine sand. This cohesive soil can be easily agitated into soft and flexible muck material which can transfer support pressure to the tunnel face. In that range of soil, it is possible to control pressure and water inflow with the screw conveyor. However, it is possible to extend the EPB application range towards non-cohesive soil by using of additives like foam and polymer, but non-cohesive soil usually cannot get good muck material for pressure balance. Therefore, EPBs are normally not used in very high pressure or under rivers. Figure 1 shows an overview of the main components of an EPB TBM. Fig. 2 Grain size distribution for different TBM types
4 2.2 Slurry Machines Slurry TBMs or MIX-Shields are applicable in more non-cohesive soil range with reduced fine content. Typically these are weathered rocks, mixed ground, sandy soils or cobbles. Bentonite slurry is the material to transfer pressure to support the tunnel face. It has better flow ability to carry the muck and transfer the pressure precisely. Very high face pressure can be handled well by slurry TBMs. It is possible to extend the Mixshield application range towards cohesive soil also, although cohesive soil will lead to the difficulty of soil treatment (separation). Due to the air bubble pressure control, slurry TBMs are very precise with regards to support pressure control. In difficult ground conditions, this is an advantage over EPB machines. Fig. 3 Components of slurry tunneling machines Due to the liquid support medium, slurry TBMs are able to provide stable face support in geology tapes such as cobbles, fractured or fresh rock, as well as mixed ground geology. When tunneling in high pressure environments, the slurry shield methods also allow a safer environment for cutterhead interventions as the bentonite filter cake supports the face safely even with air pressure.
5 Fig. 4 Mixshield TBM with Slurry Transport System and STP In order to operate a slurry TBM, the jobsite is equipped with a slurry transport system (STS). A feed line transports slurry with pumps from the surface to the machine. A discharge pipe transports the slurry and excavated muck back to the surface. In long tunnels, booster pumps are equipped in both lines to cover the distance. In the shaft, both lines are equipped with flowmeters and densitymeters. From the readings it is possible to calculate the difference between the two lines and therefore quantify the amount of excavated material. At the jobsite surface, a separation plant (or slurry treatment plant STS) is assembled. With the use of cyclones and centrifuges, the excavated muck is separated from the bentonite and disposed. The bentonite is the pumped to the TBM again. A bentonite mixing plant supplies fresh bentonite to compensate for losses. 2.3 Variable Density Machines Variable Density TBMs allow switching operation modes between EPB type and Slurry type face support gradually. They utilize a screw conveyor to extract material from the chamber into a slurryfier box where the muck is mixed with bentonite to make it pumpable. Alternatively a belt conveyor can be used for transport. As a slurry circuit is available, it can also circulate through the excavation chamber and therefore regulate the density here. For difficult ground conditions, a special high density slurry can be used additionally.
6 Fig. 5 Operation and mucking modes of the Variable Density TBM Usually economic considerations will dictate that a Variable Density TBM is rather equipped for one or the other mode to keep the invest low, but the technical possibility for all of this is there. Generally, a variable density TBM requires a comparable setup at the jobsite surface as slurry TBMs. 2.4 Convertible Machines Considering the three different basic principles which were identified as relevant for convertible machines in section 2, there are different possibilities, how a convertible machine can be realized. Firstly this can be a conversion between Open Single Shield and Slurry Shield, secondly between Open Single Shield and EPB Shield and thirdly between EPB Shield and Slurry Shield. For all these types, there are different synergies between the operation modes and different difficulties to solve as well. Regularly concepts for a universal TBM which features all three operation modes are discussed in literature but economic and practical boundary conditions make this a rather unrealistic scenario. 4. Seoul Metro Line 9 C919 The city of Seoul is expanding its metropolitan metro network. For C919 jobsite of Line 9, Herrenknecht has supplied a 7.7m diameter EPB TBM to Samsung C&T Corporation. The Herrenknecht TBM S-971 has completed two tunnel drives of 371m each.
7 4.1 Project Geology Both tunnels are bored with a very low overburden of 12m to 13m. The geology mainly consists of two different scenarios. Firstly, full face soil, consisting of alluvium and residual soil of fully weathered schist rock. Water permeability lies in a range between 2x10-4 m/s and 9x10-6 m/s. The second section encountered mixed geology of schist in various weathering stages with a maximum hardness of ca. 160MPa. Figure 4 shows a longitudinal cross section of the tunnel alignment. Fig. 4 Tunnel Alignment of Seoul Metro Line 9 C Herrenknecht S-971 EPB Tunnel Boring Machine The S-971 Herrenknecht EPB TBM has been designed for a maximum support pressure of 6 bar. Equipped with a hydraulic maindrive with a total power of 2000kW, the cutterhead is driven with a nominal torque of 10364kNm and a maximum rotation speed of 3.4rpm. The cutterhead is equipped with 17 single disc cutters and scrapers for soft ground. Full face wear protection is suitable to handle abrasive ground. The TBM is equipped with a simultaneous grouting system that mixes A and B component immediately before injecting into the ring gap. The grouting system is integrated into the TBMs tailskin. The following table summarizes the main technical parameters of the TBM: TBM Type Shield Diameter Maindrive Power Nominal Torque Cutterhead Rotation Thrust Force Operation Pressure Screw Conveyor Diameter Screw Conveyor Power Foam Generator Lines EPB 7700 mm 2000 kw knm 3.4 rpm kn 6 bar 900 mm 315 kw 6 lines
8 4.3 Project Execution Fig. 5 Herrenknecht S-971 TBM (left) and Assembly in the 5x5m shaft opening Due the site s location, in the middle of high traffic road, and its small size, the assembly of the TBM was conducted on a crowded site and through a very small shaft opening of 5x5m. The TBM design was adapted to this peculiar assembly situation. During the first drive the TBM encountered an unexpected bedrock of schist. The hard rock, not weathered, layer of schist rose up to 1m at the bottom of the excavation chamber on around 50m of the drive. This unexpected geology situation increased the wear on the cutting tools and the cutting wheel structure. This lead to two additional cutterhead interventions and repair works on the cutterhead structure in between the two drives. The fresh bedrock was not encountered during the second drive. The EPB machine has delivered a good performance of up to 10.5m per day and 55.5m per week. Figure 6 shows the advance rates of the second drive as an example.
9 Fig. 6 Herrenknecht S-971 Advance Rates of Second Drive 5. Wonju-Kangneung Railway Tunnel As part of the preparation for the 2018 winter Olympics, the Wonju Kangneung railway line is being expanded. Herrenknecht has supplied an 8.41m diameter Mixshield to the project to construct a 1160m long railway tunnel. Dongah Geological Engineering Co., Ltd. was the contractor. 5.1 Project Geology The tunnel has an over burden between 21.26m at the highest point and 7.62m under the river. A very diverse geology has to be passed. About half the tunnel trace leads through full face sandy soil with gravel and boulders. The other half leads through mixed face and different granite layers of various weathering grades. The maximum hardness is about 50MPa. All geological formations are highly permeable and due to the river crossing, high water flows could be expected. For this reason, a slurry type TBM has been chosen. Fig. 7 Geology Cross section of the Wonju-Kangneung Railway Tunnel
10 5.2 Herrenknecht S-962 Mixshield Tunnel Boring Machine Fig. 8 Herrenknecht S-962 TBM for Wonju Kangneung Railway The S-962 Herrenknecht Mixshield TBM has been designed for a maximum support pressure of 4.5 bar. The machines air bubble technology for support pressure control allows a precise setting and control oft he situation in the excavation chamber. The machines slurry feed and discharge lines are equipped with flowmeters and density sensors. The sensors allow permanently monitoring the amount of excavated material. A special software monitors the results. The following table summarizes the main technical parameters of the TBM: Machine Type Mixshield Shield Diameter 8410 mm Maindrive Power 1280 kw Nominal Torque knm Cutterhead Rotation 3.1 rpm Thrust Force kn Operation Pressure 4.5 bar Slurry Flow Rate 1400 m 3 /h
11 5.3 Project Execution The TBM has shown steadily increasing advance rates throughout the project. The learning curve for operation and maintenance has led to high performances of up to 70m per week in difficult ground conditions. Also the logistic supply has been improved throughout the project and thus allowed for higher performance. Fig. 9 Herrenknecht S-962 TBM for Wonju Kangneung Railway A number of lessons learned for face support pressure as well as slurry mode operation have led to stable face conditions and prevented major incidents. The TBM and related systems have proven reliable without downtime caused by major technical failures of equipment or components. 6. CONCLUSION Modern TBM technology can deliver high performances in all ground conditions. The design of the TBM always follows the particular ground conditions of each project. Recent experiences in Korea have proven a good track record for TBM technology and further established Korean contractors and TBM operators in their leadership position. The TBMs presented in this paper are currently being refurbished and due to be deployed to further projects in Korea.
12 REFERENCES Maidl, B., Maidl, U., Wehrmeyer, G. and Herrenknecht, M. (2010), Mechanised Shield Tunneling, Ernst & Sohn, Berlin. Burger, W Multi-Mode TBMs State of the Art and Recent Developments Rapid Excavation & Tunneling Conference & Exhibit, Washington. Burger, W The Variable Density Machine Concept. Herrenknecht AG. Schwanau. DAUB Recommendations for selecting and evaluating tunnel boring machines. Tunnel 5/97. Maidl, B., Maidl, U., Herrenknecht, M., Wehrmeyer, G Mechanized Shield Tunneling. Berlin: Ernst & Sohn. Schaub, W., Straesser, M Multi-Mode TBMs State of the Art and Recent Developments. Underground Space Engineering Conference. Kuala Lumpur. Wallis, S. Kenyon, P New Design TBM tames the Kuala Lumpur Karst. Tunnel Talk. January 2014.
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,
Soft Ground Tunneling on a Mexico City Wastewater Project
Soft Ground Tunneling on a Mexico City Wastewater Project Doug Harding The Robbins Company, Solon, Ohio Desiree Willis The Robbins Company, Kent, Washington ABSTRACT: Ground settlement in Mexico City has
Monitoring of cutting tools in TBM S
Monitoring of cutting tools in TBM S Thomas Edelmann Herrenknecht AG Tunnelbauforschung in Leoben, Schwanau und Bochum Workshop am, Ruhr Universität Bochum) CONTENT A. Introduction B. Cutting tools C.
Kuala Lumpur conquers the underground. Using pioneering tunnelling technology made in Germany.
Herrenknecht All Around Multi-mode TBM Story Page 1 / Story Kuala Lumpur conquers the underground. Using pioneering tunnelling technology made in Germany. Author: Adrian Greeman Photography: Ming Thein
Europe & Asia: Application of new TBM Conditioning Additives
Dipl.-Ing. L. Langmaack MBT International, Underground Construction Group, Zürich, Schweiz Europe & Asia: Application of new TBM Conditioning Additives ABSTRACT: The importance of shielded tunnelling is
State Route 640 Itinerary Agrigento-Caltanissetta-A19. Description of work
Description of work Sicily Tunnel Caltanissetta Year: 2013 In progress Client: Anas s.p.a. Contractor: Empedocle 2 s.c.p.a. Total length: 28 km Works amount: 175.000.000,00 Activities: Construction design
The Performance Prediction of a TBM in Tuzla - Dragos Sewerage Tunnel
The Performance Prediction of a TBM in Tuzla - Dragos Sewerage Tunnel N.Bilgin, C.Balcı, Ö.Acaroğlu, H.Tunçdemir & Ş.Eskikaya Department of Mining Engineering, Technical University Of İstanbul, Turkey.
Sany Tunnel Boring Machines
Sany Tunnel Boring Machines 3 CORPORATE CULTRUE Mission Build a top Company, Foster top employees, Make top contributions Spirit Progress constantly, Develop national industry Core Value Morality first,
Direct Pipe : Latest innovation in pipeline construction - technology and references.
Direct Pipe : Latest innovation in pipeline construction - technology and references. Author: Dr. Marc Peters, Head of R+D Herrenknecht AG Business Unit Utility Tunnelling, Schlehenweg 2, 77963 Schwanau,
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
A study on the causes of troubles in shield tunneling site with numerical analysis
A study on the causes of troubles in shield tunneling site with numerical analysis 1 B.K. Rho, 2 S.Y. Choo, 2 M.K. Song Korea Rail Network Authority, Daejeon, Korea 1 ; Danwoo E&C Co., Ltd., Sungnam, Korea
RISK MANAGEMENT APPLIED TO TUNNELS
RISK MANAGEMENT APPLIED TO TUNNELS J. Brinkman Deltares, Delft, The Netherlands e-mail: [email protected] GeoQ All tunnel projects require some sort of solid foundation, but ground conditions bring
Construction Dewatering
Construction Dewatering The purpose of construction dewatering is to control the surface and subsurface hydrologic environment in such a way as to permit the structure to be constructed in the dry. Dewatering
GOWANUS EXPRESSWAY TUNNEL PRIMER
GOWANUS EXPRESSWAY TUNNEL PRIMER T he New York State Department of Transportation is currently studying the replacement of the Gowanus Expressway with a tunnel. This investigation involves looking at a
Milan M5 metro extension the construction of Lotto station
Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy [email protected] Luca MANCINELLI, Rocksoil S.p.A., Italy, [email protected] Massimiliano
TAC Rock Tunnelling Workshop Sheraton Wall Centre Hotel, Vancouver, BC November 15-16, 2013
TAC Rock Tunnelling Workshop Sheraton Wall Centre Hotel, Vancouver, BC November 15-16, 2013 Mechanical Excavation Jens Classen Session 1: Session 2: Session 3: Principles of Rock Cutting, Rock Support
COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2
(PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals
SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK
4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016. Nina Tveiten Norwegian National Rail Administration
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016 Nina Tveiten Norwegian National Rail Administration The study has been conducted on behalf of: The Ministry of Transport and Communications The Municipality
TBM CROSSING OF STATIONS
TBM CROSSING OF STATIONS Eng. Marco Barbanti Astaldi S.p.A. Eng. Tommaso Grosso Astaldi S.p.A. 18-11-2011 In the presence of groundwater the permeability of the ground is of great interest. It is important
Marienplatz Underground Station, Munich Tunnelling method by using soil freezing
Marienplatz Underground Station, Munich Tunnelling method by using soil freezing Underground station Marienplatz visualisation Marienplatz The underground station Marienplatz is by far the most frequented
ECO-PILING METHODS. Ong Tiong Siew Group CEO Ryobi Kiso Holdings. Visit our website. 1/63
ECO-PILING METHODS Ong Tiong Siew Group CEO Ryobi Kiso Holdings Visit our website. http://www.ryobi-kiso.com/ 1/63 Scope Introduction Overview Deep Cement Mix (DCM) / Grout Mix Piling (GMP) Trench Cutting
(TBM and NATM) in heterogeneous masses for Metro do Porto.
PORTO PORTO Project and construction of Underground d stations s and tunnels (TBM and NATM) in heterogeneous masses for Metro do Porto. António Viana da Fonseca ([email protected]) António Topa Gomes ([email protected])
Risk Management Applied to Mechanized Tunnelling in Urban Area Piergiorgio GRASSO - GEODATA, Italy
Risk Management Applied to Mechanized Tunnelling in Urban Area Piergiorgio GRASSO - GEODATA, Italy ITA CBT Seminario SAT2008 Sao Paolo, June 25 2008 1 Contents Peculiar aspects of Tunnelling in urban areas
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
SHIELD TBM. The Advanced Tunneling Method
The Advanced Tunneling Method HEAD OFFICE 1033-2 Guseo 2-dong, Guemjeongu, Busan,Korea Tel. 82-051-580-5500 Fax.82-051-580-5678 SEOUL REGIONAL HEADQUARTERS 16th Floor, Seongwon Bldg, 141 Samseong-dong,
Beijing HOT Mining Tech Co Ltd
Beijing HOT Mining Tech Co Ltd Contact Us Add: Room 1016, Tower B FULLLINK, No.18 ChaoYangMenWai Street, Beijing, 100020, P.R.China Tel: +86 10-6588 6208 Fax: +86 10-6588 6209 Email: [email protected]
RotaCut Inline Grinders True protection of downstream pumps and equipment.
ENGINEERED TO WORK PRECISION INLINE GRINDING & SOLIDS SEPARATION RotaCut Inline Grinders True protection of downstream pumps and equipment. Industry Agriculture Mining Biogas Agriculture Wastewater RotaCut
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
GROUND IMPROVEMENT APPLICATIONS OF JET GROUTING TECHNOLOGY IN HONG KONG. Trevi Construction Co., Ltd., Tsim Sha Tsui, Hong Kong
GROUND IMPROVEMENT APPLICATIONS OF JET GROUTING TECHNOLOGY IN HONG KONG Trevi Construction Co., Ltd., Tsim Sha Tsui, Hong Kong Seminar on Grouting and Deep mixing Jet Grouting Technology Features: disaggregation
Determination of Thermal Conductivity of Coarse and Fine Sand Soils
Proceedings World Geothermal Congress Bali, Indonesia, - April Determination of Thermal Conductivity of Coarse and Fine Sand Soils Indra Noer Hamdhan 1 and Barry G. Clarke 2 1 Bandung National of Institute
KWANG SING ENGINEERING PTE LTD
KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters
Guideline for Installation of Standpipe Well (SW) and Standpipe Piezometer (SP)
Guideline for Installation of Standpipe Well (SW) and Standpipe Piezometer (SP) 1. GENERAL Both standpipe well and standpipe piezometer are used to measure ground water levels. The common characteristic
North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show. Denver, Colorado March, 15-19, 2015
Khaled Elnabolsy, GHD, Markham, Ontario ABSTRACT: North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March, 15-19, 2015 SHAFT CONSTRUCTION METHODS COMPARISON
TRENCHLESS TECHNOLOGY RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES
TRENCHLESS TECHNOLOGY RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION PIPEJACKING AND MICROTUNNELING NEW VERSION AUGUST 2005 1 OVERVIEW Pipe jacking and microtunnelling, including pilot
Effect of slurry clogging phenomena on the face stability of slurry-shield tunnels
Effect of slurry clogging phenomena on the face stability of slurry-shield tunnels In-Mo Lee & Sam Lee Korea University, Seoul, Korea Ki-Hoon Choi Dooosan Industrial & Development Co., Ltd., Seoul, Korea
Numerical Analysis in the Design of Urban Tunnels. Numerical Analysis in the Design of Urban Tunnels
Torino, 19-24 June 2005 Keynote Lecture Numerical Analysis in the Design of Urban Tunnels Michael Kavvadas Assoc. Professor of Civil Engineering NATIONAL TECHNICAL UNIVERSITY OF ATHENS SCHOOL OF CIVIL
VARIABLE VANE PUMPS V3
VARIABLE VANE PUMPS V3 (series 30 and 40) Nominal sizes 12; 25; 40; 63 up to p n 100 bar V g 8.5; 19; 32; 47 cm 3 /rev KE 1015 11/02 replaces 07/97 easy commissioning due to automatic bleed facility low
Advanced Technology of Soil Conditioning in EPB Shield Tunnelling
Advanced Technology of Soil Conditioning in EPB Shield Tunnelling By Lars Langmaack Chemical Eng., TBM Project Manager, MBT International, Zürich (CH) 1. Introduction The Earth Pressure Balance (EPB) shield
Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)
17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure
Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
Outotec HIGmills; A Fine Grinding Technology
23 rd International Mining Congress & Exhibition of Turkey 16-19 April 2013 ANTALYA Outotec HIGmills; A Fine Grinding Technology H. Lehto Outotec Finland Oy A. Paz Outotec Pty Ltd, Perth, Australia I.
COMPLETE SAND FILTRATION WITH SIX-WAY VALVE AND PUMP ON BASE PLATE (Models: FSP350, FSP450, FSP500, FSP650)
COMPLETE SAND FILTRATION WITH SIX-WAY VALVE AND PUMP ON BASE PLATE (Models: FSP350, FSP450, FSP500, FSP650) i INSTALLATION AND USER GUIDE Please read the user manual Content I. Function...3 II. Installation...3
ON SALE! FINE SOLID SEPARATION CENTRIFUDGE DP45
ON SALE! FINE SOLID SEPARATION CENTRIFUDGE DP45 and photo set Grupo Mecanotubo S.A (Spain) www.mecanotubo.es Contact : MSc-Ing. Javier Gallo Email: [email protected] Phone 0034-946155762 Movile 0034-629458832
EXPLAINING GROUNDWATER AND WATER WELLS
EXPLAINING GROUNDWATER AND WATER WELLS This document aims to provide a non-technical description of groundwater: how it occurs, how it moves underground, and the basic principles behind constructing and
Construction sites are dewatered for the following purposes:
9. DEWATERING CONTROL OF GROUNDWATER Construction of buildings, powerhouses, dams, locks and many other structures requires excavation below the water table into water-bearing soils. Such excavations require
Dispersion and Fine Milling in the Laboratory DISPERMAT TORUSMILL
Dispersion and Fine Milling in the Laboratory DISPERMAT TORUSMILL VMA-GETZMANN GMBH Verfahrenstechnik Dispersion and Fine Milling Dispersing with a Laboratory DISPERMAT Dispersion with the "Doughnut-Effect"
Batching and Mixing Plants
Batching and Mixing Plants Technique Strength Results Ready-mix plant with sheeted, square steel in-line bins. Precast and pipe factory with concrete in-line bins and bucket elevator. Individual solutions
COAL BENEFICIATION. Delhi Chapter at IIM. 17 th October 2015
COAL BENEFICIATION Delhi Chapter at IIM 17 th October 2015 WHAT IS BENEFICIATION Segregation of good quality coal from not so good quality coal or rejects. WHY BENEFICIATE/WASH Quality requirement by end
INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
Sewer Installation by Pipejacking in the Urban Areas of Hong Kong Part II Performance of Works, Lessons Learned and Improvements Proposed
Sewer Installation by Pipejacking in the Urban Areas of Hong Kong Part II Performance of Works, Lessons Learned and Improvements Proposed This paper discusses the performance of pipejacking works carried
Sample Project with SlurryTBM according to Anagnostou and Kovári
1 General Sample Project with SlurryTBM according to Anagnostou and Kovári The aim of the document is to provide information about the required input parameters and the necessary steps for the calculation
Vertical selfpriming Side-Channel Pumps Type WPV
Vertical selfpriming Side-Channel Pumps Type WPV FIELD OF APPLICATION The side-channel pumps are selfpriming and operate more economically (better efficiency) than normal centrifugal pumps when handling
PREFABRICATED VERTICAL WICK & STRIP DRAINS. Soil drainage method for accelerating settlement through vertical drainage. americanwick.
PREFABRICATED VERTICAL WICK & STRIP DRAINS Soil drainage method for accelerating settlement through vertical drainage americanwick.com INTRODUCTION THE PROBLEM Historically, the design of structures on
Design and Construction of Auger Cast Piles
Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN [email protected] - www.geotill.com CONTENTS 1.
Pipeline bridge crossing for mining trucks A geotechnical engineering design.
Pipeline bridge crossing for mining trucks A geotechnical engineering design. Bernard Shen Pells Sullivan Meynink, Sydney, Australia ABSTRACT The Donaldson open pit coal mine is located in Blackhill, New
Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software
th International Conference on Structural Mechanics in Reactor Technology (SMiRT ) Espoo, Finland, August 9-4, 9 SMiRT -Division 3, Paper 56 Investigations of a Long-Distance MW Heat Transport System with
DATA MANAGEMENT SYSTEM FOR TUNNELLING
DATA MANAGEMENT SYSTEM FOR TUNNELLING A working tool for data acquisition, visualization AND Reporting 2 IRIS Integrated Risk and Information System A single software solution for integrated data management
TBMs for Norwegian Hydropower projects. Sindre Log The Robbins Company
TBMs for Norwegian Hydropower projects Sindre Log The Robbins Company Who am I? Sindre Log M.Sc. Civil engineering, NTNU Specializations in tunneling, geology and Project management Working out of Oslo,
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
DESIGN AND EXECUTIVE ASPECTS OF THE CONSTRUCTION OF THE LINE 1 OF THE NAPLES METRO
DESIGN AND EXECUTIVE ASPECTS OF THE CONSTRUCTION OF THE LINE 1 OF THE NAPLES METRO Pietro Lunardi 1, Giovanna Cassani 2, Claudio De Giudici 2 1 Lunardi s Geoengineering Office, Milan, Italy 2 Rocksoil
ISO 9001 FM 537604 TAILOR MADE SOLUTION FOR HEAVY DUTY JOB. company profile
dredges catalogue ISO 9001 FM 537604 TAILOR MADE SOLUTION FOR HEAVY DUTY JOB company profile History Dragflow S.r.l. was born at the end of the 1980 s as a manufacturer of heavy duty submersible agitator
UNDER DRAINAGE AND FILTER DESIGN
UNDER DRAINAGE AND FILTER DESIGN Tailings and HLP Workshop 28 April to 1 May 2010 INTRODUCTION The internal drainage is of crucial importance to the reliability and safety of a tailings dam throughout
Gotechnical Investigations and Sampling
Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 13 15 November, 2014 1 Purpose of
Bauer Jet Grouting Process and Equipment. Process
Bauer Jet Grouting Process and Equipment Process Construction Sequence Bauer Jet Grouting Process During the jet grouting process, the soil surrounding the drill string is eroded by a high energy fluid
Process. CSM Cutter Soil Mixing Process and equipment
Process CSM Cutter Soil Mixing Process and equipment 905-656-X_01-16_CSM.qxd 26.02.2016 9:27 Uhr Seite 2 CSM-Process Mixing of self-hardening slurries with native soils by using a modified trench cutter
1.1 SECTION INCLUDES.1 Materials and installation for asphalt concrete pavement for car park areas, driveways to buildings, and walks or play areas.
Issued 2005/06/01 Section 02742 Asphalt Concrete Pavement for Building Sites Page 1 of 8 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Materials and installation for asphalt concrete pavement for car park areas,
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
by Morgan Anamoah & Martin Feeney
The Lee Tunnel - TBM Launch one of the most complicated TBM launches ever undertaken to prevent 16m cubic metres of storm water and sewage being discharged annually by Morgan Anamoah & Martin Feeney T
Casing on drilled domestic wells generally have a diameter of 4 8 in (most commonly 6 inches in newer wells)
Water Well Basics There are approximately 100,000 domestic water wells in New Brunswick. The two main types of wells found are drilled wells and the less common dug well. Historically, dug wells were dug
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
Lesson One. AQUIFERS Adopted from the Groundwater Foundation website:
Lesson One AQUIFERS Adopted from the Groundwater Foundation website: http://www.groundwater.org/kc/activity2.html The geology of each state is included in Part I. The northeastern area is based on Appalachian
JET GROUTING EQUIPMENT CATALOG
Your Best Machines JET GROUTING EQUIPMENT CATALOG YBM Co., Ltd. Japan YBM has more than 25 years of experience in manufacturing Jet ing equipment and supplies the construction industry with Your Best Machines
California Department of Transportation Doyle Drive Test Program Contract No. 04A3362
California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,
Filter Aid Filtration
Filter Aid Filtration Filtration is the separation of solids from liquids by forcing the liquid to flow through a porous medium and depositing the solids on the medium. A filter aid (finely divided material
The Voith fluid coupling with its inherent hydrodynamic advantages has proved itself by millions of sales worldwide:
Voith Our Company. Voith sets standards in paper, energy, mobility and service markets. Founded on January 1, 1867, Voith has a current workforce of 37,000, had sales of EUR 4 billion in the 2006/2007
DYNAMIC PILE MONITORING FOR OFFSHORE PILE ACCEPTANCE
DYNAMIC PILE MONITORING FOR OFFSHORE PILE ACCEPTANCE Scott Webster and Robin Givet, GRL Engineers, Inc., Charlotte, NC, USA Dynamic pile Monitoring Services (DMS) have been used for testing of offshore
Standard Specification K105 Water Reticulation
Standard Specification K105 Water Reticulation INDEX K105.1 SCOPE OF WORK 3 K105.2 STANDARDS 3 K105.3 MATERIALS 3 K105.3.1 Pipes and Fittings 3 K105.3.2 Storage and Handling 4 K105.3.3 Bedding and Haunching
Case Study: Treatment of alluvial sand, treatment of washing water and sludge.
Case Study: Treatment of alluvial sand, treatment of washing water and sludge. Client: FAMY & Cie SARL Site of BELLEGARDE Presentation of the project: The company Famy operates in the department of Ain,
LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION
4th DAAAM International Conference on Advanced Technologies for Developing Countries September 21-24, 2005 Slavonski Brod, Croatia LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION
Soils, Foundations & Moisture Control
Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations
MANUFACTURING FOAM BITUMEN IN A STANDARD DRUM MIXING ASPHALT PLANT
7 TH CONFERENCE ON ASPHALT PAVEMENTS FOR SOUTHERN AFRICA MANUFACTURING FOAM BITUMEN IN A STANDARD DRUM MIXING ASPHALT PLANT DC Engelbrecht Director National Asphalt (Pty.) Ltd. PO Box 1657 Hillcrest 3650
Section 02415. Installation of pipe and casing for sanitary sewer by methods of augering.
ITY OF PRLN UGRING PIP OR SING FOR SWRS Section 02415 UGRING PIP OR SING FOR SWRS 1.0 G N R L 1.01 STION INLUS Installation of pipe and casing for sanitary sewer by methods of augering. References to Technical
Geotechnical Investigation Test Report
Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Cooking at the Speed of light!
Cooking at the Infrared Cooking & Colouring Infrabaker is a modular infrared continuous cooking system developed by Infrabaker International. The machine is designed to cook and/or put colour on a wide
DESLUDGING THE WEST KEMPSEY STP EFFLUENT PONDS. Lalji Rathod. Kempsey Shire Council
DESLUDGING THE WEST KEMPSEY STP EFFLUENT PONDS Paper Presented by: Lalji Rathod Author: Lalji Rathod, Project Engineer Water, Kempsey Shire Council 6 th Annual WIOA NSW Water Industry Engineers & Operators
Investor Visit to Kemi Mine
Investor Visit to Kemi Mine Jyrki Salmi Vice President Kemi Mine Outokumpu Ferrochrome, Kemi Mine October 7th, 2015 Outokumpu Ferrochrome Integrated ferrochrome business in Kemi-Tornio area Location of
The Performance Prediction of A TBM in Difficult Ground Condition
The Performance Prediction of A TBM in Difficult Ground Condition Nuh BİLGİN, Cemal BALCI, Hakan TUNÇDEMİR, Şinasi ESKİKAYA Department of Mining Engineering, Technical University of İstanbul, Turkey. Mustafa
Soil Mechanics Prof. B.V.S. Viswanadham Department of Civil Engineering Indian Institute of Technology, Bombay Lecture - 7
Soil Mechanics Prof. B.V.S. Viswanadham Department of Civil Engineering Indian Institute of Technology, Bombay Lecture - 7 We have studied about index properties particularly soil grain properties and
Bored cast-in-place concrete piles
Bored cast-in-place concrete piles The Task High structural loads Difficult ground conditions In the past the position of a building was generally chosen according to the suitability of the ground. Nowadays
15 Predicting the Learning Curve in TBM Tunnelling
15 Predicting the Learning Curve in TBM Tunnelling By Axel Wais und Robert Wachter 15.1 Introduction With the ongoing development in mechanised tunnelling, driving a tunnel with Tunnel Boring Machines