Federation of Piling Specialists July 2010
|
|
|
- Cameron Gallagher
- 10 years ago
- Views:
Transcription
1 Examples of Hazards associated with Piling and Diaphragm Walling Works and how these might be managed within the design phase of a project (neither exhaustive nor exclusive) This list of examples has been produced to assist designers but given the unique nature of each individual project can not be considered exhaustive. The designer must consider the issues relevant to every new situation when engaging in the risk management process. It is important here to be aware that by designing out one hazard and eliminating the associated risk quite often another hazard will be introduced into the process. Sequencing of piling work. Piles located in positions with restricted working space, e.g. corners of site and adjacent to public areas outside the site. Piling near to the top of slopes. Working in excavations. Inadequately designed/constructed/maintained working platforms. Conflict with other parts of the project construction creating unsafe working conditions. Personal injury from falling debris, crushing. Unsafe removal of guards or auger cleaners. Risk to third parties. Slope failure, rig overturning. Access ramps and wall props can impede working space. Rig overturning, unsafe working conditions for operatives. Plan for safe, practical and economic working, not just for time. Avoid return visits for piling rigs if possible. Design the foundation so that the plan position of piles or alignment of the wall allows adequate working space with rig guards fitted and operational. Only in extreme situations, and after consultation with the CDM Co-ordinator, a controlled procedure according to FPS Notes for Guidance on PUWER Regulations in relation to Guarding and Cleaning of Augers on Piling Operations (March 2010) may be implemented. Consider the type and size of rig(s) to be used, track bearing pressures and the requirements for adequate safe working space, exclusion zones and storage areas. The physical limits of the designed platform should be clearly defined on site. Evaluate the balance between optimum earthworks scheme and optimum pile foundation scheme. Ensure working platform is designed, constructed and maintained in accordance with published guidance or other appropriate best practice. Specify site investigation works to take account of the need for measuring near surface soil properties required for design. Construct platform according to specification, inspect regularly and maintain to original specification. Operate proper procedures for excavations (e.g. for removal of obstructions) and reinstatement. Page 1 of 6
2 Underground services. Unexploded explosive ordnance (UXO). Overhead services. Working adjacent to major highways or railways Static load tests using kentledge as the reaction for loading. Personal injury or death, loss of amenity, delay to project. Personal injury or death, damage to construction plant and/or surrounding property, delay to project. Injury to workforce, electrocution, fire, loss of amenity, delay to project. Plant or materials falling onto road or rail Dangers of working at height. Enquiries with utility companies to establish presence of services. Arrange pile positions to bridge over services. Instigate permit to dig/work systems. Undertake preliminary risk assessment and if possibility of UXO is identified notify client of his CDM responsibilities should it appear they have not been discharged. Follow on with detailed assessment and risk mitigation. Implement UXO risk management strategy and emergency response plan. Instigate appropriate method statements and lifting plans. Agree working clearances with utility companies. Utilise smaller/low headroom plant if required, possibly with a change of construction technique if technically acceptable. Instigate appropriate method statements and lifting plans. Agree working clearances with relevant authority. Utilise smaller plant possibly with a change of construction technique if technically acceptable. Wherever technically feasible use reaction piles or other means of providing the reaction. CFA auger changes. Personal injury. Limit number of pile sizes on one project where possible by varying pile lengths. Hand tying of reinforcement cages. Racking of/damage to reinforcement cages while lifting. Open pile bores or wall panel excavations, with or without support fluid. Diaphragm wall panel instability prior to concreting. Repetitive strain injuries. Injury to operatives from falling steel bars. Operatives falling into open bore or excavation, injury and possible drowning. Instability of heavy plant at surface with potential for overturning. Use automated cage making equipment or tying tools. Consider design of reinforcement cages to ensure adequate robustness for temporary lifting stresses. Consider provision of lifting rings etc. Avoid leaving pile bores open, implement suitable protection measures such as barriers and life-jackets. Ensure adequate slurry head above high groundwater level. Avoid excessive surcharge and/or ground borne vibration near panel. Page 2 of 6
3 Displaced pile/panel support fluid during concreting. Contaminated spoil. Ground water contamination. Immediate environmental impact. Excessive vehicle movements on/off site. Flighting of soils during pile installation. Incorrect retaining wall excavation sequence. Temporary wall props. Contamination of open water courses. Infection of piling operatives, contamination of the site and the surrounding area. Damage to water resources. Unacceptable levels of noise and/or vibration, hearing damage to operatives. Traffic incidents, personal injury, air pollution, noise. Damage to/instability of adjacent buildings. Excavation below design depth leading to potential wall failure. Wall collapse if props are damaged. Adequate containment by bunding and control by pumping and tanking/settlement tanks as necessary. Use displacement piling methods unless these are technically unsuited to the site soil conditions or performance requirements of the foundation. Carry out foundation risk assessment in accordance with Environment Agency guidelines (1). Consider increasing pile size or number of piles to allow piles to stop above water table Determine acceptable levels of both effects that can be tolerated by the nearest receptors (both human and non-human). Compare these with predicted levels from piling techniques suited to the ground conditions and load bearing requirements, remembering to take account of anticipated programme periods and all ancillary operations. Enforce hearing protection zones. Use quiet hammers or alternative non-percussive installation methods (e.g. contiguous flight auger). Piling techniques that reduce or eliminate spoil will reduce this risk. Consider the susceptibility of soils to flighting due to piling method or plant employed. Implement suitable monitoring/construction controls or alternative piling methods or plant. Ensure excavation sequence (including levels) is communicated to project team. Design with minimum propping. Consider possibility of changing the construction sequence Failure of retaining wall props. Collapse of excavation. Ensure propping levels, sequencing and loads are communicated to project team and that responsibilities for design and implementation of propping are clearly defined. Page 3 of 6
4 Pre-stressed ground anchors. Overall stability of embedded Stability of a slope above a Base fracture by hydraulic heave or piping. Excess surcharge placed behind Sudden release of prestress energy, personal injury, damage to surrounding area. Failure passing beneath toe of Failure on slope entirely top of Rapid flooding of excavation and potential retaining wall collapse. Collapse or distress of Ensure adequate information regarding the details of pre-stressed anchors is passed on to project team so it may be incorporated in the H & S file/maintenance manual Ensure responsibility for considering this failure mode has been assigned and communicated to project team. Ensure responsibility for considering this failure mode has been assigned and communicated Consider hydraulic aspects of wall design and incorporate the necessary measures into the design. Communicate construction controls (e.g. water level to be maintained if excavating in the wet) to project team. Ensure surcharge loads/limits are clearly specified and accounted for in the design. Ensure any limitations on surcharges are communicated to project team. Ground movements behind retaining walls. Pile trimming to cut-off level and exposing of reinforcement. Scabbling pile surface. Exposed ends of reinforcement after pile trimming. Damage/instability of adjacent structures. Vibration white finger injuries. Personal injury from flying debris, vibration white finger injuries. Personal injury. Consider the effect of ground movements arising out of pile installation and wall excavation on adjacent structures. Consider if any monitoring is required. Communicate any construction controls (including responsibilities) to project team. Correct use of mechanical pile croppers or other means of pile trimming that do not involve the excessive use of hand-held tools. Consult Federation of Piling Specialists guidance (4) on breaking down of piles. Consider the possibility and practicality of debonding reinforcement above cut off level. Use pile concrete retardant to enable lighter methods of achieving scabbled finish to pile surface. Use protection caps on the bars after pile trimming and before placing foundation concrete. Page 4 of 6
5 Inadequate access to piles for integrity testing. Congested reinforcement in pile caps around head of pile during integrity tests. Voids and collapsed deep mine workings, opencast quarry edges. Shallow mine workings. Solution features in weak rocks such as chalk and marl. Inadequate or non-existent ground investigation report. Personal injury trips and slips. Personal injury to integrity testing operatives Loss of concrete with cast insitu piles, loss of base support to all pile types, possibly damaged or broken piles. Collapse of ground, loss of support to piling plant, delay to project. Loss of platform support, loss of concrete, delay to project. Inaccurate assumptions about soil parameters & profile leading to inadequate pile performance. Ensure safe access to pile head avoid steep sides of excavations for pile caps provide safe means of access and egress. Ensure there is uncluttered access to pile heads at time of test. Plan for integrity testing to taken place between pile trimming and placing of pile cap steel. Obtain Coal Authority Report (2) to determine existence of abandoned deep/opencast workings or shafts/high walls and consider also local anecdotal evidence. Grouting may be required or it may be possible to relocate structures to avoid some features. If desk study indicates likely presence Coal Authority Report (2) must be a part of the site investigation works. Use properly designed piling platform appropriate to the intended rig. Grouting may be required Resistivity imaging, electromagnetic conductivity, microgravity, can all be used in conjunction with (gamma) cone penetration testing to identify these features. Educate the Client regarding the value of a good GI and specify a scope of intrusive investigation works that is appropriate to the nature of the project and the anticipated ground conditions, starting with a good desk study. Confirmation of bedrock levels. Bedrock or boulders? Establish from desk study the expected depth to bedrock and treat shallow refusal of cable percussion boring with suspicion. Continue for an appropriate depth below rockhead with rotary drilling to prove the rock. Over reliance on pile end bearing in variable/layered rocks. Concrete durability. Excessive pile settlement possible pile failure. Inadequate concrete specification. Consideration of partial factor of safety greater than unity on shaft resistance only or reduced end bearing component. Ensure that ground and groundwater samples are collected and tested to establish the chemical properties required to apply BRE SD1 (3) protocol for classification. Page 5 of 6
6 Further sources of information and references: - (1) Federation of Piling Specialists papers on a number of subjects related to this guidance note can be found on the FPS website (2) Institution of Civil Engineers specification for piling and embedded retaining walls Second edition (2007) is published by Thomas Telford Publishing, Thomas Telford Limited, 1 Heron Quay, London E14 4JD (3) Environment Agency Guidance Piling in layered ground: risks to groundwater and archaeology Science Report SC020074/SR, Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention National Groundwater & Contaminated Land Centre report NC/99/73. Both documents are published by: - Environment Agency, Rio House, Waterside Drive, Aztec West, Almondsbury, Bristol, BS32 4UD Tel: Fax: (4) Coal Authority Reports can be obtained from (5) BRE Special Digest 1: 2005 Concrete in aggressive ground can be ordered from: - BRE Bookshop, Garston, Watford, WD25 9XX, (6) The services of the British Geological Survey can be accessed at Disclaimer Although every effort has been made to check the accuracy of the information and validity of the guidance given in this document, neither the FPS or its members accept any responsibility for mis-statements contained herein or misunderstanding arising herefrom. Federation of Piling Specialists Forum Court 83 Copers Cope Road Beckenham Kent BR3 1NR Tel: [email protected] Page 6 of 6
Federation of Piling Specialists
Federation of Piling Specialists COMPANY NAME CONTRACT NAME TENDER REF SCHEDULE OF ATTENDANCES AND FACILITIES TO BE PROVIDED BY THE CLIENT TO A STEEL SHEET PILING SPECIALIST For the purposes of this document
hs2 Ground A non-technical guide
hs2 Ground Investigations A non-technical guide Contents HS2 ground investigations 1 Essential Q&A 2 2 In-ground investigation techniques 9 2.1 Cable percussion borehole 10 2.2 Rotary core borehole 12
Design and Construction of Auger Cast Piles
Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN [email protected] - www.geotill.com CONTENTS 1.
BUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire
Federation of Piling Specialists Testing Datasheet No 1
Testing Datasheet No 1 Guidance for the Principal Contractor It is an essential requirement that the specialist testing contractor is allowed to work in a safe way and fully in accordance with their own
Emergency repair of Bridge B421
Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies
Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety
Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground
Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification
Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification Contents Introduction... 3 Asset Details... 3 Description... 3 Asset Tagging... 3 Attributes... 4 Data
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-57 Requirements for an Excavation and Lateral Support Plan Building
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
SERVICES 2015 ISO 18001
SERVICES 2015 A family business with a solid foundation of experience, we handle all aspects of site investigation.... Phase 1 Environmental Studies Phase 2 Intrusive Investigations Phase 3 Remediation
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile
1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum
Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore
ATLAS RESISTANCE Pier Foundation Systems
ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-
Geotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
Excavation Safe Working Practices
Excavation Safe Working Practices The Construction (Health, Safety and Welfare) Regulations 1996 under Excavations (Regulation 12) states that:- All practicable steps shall be taken where necessary to
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2
(PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for
Supplier ID: 26421. Local Office: GLASGOW 69 Buchanan Street Glasgow G1 3HL
M D & FOUNDATIONS MIDLANDS Supplier ID: 26421 MINI PILING PILING REINFORCED CONCRETE UNDERPINNING DRILLING & GROUTING SITE INVESTIGATION & PILE TESTING NATIONWIDE SPECIALIST PILING & FOUNDATION SERVICES
Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)
Introduction Fugro LOADTEST Overview STATIC LOAD TESTING O-cell Bi-directional testing State of the art Dr Melvin England Fugro LOADTEST Static load tests Previous/existing technology Developments O-cell
High Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES
Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
Recommendations to improve the safety of existing lifts
Recommendations to improve the safety of existing lifts Lift & Escalator Industry Association Lift Safety an introduction Lifts are amongst the very few modes of transport available for continuous unsupervised
Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
Now That s IDEAL. Now That s IDEAL. LISTEN. RESEARCH. DESIGN. DELIVER.
The Leading Edge SM At IDEAL, we try not to complicate things. We discover needs and problems, then work out solutions. It takes real teamwork to accomplish truly great things. That s you and us, working
SECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008
BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park
SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
Level 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
BRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
J. & W. LOWRY LIMITED. This case study has been prepared for J & W Lowry Limited By Thomas Elliott Foster
J. & W. LOWRY LIMITED This case study has been prepared for J & W Lowry Limited By Thomas Elliott Foster 9/3/2013 Table of Contents 1.1.Brief... 2 2.1.Introduction... 3 Charles, J (2004).... 3 2.2.Foundation
Accidents - how to deal with them
Accidents - how to deal with them Introduction Following an accident on site there seem to be so many things to do. This FactFile Information Sheet aims to provide clear guidance on the steps that should
Moving Small Mountains Vesuvius Dam Rehab
Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,
Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions
Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological
90 Brighton Road, Surbiton, Surrey
90 Brighton Road, Surbiton, Surrey Civil and Structural Engineering Basement Feasibility Report Mixed Use Scheme 108802-REP-002 March 2015 Contents 1. Executive Summary... 3 2. Site Description and Constraints...
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003
Page: 1 of 6 PROCEDURE SIG-ENV-PR003 Revision Approved Date Description 1 AV 01/04/99 New EP 2 AV 07/06/00 Revision of EP 3 AV 04/04/03 Revision of EP 4 Stuart Roseby DRAFT 5 Stuart Roseby 25/07/2005 Approved
BRITISH GEOLOGICAL SURVEY
BRITISH GEOLOGICAL SURVEY RISK ASSESSMENT FOR WORKING IN QUARRIES Definitions from Health & Safety Executive anything that can cause harm. the chance that someone will be harmed by the hazard. Health and
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,
Lighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: [email protected] Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
GUIDANCE FOR CARRYING OUT RISK ASSESSMENT SURFACE MINING OPERATIONS
SAFETY AND HEALTH COMMISSION FOR THE MINING AND OTHER EXTRACTIVE INDUSTRIES Doc. No 5995/2/98-EN Amended by the SHC on 25.3.99 (Doc. 1175/01-EN) Committee on Surface Workings GUIDANCE FOR CARRYING OUT
Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.
TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may
Pro-Lift Steel Pile Foundation Repair
Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the
GUIDE TO TRENCH EXCAVATIONS (SHORING SUPPORT AND DRAINAGE MEASURES)
GUIDE TO TRENCH EXCAVATIONS (SHORING SUPPORT AND DRAINAGE MEASURES) Utilities Technical Liaison Committee HIGHWAYS DEPARTMENT and Geotechnical Engineering Office CIVIL ENGINEERING DEPARTMENT THE GOVERNMENT
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
Procedure for Working in or around Excavations
RMS WHS Procedure: PN 066P12 (for Policy No. PN066) Procedure for Working in or around 1 of 15 Contents 1 Purpose... 3 2 Scope... 3 3 General requirements... 4 4 Definitions... 4 5 Responsibilities...
Embedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA
Final Report to STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF SPILL PREVENTION AND RESPONSE TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA May 1, 1998 Steven
For ease of reference the clauses are arranged in 12 sections as follows:-
NASC TERMS The general NASC terms under which members carry out their work are normally set out in their Standard Terms of Trading, often found on the reverse of their quotation form and referred to as
AUSTRALIAN INSURANCE SOLUTIONS PTY LTD
AUSTRALIAN INSURANCE SOLUTIONS PTY LTD ABN 64 088 550 074 ACN: 088 550 074 AFS Licence # 246939 1st Floor PO Box 2812 Tel: 07 55935522 24 Junction Road BURLEIGH DC QLD 4220 Fax: 07 55935533 BURLEIGH QLD
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS Huge landslide Leyte, Phillipines, 1998 2000 casulties Small debris
SECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1
Table of Contents Section Page 16.1 GENERAL... 16.1-1 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 16.1.2.1 Geotechnical Section/Bridge Bureau Coordination... 16.1-1 16.1.2.2 Geotechnical
GLOSSARY OF TERMINOLOGY
GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.
Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting
Good Practice Guide The Selection of Access Methods to Install and Dismantle Safety Netting FASET is the trade association for the safety net rigging and temporary safety systems industry. This document
Chapter 9 Remedial Measures
[This is an annotated version of a chapter from the US Army Corps of Engineers book, Foundations in Expansive Soils. This book is in the public domain. This document is consists of an abbreviated and annotated
and the design of construction working platforms
Federation A presentation to the Australian Geomechanics Society Victoria i Branch 11 August 2010 Dr Stephen Buttling Piling rig bearing pressures and the design of construction working platforms 1 The
68 Metal Industry Guidelines for Safe Work
3 68 Metal Industry Guidelines for Safe Work section 3 high-risk 3 activities Metal Industry Guidelines for Safe Work 69 section 3 high risk activities 3.1 working at heights Falls from heights have been
Piling Datasheets. Continuous flight auger (CFA) Driven Rotary
Piling Datasheets Continuous flight auger (CFA) Driven Rotary Continuous Flight Auger Piles (CFA) Technical Data Application Well suited to soft and/or water bearing ground where deep casings or bentonite
necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
Building façade maintenance
Building façade maintenance Legal liability and damage limitation A guide for building owners and occupiers What is a façade? The façade forms the external weatherproof envelope of a building. In modern
Managing the risk of falls while working on roofs in housing construction
Workplace Health and Safety Queensland Managing the risk of falls while working on roofs in housing construction Where the risk of falling is 3 metres or more (or roof slope over 26 ) Before you start
Mobile cranes overturning on construction sites. A guide to loss prevention
Mobile cranes overturning on construction sites A guide to loss prevention Each year, a number of mobile cranes overturn on construction sites causing serious accidents involving personal injury, significant
Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets
Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets January 2011 Edition All rights reserved. No part of this publication
Traffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
Transformer Deluge Systems
Transformer Deluge Systems How Do Transformer Fires Ignite? Common causes of transformer failure: Weather-related events such as lightning Short circuits in electrical equipment The most common cause is
TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION
ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation
SITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
Basement construction and waterproofing: Construction, safety, insulation and services. good building guide
Basement construction and waterproofing: Construction, safety, insulation and services GBG 72 Part 2 good building guide Peter Trotman The requirement for building on sloping sites or increasing the area
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
