Plumbing Code of Australia
|
|
|
- Virgil Turner
- 10 years ago
- Views:
Transcription
1 Plumbing Code of Australia Comments on the draft PCA should be sent to: National Plumbing Regulators Forum C/O Plumbing Industry Commission PO Box 360 Caulfield East VIC 3145 Australia or Fax to: (03) or to: All submissions must be received by 5.00pm on 14 October 2002 DRAFT 5 August 2002
2 CONTENTS INTRODUCTION I PART A PLUMBING SERVICES AND SYSTEMS A-1 SECTION A.1 WATER SERVICES A.1-1 SECTION A.2 SANITARY DRAINAGE AND PLUMBING SYSTEMS A.2-1 SECTION A.3 STORMWATER DRAINAGE SYSTEMS A.3-1 SECTION A.4 HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS A.4-1 SECTION A.5 ON-SITE WASTEWATER SYSTEMS A.5-1 PART B PRODUCT CERTIFICATION AND AUTHORISATION B-1 APPENDIX 1 DEFINITIONS APPENDIX 1-1 APPENDIX 2 REFERENCED DOCUMENTS APPENDIX 2-1 SCHEDULE OF REFERENCED DOCUMENTS Table 1 APPENDIX 3 STATE AND TERRITORY VARIATIONS APPENDIX 3-1 AUSTRALIAN CAPITAL TERRITORY NEW SOUTH WALES NORTHERN TERRITORY QUEENSLAND SOUTH AUSTRALIA TASMANIA VICTORIA WESTERN AUSTRALIA ACT-1 NSW-1 NT-1 QLD-1 SA-1 TAS-1 VIC-1 WA-1 DRAFT 5 August 2002
3 I. INTRODUCTION I-1 GENERAL The Plumbing Code of Australia (Code) is produced by the National Plumbing Regulators Forum (NPRF) on behalf of the Commonwealth Government and each State and Territory Government. It consists of two parts presented in a single volume. Part A of the Plumbing Code of Australia is a set of performance based technical provisions for the construction, installation, replacement, repair, alteration and maintenance of plumbing and drainage installations throughout Australia. It allows for variations in climatic and geographic conditions. Part B defines the processes for the certification of plumbing products that require statutory authorisation. I-2 THE NATIONAL PLUMBING REGULATORS FORUM The National Plumbing Regulators Forum (NPRF) was established by agreement between the Commonwealth Government and each State and Territory Government. It is a co-operative arrangement between jurisdictions and has no executive powers. Forum members represent bodies responsible for regulation of on-site plumbing and/or occupational registration. The Forum was established subsequent to the expiry of the Memorandum of Understanding (MOU) between the Agriculture and Resources Management Council of Australia and New Zealand (ARMCANZ) and Standards Australia for the establishment and maintenance of the Committee for Plumbing Products Authorisation (CPPA). The Laver Report (2000) 1 supported the establishment of such a Forum. The National Plumbing Regulators Forum is the national policy advisory body with responsibility for technical matters associated with the Plumbing Code of Australia. 1 Review of the Australian Building Codes Board, February 2000 P. Laver, L Butterfield & G Huxley. Published by Department of Industry Science and Resources 1
4 The Forum has a mission to provide benefits to Australian Governments, the industry and the public by striving for a consistent, efficient and effective regulatory environment for plumbing activities and for achieving appropriate levels of public health, safety, resource conservation and amenity, in the interest of all consumers throughout Australia. A principal objective of the National Plumbing Regulators Forum is to develop a national policy framework that encourages and assists coordinated plumbing regulatory arrangements thereby protecting public interest in a cost effective manner. I-3 THE PLUMBING CODE OF AUSTRALIA I-3.1 GOALS The goal of the Plumbing Code of Australia is to enable the achievement of an acceptable standard of installation at all times in order to provide for public health, safety and amenity, resource conservation and protection of public infrastructure for the benefit of the community now and in the future. The goal is applied so that the requirements in the Code extend no further than is necessary in the public interest, are cost effective, easily understood and are not needlessly onerous in their application. To achieve the above goal, the Plumbing Code of Australia: (iii) (iv) (v) (vi) (vii) establishes national objectives for plumbing work on a performance basis; fosters water and energy conservation; creates an accountable and transparent system of national standards and product certification and authorisation; encourages best practice; references effective solutions; calls up relevant Australian Standards; and is compatible with the Building Code of Australia (BCA). I-3.2 STATE AND TERRITORY VARIATIONS AND ADDITIONS Each State s and Territory s legislation may adopt the Plumbing Code of Australia subject to the variation or deletion of some of its provisions, or the addition of extra provisions. These variations are provided in Appendix 3 to the Code. 2
5 I-3.3 DEFINITIONS Words with special meanings are printed in italics and are defined in Appendix 1 Definitions or in the part of the Code that they appear. If a word is not defined in this Code, the meaning (if any) attributed to it under AS/NZS Glossary of terms should be used unless the contrary intention appears. I-3.4 LEGISLATIVE ARRANGEMENTS The Plumbing Code of Australia is given legal effect by plumbing and other relevant legislation in each State and Territory. This legislation consists of an Act and subordinate legislation which empowers the regulation of certain aspects of plumbing or drainage installation and contains the administrative provisions necessary to give effect to the legislation. Any provision of the Code may be overridden by, or subject to, State and Territory legislation. The Code, therefore, is to be read in conjunction with that legislation. Any queries on such matters should be referred to the State or Territory authority responsible for on-site plumbing installation matters. I-3.5 COMPLIANCE WITH THE PLUMBING CODE OF AUSTRALIA Details relating to compliance with the requirements of the Plumbing Code of Australia are provided in the relevant Part(s). In summary, the important aspects of the Code are that: I3.5.1 plumbing installations are to meet specified performance requirements; and plumbing products are to be certified and authorised in accordance with the perceived risks they may pose to the community. Installation of plumbing services and systems Subject to I-3.5.3, every part of the plumbing installation is to be constructed in an appropriate manner to achieve the requirements as set out in Part A of the Plumbing Code of Australia. Part A details the Objectives, Functional Statements, and Performance Requirements relating to various plumbing installations. Compliance with the Performance Requirements can only be achieved by: complying with the Deemed-to-Satisfy Provisions; or formulating an Alternative Solution which; 3
6 (iii) (a) (b) complies with the Performance Requirements; or is shown to be at least equivalent to the Deemed-to- Satisfy Provisions; or a combination of and. For situations other than those meeting with Deemed-to-Satisfy Provisions, appropriate documentation is to be prepared to verify compliance. Examples of the necessary documentation are provided in I The Objectives and the Functional Statements are to be used as an aid to the interpretation of the Plumbing Code of Australia and not for determining compliance with the Code. I Certification and authorisation of plumbing products Materials used in plumbing installations are to meet with the certification requirements provided in Part B to ensure that they are durable and fit for the purpose for which they are intended. They are to be manufactured, installed and maintained so as to: (iii) (iv) (v) protect public health and safety; maintain and enhance the quality of the environment; maintain and enhance community and individual amenity; meet the requirements of the network utility operator, as appropriate; and perform adequately with only normal maintenance over their serviceable life. Part B of the Plumbing Code of Australia specifies the procedures and requirements for the certification of plumbing and drainage products that require statutory authorisation. These procedures and requirements are in accordance with the perceived risks posed by a plumbing product in relation to the above five factors. In this regard, not all products will need certification and the certification process can vary subject to the perceived risks. Part B of the Plumbing Code of Australia does not cover special purpose products for which there is very limited usage. Authorisation for the use of these special purpose products, normally as once-off applications, is considered to be in the jurisdiction of the regulatory authority. Documentation relating to their authorisation or approval is to be in accordance with I
7 I Application of the Plumbing Code of Australia to a particular State or Territory For application within a particular State or Territory, the Plumbing Code of Australia comprises; sections I, A and B; and the variations, deletions and additions to Sections A and B applicable to that State or Territory specified in the relevant appendices in Appendix 3. I-3.6 VERIFICATION OF PLUMBING INSTALLATIONS Examples of the kind of documentation to be prepared include: Details of the Plumbing Solution including all relevant plans and other supporting documentation. In cases where an Alternative Solution has been proposed (a) (b) (c) (d) (e) details of the relevant Performance Requirements; the Assessment Method or methods used to establish compliance with the relevant Performance Requirements; details of any Expert Judgment relied upon including the extent to which the judgment was relied upon and the qualifications and experience of the expert; details of any tests or calculations used to determine compliance with the relevant Performance Requirements; and details of any Standards or other information which were relied upon. I-3.7 CERTIFICATION AND AUTHORISATION OF PLUMBING AND DRAINAGE PRODUCTS The processes necessary for the certification of plumbing and drainage products that require statutory authorisation are provided in Part B of the Plumbing Code of Australia. However, in a one-off situation, an application for certification may be made to the particular regulatory authority. This is to include: Details of the plumbing product including all relevant plans and other related documents; 5
8 (iii) I-3.8 Adequate documentation supporting such application being made to the individual authority rather than seeking certification through the procedures detailed in Part B; Assessment details prepared by an approved independent body, e.g., a National Association of Testing Authorities (NATA) accredited laboratory or technical expert including: (a) (b) (c) (d) (e) (f) (g) Details of the relevant Performance Requirements; outcome of the risk analysis carried out on the product and its intended use; details of any Expert Judgment relied upon including the extent to which the judgment was relied upon and the qualifications and experience of the expert; details of any tests or calculations used to determine compliance with the relevant Performance Requirements; details of any Standards or other information which were relied upon; the Assessment Method or methods used to establish compliance with the relevant Performance Requirements; features of the product that are deemed to adequately address or mitigate against the perceived risks. ADOPTION OF STANDARDS AND OTHER REFERENCES Where a Deemed-to-Satisfy Provision adopts a Standard, rule, specification or provision included in any document issued by Standards Australia or other body, that adoption does not include a provision: (iii) specifying or defining the respective rights, responsibilities or obligations as between themselves of any manufacturer, supplier or purchaser; or specifying the responsibilities of any trades person or other building operative, architect, engineer, authority, or other person or body; or requiring the submission for approval of any material, building component, form or method of construction, to any person, authority or body other than a person or body empowered under State or Territory legislation to give that approval; or 6
9 (iv) (v) specifying that a material, building component, form or method of construction must be submitted to Standards Australia or a committee of Standards Australia for expression of opinion; or permitting a departure from the code, rule, specification or provision at the sole discretion of the manufacturer or purchaser, or by arrangement or agreement between the manufacturer and purchaser. I Referenced Standards A reference in a Deemed-to-Satisfy Provision to a document under I-3.8 refers to the edition or issue, together with any amendment listed in Appendix 2 and only so much as is relevant in the context in which the document is quoted. I Differences between referenced documents and the Plumbing Code of Australia The Code overrules in any difference arising between it and any Standard, rule, specification or provision in a document listed in Appendix 2. I-3.9 LANGUAGE A reference to a plumbing or drainage service, system or product in the Code is a reference to an entire service, system or product or part of a service, system or product, as the case requires. I-3.10 FURTHER REVIEW OF THE PLUMBING CODE OF AUSTRALIA Regular reviews are planned for the Plumbing Code of Australia to improve clarity of provisions, update references and to reflect the results of research and improved technology. Later editions may therefore include reviewed Objectives, Functional Statements and Performance Requirements. I-3.11 COMMENTS Comments in writing on any matter concerning the text, presentation or further development of the Code are invited from plumbing and other authorities, industry organisations, professional operatives and the public generally. These comments should be addressed to: National Plumbing Regulators Forum C/O Plumbing Industry Commission PO Box 360 Caulfield East VIC
10 PLUMBING CODE OF AUSTRALIA PART A PLUMBING SERVICES AND SYSTEMS A. Scope & Structure A.1 Water Services A.2 Sanitary Plumbing And Drainage Systems A.3 Stormwater Drainage Systems A.4 Heating, Ventilation And Air Conditioning Systems A.5 On-Site Wastewater Systems DRAFT 5 August
11 PART A PLUMBING SERVICES AND SYSTEMS 1 SCOPE This part of the Plumbing Code of Australia contains the technical requirements for the construction, installation, replacement, repair, alteration and maintenance of: (iii) (iv) (v) water services; sanitary plumbing and drainage systems; stormwater drainage systems; heating, ventilation and air conditioning systems; and on-site wastewater treatment systems; that are associated with human occupancy of buildings. 2 STRUCTURE The structure of Part A of the Plumbing Code of Australia comprises the following: (iii) (iv) the Objectives; the Functional Statements; the Performance Requirements which all Plumbing Solutions are to satisfy; and the Plumbing Solutions which includes the Deemed-to-Satisfy Provisions and the Alternative Solutions. This is shown diagrammatically in Figure A1. 9
12 Objectives Functional Statements Guidance Levels Performance Requirements Plumbing or Drainage Solutions Compliance Levels Deemed-to-Satisfy Provisions Alternative Solutions Verification Methods Documentary Evidence per I-3.6/I-3.7 Calculation or Test Methods Comparison to Deemed-to-Satisfy Provisions Figure A1 PCA Structure for Plumbing Services and Systems 10
13 A.1 WATER SERVICES A.1.1 SCOPE This Part sets out the requirements for: (iii) (iv) cold water services, hot water services, non-potable water services, and fire fighting water services. Parts A.1.1, A.1.2, A.1.3 and A.1.4 detail the requirements for each of the water services listed above. 11
14 A.1.1 COLD WATER SERVICES A SCOPE This Part sets out the requirements for the construction, installation, replacement, repair, alteration and maintenance of any part of a cold water service of a property that is connected to the drinking water supply,from the point of connection to the points of discharge. A REFERENCED DOCUMENTS The following documents are referred to in this Part: AS 1428 Part 1 Part 2 Part 3 AS/NZS 3500 Part 1.2 Part 5 Design for access and mobility General requirements for access-new building work Enhanced and additional requirements-building and facilities Requirements for children and adolescents with physical disabilities National plumbing and drainage Water supply Acceptable solutions Domestic installations Section 2 Water supply A DEFINITIONS For the purpose of this Part, the definitions in documents referenced in I- 3.3 and in the documents referenced in A apply. A OBJECTIVES The objectives of this Part are as follows: (iii) (iv) (v) safeguard people from illness due to consumption of or contact with contaminated water; safeguard people from injury or loss of amenity due to the failure of the water service; safeguard people from disturbance or loss of amenity as a result of excessive or undue noise from a cold water service; safeguard people from a water supply that is offensive in appearance, taste or odour; ensure that a cold water installation provided for use by people with disabilities is adequate; 12
15 (vi) (vii) (viii) A conserve water resources; safeguard property and the environment; and ensure that the cold water service installation throughout its design life will continue to satisfy the requirements of items to (vii). FUNCTIONAL STATEMENT Sanitary fixtures, sanitary appliances and supply outlets for drinking water are to have safe and adequate piped cold water. The water is to be conveyed through plumbing installations that minimise any adverse impact on building occupants, the network utility operator s infrastructure, property and the environment. A PERFORMANCE REQUIREMENTS A Cold water service Cold water for human consumption, food preparation, food utensil washing or personal hygiene is to be potable. A Cold water service installation A cold water service is to be installed in such a manner as to: (iii) (iv) (v) (vi) avoid the likelihood of drinking water contamination within both the system and the network utility operator s water main; provide water to fixtures and appliances at flow rates and pressures which are adequate for the correct functioning of those fixtures and appliances under normal conditions and in a manner that does not create undue noise; avoid the likelihood of leakage or failure including uncontrolled discharges; facilitate the efficient use of drinking water from network utility operator s supply; allow adequate access for maintenance of mechanical components; and allow the system, appliances and backflow prevention devices to be isolated for testing and maintenance, where required. A People with disabilities Facilities provided for people with disabilities are to have cold water supply taps or other operational controls that are accessible and adequate for their use. 13
16 A DEEMED TO SATISFY Compliance with the following is deemed to satisfy the requirements of this Part: AS , AS , AS , as appropriate, for access to fixtures for people with disabilities, AS/NZS or AS/NZS Section 2, as appropriate, for construction, installation, replacement, repair, alteration and maintenance of the service. A MEANS OF VERIFICATION Verification acceptable to a regulatory authority can be demonstrated either: by calculation and certification by persons or organisations with recognised credentials in the design or testing of water service systems; or by satisfying the required criteria when tested in accordance with a specified test method endorsed by a recognised auditing body. A PRODUCT AUTHORISATION Products used in cold water services are to be certified and authorised as specified in Part B of this Code. 14
17 A.1.2 HOT WATER SERVICES A SCOPE This Part sets out the requirements for the construction, installation, replacement, repair, alteration and maintenance of any part of a hot water service of a property that is connected to the drinking water supply, from the point of connection to the points of discharge. A REFERENCED DOCUMENTS The following documents are referred to in this Part: AS 1428 Part 1 Part 2 Part 3 AS/NZS 3500 Part 4.2 Part 5 Design for access and mobility General requirements for access-new building work Enhanced and additional requirements-building and facilities Requirements for children and adolescents with physical disabilities National plumbing and drainage Hot water supply systems Domestic installations Section 3 Hot water supply A DEFINITIONS For the purpose of this Part, the definitions in documents referenced in I- 3.3 and in the documents referenced in A apply. A OBJECTIVES The objectives of this Part are as follows: (iii) (iv) (v) safeguard people from illness due to consumption of, or contact with, contaminated water; safeguard people from injury due to the failure of a pressure vessel or from contact with excessively hot water; safeguard people from disturbance or loss of amenity as a result of excessive or undue noise from a hot water service; safeguard people from the loss of amenity arising from a lack of hot water for personal hygiene or from a water supply which is offensive in appearance, taste or odour; ensure that a hot water installation provided for use by people with disabilities is adequate; 15
18 (vi) (vii) (viii) A reduce wastage of water and energy resources; safeguard property and the environment; and ensure that the hot water service installation throughout its design life will continue to satisfy the requirements of items to (vii). FUNCTIONAL STATEMENT Sanitary fixtures, sanitary appliances and hot water supply outlets are to have a safe and adequate piped hot water supply. The hot water supply is to be conveyed through plumbing installations that minimise any adverse impact on building occupants, the network utility operator s infrastructure, property and the environment. A PERFORMANCE REQUIREMENTS A Hot water service Hot water for human consumption, food preparation, food utensil washing or personal hygiene is to be potable. A Hot water temperatures Hot water supplied by a new hot water service is to be delivered to fixtures and appliances used primarily for personal hygiene at a temperature which reduces the likelihood of scalding. A Hot water service installation A hot water service is to be installed in such a manner as to: (iii) (iv) (v) (vi) avoid the likelihood of contamination of drinking water within both the on-site service system and the network utility operator s water main; provide hot water to fixtures and appliances at flow rates and temperatures which are adequate for the correct functioning of those fixtures and appliances under normal conditions and in a manner that does not create undue noise; avoid the likelihood of leakage or failure, including uncontrolled discharges; use energy efficiently and minimise wastage of water; allow adequate access for maintenance of mechanical components; and allow the system, appliances and backflow prevention devices to be isolated for testing and maintenance, where required. 16
19 A Pressure vessels Pressure vessels used for producing or storing hot water are to be provided with safety devices which: relieve excessive pressure during both normal and abnormal conditions; and limit temperatures to avoid the likelihood of flash steam production in the event of rupture. A Hot water storage Heated water is to be stored under conditions which avoid the likelihood of the growth of Legionella bacteria. A People with disabilities Facilities provided for people with disabilities are to have hot water supply taps or other operational controls that are accessible and adequate for their use. A DEEMED TO SATISFY Compliance with the following is deemed to satisfy the requirements of this Part: AS , AS or AS , as appropriate, for access to fixtures for people with disabilities, and AS/NZS or AS/NZS Section 3, as appropriate, for construction, installation, replacement, repair, alteration and maintenance of the service. A MEANS OF VERIFICATION Verification acceptable to a regulatory authority can be demonstrated either: by calculation and certification by persons or organisations with recognised credentials in the design or testing of hot water service systems; or by satisfying the required criteria when tested in accordance with a specified test method endorsed by a recognised auditing body. A PRODUCT AUTHORISATION Products used in hot water services are to be certified and authorised as specified in Part B of this Code. 17
20 A.1.3 NON-POTABLE WATER SERVICES A SCOPE This Part sets out the requirements for the construction, installation, replacement, repair, alteration and maintenance of any part of a nonpotable cold water service of a property from the point of connection to the points of discharge. The distribution of non-potable water is to be limited to non-potable uses such as: (iii) (iv) (v) (vi) (vii) garden watering; toilet and urinal flushing; vehicle washing; path/wall washing; industrial purposes; fire fighting; and dust suppression. A REFERENCED DOCUMENTS The following documents are referred to in this Part: AS 1428 Part 1 Part 2 Part 3 AS/NZS 3500 Part 1.2 Part 5 Design for access and mobility General requirements for access-new building work Enhanced and additional requirements-building and facilities Requirements for children and adolescents with physical disabilities National Plumbing and Drainage Water Supply Acceptable solutions Domestic installations A DEFINITIONS For the purpose of this Part, the definitions in documents referenced in I- 3.3 and in the documents referenced in A apply. 18
21 A OBJECTIVES The objectives of this Part are as follows: (iii) (iv) (v) (vi) safeguard people from illness due to consumption of or exposure to infection by non-potable water; minimise the likelihood of any inadvertent interconnection or backflow between a drinking water and a non-potable water service system; safeguard people from disturbance or loss of amenity as a result of excessive or undue noise from a non-potable water service; ensure that a non-potable water installation provided for people with disabilities is adequate for their use; safeguard property and the environment; and ensure that the non-potable water service installation throughout its design life will continue to satisfy the requirements of items to (v). A FUNCTIONAL STATEMENT Sanitary fixtures, sanitary appliances and non-potable water outlets are to have an adequate piped non-potable water supply. Non-potable water is to be supplied through plumbing installations that avoid the likelihood of inadvertent contamination of any drinking water service, minimise any adverse impact on building occupants, the network utility operator s infrastructure, property and the environment. A PERFORMANCE REQUIREMENTS A Non-potable water service A non-potable water supply can only be connected to outlets clearly identified for non potable use. It is to be for uses as described in A A non-potable water service is not to have a cross connection with a drinking water service. A Identification Pipe outlets, fittings, storage and holding tanks that are parts of a nonpotable water service are to be clearly identified. A Non-potable water service installations A non-potable water service is to be installed in such a manner as to: 19
22 (iii) (iv) (v) (vi) avoid the likelihood of contamination of drinking water in the on-site drinking water service and the network utility operator s drinking water main; provide non-potable water to fixtures and appliances at flow rates and pressures which are adequate for the correct functioning of those fixtures and appliances under normal conditions and in a manner that does not create undue noise; avoid the likelihood of leakage or failure; allow reasonable access for maintenance of mechanical components; allow the system, appliances and backflow prevention devices to be isolated for testing and maintenance; and avoid the likelihood of uncontrolled discharges. A People with disabilities Non-potable water services provided for people with disabilities are to have taps or other operational controls that are accessible, convenient and adequate for their use. A DEEMED TO SATISFY Compliance with the following is deemed to satisfy the requirements of this Part: AS , AS or AS , as appropriate, for access to fixtures; and AS/NZS or AS/NZS Section 2, as appropriate, for non-potable water systems. A MEANS OF VERIFICATION Verification acceptable to a regulatory authority can be demonstrated either by calculation and certification by persons or organisations with recognised credentials in the design or testing of nonpotable water services; or by satisfying the required criteria when tested in accordance with a specified test method endorsed by a recognised certifying body. A PRODUCT AUTHORISATION Products used in non-potable water services are to be certified and authorised as specified in Part B of this Code. 20
23 A.1.4 FIRE FIGHTING WATER SERVICES A SCOPE This Part sets out requirements for the construction, installation, replacement, repair, alteration, maintenance of any part of fire fighting water services from the network utility operator s water main or other acceptable sources of supply to the fire fighting equipment, including hydrant, hose reel, sprinkler services and wall drencher systems. A REFERENCED DOCUMENTS The following Documents are referred to in this Part: AS/NZS 1221 Fire hose reels AS 2118 Automatic fire sprinkler systems Part 1 General requirements Part 4 Residential Part 5 Domestic Part 6 Combined sprinkler and hydrant Part 9 Piping support and installation AS 2419 Fire hydrant installations Part 1 System design, installation and commissioning Part 2 Fire hydrant valves AS 2441 Installation of fire hose reels AS/NZS 3500 National plumbing and drainage Part 1.2 Water supply Acceptable solutions AS Fire sprinkler systems Part 2.1 Piping general A DEFINITIONS For the purpose of this Part, the definitions in documents referenced in I- 3.3 and in the documents referenced in A apply. 21
24 A OBJECTIVES The objectives of this Part are to: (iii) (iv) (v) (vi) safeguard people from illness due to consumption of, or contact with, contaminated water; safeguard people from injury or loss due to the failure of the fire fighting water services and equipment; safeguard the network utility operator s infrastructure from damage or contamination due to failure or malfunction of the fire fighting service; ensure that adequate water is available to all fire fighting services and equipment; conserve water resources; and ensure that a fire fighting water service installation throughout its design life will continue to satisfy the requirements of items to (v). A FUNCTIONAL STATEMENT All fire fighting equipment are to be provided with adequate water for their intended purpose. A PERFORMANCE REQUIREMENTS A fire fighting water service is to be constructed in a manner which: (iii) (iv) (v) avoids the likelihood of the contamination of drinking water within the property boundary as well as that in the water main; provides water to the fire fighting equipment at a flow rate and pressure that is adequate for the correct functioning of the equipment; avoids the likelihood of leakage or failure including uncontrolled discharges; provides adequate access for maintenance of mechanical components; and allows the system and backflow prevention devices to be isolated for testing and maintenance. 22
25 A DEEMED TO SATISFY Compliance with the following, individually or collectively, as appropriate, is deemed to satisfy the requirements of this Part. (iii) (iv) installation of fire fighting water services in accordance with AS , AS , AS , AS and AS/NZS ; installation of water services for fire hydrants in accordance with AS and AS ; and installation of fire hose reel systems in accordance with AS and AS/NZS 1221; and installation of water services for wall drencher systems in accordance with AS/NZS A MEANS OF VERIFICATION Verification of fire fighting water service performance may be conducted by a qualified third party certifier and/or the relevant fire fighting authority. A PRODUCT AUTHORISATION Materials and products used in fire fighting water services are to be authorised by a recognised body as complying with the relevant Australian Standard(s) for the specific application. 23
26 A.2 SANITARY PLUMBING & DRAINAGE SYSTEMS A.2.1 SCOPE This Part sets out the requirements for the construction, installation, replacement, repair, alteration and maintenance of any part of a sanitary plumbing and drainage system of a property from sanitary fixtures and appliances to an approved disposal system. A.2.2 REFERENCED DOCUMENTS The following documents are referred to in this Part: AS Part 1 Part 2 Part 3 AS/NZS 3500 Part 2.2 Part 5 Design for access and mobility General requirements for access-new building work Enhanced and additional requirements-building and facilities Requirements for children and adolescents with physical disabilities National plumbing and drainage Sanitary plumbing and drainage Acceptable solutions Domestic installations Section 4 Sanitary plumbing and drainage A.2.3 DEFINITIONS For the purpose of this Part, the definitions in documents referenced in I- 3.3, in the documents referenced in A.2.2 apply. A.2.4 OBJECTIVES The Objectives of this Part are to: safeguard people from illness due to infection or contamination resulting from personal hygiene activities; (iii) safeguard people from the loss of amenity due to unpleasant odours or the accumulation of offensive matter resulting from sewage disposal; safeguard people from disturbance or loss of amenity as a result of excessive or undue noise from a sanitary plumbing or drainage system; 24
27 (iv) (v) A.2.5 ensure that sanitation facilities provided for the use of people with disabilities are adequate; and ensure that the sanitary plumbing and drainage installation throughout its design life will continue to satisfy the requirements of items to (iv). FUNCTIONAL STATEMENT Sanitary fixtures and sanitary appliances using water-borne waste disposal are to be provided with an adequate disposal system that does not impact adversely on occupants of the premises, the network utility operator s infrastructure, property and the environment. A.2.6 PERFORMANCE REQUIREMENTS A Sanitary plumbing system A sanitary plumbing system using water-borne waste disposal is to be installed in such a manner as to: (iii) (iv) (v) (vi).a convey sewage or sullage to a sanitary drainage system or an approved disposal system in a manner that does not create undue noise; avoid the likelihood of blockage and leakage; avoid the likelihood of ingress of water, foul air and gases from the system into buildings; be adequately supported, jointed and protected in a way that; (a) (b) (c) avoids the likelihood of penetration by roots, avoids the likelihood of the ingress of ground water; and avoids the likelihood of damage from superimposed loads or normal building movement provide for the effective and efficient use of water; and provide adequate access for maintenance and for clearing blockages. Sanitary drainage system A sanitary drainage system using water-borne waste disposal is to be installed in such a manner as to: convey sewage from a sanitary plumbing system to an approved disposal system in a manner that does not create undue noise; avoid the likelihood of blockage and leakage; 25
28 (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) avoid the likelihood of ingress of water, foul air and gases from the system into buildings; be adequately supported, jointed and protected in a way that; (a) (b) (c) avoids the likelihood of penetration by roots, avoids the likelihood of the ingress of ground water; or avoids the likelihood of damage from superimposed loads or normal building movement provide adequate access for maintenance and for clearing blockages; provide ventilation to avoid the likelihood of foul air and gases accumulating in the sanitary drainage system; protect against internal contamination; avoid the likelihood of ingress of stormwater into the sewerage system; avoid the likelihood of uncontrolled discharge; avoid the likelihood of damage to existing buildings or site works; and avoid the likelihood of damage to the sewerage system or other approved disposal system. A People with disabilities In facilities provided for people with disabilities, sanitary fixtures are to be suitable for their use. A.2.7 DEEMED TO SATISFY Compliance with the following is deemed to satisfy the requirements of this Part: AS , AS or AS , as appropriate, for access to fixtures for people with disabilities; and AS/NZS or AS/NZS Section 4, as appropriate, for the construction, installation, replacement, repair, alteration and maintenance of the system. A.2.8 MEANS OF VERIFICATION Verification acceptable to a regulatory authority can be demonstrated either: By calculation and certification by persons or organisations with recognised credentials in the design or testing of sanitary plumbing and drainage systems; or 26
29 By satisfying the required criteria when tested in accordance with a specified test method endorsed by a recognised auditing body. A.2.9 PRODUCT AUTHORISATION Products used in sanitary plumbing and drainage systems are to be certified and authorised as specified in Part B of this Code. 27
30 A.3 STORMWATER DRAINAGE SYSTEMS A.3.1 SCOPE This Part sets out the requirements for the construction, installation, replacement, repair, alteration and maintenance of any part of a roof drainage system, surface drainage system and subsoil system to the point(s) of connection or other approved disposal point. A.3.2 REFERENCED DOCUMENTS The following documents are referred to in this Part: AS/NZS 3500 Part 3.2 National plumbing and drainage Stormwater drainage Acceptable solutions Part 5 Domestic installations - Section 5 Stormwater drainage ABCB Vol. 2 Building Code of Australia Housing provisions A.3.3 DEFINITIONS For the purpose of this Part, the definitions in documents referenced in I- 3.3 and in the documents referenced in A.3.2 apply. A.3.4 OBJECTIVES The Objectives of this Part are to: (iii) (iv) minimise risks of injury or inconvenience to people and damage to property caused by stormwater; protect against damage to the stormwater drainage systems of an individual property and of the network utility operator s system; safeguard property and the environment against damage and degradation; and ensure that stormwater drainage systems throughout their design life will satisfy the requirements of items to (iii). 28
31 A.3.5 FUNCTIONAL STATEMENT Buildings and their surroundings are to be provided with a stormwater installation constructed to provide protection for people, property and the environment from the adverse effects of stormwater. A.3.6 PERFORMANCE REQUIREMENTS A Roof drainage systems Roof drainage systems are to be installed to avoid the likelihood of injury to people, damage to property and loss of amenity from the adverse effects of stormwater. A Overflow devices or measures Overflow devices or measures are to be installed and maintained where overtopping of the roof drainage system could cause significant monetary loss, property damage or personal injury taking into account the effect of possible obstructions and blockages. A Watertightness All internal roof drainage components are to be watertight. A Surface drainage systems Surface drainage systems are to dispose of stormwater flows from rainfall events having an Average Recurrence Interval (ARI) appropriate to the importance of the site and the severity of potential damage and injury that would result from the failure of such systems. A Subsoil drainage systems Subsoil drainage systems for the removal of excess groundwater and the reduction of soil moisture levels are to be installed in such a manner as to not cause damage to buildings and other facilities by changing soil moisture conditions. A Stormwater drainage systems Stormwater drainage systems are to be installed in such a manner as to: (iii) (iv) convey stormwater to a point of collection using gravity flow where possible; avoid the likelihood of blockages; avoid the likelihood of leakage and penetration by roots; provide adequate access for maintenance and clearing of blockages; 29
32 (v) (vi) (vii) (viii) (ix) (x) avoid the likelihood of damage to the external stormwater drainage network where the stormwater is being discharged to such a network; avoid the likelihood of damage from superimposed loads on normal ground, or building movements; avoid the likelihood of ingress of sewage, trade waste or both; avoid the likelihood of ingress of stormwater into a sanitary drainage system; avoid the likelihood of damage to buildings, property or site works, in particular during the construction phase; and avoid the likelihood of uncontrolled discharge. A No point of connection In addition to the requirements listed in A above, where a point of connection to a network utility provider s stormwater drainage network is not available, the stormwater drainage system is to be installed and maintained to avoid the likelihood of the concentration of stormwater outside the approved disposal system. A.3.7 DEEMED TO SATISFY Compliance with AS/NZS , AS/NZS Section 5, as appropriate, is deemed to satisfy the requirements of this Part. (Note. See the Building Code of Australia for areas of work other than those covered by AS ) A.3.8 MEANS OF VERIFICATION Verification acceptable to a regulatory authority can be demonstrated either: by calculation and certification by persons or organisations with recognised credentials in the design or testing of stormwater water drainage systems; or by satisfying the required criteria when tested in accordance with a specified test method endorsed by a recognised auditing body. (Note: Stormwater drainage Methods for verification (AS ) is in the course of preparation) A.3.9 PRODUCT AUTHORISATION Products used in stormwater and drainage systems are to be certified and authorised as specified in Part B of this Code. 30
33 A.4 HEATING, VENTILATION AND AIR-CONDITIONING A.4.1 SCOPE This Part sets out the requirements for the installation, alteration, addition, replacement, maintenance or repair of mechanical heating, cooling and/or ventilation systems of a building. A.4.2 REFERENCED DOCUMENTS The following documents are referred to in this Part: ABCB AS/NZS 1200 AS 1271 AS 1324 Part 1 AS 1345 Building Code of Australia Pressure Equipment Safety valves, other valves, liquid level gauges, and other fittings for boilers and unfired pressure vessels Air filters for use in general ventilation and air conditioning Application, performance and construction. Identification of the contents of pipes, conduits and ducts. AS 1358 Bursting discs and bursting devices Guide to application, selection, and installation. AS/NZS 1571 AS/NZS1668 Part 1 Copper Seamless tubes for air conditioning and refrigeration. The use of mechanical ventilation and air-conditioning in buildings Fire and smoke control in multi-compartment buildings AS 1668 Part 2 Mechanical ventilation for acceptable indoor-air quality. Part 2 AS/NZS 3500 Part 1.2 Part 2.2 Part 4.2 Supplement 1 - Commentary. National plumbing and drainage. Water supply Acceptable solutions Sanitary plumbing and drainage Acceptable solutions Hot water supply systems Acceptable solutions. 31
34 AS/NZS 3666 Part 1 Part 2 Part 3 AS 4041 AS 4254 AS 4426 AS 5601 Air handling and water systems of buildings-microbial Control. Design, installation and commissioning Operation and maintenance Performance-based maintenance of cooling water systems Pressure Piping Ductwork for air-handling systems in buildings. Thermal insulation of pipe work, ductwork and equipment Selection, installation and finish. Gas installations. A.4.3 DEFINITIONS For the purposes of this Part the definitions given in I-3.3 and the documents referenced in A.4.2 apply. A.4.4 OBJECTIVES The objectives of this Part are to: (iii) (iv) (v) (vi) (vii) (viii) safeguard people from illness caused by infection due to contact with contaminated indoor air; safeguard people from loss of amenity arising from the lack of heating, cooling and/or ventilation within the building; safeguard people from disturbance or loss of amenity as a result of excessive or undue noise from any service associated with the heating, cooling and/or ventilation equipment; safeguard people from injury due to rupture of a pressure vessel or from contact with an excessively hot surface; safeguard people from internal building environments which are offensive in odour and taste; safeguard people from risk of illness due to mechanical, heating, cooling and/or ventilation equipment failure; and ensure that energy efficiency issues and outcomes are among the major considerations in the installation, ongoing maintenance and operating performance of any heating, cooling and/or ventilation installation. ensure that a heating, ventilation and air conditioning service throughout its design life will continue to satisfy the requirements of items to (vii). 32
35 A.4.5 FUNCTIONAL STATEMENT Mechanical services, plant and equipment used for heating, cooling and/or ventilation of a building are to be adequate. The building s heating, cooling and/or ventilation system installation and maintenance are to support energy efficient outcomes and minimise any adverse impact on building occupants or occupants of adjoining places, the network utility operator s infrastructure, property and the environment. A.4.6 PERFORMANCE REQUIREMENTS Mechanical services, plant and equipment for heating, cooling and/or ventilation are to be installed in such a manner as to: (iii) (iv) (v) deliver heating cooling and/or ventilation whilst avoiding the likelihood of people being exposed to microbial infection; avoid the likelihood of damage to property and loss of amenity to the building occupants; provide an environment that meets with occupational health, safety and welfare requirements; incorporate energy efficient and cost effective considerations; and provide adequate access for maintenance. A.4.7 DEEMED TO SATISFY Compliance with the following is deemed to satisfy the requirements of this Part: AS/NZS 1200, AS , AS 1345, AS 1358, AS 1358, AS , AS , AS/NZS , AS/NZS , AS/NZS , AS 4254, AS 4426 and AS 5601, as appropriate, for the construction, installation, replacement, repair, alteration and maintenance of mechanical ventilation equipment; Building Code of Australia, AS/NZS , AS/NZS , AS/NZS , as appropriate, for occupational health and safety considerations and for microbial control; (iii) (iv) AS/NZS 1200, AS 1271, AS 4041, as appropriate, for pressure equipment and piping; and AS/NZS 1571 for copper piping for air conditioning and refrigeration. 33
36 A.4.8 MEANS OF VERIFICATION Verification acceptable to a regulatory authority can be demonstrated either: by calculation and certification by persons or organisations with recognised credentials in the testing of heating, ventilation and air conditioning systems; or by satisfying the required criteria when tested in accordance with a specified test method endorsed by a recognised auditing body. 34
37 A.5 ON-SITE WASTEWATER SYSTEMS A.5.I-1 SCOPE This Part of the Code contains the technical requirements for the construction, installation, replacement, repair, alteration and maintenance of: (iii) on-site waterless composting toilets; on-site treatment and conveyance of water borne domestic allwaste, blackwater and greywater (with on-site and/or off-site disposal); and on-site treatment and conveyance of trade waste (with on-site and/or off-site disposal) that are associated with human occupancy of and/or activity in buildings. It details the Objectives, Functional Statements, Performance Requirements and the Plumbing or Drainage Solutions for each of the above services or systems. 35
38 A.5.1 ON-SITE DOMESTIC WASTEWATER TREATMENT AND DISPOSAL A SCOPE This Part sets out the requirements for the construction, installation, replacement, repair, alteration and maintenance of any part of a system of a property used for the on-site treatment and conveyance of water borne domestic all-waste, blackwater and greywater (with on-site and/or off-site disposal) with a loading equivalent not in excess of 10 people and its associated land-application system, as appropriate. A REFERENCED DOCUMENTS The following documents are referred to in this Part: AS/NZS 1546 On-site domestic wastewater treatment units Part 1 Septic tanks Part 2 Waterless composting toilets Part 3 Aerated wastewater treatment systems AS/NZS 1547 On-site domestic-wastewater management AS/NZS 3500 National plumbing and drainage code Part 0 Glossary of terms Part 2.2 Sanitary plumbing and drainage Acceptable solutions A DEFINITIONS For the purposes of this Part the definitions given in I-3.3 and the documents referenced in A apply. A OBJECTIVES The Objectives of this Part are to: (iii) safeguard people from illness due to infection resulting from contact with untreated or partially treated sewage; safeguard people from illness by ensuring that all discharges satisfy the relevant regulatory authority s requirements. safeguard the environment from degradation by ensuring that all discharges satisfy the relevant regulatory authority s requirements. 36
39 (iv) (v) (vi) A safeguard people from the loss of amenity due to the presence of unpleasant odours or the accumulation of offensive matter resulting from sewage water disposal; ensure sustainable compliance with the relevant regulator s requirements; ensure that the installation throughout its design life will continue to satisfy the requirements of items to (v). FUNCTIONAL STATEMENT On-site wastewater treatment systems are to collect, contain and process domestic-wastewater, human excreta, or both so that public health and environmental standards required by the relevant regulatory authority are achieved. A PERFORMANCE REQUIREMENTS A wastewater treatment system is to be installed in such a manner as to: (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii) (xiii) (xiv) protect and enhance public health and environment; be of sufficient capacity to receive, treat, and absorb all wastewater outputs from premises on the property; complete the treatment, uptake and absorption of the final effluent within the boundaries of the property; avoid the likelihood of the creation of unpleasant odours or the accumulation of offensive matter; avoid the likelihood of the ingress of sewage, foul air or gases into buildings; avoid the likelihood of stormwater entering the system; avoid the likelihood of root penetration or ingress of ground water; avoid the likelihood of damage from superimposed loads or normal ground movement; provide ventilation to avoid the likelihood of foul air and gases from accumulating in the system; protect against internal contamination; provide adequate access for maintenance; incorporate adequate provisions for effective cleaning; avoid the likelihood of unintended or uncontrolled discharge; and avoid the likelihood of blockage and leakage. 37
40 A DEEMED TO SATISFY Compliance with the following, as appropriate, is deemed to satisfy the requirements of this Part: (iii) AS/NZS for size determination, design and installation of septic tanks; AS/NZS for the installation of waterless composting toilets; AS/NZS for size determination, design and installation of aerated wastewater systems; (iv) AS/NZS for the construction, installation, replacement, repair, alteration and maintenance of all sanitary plumbing and drainage systems; (v) (vi) AS/NZS 1547 for the management of on-site wastewater treatment systems; and in accordance with the specified or agreed provisions as required by the relevant regulatory authority. A MEANS OF VERIFICATION Verification acceptable to a regulatory authority can be demonstrated either: by calculation and certification by persons or organisations with recognised credentials in the design or testing of on-site domestic wastewater systems; or by satisfying the required criteria when tested in accordance with a specified test method endorsed by a recognised auditing body. A PRODUCT AUTHORISATION Products used in sanitary plumbing and drainage systems connected to the on-site domestic wastewater treatment units are to be certified and authorised as specified in Part B of this Code. 38
41 A.5.2 TRADE WASTE A SCOPE This Part sets out the requirements for the construction, installation, replacement, repair, alteration and maintenance of any part of a system of a property used for the on-site treatment, conveyance and disposal of trade waste. A REFERENCED DOCUMENTS The following documents are referred to in this Part: AS/NZS 3500 National plumbing and drainage Part 2.2 Sanitary plumbing and drainage Acceptable solutions A DEFINITIONS For the purposes of this Part the definitions given in I-3.3 and the documents referenced in A apply. A OBJECTIVES The Objectives of this Part are to: (iii) (iv) (v) (vi) protect the environment and public health and safety; safeguard people from illness caused by infection or contamination resulting from working in and around trade waste installations; safeguard people from the loss of amenity due to the presence of unpleasant odours or the accumulation of offensive matter; ensure sustainable compliance with public health and environmental requirements; treat trade waste so that it meets the requirements of the relevant regulatory authority; and ensure that the installation throughout its design life will continue to satisfy the requirements of items to (v). A FUNCTIONAL STATEMENT Where trade waste is generated adequate spaces and facilities are to be provided for the safe and hygienic collection, holding, treatment and disposal of the waste. 39
42 On-site trade waste treatment systems are to process liquid waste generated from industry, business, trade or manufacturing process so that public health and environmental standards required by the relevant regulatory authority and/or particular requirements of the sewerage authority, where applicable, are achieved. A PERFORMANCE REQUIREMENTS A General An on-site trade waste system is to be installed in such a manner as to: (iii) (iv) protect public health by ensuring that: (a) (b) all discharges comply with the relevant regulatory authority; and risks associated with the discharge of treated trade waste to the environment are minimised. maintain and enhance the quality of the environment by ensuring that: (a) (b) (c) (d) environmental quality objectives set by the relevant regulatory authority are attained; surface and ground water are not polluted; soil productivity is maintained or enhanced; and adverse cumulative environmental effects comply with the relevant environmental requirements. maintain and enhance community amenity by ensuring that: (a) (b) on-site trade waste systems are managed so as to achieve sustainable long term performance; the on-site system design and its implementation contribute to improving and sustaining aesthetic values within individual properties and groups of properties; and (c) the requirements of any community resource utilisation programme for the reuse of resources within wastewater are met. meet the requirements for the acceptance of trade waste to sewers, as appropriate. A Acceptance Trade waste is to be discharged according to the requirements and agreement of the relevant regulatory authority and the receiving utility. 40
43 A Conveyance Trade waste is to be conveyed to storage containers and within disposal systems in a way that: (iii) (iv) (v) transfers wastes safely and hygienically; avoids the likelihood of blockage and leakage; avoids the likelihood of foul air and gases entering buildings; permits the manufacturer, model, serial number and designed capacity to be reasonably easily identifiable after installation; and provides adequate and safe access for clearing blockages. A Storage, treatment and disposal facilities Facilities for the storage, treatment and disposal of trade waste are to be constructed: (iii) (iv) (v) (vi) (vii) (viii) (ix) with adequate treatment and storage capacity for the volume of waste and frequency of disposal; with adequate size, strength and rigidity for the nature, flow rates, volume of wastes, by-products and residues which are to be processed; with adequate vehicle access for collection, if required; with adequate structural strength for pedestrian or vehicular traffic likely to be encountered; to avoid the likelihood of contamination of any potable water supplies installed in compliance with Part A of this Code. to avoid the likelihood of contamination of soils, ground water and waterways except as permitted; from materials which are impervious both to the waste for which disposal is required and to water; to avoid the likelihood of foul air and gases accumulating within or entering into buildings; to avoid the likelihood of unauthorised access by people; (x) to permit cleaning, maintenance, measurement and performance sampling; (xi) (xii) to avoid the likelihood of stormwater entering the sewerage system; to avoid the likelihood of uncontrolled discharge; and 41
44 (xiii) A so that the installation throughout its design life will continue to satisfy the requirements of items to (xii). DEEMED TO SATISFY The following minimum requirements are deemed to satisfy the performance requirements of Clause A A General Where pre-treatment facilities are required, they are to comply with the requirements of the appropriate regulatory authority, including those responsible for occupational health and safety, dangerous goods management and environmental protection. A Agreement requirements Where the written agreement of the relevant regulatory authority and receiving utility is required, the installation is to comply with the minimum agreement requirements. A Pre-treatment facilities not required Where pre-treatment facilities are not required by the relevant regulatory authority, the minimum requirement for Clauses A and A is compliance with AS A PRODUCT AUTHORISATION Products used in sanitary plumbing and drainage systems connected to the trade waste units/systems are to be certified and authorised as specified in Part B of this Code. 42
45 PLUMBING CODE OF AUSTRALIA PART B PRODUCT CERTIFICATION AND AUTHORISATION DRAFT 5 August
46 PART B - PRODUCT CERTIFICATION AND AUTHORISATION B1 SCOPE This part of the Plumbing Code of Australia provides detailed information on the authorisation procedures and requirements for the certification of plumbing products used for Drinking Water and Non Drinking Water delivery and products used for Plumbing and Sanitary Drainage systems based upon the National WaterMark. These certification marks form the basis of the National Certification of Plumbing and Drainage Products Scheme (known as the National Product Certification and Authorisation Scheme) Levels 1 to 3, respectively. B.2 APPLICATION This Part applies to all plumbing and drainage products that are required to be certified for authorised use in new installations, alterations, additions, replacement and repairs to existing installations. The National Product Certification and Authorisation Scheme provides for three levels of certification: Type 1 Type 2 Type 3 The WaterMark Level 1 requires manufacturers to have a quality assurance system to ISO 9002 in place and for products to comply with the relevant Australian Product Standard. The WaterMark Level 2 requires products to comply with an Australian Standard or approved specification as detailed in AS 5200 and to have a quality assurance system in place. The WaterMark Level 3 provides an Interim Authorisation for product outside the current scope of the schedule of standards or specifications listed in AS The Interim Authorisation covers new or hybrid products where an Australian Standard or WaterMark specification is not available. This Part is not intended for purpose-designed, site-specific product. Where a product is of a specialized nature or are sold in numbers that cannot justify licensing and they have no impact on health issues, manufacturers may wish to seek approval from the local plumbing regulator for each individual installation of the product. 44
47 Authority authorisation of plumbing and drainage products issued locally as a permitted product is not part of the National Product Certification and Authorisation Scheme. This Part outlines the appropriate process to enable certifying bodies and manufacturers of plumbing and drainage products to: (a) (b) (c) Determine if their types of products are covered by the scheme and, if so, ascertain which Standard or specification is applicable. Determine the level of certification. Understand the process leading up to certification and beyond. B.3 REFERENCED DOCUMENTS The following documents are referred to in this Part: SAA MP 52 MP AS/NZS 4020 B.4 DEFINITIONS Miscellaneous Publications Manual of authorisation procedures for plumbing and drainage products (also known as AS 5200) Manual for the assessment of risks of plumbing products Products for use in contact with drinking water For the purpose of this Part the definitions below apply. Authorised products are products that are automatically deemed by the participating authorities as acceptable for use in plumbing and drainage installations, consequent upon the granting of a WaterMark licence by the Certifying Body. Certification means the process by which plumbing and drainage products are evaluated in accordance with the procedures specified in this Part, and are thereby found to satisfy the nominated requirements. Certified components are components that have been tested in a Certifying Body recognised laboratory to the relevant clauses of the Australian Standard or other accepted published document for Component WaterMark Licensing. Evaluation of test results is undertaken by the Certifying Body. Certifying Body (CB) means organisation(s) approved by JAS/ANZ to administer the National Product Certification and Authorisation Scheme. Component is the part, or a subassembly of parts, that contributes to the construction of a total assembly by choice or design which will offer variations of fitment for the application of the major element of the product, whether produced by that same manufacturer or not. 45
48 Licence (WaterMark) is a formal document that covers the use of the WaterMark certification trademark owned by Standards Australia. It is granted to manufacturers whose products meet a specific Australian or International Standard or is approved by Water Services Association of Australia (WSAA) or other approved published document. Manufacturer s (or supplier s) warranty means a statement by the manufacturer or supplier of a product that says that the product is suitable for use under specified conditions. The conditions may be limits on water pressure, water temperature or any other operating circumstance. NOTE: The statement must be included with the product when sold and may be stamped onto the product, printed on the packaging, or included as part of the installation instructions. Participating authority is an authority that has adopted the National Product Certification and Authorisation Scheme (see Appendix G). Product means a product, product component or an appliance used for the conveyance of drinking water, non drinking water and sanitary and sanitary drainage systems Recognised testing laboratory means a testing laboratory from which certified test results will be accepted. NOTE: The laboratory must be one acceptable to the Certifying Body (CB) as being competent to conduct type tests under the WaterMark Scheme. Regulator is the authority that has statute jurisdiction over the installation of plumbing and drainage work and the authorisation of plumbing and drainage products. Specification means a specification that is acknowledged by the contributing organisations as applicable to the product being submitted for authorisation. A specification may be an Australian Standard, a requirement as listed in AS 5200 (MP52) or a countertop Specification (prepared by the Certifying Body and manufacturers and approved by the WS-031 Committee of Standards Australia). Products for which there is no specification cannot be considered for licensing under the National Product Certification and Authorisation Scheme. Supplier of a product is the applicant to whom the authorisation is issued. NOTE: Under the WaterMark Scheme, the supplier is the manufacturer. WaterMark See Licence WS-031 Committee means the Australian Standards Committee WS-031 Technical Procedures for Plumbing and Drainage Products Authorisation. WS-014 Committee means the Australian Standards Joint Technical Committee WS-014, National Plumbing and Drainage Code NOTE: 1. AS 5200 or MP 52 mean the current SAA Miscellaneous Publication MP 52, Manual of authorisation procedures for plumbing and drainage products. 46
49 B.5 OBJECTIVES The objective of this Part is to ensure that plumbing products are fit for purpose and that their use in plumbing installations minimises the risks of or avoids the likelihood of: (iii) (iv) (v) (vi) (vii) (viii) personal illness, injury or death; environmental degradation; contamination of the water resource; adverse impact on infrastructure (Private and Public); contamination of the water supply; wastage of resources (Water and Energy); premature failure of the product; and the inability of a product to function as intended. B.6 PRODUCT MARKING All products certified under the National Product Certification and Authorisation Scheme must be marked with the appropriate certification mark to satisfy the requirements of the participating regulators. In exceptional cases where the product is too small to receive a mark, manufacturers may make application for an exemption to this requirement. Application must be made to the National Product Certification and Authorisation Scheme via the Certifying Body.The system of marking products indicates the following: WaterMark Level 1 Level 1 is applicable to products that have been tested in a Certifying Body recognized laboratory to the relevant Australian Standard or other accepted published document. Certification must be by evaluation of the test results and auditing the product compliance program at the factory by the Certifying Body. On successful completion, registration to WaterMark Level 1 is affected and involves the manufacturer applying the WaterMark logo to the product. An Interim Authorisation licence is not available for WaterMark Level 1 WaterMark Level 2 Level 2 is applicable to products that have been type tested in a Certifying Body recognized laboratory or for which an acceptable test report from a Certifying Body agreed laboratory is available. Appliances and other nominated products for which TypeTest Certification is required are listed in the Schedule of Specifications in AS
50 WaterMark Level 3 is applicable to new or hybrid plumbing, drainage products seeking WaterMark Level 2 certification. Products qualifying for Interim Authorisation will have been tested in a Certifying Body recognized laboratory to a specification approved by the WS-031 Committee. The Certifying Body must undertake evaluation of the test results. An Interim Authorisation licence will terminate at or before a 2- year period during which time the applicant will be required to participate in the development of a relevant Standard or AS 5200 Specification. TABLE B1 - MINIMUM REQUIREMENTS FOR THE MARKING OF PLUMBING PRODUCTS Table B1 provides a summary of the levels of product marking referred to in clause B6. Type of evaluation Quality assurance Status 1 Full compliance with a relevant Australian Standard or accepted International Standard By Certifying Body to the StandardsMark Scheme. Full Product Approval or Type Test + ISO 9000:2000 W WaterMark Level Authorised by all participating regulators Participation by manufacturers or suppliers Essential minimum requirement for WaterMark Level licence 2 Full compliance to Australian Standard or approved specification as detailed in AS 5200 (in course of preparation( formerly MP52)) By the Certifying Body to the WaterMark Scheme, Type Test Approval a quality assurance program is required. W WaterMark Level Authorised by all participating regulators Essential minimum requirement for WaterMark Level licence 3 Interim authorisation to an approved countertop specification By the Certifying Body, based on risk assessment for level W WaterMark Level Authorised by all participating regulators for a period of two years only Essential minimum requirement for countertop approval and WaterMark Level licence 48
51 B.7 PRODUCT CERTIFICATION REQUIREMENTS The product certification requirements for the WaterMark are legally defined as the WaterMark Quality Assurance Program, which becomes a legally binding contract between the Certifying Body and the licensee covering the use of the certification trademark. The basic requirement is that appropriate controls are in place to ensure all products bearing a certification mark fully comply with the Standard or specification. For guidance, the quality system requirements contained within the Product Compliance Programs (PCP) follow closely the Clauses of the Standard AS/NZS/ISO Some of the PCP requirements are more specific than AS/NZS/ISO 9002 and, conversely, not all of the requirements of AS/NZS/ISO The product certification requirements for the WaterMark Level 2 is legally defined as the TypeTest Mark Certification Scheme, which becomes a legally binding contract between Certifying Body and the licensee covering the use of the certification trademark. The basic requirement is for the manufacturer to give a warranty that all products bearing the WaterMark Level 2 shall comply with relevant Standard specification. Initial product compliance is verified by a laboratory recognized by the Certifying Body against the appropriate specification. Products in contact with drinking water All water supply system components intended for drinking water applications must comply with AS/NZS 4020 as of 5 July It is the responsibility of manufacturers, suppliers and installers to verify the suitability of products for drinking water applications B.8 INTERIM PRODUCT AUTHORISATIONS Where Interim Authorisation is applied for: The WS-031 Committee reserves the right to set conditions with regard to Interim Authorisation, eg. It may request advice from the appropriate Standards Australia Committee or similar group in determining the acceptability of a countertop specification. The WS-031 Committee reserves the right to determine the suitability of any countertop specification for WaterMark authorisation (based on the issues related to health and safety, durability including performance and material requirements). 49
52 NOTES: 1. Interim Authorisation can be granted for International (including Australian) and de factor International Standards subject to initial acceptance as a countertop specification by the WS-031 Committee. 2. Products certified as complying with the respective types of certification are listed on the Schedule that accompanies the Licence issued by the Certifying Body. 3. Companies that seek to gain certification of their products under the interim authorisation process should also be aware of any restrictions or limitations with regard to their type of product in its installation. B.9 PROCEDURES The process for verifying product compliance and reviewing the manufacturers quality assurance capabilities must follow uniform procedures and be evaluated against uniformly applied criteria. The products currently covered by the National Product Certification Scheme are listed in AS Proposed installation details are to be submitted to Standards Australia Technical Committee WS-014 for a product covered in MP 52 that does not have corresponding installation details in an Australian Installation Code or Standard. When a plumbing product is not listed in MP 52, the Certifying Body is to assess, in accordance with MP78, the risks associated with its use. Should the outcome of the assessment be that certification of the product is required, the Certifying Body is to seek approval from WS-031. The installation requirements or limitations will be set by WS-014. Formal testing and assessment for conformance with the product specifications are to be carried out by the Certifying Body only when approvals for functional and installation proposals and product specification have been received from WS-031 and WS-014. When products are certified in accordance with an approved specification from WS-031, a Certifying Body, on behalf of the Manufacturer is to prepare the Standard for the product. Such Standard is to be completed within 2 years of the WaterMark being issued to the product, failing which the WaterMark will be withdrawn. In such an event the WS-031 will remove the product from the WaterMark register. An extension may be granted subject only to extenuating circumstances. Figure B1 details the process for the certification of a plumbing product. The diagram includes administrative details to assist the understanding of the overall process. Examples are provided in this Part for guidance in the use and interpretation of the certification and authorisation process. 50
53 B.10 THE CERTIFICATION PROCESS Where a manufacturer has a new product to be introduced into the market they may arrange for a Certifying Body to assess, in accordance with the requirements of MP52 and MP78. The outcome of the assessment determines whether the product requires certification or not or the level of certification required. Certification not required If the outcome of the Certifying Body s assessment is that certification is not required, the Certifying Body is to advise Standards Australia WS- 031 Committee of the details of the product and the outcome of the assessment. WS-031 will review the assessment. If WS-031 concurs that the product does not require certification, the manufacturer may produce, market and have the product incorporated in plumbing and drainage installation without the need for a WaterMark certification. Certification required and Standard available If the outcome of the Certifying Body assessment is that the product requires certification then the authorised process shown in Example 2 must be followed. Issues of WaterMark When the outcome of the assessment indicates that compliance with the Standard and the licence requirements have been met then the Certifying Body is to issue the WaterMark licence for the product and register the product on the WaterMark Register. The information will also be sent to WS-031 Committee and the Authorised Products List will be updated by the managing organisation. WaterMark Licences are issued for a period of two years. At the end of this period products must be reassessed by a Certifying Body for compliance. Certification required but no Standard available As above, the Certifying Body has assessed (to MP 78) that the product requires certification however there is not an appropriate Standard against which to assess compliance. In this case the Certifying Body is to forward an application with the product specification, details of the proposed use and proposed installation methods to the WS-031 Committee for approval. This documentation is to be in a product standard format. If the product is covered in MP 52 and WS-031 supports the proposal they forward the application details to the WS-014 Committee. 51
54 The WS-014 Committee is to advise WS-031 if installation conditions are required. On receipt of the advice, WS-031 will formally advise the Certifying Body of the approval. The Certifying Body then assesses the manufacture of the product for compliance with the approval and any relevant accompanying condition(s). If the product is not covered in MP 52, WS-031 is to assess the acceptability of the specification. If necessary the manufacturer and Certifying Body may need to refine the specification before WS-031 will approve it. Once the specification is approved WS-031 forwards the application details to the WS-014 Committee. From here the certification process is the same as that for products covered in MP 52. Development of Product Specifications All new product specifications must be developed on an Australian Standard Product template format and include installation requirements. Marking of Product All certified products must be marked unless exempted by the National Plumbing Regulators Forum. Application for exemption shall be made to the National Product Certification and Authorisation Scheme via the Certifying Body. 52
55 START Manufacturer has new product Manufacturer and Certifying Body (CB) to assess if certification is required per MP 52/MP 78 CBs to be accredited by JAS-ANZ END CB to advise WS-031 NO Does product require certification? Is product type covered in MP52? Is product use covered in a Standard? Manufacturer and CB to refine proposed use and installation details WS-031 to forward proposed use and installation details to relevant Installation Standards Committee WS-031 to determine if product covered in MP52? NO CB to forward application to Standards Committee WS-031 for approval of proposed use, installation details and Product Specification, as appropriate NO NO Are proposed use and installation details acceptable to relevant Installation Standards Committee? NO WS-031 to assess acceptability of Specification Manufacturer and CB to refine Product Specification and/or Risk Assessment WS-031 to advise CB of approval NO Installation Standards Committee to advise WS-031 of its approval of product installation details Is Specification approved by WS-031? Has WS-031 received approval from Installation Standards Committee? Manufacturer to ensure compliance with Standard or Specification CB to assess manufacturing of product Installation Standards Committee to include use of product in next update of Standard END CB to de-register & WS-031 to de-list product END NO Is product manufactured in compliance with Standard or Approved Specification? Specification converted to a Standard? NO Has 2-year limit been exceeded? NO Manufacturer and CB to actively participate in conversion of Specification to Standard END WS-031 to overview maintenance of Website and conversion, within 2 years, of Specification to a Standard NO Was product approved to a Specification? Continual update and review of Approved Products List to include any newly certified product CB to register product on WaterMark register CB to issue WaterMark FIGURE B1 FLOW CHART - PRODUCT CERTIFICATION AND AUTHORISATION 53
56 EXAMPLE 1 CERTIFICATION NOT REQUIRED Follow the red highlighted portion of the diagram and numbered squares in Figure B2. 1. STARTS where a manufacturer has a new product to be introduced into the market. 2. The next step calls for the manufacturer and Certifying Body to assess, in accordance with MP 52 and/or MP 78, whether the product requires certification. 3. If the outcome is NO, the product does not require certification. 4. The Certifying Body is to advise WS-031 the details of the product and the outcome of the assessment. 5. WS-031 considers the advice from the Certifying Body. 6. WS-031 agrees that product does not need to be certified and the process ends. 7. The product may be incorporated in plumbing and drainage installations without having it certified and authorised. 8. If WS-031 does not agree with the Certifying Body s advice they advise the Certifying Body that product must be certified and provide reasons. 9. Certifying Body advises manufacturer that certification is required. 54
57 1 START Manufacture Manufacturer r has new has new product product 2 Manufacturer and Certifying Body (CB) to assess if certification is required per MP 52/MP 78 CBs to be accredited by JAS-ANZ END CB to advise WS-031 NO Does product require certification? Is product type covered in MP52? Is product use covered in a Standard? Manufacturer and CB to refine proposed use and installation details WS-031 to forward proposed use and installation details to relevant Installation Standards Committee WS-031 to determine if product covered in MP52? NO NO CB to forward application to Standards Committee WS-031 for approval of proposed use, installation details and Product Specification, as appropriate NO Are proposed use and installation details acceptable to relevant Installation Standards Committee? NO WS-031 to assess acceptability of Specification Manufacturer and CB to refine Product Specification and/or Risk Assessment WS-031 to advise CB of approval Installation Standards Committee to advise WS-031 of its approval of product installation details Is Specification NO NO approved by WS-031? Has WS-031 received approval from Installation Standards Committee? Manufacturer to ensure compliance with Standard or Specification CB to assess manufacturing of product Installation Standards Committee to include use of product in next update of Standard END CB to de-register and WS-031 to de-list product END NO Is product manufactured in compliance with Standard or Approved Specification? Specification converted to a Standard? NO Has 2 year limit been exceeded? NO Manufacturer and CB to actively participate in conversion of Specification to Standard END WS 31 to overview maintenance of Website and conversion, within 2 years, of Specification to a Standard NO Was product approved to a Specification? Continual update and review of Approved Products List to include any newly certified product CB to register product on WaterMark Register CB to issue WaterMark FIGURE B2 FLOW CHART - PRODUCT CERTIFICATION NOT REQUIRED 55
58 EXAMPLE 2 PRODUCT REQUIRING CERTIFICATION AND COVERED BY MP 52 AND AN INSTALLATION STANDARD Following the blue highlighted portion of the diagram and numbered squares in Figure B3. 1. STARTS where a manufacturer has a new product to be introduced into the market. 2. The next step calls for the manufacturer and Certifying Body to assess, in accordance with MP 52 and/or MP 78, whether the product requires certification. 3. If the outcome is, the product requires certification and authorisation. 4. The Certifying Body then determines whether the product is covered in MP If the outcome is, the Certifying Body must to determine if the product installation is covered in an installation Standard. 6. If there is an appropriate installation standard, the Certifying Body can proceed to assess the manufacturing process for compliance with the relevant Standard. 7. If the Certifying Body assesses that the manufacturing processes do not comply 8. Manufacturers processes will have to be revised until they comply. The process loop (represented by boxes numbered 6, 7 and 8) is not broken until the manufacture of the product complies with the requirements of the Standard. 9. When the Certifying Body assesses that compliance with the Standard is achieved (box 7) the Certifying Body issues the WaterMark to the product. 10. The Certifying Body then registers the product on the WaterMark register. 11. The information is also sent to WS
59 1 START Manufactur Manufacturer er has has new new product ct 2 Manufacturer and Certifying Body (CB) to assess if certification is required per MP 52/MP 78 CBs to be accredited by JAS-ANZ END CB to advise WS-031 NO Does product require certification? Is product type covered in MP52? Is product use covered in a Standard? Manufacturer and CB to refine proposed use and installation details WS-031 to forward proposed use and installation details to relevant Installation Standards Committee WS-031 to determine if product covered in MP52? NO NO CB to forward application to Standards Committee WS-031 for approval of proposed use, installation details and Product Specification, as appropriate NO Are proposed use and installation details acceptable to relevant Installation Standards Committee? NO WS-031 to assess acceptability of Specification Manufacturer and CB to refine Product Specification NO NO Installation Standards Committee to advise WS-031 of its approval of product installation details Is Specification approved by WS-031? Has WS-031 received approval from Installation Standards Committee? 8 WS-031 to advise CB of approval Manufacturer to ensure compliance with Standard or Specification 6 CB to assess manufacturing of product 7 Installation Standards Committee to include use of product in next update of Standard Specification converted to a Standard? NO END Has 2-year limit been exceeded? CB to de-register and WS-031 to delist product NO END NO Manufacturer and CB to actively participate in conversion of Specification to Standard Is product manufactured in compliance with Standard or Approved Specification? END WS-031 to overview maintenance of Website and conversion, within 2 years, of Specification to a Standard NO Was product approved to a Specification? 13 Continual update and review of Approved Products List to include any newly certified product 12 CB to register product on WaterMark Register 10 CB to issue WaterMark FIGURE B3 FLOW CHART - PRODUCT CERTIFICATION REQUIRED COVERED BY MP 52 AND AN INSTALLATION STANDARD 57
60 EXAMPLE 3 PRODUCT REQUIRES CERTIFICATION AND IS COVERED BY MP 52 BUT NOT AN INSTALLATION STANDARD For the green highlighted portion of the diagram and numbered squares in Figure B4. 1. STARTS where a manufacturer has a new product to be introduced into the market. 2. The next step calls for the manufacturer and Certifying Body to assess, in accordance with MP 52 and/or MP 78, whether the product requires certification. 3. If the outcome is, the product requires certification and authorisation. 4. The Certifying Body then determines whether the product is covered in MP If the outcome is the Certifying Body is to determine if the product installation is covered in an installation Standard. 6. If the product is NOT covered by MP 52 OR there is NOT an appropriate installation standard, the Certifying Body forwards draft specification and details of proposed use and installation methods to WS-031 for approval. 7. WS-031 reassesses if product is covered in MP If, WS-031 forwards the application details to the relevant Installation Standards Committee. 9. Installation Standards Committee assesses application data for acceptability. 10. The Certifying Body is advised if amendment is required. 11. If the proposed use and installation details are approved, the Installation Standards Committee initiates 2 actions. One is to include details relevant to the product in the next update of the installation Standard. 12. That part of the process ends when this is completed. 13. The second action is to advise WS-031 that approval has been granted. 57
61 14. On receipt of the advice 15. WS-031 will formally advise the Certifying Body of the approval. 16. The Certifying Body then assesses the manufacturer for compliance with the approval and any relevant accompanying condition(s). From here, the process is the same as in Example 2 Boxes 10 &
62 1 START Manufactur Manufacturer er has new has produc new t product 2 Manufacturer and Certifying Body (CB) to assess if certification is required per MP 52/MP 78 CBs to be accredited by JAS-ANZ END CB to advise WS-031 NO Does product require certification? Is product type covered in MP52? Is product use covered in a Standard? Manufacturer and CB to refine proposed use and installation details 10 NO Are proposed use and installation details acceptable to relevant Installation Standards Committee? WS-031 to forward proposed use and installation details to relevant Installation Standards 9 8 WS-031 to determine if product covered in MP52? 7 NO WS-031 to assess acceptability of Specification NO NO CB to forward application to Standards Committee WS-031 for approval of proposed use, installation details and Product Specification, as appropriate 6 13 Manufacturer and CB to refine Product Specification NO Installation Standards Committee to advise WS-031 of its approval of product installation details Is Specification approved by WS 31? Has WS-031 received approval from Installation Standards Committee? 14 1 WS-031 to advise CB of approval 18 Manufacturer to ensure compliance with Standard or Specification 16 CB to assess manufacturing of product 17 Installation Standards Committee to include use of product in next update of Standard END CB to de-register and WS-031 to de-list product END NO Is product manufactured in compliance with a Standard or Approved Specification? Specification converted to a Standard? NO Has 2-year limit been exceeded? NO Manufacturer and CB to actively participate in conversion of Specification to Standard 24 END NO Was product approved to a Specification? 23 WS 31 to overview maintenance of Website and conversion, within 2 years, of Specification to a Standard Continual update and review of Approved Products List to include any newly certified product CB to register product on WaterMark register FIGURE B4 FLOW CHART - PRODUCT CERTIFICATION REQUIRED COVERED BY MP 52 AND NOT COVERED BY AN INSTALLATION STANDARD CB to issue WaterMark 60
63 APPENDIX 1 DEFINITIONS Unless the contrary intention appears ABCB means Australian Building Codes Board Adequate means adequate to achieve the particular objective of the Code. Alternative Solution means a Plumbing Solution which complies with the Performance Requirements other than by reason of satisfying the Deemed-to-Satisfy Provisions. Approved disposal system means a system approved by the relevant regulating authority for the disposal of sewage. Assessment Method means a method used for determining that a Plumbing Solution complies with the Performance Requirements. BCA means the Building Code of Australia. Blockage means an obstruction within a drainage system. Code means the Plumbing Code of Australia. Deemed-to-Satisfy Provisions means provisions which are accepted as satisfying the Performance Requirements. Drainage means any sanitary or stormwater drainage system. Energy conservation relates to the effective and efficient use of energy through the construction, installation, replacement, repair, alteration and maintenance of plumbing installations and systems. Expert Judgment means the judgment of a person who has the qualifications and experience to determine whether a Plumbing Solution complies with the Performance Requirements. Expert means a person who has the qualifications and experience to determine whether a Plumbing Solution complies with the Performance Requirements. Functional Statement describes what the Plumbing Solution needs to do to meet the Objective. JAS-ANZ means the Joint Accreditation System of Australia and New Zealand NPRF means the National Plumbing Regulators Forum 61
64 Objective is the broad societal goal. Overflow devices are devices that provide relief to a water, sewer or stormwater service or system to avoid the likelihood of uncontrolled discharges. Overflow measures are measures provided in a plumbing or drainage installation which avoid the likelihood of property damage, environmental damage, loss of amenity and protect public health and safety. Part means the particular part or section of the Code. Performance Requirement means a requirement which states the level of performance which a Plumbing Solution is to meet. Plumbing means water plumbing and sanitary plumbing. Plumbing Solution means a solution which complies with the Performance Requirements and is: (iii) an Alternative Solution; or a solution which complies with the Deemed-to-Satisfy Provisions; or a combination of and. Point of connection for a hot water service means the point where the water heater connects to the cold water service downstream of the isolation valve. Point of connection for sewage disposal means the point where the sanitary drainage connects to the network utility operator s sewerage system or to an on-site wastewater system. Point of connection for stormwater disposal means the point where the stormwater drain connects to the network utility operator s stormwater system or to an on-site storage. Point of connection for a water service means the point where the service pipe within the premises connects to the network utility operator s property service or to an alternative water supply system. Recognised auditing body means a person or organisation appropriately licensed by the Joint Accreditation System of Australia and New Zealand or one that is accepted by the relevant regulatory authority to carry out the work in the area of plumbing and drainage in question Recognised credentials means qualifications and experience in the area of plumbing and drainage in question recognised by the relevant regulating authority. Recognised expert means a person with qualifications and experience in the area of plumbing or drainage in question recognised by the relevant regulating authority. 62
65 Resource conservation relates to the effective and efficient use of a resource such as water or energy and the prevention of its contamination. Watertight means will not allow water to pass from the inside to the outside of the component or joint and vice versa. Note: Supplementary definitions are also provided in other parts of this Code for special terms that occur therein. 63
66 APPENDIX 2 STANDARDS ADOPTED BY REFERENCE 1. Schedule of referenced documents The Standards and other documents listed in Table 1 are referred to in the Code. Table 1 SCHEDULE OF REFERENCED DOCUMENTS Document No. Date Title PCA Clause AS/NZS Pressure equipment A.4.7 AS/NZS Fire hose reels A AS Safety valves, other valves, liquid level gauges, and other fittings for boilers and unfired pressure vessels A.4.7 AS 1324 Air filters for use in general ventilation and air-conditioning A.4.7 Part Application, performance and construction AS Identification of the contents of pipes, conduits and ducts A.4.7 AS Bursting discs and bursting disc devices - Guide to application, selection, and installation AS 1428 Amdt 1 April 1991 Design for access and mobility A.4.7 Part General requirements for access New building work A A A A.2.7 Part Enhanced and additional requirements-building and facilities A Part Requirements for children and adolescents with physical disabilities A A A.2.7 A A A A
67 Table 1 SCHEDULE OF REFERENCED DOCUMENTS (continued) Document No. Date PCA Clause AS/NZS 1546 On-site domestic wastewater treatment units Part Septic tanks A Part Waterless composting toilets A Part Aerated wastewater treatment systems A AS/NZS On-site domestic wastewater management A AS/NZS Copper - Seamless tubes for air-conditioning and refrigeration A.4.7 AS 1668 AS/NZS 1668 AS/NZS Part 1 The use of mechanical ventilation and air-conditioning in buildings 1998 Fire and smoke control in multi-compartment buildings A.4.7 AS Part Ventilation design for indoor air contaminant control A.4.7 AS Supp Supplement to AS : 2002 A.4.7 AS 2118 Automatic fire sprinkler systems Part General requirements Amdt 1, June 2000 A Part Residential A Part Domestic A Part Combined sprinkler and hydrant Part Piping support and installation A AS 2419 Fire hydrant installations Part System design, installation and commissioning Amdt 1, Oct 1996 A Part Fire hydrant valves A AS Installation of fire hose reels A
68 Table 1 SCHEDULE OF REFERENCED DOCUMENTS (continued) Document No. Date PCA Clause AS/NZS 3500 National plumbing and drainage code Part Glossary of terms I.3.3 Part Water supply Acceptable solutions A A A.4.7 Part Sanitary plumbing and drainage A.2.7 A.4.7 A A Part Stormwater drainage Acceptable solutions Amdt 1 Nov 1998 A.3.7 Part Hot water supply systems Acceptable solutions A A.4.7 Part Domestic installations A A A A.2.7 AS/NZS 3666 Air handling and water systems of buildings-microbial Control. A.3.7 Part Design, installation and commissioning A.4.7 Part Part Operation and maintenance Performance-based maintenance of cooling water systems AS/NZS Products for use in contact with drinking water A.4.7 A.4.7 AS 4041 Amdt 1 May 2001 Pressure piping Amdt 1 April 2001 A.4.7 AS Ductwork for air-handling systems in buildings A
69 Table 1 SCHEDULE OF REFERENCED DOCUMENTS (continued) Document No. Date PCA Clause AS 4118 Fire sprinkler systems Part 2.1 Piping general A AS Thermal insulation of pipework, ductwork and equipment - Selection, installation and finish A.4.7 AS Gas installations A.4.7 (AG 601) 2002 MP 52 (AS 5200) 2001 Manual of authorisation procedures for plumbing and drainage products B5 MP Manual for assessment of risks of plumbing products B5 BCA 1996 Building Code of Australia Volume 1 Volume 2 Class 2 9 Buildings Amdt 11, July 2002 Class 1 & 10 Buildings - Housing Provisions Amdt 11, July 2002 A.3.7 A.4.7 A
70 APPENDIX 3 STATE & TERRITORY VARIATIONS CONTENTS Australian Capital Territory (Appendix) New South Wales (Appendix) Northern Territory (Appendix) Queensland (Appendix) South Australia (Appendix) Tasmania (Appendix) Victoria (Appendix) Western Australia (Appendix) 68
71 APPENDIX 3 AUSTRALIAN CAPITAL TERRITORY INTRODUCTION (Sample text only) This Appendix contains variations and additions to the Plumbing Code of Australia (PCA) provisions which are considered necessary for the effective application of the Code in the Australian Capital Territory and shall be treated as amendments to the Code. 69
72 APPENDIX 3 NEW SOUTH WALES INTRODUCTION (Sample text only) This Appendix contains variations and additions to the Plumbing Code of Australia (PCA) provisions which are considered necessary for the effective application of the Code in New South Wales and shall be treated as amendments to the Code.. 70
73 APPENDIX 3 NORTHERN TERRITORY INTRODUCTION (Sample text only) This Appendix contains variations and additions to the Plumbing Code of Australia (PCA) provisions which are considered necessary for the effective application of the Code in the Northern Territory. 71
74 APPENDIX 3 QUEENSLAND INTRODUCTION (Sample text only) This Appendix contains variations and additions to the Plumbing Code of Australia (PCA) provisions which are considered necessary for the effective application of the Code in Queensland and shall be treated as amendments to the Code. 72
75 APPENDIX 3 SOUTH AUSTRALIA INTRODUCTION (Sample text only) This Appendix contains variations and additions to the Plumbing Code of Australia (PCA) provisions which are considered necessary for the effective application of the Code in South Australia and shall be treated as amendments to the Code. 73
76 APPENDIX 3 TASMANIA INTRODUCTION (Sample text only) This Appendix contains variations and additions to the Plumbing Code of Australia (PCA) provisions which are considered necessary for the effective application of the Code in Tasmania and shall be treated as amendments to the Code. 74
77 APPENDIX 3 VICTORIA INTRODUCTION (Sample text only) This Appendix contains variations and additions to the Plumbing Code of Australia (PCA) provisions which are considered necessary for the effective application of the Code in Victoria and shall be treated as amendments to the Code. 75
78 APPENDIX 3 WESTERN AUSTRALIA INTRODUCTION (Sample text only) This Appendix contains variations and additions to the Plumbing Code of Australia (PCA) provisions which are considered necessary for the effective application of the Code in Western Australia and shall be treated as amendments to the Code. 76
6. Principles of effective plumbing systems
6. Principles of effective plumbing systems This chapter summarizes the aims and objectives of a good local plumbing system that is, the drinking-water supply that serves a building and the system for
Australian/New Zealand Standard
AS/NZS 3500.4:2003 (Incorporating Amendment Nos 1 and 2) AS/NZS 3500.4:2003 Australian/New Zealand Standard Plumbing and drainage Part 4: Heated water services AS/NZS 3500.4:2003 This Joint Australian/New
Approved courses for licences and licence endorsements detailed in the Plumbing and Drainage Regulation 2003 (Qld) Licences
Licence Type Qualification Required Practical Experience Other Information Drainer Provisional drainer qualification plus six (a) At least one year s practical draining competencies from CPC40912 Certificate
Additional Services Agreement. Part 3: Schedule of our requirements
Additional Services Agreement Part 3: Schedule of our requirements Schedule of our requirements Part A Water Services 1 All water services All connections to our water mains, including those used for construction
STANDARD PLUMBING AND DRAINAGE REGULATION 2003
Queensland Subordinate Legislation 2003 No. 265 Plumbing and Drainage Act 2002 STANDARD PLUMBING AND DRAINAGE REGULATION 2003 TABLE OF PROVISIONS Section Page PART 1 PRELIMINARY Division 1 Introduction
Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015
Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events)
SEPTIC TANK SYSTEMS. Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only.
SEPTIC TANK SYSTEMS There are three common types of septic tank systems in Tasmania Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only. Dual purpose (or all-waste)
ENVIRONMENTAL HEALTH FACT SHEET NO. 500
ENVIRONMENTAL HEALTH FACT SHEET NO. 500 DECOMMISSIONING OR REUSE OF ON-SITE WASTEWATER SYSTEMS This provides information regarding the destruction, removal or reuse of septic tanks, collection wells, aerated
Technical Solution Sheet 7.08 7: Mechanical Services (Including duct heating)
7: Mechanical Services (Including duct heating) Split System Air Conditioning AIM The aim of this technical solution is to inform practitioners on the requirements for the safe discharge of condensate
CPC40912 Certificate IV in Plumbing and Services
CPC40912 Certificate IV in Plumbing and Services Release: 1 CPC40912 Certificate IV in Plumbing and Services Modification History Revised qualification deemed not equivalent to CPC40911 Core and elective
Minimum Housing and Health Standards
APPENDIX M.O. 57/2012 Minimum Housing and Health Standards Original version July 20, 1999. Revisions to Part lll, Housing Premises, sections 3 and 4, June 30, 2012 (all revisions are bolded and underlined).
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
PROTOCOL FOR BUILDING ENERGY ANALYSIS SOFTWARE For Class 3, 5, 6, 7, 8 and 9 buildings
PROTOCOL FOR BUILDING ENERGY ANALYSIS SOFTWARE For Class 3, 5, 6, 7, 8 and 9 buildings Version 2006.1 AUSTRALIAN BUILDING CODES BOARD JANUARY 2006 TABLE OF CONTENTS Foreword 1. Scope 2. Purpose and context
Asbestos licensing and notification guide for applicants
Asbestos licensing and notification guide for applicants Use this guide if you are: applying for an asbestos removal work licence applying for an asbestos assessor licence notifying of asbestos removal
ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS
GUIDE FOR APPLICANTS ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS TABLE OF CONTENTS INTRODUCTION... 2 WHY YOU NEED A LICENCE... 2 WHY YOU NEED TO NOTIFY... 2 LICENCE TYPES... 2 SCOPE... 2 WHO MAY APPLY
it has to be Hindmarsh for Service Excellence
it has to be Hindmarsh for Service Excellence Contents 2 Overview 3 Our People 4 Skills and Expertise 5 Quality, Safety and Environment 6 Insurances / Licenses / Registrations 7 An Award Winning Team 8
TOWNSVILLE WATER Customer Service Standards
TOWNSVILLE WATER Customer Service Standards CONTENTS Townsville Water who are we? 3 What is the Customer Service Standard? 3 >> Does the Customer Service Standard apply to me? 3 >> What will Townsville
Gas Fired Water Heater Installation
Michigan Department of Energy, Labor & Economic Growth Bureau of Construction Codes P.O. Box 30254 Lansing, Michigan 48909 (517) 241-9302 Bureau of Construction Codes Technical Bulletin Publication Number
Proposed plumbing system within units at the Bluewater Hotel, 10 West Quay, Ahuriri, Napier
Determination 2010/125 Proposed plumbing system within units at the Bluewater Hotel, 10 West Quay, Ahuriri, Napier 1. The matters to be determined 1.1 This is a Determination under Part 3 Subpart 1 of
Application & Customer Site Management Plan to Use Recycled Water from a Standpipe
Application & Customer Site Management Plan to Use Recycled Water from a Standpipe This application forms part of Western Waters Recycled Water Temporary Supply Agreement (TSA) as a Customer Site Management
Water Efficiency Self-Assessment Guide from
Water Efficiency Self-Assessment Guide from 1 Water Efficiency Self-Assessment Guide from Anglian Water Introduction More than 97% of the water in the world is too salty to drink, 2% is locked in glaciers
Practice Note 2014-62
Practice Note 2014-62 Documentation Required for Applications for Building Permits Reference to the Building Code of Australia (BCA) in this Practice Note means Volume One and Volume Two of the National
Regulation Impact Statement for a National Construction Code
Regulation Impact Statement for a National Construction Code CONSULTATION RIS April 2009 Consultation RIS to The Australian Government Department of Innovation Industry Science and Research The Allen Consulting
REGISTRATION EXAMINATION, JUNE 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 99 REGISTRATION EXAMINATION, JUNE 009 PLUMBING INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE
Guidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
CIBSE Guide M: Maintenance engineering and management Statutory compliance legislation and guidance
CIBSE Guide M: Maintenance engineering and management compliance legislation and guidance Types of System/Plant Action required Frequency by Type of Fire and Smoke Fire extinguishers Discharge (not CO
B-1 Buildings & Service Maintenance
B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is
Research of Grey Water for Use in Residential Applications Original date of publication: 12-14-2007 Updated: 8-06-2008
What is Grey Water? Research of Grey Water for Use in Residential Applications Original date of publication: 12-14-2007 Updated: 8-06-2008 Grey water comes from many sources. Grey water, gray water, greywater,
CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference
CHAPTER 150: BUILDING REGULATIONS Section Adoption of Regulatory Codes by Reference 150.01 Scope 150.02 Commercial Construction Code 150.03 Commercial Plumbing Code 150.04 Heating, Air Conditioning, Refrigeration
WORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
Asbestos removal and licensing
Applicant Guide Asbestos removal and licensing Includes: Asbestos removal and asbestos assessor licence and notifications of asbestos removal work, asbestos fibres and emergency demolition of structures
BCP03 Plumbing and Services Training Package. Volume 2 of 3
BCP03 Plumbing and Services Training Package Volume 2 of 3 Version Number: 3 Review Date: 30 November 2006 Title Page BCP03 Plumbing and Services Training Package Volume 2 of 3 Plumbing and Services Training
Cross Connection Control and Backflow Prevention Program Guidelines
Cross Connection Control and Backflow Prevention Program Guidelines February 2010 EPB #422 Note: As of October 1, 2012 The Water Security Agency and Saskatchewan Ministry of Environment share responsibility
RHODE ISLAND. Downloaded 01.15.11
Housekeeping/Laundry/Maintenance Section 35.0 Housekeeping RHODE ISLAND Downloaded 01.15.11 35.1 A full time employee of the facility shall be designated responsible for housekeeping services, supervision
Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation
Page 1 of 11 Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation This work is copyright. It may be reproduced in whole or in part for study or training purposes
Element D Services Plumbing
PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL
ONLINE VERSION ONLINE VERSION
The Building Regulations 2000 Sanitation, hot water safety and water efficiency G APPROVED DOCUMENT G1 G2 G3 G4 G5 G6 Cold water supply Water efficiency Hot water supply and systems Sanitary conveniences
GUIDELINES FOR OPERATORS OF MOBILE FOOD BUSINESSES: DESIGN, CONSTRUCTION
Southern Drive, Busselton WA 6280 All Correspondence to: The Chief Executive Officer, Locked Bag 1, Busselton WA 6280 Ph: (08) 9781 0444 Fax: (08) 9752 4958 Email: [email protected] Web: www.busselton.wa.gov.au
SECTION THREE CONSTRUCTION CODES
SECTION THREE CONSTRUCTION CODES CHAPTER 36: Construction Codes in Michigan Purpose and Applicability of Regulations Manufacturing facilities and other businesses must be designed according to code in
Oregon Administrative Rules, Chapter 918-2016 Compilation- Building Codes Division DIVISION 695
DIVISION 695 Hist.: DC 2-1983, f. & ef. 1-3-83; Renumbered from 814-020- PLUMBING LICENSING AND CERTIFICATION 0040; BCD 6-1998, f. 3-2-98, cert. ef. 4-1-98, Renumbered from 918-690-0055; BCD 21-1998, f.
CHAPTER 26 PLUMBING CODE
CHAPTER 26 PLUMBING CODE 26.01 PLUMBING CODE The Illinois Plumbing Code as promulgated by the Illinois Department of Public Health at 77 Illinois Administrative Code, Part 890, is hereby adopted as the
Hygiene Standards for all Food Businesses
Hygiene Standards for all Food Businesses Food hygiene laws are not simply a list of rules. They are intended to let food business operators assess the risks to food safety in their business and apply
Plumbing and Drainage Regulation 2012
Regulatory Impact Statement Subordinate Legislation Act 1989 Plumbing and Drainage Regulation 2012 A regulation under the Plumbing and Drainage Act 2011 April 2012 Enquiries to: NSW Fair Trading Policy
SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)
SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT) MAINTENANCE TYPE: STATUTORY 1.0 SCOPE OF SERVICES The Contractor shall provide maintenance Services for
SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.
SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage
Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations
Georgia State Amendments to the International Plumbing Code
Georgia State Amendments to the International Plumbing Code (2006 Edition) Georgia Department of Community Affairs Local Government Assistance Division 60 Executive Park South, N.E. Atlanta, Georgia 30329-2231
Chapter 8 Water and Sewage Systems
Chapter 8 Water and Sewage Systems Proper sanitary controls pertaining to the water supply system and sewage and liquid waste disposal systems are necessary in all types of food establishments to prevent
When it rains, it stores! [email protected]. Rainwater Harvesting in Australia
When it rains, it stores! [email protected] Rainwater Harvesting in Australia Australia Overview Geography: Tropical in the north, temperate in the south, desert in the center. Great Dividing Range
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that
Owner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
8 plumbing. plumbing. 2010 PulteGroup, Inc. All Rights Reserved.
8 90 2010 PulteGroup, Inc. All Rights Reserved. drains All the water you use leaves the home through a drain. Maintaining drains prevents clogging, overflows, water damage, and other problems. care and
code of practice for household customers
leakage code of practice for household customers Our household leakage policy This policy applies to any customer whose service pipe supplies water to premises which are occupied wholly as a household
Compliance Document for New Zealand Building Code Clause G12 Water Supplies Third Edition
Compliance Document for New Zealand Building Code Clause G12 Water Supplies Third Edition Prepared by the Department of Building and Housing This Compliance Document is prepared by the Department of Building
COMMINSURE HOME INSURANCE PREMIUM, EXCESS AND DISCOUNT GUIDE.
COMMINSURE HOME INSURANCE PREMIUM, EXCESS AND DISCOUNT GUIDE. This document provides you with information to help you understand how your total premium has been calculated, discounts that are available
Compliance Document for New Zealand Building Code Clause G13 Foul Water Second Edition
Compliance Document for New Zealand Building Code Clause G13 Foul Water Second Edition Prepared by the Department of Building and Housing This Compliance Document is prepared by the Department of Building
Understanding Septic Tank Systems
Understanding Septic Tank Systems Sewage and effluent can contain a variety of human disease-causing microorganisms and parasites. Disease can be spread to humans from this material by direct contact or
16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4
Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project definition 5 2.1 Pre-design studies 7 3.0 Project brief 10 4.0 Accommodation
Essential Water. Customer Charter
Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
NQTMVS GENERAL INFORMATION. heading text INSTALLATION SERVICE PAGE 1» SECTION MARKER SUB-HEADING. Body Text
NQTMVS INSTALLATION SERVICE heading text SUB-HEADING Body Text PAGE 1» SECTION MARKER GENERAL INFORMATION table of contents The Company Device Testing & Certification» Thermostatic Mixing Valves» Backflow
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS a. New Plumbing and Gas Piping Systems. This code in conjunction with the Plumbing and Fuel Gas Codes of the State of New York shall apply to plumbing
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS
Australian Transport Council National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS Edition 1 Draft for comment issued 20 December 2005 Endorsed by the Australian Transport
Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010
Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010 A. Purpose The purpose of this policy is to explain how and why sewer or stormwater backups occur, what to do in the event a homeowner
PLBG/GAS SAFETY Information Bulletin
PLBG/GAS SAFETY Information Bulletin November 2012 P/G-08-02-PLBG/GAS [Rev 3] Page 1 of 11 SUBJECT: REQUIREMENTS FOR COMBINATION HEATING SYSTEMS: DUAL PURPOSE WATER (POTABLE) HEATER (COMBO UNIT) Safety
STARTING A NEW FOOD BUSINESS? GUIDELINES FOR OPENING A CLASS 3 FOOD BUSINESS
STARTING A NEW FOOD BUSINESS? GUIDELINES FOR OPENING A CLASS 3 FOOD BUSINESS Updated: July 2010 Contents Procedure for opening a new Food Business... 2 Basic Records... 3 Summary - Construction and Fitout
WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE
SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.
water regulation facts The Water Supply Regulations The Water Supply (Water Fittings) Regulations 1999 What are they, and how do they affect you?
water regulation facts The Water Supply Regulations The Water Supply (Water Fittings) Regulations 1999 What are they, and how do they affect you? For installations connected to South East Water s supplies,
New Zealand Certificate in Plumbing (Level 4)
New Zealand Certificate in Plumbing (Level 4) Title New Zealand Certificate in Plumbing (Level 4) Version 1 Qualification type Certificate Level 4 Credits 249 NZSCED 040327 Architecture and Building >
Construction induction training - changes to regulations
Construction induction training - changes to regulations General information for industry The Occupational Safety and Health Regulations (1996) have changed to reflect the national approach to construction
Brian Coppock, Regional Compliance Officer. Office of Statewide Health Planning and Development Facilities Development Division
Brian Coppock, Regional Compliance Officer Office of Statewide Health Planning and Development Facilities Development Division CHAPTER 6 WATER SUPPLY AND DISTRIBUTION 601.0 Hot and Cold Water Required.
This presentation premiered at WaterSmart Innovations. watersmartinnovations.com
This presentation premiered at WaterSmart Innovations watersmartinnovations.com Green Plumbing and Mechanical Code Supplement David Viola IAPMO Director of Special Services 1 IAPMO Group Association of
A quick guide to our floodcare scheme
A quick guide to our floodcare scheme What to do in case of sewer flooding We re here to help We appreciate that dealing with the results of sewage flooding is always unpleasant and we know how upsetting
RULES OF THE DEPARTMENT OF PUBLIC HEALTH CHAPTER 511-3-6 PORTABLE SANITATION CONTRACTORS
RULES OF THE DEPARTMENT OF PUBLIC HEALTH CHAPTER 511-3-6 PORTABLE SANITATION CONTRACTORS TABLE OF CONTENTS 511-3-6-.01 Applicability 511-3-6-.02 Definitions 511-3-6-.03 General Provisions 511-3-6-.04 Construction
Nationwide House Energy Rating Scheme (NatHERS)
Nationwide House Energy Rating Scheme (NatHERS) Administrative and Governance Arrangements August 2015 NatHERS Administrative and Governance Arrangements Page 1 Contents PURPOSE... 3 THE NATIONWIDE HOUSE
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
Water should be removed as soon as possible once the safety of the structure has been verified.
FACT SHEET Posted October 18 2005 Check List for Infection Control Concerns when Reopening Healthcare Facilities Closed due to Extensive Water and Wind Damage Prior to opening a healthcare facility that
A Property Owner s Guide
The Operation and Maintenance of Domestic and Commercial Sewers A Property Owner s Guide KILDARE LOCAL AUTHORITIES WATER SERVICES DEPARTMENT TABLE OF CONTENTS Introduction 1. Why should I care? 2. What
www.garyklinka.com Page 1 of 51 Exterior Plumbing Quiz Part 1
www.garyklinka.com Page 1 of 51 Exterior Plumbing Quiz Part 1 Instructions: $60 1. Print these pages..all reference materials are included. 2. Review and answer the simple questions in each mini section.
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
Mould Mould A Basic Guide
Mould A Basic Guide Summary Mould is a fact of life. Moulds will grow practically everywhere people live and work. Mould is recognized as an occupational hazard for indoor workers as well as outdoor workers
ASSET CREATION DEVELOPER PROCESS INSTRUCTIONS TO DESIGNERS - MAJOR WORKS -
ASSET CREATION DEVELOPER PROCESS INSTRUCTIONS TO DESIGNERS - MAJOR WORKS - INSTRUCTIONS TO DESIGNERS CONTENTS 1. INTRODUCTION 3 2. ROLE OF THE WATER SERVICING COORDINATOR 3 3. ROLE OF THE DESIGNER 3 4.
Accident/Incident Investigation & Reporting Procedure
Accident/Incident Investigation & 1. Overview The recognises its obligation to ensure that all accidents and incidents are reported, recorded and investigated. We are committed to identifying corrective
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
Event Management Guidelines. Month 2011. 1 Event Management Guidelines (Month, 2011)
Month 2011 1 (Month, 2011) Table of Contents Executive Summary... 2 More information... 2 Event Risk Assessment... 3 Event Checklist... 4 Event Details... 8 Event Contact List... 10 Event Task List...
