1 NORSOK STANDARD ELECTRICAL, INSTRUMENTATION AND TELECOMMUNICATION INSTALLATION Z-010
2 This NORSOK standard is developed by NTS with broad industry participation. Please note that whilst every effort has been made to ensure the accuracy of this standard, neither OLF nor TBL or any of their members will assume liability for any use thereof. NTS is responsible for the administration and publication of this standard. Norwegian Technology Center Oscarsgt. 20, Postbox 7072 Majorstua N-0306 Oslo, NORWAY Telephone: Fax: [email protected] Website: Copyrights reserved
3 CONTENTS FOREWORD 2 INTRODUCTION 2 1 SCOPE 4 2 NORMATIVE REFERENCES 4 3 DEFINITIONS AND ABBREVIATIONS Definitions Abbreviations 5 4 FUNCTIONAL REQUIREMENTS General Degree of Protection (IP-Code) Spare requirements for future modifications Equipment location Electromagnetic compatibility (EMC) 7 5 LIGHTING AND SMALL POWER Lighting Control stations (Push buttons) Sockets outlets 7 6 HEAT TRACING General Installation of heat tracing cables Heat tracing junction boxes 8 7 INSTRUMENT AND TUBING In-line instruments Off-line instruments Tubing installation 9 8 TELECOMMUNICATION Public address and alarm system (PA) Telephone system (PABX) CCTV equipment 11 9 CABLING Cable requirements Cable Systems Cable installation Cable bending radius Cable cleating and strapping Cable splicing Temporary cables Cable glands selection Cable termination Spare conductors EARTHING General 16 NORSOK standard Page 1 of 37
4 10.2 Protective earth Instrumentation and telecommunication earth Bonding Earth bar and earth boss SUPPORT SYSTEM Cable support system Kick plate / protection shield Equipment brackets and supports MARKING AND LABELLING General Cable ladders Equipment Tubing for air and hydraulic supply Cabling MATERIALS Equipment materials Junction boxes Cable support systems Equipment brackets and supports Multi cable transits (MCT) Earth bosses Fixing materials Precautions against galvanic corrosion HANDBOOK Typical index 23 ANNEX A - TYPICAL INSTALLATION DRAWINGS (INFORMATIVE) 24 NORSOK standard Page 2 of 37
5 FOREWORD NORSOK (The competitive standing of the Norwegian offshore sector) is the industry initiative to add value, reduce cost and lead time and eliminate unnecessary activities in offshore field developments and operations. The NORSOK standards are developed by the Norwegian petroleum industry as a part of the NORSOK initiative and supported by OLF (The Norwegian Oil Industry Association) and TBL (Federation of Norwegian Manufacturing Industries). NORSOK standards are administered and issued by NTS (Norwegian Technology Standards Institution). The purpose of NORSOK standards is to contribute to meet the NORSOK goals, e.g. to develop standards that ensure value adding and cost effectiveness for all parties involved and thus are used in existing and future petroleum industry developments The NORSOK standards make extensive references to international standards. Where relevant, the contents of a NORSOK standard will be used to provide input to the international standardisation process. Subject to implementation into international standards, the NORSOK standard will be withdrawn. Annex is informative. INTRODUCTION This standard replaces and supersedes previous NORSOK standard Z-010, Electrical, instrument and telecommunication installation rev. 2, December This standard has been given revision 3 as being a continuation from Z-010 rev. 2. It should be noted that this standard should be read in conjunction with NORSOK standards E-001 Electrical systems, I-001 Field instrumentation, I-002 Safety and automation systems and T- CR-001 Telecommunication systems covering allied subjects. NORSOK standard Page 3 of 37
6 1 SCOPE This NORSOK standard covers functional and technical requirement related to installation of electrical, instrumentation and telecommunication equipment. In addition the standard establish basis for engineering of typical areas like cable segregation, cable requirements, Ex-philosophies, equipment enclosures etc. 2 NORMATIVE REFERENCES The following standards include provisions, which, through reference in this text, constitute provisions of this NORSOK standard. Latest issue of the references shall be used unless otherwise agreed. Other recognized standards may be used provided it can be shown that they meet or exceed the requirements of the standards referenced below. FEU Regulation on electrical equipment. Norwegian Directorate for Product and Electrical Safety Guidelines for earthing in maritime installations. EN Electromagnetic compatibility Generic emission standard, Part2: Industrial environment. EN Electromagnetic compatibility Generic immunity standard, Part 2: Industrial environment. IEC Degrees of protection provided by enclosures (IP code) IFEA Veiledning for varmekabelanlegg i industri og offshore. Guidelines for heat tracing installation in industry and offshore. (Norwegian text only) NEK 606 Cables for offshore installations Halogen-free, or mud resistant. NORSOK S-DP-001 Technical safety (will be renumbereds-001) NORSOK Z-DP-002 Coding system NORSOK M-501 Surface Preparation and Protective Coating Systems of units The SI system of units shall be applied. 3 DEFINITIONS AND ABBREVIATIONS 3.1 Definitions All terms and phrases within the scope of this standard shall be regarded as defined in the regulations and international codes and standards referred to in this document. Normative references Shall Should Shall mean normative in the application of NORSOK standards. Shall is an absolute requirement which shall be followed strictly in order to conform to the standard. Should is a recommendation. Alternative solutions having the same NORSOK standard Page 4 of 37
7 May Can Verbal form used to indicate a cource of action permissible within the limits of the standard. Verbal form used for statements of possibility and capability, wether material, physical or casual. 3.2 Abbreviations AISI American Iron Steel Institute APS Abandon Platform Shutdown ASDS Adjustable Speed Drive System CAS Communal Aerial System CCR Central Control Room CCTV Closed Circuit Television ESD Emergency shutdown IE Instrument Earth IFEA Industriens Forening for Elektroteknikk og Automatisering. (The Association for Electrotechnics and Automation in Industry) IP International Protection IS Intrinsically Safe LER Local Equipment Room MCT Multi cable Transit NEK Norsk Elektroteknisk Komite (The Norwegian national committee of the international electrotechnical commission, IEC, The European committee for electrotechnical standardization CENELEC.) PA Public Address and Alarm System PABX Telephone System PE Protective Earth EMC Electromagnetic compatibility 4 FUNCTIONAL REQUIREMENTS 4.1 General Ex-certified equipment shall be selected in accordance with the following requirements: Ex i and Ex e should be used. Ex n may be used in zone 2. Ex d and Ex p should be avoided. However, if Ex d equipment is used, it should be provided with an Ex e indirect entry. For motor installations see E-001 Electrical Systems,paragraf tabel 4 Ex s or Ex m solenoid valves are preferred. Equipment, which shall remain energised after an APS/ESD situation, shall follow the requirement specified in NORSOK standard Technical safety, S-DP-001. NORSOK standard Page 5 of 37
8 4.2 Degree of Protection (IP-Code) Minimum degree of protection provided by enclosure shall be: For outdoor, in naturally ventilated areas and wash down areas IP 56 (note 1) Dry indoor areas IP 20 Other areas IP 44 Above represents minimum requirements. It should be noted that regulations may contain more stringent requirements and must be consulted. Note 1: IP 56 is required where equipment is placed in open deck exposed to water from heavy seas or in areas exposed to water projected jets, elsewhere IP 55 is required. 4.3 Spare requirements for future modifications The requirements are related to spare at the time of plant start-up. The installation should be prepared for: Relevant area interface cabinets, junction boxes, cabling etc. to meet a 10 % increase. Main cable ladders to meet a 10 % increase. 4.4 Equipment location Equipment should be located in accordance with the following requirements: Protected against damage. Protected against vibration. Protected against weather and water jets. Operability and serviceability. Display instruments and flashing lights to be legible and visible from main access areas or walkways. Accessibility for maintenance without scaffolding, stepladder etc. Electrical equipment shall, unless unavoidable due to the functionality or necessity, be installed indoor and away from hazardous areas. Instruments that have to be installed in exposed areas should be sheltered by use of weather protection or enclosure. Final location shall be selected to avoid interference with escape routings, walkways, other equipment, pipes etc. and obstruction against activities related to transport and lifting operations. Equipment should not be supported on pipe work, handrails, access ladders or cable ladders. Lighting fixtures may however be mounted underneath cable ladders or as integrated part of handrail support arrangement Equipment such as PA flashing lights, loudspeakers, junction boxes, splitters and tap-off may be located on the support for cable ladders and trays or cable ladder's side rail. NORSOK standard Page 6 of 37
9 Equipment shall not be mounted on blastwalls/explosion relieves. Equipment can however be installed on the support frames for the blast walls if the integrity of the blast wall is not interfered. Equipment located in areas which do not allow for maintenance accessibility as required, should as shown on typical drawing be installed such that the equipment can be rotated, raised or lowered into areas where maintenance can take place without the need for scaffolding. 4.5 Electromagnetic compatibility (EMC) All equipment and installations shall comply with Norwegian Directorate for Product and Electrical Safety: Regulation on electrical equipment Chapter IV, regarding electromagnetic compatibility requirements with respect to both emission and immunity. The EMC susceptibility or EMC emission is not impaired for the complete installation. 5 LIGHTING AND SMALL POWER 5.1 Lighting Cables shall be looped between lighting fixtures, independent of the sequence numbers used for fixture identification. The use of junction boxes should be avoided. If junction boxes have to be used, they shall be installed easily accessible. 5.2 Control stations (Push buttons) Control stations shall be located approximately 1500 mm above deck level measured to center of control station, and located adjacent to the equipment which it controls without obstructing removal of the equipment. Location shall also be where it is practical for operation close to gangways etc. 5.3 Sockets outlets Special considerations should be made to the use, when finalizing the location of socket outlets in offices and similar areas like control rooms, laboratories, and workshops. As a guideline the location should be approximately 300 mm above fixed floor level or in cable chanels/ducts above desk height. In other areas, outdoor, process etc., the socket outlets shall be located approximately 1500 mm above deck level measured to center of socket outlet. NORSOK standard Page 7 of 37
10 6 HEAT TRACING 6.1 General The installation shall comply with "Veiledning for varmekabelanlegg i industri og offshore", published by IFEA. Supplier installation requirements shall be adhered to. 6.2 Installation of heat tracing cables Heat tracing cables shall be strapped to equipment and pipes using glass fiber tape, spaced approximately at 300 mm intervals along pipes and as required elsewhere. Stainless steel straps, AISI 316, or high temperature glass fiber tape shall be used on high temperature cables. Heat tracing cables should be installed along the lower semi-circle of the pipes. Cables shall pass through thermal insulation from below or side on vertical pipes. Heat tracing cables shall be installed in such a way that it allows dismantling of joints, valves, instruments etc. without cutting or damaging the cable. Where the heat tracing cables are crossing flanges, thermal insulation covers or other sharp edges, protectors of stainless steel AISI 316 shall be used. Heat tracing cables should not be spliced. Purpose made flexible stainless steel conduit shall be used for protection of the heat tracing cable between stand alone junction boxes and insulation entry kit. Flexible conduits protecting heat tracing cables shall be fixed to support approximately every 200 mm. Heat tracing cables shall be 100 % covered. Exceptions may be in instrument enclosures. The heat tracing cable should be protected against damage by applying an aluminium tape/foil on top of the cable when cellular glass is used as insulation material. 6.3 Heat tracing junction boxes Junction boxes should be installed directly to pipes or on steel supports adjacent to the pipe or instrument. NORSOK standard Page 8 of 37
11 7 INSTRUMENT AND TUBING 7.1 In-line instruments All in-line instruments shall be installed in accordance with supplier recommendations. Prior to final installation of control valve and other in-line instruments, process lines shall be properly flushed. 7.2 Off-line instruments Each instrument shall be available for maintenance and disconnection without interfering with the process. The installation shall be arranged so that it can be heat traced and thermal insulation applied. All indicating instruments which includes transmitters with indicators to be located between 1-1,8 m above deck level. Direct mounted instruments shall be used whenever applicable. Impulse tubing shall be as short as possible and be installed so that gas/liquid pockets are avoided. Instruments shall be installed below tapping point for liquid service and above tapping point for gas service. For some installations use of direct flange mounted capillary tubing is specified. The capillary will be fixed to the instrument and flange by the manufacturer. Impulse tubing shall have minimum 1:12 slope. 7.3 Tubing installation Instrument tubing shall be supported to field trays or cable ladders for tubing sizes less than 16 mm outside diameter. Cable tray, ladder or equal to be used for larger sizes when mechanical protection is required. Trays are not required for internal tubing on components if tubing is sufficiently protected. Tubing to be fastened to self drained tubing clamps with span max every 60 x tubing diameter. Tubing sizes above 25 mm outside diameter shall as a minimum have support every 1.5 m. Tubing clamps shall be made of non-corrosive material, stainless steel AISI 316 and/or flame retardant plastic. Galvanic corrosion between tubing and tubing support system shall be avoided. The tubing clamp shall, when installed, not allow for water/sea water to be accumulated between tubing and tubingclamp on wall, this is to avoid crevice corrosion. Parallel runs of tubing on the same support shall be arranged such that it is possible to have access to every connection point. NORSOK standard Page 9 of 37
12 Installation into or through panels shall be by use of bulkhead unions or multi cable transits. Instrument tubing and cables may be installed on the same field tray for shorter distances (appr. 5 m). Instrument tubing and cables may be routed through the same cable/tubing penetration provided the transit is approved for such use. All tubing and/or tube fittings which are not connected shall be sealed by use of end-plug / cap of some material as the tubing, fittings. Vent, drain and manifold valves shall be available outside insulation for test connections. Tubing shall be installed to reach outside insulation for test connections. Capillaries of filled systems shall be continuously supported Spare capillaries shall be coiled inside a cable tray or have similar mechanical protection. All tubing shall be deburred and blown through with clean, dry air before final installation. All compression tube fittings shall be of the same make. The installation shall be done by skilled personnel being familiar with the requirements from the compression fitting supplier. All tubing in hydraulic systems shall be hot oil flushed and cleaned Sealing compounds for process services, instrument air services and hydraulic oil services shall be used in accordance with supplier recommendations. 8 TELECOMMUNICATION 8.1 Public address and alarm system (PA) Public Address and Alarm System equipment should be located above deck level as follows: Loudspeakers, mm. PA flashing lights, maximum 3000 mm. Loudspeakers shall not be located above suspended ceilings or behind obstructions, which will hinder free space sound distribution. Loudspeakers shall be installed to allow for future adjustments as follows: At the horizontal plane, 180 deg. Downwards 90 deg. from the vertical plane. NORSOK standard Page 10 of 37
13 8.2 Telephone system (PABX) Telephone system equipment shall be located above deck level as following: Flashing lights, maximum 3000 mm. Telephones approximately 1400 mm. Acoustic hoods minimum 2100 mm to top of hood. 8.3 CCTV equipment To prevent vibrations, camera brackets shall be made sufficiently rigid to provide appropriate stability in all directions. 9 CABLING 9.1 Cable requirements Cables should comply with NEK 606, Cables for offshore installations Halogen-free or mud resistant. All cables used shall be minimum flame retardant. Fire resistant cables shall be used whenever required. Mud resistant cables shall be used where cables are routed into or through areas exposed to mud/oil. Multicore cables with collective screen shall be standard, individual screens shall be used only when required. The following systems shall have separate multicore cables: General instrumentation Fire and gas. ESD. Telecommunication. Cable without armour may be used in the accommodation part of the living quarter, offices and control rooms. 9.2 Cable Systems Cable Segregation The Cable Network shall be separated into: System 1 High voltage systems (above 1000V) System 2 Low voltage power supply and control cables for electrical systems (1000V and below) System 3 Instrumentation and Telecommunication systems Cable ladders installed horizontally shall have sufficient space to facilitate cable pulling and cleating/strapping, minimum 300 mm free space between top of one ladderedge to bottom of next ladder edge, and from top ladder edge to roof. NORSOK standard Page 11 of 37
14 Instrumentation and telecommunication cables may be routed on system 2 cable support systems when minimum 300mm distance between the individual systems are kept. System 2 and system 3 cables can be installed on same field tray from branch to single equipment when this is not in conflict with the type of signals in the cable. Crossing at right angels is acceptable without further segregation. Considerations must be taken during installations of cables entering and leaving field type of equipment like smaler pacages, minor modules, crane pedestals etc. related to segregations as listed above. Non IS and IS instrument cables should be routed on the same cable ladders/trays. If routed on same ladder/tray, the IS and Non-IS cables, which contain both armour and screen can be tied together in same bundle Cable routing All cables should be routed on cable ladders and trays. Trunking or conduits may be used for special mechanical protection of single field routed cables for shorter distances. (Approx. 5m.) Where conduits are used, they shall be installed with open ends. A computer based cable routing system reflecting the layout of the main cable support system (i.e. cable ladders with width 300 mm and above) represented by ladder segment references, transit numbers etc. and necessary describing information related to the individual cable including its route, shall be used in the design. Field cables may utilize the main cable support system provided the route of the individual cable is being registered in the routing system and the filling and loading of the main cable support system is acceptable. The cable ladders should not be filled so the height of the cable ladder side rail is exceeded. Redundant cable systems shall be routed separately as shown on fig.1 room N1. Field routing inside rooms in safe locations may be on same cable rack/ladder if this is not in conflict with the redundant coverage of the area as shown on fig.1 room N2. NORSOK standard Page 12 of 37
15 Figure 1 Redundant cable routing. 9.3 Cable installation Access for maintenance and an orderly layout shall be ensured when cabling below raised floor is performed. Once a cable has been cut, a protective cap/sealing shall be applied on the end, when being exposed to humid atmosphere. All cable entries to equipment located outdoors and in wash down areas should be from below. Top entry is not allowed and side entry shall be provided with drip nose. Sufficient cable spare length shall be provided for equipment which needs future adjustments (floodlights, loudspeakers, etc.) or where equipment have to be dismounted for maintenance and calibration without disconnecting the cable. Single core cables for three-phase AC shall run in trefoil formation. The braided armour shall be earthed in one end. For equipment installed in hazardous areas, the braid shall be earthed at the hazardous end. When using single core cables, additional cables for earthing have to be installed. Single core cables shall not be installed separately through openings surrounded by magnetic materials. Non-magnetic stainless steel separation walls and stay plates shall be used in multi cable transits utilised for single core cables. 9.4 Cable bending radius The minimum permissible bending radius specified by supplier shall be adhered to. NORSOK standard Page 13 of 37
16 9.5 Cable cleating and strapping General Stainless steel AISI 316 straps shall be used for all runs outside and in non ventilated areas. Ultra violet resistant plastic straps may be used for horizontal runs indoor. Stainless steel AISI 316 straps shall be used for vertical runs and for horizontal runs in the vertical plane both indoor and outdoor. For strapping of fiber-optical and coaxial cables, supplier guidelines shall be adhered to. The distance between cable straps shall not exceed: 600 mm for horizontal runs. 300 mm for vertical runs and for horizontal runs in the vertical plane. Ten times the cable outer diameter from cable entry to the first strap Single core cables Trefoil Cable cleats for single core power cables shall be approved for the potential short circuit stress. The cleats shall outdoors, in naturally ventilated areas and wash down areas is made of stainless steel AISI 316. The distance between trefoil cleats for single core cables shall be as specified by the cable manufacturer based on the calculated short circuit level. The distance shall be selected such that cable will not be damaged by a possible short circuit. Normal distance is 30 cm, and on every step on bends and risers. 9.6 Cable splicing Cable splicing should be avoided. Any splicing to be agreed with the company for the installation in question. 9.7 Temporary cables Temporary cables routed on permanent cable support systems shall be installed such that they will not obstruct permanent installations and are easy to remove. Temporary cables should not be pulled through multi cable transits intended for permanent cables. NORSOK standard Page 14 of 37
17 9.8 Cable glands selection Cable glands/blanking and drain plugs shall be selected as follows: Plastic enclosures (relevant for field cables) plastic for sizes below M32 Plastic enclosures, reinforced with a metal gland plate brass for support of large supply- and multi core cables Metal enclosures (except aluminium) brass / stainless steel (AISI 316) Aluminium enclosures stainless steel /nickel plated brass The certifications of the cable glands/blanking/and drain plugs shall comply with the certification of the equipment in which the glands/plugs are connected. Ex d gland only to be used on Ex d direct entry equipment. 9.9 Cable termination Cable make-off Cables with braid armour shall have outer heat shrink sleeve, which is fitted over the complete cable make-off. Instrument and telecommunication cables with both braid armour and screen shall have inner and outer heat shrink sleeves: The inner sleeve shall be drawn over the inner bedding, i.e. passed under the braiding providing insulation between braiding and screen. The outer sleeve shall be fitted over the complete cable make-off. The inner sleeve may be excluded at termination's providing a minimum of 50 mm inner bedding. To minimise the extent of hot work sleeves of type self vulcanising-tape may be used on units in operation Termination High voltage cables should be fitted with insulated connectors at transformers and consumers end and voltage stress cones or similar stress relieving device at feeder's end. All cable conductors shall be terminated by use of compression lugs or ferrules dependent upon the type of termination. The compression ferrule should be the type where the conductor strands are inserted through the whole ferrule and reach the bottom of the terminal. Support for cleating of cables when entering panels should be provided. In switchboards and distribution boards adequate space shall be provided for the use of a clip-on amperemeter without causing undue stress on the cable conductors or connections. The braid armour and the screen shall be separated from each other as well as from the conductors, twisted and fitted as required. This shall be done without any reduction of the cross sectional area. NORSOK standard Page 15 of 37
18 Where the screen shall be left disconnected (applicable for field instrument), it shall be sealed and isolated with an isolating cap, which allows for insulation testing without any disconnecting. Only one conductor is allowed in each terminal of a terminal block/row for external connections. This is not related to terminals as integrated part of internal components (e.g. relays, contactors) of the equipment. Two conductors may in certain cases be used in one approved type ferrule connected to one terminal Spare conductors Spare conductors in instrument and telecom cables shall be terminated and left floating at the field end. In cabinets all spare conductors shall be marked with terminal number and connected to terminals linked together by solid terminal links, which shall be connected to the relevant earth bar. Spare cores in instrument and telecom cables shall be connected to IE earth in supply end only. If there are no spare terminals left in the cabinet, all spare conductors shall be covered with yellow / green sleeves and marked with relevant cable number and connected directly to the relevant earth bar. 10 EARTHING 10.1 General The installation shall comply with "Retningslinjer for jording i maritime anlegg" published by Eltilsynet (Norwegian Directorate for Product and Electrical Safety). Exception: Field equipment shall be earthed through the supply cable. Earth bars shall be located in front of panels and junction boxes to allow easy access for usage, inspection and maintenance Main earth reference The Main earth reference for all earthing systems shall be the main structure. If aluminium is used for any part of the main structure attention shall be given to ensure that continuity in the structural earth is maintained at aluminium/steel interface points. The Main earth reference points shall be earth bosses welded to the structure as close as possible to the cabinet / equipment. Alternatively, earth bars mounted on earth bosses welded to structure may be used. There shall be a separate Main earth reference point for PE and IE. The distance between the PE and IE Reference points shall be minimum 1000 mm. NORSOK standard Page 16 of 37
19 10.2 Protective earth Field equipment shall be connected to the PE system through the cable. The braid armour shall be the earth conductor and it shall be electrically continuous from the field to the central equipment PE bar. For power cables where the braid armour does not have sufficient cross section, the equipment shall be earthed through a separate earthing conductor in the cable. Equipment supplied by single core cables shall be connected to PE by a separate earthcable. The separate earth cable shall run alongside the power cables to form a "cable system" and be terminated to the field equipment earth terminal as well as feeding end earth bar/terminal. The copper braid of the single core cables shall be earthed at one end, isolated in the other end. Where hazardous areas are involved, the copper braid shall be earthed in the hazardous area. Ex d electrical equipment with direct entry, shall be connected to the PE system by a separate earth conductor in the cable. The PE earth cables or braids armour of cables, connected to a switchgear, cabinet, equipment etc., to be connected to a PE earth bar as close as possible to the cable entry of the switchgear, cabinet, equipment. The PE earth bar to be easy accessible 10.3 Instrumentation and telecommunication earth The IE shall be the earth reference for non intrinsically safe, intrinsically safe instrumentation and telecommunication 0 volt references etc. The IE screen shall be left floating in the field end. It shall be electrically continuous from the field equipment and be connected to IE bar in the central cabinet. The screen shall be connected to one IE bar only for signal cables between two control cabinets Bonding Exposed conductive parts located in hazardous- and mechanical ventilated areas shall be bonded to the main structure. Bonding shall be provided between the platform structure and all preassemblies, modules and decks that are not welded or bolted together. Separate bonding shall only be applied for equipment, which is isolated from main structure. Enclosures of high voltage equipment located in hazardous areas shall be connected to PE and bonded to the main structure. NORSOK standard Page 17 of 37
20 10.5 Earth bar and earth boss Earth bar Earth bars shall be fabricated from copper and provided to suit number and size of connections. PE bars shall be connected to the nearest convenient main structure point through an insulated earth conductor or through the supply/feeder cable. IE Bars shall be isolated from the enclosure and connected to the nearest convenient main structure point through an insulated earth conductor Earth boss Where earth bosses are used, each earth boss shall only have one connection. After connection, the whole assembly shall be sealed in accordance with the NORSOK standard M-501 Surface preparation and protective coating. Bonding bosses in outdoor and exposed areas to be coated to prevent corrosion. 11 SUPPORT SYSTEM 11.1 Cable support system Maximum distance between the supports shall be as specified by supplier. Typical support distance is every 3m. Cable ladders installed horizontally shall have sufficient space to facilitate cable pulling and fixing, minimum 300 mm free space on top of ladder. All surfaces shall be cleaned prior to bolting together. Cable support systems shall be located to leave sufficient space for surface protection of adjacent structure. In offices and living quarters where multidiscipline socket outlets are grouped together, multipurpose cable channels designed for recessed installed outlets should be used Kick plate / protection shield Kick plate shall be fitted around penetrations in floor where cables/tubing are exposed to mechanical damages. Protection shield shall be installed where cables can be exposed to physical damages, minimum 500 mm above the floor Equipment brackets and supports Equipment brackets and supports should not be installed on removable deck, grating, panels, handrails, pipes or other removable equipment. NORSOK standard Page 18 of 37
21 12 MARKING AND LABELLING 12.1 General All marking shall be in accordance with the NORSOK standard, Coding system, Z-DP-002. All electrical equipment shall be marked with function, supply panel and circuit/cubicle Cable ladders Cable ladder segments and MCT's shall be marked with system and segment number. High voltage cable ladders, shall be marked with warning labels in accordance with the national regulations Equipment Internal in serial produced equipment with power electronics i.e. like UPS, ASDS, and supplier's standard for internal wiring and marking shall be accepted. All labels shall be fabricated and installed in accordance with the following requirements: Labels shall be readable from deck or access platform. Labelsizes to be sized accordingly. Labels should not be mounted on removable parts. Labels should be fixed by AISI 316 screws, rivets or suitable glue (only in dry areas). Separate label brackets, if used, shall be made of AISI 316. Labels shall be of engraved traffolyte, marked as follows: Black letters on white background, letter size mm. Electrical, instrumentation and telecommunication systems. (service description in Norwegian) White letters on red background, letter size mm. Instrument ESD systems, Fire & Gas systems and warning labels. (service description in Norwegian and English language) In panels fuses shall be clearly marked. A fuse list shall be provided inside of panel. All emergency lighting fixtures with integral batteries shall in addition to normal labeling be marked to identify that integral batteries are present and to identify which light source is battery backed. Warning labels shall be in accordance with national regulations Tubing for air and hydraulic supply Supply tubing shall be marked with consumer tag-number at the distribution manifold or at hook-up to main line. When tubing enters through bulkheads/penetrations, tubing shall be marked with tag no. on both,sides of the bulkhead/penetrations. NORSOK standard Page 19 of 37
22 12.5 Cabling Cables Each cable shall be marked with indelible and non-corrosive cable markers indicating the cable number. The cable markers shall be clearly visible after cleating and strapping. Outdoors, in exposed- and wash down areas the cable markers shall be of stainless steel markers. Each cable shall have a cable marker located: At both side of multi cable transits. At both ends. Outside cabinets with gland / MCT entries. Inside cabinets with open entries. Heat tracing cables shall be marked: On the cable loop inside the junction box. Warning labels indicating the legend "Heat Tracing Cable" shall be fitted to the thermal insulation covers as required, at maximum distance 5 metres. Warning labels indicating " Heat tracing splice" and "Heat tracing end seal" shall be fitted to the thermal insulation covers above splices and end seals Identification of busbars, conductors and wires Individual conductors and wires shall be identified with a closed, slip-on type plastic cable identification ferrule, carrying a number identical to the terminal. This is also applicable to the single conductors for cross wiring between the terminal blocks in panels. Busbars, conductors and earth wires shall be coded as following: AC systems: Phase 1 L1 Black Phase 2 L2 White Phase 3 L3 Red Neutral N Blue Protective Earth PE Yellow/Green Protective Earth / Neutral PEN Yellow/Green + Blue Conductors in single phase cables, from distribution boards in three phase four wire system (3ph + N), can, inside light fixtures, socket outlets, junction boxes etc., have conductor color as cable core colors (normally black and white). Black always used for the phase. DC systems: Positive pole (+) Black Negative pole (-) Blue (White) NORSOK standard Page 20 of 37
23 Color coding of earth conductors, earth bars and cables screen Protective earth (PE) Earth conductors shall be colored yellow / green. The braid armour shall be covered with sleeves, colored yellow / green. PE bars shall be marked yellow / green Instrument earth (IE) The IE screen shall be covered with sleeves, colored yellow / green: IE bars shall be marked yellow / green and with:a red mark for bars containing non-is cables only. A blue mark for bars containing IS cables only. Both red and blue mark containing non-is and IS cables Bonding Static earth conductors shall be colored yellow / green. 13 MATERIALS 13.1 Equipment materials All equipment and materials shall minimum be flame retardantand with low halogen content. Equipment enclosures located outdoor, in naturally ventilated areas and wash down areas, shall be made of proven sea water resistant material or protected by a coating system according to NORSOK Standard M-501, surface preparation and protective coating. Electrical/electronic equipment in panels shall be protected against hydraulic leakage Junction boxes Junction boxes should be made of glassfibre reinforced plastic with polyester resin. In outdoor areas exposed to changing environmental conditions stainless steel AISI 316 may be used. When junction boxes are installed in exposed areas, drain plugs shall be installed. Anti condensation heating should be provided in boxes containing active components. Junction boxes shall be designed with sufficient space for the expected number of cables and cable make-off s. NORSOK standard Page 21 of 37
24 13.3 Cable support systems Cable support systems located outdoors, in natural ventilated areas and wash down areas shall be made of stainless steel AISI 316 L. For indoor ventilated areas cable support systems made of galvanised carbon steel may be used. Cable supports shall be of same material as the cable rack / tray. Aluminium cable support system may be used in special selected areas. Cable protection shields shall be made in the same material as the cable support system in the area Equipment brackets and supports Equipment brackets and supports should be fabricated from carbon steel hot-dip galvanised in accordance with NORSOK standard M-501, surface preparation and protective coating, or from stainless steel AISI 316L. Equipment brackets shall be fabricated from the same material as the cable support system in the area. Junction box stands shall be fabricated from the same material as the cable support system in the area Multi cable transits (MCT) According to cable configuration, the material shall be selected to avoid eddy current Earth bosses Earth bosses shall be made of stainless steel AISI 316 L Fixing materials Screws, bolts, nuts and washers shall be made of stainless steel AISI 316. Star washers shall not be used. On cable racks/trays etc. nuts with integrated washer or manufacturer standard to be used Precautions against galvanic corrosion Precautions against galvanic corrosion shall be taken whenever contact between dissimilar metals is present. NORSOK standard Page 22 of 37
25 14 HANDBOOK 14.1 Typical index Below is a typical index that could be used for a Handbook if that is needed. 1. Index 2. Health Environment and Safety 3. Quality assurance 4. Specifications 5. Welding procedure 6. Numbering system 7. Typical installation drawings 8. Preservation 9. Mechanical Completion 10. Tools, warehouse and transport 11. Quality assurance NORSOK standard Page 23 of 37
26 ANNEX A - TYPICAL INSTALLATION DRAWINGS (INFORMATIVE) Figure A.1 Instrument and Telecom Earth NORSOK standard Page 24 of 37
27 Figure A.2 Electrical, Instrument and Telecom Equipment Termination NORSOK standard Page 25 of 37
28 Figure A.3 Termination in Field Junction boxes NORSOK standard Page 26 of 37
29 Figure A.4 Instrument Termination in Panels NORSOK standard Page 27 of 37
30 Figure A.5 Splicing of Fiber Optic Cable NORSOK standard Page 28 of 37
31 Figure A.6 Motor termination with Multicore cable NORSOK standard Page 29 of 37
32 Figure A.7 Motor termination with Single core cable NORSOK standard Page 30 of 37
33 Figure A.8 Installation of Transmitter for Gas/Liquid Services NORSOK standard Page 31 of 37
34 Figure A.9 Installation of Direct Mounted Transmitters and Pressure Gauge. NORSOK standard Page 32 of 37
35 Figure A.10 Installation of Level Transmitter with use of Capillary Tubing. NORSOK standard Page 33 of 37
36 Figure A.11 Hook-up of Pneumatic Valves NORSOK standard Page 34 of 37
37 Figure A.12 Instrument Air Supply Manifold NORSOK standard Page 35 of 37
38 Figure A.13 Hydraulic Supply Header NORSOK standard Page 36 of 37
39 Figure A.14 Hook-up of Hydraulic Valves NORSOK standard Page 37 of 37
Offshore Transformer Platform. Technical Standard. Energinet.dk. HV, MV, LV and Signal Cables and Cable Routing
Offshore Transformer Platform Technical Standard Energinet.dk HV, MV, LV and Signal Cables and Cable Routing ETS - 03 Rev. 1 Acadre doc. 44858-09 Revision survey Chpt. Description Revision Date Resp. -
Session 14 Cable Support Systems
Session 14 Cable Support Systems Cable Support Systems in the IEC World A new IEC Standard, IEC61537 2001 has been developed If full details of the cabling layout are available then the likely cable load
Pressure monitoring equipment for oil-sf 6. bushings, type GOEK
Pressure monitoring equipment for oil-sf 6 bushings, type GOEK Installation and maintenance guide 5693 827-6 en, Rev. 3, 2002-01-30 This document must not be copied without our written permission, and
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
Section 21. Telecommunication Hardware. www.geindustrial.com BuyLog Catalog 21-1
Introduction...21-1 Fiber Closure Hardware...21-2 Cable Location Surge Protectors...21-4 Introduction GE has been manufacturing Telecommunication Hardware products for over 20 years and has become a leader
Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.
1 Presenters Brett Weiss, Gabe Martinez, Brian Kroeger. Topics to be covered: Cable identification Purpose of the various cable types Installation techniques Building Infrastructure Overview of networking
A. Shop Drawing submittals shall include, but not be limited to, the following:
SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical
Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time
Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to
3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance
SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132
HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12
SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications
Corporate Profile ROYAL. MODERN ROYAL ELECTRIC Ideal Power Solution MRE ELECTRICAL, INSTRUMENTATION & COMMUNICATION SYSTEMS
Corporate Profile MODERN ROYAL ELECTRIC Ideal Power Solution ROYAL MRE ELECTRICAL, INSTRUMENTATION & COMMUNICATION SYSTEMS MAJOR STOCKIST >>> CATHODIC PROTECTION CABLES >>> LOW VOLTAGE CABLES >>> MEDIUM
DIVISION 26 - ELECTRICAL SECTION 26 05 20 CABLES FOR INSTRUMENTATION
DIVISION 26 - ELECTRICAL PART 1 - GENERAL 1.01 SUMMARY A. Section Includes 1. Instrumentation Cables 1.02 SUBMITTALS A. Submit in accordance with requirements of Section 01 33 00. B. Product Data: Submit
SELECTION, APPLICATION AND MAINTENANCE
DIESEL PROTECTION SYSTEMS Automatic Diesel Engine Shut Down System for Safe Area Applications SELECTION, APPLICATION AND MAINTENANCE Series 300 Series 310 SYSTEM DESCRIPTION Suitable for attended engine
Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw
4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and
Cooktop Low-Profile Ventilation Hoods
INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............
Trade of Electrician. Three-phase Distribution Boards And Socket Circuits
Trade of Electrician Standards Based Apprenticeship Three-phase Distribution Boards And Socket Circuits Phase 2 Module No. 2.3 Unit No. 2.3.2 COURSE NOTES Created by Charlie Walsh - Athlone TC Revision
Oil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1
City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included
ECOCIAT. Domestic hot water heat recovery unit
Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY
3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE
4 3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE A. Changing the Control Board B. Replacing a Heating Element C. Thermistor Replacement D. High Limit Switch Replacement E. Level Detector Replacement
EX-TECH SAS CP/PB 150 EXPLOSIONPROOF MANUAL CALL POINT/ PUSH BOTTON TECHNICAL MANUAL
PRODUCT NAME: CP/PB -150- EXPLOSION-PROOF-MANUAL CALL POINT/ PUSH BOTTON DOC NO.: EX-TECH SAS-12-CP-PB150-TM REV01 EXPLOSION-PROOF MANUAL CALL POINT/ PUSH BOTTON II 2GD EPL Gb, Db Ex d IIC T6, IP66 Ex
Cable ladder installation at S.C.M. Chemicals Limited s titanium dioxide Plant in Western Australia
Exel Composites Cable Support Systems offer engineers a structural product for solving many design and plant engineering problems, enabling long term reliable support of expensive and often critical cables.
This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink.
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink. The unit will start automatically. Please pay particular
Screened cable and data cable segregation
December 2007 Screened cable and data cable segregation Can an armoured power cable be considered a screened cable and how does this relate to power and data cable segregation? The short answer is yes;
METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
Installation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4
CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,
VOYAGER 570G. 744A Sprayer Control
VOYAGER 570G 744A Sprayer Control U S E R M A N U A L U S E R M A N U A L Table of Contents CHAPTER 1 - INTRODUCTION...1 SYSTEM CONFIGURATIONS...1 KIT CONTENTS...3 CONTROL HOUSING ASSEMBLY...5 CHAPTER
BLUE RIBBON CORP. BC001 Birdcage Installation Manual
Product Overview: This manual is applicable for the BC001 Birdcage Submersible Level Transmitters. If the product you have has a different prefix part number than listed above please contact the factory
NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS
SECTION GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS RELATED SECTIONS: Section 27 00 00 General Requirements Section 27 02 00 Communication General Requirements Section 27 05 28 Pathways for Communications
The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables
The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing
EMC Engineering Guidelines For Automation Systems PS 4 PS 416 04/97 AWB 27-1287-GB
EMC Engineering Guidelines For Automation Systems PS 4 PS 416 1st edition 04/97 Moeller GmbH, Bonn Author: Werner Albrecht Editors: Klaus Krüger, Thomas Kracht Translator: Chris Baker, Terence Osborn Contents
CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute
CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute Cable Tray Wiring Systems Have Many Cost Advantages Cost is usually a major consideration in the selection of a wiring system.
Structured Cabling, Earthing & Equipotential Bonding
White Paper Information and Communication Technology Structured Cabling, Earthing & Equipotential Bonding English Rev. 1.0.1 / 2012-06-01 1 Abstract All Dallmeier network products (PoE cameras, recorders,
270526-TC Grounding and Bonding for Telecommunications Systems
270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer
Shunt lock function 3066
Version: January 2004 Contents Alarm System Activation unit Deactivation unit Digital locking cylinder or Smart Relay 1.0 Method of Operation 4 1.1 General 4 1.2 Turning the Alarm System On 4 1.3 Turning
Emergency Telephone Systems
Standard Issued Date: 22 May 2014 Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by the NSW Government and its
FAQs-Main switchboard design criteria
FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
Operators manual Basic water heater
Operators manual Basic water heater Isotemp Basic water heater has been designed and produced to ensure that your water heater will give long and trouble free operation for many years. It is important,
Product and functional description
Product and functional description The KNX / DALI gateway N 141/02 is a 4 MU wide, DINrail mounted KNX device with one DALI interface to which up to 64 DALI actuators (e.g. DALI ballasts) can be connected
HG600/HG800. Hydro-Power Unit. Installation and Operation Guide
HG600/HG800 Hydro-Power Unit Installation and Operation Guide Copyright 04 HydroSpin, All rights reserved. The data contained in this document is proprietary to HydroSpin. It is disclosed to the receiving
Operating Instructions
Operating Instructions Cable Glands Ex d and Ex e with Compound > Contents 1 Contents 1 Contents...2 2 General Information...2 3 General Safety Information...3 4 Designated Use...4 5 Technical Data...4
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE
LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE 380/415/690 Volt AC 50/65/80/100 ka 1. Product Guide Low Voltage Motor Control Centre CONTSTRUCTION Continuous "poured in place" gasket
V - JET. Counteflow System. V-JET Counterflow System Installation and Operation Manual
V - JET Counteflow System V-JET Counterflow System Installation and Operation Manual 1. System Installation By purchasing the V - JET counterflow system you have obtained high-quality product, which will
Digital inductive conductivity transmitter
Digital inductive conductivity transmitter Optimal solution for conductivity measurements in difficult fluids (polluted, dirty,...) PEEK/PPA version for CIP applications Large range of process connections
Installation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT 2003-2014 CHEVROLET/GMC VANS FOR
INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT 2003-2014 CHEVROLET/GMC VANS FOR (For NEW 2007 ALL WHITE KWIK-KITS ONLY) Warning do not attempt to install A/C units unless you are experienced with servicing
NORSOK STANDARD H-001 Rev. 4, Nov. 2001. Heating, ventilation and air-conditioning
NORSOK STANDARD H-001 Rev. 4, Nov. 2001 Heating, ventilation and air-conditioning This NORSOK standard is developed by NTS with broad industry participation. Please note that whilst every effort has been
4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM
EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM INSTALLATION MANUAL Protec Fire Detection PLC, Protec House, Churchill Way, Nelson, Lancashire, BB9 6RT. Telephone: +44 (0) 1282 717171 Fax: +44 (0) 1282 717273
BBWX1 Satellite Weather Receiver. Installation and Maintenance Guide
BBWX1 Satellite Weather Receiver Installation and Maintenance Guide Rev FUSA 15JUL2007 Table of Contents Safety Precautions 3 Disclaimer. 3 Contents of Package. 4 Tools Required..4 Installation General
Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS
Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Technical Information sheet 0001/07/Rev01 ENG FUNCTION Series S001 and S002 circulation units are applied to the primary circuit of solar
Installation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
ADM1TE 5/30A DIN rail single phase two wire energy meter
ADMTE 5/30A DIN rail single phase two wire energy meter. Safety instruction.2 Foreword.3 Performance criteria.4 Specifications.5 Basic errors.6 Description.7 Dimensions.8 Installation.9 Operating.0 Troubleshooting.
Unified requirements for systems with voltages above 1 kv up to 15 kv
(1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to
Drayton Digistat +2RF/+3RF
/+3RF Programmable Room Thermostat Wireless Model: RF700/22090 Model: RF701/22092 Power Supply: Battery - Thermostat Mains - Digistat SCR Invensys Controls Europe Customer Service Tel: 0845 130 5522 Customer
ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION
ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION by Richard Laney Introduction Elevator traveling cable is a vital link between the elevator car and controller. In conventional elevators, all power and signal
G26 Corp. 9721-L11 Revised 07-2001 LENNOXOEMPARTS.COM. Service Literature G26 SERIES UNITS
Service Literature G26 SERIES UNITS G26 series units are high-efficiency upflow gas furnaces manufactured with DuralokPlust aluminized steel clamshell-type heat exchangers. G26 units are available in heating
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE
Comparative study for cables and busbars
Comparative study for cables and busbars Preliminary considerations To compare the prices of two categories of product as different as traditional cables and busbars, it is necessary to make some preliminary
ATS Overhead Table Shelf System INSTRUCTION MANUAL
ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System Instruction Manual Warranty Newport Corporation warrants this product to be free of defects in material and workmanship
SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
Cat7/Class F New Installation Concept New infrastructure. Handbook
Cat7/Class F New Installation Concept New infrastructure Handbook contents 1 Introduction 3 2 What is the Cat7/Class F installation concept 3 3 Distribution centre 3 3.1 Patch Modules 3 4 How to handle
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
David O Brien, CMP Products ([email protected])
David O Brien, CMP Products ([email protected]) 1) Main Function of Cable Glands 2) Common Issues with Cable Glands 3) Compliance / Standards, changing times 4) How do we select Cable Glands?
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical
Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide
Instruction Bulletin EAV85226 08/2014 Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide Retain for future use. Product Description Kit Contents The Wiser Panel Meter is for use in energy management
Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points
Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points Features SELV Compliant No Detection Passive Injector Gigabit Compatible Full Protection
A product made in Australia. Insulated Conductor Rail ACTIV-8 PLUS
A product made in Australia Insulated Conductor Rail ACTIV-8 PLUS ACTIV-8 PLUS The Industry Standard in Conductor Rails ACTIV-8 is the most widely used and stocked conductor rail in use in Australia. It
ELECTRIC METERING COMMERCIAL & INDUSTRIAL
ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS
STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2
STANDARD for Plumbing, Heating, Hot Water, Cold Water & Electrical work undertaken by owners within the building known as Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL 1.1 SUMMARY A. This section describes the requirements for the installation of Power Monitors and associated
TCTC Cabling Specifications
TCTC Cabling Specifications Purpose: To provide a standard specification that will be used for all Tri County Technical College (TCTC) facilities requiring structured cabling installation. Product specifications,
ESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants. Installation instructions ESP M1/M1R mains protectors
ESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants Installation instructions Contents Key points of installation Before installation Installation Installation check
Mechanical Services Standard Specification 5.0 - Compressed Air Systems. May 2010. For ROYAL HOLLOWAY UNIVERSITY OF LONDON
Mechanical Services Standard Specification 5.0 - Compressed Air Systems May 2010 For ROYAL HOLLOWAY UNIVERSITY OF LONDON Prepared For The Estates Division By: Hulley & Kirkwood Consulting Engineers Ltd
DRM75A 230V 20/100A DIN rail single phase two wire energy meter
DRM75A 230V 20/100A DIN rail single phase two wire energy meter 1.1 Safety instruction 1.2 Foreword 1.3 Performance criteria 1.4 Specifications 1.5 Basic errors 1.6 Description 1.7 Dimensions 1.8 Installation
Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada
Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract The methods for cable penetrations into modular industrial substations are
MCR1900 Media Converter 19-Slot Chassis
MCR1900 Media Converter 19-Slot Chassis Installation Guide Part #5500304-11 Copyright Statement This document must not be reproduced in any way whatsoever, either printed or electronically, without the
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2
DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS
DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS A. SCOPE 1. This information is intended to assist contractors, installers and code officials in the proper design and installation of flexible
CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions
Printing 3 March 2008 CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions This instruction is intended for CP2 cable pedestal installations and replacements. The following tools will be
Protection Systems. A UTC Fire & Security Company F-73-01. Linear Heat Detector FEATURES DESCRIPTION APPLICATIONS BENEFITS
Effective: May 2007 AlarmLine TM R Protection Systems Linear Heat Detector A UTC Fire & Security Company F-73-01 FEATURES Integrating Type Linear Heat Detector Analog Sensing Field Adjustable Alarm Set
OPL BASIC. Dosing System for Professional Laundry machines. Contents
OPL BASIC Dosing System for Professional Laundry machines Contents 1 Getting Started. Page 2 2 Installation. Page 4 3 Set Up & Operation. Page 8 4 Maintenance & Accessories. Page 10 5 Troubleshooting Page
ACTIV-8 PLUS Insulated Conductor Bar
ACTIV-8 PLUS Insulated Conductor Bar A product made in Australia www.conductix.com.au ACTIV-8 PLUS ACTIV-8 is the most widely used and stocked conductor rail in use in Australia. It was designed by Conductix
CEILING CASSETTE FAN COIL UNIT
CEILING CASSETTE FAN COIL UNIT Operation and Installation Manual MHCFC4W-04, 08, 12, 16 Four way ceiling cassette fan coil unit Please read this manual before using the fan coil unit. Installation and
Unarmored Variable Frequency Drive (VFD) Cable Termination Guide
Authorized Distributor Unarmored Variable Frequency Drive (VFD) Cable Termination Guide Be Certain with Belden A Step-by-Step Look at the Connection/Termination of Unarmored VFD Cables Terminating Unarmored
PRODUCT: WASHER / WASHER-DRYER COMBO MODEL: AW 120 / AW 122 / AW 125 AWD 120 / AWD 121 / AWD 129
PRODUCT: WASHER / WASHER-DRYER COMBO MODEL: The information included in this Splendide Repair Manual may change without notice. Please see our web site www.splendide.com/service/docs.html for updates,
1. Description. 2. List of Accessories included A B C F G H
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin. The unit will start automatically. Please pay particular attention to the following: Possible danger to
33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application
33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application Features Compliant with the IEEE802.3at Standard -40 to +60 C Temperature Range Diagnostic LEDs Full Protection
MIC-WKT and MIC-WKT-IR
MIC-WKT and MIC-WKT-IR Installation Manual Bosch Security Systems EN Installation and Operation Manual MIC-WKTI and MIC-WKT-IR Installation Manual EN 2 MIC-WKT and MIC-WKT-IR Washer Pump Drive Card Kits
Terminal Boxes Series 8146
Series > Enclosures in shock-resistant glass fibre reinforced polyester resin > basic enclosure sizes various heights > Fitted according to the customer's requirements > For terminals up to max. 00 mm
Element D Services Plumbing
Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.
Unit 24: Applications of Pneumatics and Hydraulics
Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 4 DIRECTIONAL CONTROL VALVES The material needed for outcome 2 is very extensive
Fire. The Fire Installers Mate. A guide to fire alarm systems design
Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects