Energy Performance & Maintenance Contracting ti applied in the context t of public procurement. Christophe Madam General Manager
|
|
|
- Suzanna Martin
- 10 years ago
- Views:
Transcription
1 Energy Performance & Maintenance Contracting ti applied in the context t of public procurement Christophe Madam General Manager
2 The context Classical approach for energy savings proved inefficient Expensive/Imprecise M&V, e.g. need to record every change in buildings Low cost-efficiency, e.g. engineering firms and installers focused on maximum investments, no follow-up and fine tuning afterwards, who garantees the savings? Since ± 2005 the EU has been pushing EPC as Best Practice for public buildings, including: Energy Efficiency Plan 2011 new Energy Efficiency Directive (ESD)
3 The solutions No limitations of existing EPC- contracts, procedures, International know-how transfer via IEA and European projects, analysis of foreign EPC-contracts) Out-of the box thinking Completely new EPC - contract
4 The solutions Fixed remuneration EPC-project Comfort (>= current value) Bonus-malus remuneration Comfort & energycost savings Year 1 n Energy cost savings ( >= offer value) Normal project requirements ( >= values tender documents) Bonus-malus remuneration surplus value building end Year n Surplus value building end (>= offer value)
5 Comfort satisfaction score
6 Comfort satisfaction score Example average comfort score per building -> Average comfort score = weighted average comfort score temperature, light,
7 Energy cost savings Project Rule: Actualised energy cost savings until end of building pool, measured >minimum offer Advantage Energy cost savings = guaranteed (IPMVP) Energy cost savings realised in buildings where realisable at lowest cost
8 Project requirements ESCO must respect 'SMART' project requirements Theme group Theme Example of project requirement Input Condition Minimum condition score element X Minimum added value building end (*) Output Functionality Maximum number breakdowns Maximum repair time breakdowns Safety Safety pictograms present Complied with fire regulations Comfort Indoor temperature meets statutory regulations Minimum average comfort satisfaction score (*) Energy Minimum energy cost savings (*) Environment Complied with statutory environmental requirements Management Communication Minimum consultation Information Information and data with respect to project requirements available (*) Bonus-malusprojecteis Project plan Plan how project requirements will be fulfilled available
9 Building value Building value = Value elements Condition score per element (NEN2767) Replacement value per element (Aspen) Value element
10 Building value Condition score and Value Id. Element Location antity Qu Un nit(s) Rep placem ent value Con ndition sc core lue% Va Va alue Control boxes ; 3-4 loop control circuit boxes Basement 1 pieces % Heat distribution; water; convectors with Level pieces % thermostatic valves Heat distribution; water; radiators with Level pieces % valves Air conditioning; local mechanical Roof 5 pieces % 105 ventilation; roof ventilator TOTAL ,8 30%
11 Building value Rules during project: Total added value building in year 1 all buildings, measured> minimum offer Actualised added value building end all buildings measured > minimum i offer Advantage Minimum added value buildings guaranteed Optimal allocation of added value, namely in buildings where there is maximum effect on comfort and energy cost savings
12 Award criteria Fixed remuneration EPC-project Comfort (>= current value) Bonus-malus remuneration Comfort & energycost savings Year 1 n Energy cost savings ( >= offer value) Normal project requirements ( >= values tender documents) Bonus-malus remuneration surplus value building end Year n Surplus value building end (>= offer value)
13 Award criteria Award for 70% points on the basis of net-cost cost, this is actualised value of: + Annual requested remuneration (= Remuneration added value building 1 + Maintenance remuneration, including replacement investment) - Annual energy cost savings - Surplus value building end
14 Remuneration during & at end project Fixed remuneration EPC-project Comfort (>= current value) Bonus-malus remuneration Comfort & energycost savings Year 1 n Energy cost savings ( >= offer value) Normal project requirements ( >= values tender documents) Bonus-malus remuneration surplus value building end Year n Surplus value building end (>= offer value)
15 Optimal project organisation ESCO financially responsible for : maintenance (HVAC, lighting, elevators,windows, roof, ) and investments (idem) and energy cost savings and comfort, cost saving combinations are possible example 1. preventive maintenance now -> less expensive investments later on example 2. replacing roof covering -> also placing roof insulation example 3. when replacing old windows -> opting for energy conserving High-efficiency windows with low maintenance costs and maximum comfort
16 Optimal project organisation Maximum autonomy for ESCO, as long as basic additional project requirements are fulfilled (safety, environment, etc). Measures designed, executed and financed by party with best information, namely by ESCO including knowledge of the buildings, general expertise with respect to energy & maintenance, etc. Minimum overheads for commissioning party, including minimum interventions and control necessary by client (owner, user, Building Agency), no long discussions about cost and necessity of measures
17 Public Esco as «Integrator» Programmatic (old fashion) Audits, technical specifications Client Integrator Installators Energy Agencies Banks/TPF ESCO Operator EPC
18 Public Esco as «Facilitator» Programmatic (old fashion) Facilitator Audits, technical specs Client Installators Energy Agencies Banks/TPF ESCO Operator EPC
19 Future opporunity: Full-fledge / Integrated energy-services company EPC-M Facilitates & Finances EPC-M Joint venture between public Facilitator & private TPF: - Set up of public procurement for EPC s - Funding of investment program within EPC s - Controlling the results (IPMVP, comfort, ) Operational Esco
20 Cash flow overview / contract duration flows Cash Y1: PPP Fedesco funds investments for energy savings made by the Operational Esco through EPC M Y1 to n: Client responsible for annual cost for maintenance including replacement => Operational Esco (EPC M) Contract duration Annual savings: used to reimburse PPP Fedesco & Operational Esco
21 Other advantages The public ESCO and facilitator/aggregator market is active/present with existing and new players We have a new standard EMPC methodology and manual/contract - EPC procurement easier than before, 1 quantitative criterion!) - Step-by-step user guide We have a Belgian ESCO Association: BELESCO We have a few competent t EPC project facilitators
22 Obstacles Still an emerging EPC market with too few projects for the numerous private ESCOs present on the market Still a complete lack of country or region wide policy support in the public and private sector The existing experienced EPC project facilitators all work together which is also slowing market acceleration (risk of bottleneck) Lack of building strategy (occupancy planning, change in use, ) Decision/sales process too long (for EPC and for EPC facilitation)
23 On-going Projects Igretec = local development agency and grid operator They (finally) realize EPC may be a good option after all Showed interest in Fedesco s energy management solution STIB/MIVB = public transportation company EE & RE strategy and investment potential to be presented to board They showed interest in assistance with energy monitoring & bookkeeping Province of Brabant Walloon Fedesco as EPC-Facilitator was only candidate for tender for EPC facilitation of a large EPC project in buildings. Currently in go/no go decision process
24 On-going Projects City of Oostend: publication of EMPC-tender in December (Fedesco as Facilitator) Federal buildings: publication of EMPC-tender in December (Fedesco as Facilitator and TPF)
25 Fedesco s partners for development & facilitation of EPCM
26 Any question? Christophe Madam hi h d
ESCO Financing. State of Israel Ministry of National Infrastructure. Pierre Baillargeon. March 2007 ECONOLER INTERNATIONAL
ESCO Financing State of Israel Ministry of National Infrastructure Pierre Baillargeon March 2007 Agenda Evaluation of the EE market Introduction to the ESCO concept Introduction to performance contracts
ENERGY SERVICES& ESCOS & THE ROLE OFBELESCO LIEVEN VANSTRAELEN IN BELGIUM
ENERGY SERVICES& ESCOS IN BELGIUM & THE ROLE OFBELESCO LIEVEN VANSTRAELEN CO-CEO& OWNER OF ENERGINVEST PRESIDENT OF BELESCO SENIOR CONSULTANT AT THE FEDESCO KNOWLEDGECENTER EnergInvest sprl Rue J. Coosemans
How To Finance Energy Efficiency Investment In Poland
Opportunities and barriers to unlock the financing of energy efficiency investment Experience with energy performance contracting to finance investment in Poland Janusz Mazur Prezes Zarządu POE ESCO Sp.
European Code of Conduct for Energy Performance Contracting
Version as of 11 July 2014 Transparense project This document has been prepared within the framework of the "Transparense Increasing Transparency of Energy Service Markets" project co funded by the Intelligent
EnPC/ESCO in Romania (public buildings and public lighting)
EnPC/ESCO in Romania (public buildings and public lighting) Dana Ionescu EBRD Bogdan Anton Tractebel Engineering 17 November 2014 Content: EU Context Romanian Context Benefits of EnPC / ESCO EBRD specific
HEATING, VENTILATION & AIR CONDITIONING
HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating
Technology: Heating, Ventilation and Air Condition (HVAC) Zone Controls
Accelerated Capital Allowances Eligibility Criteria Ref No.: HZC C2.1 Category: Process and Heating, Ventilation and Air conditioning (HVAC) Control Systems Technology: Heating, Ventilation and Air Condition
Enterprise-wide approaches to power sector energy efficiency improvements
Enterprise-wide approaches to power sector energy efficiency improvements 7 Décembre 2011 Claude K Nahon Senior Vice President Sustainable Development The Big Bang... Continuing expensive fossil fuels
Esco s experience, know-how sharing from Energy Efficiency Italian industry
A step change in the deployment of RE and EE solutions in the Mediterranean Esco s experience, know-how sharing from Energy Efficiency Italian industry Andrea PONTA - Energy Manager - IREN September 16th,
METHODOLOGY TO IDENTIFY AND EVALUATE ENERGY SERVICES COMPANIES (ESCOS)
METHODOLOGY TO IDENTIFY AND EVALUATE ENERGY SERVICES COMPANIES (ESCOS) Translated from original Metodología para identificar y evaluar empresas de servicios energéticos (ESCOS), 2007 Proyecto Desarrollo
How To Design A Room Air Conditioning System
Comparison of HVAC Technology in Buildings Conventional HVAC Technology Bauer Optimising Technology The Differences Room environment (Occupant Comfort) Energy Consumption Architecture Air flows in a room
ELENA Application Form
ELENA Application Form The EIB accepts proposals in English and French. For the application of funding under the ELENA facility the following form 1 must be used. Content of ELENA application form: 1.
Provincial Helpdesk Energy Management
Provincial Helpdesk Energy Management Building Energy Efficiency and Refurbishment by EPC in municipal buildings Province of Flemish Brabant (Belgium), local action SAVE Els Cornelis, Barbara De Kezel
MANTON CONSOLIDATED SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS
MANTON CONSOLIDATED SCHOOLS REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS On a PERFORMANCE CONTRACTING BASIS July 16, 2010 1 NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF MANTON
Investment Opportunities in the Global Energy Management Systems Industry
Investment Opportunities in the Global Energy Management Systems Industry Integration of Technology Providers with Service Companies and Development of Smart Applications to Disrupt the Market April 2015
How To Save Money On Energy Efficiency
National Association of Energy Service Companies The ESCO Industry in the U.S. Nina Kogan Lockhart Senior Program Manager, NAESCO National Association of Energy Service Companies NAESCO represents the
Nest Learning Thermostat Installation Guide. Installation step-by-step
Nest Learning Thermostat Installation Guide Installation step-by-step Contents Compatibility. 3 In the box. 4 Before you start. 5 Choose an installation method. 6 Replacing an existing wired thermostat.
D5.3 Energy audit report
Project Acronym: EPLACE Project Title: Eco public PLAtform for smart green CityzEn s living labs Call identifier: CIP-ICT-PSP Call 6 Theme 1: ICT for SMART CITIES Objective1.1: Smart Urban digital services
Condensing Boiler Efficiency
Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2
FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE
FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE CFAA 2010 Canadian Rental Housing Conference June 14, 2010 Presented by Robert Greenwald, PEng., MBA President, Prism Engineering
COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document
EUROPEAN COMMISSION Brussels, 22.6.2011 SEC(2011) 780 final COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT Accompanying the document DIRECTIVE OF THE EUROPEAN PARLIAMENT AND
NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS
NEGAUNEE PUBLIC SCHOOLS REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS On a PERFORMANCE CONTRACTING BASIS July 26, 2010 NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF NEGAUNEE
Residential HVAC Load Sizing Training October 14, 2015. David Kaiser Green Code Plan Reviewer
Residential HVAC Load Sizing Training October 14, 2015 David Kaiser Green Code Plan Reviewer DCRA - Green Building Division Regulations of green codes including: Green Building Act Green Construction Code
Key energy-efficient features of your new home
Key energy-efficient features of your new home Your thermal envelope The thermal envelope, or shell, of your home (walls, roof and floor) is designed to keep you dry and comfortable. It protects you from
A guide to Energy Services Companies (ESCOs) on how to participate in the Dubai Buildings Retrofit Program
A guide to Energy Services Companies (ESCOs) on how to participate in the Dubai Buildings Retrofit Program Version 1.0 Produced by Etihad Energy Services Co. May 2014 Contents Introduction... 3 The Dubai
Frequently asked questions
Frequently asked questions ENERGY EFFICIENCY - Project Development Assistance Call ID: H2020-EE-2014-4-PDA Topic EE 20: Project Development Assistance (PDA) for innovative bankable and aggregated sustainable
Guidance on how to comply with the 2013 Building Regulations Part L
Guidance on how to comply with the 2013 Building Regulations Part L Version 1.0 6 April 2014 This guide supports the official guidance covering the control of gas and oil fired wet central heating installations
Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019
Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Table of Contents Our Commitment to Energy Conservation...1 1.0 Introduction...2 2.0 Energy Supply in Ontario...3 2.1 Energy Supply
Case Study. Commercial Building Energy Efficiency Retrofit 4 Mort Street, Canberra. Results. Background PEOPLE PRACTICES SYSTEMS
Case Study PEOPLE PRACTICES SYSTEMS Commercial Building Energy Efficiency Retrofit 4 Mort Street, Canberra In 2010, 4 Mort St, Canberra (Figure 1) was upgraded to significantly improve its energy performance.
Energy Savings Performance Contracting. Guidelines for State Agencies. Part 2
Energy Savings Performance Contracting For The Owner (Agency) Contract Structure, Essential Elements, and Certifications Page 1 of 20 Table of Contents Table of Contents... 2 Texas Government Code Contract
Large-Scale Energy Performance Contracts: Halifax Regional School Board. October 20, 2015
Large-Scale Energy Performance Contracts: Halifax Regional School Board October 20, 2015 Overview Background HRSB Energy Performance Contracts Model for Change Implementation Energy Improvements Barriers
2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT
Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com
Energy Efficiency Insurance. Product overview
Energy Efficiency Insurance Product overview High energy prices combined with a desire to reduce CO2 emissions have seen increasing investment in green energy initiatives. With around 40%* of all the energy
Exemplary Retrofitting of an Old School in Stuttgart - EROS -
Exemplary Retrofitting of an Old School in Stuttgart - EROS - City of Stuttgart, Summary The objective of the project was to demonstrate the potentials of a retrofitting process for a typical school in
Establishing Commissioning Costs
Establishing Commissioning Costs Portland Energy Conservation, Inc. (PECI) 9/12/00; Revised 02/14/02 The following summarizes the latest information on commissioning costs taking into account costing studies
European Energy Efficiency Policy and the ESCO market: the Case of Sweden
European Energy Efficiency Policy and the ESCO market: the Case of Sweden Professor Lars J. Nilsson, Environmental and Energy Systems Studies, Lund University, Sweden Ph. D candidate Christian Stenqvist,
PROSPECTUS ALTERATION DENVER FEDERAL CENTER BUILDING 53 LAKEWOOD, CO
FY2015 Project Summary The General Services Administration (GSA) proposes a repair and alteration project to undertake system and architectural repairs as well as alteration of existing space at the Denver
Contract for Weatherization Management Address City & State
I. Parties Contract for Weatherization Management Address City & State This contract is made and entered into on and specifies the terms of the agreement between Client Name, homeowner, and Sherlock Homes
Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances
Heating, ventilation and air conditioning equipment A guide to equipment eligible for Enhanced Capital Allowances 2 Contents Introduction 03 Background 03 Setting the scene 03 Benefits of purchasing ETL
DoES-QW2 Suitability Assessment Declaration
SECTION 1: PROJECT PARTICULARS: Project Title as EU/eTenders Contract Notice: Description as EU/eTenders Contract Notice: Address: Form of Contract: Contractor s Role: Project Category: Areas of work involving
1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%
1 1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 2. How much money do commercial facilities spend per square foot on energy costs
How To Save Money On Energy
wattsmart Business Reduce your energy costs. Increase your profit. A guide to saving energy for small commercial and retail spaces Start with wattsmart Profitability is the key to a successful business
Texas School District Energy Management: The Status of Energy Management in Texas Schools
2014 Texas School District Energy Management: The Status of Energy Management in Texas Schools Texas School District Energy Management Study: The Status of Energy Management in Texas Schools Prepared by
Looking into different approaches for ESCO development. The example of Germany.
Looking into different approaches for ESCO Dr. Daniel Hesse Berliner Energieagentur GmbH Bucharest, 8 May 2015 BEA Facts and Figures Established in 1992 as Public-Private Partnership Shareholders Federal
GAS HEATING IN COMMERCIAL PREMISES
ENERGY EFFICIENCY OFFICES GAS HEATING IN COMMERCIAL PREMISES www.energia.ie www.energia.ie Typically, energy reductions of 10% or more can be made easily through maintenance and low cost improvements.
EnergySTEP (Sustainability Tiered Efficiency Program) Our Approach to Energy Efficiency
TM EnergySTEP (Sustainability Tiered Efficiency Program) Our Approach to Energy Efficiency Agenda Our Vision and Mission EnergySTEP, Our approach to Energy Efficiency Capabilities Case Study Incentives
Eco buildings and neighbourhoods. NENA Network Enterprise Alps Markus Berchtold Hochschule Luzern Technik & Architektur Eveline Thaler
Eco buildings and neighbourhoods NENA Network Enterprise Alps Markus Berchtold Hochschule Luzern Technik & Architektur Eveline Thaler Content of the workshop - NENA network as transnational co-ordinator
Alaska Commercial Energy Audit Program 2013 Program Guidelines
Alaska Commercial Energy Audit Program 2013 Program Guidelines November 1, 2013 Application Deadline: December 20, 2013 (4:30 pm) Introduction The Alaska Energy Authority initiated a commercial energy
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) Objectives Survey current HVAC system(s), operating procedures, and maintenance schedule. Analyze results of energy audit for HVAC system(s)
Air Conditioning Inspections
BUILDING EFFICIENCY Air Conditioning Inspections Understanding your obligations under the Energy Performance of Buildings Regulations Energy efficiency is vital for combating climate change... Ever since
National Fund for Environmental Protection and Water Management. activities in climate protection
National Fund for Environmental Protection and Water Management activities in climate protection National Fund for Environmental Protection and Water Management Witold Retke Head of Green Investment Scheme
Energy Efficiency Programs. Presented by Tom Knoy, CLEAResult Consulting
Energy Efficiency Programs Presented by Tom Knoy, CLEAResult Consulting Today s Agenda About Efficiency United Current Programs Implementation 2 About Efficiency United Efficiency United (EU) consists
Diego Ibarra Christoph Reinhart Harvard Graduate School of Design
Building Performance Simulation for Designers - Energy DesignBuilder // EnergyPlus Tutorial #2 Load Schedules GEOMETRY LOADS RESULTS Diego Ibarra Christoph Reinhart Harvard Graduate School of Design OVERVIEW
Business Process Management Technology: Opportunities for Improved Efficiency and Reduced Costs in the Mining Industry
Business Process Management Technology: Opportunities for Improved Efficiency and Reduced Costs in the Mining Industry A Paper Prepared for Presentation to the Industry Summit on Mining Performance: Business
QUESTIONS TO ASK WHEN REPLACING YOUR HVAC TOGETHERWESAVE.COM
QUESTIONS TO ASK WHEN REPLACING YOUR HVAC TOGETHERWESAVE.COM TOGETHERWESAVE.COM IS IT TIME TO REPLACE YOUR HVAC SYSTEM? If your heating and cooling system is 15 to 20 years old and is experiencing problems,
KNX city concept. Dipl.-Ing. Lutz Steiner, KNX Scientific
KNX city concept Dipl.-Ing. Lutz Steiner, KNX Scientific KNX home KNX is in the building Page No. 2 KNX Building KNX is in the building Page No. 3 KNX can connect buildings Interoperability with other
ULTIMATE GUIDE TO BUILDING AUTOMATION SYSTEM (BAS)
ULTIMATE GUIDE TO BUILDING AUTOMATION SYSTEM (BAS) Building Automation is monitoring and controlling a building s systems including: mechanical, security, fire and flood safety, lighting, heating, ventilation,
Contracting Practices in Mega Projects
CEM 520 Term Paper Contracting Practices in Mega Projects EPC and EPCM A L I A B D U L L A H A L - S A L E M 2 0 0 3 4 2 5 1 0 Outline Introduction Types of Contracts Contracting Strategies The Difference
Daikin Altherma hybrid heat pump. The natural combination
Daikin Altherma hybrid heat pump The natural combination Daikin Altherma hybrid heat pump, the natural combination Why choose Daikin Altherma hybrid heat pump? What the customer wants: more energy efficient
Energy Efficiency and Automated Demand Response Program Integration: Time for a Paradigm Shift
Energy Efficiency and Automated Demand Response Program Integration: Time for a Paradigm Shift Christine Riker and Kitty Wang, Energy Solutions Fred Yoo, Pacific Gas and Electric Company ABSTRACT The practice
Energy Efficiency Operations & Maintenance Plan August 25, 2010
Energy Efficiency Operations & Maintenance Plan August 25, 2010 Table of Contents Introduction... 3 Repair, Maintain and Operate Existing Equipment Efficiently... 3 Citywide Requirements Contract... 4
Framework Policy for the Governance of Major Public Infrastructure Projects
Framework Policy for the Governance of Major Public Infrastructure Projects Framework Policy for the Governance of Major Public Infrastructure Projects For further information on the Framework Policy for
PUBLIC PROCUREMENT CONTRACTS
PUBLIC PROCUREMENT CONTRACTS Public authorities conclude contracts to ensure the supply of works and delivery of services. These contracts, concluded in exchange for remuneration with one or more operators,
Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP
Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency Randy Mead, C.E.M, CMVP Introduction Chilled water plant efficiency refers to the total electrical energy it
EUSNCO309 (SQA Unit Code - FA9F 04) Monitor the installation process for Network Construction Operations
Monitor the installation process for Network Construction Operations Overview This unit is designed for the candidate to demonstrate the effectiveness of the installation and construction process by monitoring
We work for your future
We work for your future Atlas Consulting s vision is to be the leading provider of consulting expertise in the Accounting, Taxation,Administration and Financial marketplace, delivering premium value to
Guidance on Framework Agreements
1. Introduction Guidance on Framework Agreements The purpose of this document is to provide guidance to public purchasers on the operation of framework agreements as provided for under current public procurement
May 26, 2011, Strategic Planner Circle Innovation Management at Siemens Building Technologies Division Lucas Schmid, Head of Strategy
May 26, 2011, Strategic Planner Circle Innovation Management at Siemens Building Technologies Division Lucas Schmid, Head of Strategy Siemens AG 2011. All rights reserved. Areas Contents of activity Building
Your Guide to Buying an Energy-Efficient Central Air Conditioner
NJ Clean Energy Cool Advantage Rebates 866-NJSMART For more information on energy efficiency and renewable energy programs for New Jersey, visit New Jersey s Clean Energy website, www.njcleanenergy.com.
Active Roofs and Facades in Sustainable Renovation
Ellebo Garden Room, Ballerup Overall winning project of the Nordic Built Challenge Architectural competition Active Roofs and Facades in Sustainable Renovation A Nordic Innovation Initiative for development
Thermal destratification in buildings: The missing piece to the HVAC puzzle
WHITE PAPER Thermal destratification in buildings: The missing piece to the HVAC puzzle January 2013 Thermal Destratification In Buildings: The missing piece to the HVAC puzzle 1. What is Thermal Destratification
Analysis of Energy Consumption. ACME Limited
Analysis of Energy Consumption at ACME Limited by A.N. Energy Consultancy A report written using the BizEE Benchmark energy auditing software package developed by BizEE Software Ltd www.bizeesoftware.com
Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs
Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs Presented by: Paul Spiegel, Practical Energy Solutions Courtney Lane, PennFuture Commercial Building Energy Use
Contents. Public Private Comparator
Contents Introduction 7 Module 1: Inception report 15 Step 1a: describe the alternatives, scope, plan & parties involved 17 Step 1b: create the communication plan 23 Module 2: Qualitative analysis 31 Step
Energy Efficiency HOSPITALITY. www.energia.ie
Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real
Identity and Access Management
Cut costs. Increase security. Support compliance. www.siemens.com/iam Scenarios for greater efficiency and enhanced security Cost pressure is combining with increased security needs compliance requirements
OPPORTUNITY STATEMENT:
2.3.3 HVAC Contractor Business Model The HVAC contractor model reviews the operating environment for contractors whose primary service offering is HVAC installation and repair. The model also highlights
Heating, ventilation and air conditioning zone controls
Technology information leaflet ECA762 Heating, ventilation and air conditioning zone controls A guide to equipment eligible for Enhanced Capital Allowances Contents Introduction 01 Background 01 Setting