1 R Integrating CMMI, TSP and Change Management Principles to Accelerate Process Improvement SM Julie Switzer, P-3 Process Improvement Lead, NAVAIR Orville Starnes, TSP Launch Coach, NAVAIR R CMM, CMMI and Capability Maturity Model are registered in the U.S. Patent and Trademark Office. SM Personal Software Process (PSP); Team Software Process (TSP); and SCAMPI are service marks of Carnegie Mellon University
2 Objectives Background and current status of the Process Improvement effort Applying change management principles to successfully change an engineering culture Lessons learned in integrating improvement initiatives
3 Background P-3C Maritime, Patrol & Reconnaissance Aircraft (MPRA) Software Support Activity (SSA) Integrate new capabilities into the Navy s land-based, long range P-3C antisubmarine warfare patrol aircraft Primarily perform software maintenance and enhancements
4 Process Improvement Goals Positively impact cost, schedule, quality Pursue credential as evidence of strong business practices Improve the work environment Apply High Performance Organization principles to improve SSA s leadership philosophy, culture and business processes Satisfy policy that requires software intensive programs to implement process improvement
5 SSA Process Improvement Effort Tools May 2002 PSP/TSP Process Action Teams (PATs) HPO Process Improvement Group Kick-off February 2002 Documenting SSA Processes CMMI SCAMPI B Appraisal 22 PAs; 95% Low Risk Ratings October 2005 Training Defined Web Requirements May 2004 SM SCAMPI - Risk Management - Measurement & Analysis
6 Reasons for Successful Improvement Strong Sr. Management commitment and support Developed a Process Improvement culture Applied change management principles to gain and maintain buy-in from the team Used the Team Software Process (TSP) as a framework and tailored it as needed Assigned Process Action Teams (PATs) to form the organization s standard process architecture (the Golden Process) and document processes for each phase of the product life-cycle based on the organization s best practices
7 Golden Process Program Management (PM) Project Management (PJM) Requirements Generation (REQ) Design (DGN) Code Development (DEV) Verification & Validation (V&V) Deploy (DEP) Process and Product Quality Assurance (QA) Configuration Management (CM) Training (TRG) Facilities (FAC)
8 Code Development Phase Write Code (Link) Source Code Delivery Requested Conduct Personal Code Review Design (CDR) (Link) Design (Is CDR Required?-no) (Link) SW CM (Set Up Developer Areas) Notify SW CM Compile No Conduct Peer Code Inspection Pass? SW CM (Prepare Product For Delivery) Yes Conduct Unit Test Development Defect Deliver To Requester (Link) (Link) (Link) Facilities (PHIC/DTIF) SW CM (Create Integration Build) Prepare Integration Build (Link) Verification & Validation (Conduct DTRR) Integration Test Design (Are the Reqts Valid and Complete?) Project Management (Collect Information Prepare for DTRR No Monitor Status on Project Status) (Link) (Link) DOC CM (Document Submitted to CM) Generate Release Memo Postmortem Flt Release Bld? Yes Generate VDD (Link) Project Management (Assess and Analyze Project Status)
9 Applied Change Management Principles Used High Performance Organization (HPO) Methodologies to motivate the team and gear up for change Mission Statement Values Statement Organizational Goals Strategic Customer Value Analysis Built a coalition and shared decision-making Created an environment that encouraged individual and collective learning Maintained momentum Managed resistance patiently, but firmly resistance to change occurs because people don t understand it, they perceive it as a threat, or it s forced on them "People don't resist change. They resist being changed!" ~ Peter Senge
10 Developed a Process Improvement Culture Launched a communications campaign Kept the team informed Continued to remind them that Process Improvement is an integral part of their job Pep talks from Sr. Management Training Posters Newsletters Team-building picnics Logos Contests Process Improvement Group (PIG) Mascot Process Improvement is hard work do what you can to make it fun! We are what we repeatedly do. Excellence, then, is not an act, but a habit. ~ Aristotle
11 Process Improvement Group MASCOT
12 Used TSP as a Framework Benefits of Using TSP Team communication has increased exponentially Weekly TSP project meetings; monthly TSP project lead reports and meetings with Sr. Management create a collaborative work environment Team planning includes all stakeholders Outputs of the TSP launch constitute the project plans. No need to generate additional shelf paper By using historical data, teams estimate more accurately TSP enables accurate scheduling
13 Used TSP to Increase Performance Increased software engineering productivity Decreased defect density Improved schedule variance (6 months delay to 1 week delay to on time delivery) Increased ability to estimate costs
14 A4.7.3 (Baseline) ASQ ** ASQ ASQ Percent Change (Baseline) SLOCS 27,880 36,690 42, n/a Productivity (SLOCs/Hr) Development Defects Test Defects (SPRs) Defects per KSLOCs Plan DT Release Actual DT Release % n/a n/a *** 5 2 n/a 4.6 1*** % **** 1/26/2004 9/20/ /20/2006 2/5/2004 1/20/2006 4/25/2007 * PSP and TSP training received by developer, no formal project initation. ** Formal initation of PSP/TSP process along with MSA specific processes. *** Final build testing incomplete, projected number of test defects estimated to be 37(1 per KSLOC) **** Many requirements changes throughout program caused excessive replanning, dates meaningless
15 Setting and Meeting Quality Goals Deliver a high-quality product to ST with Defect Density < 1.0 SPR's/KSLOC in ST assigned to be fixed Product Actual SLOC #SPRs Achieved Goal? ASQ ,176 0 Yes ASQ ,277 0 Yes USQ 78B ,311 1 Yes
16 Setting and Meeting Schedule Goals Meet schedule commitments - 98% confident that we will deliver within 2 standard deviations (sigma) of expected delivery (planned delivery + average error of 7%) Product Build Date/Week Planned 1 Sigma (68% Confidence) 2 Sigma (98% Confidence) Week Actual Achieved Goal? ASQ /2/ /30/ /21/ /19/ Yes 2 11/5/ /31/ /18/ /29/ Yes 3 2/18/ /14/ /2/ /25/ Yes 4 5/19/ /14/ /1/ /18/ Yes 5 5/19/ /14/ /1/ TBD 7/21/
17 Used TSP to Accelerate Level 4 Performance TSP satisfied many Level 4 practices Projects using TSP were performing Level 4 activities TSP measures were used for both process and product quality (size, time, defects, completion dates)
18 TSP Planned Quality Comes from the TSP Quality Guide Measure Goal Comments Percent Defect Free (PDF) Compile > 10% Unit Test > 50% Integration Test > 70% System Test > 90% Defects/KLOC: Total defects injected If not PSP trained, use 100 to 200. Compile < 10 All defects Unit Test < 5 All major defects (in source LOC) Integration Test < 0.5 All major defects (in source LOC) System Test < 0.2 All major defects (in source LOC) Defect Ratios Detailed design review defects /unit test defects > 2.0 All major defects (in source LOC) Code review defects/compile defects > 2.0 All major defects (in source LOC) Development Time Ratios Requirements inspection/requirements time > 0.25 Elicitation in requirements time High-level design inspection/high-level design time > 0.5 Design work only, not studies Detailed design/coding time > 1.00 Detailed design review/detailed design time > 0.5 Code review/code time > 0.5 Review and Inspection Rates Requirements pages/hour < 2 Single-spaced text pages High-level design pages/hour < 5 Formatted design logic Detailed design text lines/hour < 100 Pseudocode ~ equal to 3 LOC Code LOC/hour < 200 Logical LOC
19 TSP Standard Operating Procedure for P-3 SSA Historical data used for all planning New members trained in PSP & TSP Team owns their processes Processes are continuously improved Launch Prep Launch Process Development Processes
20 Size Time Dates Defects How it All Comes Together Set TSP Project Quality Goals Record TSP Data Review SumQ (Actual & Planned Quality) at Postmortems Document and Update Organizational Quality Goals Based on Postmortem Data Use Maintained Organizational Quality Goals as Expected Goals for New Projects What you are doing today What you need for Level 4
21 Lessons Learned Develop a Process Improvement culture Keep the team informed and involved Use PSP/TSP and allow teams to tailor processes and templates based on what makes sense for them Recognize that not everyone needs to understand the model - Allow PATs to document what they do - Assign a process improvement lead to perform a gap analysis using the model and work with PATs to fill the gaps Ensure that PATs communicate early and often Network Create simple databases and spreadsheets to use for tracking training data, etc. Establish a central repository for process assets and institute standard nomenclatures for artifacts as early as possible
22 In Memory of Our Friend & Colleague Carol Karel, P-3 SSA Lead
23 Contact Information Julie Switzer, NAVAIR P-3 Program Office Phone: Orville Starnes, Advanced Information Services Phone:
24 QUESTIONS?
Quantitative Project Management Framework via Integrating
Quantitative Project Management Framework via Integrating Six Sigma and PSP/TSP Sejun Kim, BISTel Okjoo Choi, Jongmoon Baik, Abstract: Process technologies such as Personal Software Process SM (PSP) and
The Team Software Process SM (TSP SM )
The Team Software Process SM (TSP SM ) Watts S. Humphrey November 2000 TECHNICAL REPORT CMU/SEI-2000-TR-023 ESC-TR-2000-023 Pittsburgh, PA 15213-3890 The Team Software Process SM (TSP SM ) CMU/SEI-2000-TR-023
Using the Agile Methodology to Mitigate the Risks of Highly Adaptive Projects
Transdyne Corporation CMMI Implementations in Small & Medium Organizations Using the Agile Methodology to Mitigate the Risks of Highly Adaptive Projects Dana Roberson Quality Software Engineer NNSA Service
Distributed and Outsourced Software Engineering. The CMMI Model. Peter Kolb. Software Engineering
Distributed and Outsourced Software Engineering The CMMI Model Peter Kolb Software Engineering SEI Trademarks and Service Marks SM CMM Integration SCAMPI are service marks of Carnegie Mellon University
Capability Maturity Model Integration (CMMI SM ) Fundamentals
Capability Maturity Model Integration (CMMI SM ) Fundamentals Capability Maturity Model Integration and CMMI are are service marks of Carnegie Mellon University 2008, GRafP Technologies inc. 1 What is
Implementing CMMI for High-Performance
Implementing CMMI for High-Performance CMMI Made Practical London, January 2009 Topics Maturity and performance A high-performance improvement solution SEI support 2 Maturity Levels and Performance Many
SEI Level 2, 3, 4, & 5 1 Work Breakdown Structure (WBS)
SEI Level 2, 3, 4, & 5 1 Work Breakdown Structure (WBS) 1.0 SEI Product 1.1 SEI Level 2 Product 1.1.1 SEI Level 2 Process 1.1.1.1 Requirements Management Process 1.1.1.2 Software Project Planning Process
Agile, TSP SM, CMMI pick one, pick two, pick all three!
1 Agile, TSP SM, CMMI pick one, pick two, pick all three! Daniel M. Roy Cape Town SPIN 20 February, 2008 PSP, TSP, Personal Software Process and Team Software Process are service marks of CMU CMM is and
Plan-Driven Methodologies
Plan-Driven Methodologies The traditional way to develop software Based on system engineering and quality disciplines (process improvement) Standards developed from DoD & industry to make process fit a
Rapidly Defining a Lean CMMI Maturity Level 3 Process
Rapidly Defining a Lean CMMI Maturity Level 3 Process Zia Tufail, [email protected], 301.233.4228 Julie Kellum, [email protected], 404.731. 52.63 Tim Olson-QIC, [email protected], 760.804.1405 2004 Hewlett-Packard
Using CMMI Effectively for Small Business Panel
Using CMMI Effectively for Small Business Panel (With interactive discussion from panel and audience recorded in slides) NDIA CMMI Working Group NDIA Systems Engineering Division 2010 CMMI Technology Conference
The Personal Software Process (PSP) Tutorial
The Personal Software Process (PSP) Tutorial Watts Humphrey / Jim Over Speaker: Daniel M. Roy (STPP, visiting scientist SEI) Software Engineering Institute Carnegie Mellon University Pittsburgh, PA 15213
Extending CMMI Level 4/5 Organizational Metrics Beyond Software Development
Extending CMMI Level 4/5 Organizational Metrics Beyond Software Development CMMI Technology Conference and User Group Denver, Colorado 14-17 November 2005 Linda Brooks Northrop Grumman Corporation Topics
Software and Systems Engineering. Software and Systems Engineering Process Improvement at Oerlikon Aerospace
SYMPOSIUM at Claude Y. Laporte OA - Process Engineering Nicola R. Papiccio OA - Software Engineering AGENDA Introduction Software Engineering Process s Engineering Process Management of of Change Lessons
Personal Software Process (PSP)
Personal Software Process (PSP) Application of CMM principles to individuals Developed by Watts Humphrey of the Software Engineering Institute (SEI) in the early 1990s Extensive supporting materials: books,
Statistical Tune-Up of the Peer Review Engine to Reduce Escapes
Statistical Tune-Up of the Peer Review Engine to Reduce Escapes Tom Lienhard, Raytheon Missile Systems Abstract. Peer reviews are a cornerstone to the product development process. They are performed to
Measurement Strategies in the CMMI
Measurement Strategies in the CMMI International Software Measurement & Analysis Conference 9-14 September 2007 Rick Hefner, Ph.D. Director, Process Management Northrop Grumman Corporation One Space Park,
Software Project Management and Support - Practical Support for CMMI -SW Project Documentation: Using IEEE Software Engineering Standards
Software Project Management and Support - Practical Support for CMMI -SW Project Documentation: Using IEEE Software Engineering Standards John Walz The Sutton Group IEEE Computer Society Standards Activities
SW Process Improvement and CMMI. Dr. Kanchit Malaivongs Authorized SCAMPI Lead Appraisor Authorized CMMI Instructor
SW Process Improvement and CMMI Dr. Kanchit Malaivongs Authorized SCAMPI Lead Appraisor Authorized CMMI Instructor Topics of Presentation Why improvement? What is CMMI? Process Areas and Practices in CMMI
CMMI Level 5 and the Team Software Process. Dr. Gene Miluk Software Engineering Institute
Software Engineering Technology CMMI Level 5 and the Team Software Process David R. Webb 309th Software Maintenance Group Dr. Gene Miluk Software Engineering Institute Jim Van Buren The Charles Stark Draper
Assignment Kits. Summary Kit Contents Lecture 1: Kit cover sheet (page 40)
Assignment Kits These assignment kits contain the forms students need to do the assignments in the textbook A Discipline for Software Engineering by Watts S. Humphrey. In using them: - Provide each student
How To Understand And Understand The Cmm
W H I T E P A P E R SEI's Capability Maturity Model Integrated (CMMI) Relative to ICM's CMII (Rev B) SUMMARY CMMI is built on a set of integrated processes and includes CM as a supporting process. The
Introduction to the CMMI Acquisition Module (CMMI-AM)
Pittsburgh, PA 15213-3890 Introduction to the CMMI Acquisition Module (CMMI-AM) Module 2: CMMI-AM and Project Management SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University.
The Software Engineering. Today and in the Future. Software Engineering Institute Carnegie Mellon University Pittsburgh, PA 15213
The Software Engineering Institute t (SEI): Today and in the Future Software Engineering Institute Carnegie Mellon University Pittsburgh, PA 15213 Paul D. Nielsen 1 May 2008 Software Engineering Institute
What do you think? Definitions of Quality
What do you think? What is your definition of Quality? Would you recognise good quality bad quality Does quality simple apply to a products or does it apply to services as well? Does any company epitomise
Manage the acquisition of products from suppliers for which there exists a formal agreement.
Manage the acquisition of products from suppliers for which there exists a formal agreement. Establish Supplier Agreements (SG 1) Supplier Requirements Supplier Agreements s Satisfy Supplier Agreements
Managing Process Architecture and Requirements in a CMMI based SPI project 1
Managing Process Architecture and Requirements in a CMMI based SPI project 1 Author: Filippo Vitiello Abstract When developing or changing a process, and all its related assets, often the process engineers
Software Quality Management
Software Lecture 9 Software Engineering CUGS Spring 2011 Kristian Sandahl Department of Computer and Information Science Linköping University, Sweden A Software Life-cycle Model Which part will we talk
Towards a new approach of continuous process improvement based on CMMI and PMBOK
www.ijcsi.org 160 Towards a new approach of continuous process improvement based on CMMI and PMBOK Yassine Rdiouat 1, Naima Nakabi 2, Khadija Kahtani 3 and Alami Semma 4 1 Department of Mathematics and
Risk Repository. Prepare for Risk Management (SG 1) Mitigate Risks (SG 3) Identify and Analyze Risks (SG 2)
Identify potential problems before they occur, so that riskhandling activities may be planned and invoked as needed across the life of the product or project to mitigate adverse impacts on achieving objectives.
Aligning CMMI & ITIL. Where Am I and Which Way Do I Go? 2006 - cognence, inc.
Aligning CMMI & ITIL Where Am I and Which Way Do I Go? 2006 - cognence, inc. Agenda Where Am I? Current Situation Process Improvement Objectives How Do I Get There? CMMI ITIL Mapping, Commonalities, Differences
Leveraging CMMI framework for Engineering Services
Leveraging CMMI framework for Engineering Services Regu Ayyaswamy, Mala Murugappan Tata Consultancy Services Ltd. Introduction In response to Global market demand, several OEMs adopt Global Engineering
MKS Integrity & CMMI. July, 2007
& CMMI July, 2007 Why the drive for CMMI? Missed commitments Spiralling costs Late delivery to the market Last minute crunches Inadequate management visibility Too many surprises Quality problems Customer
Case Study of CMMI implementation at Bank of Montreal (BMO) Financial Group
Case Study of CMMI implementation at Bank of Montreal (BMO) Financial Group Background Started in 1817, Bank of Montreal - BMO Financial Group (NYSE, TSX: BMO) is a highly diversified financial services
CONTENTS. Preface. Acknowledgements. 1. Introduction and Overview 1 Introduction 1 Whatis the CMMI"? 2 What the CMMI* is Not 3 What are Standards?
Preface Acknowledgements xi xiii 1. Introduction and Overview 1 Introduction 1 Whatis the CMMI"? 2 What the CMMI* is Not 3 What are Standards? 3 2. Summaryof CMMI-SW 5 The CMM*-SW 5 CMMI--SW Continuous
Engineering Standards in Support of
The Application of IEEE Software and System Engineering Standards in Support of Software Process Improvement Susan K. (Kathy) Land Northrop Grumman IT Huntsville, AL [email protected] In Other Words Using
CMMI Version 1.2. SCAMPI SM A Appraisal Method Changes
Pittsburgh, PA 15213-3890 CMMI Version 1.2 SCAMPI SM A Appraisal Method Changes SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University. Capability Maturity Model, Capability
Software Engineering: Analysis and Design - CSE3308
CSE3308/DMS/2004/25 Monash University - School of Computer Science and Software Engineering Software Engineering: Analysis and Design - CSE3308 Software Quality CSE3308 - Software Engineering: Analysis
CMMI Level 5 Processes Make it Easy to Define and Deploy Measurable, Achievable Goals to Your Organization
CMMI Level 5 Processes Make it Easy to Define and Deploy Measurable, Achievable Goals to Your Organization SEPG 2005 Conference Raytheon Company Jim Stubbe March 2005 1-2004 Raytheon Company. All rights
Sustainable Software Development in Agile and CMMI: Apply Lessons Learned today
Sustainable Software Development in Agile and CMMI: Apply Lessons Learned today 2009 What is the CMMI Level 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed 1 Initial Focus Continuous Process
ORACLE NAIO Excellence combined with Quality A CMMI Case study
CASE STUDY ORACLE NAIO Excellence combined with Quality A CMMI Case study softwaredi xide com www.qaiasia.com THE CLIENT Process and Quality are important for measuring improvement. Improvement means different
Applying Agile Techniques to Process Development: Lessons Learned
Your Catalyst to Enhanced Awareness Process Technology Results Applying Agile Techniques to Process Development: Lessons Learned Nelson Perez March 25 & April 22, 2008 Topics (Agile Development) Defined
Process Improvement. From the Software Engineering Institute:
Process Improvement From the Software Engineering Institute: The Software Capability Maturity Model (SW-CMM, CMMI) (Especially CMMI V1.1 Tutorial) The Personal Software Process (PSP) (Also see The Team
Using Rational Software Solutions to Achieve CMMI Level 2
Copyright Rational Software 2003 http://www.therationaledge.com/content/jan_03/f_cmmi_rr.jsp Using Rational Software Solutions to Achieve CMMI Level 2 by Rolf W. Reitzig Founder, Cognence, Inc. Over the
CMMI: Specific Goals and Practices
Software Engineering for Outsourced & Offshore Development CMMI: Specific Goals and Practices PeterKolb Software Engineering CMMI Process Areas for R&D Projects Slide 2 Content Management in Projects Project
The Team Software Process SM (TSP SM ) in Practice: A Summary of Recent Results
The Team Software Process SM (TSP SM ) in Practice: A Summary of Recent Results Noopur Davis Julia Mullaney September 2003 TECHNICAL REPORT CMU/SEI-2003-TR-014 ESC-TR-2003-014 Pittsburgh, PA 15213-3890
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
The Compelling Case For CMMI-SVC: CMMI-SVC, ITIL & ISO20000 demystified
The Compelling Case For CMMI-SVC: CMMI-SVC, ITIL & ISO20000 demystified T: 01748 821824 E: [email protected] Agenda What is CMMI-SVC? How Does CMMI-SVC Relate to Existing Models? CMMI-SVC and ISO 20000
Project Management. 06 Requirements Management. IT M a t u r i t y. S e r v i c e s
Malte Foegen Project Management 06 Management IT M a t u r i t y S e r v i c e s Good Practices for Teaching Groups Good Practices Discuss in the teams Ask and discuss immediately do not wait until the
Reaching CMM Levels 2 and 3 with the Rational Unified Process
Reaching CMM Levels 2 and 3 with the Rational Unified Process Rational Software White Paper TP174 Table of Contents INTRODUCTION... 1 LEVEL-2, REPEATABLE... 3 Requirements Management... 3 Software Project
HOW TO CREATE USEFUL SOFTWARE PROCESS DOCUMENTATION ABSTRACT
HOW TO CREATE USEFUL SOFTWARE PROCESS DOCUMENTATION Linda Westfall The Westfall Team [email protected] 3000 Custer Road, Suite 270, PMB 383 Plano, TX 75075 ABSTRACT Whether our organization is
Integrating Quality Assurance into the Software Development Life Cycle
Integrating Quality Assurance into the Software Development Life Cycle Leslie Tierstein, STR LLC Hilary Benoit, W R Systems W R Systems, Ltd. 1 Overview (1) Why bother with QA? QA and the SEI CMM/CMMI
CMMi and Application Outsourcing
White Paper CMMi and Application Outsourcing Abstract A lot of applications outsourcing providers in the market today are claiming for being assessed in different maturity levels of CMMi. But it is important
Concept of Operations for the Capability Maturity Model Integration (CMMI SM )
Concept of Operations for the Capability Maturity Model Integration (CMMI SM ) August 11, 1999 Contents: Introduction CMMI Overview Concept for Operational Use of the CMMI Migration to CMMI Models Concept
Knowledge Infrastructure for Project Management 1
Knowledge Infrastructure for Project Management 1 Pankaj Jalote Department of Computer Science and Engineering Indian Institute of Technology Kanpur Kanpur, India 208016 [email protected] Abstract In any
CMMI KEY PROCESS AREAS
CMMI KEY PROCESS AREAS http://www.tutorialspoint.com/cmmi/cmmi-process-areas.htm Copyright tutorialspoint.com A Process Area is a cluster of related practices in an area that, when implemented collectively,
Software Engineering. Standardization of Software Processes. Lecturer: Giuseppe Santucci
Software Engineering Standardization of Software Processes Lecturer: Giuseppe Santucci Summary Introduction to Process Models The Capability Maturity Model Integration The ISO 12207 standard for software
Process and Procedure Definition: A Primer
Process and Procedure Definition: A Mike Bandor Member of the Technical Staff Acquisition Support Program [email protected] Overview What is a process? Definitions Varieties of Processes & Procedures
TMP3413 Software Engineering Lab. Lecture 01: Team Software Process Overview
TMP3413 Software Engineering Lab Lecture 01: Team Software Process Overview Topics Working in teams What is TSP? TSP objectives & principles TSP design Team member roles TSP launch TSP project tracking
Match point: Who will win the game, ITIL or CMMI-SVC? NA SEPG 2011 Paper Presentation
Match point: Who will win the game, ITIL or CMMI-SVC? NA SEPG 2011 Paper Presentation Anju Saxena John Maher IT Process and Service Management Global Consulting Practice ITIL is a Registered Trade Mark,
CMMI for Development Introduction & Implementation Roadmap
www.businessbeam.com CMMI for Development Introduction & Implementation Roadmap Business Beam (Pvt.) Limited Today 1 About CMMI for Development 2 Implementation Roadmap 3 CMMI & Business Beam 2 About CMMI
IMPLEMENTATION OF A SOFTWARE PROJECT OFFICE AT HONEYWELL AIR TRANSPORT SYSTEMS. by Michael A. Ross
IMPLEMENTATION OF A SOFTWARE PROJECT OFFICE AT HONEYWELL AIR TRANSPORT SYSTEMS by Michael A. Ross Abstract. This paper justifies, defines and describes an organization-level software project management
The Software Development Life Cycle: An Overview. Last Time. Session 8: Security and Evaluation. Information Systems Security Engineering
The Software Development Life Cycle: An Overview Presented by Maxwell Drew and Dan Kaiser Southwest State University Computer Science Program Last Time Brief review of the testing process Dynamic Testing
CDC UNIFIED PROCESS PRACTICES GUIDE
Document Purpose The purpose of this document is to provide guidance on the practice of Quality Management and to describe the practice overview, requirements, best practices, activities, and key terms
Capability Maturity Model Integration (CMMI ) Version 1.2 Overview
Capability Maturity Model Integration (CMMI ) Version 1.2 Overview SM CMM Integration, IDEAL, Personal Software Process, PSP, SCAMPI, SCAMPI Lead Appraiser, Team Software Process, and TSP are service marks
Capability Maturity Model Integration (CMMI ) Overview
Pittsburgh, PA 15213-3890 Capability Maturity Model Integration ( ) Overview SM CMM Integration, SCAMPI, SCAMPI Lead Appraiser, and SEI are service marks of Carnegie Mellon University., Capability Maturity
Implementing a Personal Software Process (PSP SM ) Course: A Case Study
Journal of Software Engineering and Applications, 212, 5, 639-644 http://dx.doi.org/1.4236/jsea.212.5874 Published Online August 212 (http://www.scirp.org/journal/jsea) 639 Implementing a Personal Software
The V-Model. Prepared for. Prepared by. Christian Bucanac [email protected] Software Engineering Student, University Of Karlskrona/Ronneby
Course: Quality Management, DPT404 Teacher: Conny Johansson Department: IDE, University Of Karlskrona/Ronneby The V-Model Prepared for Conny Johansson [email protected] IDE, University Of Karlskrona/Ronneby
Synergism of the CMMI Development and Services Constellations in a Hybrid Organization
Overview Presentation Synergism of the CMMI Development and Services Constellations in a Hybrid Organization SM CMMI (Capability Maturity Model Integration) and SCAMPI (Standard CMMI Appraisal Method for
Enterprise Application Security Program
Enterprise Application Security Program GE s approach to solving the root cause and establishing a Center of Excellence Darren Challey GE Application Security Leader Agenda Why is AppSec important? Why
NDIA CMMI Technology Conference and User Group NASA Experience with CMM and CMMI
NDIA CMMI Technology Conference and User Group NASA Experience with CMM and CMMI November, 2010 John C. Kelly & Tim Crumbley Office of Chief Engineer Outline NASA s experience with CMMI model NASA s CMMI
Data Management Maturity (DMM) Model Update
Data Management Maturity (DMM) Model Update Rawdon Young November 2012 Software Engineering Institute Carnegie Mellon University Pittsburgh, PA 15213 Contents / Agenda The DMM SEI Observations on Core
A Survey of Plan-Driven Development Methodologies
A Survey of Plan-Driven Development Methodologies Plan-driven methodologies have been utilized by organizations for many years. In this chapter, we provide an overview of three prominent, modern plan-driven
How to measure the ROI of SPI as early as possible
How to measure the ROI of SPI as early as possible Jan Jaap Cannegieter Vice President SYSQA B.V. Almere Quality Assurance in ICT / 1 Agenda Measuring the benefits of SPI Reasons for implementing reviews
ReMilNet Service Experience Overview
ReMilNet Service Experience Overview ReMilNet s knowledge across all functional service areas enables us to provide qualified personnel with knowledge across the spectrum of support services. This well
Interpreting Capability Maturity Model Integration (CMMI ) for Service Organizations a Systems Engineering and Integration Services Example
Interpreting Capability Maturity Model Integration (CMMI ) for Service Organizations a Systems Engineering and Integration Services Example Mary Anne Herndon, SAIC Robert Moore, SAIC Mike Phillips, Software
Verification and Validation of Software Components and Component Based Software Systems
Chapter 5 29 Verification and Validation of Software Components and Component Based Christina Wallin Industrial Information Technology Software Engineering Processes ABB Corporate Research [email protected]
STATE OF MICHIGAN PROCESS AND PRODUCT QUALITY ASSURANCE (PPQA) PROCESS MANUAL State Unified Information Technology Environment (SUITE)
STATE OF MICHIGAN PROCESS AND PRODUCT QUALITY ASSURANCE (PPQA) PROCESS MANUAL State Unified Information Technology Environment (SUITE) Michigan Department of Technology, Management & Budget www.michigan.gov/suite
The Capability Maturity Model for Software, Version 1.1
The Capability Maturity Model for Software, Version 1.1 Mark C. Paulk xxx 1998 Carnegie Mellon University Pittsburgh, PA 15213-3890 Sponsored by the U.S. Department of Defense. 1997 by Carnegie Mellon
Capability Maturity Model Integration (CMMI)
COPYRIGHT 2011 IJCIT, ISSN 2078-5828 (PRINT), ISSN 2218-5224 (ONLINE), VOLUME 02, ISSUE 01, MANUSCRIPT CODE: IJCIT-110748 Capability Maturity Model Integration (CMMI) Anasis Majumdar, Muhammad Ashiqe-Ur-Rouf,
CS 1632 SOFTWARE QUALITY ASSURANCE. 2 Marks. Sample Questions and Answers
CS 1632 SOFTWARE QUALITY ASSURANCE 2 Marks Sample Questions and Answers 1. Define quality. Quality is the degree of goodness of a product or service or perceived by the customer. Quality concept is the
Lessons Learned from Adopting CMMI for Small Organizations
Carnegie Mellon Software Engineering Institute Pittsburgh, PA 15213-3890 Lessons Learned from Adopting CMMI for Small Organizations Sponsored by the U.S. Army Aviation and Missile Research, Development
Integrated Project and Process Management A Cornerstone for the CMMI
Integrated Project and Process Management A Cornerstone for the CMMI Dennis J. Frailey [email protected] Copyright 2005, Dennis J. Frailey IEEE Long Island Objective To discuss what integrated process
Process In Execution Review (PIER) and the SCAMPI B Method
Process In Execution Review (PIER) and the SCAMPI B Method Lorraine Adams, SEI Lynda Rosa, MITRE Fred Schenker, SEI Dale Swanson, MITRE November 17, 2005 Sponsored by the U.S. Department of Defense SM
Foredragfor Den Norske Dataforening, den 08.10.2003
Foredragfor Den Norske Dataforening, den 08.10.2003 CMM, CMMI and ISO 15504 (SPICE) Bruk av modenhetsmodeller under programmvareutvikling, er det nøkkelen til suskess? Malte Foegen, Jürgen Richter IT Maturity
Software Quality Data Part 1: Basic and Derived Metrics
Abstract We measure, quantify and report on software quality. But can we control it? Can we actually assure quality (as opposed to just measuring it)? This is the first of three papers in which we will
CMS Policy for Capability Maturity Model Integration (CMMI)
Chief Information Officer Office of Information Services Centers for Medicare & Medicaid Services CMS Policy for Capability Maturity Model Integration (CMMI) December 2006 Document Number: CMS-CIO-POL-CMMI01-01
EXHIBIT L. Application Development Processes
EXHIBIT L Application Development Processes Optum Development Methodology Development Overview Figure 1: Development process flow The Development phase consists of activities that include the building,
The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.
CAPACITY AND AVAILABILITY MANAGEMENT A Project Management Process Area at Maturity Level 3 Purpose The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision
Life Cycle Models, CMMI, Lean, Six Sigma Why use them?
Life Cycle Models, CMMI, Lean, Six Sigma Why use them? John Walz IEEE Computer Society, VP for Standards QuEST Forum Best Practices Conference Track 3 What, Where, How & Why Monday, 24-Sep-07, 4:30 5:30
2003 Patricia Ensworth Page 1
1 1 Sample software development project 2 1.1 Start project 3 1.2 Initiation phase 4 1.2.1 Develop project charter 5 1.2.2 Project charter approved 6 1.3 Planning phase 7 1.3.1 Product activities 8 1.3.1.1