Verification for compliance with United States regulations on the outer continental shelf

Size: px
Start display at page:

Download "Verification for compliance with United States regulations on the outer continental shelf"

Transcription

1 SERVICE SPECIFICATION DNVGL-SE-0003: Verification for compliance with United States regulations on the outer continental shelf The content of this service document is the subject of intellectual property rights reserved by ( DNV GL ). The user accepts that it is prohibited by anyone else but DNV GL and/or its licensees to offer and/or perform classification, certification and/or verification services, including the issuance of certificates and/or declarations of conformity, wholly or partly, on the basis of and/or pursuant to this document whether free of charge or chargeable, without DNV GL s prior written consent. DNV GL is not responsible for the consequences arising from any use of this document by others. The electronic pdf version of this document found through is the officially binding version. The documents are available free of charge in PDF format.

2 FOREWORD The service specifications lay down procedural requirements for obtaining and retaining certificates and other conformity statements to the objects in question Any comments may be sent by to This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document, and is believed to reflect the best of contemporary technology. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document.

3 CHANGES CURRENT General This is a new document. On 12 September 2013, DNV and GL merged to form DNV GL Group. On the 25th of November 2013 Det Norske Veritas AS became the 100% shareholder of Germanischer Loyd SE, the parent company of the GL Group, and on 27th November 2013 Det Norske Veritas AS, company registration number , changed its name to. For further information, see Any reference in this document to Det Norske Veritas AS, Det Norske Veritas, DNV, GL, Germanischer Loyd SE, GL Group or any other legal entity name or trading name presently owned by the DNV GL Group shall therefore also be considered a reference to. Changes current Service specification DNVGL-SE-0003: Page 3

4 CONTENTS CHANGES CURRENT... 3 CH. 1 PRINCIPLES AND PROCEDURES... 6 Sec.1 Introduction Introduction General Objective Scope Structure Definitions Verbal forms DNV GL definitions References General Abbreviations...10 Sec.2 Regulatory basis and legal provisions Regulatory basis principles Jurisdictions OCS facilities Code of federal regulations Alternate design and equipment standards Regulatory considerations for FOIs and FPSOs Equivalent design and construction considerations Classification principles General Classification of FOIs and FPSOs including FSOs Class notations Main character of class Basic design notations Service notations (US)-notation General Compliance matrix for OCS...14 Contents CH. 2 DESIGN AND CONSTRUCTION PROVISIONS Sec.1 Introduction General General...16 Sec.2 Floating offshore installations Introduction Application Class notations Compliance matrix Application Compliance matrix for floating offshore installations with (US) Notation Service specification DNVGL-SE-0003: Page 4

5 Sec.3 Floating storage units and floating production, storage and offloading units Introduction Application Class notations Compliance matrix Application Compliance basis for FSO and FPSO Unit (US)...21 Sec.4 Equivalencies and other design considerations (informative) General Passive ballast system: External impact load on hull Fire protection boundaries Platform verification program by a certified verification agent General Scope of assessment...24 App. A United States Coast Guard policy letter Contents Service specification DNVGL-SE-0003: Page 5

6 CHAPTER 1 PRINCIPLES AND PROCEDURES SECTION 1 INTRODUCTION 1 Introduction DNV GL Offshore Classification provides assurance that a set of requirements laid down in the rules established by DNV GL are met during design and construction and maintained during operation of an offshore unit or installation. Classification has gained worldwide recognition as representing an adequate level of safety and quality. Wherever possible DNV GL offers additional, integrated services to assist clients toward fulfilling coastal state legislation, giving credit for classification activities. Chapter 1 Section 1 2 General 2.1 Objective This document outlines an alternative regulatory roadmap for owners and operators of floating offshore installation (FOI), floating storage units (FSO) and floating production, storage and offloading units (FPSO) wishing to engage in outer continental shelf (OCS) activities in the US Gulf of Mexico. The roadmap uses DNV GL classification rules and services as a building block, and identifies additional United States coast guard (USCG) design and equipment requirements for these units that are not otherwise covered by the rules. Compliance with the appropriate DNV GL classification notations and supplemental USCG requirements described herein, provide an equivalent level of safety to the USCG s design and equipment requirements prescribed in the code of federal regulations. 2.2 Scope This document outlines a class based verification scheme for US compliance for offshore objects of the following types: Floating Offshore Installations (FOI) Floating Storage Units (FSO) Floating Production, Storage, and Offloading Units (FPSO) This document does not address regulatory requirements under the jurisdiction of the Bureau of Safety and Environmental Enforcement (BSEE). Guidance note: MMS/USCG Memorandum of Agreement OCS-04, dated February 28, 2008, identifies the lead agency for systems and subsystems associated with floating OCS facilities. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e Structure This document is divided into two main chapters and an appendix: Ch.1: General information about principles, procedures and legal provisions for meeting an equivalent level of safety to the USCG requirements for FOIs, FSOs and FPSOs meant to operate on the US OCS. Ch.2: Design and equipment requirements for meeting an equivalent level of safety to the USCG requirementsfor FOIs, FSOs and FPSOs operating in the US OCS. The chapter also includes an informative section on equivalencies and design considerations. App.A: United States Coast Guard Policy letter. Service specification DNVGL-SE-0003: Page 6

7 3 Definitions 3.1 Verbal forms Table 1 Verbal forms Term Shall Should May Definition Verbal form used to indicate requirements strictly to be followed in order to conform to the document. Verbal form used to indicate that among several possibilities one is recommended as particularly suitable, without mentioning or excluding others, or that a certain course of action is preferred but not necessarily required. Verbal form used to indicate a course of action permissible within the limits of the document. 3.2 DNV GL definitions Approval or approved: Denotes acceptance by DNV GL of documentation showing design solutions, arrangements and/or equipment to comply with the rules. Chapter 1 Section Assessment: An act of assessing, appraising or evaluating a condition of a product, process or system Certificate: A document confirming compliance with the Society s rules or with other rules and regulations for which the Society has been authorized to act Certification: a service confirming compliance with applicable requirements on the date that the survey was completed Certification of Materials and Components (CMC): the activity of ensuring that materials, equipment and components considered critical for the installation have undergone a certification process for compliance with applicable Code and Standards, Class: Class is assigned to and will be retained by units complying with applicable requirements of the Society s rules Classification: A service which comprises the development of independent technical standards for offshore units class rules and standards, and verification of compliance with the rules and standards throughout the units life Classification certificate: Issued upon assignment or renewal of class. Its validity is five years subject to successful completion of annual and intermediate surveys Client: The party having requested classification or having assumed ownership of a classed offshore unit or installation. In cases where owners have authorised another party to operate the unit or installation on their behalf, such party is regarded as the client Contract: The specific agreement between DNV GL and the customer. It defines the extent of services requested by the customer, and is concerned with: the classification of offshore units or installations, both new buildings and in operation statutory work carried out on behalf of national maritime authorities equipment and materials Customer: Signifies the party who has requested the Society s service Floating offshore Installation (FOI): A buoyant OCS facility securely and substantially moored so that it cannot be moved without a special effort. This term includes tension leg platforms and permanently moored semisubmersibles or shipshaped hulls, but does not include mobile offshore drilling units Guidance note: Contain advice which is not mandatory for the assignment or retention of class, but with which the Society, in light of general experience, advises compliance Offshore installation: A collective term to cover any construction, buoyant or non-buoyant, designed and built for installation at a particular offshore location. Service specification DNVGL-SE-0003: Page 7

8 Owner: In the context of this Offshore Service Specification, the Owner is defined as the party responsible for the offshore unit or installation including its operation and safety Recognised classification society: A classification society which is a full or associate member of IACS. 4 References 4.1 General This Offshore Service Specification includes references to other DNV GL documents and regulations, codes and standards which shall be used in conjunction with the requirements given herein, for classification of FOIs, FSOs and FPSOs in the US OCS and for partial compliance with the USCG requirements Legacy DNV documents referred to are given in Table 2. Chapter 1 Section 1 Table 2 DNV GL References Reference DNV-OSS-102 DNV-OS-A101 DNV-OS-B101 DNV-OS-C102 DNV-OS-C103 DNV-OS-C104 DNV-OS-C105 DNV-OS-C106 DNV-OS-C201 DNV-OS-C301 DNV-OS-C401 DNV-OS-D101 DNV-OS-D201 DNV-OS-D202 DNV-OS-D301 DNV-OS-E201 DNV-OS-E301 DNV-OS-E401 Title Rules for Classification of Floating Production, Storage and Loading Units Safety Principles and Arrangements Metallic Materials Structural Design of Offshore Ships Structural Design of Column-Stabilised Units (LRFD method) Structural Design of Self-Elevating Units (LRFD method) Structural Design of TLPs (LRFD method) DNV-OS-C106 Structural Design of Deep Draught Floating Units (LRFD method) Structural Design of Offshore Units (WSD method) Stability and Watertight Integrity Fabrication and Testing of Offshore Structures Marine and Machinery Systems and Equipment Electrical Installations Automation, Safety, and Telecommunication Systems Fire Protection Oil and Gas Processing Systems Position Mooring Helicopter Decks Other standards and regulatory basis references for compliance as referred to herein are given in Table 3. Only parts referred to in the main text of this document or CG-ENG Policy Letter No are applicable. Table 3 Other references Reference American National Standards Institute (ANSI) UL 674 ANSI/UL 823 ANSI/UL 844 Title Standard for Electric Motors and Generators for Use in Division 1 Hazardous (Classified) Locations, Fifth Edition (dated May 31, 2011) ( ANSI/UL 674 ) Standard for Electric Heaters for Use in Hazardous (Classified) Locations, Ninth Edition including revisions through November 15, 2007 (dated October 20, 2006) Standard for Luminaires for Use in Hazardous (Classified) Locations, Thirteenth Edition (dated June 29, 2012) ( ANSI/UL 844 ) ANSI/UL 913 Standard for Intrinsically Safe Apparatus and Associated Apparatus for Use in Class I, II, and III, Division 1, Hazardous Locations, Seventh Edition including revisions through June 3, 2010 (dated July 31, 2006) ANSI/ISA (UL 1604) Non-Incendive Electrical Equipment for Use in Class I and II, Division 2 and Class III, Division 1 and 2 Hazardous (Classified) Locations Service specification DNVGL-SE-0003: Page 8

9 Table 3 Other references (Continued) Reference ANSI/UL 1203 ANSI/UL 2225 ISA (IEC through 5 Mod) ISA ( ) American Petroleum Institute (API) Recommended Practice (RP) 2FPS API RP 2T Standard for Explosion-Proof and Dust-Ignition-Proof Electrical Equipment for Use in Hazardous (Classified) Locations, Fourth Edition including revisions through October 28, 2009 (dated September 15, 2006) Standard for Cables and Cable-Fittings for Use in Hazardous (Classified) Locations, Third Edition February 25, 2011 Performance Requirements for Combustible Gas Detectors Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen Planning, Designing, and Constructing Floating Production Systems, 2011, 2nd Ed. Planning, Designing, and Constructing Tension Leg Platforms, 2010, 3rd Ed API Standard 607 Fire Test for Quarter-turn Valves and Valves Equipped with Nonmetallic Seats, 2010, 6th Ed API RP 2SK Design and Analysis of Stationkeeping Systems for Floating Structures, 2005 API RP 500 API RP 505 API RP 14C (R2007) API RP 14G API RP 14J (R2007) ANSI/API RP 14F ASTM International Standard ASTM F (2007) Canadian Standards Association (CAN/CSA), CAN/CSA-C22.2 No. 0-M91 CAN/CSA-C22.2 No Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division I and Division 2, 2012 Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1 and Zone 2, 1998 Analysis, Design, Installation and Testing of Basic Surface Safety Systems on Offshore Production Platforms Recommended Practice for Fire Prevention and Control on Open Type Offshore Production Platforms, 2007 Recommended Practice for Design and Hazards Analysis for Offshore Production Facilities Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class 1, Division 1 and Division 2 Locations, 2008 Specification for Tank Vent Flame Arresters General Requirements - Canadian Electrical Code, Part II, July 1991, Reaffirmed 2006 Intrinsically Safe and Non-Incendive Equipment for Use in Hazardous Locations, June 2003, Reaffirmed 2006 C22.2 No. 30-M1986 Explosion-Proof Enclosures for Use in Class I Hazardous Locations, November 1988, Reaffirmed 2007 C22.2 No. 213-M1987 Non-Incendive Electrical Equipment for Use in Class I, Division 2 Hazardous Locations, March 1987, Reaffirmed 2008 Factory Mutual (FM) 3600 FM 3610 FM 3611 FM 3615 FM 3620 Approval Standard for Electric Equipment for use in Hazardous (Classified) Locations General Requirements, November 1998 Approval Standard for Intrinsically Safe Apparatus and Associated Apparatus for Use in Class I, II, and III, Division 1, Hazardous (Classified) Locations, January 2010 Approval Standard for Non-Incendive Electrical Equipment for Use in Class I and II, Division 2, and Class III, Divisions 1 and 2, Hazardous (Classified) Locations, December 2004 Approval Standard for Explosionproof Electrical Equipment General Requirements, August 2006 Approval Standard for Purged and Pressurized Electrical Equipment for Hazardous (Classified) Locations, August 2000 IEC Mobile and fixed offshore units- Electrical installations- Part 7: Hazardous areas, 2007 IEC Electrical installations in ships Part 502: Tankers- Special Features, 1999 IEC Title Explosive atmospheres Part 29-1: Gas detectors Performance requirements of detectors for flammable gases, 2007 Chapter 1 Section 1 Service specification DNVGL-SE-0003: Page 9

10 Table 3 Other references (Continued) Reference IEC IEC International Maritime Organization Maritime Safety Committee Circular MSC/ Circ.677 IMO Resolution A.1023(26) Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen, 2007 Electrical installations in ships Part: 504 Special features Control and instrumentation, 2001 Revised Standards for the Design, Testing and Locating of Devices to Prevent the Passage of Flame into Cargo Tankers, 1994, as amended Code for the Construction and Equipment of Mobile Offshore Drilling Units, 2009 (2009 MODU Code) IMO Resolution A.1021(26) Code on Alerts and Indicators, 2009 ISO 19921:2005 National Fire Protection Association (NFPA) 70 Title Ships and marine technology Fire resistance of metallic pipe components with resilient and elastomeric seals Test methods National Electrical Code, 2011 NFPA Standard 496 Standard for Purged and Pressurized Enclosures for Electrical Equipment, 2013 Chapter 1 Section 1 Guidance note: Unless noted otherwise the latest issue of the references given in [4] shall be used. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e--- 5 Abbreviations The abbreviations given in Table 4 are used in this document. Table 4 Abbreviations Abbreviation Full Name BSEE CFR CVA DHS FOI FPSO FSO GOM IMO MOU MODU MRA MSC MTSA OCS OCSLA OSS NVIC USCG Bureau of Safety and Environmental Enforcement Code of Federal Regulations Certified Verification Agent Department of Homeland Security Floating Offshore Installation Floating Production Storage and Offloading Floating Storage and Offloading Gulf of Mexico International Maritime Organisation Mobile Offshore Unit Mobile Offshore Drilling Unit Mutual Recognition Agreement Maritime Safety Center Maritime Transportation Security Act Outer Continental Shelf Outer Continental Shelf Lands Act Offshore Service Specification Navigation and Vessel Inspection Circular United States Coast Guard Service specification DNVGL-SE-0003: Page 10

11 SECTION 2 REGULATORY BASIS AND LEGAL PROVISIONS 1 Regulatory basis principles 1.1 Jurisdictions The USCG, within the Department of Homeland Security (DHS), has broad authority under the Outer Continental Shelf Lands Act (OCSLA) to regulate safety of life and property on Outer Continental Shelf (OCS) facilities and vessels engaged in OCS activities, and the safety of navigation. The USCG is also responsible for security regulations on OCS facilities, as specified under the Maritime Transportation Security Act (MTSA). Other regulatory agencies, such as the Bureau of Safety and Environmental Enforcement (BSEE) also share jurisdiction over OCS activities BSEE, within the Department of Interior, exercises safety and environmental enforcement functions related to OCS facilities, including but not limited to, developing regulations governing OCS operations, permitting, conducting inspections and investigations, enforcing regulatory requirements, assessing penalties, conducting research, and overseeing oil spill planning and preparedness. Although BSEE has applicable regulations for FOIs and FPSOs, this OSS deals with USCG requirements only. Chapter 1 Section 2 Guidance note: BSEE have requirements for platform and structures which are covered under 30 CFR 250 Subpart I. The verification scheme for this is covered under a platform verification program through a certified verification agent (CVA). The CVA verification scheme is defined under It may be mentioned that DNV GL is an authorized CVA and have conducted this role for BSEE for recent projects in the GOM OCS. Some aspects of this scope has been discussed in Ch.2 Sec.4. The main areas of BSEE requirements that are not covered by this specification are primarily related to production, safety and operations for the plant/ topsides. See Ch.2 Sec.4 [5.1] ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e OCS facilities Under OCSLA, an OCS activity is any activity associated with exploration, development, production, transportation via pipeline, storage, or processing of mineral resources, including hydrocarbons (e.g. oil, gas, condensate, and natural gas liquids), salt, sulphur, sand and gravel. An OCS facility is any artificial island, installation, pipeline, or other device permanently or temporarily attached to the seabed, erected for the purpose of exploring for, developing, producing, transporting via pipeline, storing, or processing mineral resources from the OCS. This term does not include ships or vessels for transporting produced hydrocarbons. The following are types of OCS facilities: Fixed OCS Facility: A bottom-founded OCS facility permanently affixed to the seabed or subsoil of the OCS, including platforms, guyed towers, articulated gravity platforms, and other structures. This definition also includes gravel and ice islands and caisson-retained islands engaged in OCS activities used for drilling, production, or both. Floating OCS Facility: A buoyant OCS facility securely and substantially moored so that it cannot be moved without special effort. This term includes tension leg platforms, spars, semi-submersibles, and ship-shaped hulls. Mobile Offshore Drilling Unit (MODU): Vessels capable of engaging in drilling operations for exploring or exploiting subsea oil, gas, or other mineral resource. 1.3 Code of federal regulations Commercial vessel safety standards for US flagged vessels, MODUs, floating facilities, and fixed facilities are published in Chapter 1 of Titles 33 and 46, Code of Federal Regulations (CFR). The regulations provide detailed guidance for the design, construction and operation of these units. Table 1 lists some of the CFR subchapters under Titles 33 and 46 that are applicable to MODUs, undocumented floating facilities and fixed facilities on the OCS. Table 2 lists subchapter with general applicability across all units operating on the OCS. Service specification DNVGL-SE-0003: Page 11

12 Table 1 Regulatory subchapters applicable to specific units CFR Title Subchapter Applicability 33 N Outer Continental Shelf Activities 46 D Tank Vessels 46 I-A Mobile Offshore Drilling Units Table 2 Regulatory subchapters with applicability across all units CFR Title Subchapter Applicability 33 O Pollution 46 F Marine Engineering 46 J Electrical Engineering 46 Q Equipment, Construction and Materials: Specification and Approval 46 S Stability Chapter 1 Section Alternate design and equipment standards The USCG has recognized that the design and technology of offshore facilities continue to advance at a rapid pace, and that existing US regulations do not address the current state of technology. Under 33 CFR , the USCG has the authority to accept alternative design and engineering standards if an equivalent level of safety is provided. Accordingly, the USCG published CG-ENG Policy Letter No , which prescribes alternate design and equipment standards for floating offshore installations (FOI) and floating production, storage, and offloading offshore units (FPSO) located on the US OCS. In general, the policy letter requires the floating unit to be classed by a classification society that is accepted by the USCG, and establishes requirements to be met in addition to the classification society s rules. A floating facility meeting the design and construction requirements of this policy letter is considered to meet a level of safety equivalent to that prescribed by 33 CFR The USCG reviews construction plans and conducts construction and periodic inspections of floating OCS facilities to ensure compliance with regulatory requirements. In 2007, the USCG agreed to accept plan review and inspection functions performed by DNV GL on floating OCS facilities. The Coast Guard has subsequently accepted DNV GL plan review and inspection functions on an FPSO and an FOI project in the GOM. Guidance note: The latest revision of the USCG Policy Letter CG-ENG Policy Letter has been included in App.A. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e Regulatory considerations for FOIs and FPSOs Following CG-ENG Policy Letter 01-13, this document uses DNV GL rules and standards for classification of an FOI as the baseline for compliance. Additionally, the OSS includes only those supplemental requirements in CG-ENG Policy Letter that are not otherwise covered by this baseline to streamline the certification process. The DNV GL Offshore Standards together with identified international standards and USCG regulations form the basis for meeting design, construction and equipment certification. 1.6 Equivalent design and construction considerations US Coast Guard acceptance of DNV GL plan review and inspections is predicated on the basis that such actions are in accordance with the relevant class notations and additional USCG requirements described in CG-ENG Policy Letter No Decisions concerning equivalencies, or resolutions of apparent conflicts in or among the applicable requirements, will be made by the US Coast Guard. US Coast Guard recognizes that other proposals may exist that would provide an equivalent level of safety to that of existing regulations. In addition to CG-ENG Policy Letter No , US Coast Guard will continue to consider requests for alternative design and equipment standards on a case-by-case basis. A brief description of a few examples are discussed in Chapter 2 Sec.4. Service specification DNVGL-SE-0003: Page 12

13 Guidance note: The examples of design issues that may be subject to case-by-case consideration are passive ballast systems and vessel collision loads based on typical supply vessel size on location. In all cases, proposed deviations from applicable requirements should be vetted with the US Coast Guard early in the approval process. 2 Classification principles 2.1 General ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e Classification provides assurance that a set of requirements laid down in rules established by DNV GL are met during design and construction, and maintained during operation of an offshore unit or installation. Classification has gained world-wide recognition as representing an adequate level of safety and quality. Chapter 1 Section Classification implies an activity, in which an offshore unit or installation is surveyed during construction on the basis of design approval, tested before being taken into service, and surveyed regularly during its whole operational life. The aim is to verify that the required safety standard is built-in, observed and maintained. 2.2 Classification of FOIs and FPSOs including FSOs The classification rules and referred standards define acceptance criteria for design, construction, survey and testing of offshore units and installations, their marine, machinery, safety, and utility, systems / equipment, applicable to the new building and operational phase. Guidance note: See service specification DNV-OSS-102 Rules for Classificaton of Floating Prodcution, Storage and Loading Units for details on classification principles, scope, Notations and procedures for classification ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e Class notations Classed units and installations will be given a class designation consisting of: construction symbol main character of class basic design notation service notation special equipment and systems notations (as applicable) special feature notations (as applicable). 2.4 Main character of class The notation 1A1 will be given to self propelled offshore units with hull and marine machinery and equipment found to be in compliance with the basic (common) requirements of the applicable DNV GL offshore standards referred to in the rules The notation OI will be given to non-self-propelled offshore installations intended for long term service at one offshore location with main structure, utility and safety systems found to be in compliance with the requirements of the applicable DNV GL offshore standards referred to in the rules. 2.5 Basic design notations The basic design notation indicates the type of structural design. The notations currently in use are given in Table 3. Service specification DNVGL-SE-0003: Page 13

14 Table 3 Basic design notation Class Notation Column-stabilised Deep Draught Self-elevating Ship-shaped Tension Leg Floating Offshore Description A structure dependent on the buoyancy of widely spaced columns for floatation and stability in all modes of operation A floating structure having a relatively deep draught to obtain high heave Eigen period avoiding resonance responses. The structure can have single or multi-vertical columns, with or without moonpools (e.g.spars & Dry Tree Semis) A structure with hull of sufficient buoyancy for safe transport which is raised above sea surface on legs supported by the sea bed during operation Monohull ship and barge structures having displacement hulls with or without propulsion machinery A buoyant structure connected to a fixed foundation by pretensioned tendons Structure not properly characterized by the above notations. Chapter 1 Section Service notations Units or installations constructed according to DNV GL rules for offshore classification, arranged for a particular service and found to be in accordance with the relevant requirements for such service, will be given a corresponding service notation. Relevant notations are given in Table 4. Table 4 Class notations related to service Oil Production Oil Storage Oil Loading Vessel purpose production of oil Vessel purpose storage of oil Vessel purpose loading or unloading of oil 3 (US)-notation 3.1 General FOIs, FSOs and FPSOs that are designed and constructed in accordance with the DNV GL class notations and additional requirements in Ch.2 Sec.2 and Ch.2 Sec.3 are considered to provide a level of safety equivalent to that provided by 33 CFR (b), and may be assigned the class notation (US). The assignment of the (US)-notation signifies compliance with USCG requirement for the objects covered. Guidance note: DNV GL s results and conclusions related to services described in this OSS are based on DNV GL s understanding and interpretation of the USCG requirements, as outlined in the policy letter and experience from executing an FOI and an FPSO project in the OCS GOM. Compliance with the (US)-notation does not represent any formal approval on behalf of USCG. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e Verification basis applied for the (US)-notation will be stated in the Appendix to Class Certificate The following (US) notations are currently available: Production Unit (US) for FOIs Storage Unit (US) for FSOs Production and Storage Unit (US) for FPSOs. Guidance note: For Mobile Offshore Drilling Units (MODU), see DNV OSS-101, Ch. 2, Sec. 6 specifying the DRILL (US) notation. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e Compliance matrix for OCS Chapter 2 of this OSS contains a matrix of supplemental USCG requirements that are applicable to a DNV GL classed FOI and FSO/FPSO. This matrix is based on the alternate design and engineering standards published in CG-ENG Policy Letter 01-13, and includes only those items that are not otherwise satisfied by meeting DNV GL classification requirements. Meeting DNV GL class scope and the listed items in Ch.2 Sec.2 Service specification DNVGL-SE-0003: Page 14

15 (for FOI) and Sec.3 (for FPSO and FSO) provides an equivalent level of safety to the USCG s design and equipment standards for such units as described in the Code of Federal Regulations. Chapter 1 Section 2 Service specification DNVGL-SE-0003: Page 15

16 CHAPTER 2 DESIGN AND CONSTRUCTION PROVISIONS SECTION 1 INTRODUCTION 1 General 1.1 General Unless otherwise stated, the design and construction requirements given in this chapter are supplementary to the latest edition of relevant DNV GL class requirements Unless otherwise stated, class procedures, document requirements, extent of certification of materials and components, extent of surveys etc. shall be required as a minimum for the corresponding class notations. Generally the documentation requirements and extent of survey will be based on the additional regulatory basis as listed herein. Chapter 2 Section 1 Service specification DNVGL-SE-0003: Page 16

17 SECTION 2 FLOATING OFFSHORE INSTALLATIONS 1 Introduction 1.1 Application The compliance matrix described in this section applies to Floating Offshore Installations (FOI) classed with DNV GL with minimum service notation OI Production Unit, POSMOOR. 1.2 Class notations Classed installations complying with the relevant requirements of this section may, after completion of design reviews and surveys be assigned the additional class notation: Production Unit (US). 2 Compliance matrix Chapter 2 Section Application Reference to be made to Ch.1 Sec.1 [4], Table 2 for the applicable DNV GL rules and offshore standards to meet the assigned class requirements for FOIs on the OCS The objective of the compliance matrix listed below is to specify a list with supplemental USCG requirements that are not otherwise required or covered by DNV GL classification for the stated FOI notation. Accordingly, the compliance matrix is a subset of the USCG requirements listed in enclosure (1) to CG-ENG Policy Letter Compliance matrix for floating offshore installations with (US) Notation The following areas will be subject to additional design and equipment requirements as basis for assignment of the (US)-notation for FOI s. Table 1 Structures and stability Area Structural Standards Short Description FOI/FPSO (exc. TLP): API RP 2FPS, 2011, 2 nd Ed. TLP: API RP 2T, 2010, 3 rd Ed. Guidance Note: DNV GL Class requirements through DNV-OS-C101 to C503 Standards provides an accepted equivalent level of structural safety. Cranes Cranes shall be certified, inspected, tested and designed in accordance with 46 CFR , 46 CFR , 46 CFR , and 46 CFR , or other standards determined by the Commandant (CG-ENG-3) to provide an equivalent level of safety. Guidance Note DNV Standard for Certification 2.22 Lifting Appliances provides an equivalent level of safety. USCG Policy Letter, Encl. 1 Item 4 and 5 Item 12 Stability The operating manual shall include sufficient stability information for operation. Item 19 Stability, Spar and Deep Draft Caisson FOIs Ref. Policy Letter, Enclosure 1, item 22. Requirements a to h. Item 22 Stability TLPs Ref. Policy Letter, Enclosure 1, item 23. Requirements a to g. Item 23 Stability, general In applying the requirements of the 2009 IMO MODU Code: The term Administration means the Commandant (CG-ENG), USCG, except in paragraph 3.3.2, where it means the Commanding Officer, Marine Safety Center (MSC). The term should means shall and all recommendations are requirements. For purposes of paragraph 3.2.1, the free surface of liquids in tanks shall be determined according to the IMO 2008 Intact Stability Code. Paragraphs , 3.2.8, and do not apply. Item 24 Service specification DNVGL-SE-0003: Page 17

18 Table 1 Structures and stability (Continued) Area Metocean Study Sliding Watertight Doors Catwalks, floors and openings Metocean study in accordance with API Bulletin 2INT-MET required, unless the unit is capable of disconnecting from its mooring and riser systems. Item 25 Sliding watertight doors shall comply with 46 CFR (e) and (f). Item 26 1) Perimeters shall have guardrails or wire mesh fences at least 42 in (1 m) high. 2) Guardrails shall comply with 33 CFR Stairways Stairways shall have at least two courses of rails. Top course/handrail min. 36 in (0.9 m) above front tread. Table 2 Arrangement Short Description USCG Policy Letter, Encl. 1 Item 45 Item 47 Chapter 2 Section 2 Area Helicopter Landing Facilities Short Description Design in accordance with: 2009 IMO MODU Code Ch. 13, or 46 CFR to 46 CFR Guidance Note DNV GL additional Class Notation HELDK-SH meets and exceeds these requirements. USCG Policy Letter, Encl. 1 Item 46 Aluminum helidecks shall comply with NVIC 9-97, CH.1, Enclosure 1, Section 5.2. Accommodation Spaces Shall comply with 46 CFR to 46 CFR Item 48 Table 3 Piping systems Area Short Description Marine Sanitation Devices USCG Approved or compliance with MARPOL 73/78 Annex IV. Item 2 Ship to FOI/FPSO Transfer of Oil and Hazardous Materials Flow Flashpoint Fuels Vital valves with resilient materials Nonmetallic Piping Materials 1) Hose assembly shall comply with 33 CFR and ) Shutdown and communication capabilities: Remote shutdown from control room/operating station Two-way voice communication between both vessels/units. Portable radio devices certified intrinsically safe by USCG accepted Independent Laboratory (e.g. DNV GL). 1) Systems/installations with prime movers and units that use fuel with a closed-cup flashpoint of less than 60 C (140 F) shall be approved by the Marine Safety Center (MSC). 2) Fuel with flashpoint of not less than 43 C (110 F) is permitted for emergency generators and equipment not located in a Category A machinery space. Vital valves with resilient materials shall: be fire-tested to API Standard 607, h Ed., or ISO 19921:2005 meet Category A requirements of 46 CFR Plastic and non-metallic pipe installations shall meet the requirements of 46 CFR (a). Non-metallic flexible hoses shall meet the requirements of 46 CFR (b). USCG Policy Letter, Encl. 1 Item 6 Item 8 (b) Item 15 Item 16 Service specification DNVGL-SE-0003: Page 18

19 Table 4 Electrical Area Electrical Bonding Short Description Electrical bonding to the hull structure required for: Oil piping systems that are separated from the hull structure. Both sides of connections/fittings with gaskets. Emergency Generator 1) Emergency switchboards shall comply with 46 CFR Environmental Conditions for Electrical Equipment Emergency Generator Loads ATEX Certification Electrical equipment in hazardous locations Lightning circuits in hazardous locations 2) Emergency generator shall be provided with independent permanent magnet or residual magnetism type exciter for voltage build up after two months of no operation. 3) The emergency generator or its vital components shall not adjoin a Category A machinery space. Clarification/interpretation reg. separate EGEN buildings necessary. Guidance Note Main power acting as emergency power may be considered on a case-by-case basis. A 50 C (122 F) ambient temperature is assumed for all rotating electrical machinery in boiler rooms, engine rooms, auxiliary machinery rooms, and weather decks, unless it can be shown that a 45 C (113 F) ambient temperature will not be exceeded in these spaces. The following items shall be on the emergency consumers list: Essential marine control, alarm, and monitoring systems; The marine manual and automatic safety shutdown systems; The automatic electric power management system; Each critical production/process control/import/export, alarm, and monitoring system necessary to prevent a process upset; A process safety control system to shut down the flow of hydrocarbon from all wells and exports to a pipeline; The blowout preventer controls, if used; Control systems for all equipment that is required for emergency operations; The diving equipment, if equipped, that is dependent on the unit for its power source. Electrical equipment in hazardous areas is subject to plan review and approval by the MSC. ATEX certification is not accepted by the USCG. Equipment shall be tested and listed by an independent laboratory accepted by the USCG under 46 CFR Part 159. Link to accepted independent laboratories: Flame or explosion proof lighting fixtures in enclosed hazardous locations shall have: USCG Policy Letter, Encl. 1 Item 8 (a) Item 8 (c) Item 8 (d) Item 9 Item 27 Item 28 Item 30 Chapter 2 Section 2 Ventilation requirements in hazardous locations General Emergency Alarm System At least two lighting branch circuits. Light for relamping any de-energized circuit. Light switch outside hazardous location. Ref. Policy Letter, Enclosure 1, Item 31 (a). Guidance Note The cargo pump room may be classified as Zone 1 if the following three conditions are met per API 505: the space is continuously ventilated at least 20x/ min; loss of ventilation shall be alarmed in a manned space; and combustible gas detection installed. Manually operated call points in the following locations: in any main control room at any drilling console at the feeder distribution panel in any navigation bridge in a routinely occupied space that is as far as practicable from all other activation locations. Item 31 Item 43 (d) Service specification DNVGL-SE-0003: Page 19

20 Table 4 Electrical (Continued) Area Obstruction lights and warning devices Table 5 Lifesaving equipment Area Lifesaving equipment Short Description The unit shall meet applicable requirements in 33 CFR part 67. Item 44 Short Description 1) The equipment shall be USCG type approved, or approved under the MRA Agreement. 2) The FOI/FPSO shall comply with: 46 CFR , and 2009 IMO MODU Code Ch ) Lifeboats: 95 kg (210 lbs) per person, 530 mm (21 in) minimum seat width. 4) Dedicated approved rescue boat/launching appliance instead of dual approved life/rescue boat. USCG Policy Letter, Encl. 1 USCG Policy Letter, Encl. 1 Item 32 and 33 Item 33 (a) Chapter 2 Section 2 Table 6 Fire safety Area Short Description Structural Fire Protection Except for H-60, all structural fire protection materials shall be USCG type approved, or approved under the MRA Agreement. Fire extinguishing Shall be USCG type approved. Fire hoses and associated equipment shall comply with 46 CFR Fixed low expansion foam systems installed on cargo decks shall comply with 46 CFR Collapsible hoses are acceptable on open deck fire hydrants, and in enclosed columns, pontoons and machinery spaces. USCG Policy Letter, Encl. 1 Item 34 Item 35 Fire Detection Shall be USCG type approved. Item 35 Portable and semiportable fire extinguishers Fire-fighter s outfits Shall be USCG type approved and comply with 46 CFR to Fire-fighter s outfits and self-contained breathing apparatus shall comply with 46 CFR Means of escape Shall comply with 46 CFR Solid steel decking in at least one escape route from accommodation areas to a primary means of escape. Doors with provisions for locking shall comply with SOLAS II-2/ Marking Marking of fire protection equipment in accordance with 46 CFR and H-rated fire boundaries for deckhouses Minimum H-60 rating on all normally occupied deckhouses, incl. temporary buildings, facing process areas, wellheads, produced oil storage tanks and similar hazards, extending minimum 10 feet to the sides. Item 36 Item 37 Item 38 Item 39 Item 40 Service specification DNVGL-SE-0003: Page 20

21 SECTION 3 FLOATING STORAGE UNITS AND FLOATING PRODUCTION, STORAGE AND OFFLOADING UNITS 1 Introduction 1.1 Application The compliance matrix described in this section may be applied to floating storage units (FSO) and floating production, storage and offloading units (FPSO) units satisfying the following criteria: The FSO unit is classed with DNV GL with minimum class notations 1A1 Storage Unit POSMOOR OFFLOADING. The FPSO unit is classed with DNV GL with minimum class notations 1A1 Production and Storage Unit POSMOOR OFFLOADING. The unit will be registered with a national maritime administration (flagged). Chapter 2 Section 3 Guidance note: USCG s current position is to require a valid tanker certificate for evacuation during a hurricane situation. Therefore such FPSOs / FSOs require a detachable/ disconnectable turret which can be relatively quickly disconnected in the event of a hurricane or extreme weather. In such situation the vessel will adopt the tanker mode and move out to seek shelter. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e Class notations Classed units complying with the relevant requirements of this section may, after completion of design reviews and surveys be assigned the additional class notation: Storage Unit (US) Production and Storage Unit (US) Guidance note: For Floating Storage units (FSOs) the compliance matrix below shall be applied as for FPSOs, but without the production related requirements. ---e-n-d---of---g-u-i-d-a-n-c-e---n-o-t-e--- 2 Compliance matrix 2.1 Application Reference to be made to Ch.1 Sec.1 [4], Table 2 for the applicable DNV GL rules and offshore standards to meet the assigned class notation requirements for FPSOs and FSOs in the OCS The objective of this compliance matrix is to specify a list with supplemental USCG requirements that are not otherwise required by DNV GL classification for a stated notation for an FPSO. Accordingly, the matrix is a subset of the USCG requirements listed in enclosure (2) to CG-ENG Policy Letter Compliance basis for FSO and FPSO Unit (US) The following areas will be subject to additional design and equipment requirements as basis for assignment of the (US)-notation for FSOs and FPSOs. Service specification DNVGL-SE-0003: Page 21

22 Table 1 Structures and stability Area Intact and damage stability Demonstration of safe disconnection procedure Catwalks, floors and openings Short Description FPSOs shall comply with the following requirements applicable for surface units: MARPOL Annex I regulations 27 and 28 (with the exception of paragraph 6); 2009 MODU Code Sections 3.6 and 3.7. In applying the requirements from the 2009 MODU Code: The term Administration means the Commandant (CG-ENG), USCG. The term should means Shall. The term recommendations means requirements. FPSOs that employs a disconnectable system for severe weather evasion shall demonstrate that the disconnect procedure does not jeopardize the stability. Perimeters shall have guardrails or wire mesh fences at least 1 meter (39 inches) high. If guardrails are used: USCG Policy Letter, Encl. 2 Item 9 Item 10 Item 25 Chapter 2 Section 3 They shall comply with 46 CFR to ; If a toe board is installed, one of the intermediate courses may be omitted and the other course placed approximately halfway between the top of the toe board and the top course. Table 2 Piping systems Area Short Description USCG Policy Letter, Encl. 2 Tank arrangement Oil shall not be stored in any tank closer to the stern than 2.0 m. Item 2 (g) Pollution prevention The FPSO shall comply with MARPOL Annex I regulations 23, 29 and 30 (paragraphs 1, 4 and 7 only). Inert gas system in cargo tanks Ballast and produced oil piping PV Valves Oil transfer hose A fixed inert gas system shall be installed irrespective of the vessels deadweight. Compliance with SOLAS II-2/4.5.5 required, except that a dry type water seal shall not be used. Ballast and produced oil piping systems shall meet the requirements in 33 CFR (g)(1). Pressure vacuum relief valves shall meet the requirements in 46 CFR or ISO 15364:2007. Produced oil transfer hoses shall comply with the requirements in 33 CFR and 33 CFR Item 2 (h) Item 2 (j) Item 2 (m) Item 2 (n) Item 2 (o) Table 3 Hazardous locations Area Short Description Hazardous area locations Paragraph (12) and (13) of the Policy Letter Enclosure 2 shall be used to identify hazardous locations. USCG Policy Letter, Encl. 2 Item 11 See Policy Letter for Zone 0 and Zone 1 definitions. Item 12 (a),(b) Service specification DNVGL-SE-0003: Page 22

23 Table 4 Electrical and instrumentation Area Emergency Generator Loads Detection of conditions for disconnection ATEX Certification Electrical equipment in hazardous locations Lightning circuits in hazardous locations Electrical swivel certification Short Description The following items shall be on the emergency consumers list: essential marine control, alarm, and monitoring systems the marine manual and automatic safety shutdown systems the automatic electric power management system the control system for the position thrusters for the thruster-assisted mooring system, if installed each critical production/process control/import/export, alarm, and monitoring system necessary to prevent a process upset a process safety control system to shut down the flow of hydrocarbon from all wells and process systems control systems for all equipment that is required for emergency operations the diving equipment, if equipped, that is dependent on the unit for its power source quick disconnect systems that are used to stop all process flow to the floating installation automatically, without leaks from process fluids. The FPSO shall be able to detect conditions that require disconnection from the turret. Electrical equipment in hazardous areas is subject to plan review and approval by the MSC. ATEX certification is not accepted by the USCG. Equipment shall be tested and listed by an independent laboratory accepted by the USCG under 46 CFR Part 159. Link to accepted independent laboratories: Flame or explosion proof lighting fixtures in enclosed hazardous locations shall have: At least two lighting branch circuits. Light for relamping any de-energized circuit. Light switch outside hazardous location. Hydrocarbon product electrical swivels shall be tested and listed or certified by a USCG accepted independent laboratory in accordance with 46 CFR Part 159. USCG Policy Letter, Encl. 2 Item 4 Item 8 Item 11 refer to Item 27 in encl 1 Item 11 refer to item 28 in encl 1 Item 11refer to item 30 in encl 1 Item 18 Chapter 2 Section 3 Table 5 Fire safety Area Fire extinguishing system for power generation unit Short Description A USCG approved fixed fire extinguishing system shall be installed for the power generation unit enclosure. USCG Policy Letter, Encl. 2 Item 3 (a) (iv) Structural fire protection All structural fire protection materials shall be USCG type approved. Item 20 Fire Extinguishing Shall be USCG type approved. Fire main and all associated components shall comply with 46 CFR Fixed low expansion foam systems installed on cargo decks shall comply with 46 CFR Collapsible hoses are acceptable on open deck fire hydrants, and in enclosed columns, pontoons and machinery spaces. Item 21 Fire Detection Shall be USCG type approved. Item 21 Fire-fighter s outfits Wellhead protection Fire-fighter s outfits and self-contained breathing apparatus shall comply with 46 CFR If applicable, wellheads (i.e. production areas containing oil and gas risers, export lines and associated shut down valves) with a maximum shut-in pressure exceeding 600 psi shall be enclosed within minimum A-0 barriers to protect any escape routes, lifeboat embarkation stations, fire extinguishing equipment and vital systems needed for power management Item 22 Item 24 Service specification DNVGL-SE-0003: Page 23

24 SECTION 4 EQUIVALENCIES AND OTHER DESIGN CONSIDERATIONS (INFORMATIVE) 1 General The intent of this section is to highlight and include certain design and construction issues relating to FOIs operating in the US OCS which may deserve special consideration. 2 Passive ballast system: A significant number of FOIs (SPARS, certain type of semi-submersibles and to an extent certain TLPs) operating in the OCS have a ballast system with different functional design requirements than conventional ballast designs for ships and MODUs. Accordingly, care should be taken when applying the rules to such passive type systems to ensure the application is proportional to the criticality of the system to the unit. In all cases, proposed deviations from the classification rules should be vetted with the USCG early in the approval process. Chapter 2 Section 4 3 External impact load on hull One of the design conditions for a hull column or leg on a FOI is accidental impact with a supply vessel. In the US Gulf of Mexico, the impact loading is based on a supply boat of 1000 tons moving at 0.5 m/s per API RP-2A. According to DNV-OS-A101, a supply boat size of 5000 tons and a speed of 2 m/s is used, which represents a significant difference. To avoid inconsistent application of rules among different units, it is recommended that this difference is discussed early on in the design process with the USCG, and that an appropriate deviation request with justification is submitted as relevant. 4 Fire protection boundaries The issuance of CG-ENG Policy Letter marks a shift in the USCG s approach to prescribing structural fire protection boundaries and materials for FOIs. Previously, NVIC 9-97 was the standard and it has been common practice among offshore industry vendors to design and manufacture buildings on FOIs accordingly. Policy Letter invokes requirements from the 2009 IMO MODU Code, which is more stringent than NVIC 9-97 in certain areas. Additionally, the USCG has published a Notice of Proposed Rulemaking to harmonize their fire fighting regulations with international standards. (See 79 FR 2254: Harmonization of Standards for Fire Protection, Detection, and Extinguishing Equipment; Proposed Rule). Accordingly, it is important to flag these differences early in the project to ensure all are aware of the latest requirements. 5 Platform verification program by a certified verification agent 5.1 General The platform verification programme has been defined in 30 CFR 250 Subpart I. It states the requirements, the industry standards and the platform program to be undertaken by the facility operator and the platform verification program. The verification program needs to be performed by a nominated CVA (DNV GL has such authorization). The CVAs responsibilities during design, fabrication and installation are defined in and Scope of assessment As specified in for design verification for floating facilities (FOIs and FPSOs) the CVA needs to ensure that the requirements of the USCG for structural integrity and stability have been met. Besides the structural integrity and stability, BSEE requires specified independent assesments for the following: drilling, production and pipeline risers and riser tensioning system turrets and Turret-hull interfaces (for FPSOs) Service specification DNVGL-SE-0003: Page 24

25 foundations and anchoring systems mooring or tethering systems. Therefore for these units with DNV GL class including the US notation, most of the BSEE requirement for the structural integrity and stability inclusive of mooring, turret and hull interfaces will be satisfied. The above assesments can be performed under the CVA scheme using the applicable international standards mentioned in , 2007 NTL G14 and equivalent DNV GL Standards (which have been accepted by BSEE under the scheme for previous GOM projects). Chapter 2 Section 4 Service specification DNVGL-SE-0003: Page 25

26 APPENDIX A UNITED STATES COAST GUARD POLICY LETTER Chapter 2 Appendix A Service specification DNVGL-SE-0003: Page 26

27 Chapter 2 Appendix A Service specification DNVGL-SE-0003: Page 27

28 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 References: (a) ASTM International Standard ASTM F (2007), Specification for Tank Vent Flame Arresters (b) International Maritime Organization Maritime Safety Committee Circular MSC/Circ.677, Revised Standards for the Design, Testing and Locating of Devices to Prevent the Passage of Flame into Cargo Tankers, 1994, as amended. (c) American Petroleum Institute (API) Recommended Practice (RP) 2FPS, Planning, Designing, and Constructing Floating Production Systems, 2011, 2 nd Ed. (d) API RP 2T, Planning, Designing, and Constructing Tension Leg Platforms, 2010, 3 rd Ed. (e) ASTM F (2010), Standard Specification for Quick Disconnect Couplings (6in. NPS and Smaller) (f) IMO Resolution A.1023(26), Code for the Construction and Equipment of Mobile Offshore Drilling Units, 2009 (2009 MODU Code) (g) API RP 14FZ, Recommended Practice for Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Zone 0, Zone 1 and Zone 2 locations, Second Edition, 2013 (h) API Standard 607, Fire Test for Quarter-turn Valves and Valves Equipped with Nonmetallic Seats, 2010, 6 th Ed. (i) ISO 19921:2005, Ships and marine technology Fire resistance of metallic pipe components with resilient and elastomeric seals Test methods (j) API RP 500, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division I and Division 2, 2012 (k) National Fire Protection Association (NFPA) 70, National Electrical Code, 2011 (l) American National Standards Institute (ANSI) UL 674 Standard for Electric Motors and Generators for Use in Division 1 Hazardous (Classified) Locations, Fifth Edition (dated May 31, 2011) ( ANSI/UL 674 ) (m) ANSI/UL 823 Standard for Electric Heaters for Use in Hazardous (Classified) Locations, Ninth Edition including revisions through November 15, 2007 (dated October 20, 2006) (n) ANSI/UL 844 Standard for Luminaires for Use in Hazardous (Classified) Locations, Thirteenth Edition (dated June 29, 2012) ( ANSI/UL 844 ) (o) ANSI/UL Standard for Intrinsically Safe Apparatus and Associated Apparatus for Use in Class I, II, and III, Division 1, Hazardous Locations, Seventh Edition including revisions through June 3, 2010 (dated July 31, 2006) (p) ANSI/ISA (UL 1604)- Non-Incendive Electrical Equipment for Use in Class I and II, Division 2 and Class III, Division 1 and 2 Hazardous (Classified) Locations (q) ANSI/UL 1203 Standard for Explosion-Proof and Dust-Ignition-Proof Electrical Equipment for Use in Hazardous (Classified) Locations, Fourth Edition including revisions through October 28, 2009 (dated September 15, 2006) Chapter 2 Appendix A 1 Service specification DNVGL-SE-0003: Page 28

29 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (r) ANSI/UL 2225 Standard for Cables and Cable-Fittings for Use in Hazardous (Classified) Locations, Third Edition February 25, 2011 (s) Canadian Standards Association (CAN/CSA), CAN/CSA-C22.2 No. 0-M91 - General Requirements - Canadian Electrical Code, Part II, July 1991, Reaffirmed 2006 (t) CAN/CSA-C22.2 No Intrinsically Safe and Non-Incendive Equipment for Use in Hazardous Locations, June 2003, Reaffirmed 2006 (u) C22.2 No. 30-M Explosion-Proof Enclosures for Use in Class I Hazardous Locations, November 1988, Reaffirmed 2007 (v) C22.2 No. 213-M Non-Incendive Electrical Equipment for Use in Class I, Division 2 Hazardous Locations, March 1987, Reaffirmed 2008 (w) Factory Mutual (FM) Approval Standard for Electric Equipment for use in Hazardous (Classified) Locations General Requirements, November 1998 (x) FM Approval Standard for Intrinsically Safe Apparatus and Associated Apparatus for Use in Class I, II, and III, Division 1, Hazardous (Classified) Locations, January 2010 (y) FM Approval Standard for Non-Incendive Electrical Equipment for Use in Class I and II, Division 2, and Class III, Divisions 1 and 2, Hazardous (Classified) Locations, December 2004 (z) FM Approval Standard for Explosionproof Electrical Equipment General Requirements, August 2006 (aa) FM Approval Standard for Purged and Pressurized Electrical Equipment for Hazardous (Classified) Locations, August 2000 (bb) NFPA Standard 496, Standard for Purged and Pressurized Enclosures for Electrical Equipment, 2008 (cc) API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1 and Zone 2, 1998 (dd) ANSI/API RP 14F, Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class 1, Division 1 and Division 2 Locations, 2008 (ee) IEC , Mobile and fixed offshore units- Electrical installations- Part 7: Hazardous areas, 2007 (ff) IEC , Electrical installations in ships Part 502: Tankers- Special Features, 1999 (gg) ASTM E , Standard Test Methods for Determining Effects of Large Hydrocarbon Pool Fires on Structural Members and Assemblies (hh) IMO Resolution MSC.307(88), International Code for Application of Fire Test Procedures, 2010 (2010 FTP Code) (ii) API RP 14J, Recommended Practice for Design and Hazards Analysis for Offshore Production Facilities, 2001 (jj) IMO Resolution MSC.48(66), International Life-Saving Application Code, 2010 (2010 LSA Code) Chapter 2 Appendix A 2 Service specification DNVGL-SE-0003: Page 29

30 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (kk) IMO Resolution A.1021(26), Code on Alerts and Indicators, 2009 General (1) The floating offshore installation (FOI) must be classed by either the American Bureau of Shipping (ABS), Det Norske Veritas (DNV), or Lloyd s Register (LR) and receive one of the following notations: (a) ABS: A1 Floating Offshore Installation (FOI) or other applicable notation described in 1-2-3/3.1 that includes all the elements of FOI. (b) DNV: OI with applicable notations for installation design OR 1A1 for any self propelled units. (c) LR: OI 100 AT (Unit Type) (Specified Operating Area), with applicable notations for installation design and operating criteria. (2) Marine sanitation devices (MSD) installed on FOIs and floating production and storage offshore units (FPSO) must be U.S. Coast Guard type approved under 33 CFR Part 159 or may comply with MARPOL 73/78, ANNEX IV in accordance with Navigation and Vessel Inspection Circular 1-09, Voluntary Compliance with International Sewage Regulations in Annex IV to MARPOL 73/78. (3) Flame arresters on the FOI/FPSO must meet the requirements in either reference (a) or reference (b), as amended. (4) Each FOI/FPSO, other than a tension leg platform (TLP) FOI, must comply with the applicable requirements in reference (c). (5) Each Tension leg platform (TLP) FOI must comply with the applicable requirements (other than those relating to riser systems) in reference (d). Ship to FOI/FPSO Transfer of Oil and Hazardous Materials as defined by 33 CFR (6) Each hose assembly used for transferring oil or hazardous material (Methanol, LDHI, diesel oil, etc) must comply with the requirements in 33 CFR and 33 CFR (a) The FOI/FPSO must have the following oil transfer emergency shutdown and communications capabilities: (i) In a continuously manned control room, a remote emergency means to enable the person in charge (PIC) of a transfer operation to stop the flow must be provided. (ii) The means to stop the flow may be a pump control, a quick-acting power-actuated valve, or another approved operating procedure. (iii) The means to stop the flow must be operable from the operating station of the PIC of the transfer operation. (iv) The installation must have continuous two-way voice communication between the PICs of the oil transfer operations on both vessels. (v) Portable radio devices used during the transfer of flammable or combustible liquids must be tested and listed or certified intrinsically safe for Class I, Division I (IEC Zone 1 or Class I, Zone 1), Group D requirements, by an independent laboratory accepted by the Coast Guard under 46 CFR Part 159. Chapter 2 Appendix A 3 Service specification DNVGL-SE-0003: Page 30

31 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (b) Quick-disconnect couplings not designed to reference (e) must meet the following: (i) Minimum 4:1 safety factor. (ii) Pipe threads and/or flanges in accordance with reference (e) standards. (iii) The testing and inspection requirements of reference (e). Machinery and Electrical Installations (7) Machinery and electrical installations on the FOI must comply with the applicable regulations in reference (f), Chapters 4 and 5. As an alternate, the NEMA or IP ratings in reference (g) Tables 6-10, 6-11 and 6-12 may be used. (8) In addition, the following requirements apply to FOI/FPSOs: (a) The FOI/FPSO must comply with the following electrical bonding requirements: (i) Oil piping systems that are separated from the hull structure must be electrically bonded to the hull structure by a method indicated in subparagraph (iii) of this paragraph. (ii) An oil pipe joint or an oil hose connection fitting that has a gasket must be electrically bonded by a method indicated in subparagraph (iii) of this paragraph, which bonds with both sides of the connection to the hull structure. (iii) An electrical bond must be made by one of the following methods: A metal bonding strap attached by welding or bolting; Two or more bolts that give metal-to-metal contact between the bolts and the parts to be bonded; or Metal-to-metal contact between adjacent parts under designed operating conditions. (b) Except as noted below, for prime movers and units that use fuel with a closed-cup flashpoint of less than 60 C (140 F), the complete installation must specifically be approved by the Marine Safety Center (MSC). (i) Emergency generators, as well as equipment not located in a Category A machinery space, are permitted to use fuel with a flashpoint of not less than 43 C (110 F). (c) The emergency generator must meet the following: (i) The requirements for emergency switchboards in 46 CFR (ii) An emergency generator must be provided with a permanent magnet, or a residual magnetism type exciter that has a capability of voltage build up after two months of no operation. The voltage built up must be accomplished without the aid of an external electric power source. (iii) The emergency generator or its vital components must not adjoin a Category A machinery space, or those spaces containing the unit s main source of electrical power and its vital components. The emergency generator must have an emergency switchboard which must be as near as practicable to the emergency power source but not in the same space as the accumulator batteries. The separate compartments must be accessible from the weather deck, from either location, and on the same deck level. Compartments must not adjoin a Category A machinery Chapter 2 Appendix A 4 Service specification DNVGL-SE-0003: Page 31

32 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 space or spaces containing the main source of electrical power and its vital component, and cables must be kept clear of the of the bulkheads forming these boundaries. (d) Unless demonstrated otherwise by engineering calculation or empirical data, an ambient temperature of 40 C (104 F) is assumed except as otherwise stated below. (i) A 50 C (122 F) ambient temperature is assumed for all rotating electrical machinery in boiler rooms, engine rooms, auxiliary machinery rooms, and weather decks, unless it can be shown that a 45 C (113 F) ambient temperature will not be exceeded in these spaces. (ii) A 45 C (113 F) ambient temperature is assumed for cable and all other non-rotating electrical equipment in boiler rooms, in engine rooms, in auxiliary machinery rooms, and on weather decks. A 30 C (86 F) ambient temperature in air conditioned spaces. (iii) A 55 C (131 F) ambient temperature is assumed for all control and instrumentation equipment. (iv) If electrical equipment is utilized in a space in which the equipment s rated ambient temperature is below the assumed ambient temperature of the space, its load must be derated. The assumed ambient temperature of the space plus the equipment s actual temperature rise at its derated load must not exceed the equipment s total rated temperature (equipment s rated ambient temperature plus its rated temperature rise). (9) For FOIs, in addition to Regulation 5.4 of reference (f), and loads required as per design/operational requirements, the following loads must be arranged so that they can be energized by the emergency generator: (a) Essential marine control, alarm, and monitoring systems; (b) The marine manual and automatic safety shutdown systems; (c) The automatic electric power management system; (d) Each critical production/process control/import/export, alarm, and monitoring system necessary to prevent a process upset; (e) A process safety control system to shut down the flow of hydrocarbon from all wells and exports to a pipeline; (f) The blowout preventer controls, if used; (g) Control systems for all equipment that is required for emergency operations; (h) The diving equipment, if equipped, that is dependent on the unit for its power source. (10) For FOIs, in addition to the emergency generator, the emergency loads in paragraph (9) above must have a temporary or transitional supply source that provides power for at least 30 minutes and must be powered continuously, i.e. loads must not have a power outage. (11) For FOIs, the above design and engineering standards listed in paragraph (7) and (8) apply to the industrial power system when the system is connected to the ship service power system. (12) Cranes on FOI/FPSOs must be certified, inspected, tested and designed in accordance with 46 CFR , 46 CFR , 46 CFR , and 46 CFR , or other standards determined by the Commandant (CG-ENG-3) to provide an equivalent level of safety. Chapter 2 Appendix A 5 Service specification DNVGL-SE-0003: Page 32

33 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS (13) All FOI/FPSO bilge systems must meet the requirements of either: (a) SOLAS chapter II-1, regulation ; or (b) Code of Federal Regulations subchapter F, sections and CG-ENG Policy Letter No June 26, 2013 (14) TLP, spar and column-stabilized FOI ballast pumping systems must meet the requirements of section 4.10 of reference (f). (15) On all FOI/FPSO valves employing resilient materials and installed at the following locations must be fire-tested to either reference (h) or reference (i), and must meet the Category A requirements of 46 CFR : (a) Vital piping system manifolds; and (b) Closure for any opening in the shell of the vessel. Chapter 2 Appendix A Nonmetallic Piping Materials (16) Plastic and nonmetallic pipe installations on FOI/FPSOs must meet the requirements of 46 CFR (a). Nonmetallic flexible hose must meet the requirements of 46 CFR (b). Fuel Gas Supply Valves (17) On the FOI/FPSOs, fuel supply for service generator prime movers must be fitted with positive shutoff valves arranged for both local control and remote control from an accessible location outside the engine compartment. These valves must be located as close as practicable to the tank or other source of fuel. The installation must have maintenance and testing plans for these valves and operators. Stability (18) The lightweight displacement and centers of gravity of the FOI/FPSO must be determined in accordance with the requirements in 46 CFR 170 subpart F. This includes submission and approval of a stability test procedure as prescribed by 46 CFR (19) The operating manual must include sufficient stability information to enable the master or person in charge to operate the FOI/FPSO in compliance with the applicable requirements of this section and must be maintained throughout the life of the installation. (20) Ship-type FOIs, other than those used to store produced oil in bulk, must comply with the requirements in sections 3.2, 3.3, 3.4, 3.5, 3.6, and 3.7 of reference (f), that are applicable to surface units. (21) Column-stabilized FOIs must comply with the requirements in sections 3.2, 3.3, 3.4, 3.5, 3.6, and 3.7 (except that issuance of a load line certificate is not required) of reference (f) that are applicable to column-stabilized units. (22) Spar and Deep Draft Caisson FOIs must comply with the following requirements in each condition of operation over the full range of operating drafts: (a) The height of the vertical center of gravity must not exceed that of the vertical center of buoyancy. 6 Service specification DNVGL-SE-0003: Page 33

34 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (b) Curves of righting moments and wind heeling moments must be calculated in accordance with section 3.2 of reference (f), except that the lever of the wind overturning force in paragraph must be taken to the attachment point of the mooring lines if that is below the center of lateral resistance of the underwater body. (c) In the intact condition, the area under the righting moment curve to 30 degrees must not be less than 130 percent of the area under the wind heeling moment curve to the same angle, and the downflooding angle must not be less than 30 degrees. (d) In the intact condition with the wind heeling moment applied, the maximum angle of heel must not be greater than 6 degrees for normal operating conditions and 12 degrees for severe storm conditions. (e) The spar must comply with the requirements in paragraphs 3.3.2, through 3.7.6, and section 3.6 of reference (f). (f) For damage stability assessment purposes, the assumed extent of damage must have a height and width of 3 meters (10 feet) with a horizontal penetration of 1.5 meters (5 feet) inboard from the hull plating. This extent of damage must be assumed at all levels between 3 meters (10 feet) below the minimum operating draft and 5 meters (16.4 feet) above the maximum operating draft. (i) All compartments within the extent of damage must be assumed to be flooded. (ii) Any piping and ventilation systems within the extent of damage must be assumed to be damaged, and a positive means of closure for these systems must be provided at all adjacent watertight boundaries to prevent progressive flooding of other compartments. (iii) In any case where damage of a lesser extent would result in a more severe stability condition, such lesser extent must be assumed. (g) In the damaged condition, the spar must comply with the requirements in paragraphs 3.4.3, 3.4.4, 3.4.5, and of reference (f), except that the damage referenced in paragraph must be replaced by the damage indicated in paragraph (f). (h) In the damaged condition with the wind heeling moment applied, the final waterline must be at least 1.5 meters (5 feet) below the lowest point of the hull upper deck. (23) TLP FOIs must comply with the following requirements: (a) Tendon tensions must be maintained in a safe positive range to ensure integrity of the tendons and floating installation in all operating conditions. The analysis to demonstrate a safe positive range of tendon tensions must include all loading conditions and center of gravity variations permitted by the operating manual, and must be conducted in accordance with the applicable provisions of reference (d) and API Bulletin 2INT-MET. (b) A tendon load monitoring system must be installed in accordance with reference (d). The system must have sufficient redundancy to ensure continued or restored operation in the event of a single component failure. (c) A tendon removed analysis must be conducted in accordance with reference (d), section (d) A safe positive range of tendon tensions must also be maintained after assumed flooding from the following damage cases: Chapter 2 Appendix A 7 Service specification DNVGL-SE-0003: Page 34

35 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (i) An extent of damage with a height and width of 3 meters (10 feet) and a horizontal penetration of 1.5 meters (5 feet) inboard from the hull plating. This extent of damage must be assumed on the exposed periphery of the hull at all levels between 3 meters (10 feet) below the minimum operating draft and 5 meters (16.4 feet) above the maximum operating draft. However, no vertical bulkhead should be assumed to be damaged except where bulkheads are spaced closer than a distance of one eighth of the column perimeter at the draft under consideration, measured at the periphery. The exposed periphery of the hull means outboard of a plane that connects the vertical centerlines of the columns on the periphery of the floating installation; (ii) Damage to any one hull compartment at or below the waterline at all operating drafts; and (iii) Damage to any one tendon compartment. (e) In addition to the provisions in paragraph (a), the analysis to demonstrate a safe positive range of tendon tensions after damage must apply the following provisions: (i) No pumping out or ballasting of compartments to compensate for flooding may be considered in the analysis. (ii) All compartments within the extent of damage specified in subparagraph (d)(i) must be assumed to be flooded. (iii) Any piping and ventilation systems within the extent of damage specified in subparagraph (d)(i) must be assumed to be damaged, and a positive means of closure for these systems must be provided at all adjacent watertight boundaries to prevent progressive flooding of other compartments. (f) The TLP must comply with the requirements in paragraphs 3.3.2, 3.7.2, and 3.7.3, and section 3.6 of reference (f). (g) If the OCMI determines that it is necessary, an analysis will be required comparing the tendon tensions from the tendon load monitoring system to the tendon tensions calculated from weight and buoyancy principles. Any significant differences between the tendon tensions in the analysis must be reconciled to the satisfaction of the OCMI. (24) In applying the requirements of reference (f) in paragraphs (20) to (23) above: (a) The term Administration means the Commandant (CG-ENG), U.S. Coast Guard, except in paragraph 3.3.2, where it means the Commanding Officer, Marine Safety Center (MSC). (b) The term should means must and all recommendations are requirements. (c) For purposes of paragraph 3.2.1, the free surface of liquids in tanks must be determined according to the IMO 2008 Intact Stability Code. (d) Paragraphs , 3.2.8, and do not apply. (25) A site-specific metocean study, performed in accordance with the applicable standards in API Bulletin 2INT-MET, must be conducted to determine the expected environment conditions for the FOI/FPSO location. If the one minute mean wind speed (at 10 meters above sea level) for the 100-year return period is less than 100 knots (51.5 m/s), a minimum 100 knots wind speed must be used as the severe storm condition wind velocity for compliance with the applicable requirements of this section. Chapter 2 Appendix A 8 Service specification DNVGL-SE-0003: Page 35

36 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 This paragraph does not apply to FOI/FPSOs that are capable of disconnecting from its mooring and riser systems for purposes of severe weather evasion. (26) All sliding watertight doors on the FOI/FPSO must comply with the requirements listed in 46 CFR (e) and (f). Hazardous Locations Electrical installations in hazardous locations on the FOI must meet the following requirements: (27) Electrical equipment installed in hazardous areas is subject to plan review and approval by the MSC. Equipment certified under the ATEX scheme is not accepted by the U.S. Coast Guard. (28) Electrical installations in hazardous locations must comply with either (a), (b)(i) or (b)(ii) of this paragraph. Standards must not be combined in a manner that would compromise system integrity or safety: (a) The criteria of reference (j) may be used to identify hazardous locations. When reference (j) is selected to determine hazardous locations, the protection techniques listed in section of reference (k) may be used and the equipment requirements in section of reference (k) must be met. The equipment must be tested and listed by an independent laboratory accepted by the U.S. Coast Guard under 46 CFR Part 159 as meeting any of the standards of references (l)-(z). You may also use the standards of section (b)(i) of this paragraph. Where these standards are applied, the zone to division mapping criteria of Clause of Article 501 of reference (k) must be used. Equipment that meets references (aa) or (bb) is subject to plan review and approval by the MSC. (b) The criteria of reference (cc) to identify hazardous locations may be used. When reference (cc) is selected to determine hazardous locations, the requirements listed in paragraphs (b)(i) or (b)(ii) may be used. (i) Equipment identified for Class I locations may meet Sections and of reference (k) and must be tested and listed by an independent laboratory accepted by the U.S. Coast Guard under 46 CFR Part 159 as meeting one or the combination of the ANSI/ISA Series of standards incorporated in reference (k) Article 505. You may also use the standards of section (a) of this paragraph. Where these standards are applied, the zone to division mapping criteria of Clause 505.9(C)(1) of Article 505 of reference (k) must be used. (ii) Electrical apparatus in hazardous locations must meet one or the combination of the IEC , -1, -2, -5, -6, -7, -11, -13, -15, -18 and/or -25 standards and be tested by an Ex Testing Laboratory (ExTL) and certified by an Ex Certification Body (ExCB) under the IECEx System, both accepted by the Coast Guard under 46 CFR Where these standards are applied, the zone to division mapping criteria of Clause of Article 501 of the NEC 2011 may be used. (29) Cable and wiring in hazardous locations must meet the following: (a) As allowed in reference (k) Articles , rigid metal conduit, and MI or HL type cables may be used instead of the marine shipboard cables. Conduits, cable seals and sealing methods must meet Clause 6.8 of references (dd) and (g). Chapter 2 Appendix A 9 Service specification DNVGL-SE-0003: Page 36

37 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (b) For hydrocarbon production, production support, process, transfer, and venting systems, the wiring materials and methods in Clause 6.4 of reference (dd) may be used. (c) The wiring methods for intrinsically safe systems must meet Section of reference (k). The installation and wiring to the standards in paragraph (28)(b)(ii), must comply with Clause 7 of reference (ee). (d) Joints or splices in hazardous locations must be avoided if possible. Any joints or splices must be provided junction boxes or enclosures for hazardous locations. (30) Lighting circuits serving flameproof or explosion proof lighting fixtures in an enclosed hazardous location must have at least two lighting branch circuits, be arranged so that there is light for relamping any de-energized lighting circuit, and be arranged so that the switch for the room containing flameproof or explosion proof lighting fixtures is not within the hazardous location. (31) Ventilation requirements for hazardous locations must comply with Clauses 8.1.3, 8.2, and 8.3 of reference (ff). Note: The word mechanical, as used in this section, is interchangeable with the word artificial in reference (ff). (a) The power ventilation of enclosed hydrocarbon pump rooms must be sufficient to effect a minimum complete 20 air changes per hour, based upon the volume of the pump room and associated trunks up to the deck at which access from the weather is provided. The power ventilation units must be able to remove vapors from points near the deck or bilges at points where concentrations of vapors may be expected. Enclosed areas containing devices handling hydrocarbons, such as hydrocarbon handling or pump rooms are Class I, Special Division 1 (Zone 0) hazardous locations. (b) The mechanical ventilation for the enclosed pump-engine compartment that contain the prime movers for the pumps that handle flammable or combustible liquids must be sufficient to provide at least 8 air changes per hour. Chapter 2 Appendix A Lifesaving Equipment (32) Lifesaving equipment must be USCG type approved. The FOI/FPSO must comply with the lifesaving requirements of 46 CFR and chapter 10 of the reference (f), Lifesaving Appliances and Equipment. (33) Equipment approved under the MRA agreement will be accepted; provided it has a Coast Guard type approval series number as per the requirements of NVIC 08-04, Change 1: Guide to Marine Equipment Approvals Covered by US-EC MRA & by US-EEA EFTA MRA. (a) In accordance with 77 Federal Register Lifesaving and Fire-Fighting Equipment, Training and Drills Onboard Offshore Facilities and Mobile Offshore Drilling Units (MODUs) Operating on the U.S. Outer Continental Shelf (OCS) November 23, 2012, it is recommended that: (i) New or replacement lifeboats use a weight of 95 kg (210 lbs) per person with a minimum seat width of 530 mm (21 inches); and (ii) A dedicated approved SOLAS rescue boat (USCG approval series or equivalent) and dedicated approved launching appliance be provided instead of relying on a dual approved life/rescue boat. 10 Service specification DNVGL-SE-0003: Page 37

38 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS Firefighting and Fire Protection CG-ENG Policy Letter No June 26, 2013 (34) Structural fire protection boundaries and materials for the FOI must comply with Chapter 9, paragraphs 9.2 through 9.3, of reference (f). Except for H-60, all structural fire protection materials must be Coast Guard type approved. Materials that have USCG type approval under the U.S. and EC/EEA MRA agreements are acceptable. (35) Fire-extinguishing and fire-detection equipment must be USCG type approved, and comply with Chapter 9, paragraphs 9.5, 9.6, 9.8, 9.10 and 9.11, of the reference (f). The fire main system and all associated components, including, but not limited to, fire pumps, fire hoses, fire hydrants, and fire hose nozzles, must comply with 46 CFR in lieu of the paragraphs and of reference (f). Fixed low expansion foam systems installed on the cargo decks must comply with 46 CFR and acceptance is also contingent upon the review of the proposed modifications of the system to account for the fire suppression of both the process modules and the cargo tanks under the modules. AFFF hose reel stations with non-collapsible hose that are USCG approved for fire main service may be substituted for collapsible hoses on open deck fire hydrants, and in enclosed columns, pontoons and machinery spaces. (36) Portable and semi-portable fire extinguishers must be USCG type approved and comply with 46 CFR through (37) Fire-fighter s outfits and self contained breathing apparatus must comply with 46 CFR (38) Means of escape must comply with paragraph 9.4 of the reference (f) and 46 CFR To satisfy paragraph of reference (f) at least one escape route from accommodation areas to a primary means of escape must provide protection for escaping personnel from fires, blowouts, and explosions. Solid steel decking must be used in this escape route. Additionally, all doors in escape routes must open in the direction of travel to the embarkation stations and survival craft. Any doors with provisions for locking must comply with SOLAS regulation II-2/ (39) Fire protection equipment must be marked in accordance with 46 CFR through and (40) Exterior boundaries of all normally occupied deckhouses or temporarily installed modular buildings that are normally occupied, including overhanging decks that face process areas, wellheads, produced oil storage tanks and similar hydrocarbon hazards must meet minimum H-60 rating standards, and extend on the sides of any such structures for a minimum distance of 10 feet. H-60 test methods must be in accordance with: (a) Reference (gg), test method C, Tests of Fire-Containment Capability or Walls; or (b) Annex 1, Part 3 of reference (hh), using the H-class time-temperature curve, where the furnace temperature reaches 815 C after 3 minutes, 1010 C after 5 minutes, and is maintained between 1010 C and 1180 C for the duration of the test. (41) Any escape routes, lifeboat embarkation stations, fire extinguishing equipment and vital systems needed for power management must be protected from any fired vessels such as glycol re-boilers and hot oil heaters by barriers with a minimum A-0 rating. (42) General arrangement of process areas and segregation of fuel and ignition sources must be in accordance with reference (ii). Chapter 2 Appendix A 11 Service specification DNVGL-SE-0003: Page 38

39 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS General Emergency Alarm Systems CG-ENG Policy Letter No June 26, 2013 (43) The general emergency alarm system for the FOI/FPSO must comply with the following: (a) Each general emergency alarm system to signal personnel to their emergency stations must be audible throughout the FOI/FPSO and must be distinct and unambiguous from other audible alarm signals. The general emergency alarm must continue to function after it has initiated until it is manually turned off or is temporarily interrupted by a message on the public address system. (b) The general emergency alarm must: (i) Be audible in all permanent, temporary, and crew accommodation spaces, and in all crew working spaces where persons may be maintaining, repairing, or operating equipment, stowing or drawing store of equipment, or transiting, such as public spaces; work spaces; machinery spaces; workshops; galleys; emergency fire pump rooms; bow thruster rooms; storage areas for paint, rope, and other stores; and under deck passageways and open decks; (ii) The alarm system must provide a minimum sound pressure levels for the general emergency alarm tone specified in chapter VII, section and of reference (jj). (c) Wiring materials for the general emergency alarm system must meet the construction and testing requirements for marine shipboard cables. (d) Manually operated contact makers must be installed in the following locations: (i) In the main control room, if provided; (ii) At the drilling console on a unit with a drilling package; (iii) At the feeder distribution panel; (iv) In the navigation bridge, if there is a navigation bridge; and (v) In a routinely occupied space that is as far as practicable from all other activation locations. (e) The general emergency alarm system must have at least two branch supply circuits for the general emergency alarm system. One supply must be from the main switchboard and the other must be from an emergency source of power that meets SOLAS II-1/42 or II-1/43 or reference (f) (as applicable). An automatic change-over switch from these feeders must be located, or adjacent to, the feeder distribution panel. The emergency power source may be a battery, provided that has the capacity for at least 30 minutes of continuous operation and 18 hours in standby, and a battery charger that is charged from the emergency switchboard. (f) The general emergency alarm system feeders and branch circuits must have a feeder distribution panel to divide the system into the necessary number of zone feeders, except where, because of the arrangement of the FOI/FPSO, only one zone feeder is necessary. (g) General emergency alarm feeders and branch circuit cables must be in passageways and must not be in staterooms, lockers, galleys, machinery spaces, or other enclosed spaces, unless it is necessary to supply general emergency alarm signal in those spaces. (h) The general emergency alarm must have flashing lights or rotating beacons installed in locations, where the general emergency alarm signal cannot be heard due to high ambient noise, and must meet the requirements of section 6 and equipment marked in colors specified in reference (kk). Chapter 2 Appendix A 12 Service specification DNVGL-SE-0003: Page 39

40 Enclosure (1): Requirements for FOIs and FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (i) Each general emergency alarm signal and/or alarm sounding device on the system must be marked with visual indicators that meet the requirements of reference (kk). Obstruction Lights and Warning Devices (44) The FOI/FPSO must meet the applicable requirements for obstruction lights and warning devices in 33 CFR part 67. Catwalks, Floors, and Openings (45) The unprotected perimeter of all catwalks, floor or deck areas, and openings on FOIs must be rimmed with guardrails or wire mesh fences, at least 42 inches high. Guardrails used on FOIs must comply with the requirements in 33 CFR Helicopter Landing Facilities (46) Helicopter landing facilities, on all FOI/FPSOs, must be designed in accordance with one of the following standards: (a) The requirements in Chapter 13 of reference (f); or (b) The requirements in 46 CFR through 46 CFR (c) In addition to meeting the requirements in paragraph (46)(a) or (46)(b) above, aluminum helidecks must also meet the provisions of NVIC 9-97, CH-1, Guide to Structural Fire Protection in Enclosure 1, Section 5.2. Stairways (47) Stairways on the FOI/FPSO must have at least two courses of rails. The top course must serve as a handrail and be at least 36 inches above the front tread. Accommodation spaces (48) Accommodation spaces in the FOI/FPSO must comply with the requirements in 46 CFR through 46 CFR Chapter 2 Appendix A 13 Service specification DNVGL-SE-0003: Page 40

41 Enclosure (2): Requirements for FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 References: (a) IMO Specifications for the Design, Operation and Control of Crude Oil Washing Systems adopted by resolution A.446(XI) and amended by resolution A.497(XII) and further amended by resolution A.897(21) (b) ISO 15364:2007, Ships and marine technology Pressure/vacuum valves for cargo tanks (c) IMO Resolution A.1023(26), Code for the Construction and Equipment of Mobile Offshore Drilling Units, 2009 (2009 MODU Code) (d) API RP 500, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division I and Division 2, 2012 (e) API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1 and Zone 2, 1998 For a floating production, storage, and offloading unit (FPSO) design, the requirements in this enclosure should be combined with the requirements in enclosure (1). Where the requirements of enclosures (1) and (2) differ for an FPSO, enclosure (2) takes precedence. General (1) The FPSO must be classed by either the American Bureau of Shipping (ABS), Det Norske Veritas (DNV), or Lloyd s Register (LR) and receive the following notations as applicable: (a) ABS: A1 Floating Production, Storage and Offloading System (ship-type) (Disconnectable) AMS (b) DNV: 1A1, Oil Production, Oil Storage, Oil Loading with additional notations applicable to the installation design (c) LR: OI 100 AT Floating production and oil storage installation, with additional notations applicable to the installation design and operating criteria. If a notation applicable to mobile units is required, the designation OI will be replaced with OU and other notations modified as necessary. Produced Oil Storage and Handling (2) The following requirements apply: (a) Ballast water must not be carried in any fuel tanks. (b) Ballast water must not be carried in any produced oil storage tanks, except when considered necessary for the safety of the FPSO in a severe weather emergency. (c) Ballast tank capacity must be sufficient to meet the following draft and trim requirements with the produced oil storage tanks empty: (i) The molded draft amidship (d m ) in meters, without taking into account any hull deformation, must not be less than d m = L. (ii) The drafts at the forward and after perpendiculars must correspond to that determined by the draft amidship in paragraph (c)(i), in association with a trim by the stern of no more than 0.015L. Chapter 2 Appendix A 1 Service specification DNVGL-SE-0003: Page 41

42 Enclosure (2): Requirements for FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (iii) If a self-propelled FPSO employs a disconnectable system, the minimum draft at the after perpendicular must be sufficient to obtain full immersion of the propeller. (d) Double hull requirements in 33 CFR d(c)(1)(i) and 33 CFR d(c)(2)(i), and the requirements in 33 CFR d(c)(3) and 33 CFR (g)(2) must be met. (e) The aggregate volume of the double hull tanks, forepeak tanks, and afterpeak tanks must not be less than the ballast tank capacity required in paragraph (c). (f) Oil must not be stored in any tank extending forward of the collision bulkhead except independent fuel oil tanks that must serve adjacent deck equipment that cannot be located further aft. Such tanks must be as small and as far aft as practicable. (g) Oil must not be stored in any tank closer to the stern than 2.0 meters. (h) The FPSO must comply with MARPOL Annex I regulations 23, 29 and 30 (paragraphs 1, 4 and 7 only). (i) The FPSO must comply with SOLAS regulation II-2/4 (paragraphs 5.2, 5.3, 5.4, 5.9 and 5.10 only), and regulation II-2/9 (paragraphs and only). (j) Irrespective of its deadweight, a fixed inert gas system must be installed that complies with the requirements in SOLAS regulation II-2/4.5.5, except that a dry type water seal must not be used. (k) If crude oil washing equipment is installed, it must comply with the crude oil washing system safety requirements in reference (a). (l) If an oil piping system interconnects produced oil storage tanks, the system must have valves to separate the tanks from each other. (m) Ballast and produced oil piping systems must meet the requirements in 33 CFR (g)(1). (n) Pressure vacuum relief valves must meet the requirements in 46 CFR or reference (b). (o) Each produced oil transfer hose must comply with the requirements in 33 CFR and 33 CFR (p) The produced oil pumping/piping systems must be arranged independently from all other systems. Recovered oil transfer pumps and piping (including fill, discharge, vent, and sounding piping) must not be located in or pass through any accommodation, service or machinery spaces. Machinery and Electrical Installations (3) Machinery and electrical installations must comply with the applicable cargo ship regulations in SOLAS, Chapter II-1, Parts C, D and E. In addition, the following requirements apply: (a) The FPSO must comply with the arrangement requirements in SOLAS regulation II- 2/4.5.1, except that a power generation unit may be located above the produced oil storage tanks if: (i) The power generation unit and all related systems are located outside of the hazardous area locations; 2 Chapter 2 Appendix A Service specification DNVGL-SE-0003: Page 42

43 Enclosure (2): Requirements for FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (ii) The power generation unit exhaust pipes do not emit sparks or discharge exhaust gas in the direction of a hazardous area; (iii) The power generation unit is enclosed in A-class divisions if used for emergency shipboard power service or is required to supply loads necessary to maintain or restore the propulsion plant, including thrusters; and (iv) A Coast Guard approved fixed fire extinguishing system is installed for the power generation unit enclosure. (4) In addition to regulations 42.4 and 43.2, Chapter II-1 SOLAS, and loads required as per design/operational requirements, the following additional loads must be arranged so that they can be energized by the emergency generator: (a) Essential marine control, alarm, and monitoring systems; (b) The marine manual and automatic safety shutdown systems; (c) The automatic electric power management system; (d) The control system for the position thrusters for the thruster-assisted mooring system, if installed; (e) Each critical production/process control/import/export, alarm, and monitoring system necessary to prevent a process upset; (f) A process safety control system to shut down the flow of hydrocarbon from all wells and process systems; (g) Control systems for all equipment that is required for emergency operations; (h) The diving equipment, if equipped, that is dependent on the unit for its power source; (i) Quick disconnect systems that are used to stop all process flow to the floating installation automatically, without leaks from process fluids. (5) In addition to the emergency generator, the emergency loads in paragraph (4) above must have a temporary or transitional supply source that provides power for at least 30 minutes. (6) If self propelled: the emergency generator is used for part or all of the electric power necessary to start the installation s electric and propulsion plants (via a bus-tie to the main switchboard from a dead-ship condition), the emergency power source or emergency generator must be capable of providing power to all the emergency loads, in addition to the power used to start the installation s electric and propulsion plants. If arranged for feedback operation, the emergency bus-tie to the main switchboard must open automatically upon overload of the emergency generator before the emergency generator is tripped off the line due to the overload. (7) The above design and engineering standards in paragraph (3) of this section apply to the industrial power system when the system is connected to the ship service power system. Chapter 2 Appendix A Criteria for Emergency Disconnect (8) The FPSO must be able to detect conditions that require disconnection from the turret, such as: (a) Current or predicted environmental conditions in excess of the FPSO design capabilities; (b) Exceeding turret and disconnect systems operational limits; 3 Service specification DNVGL-SE-0003: Page 43

44 Enclosure (2): Requirements for FPSOs on the U.S. OCS (c) Exceeding vessel motion operational limits. Stability CG-ENG Policy Letter No June 26, 2013 (9) The FPSO must comply with the requirements in MARPOL Annex I regulations 27 and 28 (with the exception of paragraph 6), and the requirements in sections 3.6 and 3.7 of reference (c), that are applicable to surface units. In applying the requirements from reference (c): (a) The term Administration means the Commandant (CG-ENG), U.S. Coast Guard. (b) The term should means must. (c) The term recommendations means requirements. (10) Any FPSO that employs a disconnectable system for severe weather evasion must demonstrate that the disconnect procedure does not jeopardize the stability. Hazardous Locations (11) In lieu of using the criteria of references (i) and (bb) of enclosure (1) to identify hazardous locations, paragraphs (12) and (13) of this enclosure must be used. Except as noted in paragraphs (14) and (15) of this enclosure, electrical installations in hazardous locations must meet paragraphs (26) through (30) of enclosure (1). (12) Hazardous location classification of storage and handling locations for hydrocarbons with closed-cup flashpoints not exceeding 140 F (60 C). (a) The following are Zone 0 locations: (i) Enclosed areas containing devices handling hydrocarbons, such as hydrocarbon handling or pump rooms; (ii) The interiors of hydrocarbon storage tanks, slop tanks, any pipework for pressure relief or other venting systems for hydrocarbon and slop tanks, pipes, and equipment containing the hydrocarbon or developing flammable gases or vapors; (iii) Areas on an open deck, or a semi-enclosed space on an open deck, within 0.5 meters of any hydrocarbon storage tank outlet, hydrocarbon gas or vapor outlet, ullage opening, sounding pipe, hydrocarbon tank opening for pressure release, or hydrocarbon storage tank pressure or vacuum valve provided to permit the flow of small volumes of gas or vapor mixtures caused by thermal variation; (iv) Areas on an open deck, or semi-enclosed spaces on an open deck, within 0.5 meters of any hydrocarbon handling or pump room entrance, or hydrocarbon ventilation handling or pump room ventilation inlet or outlet; (v) Areas in the vicinity of any hydrocarbon vent outlet for the free flow of large volumes of vapor mixtures during hydrocarbon loading and discharging of storage tanks, within a vertical cylinder of unlimited height, of 1 meter radius centered upon the vent outlet, and within a hemisphere of 1-meter radius below the vent outlet; and (vi) Areas in the vicinity of any hydrocarbon high-velocity vent outlet during hydrocarbon loading and discharging of storage tanks, within a vertical cylinder of unlimited height, of 0.5 meters radius centered upon the vent outlet, and within a hemisphere of 0.5 meters radius below the vent outlet. Chapter 2 Appendix A 4 Service specification DNVGL-SE-0003: Page 44

45 Enclosure (2): Requirements for FPSOs on the U.S. OCS (b) The following are Zone 1 locations: CG-ENG Policy Letter No June 26, 2013 (i) Areas on an open deck, or a semi-enclosed space on an open deck, that are 2.5 meters beyond the Zone 0 areas cited in paragraphs (12)(a)(iii) and (12)(a)(iv) of this section; (ii) Areas on an open deck, or a semi-enclosed space on an open deck, that are within 3 meters of any hydrocarbon manifold valve, hydrocarbon valve, hydrocarbon pipe flange, hydrocarbon tank hatches, sight ports, tank cleaning openings, and openings into cofferdams or other Zone 1 spaces; (iii) Regardless of the level of natural ventilation, areas on an open deck above the tank top of each hydrocarbon tank extending out 3 meters beyond the tank top boundaries of each hydrocarbon tank, up to a height of 2.4 meters above the deck; (iv) Areas on open deck within spillage coamings surrounding hydrocarbon manifold valves extending 3 meters beyond the boundaries of the spillage coamings, up to a height of 1.2 meters; (v) A void space or an enclosed space, including cofferdams and permanent (e.g., segregated) ballast tanks, immediately above, below, or adjacent to an integral hydrocarbon storage tank; (vi) A hold space containing an independent hydrocarbon storage tank; (vii) Compartments for hydrocarbon transfer hoses; (viii) Enclosed or semi-enclosed spaces in which pipes containing hydrocarbons are located; (ix) Areas 7.5 meters beyond the cylinder and 7.5 meters beyond the hemisphere of the Zone 0 hazardous areas cited in paragraph (12)(a)(v) of this section; and (x) Areas 5.5 meters beyond the cylinder and 5.5 meters beyond the hemisphere of the Zone 0 hazardous areas cited in paragraph (12)(a)(vi) of this section; (c) The following are Zone 2 locations: (i) Areas on an open deck, or a semi-enclosed space on an open deck, that are 1.5 meters beyond the Zone 1 areas cited in paragraphs (12)(b)(i), (12)(b)(ii), (12)(b)(iii), and (12)(b)(iv) of this section; (ii) Areas 1.5 meters beyond the cylinder and 1.5 meters beyond the hemisphere of the Zone 1 hazardous areas cited in paragraph (12)(b)(ix) of this section; (iii) Areas 4 meters beyond the cylinder and 4 meters beyond the hemisphere of the Zone 1 hazardous areas cited in paragraph (12)(b)(x) of this section; and (iv) Enclosed spaces beyond the open deck areas cited in paragraph (12)(b)(iii) which are below the level of the main deck, and have an opening onto the main deck or at a level less than 0.5 meters above the main deck, unless the entrances to such spaces, including ventilation inlets and outlets, are situated at least 5 meters from the closest integral hydrocarbon tank bulkhead and at least 10 meters measured horizontally from any integral hydrocarbon tank outlet or gas or vapor outlet; and the spaces are mechanically ventilated. Chapter 2 Appendix A 5 Service specification DNVGL-SE-0003: Page 45

46 Enclosure (2): Requirements for FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 (13) Hazardous location classification of heated combustible hydrocarbon storage and handling locations. (a) This section applies to storage and handling locations for hydrocarbons with closed-cup flashpoints exceeding 60 C (140 F). (b) The interiors of storage tanks and integral tanks containing hydrocarbons with closedcup flashpoints of 60 C (140 F) or higher and heated to within 15 C (59 F) of its flashpoint are considered Zone 0. The hazardous locations in paragraphs (12)(a)(iii), (12)(a)(iv), (12)(b)(i), (12)(b)(ii) and (12)(c)(i) apply. (14) Requirements for enclosed locations containing devices handling hydrocarbons with closed-cup flashpoints not exceeding 60 C (140 F). (a) Hydrocarbon pumps must be isolated from all sources of vapor ignition by gastight bulkheads. The gastight bulkhead between the pump room and the pump-engine compartment may be pierced by fixed lights, drive shaft, and pump-engine control rods, provided that the shafts and rods are fitted with stuffing boxes where they pass through the gastight bulkheads. The access to a hydrocarbon pump enclosed room must be from the open deck. (b) The hydrocarbon pumping/piping systems must be arranged independently from all other systems. Hydrocarbon transfer pumps and piping (including fill, discharge, vent, and sounding piping) must not be located in or pass through any accommodation, service or machinery locations. (c) Fixed lights in hydrocarbon pump enclosed locations must be lighted through fixed glass lenses in the bulkhead or overhead. Each fixed glass lens must be wire-inserted glass that is at least 6.35 mm (0.25 inches) thick and arranged to maintain the watertight and gastight integrity of the structure. The fixed glass lens may form a part of a listing fixture if the following are met: (i) There is no access to the interior of the fixture from the hydrocarbon pump or handling room. (ii) The fixture is vented to the engine room or a similar non-hazardous location. (iii) The fixture is wired from outside the cargo handling room. (iv) The surface temperature of the fixed glass lens on the hydrocarbon pump or handling room, based on an ambient temperature of 40 C, must not be higher than 180 C. (d) An enclosed hydrocarbon handling location that precludes the lighting arrangement or where the lighting arrangement does not give the required illumination in paragraph (13)(c) above, must have explosion proof or, flameproof (Ex d ), or flameproof-increased safety (Ex de ) lighting fixtures. (15) In lieu of meeting paragraphs (12) through (14) the FPSO may meet 46 CFR and 31. Production Processing/Support Systems and Associated Venting (16) Hazardous area classification of production processing and process systems, venting, production support systems, and auxiliary equipment for processing hydrocarbon liquid and gas mixtures from wells or other sources, must meet the applicable requirements and classification of 6 Chapter 2 Appendix A Service specification DNVGL-SE-0003: Page 46

47 Enclosure (2): Requirements for FPSOs on the U.S. OCS CG-ENG Policy Letter No June 26, 2013 hazardous areas in paragraphs (11), (12) and (15), and the applicable appendixes of references (d) and (e). Hazardous Areas for Hydrocarbon Product Swivels, Turrets, and Yokes (17) The hazardous location classification of hydrocarbon product swivels, internal or external turrets, yokes, and associated electrical apparatus or equipment must meet the following: (a) The internals of tanks, swivels or pipes containing hydrocarbons are considered Zone 0 locations. (b) An enclosed location where a hydrocarbon product swivel is installed is considered a Zone 1 location. (c) In a non-enclosed location, the area within 3 meters (10 feet) of a hydrocarbon product swivel is considered a Zone 2 location. (18) The hydrocarbon product electrical swivel, must be tested and listed or certified by a Coast Guard accepted independent laboratory in accordance with 46 CFR Part 159. (19) The current rating of the hydrocarbon product electrical swivel (slip ring) must be adequate to carry the full-load current of the equipment supplied. Firefighting and Fire Protection (20) Structural fire protection boundaries and materials must comply with SOLAS Cargo ship Method 1C requirements. All structural fire protection materials must be Coast Guard type approved. (21) Fire-fighting and fire-detection equipment, except for the fire main system, must comply with SOLAS Cargo ship requirements. The fire main system and all associated components, including, but not limited to, fire pumps, fire hoses, fire hydrants, and fire hose nozzles, must comply with 46 CFR Fixed low expansion foam systems installed on the cargo decks must comply with 46 CFR and acceptance is also contingent upon the review of the proposed modifications of the system to account for the fire suppression of both the process modules and the cargo tanks under the modules. AFFF hose reel stations with non-collapsible hose that are Coast Guard approved for fire main service may be substituted for collapsible hoses on open deck locations, and in enclosed columns, pontoons and machinery spaces. All equipment must be Coast Guard type approved. (22) Fire-fighter s outfits and self contained breathing apparatus must comply with 46 CFR (23) Produced oil pump rooms must be separated from adjacent normally occupied rooms by A- 60 barriers, except that bulkheads and decks separating pump rooms from machinery spaces of category and other machinery spaces may be reduced to A-0. Such bulkheads may be penetrated by pump shaft glands, provided that gas-tight seals are provided to prevent seepage of flammable vapors into the machinery space. (24) If applicable, wellheads (i.e. production areas containing oil and gas risers, export lines and associated shut down valves) with a maximum shut-in pressure exceeding 600 psi must be enclosed within minimum A-0 barriers to protect any escape routes, lifeboat embarkation stations, fire extinguishing equipment and vital systems needed for power management. Chapter 2 Appendix A 7 Service specification DNVGL-SE-0003: Page 47

48 Enclosure (2): Requirements for FPSOs on the U.S. OCS Catwalks, Floors, and Openings CG-ENG Policy Letter No June 26, 2013 (25) The unprotected perimeter of all catwalks, floor or deck areas, and openings must be rimmed with guardrails or wire mesh fences, at least 1 meter (39 inches) high. If guardrails are used: (a) They must comply with the requirements in 46 CFR through 46 CFR ; (b) If a toe board is installed, one of the intermediate courses may be omitted and the other course placed approximately halfway between the top of the toe board and the top course. Chapter 2 Appendix A 8 Service specification DNVGL-SE-0003: Page 48

49 DNV GL Driven by our purpose of safeguarding life, property and the environment, DNV GL enables organizations to advance the safety and sustainability of their business. We provide classification and technical assurance along with software and independent expert advisory services to the maritime, oil and gas, and energy industries. We also provide certification services to customers across a wide range of industries. Operating in more than 100 countries, our professionals are dedicated to helping our customers make the world safer, smarter and greener. SAFER, SMARTER, GREENER

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations; (1979) (Rev.1 1990) (Rev.2 1996) (Rev.3 Jan 2012) Safety features.1 Fire protection and extinction.1.1 General Fire protection arrangements and fire extinguishing systems are to be in accordance with the

More information

Cable Trays and Ducts (Metallic)

Cable Trays and Ducts (Metallic) p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-P009 Cable

More information

DNVGL-RU-0050 Edition October 2014

DNVGL-RU-0050 Edition October 2014 RULES FOR CLASSIFICATION DNVGL-RU-0050 Edition October 2014 The content of this service document is the subject of intellectual property rights reserved by ( DNV GL ). The user accepts that it is prohibited

More information

Electrical Shore Connections / Cold Ironing

Electrical Shore Connections / Cold Ironing STANDARD FOR CERTIFICATION No. 2.25 Electrical Shore Connections / Cold Ironing JULY 2014 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version

More information

Fuel Treatment and Conditioning Systems

Fuel Treatment and Conditioning Systems RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 14 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Fuel Treatment and Conditioning Systems JULY 2006 This chapter has been amended since the

More information

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS A. Purpose and Scope A.1 The purpose and scope of these requirements is to establish safety and environmental requirements for contractors to be able to

More information

DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES

DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES REV. 0 December 2012 TABLE OF CONTENT TABLE OF CONTENT... 2 DOCUMENT CONTROL...

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD IEC 61892-7 INTERNATIONAL STANDARD Edition 2.0 2007-11 Mobile and fixed offshore units Electrical installations Part 7: Hazardous areas INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE XA ICS 47.020.60

More information

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Code Edition I - Ship Technology Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Part 1 - Seagoing Ships Chapter 1 - Hull Structures I-1-1 2016-01 Chapter 1 - Hull Structures

More information

HELI-DECKS & HELI-PORTS

HELI-DECKS & HELI-PORTS 1 HELI-DECKS & HELI-PORTS GENERAL FOAM INFORMATION DESCRIPTION Helicopters provide a level of convenience that is probably unequaled by other forms of transport. While helicopters can land in the middle

More information

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Ethanol Vehicle and Infrastructure Codes and Standards Citations Ethanol Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects. To determine which codes and

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION Page: 1/6 This checklist recognizes the major accident hazards found by experience of previous HAZID studies. It is not intended to be totally exhaustive and feedback from users should be incorporated

More information

Regulation of 15 September 1992 No. 704 concerning operating arrangements on Norwegian ships

Regulation of 15 September 1992 No. 704 concerning operating arrangements on Norwegian ships Regulation of 5 September 992 No. 704 concerning operating arrangements on Norwegian ships Laid down by the Norwegian Maritime Directorate on 5 September 992 pursuant to the Act of 9 June 903 no. 7 relating

More information

IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE

IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE STATUTORY UPDATE No. 05, 2015 / JUNE Update available View No. 12/2016 IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE Keeping updated on new and retroactive requirements from IMO/ ILO can be a

More information

REPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS

REPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS REPUBLIC OF Marine Notice THE MARSHALL ISLANDS No. 2-011-14 OFFICE OF THE MARITIME ADMINISTRATOR Rev. 2/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED

More information

MOBILE OFFSHORE DRILLING UNITS 2012

MOBILE OFFSHORE DRILLING UNITS 2012 Part 4: Machinery and Systems RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2012 PART 4 MACHINERY AND SYSTEMS American Bureau of Shipping Incorporated by Act of Legislature of the State

More information

STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012

STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012 RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012 NOTICES AND GENERAL INFORMATION American Bureau of Shipping Incorporated by Act of Legislature of the State of New

More information

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society (Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions

More information

STATEMENT OF DOUG SLITOR, ACTING CHIEF OFFICE OF OFFSHORE REGULATORY PROGRAMS BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT BEFORE THE COMMITTEE ON EDUCATION AND LABOR UNITED STATES HOUSE

More information

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.

More information

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion Annex 17, page 1 ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16 Part B Prevention of fire and explosion Regulation 4 Probability of ignition 1 The existing paragraph 5.5 is replaced

More information

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment

Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment STANDARD FOR CERTIFICATION No. 2.9 TYPE APPROVAL PROGRAMME NO. 7-473.30/31 / MED A.1/3.30/54 Gas Detector System, Portable/Fixed Oxygen Analysis and Gas Detection Equipment SEPTEMBER 2011 The content of

More information

United States Coast Guard COMDTPUB 16700.4 NVIC 11-83, CH-1 7 JULY 1995

United States Coast Guard COMDTPUB 16700.4 NVIC 11-83, CH-1 7 JULY 1995 United States Coast Guard COMDTPUB 16700.4 NVIC 11-83, CH-1 7 JULY 1995 NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 11-83, CH-1 Electronic Version for Distribution on the World Wide Web Subj: CH-l TO

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice FIR-001 Rev. 06/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

Fig. 2 Option 1 Integrated Design using Physical Separation. Fig. 1 Standard Modular Process Skid Design Concept

Fig. 2 Option 1 Integrated Design using Physical Separation. Fig. 1 Standard Modular Process Skid Design Concept Modular Integration of Process Equipment Packages for Oil and Gas Facilities Copyright Material PCIC Europe Paper No. PCIC Europe XXXX Allan Bozek EngWorks, Inc. 1620 49 th Avenue, SW Calgary, AB T2T 2T7

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011, Updated March 2012 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or

More information

Safety Management System Manual Guidebook

Safety Management System Manual Guidebook Safety Management System Manual Guidebook Developed by: Commandant (G-MSO-2) U.S. Coast Guard Table of Contents Chapter 1: Introduction 1 Chapter 2: Safety and Environmental Protection Policy 3 Chapter

More information

STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS.

STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS. STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS. PART I. INTRODUCTION. 1. Interpretation accident Act approved safe ship management

More information

DNVGL-CP-0393 Edition December 2015

DNVGL-CP-0393 Edition December 2015 CLASS PROGRAMME Type approval DNVGL-CP-0393 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

COMDTPUB P16721 NVIC 20-14 August 25, 2014. Subj: GUIDELINES FOR QUALIFICATION FOR HIGH-SPEED CRAFT TYPE-RATING ENDORSEMENTS

COMDTPUB P16721 NVIC 20-14 August 25, 2014. Subj: GUIDELINES FOR QUALIFICATION FOR HIGH-SPEED CRAFT TYPE-RATING ENDORSEMENTS Commandant United States Coast Guard 2703 Martin Luther King Jr. Ave. SE Washington, DC 20593-7501 Staff Symbol: CG-CVC-4 Phone: (202) 372-2357 E-Mail: [email protected] NAVIGATION AND VESSEL INSPECTION

More information

Notes. Material 1. Appropriate Flammable Liquids

Notes. Material 1. Appropriate Flammable Liquids 29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make

More information

Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities

Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract An integrated design approach to a modular

More information

Hurricanes and the Offshore oil and Natural Gas Industry

Hurricanes and the Offshore oil and Natural Gas Industry Every year, hurricanes of varying strength lay siege to America s coasts. The images of wind-battered buildings and flooded lands are well-known - 2004 and 2005 were particularly destructive seasons. The

More information

Certification of Materials and Components

Certification of Materials and Components OIL & GAS Certification of Materials and Components Standardisation of the industry s approach to quality control and assurance processes Martin Fowlie 12th February 2015 1 DNV GL 2013 12th February 2015

More information

CLASSIFICATION SOCIETIES - their key role

CLASSIFICATION SOCIETIES - their key role CLASSIFICATION SOCIETIES - their key role Leading the way: dedicated to safe ships and clean seas, IACS Members make a unique contribution to maritime safety and regulation through technical support, compliance

More information

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING Chapter 24 PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING This Chapter provides guidance on precautions to be observed by both tanker and shore when cargo handling, ballasting, bunkering, tank

More information

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee:

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee: M-20.2 SOLAS II-2 THE PREFERRED EEBD SOLUTION The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee: The 73rd meeting of the IMO s

More information

PANAMA MARITIME AUTHORITY

PANAMA MARITIME AUTHORITY PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-226 PanCanal Building Albrook, Panama City Republic of Panama Tel: (507) 501-5000 [email protected] To: Ship-owners/Operators, CSO, Legal Representatives

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or comments regarding the

More information

TANKER - SHORE SAFETY CHECK-LIST

TANKER - SHORE SAFETY CHECK-LIST TANKE - SHOE SAFETY CHECK-LIST Part A - Bulk Liquid General - Physical Checks Bulk Liquid - General Tanker Terminal Code emarks 1 There is safe access between the tanker and shore. L1 The fendering arrangements

More information

Winnipeg Fire Department Fire Prevention Branch

Winnipeg Fire Department Fire Prevention Branch Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of

More information

Offshore Structures. Offshore Drilling Equipment

Offshore Structures. Offshore Drilling Equipment Offshore Structures Offshore Drilling Equipment The drill string is lowered through a conduit (riser). The drill string consists of a drill bit, drill collar and drill pipe. Drill pipe sections are added

More information

DNVGL-CP-0209 Edition March 2016

DNVGL-CP-0209 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0209 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS Fire Safety Technical Guide UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS 1.0. BACKGROUND 1.1. The Regulatory Reform (Fire Safety) Order (known Fire Safety Order) applies to England and Wales (Northern

More information

Overview of Standards for CO Detection Products

Overview of Standards for CO Detection Products Overview of Standards for CO Detection Products Rev 1.1 INTEC Controls 12700 Stowe Dr., Suite 100 Poway, CA 92064 The Right Choice [email protected] www.inteccontrols.com Phone: (858) 578-7887 Fax:

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

General Description of The CMC- Services

General Description of The CMC- Services STANDARD FOR CERTIFICATION No.1.1 General Description of The CMC- Services JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The

More information

SAFETY ENVIRONMENTAL MANAGEMENT SYSTEM (SEMS) STANDARDS MANUAL TABLE OF CONTENTS

SAFETY ENVIRONMENTAL MANAGEMENT SYSTEM (SEMS) STANDARDS MANUAL TABLE OF CONTENTS SAFETY ENVIRONMENTAL MANAGEMENT SYSTEM (SEMS) STANDARDS MANUAL NXY000-080-SF-ST-0000-0001 Proponent: Brad Koskowich Issue Date: Nov. 2011 Approver: Rick Johnston Audit Date: Mar 2014 Ross Sommer Competency

More information

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS In this document are the fire safety equipment maintenance requirements that are found in Division B of the Alberta Fire Code (AFC 2006) for

More information

13. FPSO Operational Problems Don Smith, OGP

13. FPSO Operational Problems Don Smith, OGP OGP Marine Risks Workshop Proceedings 13. FPSO Operational Problems Don Smith, OGP FPSO Operational Problems Don Smith OGP Analysis of Accident Statistics for Floating Monohull and Fixed Installations

More information

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result

More information

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS)

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS) SURVEYOR S MANUAL - STATUTORY TD-SP-DGC Page. 1 de 8 CARRIAGE OF DANGEROUS GOODS SECTION 1 General 1.1 Surveyors carrying out surveys for the carriage of dangerous goods should be familiar with the applicable

More information

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager LNG Storage and Fuel Gas Systems LNG: Fuel for Shipping, London 15-Feb-2011 Carriers & Offshore Units Jürgen Harperscheidt Sales Manager CONTENT TGE Company Profile Small LNG carriers Bunkering LNG fuel

More information

STANDARD. Maritime training providers DNVGL-ST-0029:2014-04 DNV GL AS

STANDARD. Maritime training providers DNVGL-ST-0029:2014-04 DNV GL AS STANDARD DNVGL-ST-0029:2014-04 Maritime training providers The electronic pdf version of this document found through http://www.dnvgl.com is the officially binding version. The documents are available

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms U.S. Department of the Interior Bureau of Indian Affairs Division of Safety and Risk Management Introduction

More information

Certification of seafarers

Certification of seafarers 1 (14) Date of issue: 19 June 2014 Entry into force: 1 August 2014 Validity: Indefinitely Legal basis: Act on Ships Crews and the Safety Management of Ships (1687/2009), sections 5(4), 17(6), 18(2), 19(4)

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS

More information

26.3.3 The Ship/Shore Safety Check-List

26.3.3 The Ship/Shore Safety Check-List International Safety Guide for Oil Tankers and Terminal Fifth Edition 2006-12-05 26.3.3 The Ship/Shore Safety Check-List Ship's Name Berth Date of Arrival Port Time of Arrival Part `A' - Bulk Liquid General

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering [email protected] PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

From WorldWide to Arctic, challenges and risk

From WorldWide to Arctic, challenges and risk Resource exploration under extreme Arctic conditions Morten Mejlænder-Larsen, Director Arctic Operations Content Challenges Arctic Risk Class Rules and Notations today International Rules and Notations

More information

[Docket ID BSEE-2015-0007; OMB Control Number 1014-0013; 15XE1700DX. Information Collection Activities: Global Positioning Systems (GPS) for

[Docket ID BSEE-2015-0007; OMB Control Number 1014-0013; 15XE1700DX. Information Collection Activities: Global Positioning Systems (GPS) for This document is scheduled to be published in the Federal Register on 08/26/2015 and available online at http://federalregister.gov/a/2015-21103, and on FDsys.gov 4310-VH-P DEPARTMENT OF THE INTERIOR Bureau

More information

IMO Ships Systems & Equipment (SSE 1)

IMO Ships Systems & Equipment (SSE 1) Working together for a safer world IMO Ships Systems & Equipment (SSE 1) Summary Report Introduction The 1st session of the IMO Sub-Committee on Ship Systems and Equipment (SSE 1) was held from 10-14,

More information

GUIDANCE ON DETENTION AND ACTION TAKEN

GUIDANCE ON DETENTION AND ACTION TAKEN 1. INTRODUCTION 1.1. General GUIDANCE ON DETENTION AND ACTION TAKEN If deficiencies are found the PSCO must: decide on the appropriate action to be taken. be satisfied that they will be rectified. decide

More information

Static Spark Ignites Flammable Liquid during Portable Tank Filling Operation

Static Spark Ignites Flammable Liquid during Portable Tank Filling Operation Static Spark Ignites Flammable Liquid during Portable Tank Filling Operation No. 2008-02-I-IA (September 2008) Key Lessons for Safe Handling and Storage of Flammables Ensure that equipment, such as fill

More information

Name Of Occupancy Date. Yes No Describe

Name Of Occupancy Date. Yes No Describe FIRE PREVENTION INSPECTION CHECKLIST For Class A Occupancy (For Assembly Buildings, Bars, Restaurants, Gyms, Churches, Arenas, Theatres or wherever people gather) Name Of Occupancy Date Physical Address

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

Resolution A.1079(28) Adopted on 4 December 2013 (Agenda item 10)

Resolution A.1079(28) Adopted on 4 December 2013 (Agenda item 10) E ASSEMBLY 28th session Agenda item 10 A 28/Res.1079 27 March 2014 Original: ENGLISH Resolution A.1079(28) Adopted on 4 December 2013 (Agenda item 10) RECOMMENDATIONS FOR THE TRAINING AND CERTIFICATION

More information

Isle of Man Regulations implementing the STCW Manila Amendments

Isle of Man Regulations implementing the STCW Manila Amendments MANX SHIPPING NOTICE DEPARTMENT OF ECONOMIC DEVELOPMENT MSN 050 Issued August 2014 Isle of Man Regulations implementing the STCW Manila Amendments This MSN provides information on the certification and

More information

DET NORSKE VERITAS TM

DET NORSKE VERITAS TM DET NORSKE VERITAS TM APPENDIX B HAZID REPORT NO./DNV REG NO.: 2013-4091 / 17TLT29-5 REV 1, 11.06.2013 DET NORSKE VERITAS Table of Contents Page 1 BACKGROUND AND SCOPE OF WORK... 2 2 METHODOLOGY... 4 3

More information

Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units

Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units Laid down by the Norwegian Maritime Directorate on 15 September 1992 pursuant to

More information

INSPECTION AND TESTING OF EMERGENCY GENERATORS

INSPECTION AND TESTING OF EMERGENCY GENERATORS INSPECTION AND TESTING OF EMERGENCY GENERATORS Certification requirements NFPA 101(00), Sec. 7.9.2.3 requires that emergency generators be installed, tested and maintained in accordance with NFPA 110,

More information

FIREFIGHTING AND DAMAGE CONTROL

FIREFIGHTING AND DAMAGE CONTROL FIREFIGHTING AND DAMAGE CONTROL Everyone on aboardship have another big job - to work aside from their primary duties. This big job is to look out constantly for the safety of the ship and crew. When the

More information

Fire Safety In High Rise Building

Fire Safety In High Rise Building Fire Safety In High Rise Building CLASSIFICATION OF BUILDINGS AS PER NATIONAL BUILDING CODE 1. GROUPING. Group A - Residential : Lodgings, Dwellings, Dormitories, Flats, Hotels. Group B Group C - Educational

More information

COMDTPUB P16700.4 NVIC 11-93, CH-3 NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 11-93, CHANGE 3

COMDTPUB P16700.4 NVIC 11-93, CH-3 NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 11-93, CHANGE 3 Commandant United States Coast Guard www.uscg.mil/hq/msc 400 7th Street, S.W. Washington, DC 20590-0001 Staff Symbol: MSC Phone: (202) 366-6481 FAX: (202) 366-3877 EMAIL: [email protected] COMDTPUB P16700.4

More information

QUALITY & TECHNICAL CERTIFICATIONS

QUALITY & TECHNICAL CERTIFICATIONS QUALITY & TECHNICAL CERTIFICATIONS October 2015 ODIN Underwater Inspection in Lieu of Drydocking I am writing in regard to the EM&I ODIN System for Underwater Inspection in Lieu of Drydocking. ABS has

More information

National Archives and Records Administration (NARA) Facility Standards for Federal Records Storage Facilities

National Archives and Records Administration (NARA) Facility Standards for Federal Records Storage Facilities National Archives and Records Administration (NARA) Facility Standards for Federal Records Storage Facilities A quick overview of what Federal Records Officers need to know about: What the Records Storage

More information

Walking and Working Surface Checklist:

Walking and Working Surface Checklist: Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER LIST OF CERTIFICATES AND DOCUMENTS REQUIRED ON BOARD SAFER, SMARTER, GREENER page 1/18 Passenger Container Speed 1 SOLAS 74 1.1 Certificates Passenger Ship Safety Certificate Reg. I / 12 s carrying more

More information

CLASSIFICATION NOTES

CLASSIFICATION NOTES CLASSIFICATION NOTES Type Approval, Installation and Testing of Water Level Detectors on Bulk Carriers and Single Hold Cargo Ships other than Bulk Carriers General Information This edition of the classification

More information

Frequently Asked Questions: North American Emission Control Area (ECA) U.S. Coast Guard Office of Commercial Vessel Compliance

Frequently Asked Questions: North American Emission Control Area (ECA) U.S. Coast Guard Office of Commercial Vessel Compliance Frequently Asked Questions: North American Emission Control Area (ECA) U.S. Coast Guard Office of Commercial Vessel Compliance The USCG and EPA have compiled this consolidated list of FAQs and associated

More information

Waste Oil Collection / Storage

Waste Oil Collection / Storage ENVIRONMENTAL & REGULATORY SERVICES Storage Tank Regulation Section P. O. Box 7837 Madison, Wisconsin 53707-7837 TDD #: (608) 264-8777 http://www.commerce.state.wi.us http://www.wisconsin.gov Jim Doyle,

More information

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies 海 事 處 船 舶 事 務 科 香 港 中 環 統 一 碼 頭 道 38 號 海 港 政 府 大 樓 ---------- 香 港 郵 箱 4155 號 MARINE DEPARTMENT Shipping Division Harbour Building 38 Pier Road, Central, Hong Kong ----------- G.P.O.Box 4155 網 站 Website

More information

The Dalian Developer A new approach to oil spill response

The Dalian Developer A new approach to oil spill response The Dalian Developer A new approach to oil spill response Presenter: Jim O Sullivan, Vice President Technip USA National Ocean Industries Association Scottsdale, Arizona, October 18, 2012 Contents Introduction

More information

SECTION A... 3 SECTION B... 7

SECTION A... 3 SECTION B... 7 BRITISH COLUMBIA SAFETY AUTHORITY Manual for Owners and Operators of Special Status Plants Risk Assessed and General Supervision Date: March 12, 2012 Controlled Document: MAN -4000-03 I TABLE OF CONTENTS

More information

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

IFE Level 4 Certificate in Fire Science and Fire Safety (HL) IFE Level 4 Certificate in Fire Science and Fire Safety (HL) Unit 2: Fire Safety Unit Reference Number: D/505/5932 Introduction This unit focuses on the prevention and detection of fire in premises and

More information

IMO. 8 June 1998 *** I:\CIRC\MSC\848.WPD INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

IMO. 8 June 1998 *** I:\CIRC\MSC\848.WPD INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR E Telephone: 0171-735 7611 Fax: 0171-587 3210 Telex: 23588 IMOLDN G IMO Ref. T4/4.03 MSC/Circ.848 8 June 1998 REVISED GUIDELINES FOR

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

In accordance with NFPA 30, these containers are not to store Class I flammable liquids.

In accordance with NFPA 30, these containers are not to store Class I flammable liquids. In accordance with NFPA 30, these containers are not to store Class I flammable liquids. Zurich recommends storing these containers in dedicated liquid storage rooms, detached buildings, or in listed dispensing

More information

WORKING IN CONFINED SPACES GUIDELINES

WORKING IN CONFINED SPACES GUIDELINES WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 19 Guidelines for the Carriage of Refrigerated Containers on Board Ships Edition 2003 The following Guidelines come into force

More information

General Fire Code Requirements Within Commercial Tenant Spaces

General Fire Code Requirements Within Commercial Tenant Spaces FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding

More information

FIRE SAFETY SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS MACHINERY AND SYSTEMS MAIN CLASS PART 4 CHAPTER 10 JANUARY 2001

FIRE SAFETY SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS MACHINERY AND SYSTEMS MAIN CLASS PART 4 CHAPTER 10 JANUARY 2001 RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS MACHINERY AND SYSTEMS MAIN CLASS PART 4 CHAPTER 10 FIRE SAFETY JANUARY 2001 CONTENTS PAGE Sec. 1 General Requirements... 5 Sec. 2 Fire Pumps and Fire Main...

More information

Compliance Schedules and Building Warrant of Fitness

Compliance Schedules and Building Warrant of Fitness Compliance Schedules and Building Warrant of Fitness Purpose of this guidance information The purpose of this guidance information is to help building owners and managers of commercial, industrial or communal

More information

Noble Denton marine services - marine warranty survey

Noble Denton marine services - marine warranty survey SERVICE SPECIFICATION DNVGL-SE-0080 Edition December 2015 Noble Denton marine services - marine warranty survey The content of this service document is the subject of intellectual property rights reserved

More information

INTERNATIONAL FIRE CODE SECTION 3103 TEMPORARY TENTS AND MEMBRANE STRUCTURES

INTERNATIONAL FIRE CODE SECTION 3103 TEMPORARY TENTS AND MEMBRANE STRUCTURES INTERNATIONAL FIRE CODE SECTION 3103 TEMPORARY TENTS AND MEMBRANE STRUCTURES 3103.1 General. All temporary tents and membrane structures shall comply with this section. 3103.2 Approval required. Tents

More information

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS 527 CMR 31.00: CARBON MONOXIDE ALARMS Section 31.01: Purpose and Scope 31.02: Definitions 31.03: General Installation Provisions 31.04: Specific Installation Provisions 31.05: Carbon Monoxide Protection:

More information

1 What is the purpose of this document?

1 What is the purpose of this document? Executive Summary Comparing the Oil and Gas Drilling Regulatory Regimes of the, the, the U.K,, and 1 What is the purpose of this document? The National Energy Board (NEB) regulates offshore oil and gas

More information