Q U A L I F I C A T I O N S. SCADA Programming. Services
|
|
|
- Alvin Powers
- 10 years ago
- Views:
Transcription
1 Q U A L I F I C A T I O N S SCADA Programming Services
2 preface Carollo Engineers is an environmental consulting firm with more than 700 employees in 38 offices throughout the United States. All of our work is performed in the areas of water and wastewater, resulting in a level of understanding of key project issues that few can match. Carollo Systems, LLC is a subsidiary of Carollo Engineers that provides SCADA programming and control systems integration services to water and wastewater utilities. We formed this specialized company to provide dedicated, focused expertise and best-in-class products and services. We provide the full range of SCADA system design, implementation, and support services, including full designbuild project delivery. This is a specialty Statement of Qualifications presenting Carollo's experience and expertise in control system programming and SCADA system integration. CONTENTS Issues and Differentiators Capabilities Key Achievements Resources Company Profile V:\CompanySOQs\ProgrammingSvcs\Indd\00PrefacePRG.indd preface
3 Issues and differentiators Delivering Quality Solutions for Operational Results More and more utilities are deciding to obtain control system programming services as a professional service rather than a low-bid commodity. They have learned that programming quality cannot be controlled with a low-bid, construction contract approach. Since 1993, Carollo has been a leader in providing quality programmable logic controller (PLC) and human-machine interface (HMI) programming services to water and wastewater utilities. Our clients have benefited from having their engineer design and program their process control systems, especially when their engineer has the programming resources of Carollo. In 2006, Carollo formed a dedicated subsidiary, Carollo Systems, LLC, to better serve our clients' needs by focusing on delivering the water industry's finest supervisory control and data acquisition (SCADA) programming services. V:\CompanySOQs\ProgrammingSvcs\Indd\01IssuesPRG.indd Carollo programmers will work with your operations staff to develop easy-to-use SCADA graphic screens. The Limitations of Low-Bid Software On most construction projects, the SCADA control system is part of a low-bid contract. The SCADA system is generally the last portion of a construction project to be completed and often the most troublesome. Every modification can become a significant change order. Low-bid programmers often leave unfinished work, software bugs, and very little documentation. On these projects, treatment plant staff have minimal input on the look and feel of the operator interface and the details of control strategy operation. That s because the contractor-programmer performs its work far from the owner s facilities. By the time the SCADA software is completed and placed in operation and operations staff can really see how it works, the general contractor and programmer are out of time and money and are primarily motivated to wrap things up and leave. issues and differentiators 1
4 The Right Approach Carollo Systems can eliminate these difficulties by performing the programming as a direct extension of our engineering services. When Carollo Systems performs system programming, we establish a relationship with you before the work starts, develop it throughout the project, and continue that relationship long after your new control system is commissioned. We work with your staff to select screen colors and symbols, command sequences, and other look and feel aspects of the SCADA operator interface. We also reserve part of our budget for post-installation refinements. This way, operations staff can test drive the new SCADA system before the final configuration adjustments are performed. Because Carollo's staff includes programmers, engineers, and operators, we can provide the most effective, innovative control system solutions customized to meet your needs. We take advanced control strategies from conception to successful implementation, working with your operations staff each step of the way. Benefits Many of our clients have experienced the benefits of Carollo s programming services. Carollo delivers SCADA systems that work. A successful SCADA system project should provide the means to effectively translate the Engineer's process control concepts into a practical SCADA system that can be readily understood and fully utilized by operators. By eliminating the low-bid contractor from the delivery process, the Carollo engineer/programmer can work directly with your operations staff to refine control strategies into practical, effective operational logic and easy-to-use graphic screens. Carollo combines our programming, process engineering, and operations expertise with your operations staff s knowledge to deliver control systems that improve your plant s performance. We streamline the automation process. By eliminating the contractorprogrammer, an unnecessary middle-man in the process, many of the typical construction delays and disputes related to development and configuration of the SCADA software are eliminated. Because we have extensive experience programming our own control strategies, we can efficiently deliver quality SCADA solutions that improve treatment plant performance, reliability, and efficiency. V:\CompanySOQs\ProgrammingSvcs\Indd\01IssuesPRG.indd We achieve operations staff participation and buy-in, resulting in greater utilization of the new technology and automation. Carollo delivers practical process control solutions directly to the user, tailored to meet each of our clients' individual needs. We understand that early involvement of operations staff in the development of SCADA screens, staff training, and easy-to-use documentation are keys to realizing full operator use of new SCADA controls and technology. issues and differentiators 2
5 We deliver quality and value. Our engineering heritage has instilled in our staff the importance of providing quality services and work products. We have developed a systematic approach to software development and project delivery tailored to the special demands of the water industry. We start with standard software modules that we have developed over many years and many projects. This leverages our extensive water industry experience for greater programming efficiency. We work with each of our clients to customize how the modules are utilized and combined in order to meet project specific requirements and operational needs. We have rigorous standards for program documentation, which are enforced through in-house peer review and quality checks. The result is a well-documented, easy-to-use, and reliable system that is easier to maintain and more effectively used by operators. V:\CompanySOQs\ProgrammingSvcs\Indd\01IssuesPRG.indd issues and differentiators 3
6 capabilities Carollo provides the full range of SCADA system engineering and implementation services, including: System planning and design. SCADA system programming and integration. Equipment procurement and installation. System testing and commissioning. Detailed installation design. Design-build contracting. Optimization. Radio telemetry systems. Maintenance services. Carollo recently completed a utility-wide SCADA Master Plan for the City of Reedley, CA. System Planning and Design Carollo is a water and wastewater industry leader in all aspects of instrumentation, control, and communication systems planning, design, and implementation. We have successfully designed hundreds of treatment facilities, each with an instrumentation and control system designed to optimize the operation of the facility. Our dedication to the water and wastewater industries gives us unparalleled expertise in applying instrumentation and control systems to solve water and wastewater operations challenges. V:\CompanySOQs\ProgrammingSvcs\Indd\02CapabilitiesPRG.indd Our projects cover every aspect of water and wastewater control systems: telemetry, SCADA, distributed control systems (DCSs), PLC systems, PC-based computer systems, operator interface software, local area networks, information management systems, and the full range of physical and analytical instruments. Our clients have ranged from small municipalities to some of the largest utilities in the country. We have designed treatment plants ranging in size from less than 1 mgd to more than 600 mgd. capabilities 4
7 SCADA System Programming and Integration Carollo s outstanding team of programmers and control system engineers is experienced in implementing the full range of control, SCADA, and information system technologies. We can deliver comprehensive solutions, from planning through design and complete implementation, including: Excellent project management capabilities for all SCADA project phases. Configuration expertise in all SCADA HMI programming packages and local operator interface displays. Extensive programming experience with all of the major PLC products. Programming in high-level languages, such as MS Visual Basic. Many years of experience setting up Ethernet local-area networks (LANs), fiber optic systems, and wide-area networks (WANs). Experience with implementation of radio systems, including licensed VHF, UHF, 900MHz MAS, and microwave, as well as unlicensed ISM and UNII spread-spectrum technologies. Ability to troubleshoot systems and fix hardware or software problems. Extensive experience cutting over from old to new systems with minimal operational disruption. Equipment Procurement On most of Carollo s programming projects, we provide some or all of the computer and PLC hardware. We can also supply complete control panels for a project. Carollo has discount purchasing arrangements with many of the major PLC vendors. V:\CompanySOQs\ProgrammingSvcs\Indd\02CapabilitiesPRG.indd Carollo s systematically organized and thoroughly documented PLC code results in fewer bugs during startup and easier maintenance for the life of the system. System Commissioning After the PLC programming and HMI configuration has been completed, the critical steps of testing, training, startup, commissioning, and documentation must be effectively completed for a successful SCADA project. Often, these tasks are the most challenging, particularly with a low-bid contractor. Carollo provides thorough testing of our systems in the shop and in the field on every project. We develop comprehensive test procedures and perform thorough testing in the office to make sure we are ready for a trouble-free startup when we go to the field. capabilities 5
8 Carollo has commissioned all of the systems we have programmed, usually in cooperation with a construction contractor that is building the facility for which we are providing the SCADA system. All of our programmers also serve as startup engineers, actively working with the other startup personnel to plan the startup, perform the tests, solve problems, and startup the equipment, processes, and controls. Our experience and "can do" attitude significantly streamlines startup activities related to the control system and minimizes hassles during this critical project activity. We know that operator training and SCADA system operations and maintenance (O&M) documentation are critical to a successful project. At Carollo, we pride ourselves in effective, thorough training and complete, useful, and clear O&M documentation. Detailed Installation Design Carollo provides panel designs, loop drawings, control schematics, and other wiring design services for our clients. These are used by panel shops and electrical contractors to construct the hardware infrastructure for the control systems we design. With a staff of more than 50 electrical and instrumentation engineers and designers, we can handle even the largest projects. We understand that providing our clients with clear and complete wiring documentation is essential for SCADA/control system maintenance and longevity. Design-Build Contracting Carollo can provide complete turnkey solutions, including design, equipment procurement, system integration and programming, installation, startup, testing, training, and documentation. Carollo is a licensed electrical contractor in California and can obtain project performance bonds and meet other contracting requirements. We have established relationships with several electrical contractors and can perform the procurement and installation work required for our clients' SCADA projects. Carollo has performed design-build SCADA projects for several of our clients, including: V:\CompanySOQs\ProgrammingSvcs\Indd\02CapabilitiesPRG.indd Contra Costa Water District, CA. Carollo successfully performed a complete design-build replacement of the distributed computer control system at the City of Santa Cruz, CA. 40-mgd Randall-Bold Water Treatment Plant. Collier County Utilities, FL. capabilities 6
9 City of Hillsborough, CA. City of Plantation, FL. Optimization Advanced automation and process optimization have become increasingly important parts of our firm s services. Recent projects have increasingly focused on greater levels of automation for enhanced operational efficiency, process control standardization, and unattended operation. Utilities are also increasingly integrating control systems data with utility information management systems, including computerized maintenance management systems (CMMS), laboratory information management systems (LIMS), geographic information systems (GIS), hydraulic modeling programs, etc. Carollo is a leader in the application of distributed control and SCADA systems to improve operational efficiency. We achieve this by optimizing the operator s interaction with the process and reducing chemical and energy use. Carollo s licensed, experienced operators work with programmers and control engineers to develop practical approaches to advanced process automation. Carollo designs and implements SCADA systems for remote telemetry applications, including all types of radio technologies. Radio Telemetry Systems Our experience with computerized SCADA/telemetry for water, sewer, and storm drain systems spans more than 25 years. We have completed over 40 water and wastewater SCADA telemetry planning, design, and implementation projects in the past 10 years, including projects tailored to water and wastewater transmission systems ranging from less than 10 mgd to more than 300 mgd in capacity. Our experience with SCADA and telemetry systems includes radio, telephone, hardwire, and microwave systems handling from 5 to 235 remote facilities. Our radio experience includes conventional licensed radio systems and unlicensed spread-spectrum systems, including Ethernet radio systems. Central station computers range from personal computers to minicomputers and workstations, and associated information management networks. We have designed large-scale systems with over 10,000 (physical and software) data and control point capacity. V:\CompanySOQs\ProgrammingSvcs\Indd\02CapabilitiesPRG.indd Maintenance Services Carollo provides ongoing service to our clients once a project is complete. Our technicians are available to service your control systems whenever we are needed. capabilities 7
10 Our approach to maintenance services is to develop long-term relationships and serve as an extension of your staff. Your assigned programmer will get to know your staff and your facilities and will work with you to solve problems and improve performance. SCADA maintenance services include: Troubleshooting equipment. Preventative maintenance. System backups. Supplementary instruction. Software upgrades. Control logic modifications. System enhancements. Carollo provides ongoing support to all of our SCADA clients for system training, maintenance, and upgrades. Automation Hardware and Software Products Supported As a professional services company, Carollo has specified and used a diverse range of different manufacturers' products. Our emphasis is always on providing the best fit for each application. The following tables provide an overview of the manufacturers and related products we support, organized by major automation hardware and software category. Carollo Systems is a member of the systems integrator programs for all of the major hardware and software manufacturers. V:\CompanySOQs\ProgrammingSvcs\Indd\02CapabilitiesPRG.indd capabilities 8
11 V:\CompanySOQs\ProgrammingSvcs\Indd\02CapabilitiesPRG.indd PLC / RTU Hardware PLC / RTU Programming and Configuration Software SCADA/HMI Software Database Historian Operator Interface Automation Hardware and Software Products Supported Manufacturer Rockwell Automation / Allen-Bradley Modicon / Schneider Electric General Electric / GE Fanuc Siemens Control MicroSystems Automation Direct Opto-22 Industrial Control Links Motorola Others Manufacturer Rockwell Automation / Allen-Bradley Modicon / Schneider Electric General Electric / GE Fanuc Siemens Control MicroSystems Automation Direct Opto-22 ICS Triplex Manufacturer Wonderware / Invensys Rockwell Automation Modicon / Schneider Electric General Electric / GE Fanuc Siemens National Instruments Transdyn Iconics Control MicroSystems Manufacturer Wonderware / Invensys Rockwell Automation OSISoft General Electric / GE Fanuc Microsoft Oracle Others Manufacturer Maple Systems Rockwell Automation General Electric / GE Fanuc Total Control Products Others Products SLC 500, PLC-5, MicroLogix, CompactLogix, and ControlLogix 984 Series, Compact-984, Micro, Momentum, Premium, Quantum, Atrium, and M340 PAC Series and PLCs, RX3i and RX7i PAC Systems, and VersaMax Simatic S5 and S7 PLCs SCADAPack Controllers DirectLogic / Koyo PLCs SNAP PAC Controllers, Brains, and SNAP I/O SCADA Flex/Plus, ICL-4300, EtherLogic MOSCAD Bristol-Babcock, Idec, Mitsubishi, Omron, ABB Products 6200 Series, RSLogix5, RSLogix500, RSLogix5000 Modsoft, ProWORX Nxt, Concept, Unity PRO LogicMaster 90 and Proficy MicroWin, S5/S7 for Windows TelePACE RLL, ISaGRAF IEC-61131, C/C++ DirectSoft PAC Project Suite ISaGRAF IEC /IEC Suite Products InTouch and System Platform RSView32, SE, and now FactoryTalk View HMI Citect Intellution FIX32, ifix, and now Proficy HMI WinCC LookOut Dynac Genesis32, Genesis64 ClearSCADA Products ActiveFactory and In-SQL Historian FactoryTalk Historian PI Historian Intellution's ihistorian and Proficy Historian Access and SQL-Server RDBMS RDBMS Sybase, Ingress Products MicroOIT, Blue, Silver, Ivory, and Gold Series PanelView, PanelView Plus, Industrial Series QuickPanel QuickPanel QSI QTerm, Pro-Face HMI, IDEC, C-More, DirectView, MicroOIT, Teco, Christensen, P&F, Xycom, Eaton / C-H capabilities 9
12 Key achievements a c =--=-::..c '--=--' :...::...:::...::...: :...:.-=-- Our work is performed exclusively in the areas of water and wastewater, resulting in a level of understanding of key project issues that few can match. WATER AND WASTEWATER EXPERTS Carollo Engineers specializes in the planning, design, and construction of water and wastewater facilities. Carollo s reputation is based upon client service and a continual commitment to quality. During our 80-year history, Carollo has successfully completed more than 20,000 projects for public sector clients. As the quality of SCADA systems implementation has become more critical to our clients' operations, we have added SCADA system programming and integration to our client services offerings. We now have a staff of some of the most capable and experienced water and wastewater SCADA programmers in the industry. Summary of RECENT EXPERIENCE On the next page is a table summarizing some of Carollo's recent SCADA programming and systems integration projects. Our experience is very broad and includes a wide range of project sizes, treatment processes, PLC models, and SCADA operator interface software. The project profiles on the subsequent pages present highlights and descriptions of a number of Carollo s more significant control system programming projects. They demonstrate that our team of experienced systems integration professionals can handle any type or size of project. These clients can attest to the quality and responsiveness of Carollo s services. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd i. key achievements 10
13 V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd Recent SCADA Programming Experience Client Name/Project Name City of Bellingham, Washington Wastewater Treatment Plant Energy and Aeration Upgrades City of Benicia, California Wastewater Treatment Plant Improvements Collier County, Florida North County Regional WTP Control & Information System Upgrade City of Corcoran, California Arsenic Removal WTP SCADA System Design and Programming Contra Costa Water District, Concord, California Bollman Water Treatment Plant DCS Replacement Contra Costa Water District, Concord, California Randall-Bold DCS Replacement Design-Build Project Contra Costa Water District, Concord, California MPP & Willow Pass Pump Stations PLC/HMI Programming City of Fresno, California Fresno-Clovis Regional Wastewater Reclamation Facility 68-mgd Expansion Town of Hillsborough, California SCADA System Design and Programming City of Merced, California Wastewater Treatment Plant Phase III Interim Improvements/Upgrade Cities of Mesa and Phoenix, Arizona Val Vista Water Treatment Plant Upgrade DCS Orange County Sanitation District, California Wastewater Treatment Plant Expansion Placer County Water Agency, California Maintenance Services City of Plantation, Florida East Water Treatment Plant SCADA System Upgrade Design-Build City of Reedley, California SCADA Master Plan and WWTP Expansion Programming City of Roseville, California Barton Road Water Treatment Plant SCADA Communications Upgrade City of Roseville, California Dry Creek WWTP Conversion to UV Disinfection City of Roseville, California Pleasant Grove Wastewater Treatment Plant, Miscellaneous Upgrades Sacramento Regional County Sanitation District, California Wastewater Treatment Plant Boiler System Control Salt Lake City Public Utilities, Utah Redwood Road Water Reclamation Facility Process Control Upgrade City of Santa Cruz, California Water Pollution Control Plant DCS City of Santa Maria, California Water Telemetry/SCADA System DCS City of Santa Rosa, California Laguna Subregional Water Reclamation Facility PLC Programming South Tahoe Public Utility District, California Effluent Pumping SCADA Upgrade City of Watsonville, California Recycled Water Facility SCADA System Design and Programming City of Watsonville, California Secondary Treatment Plant Upgrade City of Yuma, Arizona East Mesa Water Treatment Plant Controller Hardware Siemens S7 Modicon Allen-Bradley ControlLogix Allen-Bradley SLC5/05 Modicon Quantum Modicon Modicon Modicon Software Dynac Step 7 Citect Concepts Intellution ifix AB RSLogix 5000 Intellution ifix AB RSLogix 500 Wonderware Unity Pro Concept Wonderware Concept Wonderware ProWORX NxT FactoryLink I/O Points 250 1,100 1,000 key achievements ,000 1, ,000 Control Micro SCADAPac TelePace Lookout 500 Allen-Bradley AB RSView 950 AB RSLogix 5000 Modicon ProWORX NxT FactoryLink 2,000 Modicon ProWORX NxT 1,300 StreamLine Allen-Bradley AB RSLogix Allen-Bradley ControlLogix AB RSView SE AB RSLogix Modicon Wonderware 950 Quantum Unity Pro Allen-Bradley Allen-Bradley Dynac 800 Modicon Concept 500 Quantum Dynac Modicon Concept 100 Quantum Dynac Allen-Bradley AB RSLogix AB RSView Modicon Concept 1,000 Wonderware Allen-Bradley AB RSLogix 5 Wonderware 300 Modicon Modsoft 600 Wonderware Siemens S5 Siemens S5 450 Wonderware Allen-Bradley Wonderware 100 AB RSLogix 5000 Allen-Bradley Wonderware 1,000 AB RSLogix 5000 Siemens S7 Concept 400 Wonderware Allen-Bradley AB RSLogix ie
14 Contra Costa Water District, California Bollman Water Treatment Plant DCS Replacement H I G H L I G H T S Turnkey design-build SCADA system for a 75-mgd water treatment plant Modicon Quantum Unity PLCs Wonderware HMI using terminal services and thin-client operator workstations Detailed cutover planning and tightly phased switchover to maintain water production Carollo was the prime contractor for a $1.7 million turnkey (hardware and software) replacement of the distributed control system at the 75-mgd Bollman Water Treatment Plant for the Contra Costa Water District in Concord, California. The project included replacement of the plant s obsolete, proprietary Bailey Infi-90 DCS with a modern, open standards based distributed PC/PLC system. The new system utilizes four Modicon Quantum Unity hot-failover CPU pairs connected to I/O modules in eight area control cabinets. The PLC control network is configured in a redundant Ethernet/fiber ring. The remote I/O communications are also redundant. The operator interface is provided by 12 thin-client terminals connected to redundant SCADA terminal servers running Wonderware InTouch for Terminal Services version 9.5. Carollo provided hardware, software, programming, and complete systems integration services. Carollo was the prime contractor and directed the work of subcontractors for electrical installation, fiber optic cable testing, panel fabrication, and design assistance. The Bollman Plant is the main source of water for several communities, and allowable shut down times were very short, considering the magnitude of the project. Our team worked closely with District staff to develop a comprehensive cutover plan, including fallback options to ensure continuous water deliveries. Carollo replaced the entire distributed control system for the CCWD 75-mgd Bollman Water Treatment Plant. Carollo completed the project on time, within budget, and with minimal disruptions to staff and operations. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd ~. key achievements 12
15 Collier County, Florida North County Regional Water Treatment Plant Control and Information SCADA System Upgrade H I G H L I G H T S Design-build replacement of control system for 20-mgd membrane water treatment plant Successful cutover of operational treatment plant with minimal downtime Complete reprogramming of membrane treatment units Innovative design reduced cost by interfacing with existing I/O module subsystem Operations at the Collier County North County Regional Water Treatment Plant are assisted by its control and information system. The old control system used Siemens/Texas Instruments 555 and 315 PLCs for monitoring and automatic control using remote I/O over a Profibus network. A graphics interface to the plant operations staff was provided by a PC-based SCADA/HMI system using Iconics Genesis software on two operator workstations and a SCADA server. Engineering and operator workstations had reached an age of declining reliability, and the PLC/remote I/O network demonstrated serious performance problems. Carollo was retained by the County to: Provide evaluations, upgrade recommendations, and design-build services for the control and information system including concept and architecture, networks, PLC/HMI hardware, redundancy, reporting, and data sharing. Replace all existing Genesis SCADA/HMI software with the County standard, Intellution ifix. Carollo upgraded the SCADA system at the Collier County, Install a fiber optic based Ethernet network to support communications between all PCs and PLC CPUs. Florida, North Regional Water Treatment Plant, including Replace existing PLC CPUs with new Allen-Bradley complete replacement of all PLC and HMI programs. ControlLogix CPUs and completely reprogram all PLC controls, including the nanofiltration and reverse osmosis membrane treatment units. Replace the existing process data reporting system with a new Proficy Historian and Xcel Reporter report generation package. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd Carollo served effectively as the general contractor by preparing the scope of work for and supervising the work of the electrical installation contractor. Carollo purchased and installed the computer equipment and software. The project was completed successfully on time and on budget, despite technical and cutover challenges. Carollo has been retained to provide continuing services to Collier County ~. key achievements 13
16 City of Watsonville, California Recycled Water Facility SCADA System Design and Programming H I G H L I G H T S SCADA design, programming, startup, and training Wonderware 9.5 SCADA HMI with thin client operator stations Terminal Services architecture to reduce costs and simplify maintenance Allen-Bradley ControlLogix PLCs Modular programming to simplify maintenance and streamline changes Carollo Engineers and another firm designed a new 7.7-mgd water recycling facility for the City of Watsonville, California. The $50 million treatment plant includes coagulation, flocculation, and sedimentation as pretreatment, followed by filtration and UV disinfection. The Carollo design included a new SCADA process control system for the plant. The new SCADA system consists of redundant SCADA servers running Wonderware InTouch 9.5 for Terminal Services, plus a dedicated History Server. The system also includes control room operator stations and four remote operator terminals, all running thin client sessions of Wonderware InTouch. The system includes a dedicated SCADA computer Ethernet network. The plant PLCs are all Allen-Bradley, mostly ControlLogix models. The PLC system is connected over an Ethernet network, which uses fiber optic media for all runs between buildings. Carollo Systems was selected to provide complete SCADA HMI and PLC programming services. The scope of work included meetings with the client prior to programming, coordination with the construction contractor and several vendors and subcontractors, programming, testing, startup, and training. Carollo Systems provided complete SCADA HMI and PLC programming services for Watsonville's new Recycled Water Facility. Carollo Systems worked as an integral part of the construction team. During startup, Carollo programmers worked in the field with contractor and construction management personnel to integrate all of the various plant PLCs, including those provided as part of mechanical equipment packages. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd key achievements 14
17 City of Reedley, California SCADA Master Plan and Wastewater Treatment Plant Expansion Programming H I G H L I G H T S Utility-wide SCADA Master Plan for water, wastewater, and stormwater services Programming and engineering for new Wonderware/Modicon plant SCADA control system Modicon Quantum PLCs programmed with Unity software Wonderware InTouch Version 10.0 using terminal services The City of Reedley, California, Public Works Department is responsible for facilities that provide services for water distribution, stormwater collection, wastewater collection and treatment, and solids disposal systems throughout the City s sphere of influence. The various systems have been operated independently with different types of SCADA hardware and software. The primary purpose of the master plan was to determine the most economical way of consolidating, integrating, and standardizing all of the various water, stormwater, and wastewater related SCADA facilities to enable City staff to manage the system more efficiently with less burden on operations staff. Carollo was retained to perform an evaluation of these facilities. We prepared a SCADA Master Plan that provided the necessary information to design a functional and consolidated control system for the City s various utilities departments. The goal was to develop a control system master plan that would reduce the utilities current operating costs by replacing existing obsolete equipment, improving operational efficiency through utilization of innovative technologies, improving current operations staff efficiency, reducing total chemical usage, and reducing total electrical power consumption. Carollo's SCADA Master Plan for the City of Reedley leveraged the City's ongoing Wastewater Treatment Plant Expansion to form the foundation for the citywide SCADA system. The wastewater treatment plant is currently undergoing an expansion that will include a new SCADA system, which will serve as the central consolidation point as well as a foundation for the new citywide SCADA system project. Carollo is programming the new wastewater treatment plant SCADA system, which uses a Wonderware InTouch HMI and Modicon Quantum PLCs. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd ~. key achievements 15
18 City of Roseville, California Dry Creek Wastewater Treatment Plant Conversion to UV Disinfection H I G H L I G H T S Complete system design responsibilities Construction support SCADA/HMI system programming PLC programming (Modicon Quantum) Expansion/additions to existing, fully operational wastewater treatment plant Startup and commissioning The City of Roseville s 18-mgd Dry Creek Wastewater Treatment Plant used gaseous chlorine for effluent disinfection and sulfur dioxide for dechlorination. Based on safety, cost, and toxicity concerns, Roseville retained Carollo to evaluate alternatives to its current disinfection system. A project to convert the existing system to UV disinfection resulted. Project scope included design, PLC and HMI programming, construction management, startup, and commissioning. As part of the project, extensive control system modifications are being implemented. The control system uses Modicon Quantum PLCs and a Dynac SCADA HMI. PLC cabinets are being added to support the UV generation system, as well as on-site hypochlorite generation, electrical system additions, chemical system changes, and plant flow control modifications. Carollo programmed the PLCs and SCADA HMI screens for the project. The UV PLCs were programmed by the vendor. Due to Carollo's programming approach, industry experience, and close working relationship with the design team, our experienced programming team was able to accommodate a number of design and schedule changes without additional cost to the owner. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd Carollo performed PLC and HMI programming, as well as construction phase support, for the Dry Creek Wastewater Treatment Plant UV Disinfection project. Roseville has new detailed programming standards to facilitate easier troubleshooting and more efficient maintenance overall. Carollo's programmers delivered system modifications in full compliance with these standards, giving the City a quality product that interfaces perfectly with its other systems and facilities ~. key achievements 16
19 Town of Hillsborough, California SCADA System Design and Programming H I G H L I G H T S Full-service SCADA system design, equipment selection, programming, commissioning, and field testing 154-MHz radio telemetry system for 25 sites Radio system design and implementation in a highly congested environment Sophisticated digital radios for high-speed transmission on limited bandwidth Redundant PCs at the master station and communications processing PLC at the master station to enhance reliability Carollo designed water, water quality, and wastewater facility telemetry for the Town of Hillsborough. This project included a fully integrated and programmed control and monitoring system. Hillsborough also selected Carollo to integrate and program the system, provide construction management, and assist with system installation. Teledesign Systems radios with digital modems were installed. The Carollo team determined the radio frequency band during design. Signal propagation was an important consideration, since most of the facilities are located in hilly areas with buildings and trees. However, the bandwidth available in the highly congested San Francisco Bay Area was only about one-third the amount normally used for high-speed telemetry systems. The use of specialized radios allows use of the assigned frequency ( MHz) with a reasonable speed of data transmission (4,800 bps). The team tested radio communication at this speed during design. At some low-lying sites, a dial-up telephone line was provided for increased reliability. Field instrumentation included water quality monitoring for turbidity and chlorine residual; monitoring of flow, pressure, and energy usage for each pump at the pump stations; utility power monitoring; and process alarms. Carollo configured the PLCs/RTUs and the master station. The PLCs/RTUs are SCADAPack with radios manufactured by Teledesign Systems of San Jose, California. This system is open-architecture with ladder logic programming of the SCADAPack RTUs. National Instruments Lookout is used for operatorinterface functions at the master station PC. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd Hillsborough s SCADA system features a 154-MHz radio telemetry system for high-speed transmission to 25 sites on limited available bandwidth, in hilly terrain ~. key achievements 17
20 City of Merced, California Wastewater Treatment Plant Phase III Interim Improvements/Upgrade H I G H L I G H T S New Allen-Bradley based PC/ PLC SCADA system for a 10-mgd wastewater treatment plant Process and SCADA upgrades Complete programming by Carollo Relational database history and reporting system As part of the Phase III upgrade to its wastewater treatment plant, the City of Merced needed a new SCADA control system. Carollo designed both the process improvements and the control system upgrades. Prior to the upgrade, the Merced plant operated using stand-alone controllers and hardwired control devices. The new design provides for a central PC-based computer system used for monitoring and controlling the plant processes. The project included the installation of new PLCs in both the new and existing process areas, the installation of a new fiber optic network, and the installation of a host computer system. The design of the system included hardware specifications, details on the related electrical system modifications, and comprehensive process descriptions presenting the revised methods of operation. Carollo performed all of the programming and system integration for the project, including establishing programming standards, PLC programming, HMI configuration, testing, commissioning, training, and documentation. Because the Merced Wastewater Treatment Plant is normally staffed only 40 hours per week, Carollo provided a redundant dialer system to alert operators of any problems at the plant. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd ~. key achievements 18
21 City of Corcoran, California Arsenic Removal Water Treatment Plant SCADA System Design and Programming H I G H L I G H T S Programming and startup of 20-mgd pressurized filtration plant for removal of arsenic from groundwater supply Replacement of outdated interface software for existing wellfield control system and integration with new plant control system Upgrade using GE/Intellution ifix software Carollo Engineers, in cooperation with another firm, designed the new Arsenic Water Treatment Plant for the City of Corcoran, California. Carollo Systems was selected to program the new plant control system. Prior to the project, the City of Corcoran's existing water supply system consisted of eight groundwater wells delivering water to the city storage system with minimal filtration through a sand filter and chemical disinfection. The existing control system consisted of RTUs at each well and pump station communicating through a radio network to a National Instrument's Lookout SCADA program at the public works facility. In addition to the process upgrades, declining factory support for the existing SCADA software prompted the replacement of the existing SCADA control system with an implementation of GE Proficy ifix 4.0 SCADA/HMI software. Plant control is now handled through a pair of Allen-Bradley SLC5/05 processors. Carollo's efforts on this project included: Duplication of existing well and pump station controls in new SCADA/HMI system. Programming of control and operator interface for all plant processes (with exception of OEM filtration system). Integration of communications with OEM filtration system into plant SCADA system. System startup and commissioning. Provision of thoroughly documented control system for the City. Operations personnel training. Process report development. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd Automated alarm paging system. Carollo programmed the City of Corcoran's Remote site access. very first water treatment plant ~. key achievements 19
22 City of Fresno, California Fresno-Clovis Regional Wastewater Reclamation Facility 68-mgd Expansion H I G H L I G H T S Design and programming of a complete PLC-based distributed control system with over 8,000 I/O points Programming, graphics display configuration, and MIS database development Fiber-optic data highway Carollo designed and programmed the new control system for the $87-million expansion to the existing Fresno-Clovis Regional Wastewater Treatment Plant. The control system includes multiple, hot backup PLCs and a network of 15 PC operator interface computers (OIS). All data highways are fiber optics. This distributed control system has more than 8,000 input/output points, which can be accessed from any of the 15 OIS computers. In addition, there is a separate MIS network, which consists of an additional 30 computers. Any of these 30 MIS computers can access process data and graphic displays with proper passwords. Carollo performed process control software programming, graphic display configuration, and MIS database application software, which includes automatic report generation. Carollo programmed a complete control system with more than 8,000 I/O points for the $87 million, 68-mgd expansion to the Fresno-Clovis Regional Wastewater Treatment Plant. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd ~. key achievements 20
23 South Tahoe Public Utility District, California Effluent Pumping SCADA Upgrade H I G H L I G H T S Worked directly with operations and maintenance staff Programming of Allen-Bradley PLCs Configuration of Wonderware HMI Development of energy management pump scheduling program The South Tahoe Public Utility District (STPUD) Wastewater Plant discharges effluent through a pipeline that extends from the plant, over a Sierra Nevada pass, to the Harvey Place Reservoir. Two pumping stations convey the water through the pipelines. Significant power cost savings have been realized by curtailing the use of the pumps during the afternoon hours by avoiding pumping during peak electric rate hours. Carollo worked directly with the plant O&M staff to develop a practical control strategy to store effluent during peak rate hours and pump at high rates during the lowest rate periods. Carollo designed and programmed the new control system for operating the export pumps and scheduling their operation based on a computer model of the pumping system. The control system was built around Allen-Bradley PLCs and the existing Wonderware SCADA system. Active X components were also developed for this project to provide a spreadsheet-style interface for the data tables required to adjust the pump scheduling program. The Wonderware displays served as a container for the custom components to seamlessly integrate the custom operations into the existing SCADA system. Carollo worked with operations and maintenance staff at the STPUD s Wastewater Treatment Plant to design and program a new control system for the plant s export pumps. Carollo provided wiring drawings and worked with maintenance staff who installed the hardware and wiring for the project. Carollo worked with operations staff to test and refine the logic to make sure it is effective, reliable, and easy to use. V:\CompanySOQs\SCADAProgrammingSvcs\Indd\03KeyAcheivePRG.indd key achievements 21
24 resources Name/Education/ Certifications/Years of Experience Representative Experience Expertise Jeff Martin CEO, General Manager, Carollo Systems BA Education Graduate Coursework in Accounting, MIS/ DSS, Basic and COBOL, University of Wisconsin 25 Years of Experience Over 24 years of experience in planning, design, project management, strategic planning, and business management in the areas of computer systems, instrumentation, and process automation for water, wastewater, industrial, aquaculture, mining and military systems. Project experience includes management of studies, designs, construction services, and systems implementation. Project scopes have included process control, SCADA, instrumentation, computer control, telemetry, information technology and turnkey EI& C systems. Major project assignments have included: City of Mankato, MN 18 years of overall I&C project planning and management. ($5.65 Million) City of Buffalo, MN 10 years of overall I&C project planning and management. ($1.64 Million) Western Lakes Superior Sanitary District (WLSSD) 12 years of overall I&C project planning and management. ($3.2 Million)) Gencor (8) Synthetic Fuel Recovery Facilities throughout the United States ($4 Million) Venezuela World Bank and EX/IM Bank Environmental Projects ($3.68 Million) Project management Domestic/ international contract negotiations Scada system planning and design Software standards planning and documentation Hardware selection and design Scada master plan development Design-build, CMAR turnkey delivery methodologies Systems implementation Communication networks V:\CompanySOQs\SCADAProgrammingSvcs\Indd\04ResourcesPRG.indd Michael Prosser Engineering Manager, Carollo Systems BS Electrical Engineering Certified Netware Engineer; Technical Certifications from Allen Bradley and Modicon; Manufacturer Certifications in Networking and Communications 27 Years of Experience Designed and implemented a networked district-wide SCADA based control system, including multiple data historians, redundant SCADA servers, and thin-client access via Microsoft terminal services for the Olivenhain Municipal Water District, California. Provided all automation equipment and services for a complete SCADA system for a microfiltration membrane water treatment plant. Provided system integration services for the City of Tracy, California, for both the water and wastewater utility departments including treatment plants and remote facilities. Services included development of the City's engineering standards for SCADA, PLCs, networks, RF and fiber-optic communications, instrumentation, UL-891 electrical switchboards, UL- 845 motor control, and UL-508 industrial control panels. Provided planning, design, and implementation services for all distribution system infrastructure for the Sacramento Suburban Water District, California. Provided multiple centralized SCADA systems, controls, instrumentation, PLC-based RTUs, and wide area communications network. Designed and implemented County standards for RTUs, electrical switchboards, motor control, instrumentation, and several SCADAbased control systems for Okaloosa County, Florida. Provided a wireless communications infrastructure to support 250+ remotely located RTUs. Technology project management SCADA system engineering SCADA system master planning SCADA technology trends and innovation Communication system design and implementation System testing and startup Construction management Radio telemetry systems Ethernet networks ~. resources 22
25 Name/Education/ Certifications/Years of Experience Representative Experience Expertise Jeff Janowiak Wonderware Certified Application Developer 17 Years of Experience Senior programmer for the City of Corcoran, California, Arsenic Removal Water Treatment Plant. Responsibilities included designing the interface system using Intellution Proficy ifix SCADA/HMI software, integrating existing HMI software into new ifix SCADA system, programming Allen Bradley SLC5/05, programming SCADAPack RTUs using TelePace software, developing process data reports, integrating automated alarm paging software with plant SCADA software, and performing startup, troubleshooting, and system cutover duties. Lead programmer for the Collier County, Florida, North Regional Water Treatment Plant SCADA System Replacement. Developed detailed equipment lists for the procurement of the Control System Components and developed project programming templates and standards for this major control system upgrade. Lead PLC programmer and SCADA system developer for control system upgrades of four Placer County Water Agency (PCWA), California, water treatment plants. Initial work for PCWA included development of hardware and software design guides. All PCWA plant control systems use Allen-Bradley PLC 5/40E processors and Intellution SCADA software. SCADA workstations were developed so that each plant can be monitored remotely from PCWA headquarters. Staff engineer for upgrading the South Bayside System Authority s SCADA plant system in Redwood City, California. This project involved upgrading the existing Intellution SCADA software from Fix32 to ifix. Staff engineer for RTU programming and SCADA development of the Santa Lucia Preserve Control Network in Carmel, California. This project involved coordination of over 20 RTU-controlled well sites connected by a spreadspectrum radio network, with future expansion to exceed 100 sites. Lead PLC programmer and SCADA system developer for a three-phase control system upgrade for the Medford Water Commission Robert A. Duff Water Treatment Plant in Medford, Oregon. Phase 1 included the addition of Allen-Bradley SLC500 controllers to handle control of the plant s eight existing filters, the chemical feed system, and the raw water and distribution pumping systems. Phase 2 involved the addition of four new filters, along with associated PLC and SCADA graphics. Phase 3 added an ozone system to the plant headworks. PLC programming SCADA software programming Data highway networks System cutover, testing, and commissioning Troubleshooting and maintenance Project engineering Operator and maintenance staff training V:\CompanySOQs\SCADAProgrammingSvcs\Indd\04ResourcesPRG.indd ~. resources 23
26 V:\CompanySOQs\SCADAProgrammingSvcs\Indd\04ResourcesPRG.indd Name/Education/ Certifications/Years of Experience Representative Experience Expertise Mark Weston BS Computer Engineering Wonderware Certified Application Developer 28 Years of Experience Amir Najafi BS Electrical Engineering Controls and Instrumentation 22 Years of Experience Implemented replacement SCADA system for the City of Casa Grande, Arizona. System requirements include support for 24 Allen Bradley ControlLogix PLCs, fiber and copper infrastructure, servers, workstations, Wonderware Intouch/Active Factory/Historian, security camera support and managed switches. Design includes compatibility with current and future City infrastructure. Implemented the latest generation of Wonderware/Intouch/Active Factory SCADA system for the City of Reedley, California. Design included advanced terminal services techniques that allows for simple addition of workstations and wireless remote access as well as future master plan capacities. The design includes dual redundant rack mount servers and Historian running the latest server class operating systems as well as secure remote access using Cisco technologies for highly efficient ongoing support and enhancement capabilities. Provided professional design services for a major upgrade to a potable water production facility and superfund site for the San Gabriel Valley Water Company, El Monte, California. Services included design and coordination of PLCs/communication capabilities and traditional discrete/ analog communications. Provided a comprehensive SCADA/PLC system communications master plan to integrate the new equipment into an existing 35-node wide area network (WAN). Provided systems integration services for a large wastewater treatment plant expansion for the City of Tracy, California. Worked with the electrical engineer on design modifications to include industrial computers running appropriate SCADA software. Provided design and procurement services for all I&C equipment, electrical switchboards, motor control centers, and industrial control panels. Also performed testing, installation, startup, commissioning, and generation of final documentation. PLC/HMI programmer for the Contra Costa Water District 80-mgd Bollman Water Treatment Plant DCS Replacement, Concord, California. The new control systems consist of Quantum Unity hot standby PLCs and Wonderware InTouch HMI program. Duties included programming, debugging, FAT testing, and commissioning on customer site. PLC programmer for the City of Reedley, California, Wastewater Treatment Plant DCS Upgrade. Duties included PLC programming, debugging, FAT testing, and commissioning on customer site. Senior automation engineer for Schneider Electric. Responsibilities included organizing technical seminars to introduce Schneider automation products (PLCs, HMIs), monitoring and programming software, holding courses for PLC and HMI programming, technical support for OEMs, and technical support of system integrators for preparing proposals, configuration, design, and implementation. Project software leader for providing six hot test dynamometer stands for testing six cylinder diesel engineers for Perkins Engines Company Limited, United Kingdom. Duties included programming, debugging, and commissioning on customer site. Project manager for an unloading grab crane (1000 T/hr) control system for Razi Petrochemical Company. Duties included project management, design management, and supervision of commissioning and after sales service. This is a PLC-based system with Schneider Electric Telemacanique PLC and speed drives. SCADA software programming Software architecture design Communication Networks System cutover, testing, and commissioning Troubleshooting and maintenance LAN/WAN network automation PLC programming SCADA software systems Software architecture design Control systems design Project engineering Communication networks Operator and maintenance staff training ~. resources 24
27 V:\CompanySOQs\SCADAProgrammingSvcs\Indd\04ResourcesPRG.indd Name/Education/ Certifications/Years of Experience Representative Experience Expertise Tony Burgarino, PhD, P.E. PhD Environmental Engineering, MS Environmental Engineering, BS Science and Engineering 40 Years of Experience Charlie Chung, P.E. BS Electrical Engineering 45 Years of Experience Project manager for the City of Yuma, Arizona, Utility SCADA System Upgrade Phase 1. This system is a major upgrade of telemetry between remote pumping and treatment facilities and the Main Street Water Treatment Plant. Project manager for the Town of Hillsborough, California, Utilities Telemetry System. This system replaced an existing telephone-based telemetry system with a radio-based system. The system includes 9 storage tank locations, 15 pumping plant locations, and 4 sewer lift locations. Dr. Burgarino led the radio design and programming effort for the new system. Project manager for the City of Santa Cruz, California, Remote Facilities Upgrade. This project replaced remote terminal units and analog radio with new Modicon momentum programmable logic controllers and Teledesign Systems digital packet radio. Project manager/project engineer for the City of Fresno, California, Water System Telemetry and the Water System Telemetry Expansion projects. Dr. Burgarino used simulation and modeling to develop energy management control procedures and a telemetry monitoring and control system for Fresno's Water Division made up of 235 wells, a central control facility, and an integrated information management network of computers. Project manager and systems engineer for planning, evaluation, design, and construction assistance for the Municipal SCADA System Upgrades for the City of Sunnyvale, California. This was an extensive radio telemetry project to integrate control of pumping stations, water wells, a recycle plant, storm and sewer remote facilities, using radio, Ethernet radio surveillance, and server/client based computer systems. Project manager for the Contra Costa Water District Randall-Bold Water Treatment Plant DCS Upgrade, Concord, California. Provided programming services for the DCS and SCADA system. Project manager for the Contra Costa Water District, California, Randall- Bold MPP Pump Station. Project responsibilities included PLC and HMI configuration. Project engineer for software programming and startup for 68-mgd and 80-mgd expansions to the Fresno-Clovis Regional Wastewater Reclamation Facility for the City of Fresno, California. Systems engineer for design, programming, integration, and startup of a standby power facility PLC and OIS programming project for the Central Contra Costa Sanitary District in Martinez, California. The project included a redundant Modicon 984 PLC in a hot standby mode, WonderWare OIS software, and Modbus Plus fiber optic networks to communicate to all the plant control Modicon 984 PLCs. Control systems engineer for PLC software programming for the sludge distribution system for the City of Visalia, California. The system uses Allen-Bradley PLCs and a Ready Panel operator interface terminal. Project engineer for PLC programming for a wastewater treatment plant upgrade for the City of Santa Rosa, California. The work included PLC and local operator interface station programming for nine Siemens S5 PLCs. The project involved using an SST PLC simulation program to simulate all of the processes before plant startup. System programming Project management Radio telemetry systems SCADA system design Chemical feed system design PLC programming HMI programming Control system design Water and wastewater control strategy design System cutover, testing, and commissioning ~. resources 25
28 Name/Education/ Certifications/Years of Experience Representative Experience Expertise Bill Roberts BS Electrical Engineering 45 Years of Experience Elise Moore Wonderware Certified Application Developer 6 Years of Experience Provided lead support for a system integration team for the City of Fort Collins, Colorado. The team of electrical engineers, controls engineers, and electricians developed utility-wide standards for electrical and control systems primarily for two wastewater treatment facilities and one water treatment facility. Integration services included design, build, programming, and commissioning, as well as continued operations staff support. Implemented a automations program for the City of Fort Collins, Colorado, Water Production Division. Provided standards, design, and programming to convert a hard-wired 57-mgd water treatment plant to a PLC based control system. The system consisted of Modicon PLC and Modvue HMIs. Oracle was used as a historical database. Provided design-build consulting and PLC programming for a 50-mgd water treatment expansion for the City of Fort Collins, Colorado. Specified instrumentation and controls equipment and procured all equipment for in-house controls cabinet construction. Provided lead support for PLC programming, HMI programming, and database management. Performed commissioning services for the I&C equipment and the eight PLCs. Held control system training classes for the plant operations and maintenance staff. Implemented a new SCADA system for the East Larimer County Water District, Colorado. Designed, programmed, and commissioned a GE Proficy ifix HMI that communicated to remote pump stations and storage reservoirs over Ethernet/TCPIP radios to Modicon Quantum controllers. Local control was through Red Lion HMIs. Proficy Historian was used for the historical data storage. Upgraded the PLC/HMI systems for a regional water treatment facility in northern Colorado. Replaced Modicon 685 PLC controllers with Quantums and reprogrammed ten PLCs for improved communication and control. Provided logic annotation and system documentation. The stand-alone Intellution FIX 2.7 was replaced with GE Proficy ifix 5.0 and Historian with reporting through Hach WIMS. Responsible for SCADA screen development for Ak-Chin Indian Community, Arizona, Water and Wastewater SCADA/PLC System Integration. Project coordinator for the 18-mgd Dry Creek Wastewater Treatment Plant Chlorine Conversion to UV Disinfection for the City of Roseville, California. Responsibilities include managing all hard copy and electronic files, generating weekly progress meeting agendas, recording and distributing meeting minutes, and managing all programming and project coordination meetings. Project coordinator for the City of Roseville s new $100-million, 12- mgd Pleasant Grove Wastewater Treatment Plant Aeration Upgrade. Responsibilities included generating agendas for weekly progress meetings, recording and distributing meeting minutes, and writing proposed contract modifications (PCMs) and change orders (COs). PLC programming HMI programming Control cabinet design Final EI&C commissioning Operations and maintenance training SCADA software programming Database development Project administration Construction management Project coordination V:\CompanySOQs\SCADAProgrammingSvcs\Indd\04ResourcesPRG.indd ~. resources 26
29 Company profile Sacramento San Francisco Sunnyvale Fresno Our work is performed exclusively in the areas of water and wastewater, resulting in a level of understanding of key project issues that few can match. Pasadena Los Angeles Orange County Oceanside San Diego Seattle Portland Reno Carson City Walnut Creek Yuma Boise Las Vegas Inland Empire Phoenix Carollo Office Locations Salt Lake City Littleton Albuquerque Broomfield Carollo is an environmental engineering firm specializing in the planning, design, and construction of water and wastewater facilities. Our reputation is based upon client service and a continual commitment to quality. We currently maintain 38 offices in 16 states. During our 82-year history, Carollo has successfully completed more than 20,000 projects for public sector clients. Carollo is currently ranked within Engineering News Record s (ENR's) top 500 design firms. More importantly, ENR s annual Source Book ranks Carollo among the top 20 firms for water and wastewater treatment plant design. Unlike our competitors, Carollo only provides water and wastewater engineering services. We recruit nationwide and hire technical staff who have extensive background and Boston training specific to this field. For Chicago Omaha that reason, the Fort Worth Oklahoma City Dallas Austin Houston Kansas City Tampa Sarasota quality and professional standing of our core group of wastewater and water professionals equals or exceeds that provided by some of the largest Orlando Palm Beach Broward County Miami engineering firms in the country. V:\CompanySOQs\ProgrammingSvcs\Indd\05ComProfPRG.indd V:\Graphics\Stock\USCarolloOffices.ai Rev CAROLLO SYSTEMS, LLC Carollo Systems is a subsidiary of Carollo Engineers, created to provide quality SCADA system programming and integration services to our water and wastewater clients. Carollo has been providing SCADA programming services for many of our clients since In recent years, more and more of our clients have asked us to program their SCADA systems. They have been frustrated by the frequent poor quality of SCADA systems provided by company profile 27
30 We have provided engineering services to some clients for more than 70 years. contractors in the low-bid environment and want another alternative. Our clients appreciate the quality and superior long-term service that Carollo's professional and industry-focused programmers and systems engineers provide. Both our clients and Carollo have found that when SCADA programming services are provided as a professional service, the quality of the SCADA projects is significantly higher and our clients' operations personnel are more satisfied with the results. To better serve this need, Carollo formed a subsidiary company with our programming staff. We created Carollo Systems to provide: A professional, "no hassle" approach to SCADA programming projects. Best-in-class quality, service, and expertise, focused on the needs of water and wastewater utility clients. An organization built to deliver the most challenging projects on time and on budget. More client staff input on SCADA projects, resulting in less rework and greater staff satisfaction with the final product. Competitive pricing. WATER AND WASTEWATER SCADA PROGRAMMING EXPERTS Since 1993, Carollo has performed over 50 separate programming projects for over 30 different clients, all water and wastewater treatment and transmission facilities. Projects have ranged from small 100-point systems to systems with over 5,000 PLC I/O points. Our clients span the country from California to Florida. V:\CompanySOQs\ProgrammingSvcs\Indd\05ComProfPRG.indd Our staff are experienced with all of the major brands of PLCs (including Allen-Bradley, Modicon, GE, and Siemens) and SCADA HMI software (including City of Phoenix, Arizona, Cave Creek Wonderware, ifix, and RSView). We are members of the Water Reclamation Plant. Systems Integrator programs with the major vendors and maintain complete in-house hardware and software development systems for most of these products. Carollo Systems provides the full range of systems integration and SCADA programming services, focusing exclusively on water and wastewater applications. Depending on project needs, Carollo Systems can provide: PLC programming. SCADA operator interface configuration. Network equipment setup and commissioning. Radio telemetry setup and commissioning. company profile 28
31 Our client list includes the following: City of Phoenix, Arizona County Sanitation Districts of Los Angeles County, California East Bay Municipal Utility District, Oakland, California City of Fresno, California Metropolitan Water District of Southern California City of Minneapolis, Minnesota Orange County Sanitation District, California Sacramento Regional County Sanitation District, California City of San Diego, California City and County of San Francisco, California City of San José, California Santa Clara Valley Water District, California Colorado Springs Utilities, Colorado Denver Water Department, Colorado Metro Wastewater Reclamation District, Denver, Colorado City of Honolulu, Hawaii City of Minneapolis, Minnesota Kansas City, Missouri City of St. Louis, Missouri Clark County Water Reclamation District, Nevada City of Las Vegas, Nevada Southern Nevada Water Authority, Nevada City of Portland, Oregon City of Arlington, Texas El Paso Water Utilities, Texas City of Fort Worth, Texas Salt Lake City, Utah Development of historical database systems and reports. Equipment and software procurement. Installation design. Complete testing and startup services. Training and O&M manuals. Software and system upgrades. Comprehensive maintenance support services. DEDICATED TO SERVICE AND QUALITY Our team is dedicated to the goal that Carollo Systems will deliver only the best quality programming and systems integration services to our clients. The employees of Carollo Systems are located in the offices of Carollo Engineers. This maintains a close working relationship and exchange of expertise between our programmers and water utility engineers. All of the resources and expertise of Carollo Engineers are available to Carollo Systems. The two organizations continue to work closely and seamlessly to meet the needs of our clients. The mission of Carollo Systems is the same as that of Carollo Engineers: "Dedicated to creative, responsive, quality solutions for those we serve." We are confident that Carollo Systems will provide our clients with the same high caliber of expertise and service that Carollo Engineers has provided since V:\CompanySOQs\ProgrammingSvcs\Indd\05ComProfPRG.indd Carollo s state-of-the-art computer network allows us to effectively communicate and efficiently share our workload between offices. company profile 29
32 RESOURCES OF CAROLLO ENGINEERS Carollo s staff numbers more than 700 employees including more than 325 registered engineers. We are a full-service company with the experience and qualified professionals to successfully manage projects of various sizes. Our staff includes civil, sanitary, environmental, electrical, mechanical, chemical, structural, control systems, and corrosion control engineers, as well as architects, planners, and specialists in other areas. Our Electrical, Instrumentation, and Controls Design Group includes more than 50 engineers and technicians. Carollo also has computer resources including an expanded local area network (LAN) within each office, as well as a wide area network (WAN) between our offices to better facilitate communication, document transmittal, and workload sharing. MANAGEMENT PHILOSOPHY Carollo s management philosophy and the success of our company are founded on simple precepts: Seek out, hire, and hold onto the best people in the business. We recognize that the most critical element for a successful project is the project team. Carollo aggressively recruits the top candidates from the leading engineering schools across the country. We train and mentor these engineers to become the next generation of leaders for Carollo and the industry. This long-term commitment to developing excellent engineers has resulted in a depth of talent unmatched by other consulting firms. Specialize in the planning, design, and construction management of water and wastewater projects. This is our business. Our success hinges solely upon our ability to provide responsive service to our municipal clients. Commit our partners to an active role in projects. This provides our clients with top management interest, clear accountability, responsiveness, and talent. It also provides the project with a top-level team member able to commit the necessary staff and resources to each assignment. V:\CompanySOQs\ProgrammingSvcs\Indd\05ComProfPRG.indd City of Pittsburg, California Oak Hills Zone III Water Pump Station. Focus on client service. Carollo knows the value of listening to our clients and recognizes that successful projects result from the combined expertise of our staff and the client s staff. This commitment of listening and valuing client input is one of the cornerstones of Carollo s success. company profile 30
33 Our firm takes pride in the large number of clients with whom we have maintained continuing working relationships. We have worked with some clients for more than 70 years a clear indication of the quality of our work, our control of costs, and our ability to meet schedules. This whole-hearted dedication to quality results in tangible benefits to our clients and is demonstrated by our record of low change orders during construction. Carollo s Range of Expertise Carollo has provided planning, design, and construction management services for water and wastewater agencies serving populations ranging from less than 10,000 to more than 2 million. In addition to the programming services capabilities presented in the previous sections, Carollo s experience includes: Wastewater Master Planning. Wastewater Treatment. Water Reuse. Wastewater Infrastructure. Combined Sewer Overflow/Sanitary Sewer Overflow Facilities. Biosolids Management. Water Planning. Orange County Sanitation District, California. Water Treatment. Water Infrastructure. Applied Research. Construction Management. A NATIONAL PRESENCE Carollo is a national leader in water and wastewater technology. As our business has grown, we have established a strong presence throughout the U.S. Highlights of our national experience in the planning and design of water and wastewater facilities are included in the map at the end of this section. V:\CompanySOQs\ProgrammingSvcs\Indd\05ComProfPRG.indd company profile 31
34 V:\CompanySOQs\ProgrammingSvcs\Indd\05ComProfPRG.indd 2880 Gateway Oaks Drive, Suite 300 Sacramento, CA carollosystems.com Carollo Offices Phoenix, Arizona Yuma, Arizona Fresno, California Inland Empire, California Los Angeles, California Oceanside, California Orange County, California Pasadena, California Sacramento, California San Diego, California San Francisco, California Sunnyvale, California Walnut Creek, California Broomfield, Colorado Littleton, Colorado Broward County, Florida Miami, Florida Orlando, Florida Palm Beach, Florida Sarasota, Florida Tampa, Florida Boise, Idaho Chicago, Illinois Boston, Massachusetts Kansas City, Missouri Omaha, Nebraska Albuquerque, New Mexico Carson City, Nevada Las Vegas, Nevada Reno, Nevada Oklahoma City, Oklahoma Portland, Oregon Austin, Texas Dallas, Texas Fort Worth, Texas Houston, Texas Salt Lake City, Utah Seattle, Washington company profile 32
35 Carollo s Representative National Experience Carollo Engineers has been handling America s water since Our reputation is based upon client service and a continual commitment to quality. There are 38 offices nationwide staffed with more than 325 professionals. Portland, OR Design of the 300-mgd Columbia Blvd. Wastewater Treatment Plant Headworks Replacement for the City of Portland. San Francisco Bay Area, CA Assistance with several projects as part of the East Bay Municipal Utility District's $250 million Wet Weather Program to protect San Francisco Bay. Huntington Beach/Fountain Valley, CA Nearly 100 projects totaling more than $600 million in construction for the Orange County Sanitation District. Englewood, CO Permit assistance and utility planning for the Littleton/Englewood Wastewater Treatment Plant. Arlington, TX Planning and design services for first community in Texasto have its entire water supply treated with ozone. Syracuse, NY Part of a team assisting the City of Syracuse with the conceptual design of a UV disinfection facility. Las Vegas, NV Biological phosphorus removal retrofit and expansion for the Clark County Sanitation District. South Adams County, CO Comprehensive planning study to locate a new regional waste-water treatment facility for the Lower South Platte Regional Group. St. Louis/Kansas City, MO AwwaRF project to evaluate membrane technologies for removal of atrazine and other synthetic organic compounds. Mankato, MN Evaluation of ozone, ultrafiltration, nanofiltration, and UV disinfection technologies for water treatment facility optimization. Mount Pleasant, SC Membrane replacement study and water treatment master plan for Mount Pleasant Waterworks. V:\CompanySOQs\ProgrammingSvcs\Indd\06NationalExp11x17PRG.indd WtrWWNationaalExp.ai 12/20/07 Boise, ID Design of expansion of United Water Idaho's Marden Water Treatment Plant. Layton, UT Design of expansion of Weber Basin Water Conservancy District's Plant No. 3 from 26 to 46 mgd. Facilities include ozonation and UV disinfection. Phoenix, AZ 60-year relationship including $500 million in improvements for the City of Phoenix 91st Avenue Wastewater Treatment Plant. Austin,TX/Atlanta, GA/Central UT AwwaRF Project 2593, Innactivation of Pathogens by Innovative UV Technologies (participating agencies). Jefferson City, MO Facility planning and design of an innovative filter complex upgrade for the United Water Missouri Water Treatment Plant. Appleton, WI Design of 24-mgd ultrafiltration membrane water treatment plant, 4-million-gallon reservoir, and high-service pump station. Lake Forest, IL Design of a new low-pressure membrane water treatment system. East Chicago, IN Phased implementation plan to improve an aging water treatment facility. Jacksonville, FL Water treatment master plan for United Water Florida's St. John's Forest service area. RO offered the lowest cost alternative for desalination of brackish well water. Utilities Throughout U.S. AwwaRF Project 2639, PublicPerception of Tap Water Chlorinous Flavor (representative participating agencies). company profile 33
36 carolosystems.com
Tesco Controls, Inc. Design-Build & Professional Engineering Services
TESCO CONTROLS, INC. 100% EMPLOYEE- OWNED Tesco Controls, Inc. Design-Build & Professional Engineering Services Partnering Engineering Project Management Manufacturing Service Contracts Since its founding
Square D Power Management Services. Complete Custom Solutions for Your Power System
Square D Power Management Services Complete Custom Solutions for Your Power System The Total Power Management Solution Power. Managing it more efficiently and productively can give you a competitive edge.
Introduction To SCADA and Telemetry
Introduction To SCADA and Telemetry Joe Mullaney Senior I&C Engineer MSE Technology Applications, Inc. Tetragenics Division [email protected] Overview Definitions What is SCADA? What is Telemetry?
AUTOMATION AND PROCESS CONTROL
AUTOMATION AND PROCESS CONTROL THE CONTROL TECHNOLOGY GROUP FAST GROUP Since 1982, the year in which it was established, FAST has represented a costant reference point on the international scene for supplies
SHORT TRAINING COURSES
Post Office Box SR 95, Spintex Road, Ghana Tel: +233 302 812680, Fax: +233 302 814709 E mail: [email protected] Website: www.automationghana.com SHORT TRAINING COURSES Equipping industries with
ATS World-Wide Training Certification
ATS International B.V. ATS World-Wide Training Certification Life long learning is the challenge ATS combines theory and practice, from the class room to the shop-floor and IT environment. Life long learning
SECTION 13421 PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL. 1.01 Summary. A. Section Includes:
SECTION 13421 PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL 1.01 Summary A. Section Includes: 1. The ISS shall furnish all labor, materials, equipment, services and incidentals
NRG Energy Center Minneapolis
NRG Energy Center Minneapolis Beyond the Strip Chart: Drivers, Goals and Lessons Learned in Customer Metering Modernization Presented by: Tim Johnston, P.E., NRG Energy Center Minneapolis at the IDEA 99
How To Build A Scada System
SECTION 17902 SCADA SYSTEMS PART 1 - GENERAL 1.01 SCOPE OF WORK A. The work of this section shall be performed by a qualified System Integrator and includes providing and installing SCADA computer system
PLCs and SCADA Systems
Hands-On Programmable Logic Controllers and Supervisory Control / Data Acquisition Course Description This extensive course covers the essentials of SCADA and PLC systems, which are often used in close
SECTION 16926 CONTROL SOFTWARE
SECTION 16926 CONTROL SOFTWARE PART 1 GENERAL 1.01 SUMMARY: A. Contractor shall furnish a complete control software package for the Red River Wastewater Treatment Plant and the Northeast Wastewater Treatment
NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER
NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER Understanding what a PAC is starts from the understanding of PLC. A PLC is a Programmable Logic while
SCADA System Fundamentals
SCADA System Fundamentals Course No: E01-007 Credit: 1 PDH Tracy Adams, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774
Modicon M580 The next generation controller for PlantStruxure architecture
Modicon M580 The next generation controller for PlantStruxure architecture 3 5 ways the Modicon M580 will revolutionize your process Introducing Modicon M580 Built for truly open and efficient Ethernet
APPLICATION-SMART CONTROL
APPLICATION-SMART CONTROL SOLUTIONS Filling the automation void Today, customers and competitors are cutting back on process control expertise. Not so at MicroMod Automation. Instead, we re heavily investing
Intelligent Device Management with DCS, PLC, and RTU
wp_dcs PLC RTU ra 2015-07-04 12:47:00 Intelligent Device Management with DCS, PLC, and RTU EDDL-based Intelligent Device Management (IDM) software part of the Asset Management System (AMS) can be used
Enterprise Data Historian for Water Operations - Part 2
Enterprise Data Historian for Water Operations - Part 2 San Francisco Public Utilities Commission Paul Karawanny, Project Manager San Francisco s Data Historian Project Part 1: Installation & Development
The data can be transmitted through a variety of different communications platforms such as:
COMMUNICATION NETWORK General Overview of SCADA Communications Without a properly designed communication network system, a SCADA system cannot exist. All supervisory control and data acquisition aspects
City of West Palm Beach makes Water Treatment Plant Improvements by Implementing Priority Projects
October 13, 2014 Tulsa, OK City of West Palm Beach makes Water Treatment Plant Improvements by Implementing Priority Projects Ron Cass Gert-Jan Schers Location West Palm Beach 2 Consent Order - 2008 Source
ACE3600 HIGH PERFORMANCE MONITORING & CONTROL REMOTE TERMINAL UNIT
HIGH PERFORMANCE MONITORING & CONTROL REMOTE TERMINAL UNIT PAGE 1 EMPOWER YOUR SCADA NETWORK Utilities, now more than ever, are facing newer and greater hurdles. Multiple wired and wireless communication
Alain Nifenecker - General Electric Manager Controls Engineering
GE Energy Benefits of Integrating a Single Plant-Wide Control System Into a Standard Plant Design Philosophy Authors: Luis Cerrada Duque - Empresarios Agrupados Director of I&C Department Charles Weidner
Recently Completed Projects - Storage Projects
Nicor Gas Thermal Oxidizer at Reboiler #6 N/A Illinois, USA Installation of a 3.0MM BTU/HR thermal oxidizer to replace the existing less efficient flare stack at Reboiler #6. Worked through the procurement
Industry White Paper. Ensuring system availability in RSView Supervisory Edition applications
Industry White Paper Ensuring system availability in RSView Supervisory Edition applications White Paper Ensuring system availability in RSView Supervisory Edition applications Rockwell Software, Visualization
Terminal Services for InTouch 7.1/7.11. Terminal Services for InTouch 7.1/7.11 PRODUCT POSITION PRODUCT DATASHEET
Terminal Services for InTouch 7.1/7.11 PRODUCT POSITION Terminal Services for InTouch 7.1/7.11 PRODUCT DATASHEET Terminal Services for InTouch 7.1/7.11 provides manufacturing users with all the benefits
2015 Schneider Electric Training Courses. Interact with and learn about SCADA, Historian, MES and Telemetry offers.
2015 Schneider Electric Training Courses Interact with and learn about SCADA, Historian, MES and Telemetry offers. With constant industry changes and advances in technology, it s more important than ever
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION Cornerstone Principles for Conducting Business Active Treatment Systems, Inc. goes to great lengths to instill in every employee the importance of ethical
Understanding Programmable Automation Controllers (PACs) in Industrial Automation
Understanding Programmable Automation Controllers (s) in Industrial Automation Meet the Modern Industrial Application Implementing a modern industrial application can present a challenging and sometimes
Internet-Accessible Power Monitoring & Control Systems
Internet-Accessible Power Monitoring & Control Systems By GE Specification Engineers Keith B. Brock, P.E. Robert P. Hansen, PhD, P.E. Introduction Accessing electrical system information from any location
GE Intelligent Platforms. PACSystems High Availability Solutions
GE Intelligent Platforms PACSystems Solutions Minimizing the high cost of downtime To keep your essential systems running, PACSystems ensures continuous, efficient operations with superior performance
DeltaV Remote Client. DeltaV Remote Client. Introduction. DeltaV Product Data Sheet. Remote engineering and operator consoles
January 2013 Page 1 DeltaV Remote Client Remote engineering and operator consoles View Multiple DeltaV Systems from a single workstation Remote Operator Station over low speed and dial up communications
V5_21/7/14. Water Control System Integration
V5_21/7/14 Water Control System Integration Overview UGL is a highly experienced and respected engineering contractor in the Australian water industry, having successfully delivered numerous significant
Virtualized System Reduces Client s Capital and Maintenance Costs
Virtualized System Reduces Client s Capital and Maintenance Costs Insert Photo Here Steve Malyszko, P. E. President Steve Schneebeli Lead Systems Engineer Rockwell Automation Process Solutions User Group
Efficient remote access to machines and plants with SIMATIC
Efficient remote access to machines and plants with SIMATIC Telecontrol and teleservice solutions modular, flexible and secure SIMATIC NET siemens.com/industrial-remote-access Industrial remote access
INVENSYS OPERATIONS MANAGEMENT: AUTOMATING THE FUTURE OF A SUSTAINABLE SAN FRANCISCO. Invensys Operations Management
Invensys Operations Management INVENSYS OPERATIONS MANAGEMENT: AUTOMATING THE FUTURE OF A SUSTAINABLE SAN FRANCISCO SAN FRANCISCO S MASSIVE WASTEWATER AND SEWER RENOVATION PROJECT UTILIZES INVENSYS OPERATIONS
We Speak the Language of Controls
We Speak the Language of Controls Orenco Controls builds thousands upon thousands of control panels each year, from simple alarms to custom-built control systems featuring digital programmable logic and
FOXBORO. I/A Series SOFTWARE Product Specifications. I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 OVERVIEW
I/A Series SOFTWARE Product Specifications Logo I/A Series Intelligent SCADA SCADA Platform PSS 21S-2M1 B3 The I/A Series Intelligent SCADA Platform takes the traditional SCADA Master Station to a new
Changing the setup of a Factory Talk Directory. Daði Benediktson Skúli Björn Jónsson
Changing the setup of a Factory Talk Directory Daði Benediktson Skúli Björn Jónsson Factory talk directory From startup to running smelter ALCOA Fjarðaál Topics Description of the system before change
CMMS & SCADA. SCADA Intro CMMS Intro. SCADA/CMMS Interfaces Real World Applications
CMMS & SCADA Condition based maintenance SCADA Intro CMMS Intro CMMS & SCADA SCADA/CMMS Interfaces Real World Applications SCADA Intro SCADA- Supervisory Control And Data Acquisition A system that collects
The Ovation Control System. Advanced technology for secure operations and best-in-class performance
The Ovation Control System Advanced technology for secure operations and best-in-class performance Ovation Precise Control A key component of Emerson s PlantWeb digital architecture, the Ovation distributed
CLOUD-BASED SCADA SOLUTIONS
CLOUD-BASED SCADA SOLUTIONS AFFORDABLE CONTROL. ANYTIME. ANYWHERE. WWW.PRIMEXCONTROLS.COM YOU RE FEELING THE PRESSURE. From water pressure to financial pressure, communities today face a growing number
ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery
ABB North America Substation Automation Systems Innovative solutions for reliable and optimized power delivery Substation Automation Systems Advanced substation automation, protection and control solutions
Combined Cycle Control Overview
Combined Cycle Control Overview Introduction The Combined Cycle (CC) solution provides for the control and monitoring of a typical CC power plant in a cost effective, preengineered package. Basic Architecture
Monitoring Underground Power Networks
Monitoring Underground Power Networks By Mark Stiles Merve Cankaya ABSTRACT Underground electric distribution systems are common in large cities throughout the United States. Power usage for the entire
Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability
Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability Treating water efficiently A global challenge Water and wastewater treatment
HMI and Industrial PC Solutions
Right Size, Right Technology HMI and Industrial PC Solutions Inside: Improve Overall Equipment Effectiveness From factory floor to the top floor Slash Machine Cost Reduce machine component costs Update
Wonderware Industry Solutions for Facilities Management
Wonderware Industry Solutions for Facilities Management Wonderware offers software solutions for the facilities management industry that can help you provide higher quality services to your occupants,
CITY OF SANTA ROSA CITY COUNCIL CONTRACT AWARDS ACCELA PERMITS PLUS LAND MANAGEMENT SYSTEM SOFTWARE AND SERVICES
CITY OF SANTA ROSA CITY COUNCIL Agenda Item #12.2 For Council Meeting of: July 30, 2013 TO: SUBJECT: STAFF PRESENTERS: MAYOR AND CITY COUNCIL CONTRACT AWARDS ACCELA PERMITS PLUS LAND MANAGEMENT SYSTEM
Safeguarding Your Plant Automation Programs with Change Management
Safeguarding Your Plant Automation Programs with Change Management By Gary Gillespie M.S. Mechanical Engineering B.S. Mining Engineering 1 Introduction... 3 Change Management and the Plant... 3 Impact
Ease Server Support With Pre-Configured Virtualization Systems
Ease Server Support With Pre-Configured Virtualization Systems Manufacturers and industrial production companies are increasingly challenged with supporting the complex server environments that host their
CEC Controls Company Designers and Builders of quality Process Control Systems
CEC Controls Company Designers and Builders of quality Process Control Systems http://www.ceccontrols.com CEC Controls Company CEC Controls Company, Inc., founded in 1966, specializes in the design, build
COMPANY PROFILE & CAPABILITY STATEMENT
COMPANY PROFILE & CAPABILITY STATEMENT November 2014 Contents 1. Introduction... 1 1.1. Corporate Summary... 2 2. Extent of Capabilities... 3 2.1. General... 3 2.2. Water Treatment... 3 2.3. Municipal
Municipality Moves SCADA System from Desktop Computers to Terminal Services
Municipality Moves SCADA System from Desktop Computers to Terminal Services KEYWORDS Bosko Bob Loncar 1 1 1151 Bronte Road Oakville, Ontario L6M 3L1 ([email protected]) SCADA, Terminal Services, Remote
Automation & Control Planning Guide
Automation & Control Planning Guide Making Informed Decisions About Your Installed Equipment Make the most of your energy SM Introduction This guide has been assembled for customers, like you, with an
Accelerating your engineering workflow. Engineering solutions for industry
Accelerating your engineering workflow Engineering solutions for industry PlantStruxure TM is a collaborative system that allows industrial and infrastructure companies meet their automation needs and
Semaphore T BOX Applications in Data Center Facilities
Semaphore T BOX Applications in Data Center Facilities Introduction Data centers must reliably provide 24/7/365 operation. For automation and monitoring of the facility, use of a rugged, reliable RTU is
White Paper. Replacing Aging Process Automation Systems: Finding the best option. What s Inside:
White Paper Replacing Aging Process Automation Systems: What s Inside: 1. Introduction 2. The Need to Modernize Bringing business and manufacturing together Improving plant performance 3. Making the Correct
Off-the-shelf Packaged Software Systems And Custom Software Analysis By Gamal Balady MASS Group, Inc.
Off-the-shelf Packaged Software Systems And Custom Software Analysis By Gamal Balady MASS Group, Inc. April 1, 2004 1 Presentation Overview I. Packaged Software Systems vs. Custom Software Systems II.
How can I Utilize telemetry and remote SCADA architecture for distributed infrastructure?
How can I Utilize telemetry and remote SCADA architecture for distributed infrastructure? System Technical Note PlantStruxure Reference Architecture Design Your architecture Important Information Notice
The Best Solution for Energy Monitoring and Efficiency
Energy The Best Solution for Energy Monitoring and Efficiency Energy Collecting, displaying and analyzing our energy consumption is vital to our energy efficiency policy. For us this means reducing costs,
Wireless Communications for SCADA Systems Utilizing Mobile Nodes
, pp. 1-8 http://dx.doi.org/10.14257/ijsh.2013.7.5.01 Wireless Communications for SCADA Systems Utilizing Mobile Nodes Minkyu Choi Security Engineering Research Support Center, Daejon, Republic of Korea
Control of Boiler Operation using PLC SCADA
Control of Boiler Operation using PLC SCADA K. Gowri Shankar Abstract This paper outlines the various stages of operation involved in the conversion of a manually operated boiler towards a fully automated
Introduction 1 Rockwell - FactoryTalk Historian 1 Inductive Automation - Ignition 3 Wonderware - Historian 5 Siemens - Simatic Process Historian 6
Corso Systems, Inc. 125 E. 21st Street Unit 109 Chicago IL, 60616 (775) 750-0540 Choosing a Process Historian A comparison of 4 popular Process Historians and the top 5 decision making criteria most companies
Industrial Communications Training
Standards Certification Education & Training Publishing Conferences & Exhibits Industrial Communications Training Optimizing the flow and value of real-time data Expert-led training with real-world application
GEA Process Automation Solutions: Diversity A natural advantage also in process control engineering.
GEA Process Automation Solutions: Diversity A natural advantage also in process control engineering. engineering for a better world GEA Process Engineering Automation and process control systems for breweries.
Indiana s Newest Filtration Facility; East Chicago
Indiana s Newest Filtration Facility; East Chicago Innovation and Value-Added Benefits Behind East Chicago s Membrane Treatment Facility Eric Horvath, PE and Kara M. Boyles, PhD, PE August 1, 2012 Presentation
INTEGRATING SUBSTATION IT AND OT DEVICE ACCESS AND MANAGEMENT
Utilities WHITE PAPER May 2013 INTEGRATING SUBSTATION IT AND OT DEVICE ACCESS AND MANAGEMENT Table of Contents Introduction...3 Problem Statement...4 Solution Requirements...5 Components of an Integrated
A Proposed Integration of Hierarchical Mobile IP based Networks in SCADA Systems
, pp. 49-56 http://dx.doi.org/10.14257/ijsh.2013.7.5.05 A Proposed Integration of Hierarchical Mobile IP based Networks in SCADA Systems Minkyu Choi 1 and Ronnie D. Caytiles 2 1 Security Engineering Research
The Continuously Current Enterprise: Trends in lifecycle management of automation assets
: Trends in lifecycle management of automation assets 1. Introduction 2. Managing the Automation Lifecycle 3. Return on Upgrade Investment 4. Ramping Up to the Enterprise 5. Customer FIRST Regardless of
CHAPTER 12 MONITORING AND CONTROL SYSTEMS
CHAPTER 12 MONITORING AND CONTROL SYSTEMS To manage onsite wastewater treatment systems properly, monitoring of process operation and performance is necessary. Because of the increasing number and complexity
Programming software the Windows based solution for Modicon Micro/Compact/ Quantum/Momentum/584/984
Programming software the Windows based solution for Modicon Micro/Compact/ Quantum/Momentum/584/984 We do more with electricity 2 If you are like other loyal Modicon PLC owners, chances are you have a
California Wastewater
Abridged Edition L A Y P E R S O N S G U I D E T O California Wastewater Prepared by the Water Education Foundation Contents The Layperson s Guide to California Wastewater is prepared and distributed by
IT Security and OT Security. Understanding the Challenges
IT Security and OT Security Understanding the Challenges Security Maturity Evolution in Industrial Control 1950s 5/4/2012 # 2 Technology Sophistication Security Maturity Evolution in Industrial Control
PROCESS DATA VISUALIZATION AND MONITORING USING INTERNET
International Carpathian Control Conference ICCC 2002 MALENOVICE, CZECH REPUBLIC May 27-30, 2002 PROCESS DATA VISUALIZATION AND MONITORING USING INTERNET Lenka LANDRYOVÁ 1 and Jiří KOZIOREK 2 1 Department
Web SCADA Employing Application Program Interface as Data Source
보안공학연구논문지 (Journal of Security Engineering), 제 7권 제 6호 2010년 12월 Web SCADA Employing Application Program Interface as Data Source Hoon Ko 1) Abstract An Application programming interface or API is a set
E-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT
SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL 1.1. SCOPE OF WORK A. Under this item the Contractor shall furnish and install a sodium hypochlorite solution metering system complete with all accessories
LOWER TOTAL COST OF OWNERSHIP & INCREASED PRODUCTIVITY
InTouch 9.0 for Terminal Services b Lower Total Cost of Ownership b Increased Productivity b Flexible Software Deployment Visualize Analyze Optimize PRODUCT HIGHLIGHTS Multiple Platforms and Devices Ease
Using TIA Portal and the S7-1200 for Simplified, Distributed Control
Using TIA Portal and the S7-1200 for Simplified, Distributed Control Overview Introductions Patco Machine and Fab, Inc. Project Challenges The Traditional Solution Distributed Control Presenter Info Jason
COIL PROCESSING SOLUTIONS
COIL PROCESSING SOLUTIONS CELEBRATING 110 YEARS About Us The RDI Group, the parent company of Chicago Slitter, RDI Laser Blanking Systems, and RDI Punching & Bending Systems, celebrates over 110 years
KPI, OEE AND DOWNTIME ANALYTICS. An ICONICS Whitepaper
2010 KPI, OEE AND DOWNTIME ANALYTICS An ICONICS Whitepaper CONTENTS 1 ABOUT THIS DOCUMENT 1 1.1 SCOPE OF THE DOCUMENT... 1 2 INTRODUCTION 2 2.1 ICONICS TOOLS PROVIDE DOWNTIME ANALYTICS... 2 3 DETERMINING
Remote & Vendor Managed Inventory Management Systems for Bulk Solids
Inventory Management Systems for Bulk Solids Monitor Technologies, LLC. February 2005 Introduction A remote managed inventory (RMI) system allows more efficient management of product between supplier and
High Availability for Non-Traditional Discrete and Process Applications Ensuring Continuous Operations With Increased Controller Reliability
GE Intelligent Platforms High Availability for Non-Traditional Discrete and Process Applications Ensuring Continuous Operations With Increased Controller Reliability High Availability for Non-Traditional
100810-CSX-CMOS-E-2005 Automation Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
100810-CSX-CMOS-E-2005 Automation Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has about 8 years hands-on experience in process control and automation of Rockwell Automation,
Pump Controller Type ABS PC 441 Monitoring and/or Control of Pumps and Pumping Stations
Pump Controller Type ABS PC 441 Monitoring and/or Control of Pumps and Pumping Stations 2 One Solution for Monitoring, Control or Both There are many ways to improve the efficiency and reliability of your
Using Industrial IoT (IIoT)Technology
DeviceLynk is an Industrial Internet of Things application that delivers Actionable Information via hierarchical dashboards that enables users to quickly determine the appropriate action to take. When
PIPELINE ENGINEERING - Pipeline System Automation and Control - C. Bruce Warren and Mike S. Yoon PIPELINE SYSTEM AUTOMATION AND CONTROL
PIPELINE SYSTEM AUTOMATION AND CONTROL C. Bruce Warren and Mike S. Yoon BCT Group and Yoon Consulting Keywords: SCADA, RTU, Communications, Data Management, HMI, Alarm, Security, Measurement, Flow Meters,
Technical Training Module ( 30 Days)
Annexure - I Technical Training Module ( 30 Days) Section 1 : Programmable Logic Controller (PLC) 1. Introduction to Programmable Logic Controller - A Brief History, Need and advantages of PLC, PLC configuration,
EA7-T8C EA7-T10C EA7-T12C EA7-T15C
The new Generation of Touch Panels with ambitious image presentation and integrated operating function With the C-more series, featuring STN and TFT touch screens, AutomationDirect now provides the best
Recent Technologies in Nuclear Power Plant Supervisory and Control Systems
Hitachi Review Vol. 49 (2000), No. 2 61 Recent Technologies in Nuclear Power Plant Supervisory and Control Systems Toshiharu Yamamori Takashi Ichikawa Satoshi Kawaguchi Hiroyuki Honma OVERVIEW: Supervisory
How Wonderware Software Addresses the Top Challenges of the Municipal Water and Wastewater Business. Steve Garbrecht, Director of Product Marketing
How Wonderware Software Addresses the Top Challenges of the Municipal Water and Wastewater Business Steve Garbrecht, Director of Product Marketing Introduction Since 2004, the American Water Works Association
Raising the Bar on Scalability
by Phil Couling, Product Marketing Director, Supervisory HMI & SCADA Executive summary Automation and information systems represent a major investment for industrial businesses, both large and small. Long-term
InTouch. Machine Edition
Machine Edition Wonderware Machine Edition enables OEMs, Panel Builders, and End Users to quickly create intuitive, secure, and highly maintainable HMI applications for intelligent machines and on a variety
Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System)
Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System) Aye Min Zaw 1, Hla Myo Tun 2 Department of Electronic Engineering, Mandalay Technological
