29 What SHOULD be done? What CAN be done? What WILL be done? What DID we do? Master schedule Phase schedule Lookahead plan Weekly work plan

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105 Improve the planning process Establish a lean culture Create ownership and responsibility Understand the entire construction process Accept the chaotic circumstances of construction Focus on collaborative planning Be proactive and avoid firefighting Use backward planning Continuous improvement Build trust Focus on communication in all levels of the project Create accountability Involve everyone Delegate responsibility Encourage ownership and autonomy Get away from silomentality Gain overview of dependencies and relationships Optimize the process first, then improve individual activities

106

107

108

109

110

111 Alukal, G. (2003). Create a lean, mean machine. Alves, T., & Formoso, C. (2000). Guidelines for managing physical flows in construction sites. Paper presented at the Proceedings of the 8th Annual Conference of the International Group for Lean Construction Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), Aziz, R. F., & Hafez, S. M. (2013). Applying lean thinking in construction and performance improvement. Alexandria Engineering Journal, 52(4), Ballard, G. (1997). Lookahead planning: the missing link in production control. Paper presented at the 5th Annual Conference of the International Group for Lean Construction. Ballard, G. (2000). The last planner system of production control. The University of Birmingham. Ballard, G. (Producer). (2013). Glenn Ballard at NCC [video file]. Retrieved from Ballard, G., & Howell, G. (1994). Implementing lean construction: stabilizing work flow. Lean construction, Ballard, G., & Howell, G. (1995). Toward construction JIT. Lean construction, Ballard, G., & Howell, G. (1997). Implementing lean construction: improving downstream performance. Lean construction, Ballard, G., & Howell, G. (1998a). Shielding production: essential step in production control. Journal of Construction Engineering and management, 124(1), Ballard, G., & Howell, G. (1998b). What kind of production is construction. Paper presented at the 6th Annual Conference of the International Group for Lean Construction. Ballard, G., & Howell, G. (2003). An update on last planner1. Paper presented at the 11th Annual Conference of the International Group for Lean Construction.

112 Ballard, G., Howell, G., & Kartam, S. (1994). Redesigning job site planning systems. Paper presented at the Computing in Civil Engineering (1994). Bell, J. (2014). Doing Your Research Project: A guide for first-time researchers: McGraw-Hill Education (UK). Bertelsen, S. (2004). Lean Construction: Where are we and how to proceed. Lean construction journal, 1(1), Bertelsen, S., & Bonke, S. (2011). TFV as a strategic tool. Paper presented at the 19th Annual Conference of the International Group for Lean Construction. Bertelsen, S., & Koskela, L. (2002). Managing the three aspects of production in construction. Paper presented at the 10th Annual Conference of the International Group for Lean Construction Gramado, Brazil. Bertelsen, S., Koskela, L., Henrich, G., & Rooke, J. (2006). Critical flow towards a construction flow theory. Paper presented at the Proceedings of the 14th Annual Conference of the International Group for Lean Construction. BKP. (2010). Organisasjonsutvikling og læring knyttet til Trimmet bygging. Brass, D. J. (1981). Structural relationships, job characteristics, and worker satisfaction and performance. Administrative science quarterly, Bølviken, T., & Kalsaas, B. T. (2011). Discussion of strategies for measuring workflow in construction. Paper presented at the Proceedings 19th Annual Conference of the International Group for Lean Construction. Chapman, C. (2005). Clean house with lean 5S. Quality progress, 38(6), Cherry, E. (2009). Architectural Programming. Retrieved , from Chua, D., & Shen, L. (2005). Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and management, 131(7), Forbes, L. H., & Ahmed, S. M. (2010). Modern construction: lean project delivery and integrated practices: CRC Press. Fosse, R. (2014). Forbedring av arbeid på byggeplass ved operasjonsanalyse og Lean Construction. NTNU, Trondheim. Frandson, A., Berghede, K., & Tommelein, I. D. (2014). Takt-Time Planning and the Last Planner. Paper presented at the Proceedings of the 22nd Annual Conference of the International Group for Lean Construction. Hamzeh, F. R., Ballard, G., & Tommelein, I. D. (2008). Improving construction workflow-the connective role of lookahead planning. Paper presented at the Proceedings for the 16th annual conference of the International Group for Lean Construction. Herzberg, F., Mausner, B., & Snyderman, B. (1959). Themotivation to work. NewYork, NY: John Wiley and Sons, 141. Howell, G. (1999). What is lean construction. Paper presented at the 7th Annual Conference of the International Group for Lean Construction Howell, G., & Ballard, G. (1997). Lean production theory: Moving beyond Can- Do. Lean construction, Kalsaas, B. T. (2013). Measuring waste and workflow in construction. Proceedings of the 21st Annual Conference of the International Group for Lean Construction. Kalsaas, B. T., & Bølviken, T. (2010). Flow of work in construction a conceptual discussion. Proceedings of the 18th Annual Conference of the International Group for Lean Construction.

113 Kalsaas, B. T., & Bølviken, T. (2011). Discussion of Strategies for Measuring Workflow in Construction. Paper presented at the Proceedings of the 19th Annual Conference of the International Group for Lean Construction. Kalsaas, B. T., Grindhein, I., & Læknes, N. (2014). Integrated Planning vs. Last Planner System. Paper presented at the Proceedings of the 22nd Annual Conference of the International Group for Lean Construction. Kalsaas, B. T., Gundersen, M., & Berge, T. O. (2014). To Measure Workflow and Waste. A Concept for Continuous Improvement. Paper presented at the Proceedings of the 22nd Annual Conference of the International Group for Lean Construction. Kim, Y.-W., & Ballard, G. (2000). Is the earned-value method an enemy of work flow. Paper presented at the 8th Annual Conference of the International Group for Lean Construction King's-College. Google Scholar for citation analysis? Retrieved 16.06, 2015, from nalysis/googlescholar.aspx KIT. Implementation of Lean Management to the Decommissioning of Nuclear Facilities. Karlsruhe Institute of Technology. Retrieved 17.06, 2015, from Koskela, L. (1997). Lean production in construction. Lean construction, 1-9. Koskela, L. (1999). Management of production in construction: a theoretical view. Paper presented at the 7th Annual Conference of the International Group for Lean Construction. Koskela, L. (2000). An exploration towards a production theory and its application to construction: VTT Technical Research Centre of Finland. Koskela, L. (2004). Making do-the eighth category of waste. Paper presented at the Proceedings of the 12th annual conference of the International Group for Lean Construction. KPMG. (2015). Global Construction Survey Climbing the curve. Kraemer, K., Henrich, G., Koskela, L., & Kagioglou, M. (2007). How construction flows have been understood in lean construction. Paper presented at the 4th International SCRI Symposium, as part of the 4th International Research Week (IRW proceedings). Kvale, S. (2008). Doing interviews: Sage. LCI. What is Lean Design and Construction? Retrieved 13.06, 2015, from LeanConstruction-DK. (2012). Håndbog i Trimmet Byggeri. Retrieved 03.06, 2015, from Leone, G., & Rahn, R. D. (2002). Fundamentals of flow manufacturing: Flow Publishing. Liker, J. (2004). The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer: McGraw-Hill. Lindhard, S., & Wandahl, S. (2012). On the road to improved scheduling - fitting activities to capacity. Paper presented at the COBRA 2012-RICS International Research Conference. Lindhard, S., & Wandahl, S. (2014). Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1),

114 Linnik, M., Berghede, K., & Ballard, G. (2013). An experiment in takt-time planning applied to non-repetitive work. Paper presented at the Proceedings of the 21st Annual Conference of the International Group for Lean Construction. Liu, M., Ballard, G., & Ibbs, W. (2010). Work flow variation and labor productivity: Case study. Journal of management in engineering, 27(4), Martin, K., & Osterling, M. (2013). Value stream mapping: how to visualize work and align leadership for organizational transformation: McGraw Hill Professional. Meld.St.28. (2012). Meld. St. 28 ( ) Gode bygg for eit betre samfunn (Public report nr. 28). Miles, M. B., & Huberman, A. M. (1994). Qualitative data analysis: An expanded sourcebook: Sage. Milling, C., & Høybye, D. (2014). Merværdi i Leanpojekter. DTU, Lyngby. Mitropoulos, P., & Nichita, T. (2009). Critical concerns of production control system on projects with labor constraints: Lessons from a residential case study. Journal of management in engineering, 26(3), Modig, N., & Åhlström, P. (2012). This is lean: Resolving the efficiency paradox: Rheologica. Moen, R., & Norman, C. (2006). Evolution of the PDCA cycle. NCC-Denmark. (2013). Rapport Projekt Tillidsbaseret Lean. Retrieved 15.06, 2015, from final-word-2-.pdf Nielsen, A. S., & Kristensen, E. L. (2002). Lean Construction En redegørelse for det amerikanske produktionskoncept. Final thesis at Aalborg University. Odgaard, G., & Scheibel, L. (2014). Trust-based LEAN - a collaboration project between employers and construction workers in NCC Construction, Denmark. Ōno, T. (1988). Toyota production system: beyond large-scale production: Productivity press. Pedersen, P. H. (2013). SSB-statistikken om produktivitet er ikke verdt noe. Pérez, C., Costa, D., & Gonçalves, J. (2014). Concepts and Methods for Measuring Flows and Associated Wastes. Paper presented at the Proceedings of the 22nd Annual Conference of the International Group for Lean Construction. Produktivitetskommisjonen. (2015). Produktivitet - grunnlag for vekst og velferd: Norwegian Comission of Productivity. Rother, M., & Shook, J. (2003). Learning to see: value stream mapping to add value and eliminate muda: Lean Enterprise Institute. Sacks, R., Treckmann, M., & Rozenfeld, O. (2009). Visualization of work flow to support lean construction. Journal of Construction Engineering and management, 135(12), Salthaug, M., & Sørensen, M. (2010). Arbeidsflyt i byggproduksjon-analyse av målemuligheter. Saunders, M., Lewis, P., & Thornhill, A. (2009). Research methods for business students. Harlow: Prentice Hall. Schmenner, R. (1988). The merit of making things fast. MIT Sloan Management Review, 30(1), 11.

115 Seppänen, O. (2014). Comparison of Takt Time and LBMS Planning Methods. Paper presented at the Proceedings of the 22nd Annual Conference of the International Group for Lean Construction, Oslo, Norway. Seppänen, O., Ballard, G., & Pesonen, S. (2010). The combination of last planner system and location-based management system. Lean construction journal, 6(1), Serrat, O. (2009). The five whys technique. Knowledge Solutions, Asian Development Bank. Shingo, S. (1988). Non-stock production: the Shingo system of continuous improvement: Productivity Press. Sweis, G., Sweis, R., Hammad, A. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International journal of project management, 26(6), Tommelein, I. D., Riley, D. R., & Howell, G. (1999). Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and management, 125(5), UHS. Lean Project Delivery Guide Appendix 6: Last Planner System of Production Control: Universal Health Services. Womack, J. P., & Jones, D. T. (2003). Lean thinking: banish waste and create wealth in your corporation (2nd ed.): Simon and Schuster. Yassine, T., Bacha, M., Fayek, F., & Hamzeh, F. (2014). Implementing Takt-Time Planning in Construction to Improve Work Flow. Paper presented at the 22nd Annual Conference of the International Group for Lean Construction, Oslo, Norway. Yin, R. K. (2010). Qualitative research from start to finish: Guilford Press. Yin, R. K. (2013). Case study research: Design and methods: Sage publications. Zuo, J., & Zillante, G. (2005). Project culture within construction projects: a literature review. Paper presented at the 13th Annual Conference of the International Group for Lean Construction

116

117

118

119

120

121

122

ResearcH JournaL 2014 / VOL 06.02. www.perkinswill.com

ResearcH JournaL 2014 / VOL 06.02. www.perkinswill.com ResearcH JournaL 2014 / VOL 06.02 www.perkinswill.com PERKINS+WILL RESEARCH JOURNAL / VOL 06.02 02. IMPACT OF LEAN PRINCIPLES ON TIMELY PROJECT COMPLETION Helena O Connor, CAU-RJ, LEEP AP, helena.oconnor@perkinswill.com

More information

The Combination of Last Planner System and Location-Based Management System

The Combination of Last Planner System and Location-Based Management System Seppänen, Olli, Glenn Ballard & Sakari Pesonen (2010) The Combination of Last Planner System and Location- Based Management System Lean Construction Journal 1 2010 pp 43-54 Abstract The Combination of

More information

PLANNING THE PRODUCT DEVELOPMENT PROCESS IN CONSTRUCTION: AN EXPLORATORY CASE STUDY

PLANNING THE PRODUCT DEVELOPMENT PROCESS IN CONSTRUCTION: AN EXPLORATORY CASE STUDY PLANNING THE PRODUCT DEVELOPMENT PROCESS IN CONSTRUCTION: AN EXPLORATORY CASE STUDY Patricia Tzortzopoulos 1, Carlos Torres Formoso 2, Martin Betts 3 ABSTRACT The emergence of a new production paradigm

More information

Implementing Lean Construction: Stabilizing Work Flow *

Implementing Lean Construction: Stabilizing Work Flow * Implementing Lean Construction: Stabilizing Work Flow * GLENN BALLARD Department of Civil Engineering, University of California, Berkeley, CA 94720 GREG HOWELL Department of Civil Engineering, University

More information

Learning to see the Effects of Improved Workflow in Civil Engineering Projects

Learning to see the Effects of Improved Workflow in Civil Engineering Projects Simonsson, Peter; Björnfot, Anders; Erikshammar, Jarkko and Olofsson, Thomas (2012) Learning to see the Effects of Improved Workflow in Civil Engineering Projects. Lean Construction Journal 2012 pp 35-48

More information

DIFFERENT PERSPECTIVES ON TEACHING LEAN CONSTRUCTION

DIFFERENT PERSPECTIVES ON TEACHING LEAN CONSTRUCTION DIFFERENT PERSPECTIVES ON TEACHING LEAN CONSTRUCTION Cynthia C.Y. Tsao 1, Thais da C. L. Alves 2, and Panagiotis (Takis) Mitropoulos 3 ABSTRACT There has been limited documentation in the literature on

More information

A RESEARCH SYNTHESIS ON THE INTERFACE BETWEEN LEAN CONSTRUCTION AND SAFETY MANAGEMENT

A RESEARCH SYNTHESIS ON THE INTERFACE BETWEEN LEAN CONSTRUCTION AND SAFETY MANAGEMENT A RESEARCH SYNTHESIS ON THE INTERFACE BETWEEN LEAN CONSTRUCTION AND SAFETY MANAGEMENT Eric I. Antillón 1, Luis F. Alarcón 2, Matthew R. Hallowell 3, and Keith R. Molenaar 4 ABSTRACT Applying lean construction

More information

CREATING VALUE THROUGH LEAN PRODUCT DEVELOPMENT APPLYING LEAN PRINCIPLES

CREATING VALUE THROUGH LEAN PRODUCT DEVELOPMENT APPLYING LEAN PRINCIPLES INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, ICED11 15-18 AUGUST 2011, TECHNICAL UNIVERSITY OF DENMARK CREATING VALUE THROUGH LEAN PRODUCT DEVELOPMENT APPLYING LEAN PRINCIPLES Jörgen Furuhjelm 1, Håkan

More information

: Dr. A.Satyanandini (Professor & HOD, Management Studies &Research Centre, BMS College of Engineering, Bangalore)

: Dr. A.Satyanandini (Professor & HOD, Management Studies &Research Centre, BMS College of Engineering, Bangalore) Name of the Candidate Name of the Guide Research Centre : Mrs. Jayasree Radhakrishnan : Dr. A.Satyanandini (Professor & HOD, Management Studies &Research Centre, BMS College of Engineering, Bangalore)

More information

APPLICATION OF LEAN PRINCIPLES & PRACTICES IN CONSTRUCTION MANAGEMENT

APPLICATION OF LEAN PRINCIPLES & PRACTICES IN CONSTRUCTION MANAGEMENT APPLICATION OF LEAN PRINCIPLES & PRACTICES IN CONSTRUCTION MANAGEMENT John Gresh, Drexel University The Big Deal about Lean Lean as a production philosophy can often be credited to the Toyota Production

More information

IMPROVING THE PRODUCTION PLANNING AND CONTROL SYSTEM IN A BUILDING COMPANY: CONTRIBUTIONS AFTER STABILIZATION

IMPROVING THE PRODUCTION PLANNING AND CONTROL SYSTEM IN A BUILDING COMPANY: CONTRIBUTIONS AFTER STABILIZATION IMPROVING THE PRODUCTION PLANNING AND CONTROL SYSTEM IN A BUILDING COMPANY: CONTRIBUTIONS AFTER STABILIZATION Alexandre C. Soares 1, Maurício M. S. Bernardes 2 and Carlos T. Formoso 3 ABSTRACT Several

More information

How To Implement Ppc In Korea

How To Implement Ppc In Korea IMPLEMENTING PPC IN KOREA S CONSTRUCTION INDUSTRY Chul-woo Lim 1, Jung-ho Yu 2, and Chang-duk Kim 3 ABSTRACT Developed by the Lean Construction Institute, the Last Planner System (LPS) consists of four

More information

CONSTRUCTION BEYOND LEAN: A NEW UNDERSTANDING OF CONSTRUCTION MANAGEMENT

CONSTRUCTION BEYOND LEAN: A NEW UNDERSTANDING OF CONSTRUCTION MANAGEMENT Presented at the 12th annual conference in the International Grop for Lean Construction, Elsinore, Denmark, 2004 CONSTRUCTION BEYOND LEAN: A NEW UNDERSTANDING OF CONSTRUCTION MANAGEMENT Sven Bertelsen

More information

IPD, Lean and BIM: Hype or the Real Deal?

IPD, Lean and BIM: Hype or the Real Deal? IPD, Lean and BIM: Hype or the Real Deal? Retail Contractors Association 2012 Annual Meeting Michael Stark AGC of America What Are BIM, Lean and IPD? The Next 45 Minutes How Are They Tied Together? Should

More information

QUANTIFYING IMPACTS OF LAST PLANNER IMPLEMENTATION IN INDUSTRIAL MINING PROJECTS

QUANTIFYING IMPACTS OF LAST PLANNER IMPLEMENTATION IN INDUSTRIAL MINING PROJECTS 518 QUANTIFYING IMPACTS OF LAST PLANNER IMPLEMENTATION IN INDUSTRIAL MINING PROJECTS ABSTRACT Mauricio Leal 1 and Luis F. Alarcón 2 Over the years an increasing number of companies have implemented the

More information

A LEAN WORKFLOW INDEX FOR CONSTRUCTION PROJECTS

A LEAN WORKFLOW INDEX FOR CONSTRUCTION PROJECTS A Lean Workflow Index for Construction Projects A LEAN WORKFLOW INDEX FOR CONSTRUCTION PROJECTS Vitaliy Priven 1, Rafael Sacks 2, Olli Seppänen 3 and Jonathan Savosnick 4 ABSTRACT Traditional monitoring

More information

Lean IT Foundation Syllabus

Lean IT Foundation Syllabus Lean IT Foundation Syllabus December 2015 - Version 1.06 1 Introduction Lean IT Foundation helps IT organizations to ensure that they provide their customers with the best possible services. Through understanding

More information

The paper should take you around 60 minutes to read and complete any directed tasks.

The paper should take you around 60 minutes to read and complete any directed tasks. Lean Production B This paper is extracted from the BE1170 Project, Programme and Portfolio Management module, Department of Architecture, Engineering and Construction, School of the Built and Natural Environment,

More information

Syllabus ENVR E-137 Sustainable Manufacturing and Supply Chain Management Operations Fall 2014 (4 Credits) CRN (14010)

Syllabus ENVR E-137 Sustainable Manufacturing and Supply Chain Management Operations Fall 2014 (4 Credits) CRN (14010) Syllabus ENVR E-137 Sustainable Manufacturing and Supply Chain Management Operations Fall 2014 (4 Credits) CRN (14010) Instructor: Ramon Sanchez, ScD. Assistant Director Sustainability and Environmental

More information

Course Outline UCLA Extension Department of Engineering, Information Systems & Technical Management

Course Outline UCLA Extension Department of Engineering, Information Systems & Technical Management Course Outline UCLA Extension Department of Engineering, Information Systems & Technical Management Course Number & Title: X 428.68 Lean Operations Course Instructor: Saeed Madjidi, BSIE, MBA Phone: (C)

More information

MDM AS A PROCESS MAPPING TOOL IN LEAN CONSTRUCTION

MDM AS A PROCESS MAPPING TOOL IN LEAN CONSTRUCTION 12 TH INTERNATIONAL DEPENDENCY AND STRUCTURE MODELLING CONFERENCE, DSM 10 22 23 JULY 2010, CAMBRIDGE, UK MDM AS A PROCESS MAPPING TOOL IN LEAN CONSTRUCTION Fabian Furtmeier 1, Martin Graebsch 1, Fatos

More information

IMPACT OF LEAN MANUFACTURING TECHNIQUES FROM THE PERSPECTIVE OF MANAGEMENT ACCOUNTING ON INVENTORY TURNOVER

IMPACT OF LEAN MANUFACTURING TECHNIQUES FROM THE PERSPECTIVE OF MANAGEMENT ACCOUNTING ON INVENTORY TURNOVER IMPACT OF LEAN MANUFACTURING TECHNIQUES FROM THE PERSPECTIVE OF MANAGEMENT ACCOUNTING ON INVENTORY TURNOVER *Jalal Aspookeh 1, Hamid Reza Vakili Fard 2 and Shirzad Naderi 1 1 Department of Accounting,

More information

OPERATIONAL EXCELLENCE A KEY TO WORLD- CLASS BUSINESS PERFORMANCE

OPERATIONAL EXCELLENCE A KEY TO WORLD- CLASS BUSINESS PERFORMANCE OPERATIONAL EXCELLENCE A KEY TO WORLD- CLASS BUSINESS PERFORMANCE NĂFTĂNĂILĂ Ion Academy of Economic Studies, Bucharest, Romania RADU Cătălina Academy of Economic Studies, Bucharest, Romania CIOANĂ Georgiana

More information

Job Shop Lean Production Implementation Using Program Evaluation and Review Technique (Pert)

Job Shop Lean Production Implementation Using Program Evaluation and Review Technique (Pert) Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 Job Shop Lean Production Implementation Using Program Evaluation

More information

CONSTRUCTION SUPPLY CHAINS: TURKISH SUPPLY CHAIN CONFIGURATIONS FOR CUT AND BENT REBAR

CONSTRUCTION SUPPLY CHAINS: TURKISH SUPPLY CHAIN CONFIGURATIONS FOR CUT AND BENT REBAR CONSTRUCTION SUPPLY CHAINS: TURKISH SUPPLY CHAIN CONFIGURATIONS FOR CUT AND BENT REBAR Gul Polat 1 and Glenn Ballard 2 ABSTRACT This paper presents current supply chain configurations for concrete reinforcement

More information

MSc in Lean Operations. Module Descriptions

MSc in Lean Operations. Module Descriptions MSc in Lean Operations Module Descriptions 2010 BSP320 Lean Thinking & Practice To establish the roots, underlying philosophy and development of the lean thinking approach. By the end of the module, the

More information

A PRODUCTION PLANNING SUPPORT SYSTEM FOR CONSTRUCTION PROJECTS

A PRODUCTION PLANNING SUPPORT SYSTEM FOR CONSTRUCTION PROJECTS A PRODUCTION PLANNING SUPPORT SYSTEM FOR CONSTRUCTION PROJECTS Luis F. Alarcón 1 and Rodrigo Calderón 2 ABSTRACT This paper describes a computer system developed by the Production Management Center of

More information

WHITE PAPER. Lean Construction. Technology Advances in Lean Construction

WHITE PAPER. Lean Construction. Technology Advances in Lean Construction WHITE PAPER Lean Construction Technology Advances in Lean Construction Contents 1. Introduction... 1 2. Origins of Lean Construction... 2 3. Lean Construction Principles... 4 4. Advancements in Lean Construction

More information

DEVELOPING A MODEL FOR PLANNING AND CONTROLLING PRODUCTION IN SMALL SIZED BUILDING FIRMS

DEVELOPING A MODEL FOR PLANNING AND CONTROLLING PRODUCTION IN SMALL SIZED BUILDING FIRMS Developing a Model for Planning and Controlling Production in Small Sized Building Firms DEVELOPING A MODEL FOR PLANNING AND CONTROLLING PRODUCTION IN SMALL SIZED BUILDING FIRMS Carlos T. Formoso 1, Maurício

More information

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage. Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Last Planner in Lean Construction

More information

The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures

The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures Daryl Powell 1, Erlend Alfnes 1 and Marco Semini 2 1 Department of Production

More information

AN EXPERIENCE OF INTRODUCING LAST PLANNER INTO A UK CONSTRUCTION PROJECT

AN EXPERIENCE OF INTRODUCING LAST PLANNER INTO A UK CONSTRUCTION PROJECT AN EXPERIENCE OF INTRODUCING LAST PLANNER INTO A UK CONSTRUCTION PROJECT Eric Johansen 1 and Geoff Porter 2 ABSTRACT The Last Planner methodology developed by the Lean Construction Institute is a production

More information

How To Be A Successful Company

How To Be A Successful Company LEAN In the End It s All About People Orest J Fiume Retired VP Finance The Wiremold Company Copyright 2010- Orest J Fiume. All rights reserved LEAN A Business Strategy Not A Manufacturing Tactic Not A

More information

WORKPLAN: DATABASE FOR WORK PACKAGE PRODUCTION SCHEDULING

WORKPLAN: DATABASE FOR WORK PACKAGE PRODUCTION SCHEDULING WorkPlan: Database for Work Package Production Scheduling WORKPLAN: DATABASE FOR WORK PACKAGE PRODUCTION SCHEDULING Hyun Jeong Choo 1, Iris D. Tommelein 2, Glenn Ballard 3, and Todd R. Zabelle 4 ABSTRACT

More information

Exploring Competitive Advantage through Lean Implementation in the Aerospace Supply Chain

Exploring Competitive Advantage through Lean Implementation in the Aerospace Supply Chain Exploring Competitive Advantage through Lean Implementation in the Aerospace Supply Chain Valerie Crute, Allan Wickham, Richard Johns and Andrew Graves UK Lean Aerospace Initiative, School of Management

More information

The Last Planner System of Production Planning & Control. Glenn Ballard Trondheim, Norway May 21, 2014

The Last Planner System of Production Planning & Control. Glenn Ballard Trondheim, Norway May 21, 2014 The Last Planner System of Production Planning & Control Glenn Ballard Trondheim, Norway May 21, 2014 Outline Peculiarities of ETO projects Characteristics of construction and shipbuilding Last Planner

More information

LEAN CONSTRUCTION: WHERE ARE WE AND HOW TO PROCEED?

LEAN CONSTRUCTION: WHERE ARE WE AND HOW TO PROCEED? LEAN CONSTRUCTION: WHERE ARE WE AND HOW TO PROCEED? Abstract Sven Bertelsen 1 This paper is written in the light of the papers for the 12 th annual conference in the International Group for Lean Construction.

More information

THE TRANSPARENT AND VISUAL AUTOMOTIVE SUPPLY CHAIN

THE TRANSPARENT AND VISUAL AUTOMOTIVE SUPPLY CHAIN THE TRANSPARENT AND VISUAL AUTOMOTIVE SUPPLY CHAIN Dr.ing Kristian Martinsen, Raufoss Technology and Industrial Mangement Box 221, N2831 Raufoss, NORWAY, kristian.martinsen@raufoss.com Dr.ing. Jan Ola

More information

Implementing Automation after Making Lean Improvements

Implementing Automation after Making Lean Improvements Implementing Automation after Making Lean Improvements Frank C. Garcia, P.E., Director Business Solutions & Engineering Services Tom Lawton, President Advent Design Corporation Bristol, PA, USA December

More information

Value Stream Mapping Basics

Value Stream Mapping Basics Value Stream Mapping Basics Learning Objectives At the end of this module, you will be able to: Sketch a basic value stream map Demonstrate basic value stream analysis Recognize steps for process improvement

More information

Lean Training Ideas for TECOM. The Marine Corps needs more training time. Industry best practices can improve our training pipeline.

Lean Training Ideas for TECOM. The Marine Corps needs more training time. Industry best practices can improve our training pipeline. Lean Training Ideas for TECOM The Marine Corps needs more training time. Industry best practices can improve our training pipeline. LtCol B. B. McBreen, 1st RTBn, 2007 1 What is Lean? At MIT in 1988, Dr.

More information

PLAYING GAMES: EVALUATING THE IMPACT OF LEAN PRODUCTION STRATEGIES ON PROJECT COST AND SCHEDULE

PLAYING GAMES: EVALUATING THE IMPACT OF LEAN PRODUCTION STRATEGIES ON PROJECT COST AND SCHEDULE Playing Games: Evaluating The Impact of Lean Production Strategies on Project Cost and Schedule PLAYING GAMES: EVALUATING THE IMPACT OF LEAN PRODUCTION STRATEGIES ON PROJECT COST AND SCHEDULE Luis F. Alarcón

More information

A Study of the Application of Supply Chain Management in Construction Industry

A Study of the Application of Supply Chain Management in Construction Industry Association for Information Systems AIS Electronic Library (AISeL) WHICEB 2013 Proceedings Wuhan International Conference on e-business 5-25-2013 A Study of the Application of Supply Chain Management in

More information

The Building Process - challenges in a changing environment

The Building Process - challenges in a changing environment The Building Process - challenges in a changing environment Introduction Tore I Haugen, professor BEAM - Building Economics and Architectural Management Norwegian University of Science and Technology The

More information

The Need for Lean Training

The Need for Lean Training The Need for Lean Training Jim Keyes University of Wisconsin Stout The recent economic downturn and the sustaining of lower economic conditions into the near future have caused manufacturers to reevaluate

More information

REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL

REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL Praveen Saraswat 1, Deepak Kumar 2 and Manoj Kumar Sain 3 1 Senior Lecturer, 2,3 Associate

More information

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 MODULE 1 LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 1. Cultural Enablers 15% 20% 25% 1.1. Principles of Cultural Enablers 3% 4% 5% 1.1.1. Respect for the individual 1.1.2. Humility 1.2. Processes

More information

ADDING PRODUCTION VALUE THROUGH APPLICATION OF VALUE BASED SCHEDULING

ADDING PRODUCTION VALUE THROUGH APPLICATION OF VALUE BASED SCHEDULING ADDING PRODUCTION VALUE THROUGH APPLICATION OF VALUE BASED SCHEDULING Søren Lindhard 1 and Søren Wandahl 2 1Department of Mecanical and Manufacturing Engeneering, Aalborg University, Fibigerstræde 16,

More information

Stay Up-to-Date on Webinars. @LeanDotOrg (Twitter)

Stay Up-to-Date on Webinars. @LeanDotOrg (Twitter) Stay Up-to-Date on Webinars @LeanDotOrg (Twitter) 1 June 23, 2011 The Gemba Walk Jim Womack Senior Advisor, Lean Enterprise Institute 2 Housekeeping To enlarge slides, use the magnifying g glass icon just

More information

WE NEED A THEORY OF CONSTRUCTION. Lauri Koskela 1

WE NEED A THEORY OF CONSTRUCTION. Lauri Koskela 1 WE NEED A THEORY OF CONSTRUCTION Lauri Koskela 1 INTRODUCTION The guidelines for White Papers for Berkeley-Stanford CE&M workshop suggest deriving research needs from the practical needs of the industry.

More information

A case for a paradigm shift in the foundational theory of client-side construction project management. Greg Usher

A case for a paradigm shift in the foundational theory of client-side construction project management. Greg Usher A case for a paradigm shift in the foundational theory of client-side construction project management Greg Usher Explore whether the traditionally-accepted, underlying body of theory for project management

More information

How to Initiate and Sustain Lean Process Improvement

How to Initiate and Sustain Lean Process Improvement How to Initiate and Sustain Lean Process Improvement Gary Sheehan, MBA President and Chief Executive Officer Cape Medical Supply, Inc. HOMES Annual Meeting May 19th, 2014 Newport, RI Learning Objectives

More information

Degree Programme in International Business Management (Masters Degree) Management and Business Research Strategies

Degree Programme in International Business Management (Masters Degree) Management and Business Research Strategies Page 1 of 13 Degree Programme in International Business Management (Masters Degree) Management and Business Research Strategies Code: MGT2LG011 Extent: 6 ECTS 1st semester English core studies compulsory

More information

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Integrity, Reliability and Failure of Mechanical Systems Paper Ref: 3927 AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Eric Costa 1(*), Rui Sousa 1, Sara Bragança 1,

More information

A PRELIMINARY PROPOSAL FOR A WASTE- BASED MANAGEMENT APPROACH TO IMPROVE PERFORMANCE IN CONSTRUCTION

A PRELIMINARY PROPOSAL FOR A WASTE- BASED MANAGEMENT APPROACH TO IMPROVE PERFORMANCE IN CONSTRUCTION A PRELIMINARY PROPOSAL FOR A WASTE- BASED MANAGEMENT APPROACH TO IMPROVE PERFORMANCE IN CONSTRUCTION Juan Felipe Pons Achell 1 and Marc Bach Bonet 2 ABSTRACT The 20th IGLC Conference held in San Diego

More information

EFFECTIVENESS OF LEAN PRINCIPLES IN CONSTRUCTION

EFFECTIVENESS OF LEAN PRINCIPLES IN CONSTRUCTION 421 EFFECTIVENESS OF LEAN PRINCIPLES IN CONSTRUCTION Satish B. Mohan 1 and Sumathi Iyer 2 ABSTRACT This paper analyses the experiences of 16 companies who utilized lean construction principles, during

More information

Electric vehicles or use of hydrogen in the Norwegian transport sector in 2050?

Electric vehicles or use of hydrogen in the Norwegian transport sector in 2050? Electric vehicles or use of hydrogen in the Norwegian transport sector in 2050? Klaus Skytte DTU Management Engineering Energy Economics and Regulation klsk@dtu.dk TOP NEST workshop - WP2 NIFU, Oslo, 2

More information

Optimization of kitting process: A case study of Dynapac Compaction Equipment AB

Optimization of kitting process: A case study of Dynapac Compaction Equipment AB Optimization of kitting process: A case study of Dynapac Compaction Equipment AB Jonas Hantoft Department of Industrial Economics and Management Blekinge Institute of Technology Karlskrona Sweden 2015

More information

The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1

The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1 The Thinking Approach LEAN CONCEPTS All rights reserved 1 Basic Thinking to Manage the Journey MANAGEMENT TACTICS OF A LEAN TRANSFORMATION All rights reserved 2 LEAN MANAGEMENT Two key questions What is

More information

Course Outline. Executive Master of Arts in International Educational Leadership and Change : Leading Organizational Change

Course Outline. Executive Master of Arts in International Educational Leadership and Change : Leading Organizational Change Course Outline Part I Programme Title : Executive Master of Arts in International Educational Leadership and Change Course Title Course code Department : Leading Organizational Change : EDA6009 : Education

More information

TOOL FOR MAPPING MANUFACTURING CRTICAL-PATH TIME IN JOB SHOP ENVIRONMENT Chong Kuan Eng 1, How Whee Ching 2 1,2 Faculty of Manufacturing Engineering,

TOOL FOR MAPPING MANUFACTURING CRTICAL-PATH TIME IN JOB SHOP ENVIRONMENT Chong Kuan Eng 1, How Whee Ching 2 1,2 Faculty of Manufacturing Engineering, Sci.Int.(Lahore),26(4),1585-1589,2014 ISSN 1013-5316; CODEN: SINTE 8 1585 TOOL FOR MAPPING MANUFACTURING CRTICAL-PATH TIME IN JOB SHOP ENVIRONMENT Chong Kuan Eng 1, How Whee Ching 2 1,2 Faculty of Manufacturing

More information

ABSTRACT MAXIMIZING VALUE AND MINIMIZING WASTE: UNIVERSAL GOALS

ABSTRACT MAXIMIZING VALUE AND MINIMIZING WASTE: UNIVERSAL GOALS Production System Design: Work Structuring Revisited LCI White Paper #11 by Glenn Ballard, Lauri Koskela, Gregory Howell, and Todd Zabelle January 24, 2001 ABSTRACT A guide is proposed for the design of

More information

Standardized Work Module 6.1

Standardized Work Module 6.1 Standardized Work Module 6.1 Jessica Dolak, LFM 06 Ben Lathrop, LFM 06 Kris Harper, LFM 02, Blinds To Go Rob Spina, MIT 99, Blinds To Go Presentation for: ESD.60 Lean/Six Sigma Systems MIT Leaders for

More information

The improvement of HR management by using Lean

The improvement of HR management by using Lean The improvement of HR management by using Lean Jan Byfuglien, Heidi Torstensen and Anne Trolie, Statistics Norway A major challenge for all organizations is to improve efficiency and to ensure continuous

More information

COMPETING CONSTRUCTION MANAGEMENT PARADIGMS

COMPETING CONSTRUCTION MANAGEMENT PARADIGMS COMPETING CONSTRUCTION MANAGEMENT PARADIGMS Glenn Ballard and Gregory A. Howell 1 Abstarct The Lean Construction Institute s (LCI) goal is to develop and deploy a new way of thinking about and practicing

More information

LEAN TECHNIQUES. Some of Our Lean Courses: --How to Implement Lean in Small Companies --Flow control/management

LEAN TECHNIQUES. Some of Our Lean Courses: --How to Implement Lean in Small Companies --Flow control/management One Sunny Hill, Oxford, MA 01540 Phone: 1-877-987-3801 Email: info@qpsinc.com LEAN TECHNIQUES ARE YOU LOOKING TO LEAD THE INDUSTRY? For Manufacturing or Service Does your company: - Have adequate profitability

More information

REFLECTIONS ON MONEY AND LEAN CONSTRUCTION

REFLECTIONS ON MONEY AND LEAN CONSTRUCTION Reflections on Money and Lean Construction REFLECTIONS ON MONEY AND LEAN CONSTRUCTION Federico Orrechia 1 and Gregory A. Howell 2 ABSTRACT Money is a particularly tricky resource to manage because it comes

More information

Improving Project Management with Lean Thinking?

Improving Project Management with Lean Thinking? Master of Management of Innovation and Product Development, INN Division of Project, Innovation and Entrepreneurship (PIE) LIU-IEI-TEK-A--12/01272--SE Improving Project Management with Lean Thinking? Author

More information

Academic Journal of Research in Business & Accounting www.newscienceseries.com. Vol. 2, No. 4, April 2014, 36-45 ISSN: 2311-326X

Academic Journal of Research in Business & Accounting www.newscienceseries.com. Vol. 2, No. 4, April 2014, 36-45 ISSN: 2311-326X Academic Journal of Research in Business & Accounting www.newscienceseries.com Vol. 2, No. 4, April 2014, 36-45 ISSN: 2311-326X Lean and its Basic Components Amir Reza Ramezani 1* and Mohammad Mahdloo

More information

Lean toolbox for seasonal process industries: A nougat fabrication case study

Lean toolbox for seasonal process industries: A nougat fabrication case study 6th International Conference on Industrial Engineering and Industrial Management. XVI Congreso de Ingeniería de Organización. Vigo, July 18-20, 2012 Lean toolbox for seasonal process industries: A nougat

More information

LCI Lean Project Delivery Glossary

LCI Lean Project Delivery Glossary A3 5S LCI Lean Project Delivery Glossary A one-page report prepared on a single 11 x 17 sheet of paper that adheres to the discipline of PDCA thinking as applied to problem solving or A3 Thinking. The

More information

Lean Management and the Role of Lean Leadership

Lean Management and the Role of Lean Leadership Lean Management and the Role of Lean Leadership The presentation will begin momentarily. Please make sure that your pop-up blocker is turned off to view today s full presentation. James P. Womack Lean

More information

How To Implement Lean And Bim On An Infrastructure Project

How To Implement Lean And Bim On An Infrastructure Project CHALLENGES AND OPPORTUNITIES IN IMPLEMENTING LEAN AND BIM ON AN INFRASTRUCTURE PROJECT Bhargav Dave 1, Stefan Boddy 2 and Lauri Koskela 3 ABSTRACT: It has been realised through research and practice that

More information

LEAN PROJECT DELIVERY THROUGH DESIGN-BUILD

LEAN PROJECT DELIVERY THROUGH DESIGN-BUILD LEAN PROJECT DELIVERY THROUGH DESIGN-BUILD Presented to Arizona State University DBIA Student Chapter Co-sponsored by DBIA Arizona Chapter and LCI Arizona CoP February 24, 2015 In the Beginning + 80 percent

More information

PREPLANNING METHOD FOR MULTI-STORY BUILDING CONSTRUCTION USING LINE OF BALANCE

PREPLANNING METHOD FOR MULTI-STORY BUILDING CONSTRUCTION USING LINE OF BALANCE PREPLANNING METHOD FOR MULTI-STORY BUILDING CONSTRUCTION USING LINE OF BALANCE Ricardo Mendes Jr. 1 and Luiz Fernando M. Heineck 2 ABSTRACT This paper reports one aspect of a research program devoted to

More information

DEPARTMENT OF LEADERSHIP AND GOVERNANCE

DEPARTMENT OF LEADERSHIP AND GOVERNANCE THE OPEN UNIVERSITY OF TANZANIA FACULTY OF BUINESS MANAGEMENT DEPARTMENT OF LEADERSHIP AND GOVERNANCE MASTER OF PROJECT MANAGEMENT (MPM) PROGRAMME OLG 629: Management of Strategic Operations COURSE OUTLINE

More information

MARTIN BALTSER HANSEN. Partnering, Lean Construction and BygLOK integrated in construction projects: A case study of a construction project in Denmark

MARTIN BALTSER HANSEN. Partnering, Lean Construction and BygLOK integrated in construction projects: A case study of a construction project in Denmark Partnering, Lean Construction and BygLOK integrated in construction projects: A case study of a construction project in Denmark MARTIN BALTSER HANSEN Department of Civil and Environmental Engineering Building

More information

THE LEAN TRANSFORMATION MODEL FOR THE EDUCATION SYSTEM

THE LEAN TRANSFORMATION MODEL FOR THE EDUCATION SYSTEM THE LEAN TRANSFORMATION MODEL FOR THE EDUCATION SYSTEM Dr. Neslihan Alp The University of Tennessee at Chattanooga Chattanooga, TN 37403-2598 Abstract: Lean thinking not only changes the way of manufacturing,

More information

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage. Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Target Value Design, in the

More information

Analyze Mix for Opportunities. Create Full Current State Value Stream Map. Create Full Future State Value Stream Map

Analyze Mix for Opportunities. Create Full Current State Value Stream Map. Create Full Future State Value Stream Map Method: Analyze Mix for Opportunities Gather Data Family Analysis Pareto Order- out Lead Time Create Full Current State Value Stream Map Demand Proportionate Boxes Product Variety Funnel Create Full Future

More information

Strategies for overlapping dependent design activities

Strategies for overlapping dependent design activities Construction Management and Economics (August 2006) 24, 829 837 Strategies for overlapping dependent design activities SUSAN M. BOGUS 1 *, KEITH R. MOLENAAR 2 and JAMES E. DIEKMANN 2 1 Department of Civil

More information

Assessing the impacts of implementing lean construction. Evaluando los impactos de la implementación de lean construction

Assessing the impacts of implementing lean construction. Evaluando los impactos de la implementación de lean construction Assessing the impacts of implementing lean construction Assessing the impacts of implementing lean construction Evaluando los impactos de la implementación de lean construction Luis F. Alarcón* 1, Sven

More information

Accelerated Route to Lean Manufacturing

Accelerated Route to Lean Manufacturing Accelerated Route to Lean Manufacturing Our Accelerated Route to Lean Manufacturing programme (ARTL) can take your team from zero knowledge to lean champions in just 10 weeks. Designed to fit in with the

More information

Lean Management. KAIZEN Training of Trainers. KAIZEN Facilitators Guide Page to.

Lean Management. KAIZEN Training of Trainers. KAIZEN Facilitators Guide Page to. Lean Management KAIZEN Training of Trainers KAIZEN Facilitators Guide Page to. Objectives of the session At the end of the session, trainees are able to: 1) Understand the philosophy on lean management

More information

IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS

IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS Mel Adams and Bernard J. Schroer Center for Automation & Robotics University of Alabama in Huntsville Huntsville, AL 35899 adamsm@email.uah.edu

More information

Quality Improvement Primers. Change Concepts and Ideas

Quality Improvement Primers. Change Concepts and Ideas Quality Improvement Primers Change Concepts and Ideas ACKNOWLEDGEMENTS This workbook is the result of the efforts of the Health Quality Ontario (HQO). For additional information about other resources,

More information

Continuous Flow Operations Module 8.3

Continuous Flow Operations Module 8.3 Continuous Flow Operations Module 8.3 Bret Awbrey & Jacob Silber Chris Musso, MIT ESD Presentation for: ESD.60 Lean/Six Sigma Systems MIT Leaders for Manufacturing Program (LFM) Summer 2004 These materials

More information

A Book Review: Lean Thinking by Womack and Jones

A Book Review: Lean Thinking by Womack and Jones A : Lean Thinking by Womack and Jones Assignment for ESD.83: Research Seminar in Engineering Systems Prepared by Annalisa L. Weigel November 2000 We can lick gravity, but sometimes the paperwork is overwhelming.

More information

Lean Six Sigma Black Belt Body of Knowledge

Lean Six Sigma Black Belt Body of Knowledge General Lean Six Sigma Defined UN Describe Nature and purpose of Lean Six Sigma Integration of Lean and Six Sigma UN Compare and contrast focus and approaches (Process Velocity and Quality) Y=f(X) Input

More information

THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL HERMAN GLENN BALLARD. A thesis submitted to the Faculty of Engineering. of The University of Birmingham

THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL HERMAN GLENN BALLARD. A thesis submitted to the Faculty of Engineering. of The University of Birmingham THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL by HERMAN GLENN BALLARD A thesis submitted to the Faculty of Engineering of The University of Birmingham for the degree of DOCTOR OF PHILOSOPHY School of Civil

More information

IMPLEMENTATION OF LINE-OF-BALANCE BASED SCHEDULING AND PROJECT CONTROL SYSTEM IN A LARGE CONSTRUCTION COMPANY

IMPLEMENTATION OF LINE-OF-BALANCE BASED SCHEDULING AND PROJECT CONTROL SYSTEM IN A LARGE CONSTRUCTION COMPANY IMPLEMENTATION OF LINE-OF-BALANCE BASED SCHEDULING AND PROJECT CONTROL SYSTEM IN A LARGE CONSTRUCTION COMPANY Mika Soini\ Ilkka LeskeHi 2, Olli Seppanen 3 ABSTRACT Line-of-Balance has been successfully

More information

BQF Lean Certification Process

BQF Lean Certification Process BQF Lean Certification Process Overview The CI/Lean Certification process provides for four levels of BQF certification. These are: BQF CI/Lean Associate; BQF CI/Lean Practitioner; BQF CI/Lean Advanced

More information

Lean production vs ERP systems: an ICT paradox?

Lean production vs ERP systems: an ICT paradox? Daryl Powell and Jan Ola Strandhagen About the authors page 35 Lean production vs ERP systems: Introduction ean production and enterprise resource (ERP) systems are consistently rated in L manufacturing

More information

STRATEGIC DESIGN MANAGEMENT FOR SUSTAINABILITY: PROCESS GOVERNS OUTCOME

STRATEGIC DESIGN MANAGEMENT FOR SUSTAINABILITY: PROCESS GOVERNS OUTCOME STRATEGIC DESIGN MANAGEMENT FOR SUSTAINABILITY: PROCESS GOVERNS OUTCOME Vera M. NOVAK Virginia Tech, Blacksburg, Virginia, USA, vnovak@vt.edu Summary The complexity of sustainability issues reveals the

More information

To Increase Predictability in Complex Engineering and Fabrication Projects

To Increase Predictability in Complex Engineering and Fabrication Projects To Increase Predictability in Complex Engineering and Fabrication Projects Construct of a Framework for Planning and Production Control in FMC Technologies Knut Anders Lia Henning Ringerike Supervisors

More information

Evaluering av Internship-ordningen ved Universitetet i Tromsø. Asbjørn Kårstein Tone Cecilie Carlsten

Evaluering av Internship-ordningen ved Universitetet i Tromsø. Asbjørn Kårstein Tone Cecilie Carlsten Evaluering av Internship-ordningen ved Universitetet i Tromsø Asbjørn Kårstein Tone Cecilie Carlsten Rapport 26/2013 Rapport 26/2013 Utgitt av Adresse Oppdragsgiver Adresse Trykk Nordisk institutt for

More information

Identifying Real Cost Saving in Lean Manufacturing

Identifying Real Cost Saving in Lean Manufacturing Purdue University Purdue e-pubs Aviation Technology Graduate Student Publications Department of Aviation Technology 4-1-2013 Identifying Real Cost Saving in Lean Manufacturing Bryan Jones Follow this and

More information

Teaching lean thinking through game: some challenges

Teaching lean thinking through game: some challenges Teaching lean thinking through game: some challenges I. Dukovska-Popovska 1, V. Hove-Madsen 2, K.B. Nielsen 3 1 Aalborg University, Department of Production, DK-9220 Aalborg, Denmark (iskra@production.aau.dk)

More information

Lead Time Reduction in SME s; A Survey

Lead Time Reduction in SME s; A Survey Lead Time Reduction in SME s; A Survey - Research and experiences from the HAN LEAN-QRM Center - Wilfred Knol MSc http://www.han.nl/lectoraatlean Introduction Quantitative research on the relevance of

More information

INTERACTIVE VISUAL LEAN SYSTEM FOR RESOURCE PLANNING OF EARTHWORK OPERATIONS

INTERACTIVE VISUAL LEAN SYSTEM FOR RESOURCE PLANNING OF EARTHWORK OPERATIONS 652 INTERACTIVE VISUAL LEAN SYSTEM FOR RESOURCE PLANNING OF EARTHWORK OPERATIONS Nashwan Dawood 1, Rajiv Chavada 2, Claudio Benghi 3 and Romeu Sanches 4 ABSTRACT Poor resource planning and low productivities

More information