2 Today s Discussion Market Influences Being Ready on Time Managing Construction Costs Delivery Dates Penalties
3 Market Influences Rising Costs Leasing Costs - Less multi-floor contiguous space - Base Building: rising taxes and fuel costs - higher density space - Extreme growth - Staff attraction and retention - Construction costs remain at 2007 levels Technology change every 6 months i.e. wireless Churn rates 100% Reduced credit = volatile marketplace
4 Building Search / Feasibility Planning The more lead time you have the better the costs and schedule are controlled Preliminary space planning, often of several buildings Schedule: - 10,000 sq. ft. requires approximately 4 days for planning - 20,000 sq. ft. requires approximately 1 to 1 ½ weeks for planning - 60,000 sq. ft. requires approximately 1 ½ weeks for planning - 120,000 sq. ft. requires approximately 2 weeks for planning LEED Certified buildings LEED CI Commercial Interiors Being Ready on Time Managing Construction Costs Delivery Dates
5 Building Search / Feasibility Planning High Level Generic Preliminary Budget Pricing Existing Buildings - Level of existing finishes and architectural detailing have a significant affect on the bottom line - 13,000 sq. ft. comparison is $60,000 different New Buildings - Building Efficiency: Building A - 127,000 sq. ft. Building B - 147,000 sq. ft. Being Ready on Time Managing Construction Costs Delivery Dates
6 Programming Base Building Delivery New buildings under construction: - no elevators: schedule extension higher costs access to complete space - loading dock not accessible - base building occupancy permit - no phone service - no air conditioning or cannot be balanced Being Ready on Time Managing Construction Costs Delivery Dates
7 Programming Construction Managers - Experience in buildings you are considering - Over 15 years in the Calgary marketplace; loyalty from the subtrades - Has experience with LEED projects Landlord work to be completed by the Landlord - Incorporate electrical and mechanical systems and interconnecting stair openings based on a Tenant s plan layout = significant savings in construction costs Being Ready on Time Managing Construction Costs Delivery Dates
8 Detailed Planning Identify types of planning expectations Open planning is typically less construction cost Schedule: - 10,000 sq. ft. requires approximately 2 weeks for planning - 20,000 sq. ft. requires approximately 3 weeks for planning - 60,000 sq. ft. requires approximately 4 weeks for planning - 120,000 sq. ft. requires approximately 5 weeks for planning Being Ready on Time Managing Construction Costs Delivery Dates
9 Modular Planning Modular planning = future flexibility = lower renovation / reconfiguration costs Law Firm, Downtown Calgary Being Ready on Time Managing Construction Costs Delivery Dates
10 Design Development Sustainability Materials should be analyzed for their lifecycle, not just initial cost Materials need to be: - durable over a long period of time - made from recycled material - recyclable - reused on site - designs need to use less new materials = reduced cost Professional fees on a 127,000 sq. ft. project = $1.00 sq. ft. for interior design fees Most Sustainable Materials have little or NO cost increase Being Ready on Time Managing Construction Costs Delivery Dates
11 Design Development Pre-ordering of long delivery items Schedule: - 10,000 sq. ft. project start 6 to 8 months prior to move-in - 20,000 sq. ft. project start 9 months prior to move-in - 60,000 sq. ft. project start 1 year prior to move-in - 120,000 sq. ft. project start 2 years prior to move-in Being Ready on Time Managing Construction Costs Delivery Dates
12 Design Development Shortage of materials: - drywall vs. moveable wall systems - less credit = manufacturers carry less inventory = longer delivery time - less credit = risk of manufacturer closing, plan B and C alternative materials Shortage of labour: - millwork 6 weeks manufacturing time - modular kitchens - less time to manufacture - systems furniture instead of millwork less time and less expensive - modular walls, doors, hardware and glass are being used for wall construction or office fronts to reduce costs and installation time Being Ready on Time Managing Construction Costs Delivery Dates
13 Contract Documentation / Working Drawings Construction employees in training The tighter the drawings, the more controlled the cost of construction Schedule: - 10,000 sq. ft. requires approximately 3 weeks for Working Drawings - 20,000 sq. ft. requires approximately 3 weeks for Working Drawings - 60,000 sq. ft. requires approximately 4 weeks for Working Drawings - 120,000 sq. ft. requires approximately 8 to 10 weeks for Working Drawings Being Ready on Time Managing Construction Costs Delivery Dates
14 Building Permits Process ranges from 5 to 7 weeks If no permit is posted, the job site can be shut down, resulting in the schedule being compromised Fines add cost to the project Being Ready on Time Managing Construction Costs Delivery Dates
15 Tender / Final Pricing In the Calgary marketplace, we recommend: Working with construction managers to ensure quality, cost control and meeting of schedules Using the industry standard stipulated price CCDC contract Being Ready on Time Managing Construction Costs Delivery Dates
16 Tender / Final Pricing Cost per square foot in the Calgary marketplace: New Construction Basic space: $80.00 per sq. ft. Being Ready on Time Managing Construction Costs Delivery Dates
17 Tender / Final Pricing Cost per square foot in the Calgary marketplace: New Construction More typical: $ to $ per sq. ft. Being Ready on Time Managing Construction Costs Delivery Dates
18 Tender / Final Pricing Cost per square foot in the Calgary marketplace: New Construction High-end: up to $ per sq. ft. Being Ready on Time Managing Construction Costs Delivery Dates
19 Tender / Final Pricing Cost per square foot in the Calgary marketplace: Renovation Depending on the quality of the existing space, pricing can range from $40.00 per sq. ft. to $80.00 per sq. ft. Being Ready on Time Managing Construction Costs Delivery Dates
20 Construction / Field Review Schedule: New Construction - 10,000 sq. ft. one floor 8 to 10 weeks - 20,000 sq. ft. one floor ranging from 10 to 12 weeks - 60,000 sq. ft. three floors 16 to 20 weeks - 120,000 sq. ft. 8 to 10 months depending on the extent of architectural detailing Renovations - Similar to new full floor construction depending on the extent of the work - Up to 30% more time required if the space is occupied Being Ready on Time Managing Construction Costs Delivery Dates
21 Contract Administration / Cost Control Get everything in writing! Document daily materials being shipped, stored in warehouses delivered to site and installed on site Penalties / Bonuses Furniture Installation: - 10,000 sq. ft. one floor 3 to 4 days - 20,000 sq. ft. one floor ranging from 5 to 7 days - 60,000 sq. ft. three floors 3 weeks - 120,000 sq. ft. 6 weeks depending on the extent of systems furniture Being Ready on Time Managing Construction Costs Delivery Dates
22 Project Closeout Follow instructions in maintenance manuals to ensure the warranty does not become void Establish yearly service agreement for equipment. i.e., air conditioners One-year warranty walkthrough Being Ready on Time Managing Construction Costs Delivery Dates
23 Schedule Summary Lease Negotiations / Design Process through to Furniture Installation - 10,000 sq. ft. project approximately 3 to 4 months to complete - 20,000 sq. ft. project approximately 6 to 7 months to complete - 60,000 sq. ft. project approximately 7 to 8 months to complete - 120,000 sq. ft. project approximately 1 year to 1.5 years to complete Being Ready on Time Managing Construction Costs Delivery Dates
24 Benefits of Using an Interior Design Consultant Cost control and savings Market knowledge / benchmarking / future trends Experience and strength in accurate scheduling Have long-term relationships with Construction Managers and subtrades Client can focus on their core business
25 SHAPING THE WAY YOU WORK ONE SQUARE FOOT AT A TIME DISCUSSION
Segreti Design Scope of Interior Design Services
Segreti Design Scope of Interior Design Services Programming: During this phase, Segreti Design consults with the owner to develop the applicable requirements of the project and studies the feasibility
More informationCITY OF WATERVILLE DOWNTOWN FORGIVABLE LOAN PROGRAM
CITY OF WATERVILLE DOWNTOWN FORGIVABLE LOAN PROGRAM I. PROGRAM SUMMARY The City of Waterville has established a Downtown Forgivable Loan Program to provide financial assistance to business and property
More informationWe ve been transforming storage and workspaces for over 40 years.
We ve been transforming storage and workspaces for over 40 years. INNOVATIVE AND MODERN BUSINESS SOLUTIONS COMPANY SPACESAVER INTERIORS is a woman-owned small business with offices in Kensington, Maryland.
More informationPlanning and Construction Management Services
Planning and Construction Management Services Construction Project Management Services New construction, major renovations or improvements to building structures and systems are part of the Department's
More informationNUMBER 107-011-100 EFFECTIVE DATE. July 23, 2003
STATEWIDE POLICY NUMBER 107-011-100 EFFECTIVE DATE SUPERSEDES Policy 125-6-100 July 23, 2003 PAGE NUMBER Division Enterprise Asset Management July 23, 2003 Pages 1 of 9 REFERENCE ORS 276.004 and other
More information0 - Initial Services
Overview At All Australian Architecture we consider each project in terms of self contained stages (see below). Each stage is independent and does not tie you into completing every stage of your project
More informationAvailable Office Space in St. Catharines
Available Office Space in St. Catharines 43 Church St., Landmark Building Available - 17,000.00 square feet Basic Lease Rate - $10.00 Downtown office building with new addition and major renovations completed
More informationT170 Interior Design Technology MTCU Code 61833 Program Learning Outcomes
T170 Interior Design Technology MTCU Code 61833 Program Learning Outcomes Synopsis of the Vocational Learning Outcomes The graduate has reliably demonstrated the ability to 1. analyze a client's needs
More informationMenu of Architecture Services 2009
Menu of Architecture Services 2009 We deliver architecture and interior design services in an accessible, easy to use format. We help you to select services that suit your project, budget and level of
More informationAPI AIMM PHILADELPHIA INSTALLATIONS FURNITURE INSTALLATIONS RECONFIGURATION RELOCATION PROJECT MANAGEMENT WAREHOUSING
API AIMM PHILADELPHIA INSTALLATIONS FURNITURE INSTALLATIONS RECONFIGURATION RELOCATION PROJECT MANAGEMENT WAREHOUSING API ABOUT US AIMM Philadelphia Installations Inc. is a furnishings installation, millwork,
More information125900 FURNITURE and MODULAR OFFICE SYSTEMS
125900 FURNITURE and MODULAR OFFICE SYSTEMS PART 1: GENERAL 1.01 RELATED SECTIONS / POLICIES A. Section 013010 Accessibility for People with Disabilities B. Section 018110 Green Building Guidelines C.
More informationHow to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table
More informationCanada. What s Typical? CBRE Offices. For More Information
What s Typical? Term, generally any length Breaks Renewal Rent Gross Free rent Escalation Security Fit-out Landlord often contributes or builds Tenant broker Landlord pays Right to sublet Common Transparency
More informationBenchmarking Questionnaire on Facility Management Costs and Business Practices
Benchmarking Questionnaire on Facility Management Costs and Business Practices April 21, 2004 Introduction KPMG has been contracted by Hydro Quebec s Facility Management Division to perform a benchmark
More informationBarrie Primary Care Campus
Barrie Primary Care Campus Barrie Primary Care Campus Location The Barrie Primary Care Campus will lead the market as the most advance primary health care center in Ontario. It will be a significant development
More informationREQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT
More informationReal Estate Services, Inc.
½ Self-Storage & ½ Warehouse Storage on I-278 863 East 141 st Street aka 327 Walnut Avenue, Bronx, NY Large Billboard Facing I-278 NYC Mini-Storage & Ben Hur Moving & Storage Building Size: 132,000 SF
More informationEffective Workspaces. Understanding how your space and location decisions can improve your organization s impact, staff morale and your bottom line
Effective Workspaces Understanding how your space and location decisions can improve your organization s impact, staff morale and your bottom line Today s Agenda Objective 1: Objective 2: Objective 3:
More informationHow To Sell An Industrial Building In Batavia, Illinois For $879,000
Industrial Building Batavia, IL For Sale $879,000 Offering Highlights 16,000 SF Office / Warehouse Flex Building 66.9% Leased to 2 Tenants 2,000-5,300 SF Available for Owner / User Neil Johnson Managing
More informationSelected Telecom Retail Projects
Selected Telecom Retail Projects Telecom Retail Design Jordan Parnass Digital Architecture (JPDA) designs unique store environments to help telecom retailers stand apart from the competition and deliver
More informationPUBLIC NOTICE State of Kansas. Request for Proposal Leased Office Space
PUBLIC NOTICE State of Kansas Request for Proposal Leased Office Space The Kansas Department of Credit Unions is accepting written proposals for approximately 2,250 square feet of renovated or new office
More informationREFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft.
Montgomery County Community College West Campus Expansion 60,000 Sq. Ft. Warehouse adaptive reuse of the former Vaughn Knitting Mill, a major architectural component of Pottstown s Industrial Heritage.
More informationSaint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
More informationSpace: Flexible, Productive, & Cost-Effective
Space: Flexible, Productive, & Cost-Effective A Guide to Your Future Workspace By: Peter T. Allen Space: Flexible, Productive, & Cost-Effective A Guide to Your Future Workspace Contents Introduction &
More informationOffice Relocation Planning Guide. The Department of Administrative Services (DAS) offers these guidelines to help plan office relocations.
The Department of Administrative Services (DAS) offers these guidelines to help plan office relocations. Who from DAS can help you? Consider these DAS groups as resources to help make your relocation as
More informationToronto s Growing Tech Sector DEFIXTURING. is the new fixturing
Toronto s Growing Tech Sector DEFIXTURING is the new fixturing September 2015 Tech Sector On the Rise The technology sector accounted for 38% of Canadian office leases in the second quarter of 2015 and
More informationReal Property Performance Results
GSA Office of Governmentwide Policy Real Property Performance Results Featuring the 2002 Space Use Update December 2002 Office of Real Property Innovative Workplaces Division Introduction In 1997, the
More informationOffice Move Checklist
Office Move Checklist Plan your entire office move from start to finish with this definitive Moving Office Checklist. It guides you through each step of the planning process and is loaded with top tips
More informationOFFICE SPACE FOR SUBLEASE 1 Eglinton Avenue East Toronto, ON
OFFICE SPACE FOR SUBLEASE 1 Eglinton Avenue East Toronto, ON SUBLET OPPORTUNITY Available Sublet: 3 rd Floor 1,166 sf Suite is built-out with Reception area, boardroom, meeting rooms, and open area. Tenant
More informationRegular Public Meeting-Study Session June 23, 2011
Regular Public Meeting-Study Session June 23, 2011 Dr. Ruth Ann Marston presided over the PESD No. 1 Governing Board Meeting in the Phoenix Elementary School District Governing Board Room Other Board Members
More informationEnCana Denver Environmental Story Recycling and Recycled Materials Won t Change our Environmental Impact
EnCana Denver Environmental Story Recycling and Recycled Materials Won t Change our Environmental Impact It s time to stop building interiors as though they are disposable or nearly as bad Recyclable.
More informationBringing experienced vision to Williston, North Dakota
The Renaissance on Main Mixed-use new construction Retail, Office, and 60 Apartment Units Live Work Shop DOWNTOWN Bringing experienced vision to Williston, North Dakota Presented by The Renaissance Companies
More informationOFFICE DESIGN CHECKLIST 7 STEPS TO MAKE YOUR OFFICE DESIGN PROJECT AS SIMPLE AS POSSIBLE.
1 OFFICE DESIGN CHECKLIST 7 STEPS TO MAKE YOUR OFFICE DESIGN PROJECT AS SIMPLE AS POSSIBLE. 1 OFFICE DESIGN CHECKLIST 7 STEPS TO MAKE YOUR OFFICE DESIGN PROJECT AS SIMPLE AS POSSIBLE. HOW THIS CHECKLIST
More informationStep 1: Determine the Size, Parameters and Construction Timeline for the Property
The Real Estate Development Process While real estate development models may look complex, the actual concepts are simpler than what you see for normal companies. Real estate development modeling is different
More informationOffice Space Standards and Guidelines
Office Space Standards and Guidelines Revised: February, 2003 Contents Introduction...3 Principles...3 Definitions...4 Space Allocation Standards...6 Purpose...6 Space Envelope...6 Special Purpose Space...6
More informationCONSTRUCTION CONTRACT TERMINOLOGY
PAGE 1 ALLOWANCE - in bidding, an amount budgeted for an item for which no exact dollar amount if available; a contingency for unforeseen costs; the classification of connected parts or members according
More informationGreen Building Standards Guidance for Potential ERG and Grow NJ Applicants (Updated 7/13/16)
Green Building Standards Guidance for Potential ERG and Grow NJ Applicants (Updated 7/13/16) The below information is intended to be plain language guidance as to the process EDA uses to evaluate compliance
More informationSchematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
More informationApplies to: All Employees within the Facilities Management Department (FMD)
Building Area Measurement Guidelines Applies to: All Employees within the Facilities Management Department (FMD) GUIDELINES: Issued: December 17, 2013 Author: FMD Physical Planning Team PURPOSE: To establish
More informationSpace Planning. Gretchen Addi, Associate AIA, and Jacqueline Lytle, IIDA, Associate AIA. Summary CLIENT NEEDS
Excerpt from The Architect s Handbook of Professional Practice, 13th edition, 2000 Space Planning Gretchen Addi, Associate AIA, and Jacqueline Lytle, IIDA, Associate AIA Space planning is an integral part
More informationTate s Wire & Cable Solution
Access Floors Tate s Wire & Cable Solution A Flexible & Sustainable Management System Access Flooring to the Power of Your company will discover complete flexibility and reconfiguration capability 2 Creating
More informationProfessional Property Management TREC 4507
Professional Property Management TREC 4507 ANSWER KEY FOR FINAL EXAMINATION (With rational followed by chapter and page references) Example: (1:3 means the answer can be found in Chapter 1 on Page 3).
More informationM E M O R A N D U M. DATE: March 26, 1997 Updated September 7, 2001. Alabama Department of Public Health Employees The RSA Tower
M E M O R A N D U M DATE: Updated September 7, 2001 TO: FROM: SUBJECT: Alabama Department of Public Health Employees The RSA Tower Donald E. Williamson, M.D. State Health Officer Welcome to our new facilities
More informationPost Occupancy Evaluation (POE) Technical Instructions
1.0 Purpose These technical instructions define the typical steps required by HHS personnel in the use of the. The POE consists of a detailed and systematic assessment of a facility that is operational
More informationOfficeMax Interiors and Gensler partner for a streamlined glass wall system relocation
SPENCER STUART PROJECT OfficeMax Interiors and Gensler partner for a streamlined glass wall system relocation By design, Altos wall systems are cost-effective to reconfigure or fully relocate. PROJECT
More informationA&E PRACTICE BUSINESS OFFICE PACKAGE APPLICATION
A&E PRACTICE BUSINESS OFFICE PACKAGE APPLICATION Section 1. General Information 1. a. Applicant: b. Federal ID #: c. Primary Mailing Address: Address City State Zip d. Pho #: e. # Offices: # f. Founded:
More informationBUILDING COST UPDATE: Q1 2014 COMMERCIAL FIT-OUT AND REFURBISHMENT
BUILDING COST UPDATE: Q1 2014 COMMERCIAL FIT-OUT AND REFURBISHMENT UK BUILDING CONSULTANCY COST CONSULTANCY 2014 EDITION A A 2 BUILDING COST UPDATE INTRODUCTION The construction industry is reporting activity
More informationSanta Clara Gateway 5451 Great America Parkway, Santa Clara
MOVE-IN READY SOLUTIONS FOR SMALL BUSINESS Opportunities from 4,853-14,409 rentable sq. ft. Santa Clara Gateway 5451 Great America Parkway, Santa Clara Big Benefits for Small Business 5451 GREAT AMERICA
More informationTO LET Ideal Starter Warehouse / Light Industrial Unit
TO LET Ideal Starter Warehouse / Light Industrial Unit WARWICK HOUSE BUSINESS PARK BANBURY ROAD SOUTHAM CV47 2PT Typical terrace frontage Unit 14 500 sq ft (46.37 sq m) Extensively refurbished former bathroom
More informationCity of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.
cityoflavernia@lavernia-tx.gov Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be
More informationInterior Design Excellence. Team-Oriented Client Solutions.
Interior Design Excellence. Team-Oriented Client Solutions. Lauren & Chase Design Group is a full-service interior design firm in New York City offering expert space planning, interior design, and project
More informationVIRGINIASCAN OFFICE BUILDING DATA SHEET
VIRGINIASCAN OFFICE BUILDING DATA SHEET To be included on VirginiaScan, the building must have at least 10,000 sq. ft. available and all the fields in blue must be provided. A sale/lease price or price
More informationArchitect s Guide Last Revised: April 2015
Architect s Guide Last Revised: April 2015 The Minnesota Housing Finance Agency does not discriminate on the basis of race, color, creed, national origin, sex, religion, marital status, status with regard
More informationAUSTIN PROPERTY SOLUTIONS
AUSTIN PROPERTY SOLUTIONS Hassle Free Home Sales with C Squared Solutions If you are interested in selling your house quickly and hassle free, you ve come to the right place! Read on to learn what C Squared
More informationWelcome to AISB Created by IT Facilities Manager, Lylah Shelor and Updated on July 28, 2015
Welcome to AISB Created by IT Facilities Manager, Lylah Shelor and Updated on July 28, 2015 Index Emergency Action Plan online at www.it.vt.edu Location of Fire Extinguishers, Emergency Pulls & AEDs..2
More informationMARQUETTE UNIVERSITY: McCabe Hall
MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate
More informationOffice Space For Sublease. Toronto, Ontario. 133 Richmond Street West. Toronto, Ontario. Tel: 416 863 1215. www.dtzbarnicke.com
Office Space For Sublease 133 Richmond Street West Location Richmond Street West and York Street Available 2,500 sq ft - 3,000 sq ft Term August 31, 2012 Net Rent $9.50 per sq ft Additional Rent $14.97
More informationHome Designer. Interiors. New Version!
Interiors Home Designer New Version! 0 10 T quickly with easy How-To Videos for step-by-step instructions HomeDesignerSoftware.com Interior Design Decorating Kitchens & Baths Room Design Remodeling Furniture
More informationLOWER LEVEL ABUNDANT STORAGE SPACE BIKE PARKING PRIVATE SHOWERS AND LOCKER ROOMS 5,115 SQ FT LOWER LEVEL 13 2 CEILING HEIGHT
LOWER LEVEL STORAGE MECHANICAL MANAGEMENT OFFICE ABUNDANT STORAGE SPACE BIKE PARKING PRIVATE SHOWERS AND LOCKER ROOMS 5,115 SQ FT 13 2 CEILING HEIGHT MECHANICAL ABUNDANT STORAGE FOR RECEIVING AREA LOCKER
More informationMACHINE-ROOM-LESS AND MACHINE-ROOM ELEVATOR SOLUTIONS KONE Scenic Elevators
MACHINE-ROOM-LESS AND MACHINE-ROOM ELEVATOR SOLUTIONS KONE Scenic Elevators Diamonds are forever And so are KONE Scenic Elevators. Decorate your exclusive interior with these jewels in Retail, Cruise ship,
More informationElement Z General Design Requirements Owner Standards and other Requirements
Element Z General Design Furniture and Accessories PART 1 - REQUIREMENTS FOR WORKING WITH MD ANDERSON PLANNER DESIGNER 1.01 OVERVIEW A. The MD Anderson Planner/Designer shall participate in the space,
More informationFlexible Office Space Up to 66,240 Ft 2
Flexible Office Space Up to 66,240 Ft 2 Building Description: Wide Open Large Office Complex Numerous Perimeter Offices, Conference & Break Rooms and Wide Open Office Space Throughout Can Be Modified to
More informationBrian Salisbury. Director, Strategic Planning Community Living British Columbia
Community Living British Columbia (CLBC) actively promoted green ideas to staff through its Go Green Committee and network of Go Green office leads located throughout the province. CLBC also maintains
More informationESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY
ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles
More informationIntroduction to Energy Codes & Green Building Programs
Introduction to Energy Codes & Green Building Programs David Neiger B.S. Arch, LEED AP Homes, Certified HERS Rater Principal Populus Sustainable Design Consulting Why green homes? The Building Sector:
More informationMasters Series LEED. Masters Series Contributions to LEED
Masters Series LEED Masters Series Contributions to LEED Masters Series wood casegood products may contribute to the individual prerequisites and credits of LEED. Because LEED is a holistic building rating
More information6 FAM 1700 SPACE ALLOCATION AND RELATED SERVICES
6 FAM 1700 SPACE ALLOCATION AND RELATED SERVICES 6 FAM 1710 OFFICE SPACE ASSIGNMENT AND UTILIZATION, DESIGN AND CONSTRUCTION (CT:GS-174; 05-29-2013) (Office of Origin: A/OPR/RPM) 6 FAM 1711 GENERAL PROVISIONS:
More informationLake Plaza Center 44 & 134 Union Boulevard Lakewood, CO 80228 ±455-33,283 RSF Available For Lease
LPC Lake Plaza Center 44 & 134 Union Boulevard Lakewood, CO 80228 ±455-33,283 RSF Available For Lease This well-maintained property provides excellent identity and access to users looking to occupy a Union
More informationElement D Services Heating, Ventilating, and Air Conditioning
Load Calculation Criteria PART 1 - GENERAL 1.01 OVERVIEW A. This section includes requirements for calculating HVAC cooling and heating loads. B. Load calculations must be performed in accordance with
More informationTransportation assistance parents are encouraged to car pool when driving to schools
s Towards Carbon Neutrality The actions listed below contribute to a reduction in greenhouse gas emissions from sources for which public sector organizations are responsible under the carbon neutral government
More informationOFFICE OF PERSONNEL MANAGEMENT ATLANTA OVERSIGHT DIVISION ATLANTA, GEORGIA
OFFICE OF PERSONNEL MANAGEMENT ATLANTA OVERSIGHT DIVISION ATLANTA, GEORGIA CLASSIFICATION APPEAL DECISION Under section 5112(b) of title 5, United States Code Appellant: [the appellant] Position: Engineering
More informationState of Louisiana Residential Rehabilitation Tax Credit RS 47:297.6. Program Guidance
State of Louisiana Residential Rehabilitation Tax Credit RS 47:297.6 Program Guidance Effective January 1, 2006, homeowners may qualify for a 25% tax credit against their individual State income taxes
More informationYour guide to the residential architectural process. A step-by-step guide from Context Architects
Your guide to the residential architectural process A step-by-step guide from Context Architects We know that building a new house or renovating your home can seem daunting and complicated. So we ve produced
More informationVERTICAL DESIGN OPTImAL ACOUSTICS
VERTICAL DESIGN OPTImAL ACOUSTICS 3 8 EnDLESS lines products possibilities Discover the family of products, vertically folding operable walls that unite design, performance, flexibility and acoustics.
More informationWOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through
More informationFacilities Planning and Management. Moving Guide. Table of Contents. Advance planning
Facilities Planning and Management Moving Guide Advance planning Move team Information Technology Services Central Stores Environmental Health and Safety Table of Contents Building Issues Signage Keys/building
More informationHOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015
HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015 May 2015 MAYOR OF LONDON Housing Standards: Transition Policy Statement. On 25 March 2015 through a written ministerial statement,
More informationEVO HOMEOWNERS ASSOCIATION MOVE-IN PROCEDURES
EVO HOMEOWNERS ASSOCIATION MOVE-IN PROCEDURES Prior to Move-In: Moving into a high-rise building for the first time requires the coordination of many people. In addition, Evo has inherited significant
More informationCode Requirements for Existing Buildings
Code Requirements for Existing Buildings Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS)
More informationNew Hope Borough Landlord Registration Statement & Application
Landlord s Name: Registration Year: Tax Map Parcel Number 27- Property Address: New Hope Borough Landlord Registration Statement & Application This form must be completed by Landlords, pursuant to Borough
More informationCalvert USA, Inc. Attic Stairs
Calvert USA, Inc. Attic Stairs Instructions for installation of vertical opening access stairs Model numbers: 7035 through 7047 Calvert USA, Inc., P.O. Box 841, Solomons, MD 20688, Tel. (410) 286-1430,
More informationHaworth s Product to LEED Points. LEED - Commercial Interiors
Haworth s Product to LEED Points LEED - Commercial Interiors Chicago Showroom Haworth products may contribute to the individual prerequisites and credits of LEED. LEED is a holistic building rating system
More information225 MARSH WALL LONDON E14 9FW Offices To Let On Flexible Terms
LONDON E14 9FW Offices To Let On Flexible Terms LOCATION 225 Marsh Wall occupies a prominent location on the north side of Marsh Wall, to the east of its junction with Limeharbour. South Quay DLR station
More informationWELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING DIVISIONS OF FACILITIES MANAGEMENT AND REAL ESTATE. Space Allocation and Furniture Standards
WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING DIVISIONS OF FACILITIES MANAGEMENT AND REAL ESTATE Space Allocation and Furniture Standards WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING Space Allocation and
More informationWANT TO BECOME A LANDLORD? A handbook for new landlords renting in London.
SO YOU WANT TO BECOME A LANDLORD? A handbook for new landlords renting in London. Table of Contents Marketing Your Unit.. 2 Types of Rentals 2 Ontario Legislation...2 Leases/Agreements..3 Property Standards..3
More informationJump Start Program Application
Pendleton Development Commission 500 SW Dorion Ave. Pendleton, OR 97801 Jump Start Program Application The Jump Start program provides benefits to businesses that wish to locate or expand* in Downtown
More informationHouse your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data
Protection is Central. Twin Cities East Data Center House your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data Center is nothing less than
More informationCASE STUDY: The EVERGREEN
CASE STUDY: The EVERGREEN 1691 Palm Ave Summary Information Type: Residential Occupancy: Single Family Residence Size: 3,075 square feet Completed: 2009 Owner: Rob and Denise Smith Developer: E2 Homes,
More informationHOW TO HIRE AN ARCHITECT
HOW TO HIRE AN ARCHITECT Welcome. We prepared this guide after seeing so many people struggle with understanding the design and construction process. This process can seem like a complex and frightening
More informationPENNSYLVANIA GREEN ENERGY LOAN FUND
PENNSYLVANIA GREEN ENERGY LOAN FUND Procedures Manual for Quantifying Energy Savings A. Introduction A building project applying for a GELF energy loan must demonstrate that it will result in a 25% reduction
More information101 Congress Parkway Federal Building
101 Congress Parkway Federal Building The Department of Homeland Security Story In 2001, the General Services Administration (GSA) contracted with the Clark Street Design Group (a tri-venture comprised
More information9,940 SF Office Building
204 East Rhapsody Drive, San Antonio, Texas 78216 BUILDING SIZE 9,940 Sq. Ft. (According to Bexar Appraisal District) LAND SIZE 0.6862 Acre or 29,890 Sq. Ft. (According to Bexar Appraisal District) BUILDING
More information@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA: 705 671 6099
Buying A New Home Presented in Partnership with Greater Sudbury Public Library PHONE SDHBA: 705 671 6099 1 Four Month Series DATES: Sept 13: Underground / Cash Deal Oct 11: Talking with Builder / Renovator
More informationAgenda Number 6. CAP Server Room & Building Two Multi function Space Capital Project
Agenda Number 6. CAP Server Room & Building Two Multi function Space Capital Project Prologue-Summary Originally began as two separate projects Similar history and background on each project - No master
More information09 00 03 GENERAL PROVISIONS
09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have
More informationATLANTA RISING TO THE CHALLENGE. www.atlantabbc.com
ATLANTA RISING TO THE CHALLENGE www.atlantabbc.com Atlanta Better Buildings Challenge Background Atlanta s Goal: To engage the local community to reduce energy and water consumption by at least 20% in
More informationOFFICE SPACE SUBLEASE 1105 Berkshire Boulevard / The TRAVELERS BUILDING Wyomissing, PA 19610. Rare Wyomissing Sublease 4,926 SF AVAILABLE NOW
SPACE SUBLEASE 1105 Berkshire Boulevard / The TRAVELERS BUILDING Rare Wyomissing Sublease 4,926 SF AVAILABLE NOW Full Service Lease, all-in for only $16.50 / SF! Glass on three sides, huge conference room
More informationWHITE PAPER THE MODULAR DATA CENTER CONUNDRUM AND THE TRULY MODULAR SOLUTION
WHITE PAPER THE MODULAR DATA CENTER CONUNDRUM AND THE TRULY MODULAR SOLUTION April 16, 2012 If one were asked to describe the nature of data center offerings today they could easily paraphrase Shakespeare
More informationSample Service Level Agreement
Sample Service Level Agreement Building Name Management Company Date Table of Contents: I. Purpose II. Rent Setting III. Initiatives IV. General Information V. Management Company - Services VI. Occupant
More informationSG COMMERCIAL. 30 St. Patrick. Modern Office Building Queen & University Under $30 Gross. SG Commercial Real Estate Inc. (Real Estate Brokerage)
SG COMMERCIAL 30 St. Patrick Quality Location Price Modern Office Building Queen & University Under $30 Gross SG Commercial Real Estate Inc. (Real Estate Brokerage) 30 ST. PATRICK STREET Year Built: 1986
More information