Agenda Number 6. CAP Server Room & Building Two Multi function Space Capital Project

Size: px
Start display at page:

Download "Agenda Number 6. CAP Server Room & Building Two Multi function Space Capital Project"

Transcription

1 Agenda Number 6. CAP Server Room & Building Two Multi function Space Capital Project

2 Prologue-Summary Originally began as two separate projects Similar history and background on each project - No master plan - Make do with available space As time went on and needs changed, the make do approach would no longer work - Too many requests to satisfy them all - Work arounds becoming expensive or impossible Time out to evaluate more comprehensive and sustainable options - CAP HQ Site Utilization and overall Facilities Master Plan - Information Technology Facilities

3 Prologue-Summary Each project proceeded independently for a while Some of the same staff were working on both projects (Project Steering Committee, Facilities Services, IT, Engineering) - Identified opportunities for synergy and cost savings if projects were combined Projects were combined and various alternatives and options were considered and evaluated Combined Server Room and Building Two Multi function Room Project recommendation included in the Budget

4 Building Two Multi-function Space Project

5 History The CAP Headquarters Complex originally served as a construction facility for the Bureau of Reclamation with fewer people than CAWCD requires for Operations and Maintenance CAP Staff moved in June of 1984 to share Building 1 with BOR Building 2 was completed in 1987, and the CAP Campus was fully occupied with two main buildings and ancillary buildings and yards throughout At its peak, CAP Headquarters supported over 900 people In 1996 the Bureau vacated the campus CAWCD planned and phased in site tenant improvements over time aimed at long term occupancy in support of O&M

6 History Renovations and reconfigurations included offices, ceiling tile, carpeting, office furniture/equipment and conference rooms Board Room renovations included carpet, chairs, acoustical panels and updated audio/visual technology In 2002 a Needs Analysis Space Planning Study was completed, resulting in a Machine Shop Expansion and new Sandblast Booth and Paint Shop at CAP HQ and the building of a permanent Tucson Field Office The CAP Headquarters campus is nearly 30 years old Major renovations made after the exit of the Bureau are nearly 20 years old

7 History Improvements have been limited by available space and functionality and consequently have been somewhat incremental The incremental nature of past facilities improvements, the legacy design of some CAP facilities and the lack of space to effectively stage coordinated changes over time have not always contributed to an efficient workplace By 2011 CAWCD had reached the point of nearly outgrowing its environment (with respect to both space and functionality) and exceeding its useful life in several areas

8 Changing Needs In 2012, the decision to close the CAP Cafeteria, a facility experiencing diminishing use, costly ongoing subsidies and increasing maintenance and replacement costs, freed up a significant amount of space, offering more flexibility and an opportunity to stage a more holistic site upgrade Many requests have been received for new build and additional space: Engineering larger conference room Centralized Learning and Development additional training room to accommodate 60+ students to negate the need to rent off site space Material Control climate controlled break room Headquarters Maintenance additional equipment room climate control for tools, shop space and equipment

9 Changing Needs CAP Strategic Plan includes PR21 Conduct a system wide spatial needs analysis for all functions and develop implementation plan to optimize workflow and functional efficiencies throughout CAP During 2012, a comprehensive space utilization study for CAP Headquarters was performed resulting in a go forward master plan The study cataloged the existing space use of the CAP facilities and benchmarked this data to nationally recognized standards

10 Changing Needs The final report identified areas that were not in line with comparable organizations including: Insufficient flexible meeting space (approximately 4,000 meetings have been held so far in 2013 in 13 conference rooms) Outdated technology Lack of efficient storage utilization A need for the space to support collaboration and the use of shared resources

11 Server Room Project

12 History When CAP Headquarters was originally built in the 1980s, centralized computing facilities were adequate for the times Over the years as computing and data needs grew, additional facilities to house centralized computer equipment ( server rooms or computer rooms ) have been located where space has been available Special needs for server rooms (HVAC, power, cabling, raised flooring) have often been a compromise In 2001 a Server Room Upgrade Project was completed in connection with the implementation of CAP s Enterprise Resource Planning (ERP) system and replacement of local/wide area network and desktop computing environment

13 History CAP servers and computer equipment now reside in several different locations The last significant technology facilities upgrade is over 10 years old Improvements have been in the context of long term occupancy in support of operations & maintenance, but have been limited by available space and functionality and consequently have been somewhat incremental CAP technology infrastructure has run out of capacity (floor space, power, HVAC) in existing locations without expensive temporary work arounds

14 Changing Needs CAP s business needs drive growth in technology - Servers - Data and data storage - Power consumption and distribution - Data transmission, cabling and infrastructure - Air conditioning Not only discrete technology (e.g., hardware and software systems related to enterprise applications), but technology is embedded in everything and creates data This is the most critical CAP facilities need CAP has expanded to offsite facilities temporarily (Business Disaster Recovery), but this is an expensive approach longterm

15 15

16 Computer Rooms

17 Tower and Cable Growth

18 Changing Needs The best solution is CAP Building 1 along the east wall Orthogonal shape with access to outside walls Close to microwave tower, power and telephone/internet connections Northeast corner is the current location of the Control Center Southeast corner is the current location of the Board Room Option does not displace employees during construction Other alternatives include - A new building (either pre fab or constructed) on CAP site - Relocating technology facilities somewhere else on CAP site that would provide additional space and ability to upgrade power capacity and air handling - Use of ancillary CAP buildings (e.g., helicopter hangar) Some alternatives are not feasible due to lack of utilities or cost to relocate utilities

19 Combined Projects

20 Combining the Projects Staff working on both Building Two Space Project and Server Room Project began to see opportunities in combining these projects Cost savings from unified construction mobilization and project management (including required ADA improvements) Completion of Building Two Space Project first would create more usable area to help alleviate any disruption from relocation of the Server Room If the Server Room displaces the current Board Room, which is vacant most of the time, the Building Two Multi function room could absorb these needs with no additional cost The Building Two Multi function Space could be used for meetings, training, etc. every day and reconfigured for Board functions when needed, expandable if required beyond the capacity of the current room Board meetings in the Building Two Multi function Space could take advantage of improved technology capabilities for broadcasting, recording, teleconferencing, etc. that are limited in the existing Board Room

21 Combining the Projects Staff, through the Project Steering Committee, evaluated feasible combinations 1) No new facilities refurbish the existing facilities to the extent possible 2) Relocate the current Board Room to Building 2 as part of the Multi function Space Project and build a new Server Room in the location of the current Board Room 3) Build a new Server Room in the location of the current Board Room; do not complete the Building Two Space Project at this time; rent space for Board functions 4) Complete the Building Two Space Project without incorporating the Board room and build a new Server Room elsewhere in Building One or in a new building or module outside Building One; refurbish the current Board Room to the extent possible

22 Combining the Projects Criteria considered Cost Constructability/existing utilities Displacement and disruption Support of long term objectives Maintainability/reliability Aesthetics Security considerations/access Some alternatives, while less expensive in the short term, are temporary in nature and only defer longer term solutions Some alternatives include sunk costs that will not contribute to longerterm solutions Some alternatives will incur higher costs due to additional disruption and displacement

23 Combining the Projects Staff Recommendation included in the budget is to complete the Building Two Multi function Space project first, incorporating the needs for a Board meeting space, followed immediately by building a new Server Room in the old Board Room space (Option 2) This alternative has the best fit with the overall criteria CAP Engineering and IT Departments and the space consultant used value engineering to reduce the original estimate of this option by $2.5 million Multi functional use Review multiple estimates to identify lowest cost options Combine construction activities Stage activities to reduce work disruptions Recycle and reuse where appropriate Use internal forces where appropriate

24 Appendix

25 Proposed Multi-Purpose Area

26 Proposed Multi-Purpose Area

27 Proposed Multi-Purpose Area

28 Proposed Multi-Purpose Area STORAGE UNI-SEX TOILET KITCHEN CONTROL ROOM

29 Multi-Purpose Room Flexibility Training Seating Auditorium Seating (configured for Board) Theatre Seating

30 Multi-Purpose Room Flexibility Workshop Seating Banquet Seating

31 Multi-Purpose Room Flexibility Conference Room Seating Options

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

InTech Case Study - Design and Build New Call Centers

InTech Case Study - Design and Build New Call Centers Case Study: System Stabilization and Redesign Stabilized and redesigned a complex multi vendor environment for a fast growing 311 call center Largest municipal government in North America InTech has done

More information

Office Move Checklist

Office Move Checklist Office Move Checklist Plan your entire office move from start to finish with this definitive Moving Office Checklist. It guides you through each step of the planning process and is loaded with top tips

More information

Ongoing communication with our tenants, residents and the public is essential to the projects success.

Ongoing communication with our tenants, residents and the public is essential to the projects success. Multi infrastructure repair and upgrade program to preserve and improve the historic Pike Place Market Funded by a six (6) year, $73 million Seattle property tax levy approved by voters in the fall of

More information

SECTION XI OPINION OF PROBABLE COST

SECTION XI OPINION OF PROBABLE COST SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing

More information

POLICY AND PROCEDURES OFFICE OF MANAGEMENT CONFERENCE ROOM MANAGEMENT. Table of Contents

POLICY AND PROCEDURES OFFICE OF MANAGEMENT CONFERENCE ROOM MANAGEMENT. Table of Contents POLICY AND PROCEDURES OFFICE OF MANAGEMENT CONFERENCE ROOM MANAGEMENT Table of Contents PURPOSE...1 BACKGROUND...1 POLICY...2 RESPONSIBILITIES...2 PROCEDURES...4 DEFINITIONS...6 EFFECTIVE DATE...7 CHANGE

More information

ACCOMMODATION FOR THE ICT SERVER ROOM. (Report by the ICT Services Manager and the Projects and Assets Manager)

ACCOMMODATION FOR THE ICT SERVER ROOM. (Report by the ICT Services Manager and the Projects and Assets Manager) CABINET ACCOMMODATION FOR THE ICT SERVER ROOM (Report by the ICT Services Manager and the Projects and Assets Manager) 1. PURPOSE 1.1 To recommend that the ICT server room on the 2 nd floor of Pathfinder

More information

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces. I-1 2.0 INTRODUCTION 2.1 BACKGROUND Located in the rapidly growing Inland Empire area of Southern California (Riverside and San Bernardino Counties), the University of California, Riverside is well positioned

More information

5703 South Sossaman Road Aviation Center

5703 South Sossaman Road Aviation Center 5703 South Sossaman Road Aviation Center has an available Class A aviation center with a 10,000 s.f. hangar. This facility includes 10,000 s.f. of space for offices, avionics repair, or other uses. It

More information

Table C33. Total fuel oil consumption and expenditures, 2012

Table C33. Total fuel oil consumption and expenditures, 2012 Release date: May 2016 Table C33. fuel oil consumption and, 2012 ) gallons) dollars) Building ( 1,001 to 5,000 204 604 3.0 21 151 522 5,001 to 10,000 74 559 7.6 10 74 253 10,001 to 25,000 67 1,123 16.7

More information

T: 0344 875 4555 ENQUIRIES@DATACENTRE-UK.COM

T: 0344 875 4555 ENQUIRIES@DATACENTRE-UK.COM T: 0344 875 4555 ENQUIRIES@DATACENTRE-UK.COM DATACENTRE UK INTRODUCTION Datacentre UK are specialist providers of energy efficient data centre and physical infrastructure solutions across the UK, Europe

More information

Data centres that deliver ENQUIRIES@DATACENTRE-MEA.AE

Data centres that deliver ENQUIRIES@DATACENTRE-MEA.AE Data centres that deliver ENQUIRIES@DATACENTRE-MEA.AE DATA CENTRE INFRASTRUCTURE MANAGEMENT (DCIM) DCIM solutions are designed to collect and manage information about a data centre s assets, resource use

More information

STICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation

STICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation STICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation APRIL 30, 2014 SCHEMATIC DESIGN PROGRESS Code Study Analysis: key issues and resolutions Seating Analysis of sightlines, seating and

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011 Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction

More information

Hole In One. Freehold 425,000 + VAT SOLE SELLING RIGHTS REF: NW-315821. Forest Drive, Lytham, St Annes, Lancashire FY8 4QF

Hole In One. Freehold 425,000 + VAT SOLE SELLING RIGHTS REF: NW-315821. Forest Drive, Lytham, St Annes, Lancashire FY8 4QF Hole In One Forest Drive, Lytham, St Annes, Lancashire FY8 4QF Freehold 425,000 + VAT Lancashire Freehold Densely populated residential area Lounge bar. Dining room & Public bar Private flat Site area

More information

MARQUETTE UNIVERSITY: McCabe Hall

MARQUETTE UNIVERSITY: McCabe Hall MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB6 Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For Meeting of September 17, 2013 ACTION ITEM APPROVAL OF PRELIMINARY PLANS FUNDING, BLAKE HOUSE RENOVATIONS, REPAIR, AND

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system

More information

CITY OF LOS ANGELES CALIFORNIA

CITY OF LOS ANGELES CALIFORNIA MERCEDES M. MÁRQUEZ GENERAL MANAGER PUBLIC COUNTERS 3550 WILSHIRE BOULEVARD, 15 TH FLOOR LOS ANGELES, CA 90010 3415 SOUTH SEPULVEDA BOULEVARD, SUITE 150 LOS ANGELES, CA 90034 8475 SOUTH VERMONT AVENUE

More information

2010 White Paper Report: Call Center Trends/Best Practice

2010 White Paper Report: Call Center Trends/Best Practice 2010 White Paper Report: Call Center Trends/Best Practice In order to change the fundamental patterns of call centers, we must understand the evolving trends and identify key business drivers that make

More information

Revised July 2001 CAPITALIZATION OF TENANT IMPROVEMENTS

Revised July 2001 CAPITALIZATION OF TENANT IMPROVEMENTS Revised July 2001 CAPITALIZATION OF TENANT IMPROVEMENTS Capitalization of Tenant Improvements 1.0 What is a Tenant Improvement (TI)?... 3 2.0 Capitalization Guidelines... 3 3.0 Approval Levels... 4 4.0

More information

March 13, 2006. Hon. Scott M. Stringer Manhattan Borough President 1 Centre Street New York, NY 10007. Dear Borough President Stringer:

March 13, 2006. Hon. Scott M. Stringer Manhattan Borough President 1 Centre Street New York, NY 10007. Dear Borough President Stringer: THE CITY OF NEW YORK INDEPENDENT BUDGET OFFICE 110 WILLIAM STREET, 14 TH FLOOR NEW YORK, NEW YORK 10038 (212) 442-0632 FAX (212) 442-0350 EMAIL: ibo@ibo.nyc.ny.us http://www.ibo.nyc.ny.us Hon. Scott M.

More information

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State

More information

Tate s Wire & Cable Solution

Tate s Wire & Cable Solution Access Floors Tate s Wire & Cable Solution A Flexible & Sustainable Management System Access Flooring to the Power of Your company will discover complete flexibility and reconfiguration capability 2 Creating

More information

Greening The Data Center

Greening The Data Center Greening The Data Center A Five Step Method for CIO s and Data Center Managers Professionals who manage Data Centers know what is expected from them for performance and uptime. What many are only just

More information

Facilities Advisory Committee Recommendations. Presentation to the Administrative Council May 22, 2013

Facilities Advisory Committee Recommendations. Presentation to the Administrative Council May 22, 2013 Facilities Advisory Committee Recommendations Presentation to the Administrative Council May 22, 2013 Harun Biswas (Chair) Kara Mullen Caroline Clower Rasheen Hunter Gid Rowell John Shiffert Cindy Lauer

More information

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity

More information

County Of Sonoma Agenda Item Summary Report

County Of Sonoma Agenda Item Summary Report County Of Sonoma Agenda Item Summary Report Department: General Services Contact: Rob Kambak Phone: (707) 565-3211 Board Date: 10/27/2009 4/5 Vote Required Deadline for Board Action: AGENDA SHORT TITLE:

More information

Videoconferencing. Province of British Columbia. Inside: Overview

Videoconferencing. Province of British Columbia. Inside: Overview Province of British Columbia Videoconferencing Inside: Overview... 1 Services and features... 2-3 Support... 4 Choosing a service... 5-7 Pricing... 8 Certification... 8 How to Order... 8 For more information

More information

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following: ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL

More information

NRDC SUSTAINABLE WORKPLACE PRACTICES IN CHICAGO

NRDC SUSTAINABLE WORKPLACE PRACTICES IN CHICAGO NRDC SUSTAINABLE WORKPLACE PRACTICES IN CHICAGO MISSION The Natural Resources Defense Council s purpose is to safeguard the Earth: its people, its plants and animals and the natural systems on which all

More information

THE WALTER AND ELIZA HALL INSTITUTE OF MEDICAL RESEARCH POSITION DESCRIPTION

THE WALTER AND ELIZA HALL INSTITUTE OF MEDICAL RESEARCH POSITION DESCRIPTION THE WALTER AND ELIZA HALL INSTITUTE OF MEDICAL RESEARCH POSITION DESCRIPTION POSITION TITLE: Head, Information Technology Services DIVISION / DEPARTMENT: Information Technology Services DATE: 2 June 2009

More information

Code Requirements for Existing Buildings

Code Requirements for Existing Buildings Code Requirements for Existing Buildings Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS)

More information

COUNTY ADMINISTRATOR 220 NORTH MAIN STREET, P.O. BOX 8645 ANN ARBOR, MICHIGAN 48107-8645 (734) 222-6850 FAX (734) 222-6715

COUNTY ADMINISTRATOR 220 NORTH MAIN STREET, P.O. BOX 8645 ANN ARBOR, MICHIGAN 48107-8645 (734) 222-6850 FAX (734) 222-6715 COUNTY ADMINISTRATOR 220 NORTH MAIN STREET, P.O. BOX 8645 ANN ARBOR, MICHIGAN 48107-8645 (734) 222-6850 FAX (734) 222-6715 TO: THROUGH: FROM: Barbara Levin Bergman, Chair Ways & Means Committee Robert

More information

Standard Comms Rooms Specification

Standard Comms Rooms Specification Standard Comms Rooms Specification Room Configuration Electrical General Distribution Boards Small Power Lighting Containment Fire Detection General To be defined in the project brief but should meet requirements

More information

EAST AYRSHIRE COUNCIL CABINET. 16 th June 2010. 2010 / 11 to 2012 / 13 INFORMATION TECHNOLOGY SERVICES CAPITAL EXPENDITURE PROGRAMME

EAST AYRSHIRE COUNCIL CABINET. 16 th June 2010. 2010 / 11 to 2012 / 13 INFORMATION TECHNOLOGY SERVICES CAPITAL EXPENDITURE PROGRAMME EAST AYRSHIRE COUNCIL CABINET 16 th June 2010 2010 / 11 to 2012 / 13 INFORMATION TECHNOLOGY SERVICES CAPITAL EXPENDITURE PROGRAMME Report by Executive Director of Finance & Corporate Support 1. PURPOSE

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT

More information

PROSPECTUS ALTERATION DENVER FEDERAL CENTER BUILDING 53 LAKEWOOD, CO

PROSPECTUS ALTERATION DENVER FEDERAL CENTER BUILDING 53 LAKEWOOD, CO FY2015 Project Summary The General Services Administration (GSA) proposes a repair and alteration project to undertake system and architectural repairs as well as alteration of existing space at the Denver

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

UNIVERSITY OF TOLEDO

UNIVERSITY OF TOLEDO UNIVERSITY OF TOLEDO SUBJECT: INTERIM LIFE SAFETY MEASURES AND INFECTION Procedure No: LS-08-008 CONTROL PROCEDURE STATEMENT Interim life safety and infection control measures will be implemented to protect

More information

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project March, 2015

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project March, 2015 Addendum 1: Changes to the Draft IS/MND Text and Figures Introduction This summary presents minor corrections and revisions made to the Draft IS/MND initiated by the public, staff and/or consultants based

More information

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses.

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses. Lee Householder Project Homes 88 Carnation Street Richmond, VA 2325 Re: William Byrd Renovation, Addendum 01 August 24, 2015 Lee, Here are the questions from bidders received between August 17, 2015 and

More information

OFFICE OF FINANCIAL MANAGEMENT

OFFICE OF FINANCIAL MANAGEMENT STATE OF WASHINGTON OFFICE OF FINANCIAL MANAGEMENT Insurance Building, PO Box 43113 Olympia, Washington 985043113 (360) 9020555 June 13, 2012 The Honorable Mary Margaret Haugen, Chair The Honorable Curtis

More information

Computer and Telecommunication Services Energy Management Plan. Introduction. Level Zero Standard Operating Procedures

Computer and Telecommunication Services Energy Management Plan. Introduction. Level Zero Standard Operating Procedures Computer and Telecommunication s Energy Management Plan Standard Operating Procedures Consolidation Reduction Cessation Introduction Technology is an integral component of university operations. Technology

More information

Commercial Cable Installation Philadelphia PA

Commercial Cable Installation Philadelphia PA Commercial Cable Installation Philadelphia PA About Us Squid Wire is a low voltage cabling company which is dedicated to providing solid, reliable technology advice and solutions to support our clients

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

Modular Accommodation Solutions. Flexibility, efficiency and quality in one complete package

Modular Accommodation Solutions. Flexibility, efficiency and quality in one complete package Modular Accommodation Solutions Flexibility, efficiency and quality in one complete package Welcome Our Services Providing Your Solutions The clients who work with SEDAC Accommodation Solutions are extremely

More information

WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING DIVISIONS OF FACILITIES MANAGEMENT AND REAL ESTATE. Space Allocation and Furniture Standards

WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING DIVISIONS OF FACILITIES MANAGEMENT AND REAL ESTATE. Space Allocation and Furniture Standards WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING DIVISIONS OF FACILITIES MANAGEMENT AND REAL ESTATE Space Allocation and Furniture Standards WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING Space Allocation and

More information

Space Allocation Guidelines. October, 2014

Space Allocation Guidelines. October, 2014 Space Allocation Guidelines October, 2014 Contents 1 Executive Summary... 2 2 More information... 2 3 Staff... 2 4 Students... 3 5 External Parties... 4 6 Glossary... 5 7 Versioning... 5 Responsible Officer

More information

Steps for Success and Reliability in PLM Implementations. Jay Imerman Senior Technical Consultant MSC.Software Corporation

Steps for Success and Reliability in PLM Implementations. Jay Imerman Senior Technical Consultant MSC.Software Corporation Steps for Success and Reliability in PLM Implementations Jay Imerman Senior Technical Consultant MSC.Software Corporation Implementing a Product Lifecycle Management system is difficult and risky, because

More information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park

More information

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design

More information

LaSalle Bank Business Continuity Best Practices

LaSalle Bank Business Continuity Best Practices LaSalle Bank Business Continuity Best Practices Outline Timeline of Events Crisis Management Communications Recovery Site Incident Site Photo Courtesy of Chicago Tribune 2 The Fire Monday, December 6,

More information

Optimal audio for. White Paper. May 2007

Optimal audio for. White Paper. May 2007 Optimal audio for Conference Rooms May 2007 2007 ClearOne Communications, Inc. All rights reserved. No part of this document may be reproduced in any form or by any means without written permission from

More information

FY09 PERFORMANCE PLAN Office of Property Management

FY09 PERFORMANCE PLAN Office of Property Management FY09 PERFORMANCE PLAN MISSION Support the District Government and residents through strategic real estate management, construction and facilities management. SUMMARY OF SERVICES The (OPM) has primary responsibility

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

The City of Corner Brook. Request for Proposals Marketing Consultant

The City of Corner Brook. Request for Proposals Marketing Consultant The City of Corner Brook Public Notice Request for Proposals Marketing Consultant Proposals are invited for Marketing Consultation services to develop a marketing plan for the Pepsi Centre to attract additional

More information

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks

More information

Program Summary. Criterion 1: Importance to University Mission / Operations. Importance to Mission

Program Summary. Criterion 1: Importance to University Mission / Operations. Importance to Mission Program Summary DoIT provides support for 1,200 virtual and 150 physical servers. Housed in DoIT data centers to take advantage of climate control, power conditioning and redundancy, fire suppression systems,

More information

Adams Service Bureau Colocation Assessment. Overview

Adams Service Bureau Colocation Assessment. Overview Adams Service Bureau Colocation Assessment Overview Adams Service Bureau has about 50 employees and is headquartered in Cleveland, Ohio with offices in Akron, Columbus, and Dayton. Adams has an Internet

More information

Understand VLANs, Wired LANs, and Wireless LANs

Understand VLANs, Wired LANs, and Wireless LANs LESSON 1,2_B Understand VLANs, Wired LANs, and Wireless LANs Lesson Overview In this lesson, you will review: Wired local area networks Wireless local area networks Virtual local area networks (VLANs)

More information

Borough President and City Council Capital Funding Requests FY 2009

Borough President and City Council Capital Funding Requests FY 2009 Borough President and City Council Capital Funding Requests FY 2009 CIP Number Phase* Request $ Classroom Development GR-0928061514 DCE $1,088,000 Expansion of Campus Security Systems GR-0504070756 DCE

More information

Planning and Budgeting for Capital Projects and Other Capital Items at Vassar

Planning and Budgeting for Capital Projects and Other Capital Items at Vassar September 2, 2008 Memorandum To: From: Re: Members of the Administration Department and Program Chairs Betsy Eismeier, Vice President for Finance and Administration Planning and Budgeting for Capital Projects

More information

Request for Proposals DATA CENTER RENOVATION

Request for Proposals DATA CENTER RENOVATION Request for Proposals DATA CENTER RENOVATION Deadline to Submit Questions for Response: August 1, 2014 by 4:00 pm Deadline for Proposal Submissions: August 15, 2014 by 4:00 pm REQUEST FOR PROPOSALS FOR

More information

Food and Drug Administration FY 2011 Congressional Budget Request Table of Contents

Food and Drug Administration FY 2011 Congressional Budget Request Table of Contents Food and Drug Administration FY 2011 Congressional Budget Request Table of Contents Page Narrative by Activity FDA Program Resources Table Program Description and Accomplishments Funding History Budget

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

UK HOSPITAL. Projects NOT Involving the General Fund, Road Fund, or Agency Bonds* Project Title / Description Total Budget Source(s) 2008-2010

UK HOSPITAL. Projects NOT Involving the General Fund, Road Fund, or Agency Bonds* Project Title / Description Total Budget Source(s) 2008-2010 UK HOSPITAL Projects NOT Involving the General Fund, Road Fund, or Agency Bonds* Project Title / Description Total Budget Source(s) 2008-2010 Construct/Purchase Good Sam Medical Office Building... $15,730,000...RF

More information

6 FAM 1700 SPACE ALLOCATION AND RELATED SERVICES

6 FAM 1700 SPACE ALLOCATION AND RELATED SERVICES 6 FAM 1700 SPACE ALLOCATION AND RELATED SERVICES 6 FAM 1710 OFFICE SPACE ASSIGNMENT AND UTILIZATION, DESIGN AND CONSTRUCTION (CT:GS-174; 05-29-2013) (Office of Origin: A/OPR/RPM) 6 FAM 1711 GENERAL PROVISIONS:

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Proposed Project For Exide Technologies Bristol, Tennessee - New NEPA Analysis

Proposed Project For Exide Technologies Bristol, Tennessee - New NEPA Analysis MEMORANDUM FOR NEPA FILE FROM: SUBJECT: MARK LUSK NEPA DOCUMENT MANAGER Supplement Analysis for the Exide Technologies' Proposed Project under the Electric Drive Vehicle Battery and Component Manufacturing

More information

Louisiana State University Information Technology Services (ITS) Frey Computing Services Center Data Center Policy

Louisiana State University Information Technology Services (ITS) Frey Computing Services Center Data Center Policy Louisiana State University Information Technology Services (ITS) Frey Computing Services Center Data Center Policy Access: If you have been granted a Frey Access Card with currently approved access to

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

The Rise and Benefits of Smart Buildings

The Rise and Benefits of Smart Buildings The Rise and Benefits of Smart Buildings Table of Contents Today s core enterprise real estate concerns How smart buildings solve these core dilemmas Case study: 18 York Why you need FlexITy to turn your

More information

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes. Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items

More information

SELECTED SPECIAL EVENTS PROJECTS

SELECTED SPECIAL EVENTS PROJECTS 1 5 SELECTED SPECIAL EVENTS PROJECTS 3 1 DONNA AND MARVIN SCHWATZ CENTER FOR PERFORMING ARTS, ATLANTA, GEORGIA, USA. COBB ENERGY PERFORMING ARTS CENTRE, COBB COUNTY, GEORGIA, USA. 3 OLYMPIC AQUATIC CENTER,

More information

SCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers

SCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers SCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers WHAT IS THE ISSUE? Last year our School Board entered into a full-scale study of our educational facilities conducted by the Ohio

More information

Perspectives on Workplace Sustainability

Perspectives on Workplace Sustainability Perspectives on Workplace Sustainability Is your portfolio green and productive? You can measure it really. In a recent productivity study of 32,000 employees, almost half of them admitted to performing

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY. 3.5 ENERGY CONSERVATION AND SUSTAINABILITY As a result of the analysis undertaken in the Initial Study 1 for the Los Angeles Mission College Facilities Master Plan, the LACCD determined that the proposed

More information

The Conference is Calling. A guide to getting the most out of your conference calls

The Conference is Calling. A guide to getting the most out of your conference calls The Conference is Calling A guide to getting the most out of your conference calls The Conference is Calling Why use a conference phone? Most phones today have a speakerphone button but there are in fact

More information

W H I T E P A P E R. Reducing Server Total Cost of Ownership with VMware Virtualization Software

W H I T E P A P E R. Reducing Server Total Cost of Ownership with VMware Virtualization Software W H I T E P A P E R Reducing Server Total Cost of Ownership with VMware Virtualization Software Table of Contents Executive Summary............................................................ 3 Why is

More information

Survey Responses: Users of MSB105 AV and Conferencing Equipment

Survey Responses: Users of MSB105 AV and Conferencing Equipment Survey Responses: Users of MSB105 AV and Conferencing Equipment Responses gathered in-person and via email 1. What is your department/business unit? EDUCATION DEAN S OFFICE Vice Dean s Office UME PGE LEW

More information

Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM Office of the President TO MEMBERS OF THE COMMITTEE ON : For Meeting of ACTION ITEM GB2 AMENDMENT OF THE BUDGET AND SCOPE, APPROVAL OF EXTERNAL FINANCING, AND APPROVAL OF THE DESIGN FOLLOWING ACTION PURSUANT

More information

Coastside County Water District Board of Directors

Coastside County Water District Board of Directors To: From: Coastside County Water District Board of Directors David Dickson, General Manager Report Date: February 5, 2014 Subject: District Office Fire Recovery Recommendation: None. Information only.

More information

PROSPECTUS - ALTERATION Prospectus for Design

PROSPECTUS - ALTERATION Prospectus for Design Description fhe General Services Administration (GSA) is seeking authorization for design projects during liscal year 2011 that we will schedule for construction in future years. Project descriptions are

More information

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center EMC PERSPECTIVE Managing Energy Efficiency in the Data Center A tactical approach can deliver immediate problem resolution plus long-term savings and efficiencies Managing Energy Efficiency in the Data

More information

How does Architecture Affect the Acoustics of a Space

How does Architecture Affect the Acoustics of a Space How does Architecture Affect the Acoustics of a Space Grade Level This lesson plan was developed for a 9 th grade Physical Science Class. Objectives To develop aural senses of spatial awareness To understand

More information

Best Practices for Using Symantec Online Storage for Backup Exec

Best Practices for Using Symantec Online Storage for Backup Exec WHITE PAPER: xxxxxx Data Protection [00-Cover_Bar] Best Practices for Using Symantec Online Storage for Backup Exec Confidence in a connected world. White Paper: Data Protection Best Practices for Using

More information

Sydney's most unique and versatile venue. 14,000m 2 of infinitely flexible event space set in stunning historic Locomotive Workshops

Sydney's most unique and versatile venue. 14,000m 2 of infinitely flexible event space set in stunning historic Locomotive Workshops Sydney's most unique and versatile venue 14,000m 2 of infinitely flexible event space set in stunning historic Locomotive Workshops The Australian Technology Park offers exceptional facilities for exhibitions,

More information

TECHNICAL SUPPORT. and HARDWARE/SOFTWARE/NETWORK MAINTENANCE. for

TECHNICAL SUPPORT. and HARDWARE/SOFTWARE/NETWORK MAINTENANCE. for IT Services Service Level Agreement TECHNICAL SUPPORT and HARDWARE/SOFTWARE/NETWORK MAINTENANCE for CENTER FOR ACADEMIC SUPPORT AND ADVANCEMENT COMPUTER LABS AND STEPS PROGRAM IT Services Service Level

More information

Early Learning Coalition of Miami-Dade/Monroe, Inc. Office Space Search

Early Learning Coalition of Miami-Dade/Monroe, Inc. Office Space Search Early Learning Coalition of Miami-Dade/Monroe, Inc. Office Space Search August 3, 2009 Introduction President of Paul L. White & Associates, Inc., a commercial real estate consulting company Director,

More information

Solicitation 4448/4449 COOK/CHILL EQUIPMENT INSTALLATION & KITCHEN AIR CONDITIONING INSTALLATION. State of California

Solicitation 4448/4449 COOK/CHILL EQUIPMENT INSTALLATION & KITCHEN AIR CONDITIONING INSTALLATION. State of California Solicitation 4448/4449 COOK/CHILL EQUIPMENT INSTALLATION & KITCHEN AIR CONDITIONING INSTALLATION State of California May 20, 2010 2:04:19 PM PDT p. 1 Bid 4448/4449 COOK/CHILL EQUIPMENT INSTALLATION & KITCHEN

More information

CONSTRUCTION UPDATE November 6, 2015

CONSTRUCTION UPDATE November 6, 2015 CONSTRUCTION UPDATE November 6, 2015 Donaldsonville High School Athletic Addition East Ascension High School Athletic Addition St. Amant High School Athletic Addition St. Amant High School Freshman Academy

More information

Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015

Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015 Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015 END 3.3 Centralia College will plan, implement and utilize a technology system and infrastructure that supports

More information

Flexible Office Space Up to 66,240 Ft 2

Flexible Office Space Up to 66,240 Ft 2 Flexible Office Space Up to 66,240 Ft 2 Building Description: Wide Open Large Office Complex Numerous Perimeter Offices, Conference & Break Rooms and Wide Open Office Space Throughout Can Be Modified to

More information

TECHNOLOGY PLAN SUMMARY

TECHNOLOGY PLAN SUMMARY IV. TECHNOLOGY PLAN SUMMARY The Oklahoma City Metropolitan Area Public Schools (OCMAPS) Technology Plan serves as a guide for OCMAPS funding of technology into the Oklahoma City Public School District

More information

Capital Budget Summary

Capital Budget Summary Capital Budget Summary WA01 Department of State Police State-owned Capital Improvement Program ($ in Millions) Projects Prior Auth. 2015 Request 2016 2017 2018 2019 Beyond CIP Tactical Services Facility

More information