MAPPING URBAN POVERTY IN HO CHI MINH CITY
|
|
|
- June Ross
- 9 years ago
- Views:
Transcription
1 MAPPING URBAN POVERTY IN HO CHI MINH CITY NOVEMBER
2 ACKNOWLEDGEMENTS This report has been written and collated by Lucinda Hartley and Lam Quoc Toan. The mapping team would like to acknowledge the generous time and support following Habitat for Humanity staff, interns and volunteers who helped with data collection, editing and translation and without whom this report would not be possible: Alissa Tran Desiree Bartosiak Esther Arthur Le Ngoc Linh Pham Thi Kim Phuong Thanh Trung Giang DISCLAIMER This report is the report of an independednt research project carried out entirely by Habitat for Humanity Staff, Interns and Volunteers listed above. 2
3 LIST OF ABBREVIATIONS ADB Asia Development Bank CPRGS HFHI HFHI-V MDG UN UNFPA UN-Habitat VDG VeT VHLSS VLSS Comprehensive Poverty Reduction and Growth Strategy Habitat for Humanity International Habitat for Humanity International Vietnam Millennium Development Goals United Nations United Nations Population Fund United Nations Human Settlements Program Vietnam Development Goals Villes en Transition Vietnam Household Living Standard Survey 2002 and 2004 Vietnam Living Standards Survey
4 TABLE OF CONTENTS EXECUTIVE SUMMARY 6 INTRODUCTION 12 PURPOSE OF STUDY 13 BACKGROUND 13 HOUSING AND THE MILLENIUM DEVELOPMENT GOALS 13 VIETNAM DEVELOPMENT GOALS AND NATIONAL POVERTY REDUCTION TARGETS 13 PART 1 POVERTY AND HOUSING 15 URBAN POVERTY IN HO CHI MINH CITY 16 POVERTY AND HOUSING 17 PART 2 19 HO CHI MINH CITY IN CONTEXT 19 ADMINISTRATIVE BOUNDARIES AND URBAN HIERARCHIES 20 URBANIZATION AND SPATIAL EXPANSION 20 INFRASTRUCTURE 23 URBAN PLANNING 23 SOCIO-ECONOMIC DIMENSIONS 25 PART 3 NEW URBAN CHALLENGES 26 HOUSING SHORTAGES 27 RURAL-URBAN MIGRATION 27 RESETTLEMENT 29 SUMMARY 32 4 PART 4 HO CHI MINH CITY MAPPING REPORT 33 OVERVIEW AND OBJECTIVES 34 SCOPE OF WORK 34 METHODOLOGY 35 Spatial Analysis 35 Field Surveys and Visual Analysis 35 Visual Parameters 37 Housing Typologies 38 Risks and Assumptions 38 SUMMARY OF FINDINGS 39 Spatial Analysis 39 FIELD SURVEYS AND VISUAL ANALYSIS 41 PART 5 DISTRICT SUMMARY 43 URBAN: DISTRICT 4 44 URBAN: DISTRICT 6 45 URBAN: DISTRICT 8 46 URBAN: DISTRICT URBAN: BINH THANH DISTRICT 48 URBAN: GO VAP DISTRICT 49 URBAN: TAN BINH AND TAN PHU DIST. 50 SEMI-URBAN DISTRICT 2 51 SEMI-URBAN: DISTRICT 7 52 SEMI-URBAN: DISTRICT 9 53 SEMI-URBAN: DISTRICT SEMI-URBAN: BINH TAN DISTRICT 55 SEMI-URBAN: THU DUC DISTRICT 56 RURAL: HUYEN CU CHI 57 RURAL: HUYEN BINH CHANH 58 PART 6 MAJOR FINDING AND CONCLUSION 59 MAJOR FINDINGS: HOUSING NEEDS 60 LOCATION OF URBAN SLUMS AND SLUM SETTLEMENTS 62 RESETTLEMENT AND URBAN SLUMS 63 MAJOR FINDINGS: PRIORITY LOCATIONS 64 CONCLUSION 66 CONCLUDING STATEMENT 67 REFERENCES 68 ANNEX: A1 DEFINITION OF TERMS 71 A2 SPATIAL ANALYSIS MAP 73 A3 VISUAL ANALYSIS MAP 74 A4 COMBINED MAP 75 A5 OBSERVATIONS 76
5 Canal Slum Settlements in District 4, Ho Chi Minh City 5
6 6 EXECUTIVE SUMMARY Urban poverty in Ho Chi Minh City, Vietnam, is an issue of increasing concern. While the opening up of Vietnam s economy to global capital since the Renovation or Doi Moi policy in 1986 has generally improved peoples living conditions, rapid urbanisation combined with soaring land prices 1 and an influx of rural-urban migration has accelerated the growth of urban slums. Affordable, decent housing, and access to improved water and sanitation, are especially large and pressing needs. To meet housing and development needs in Ho Chi Minh City, Habitat for Humanity International Vietnam (HFHI-V) plans to expand its program into urban areas. HFHI-V has been working towards the goal of eliminating poverty housing and improving water and sanitation in Vietnam since While HFHI-V have a made an impressive start on projects in Danang and the Mekong Delta, it is important to also focus on urban development to attack and mitigate urban poverty. Habitat for Humanity International (HFHI) believe that simple, decent housing is a basic human right as well as matter of conscience and action. Not only is housing improvement in Vietnam a catalyst for poverty alleviation but it also works towards meeting Millennium Development Goal 7 target 11: By 2020, to have achieved a significant improvement in the 1 Over 500% since 1990s (World Bank 2007:1) lives of at least 100 million slum dwellers 2, in addition to helping to meet Vietnam s Development Goals and other national poverty reduction targets. The purpose of this report is to outline firstly the background context in which poverty housing exists in Ho Chi Minh City and secondly to present the findings from a broad scale urban mapping study undertaken by HFHI-V in The aim of the mapping study was to document trends and patterns in urban slums and slum settlements as well as identify areas of the city which have the 2 Table 1: Ho Chi Minh City at a Glance Area (Ha) No. of Districts 24 - Urban Districts 19 - Rural Districts 5 Population 6,650,492 - Urban districts 5,640,288 - Rural districts 1,010,654 - Women 3, 466, Men 3,184,175 Population Increase Rate (%) Urban Districts Rural Districts Source: Ho Chi Minh City Statistical Yearbook 2007
7 Hanoi greatest housing, water and sanitation needs. Drawing conclusions from this information, this report makes recommendations for appropriate locations within Ho Chi Minh City for HFHI-V to establish an urban program. PART 1: POVERTY AND HOUSING Poverty in Vietnam has typically been considered a rural phenomenon. However, while the percentage of population classified as poor remains higher in rural areas, the absolute number of poor is greater in cities, and is steadily growing. On a national level, Vietnam has made remarkable progress in reducing its national poverty rate over the past two decades from 58.1% in 1993 to 24.1% in However, in recent times urban poverty has risen. Estimates of substandard housing vary widely, however it is clear that slums are extensive and growing. According to the Vietnam Housing and Living Standards Survey (2004), 16.0% of households in and around Ho Chi Minh City live in substandard inadequate housing with very poor or non-existent access to water and sanitation. In 2008, 17,033 households in Ho Chi Minh City were found to be living below the official poverty line 4 3 Poverty as the percentage of people who live below $1 a day; (CIEM 2006:91) 4 The re-adjusted poverty line for Ho Chi Minh City in 2008 is 6 million VND/capita/annum while the Department of Land and Housing estimates that over 300,000 people live in slum conditions (World Bank 2007:2). Other sources indicate the percentage of the population living in slums or temporary housing to be between 15-25% (World Bank 2004:p4/World Bank 2004/A). By any measure, the need for housing in Ho Chi Minh City is very great. PART 2: HO CHI MINH CITY IN CONTEXT To put urban poverty in context, this report presents Ho Chi Minh City from a geographical, planning and social-economic perspective. Geographically, Ho Chi Minh City is Vietnam s second largest metropolitan area after greater Hanoi (Table 1), and is also one of the region s fastest growing urban centres 5. Its 24 administrative districts have been, for the purposes of this report, classified as urban, semi-urban and rural according to their level of urbanisation. Urban growth is one of the key contributors to increasing rates of urban poverty in Ho Chi Minh City. Typical of many rapidly urbanizing centers Ho Chi Minh City exhibits characteristics such as high rates of rural-urban migration, shortage of housing 5 Average growth rate 3.1% ( ; HCMC-SO 2007:23) Ho Chi Minh City Figure 1: Ho Chi Minh City Location Map space, increasing land prices, changes in land use, increasing socio-economic disparities together with urban renewal and modernisation. Ho Chi Minh City s population is growing faster than its level of infrastructure has been able to expand. As such, environmental sustainability and urban sanitation are major challenges for the city. The urban poor are particularly disadvantaged in their access to basic infrastructure and services. Many houses do not have direct water supply and sewage connections are limited (World Bank, 2006). From a planning perspective, The Orientation Masterplan for Urban Development 2020, (Figure 6) sets out an infrastructure strategy, as well as designating areas for urban upgrading and new city centers. The strategy sets objectives for urban and economic growth corridors, however it was under revision at the time of writing. Planning and infrastructure factors have contributed a lot to the settlement pattern of the city. In particular, they 7
8 Satellite image of District 1, Ho Chi Minh City. Source: Google Earth , November 2008 have been a major driver behind resettlement projects for the city s urban slums, particularly along canals and waterways. Economically, Ho Chi Minh City has derived enormous benefit from Vietnam s shift to a marketoriented economy, having received 85% of all the Foreign Direct Investment (FDI) coming into Vietnam (World Bank; 2007). However, the establishment of new industrial and economic zones has fuelled rural-urban migration which, in turn, has accelerated the growth of urban slums. PART 3: NEW URBAN CHALLENGES In the context of rapid economic growth and urbanization, the major challenges for providing adequate housing, water and sanitation for Ho Chi Minh City s urban poor are related to two key issues: rural-urban migration and resettlement. Between percent of Ho Chi Minh City s population are estimated to be migrants or temporary residents (Waibel, 2007), many of whom live in cramped transitional boarding houses, or squatter settlements, particularly on the urban fringe. Conversely, urban slums and slum settlements in established urban areas, which tend to be concentrated along canals, waterways and public infrastructure, are being resettled to semi-urban 8 and rural districts as part of urban renewal and infrastructure projects. As such, there is a need for improved housing, water and sanitation in many different areas of the city. PART 4: MAPPING STUDY The purpose of this section is to examine the dynamics and settlement patterns of urban poverty housing in Ho Chi Minh City on a broad scale. Two phases of mapping were undertaken by HFHI-V in 2008: a desktop spatial analysis study using Remote Sensing (RS) imagery and aerial photography followed by a visual and qualitative analysis based on field surveys. In the first instance, spatial analysis was used to identify slum settlements from aerial photography. This showed notable trends in settlement patterns in Ho Chi Minh City. In urban and semi-urban areas, slums were typically located along canals and waterways or adjacent to public infrastructure. In rural districts the pattern was more fragmented rather than concentrated, and therefore difficult to distinguish from spatial analysis alone. Following this, field surveys were undertaken using a set of defined visual parameters to identify slums and squatter settlements. This visual analysis confirmed the pattern of slum settlements that were identified through spatial analysis but allowed for further analysis of urban housing typologies and the context in which urban slums exist. As for phase one, slums in urban areas were concentrated along canals and waterways, while in rural areas there were individual slum houses scattered throughout. In semi-urban and rural areas there was also a high incidence of transitional boarding houses for urban migrants, many of which exhibited signs of cramped living conditions and inadequate sanitation. Through both the spatial and visual analysis, it was concluded that the major issues affecting poverty housing, water and sanitation in Ho Chi Minh City were: - Durability of building construction - Hazardous housing locations - Inadequate living space - Inadequate access to water and sanitation - A need for adequate transitional rental housing for migrants - A need for adequate housing for communities that have been resettled The study did not conclude that one particular district had the greatest need, but identifies several districts in each of the urban, semi-urban and rural areas have been as priorities for HFHI-V s program.
9 TÓM TẮT THỰC THI Vấn đề Nghèo Đô Thị của Thành phố Hồ Chí Minh, Việt Nam đang ngày càng được quan tâm. Việc mở cửa nền kinh tế Việt Nam ra toàn cầu từ sau chính sách Đổi Mới 1986 nhìn chung đã cải thiện điều kiện sống của người dân, song việc đô thị hóa nhanh chóng đã kéo theo sự tăng vọt giá cả 1 và việc di cư ào ạt từ nông thôn vào thành thị đã tăng tốc cho sự phát triển các khu nhà ổ chuột trong đô thị. Nhà ở tươm tất, phù hợp với khả năng với nước sinh hoạt và vệ sinh được cải thiên đặc biệt đang là những vấn đề lớn và nổi trội. Để đáp ứng nhu cầu cấp bách về nhà ở và phát triển của Thành phố Hồ Chí Minh, Habitat for Humanity International Vietnam (HFHIV) lên kế hoạch mở rộng chương trình của mình sang các khu vực đô thị. HFHIV đã và đang hướng tới mục tiêu giảm thiểu nghèo nàn trong vấn đề nhà ở, nước sinh hoạt và điều kiện vệ sinh tại Việt Nam từ năm HFHIV đã có những khởi đầu ấn tượng trong các dự án tại Đà Nẵng và khu vực Đồng bằng sông Cửu Long, song cũng rất quan trong để tập trung vào phát triển các khu vực độ thị để giảm thiểu và chống lại cái nghèo. Habitat for Humanity International (HFHI) tin rằng nhà ở tươm tất, giản dị là một quyền con người cơ bản cũng như là vấn đề của nhận thức và hành động. Chương trình cải thiện nhà ở tại Việt Nam không chỉ là chất xúc tác cho việc giảm thiểu nghèo mà còn tiến tới việc đáp ứng Mục đích 7, Tiêu chí 11 của Mục tiêu Phát Triển Thiên Niên Kỷ: Vào năm 2020 phải đạt được 1 Trên 500% từ những năm 1990; (Ngân hàng Thế giới 2007:1) thành tựu đáng kể trong việc cải thiện cuộc sống cho tối thiệu 100 triệu hộ gia đình sống trong các khu ổ chuột. 2, hơn nữa sẽ giúp đáp ứng mục tiêu phát triển và các mục tiêu khác trong việc giảm nghèo của Việt Nam. Mục đích của báo cáo này là trước tiên phác thảo bối cảnh về nhà ở nghèo nàn đang tồn tại trong Thành phố Hồ Chí Minh và tiếp đến là thể hiện những kết quả đã được HFHIV đảm trách trong năm 2008 trong việc nghiên cứu lập bản đồ Nghèo đô thị trên đô thị có quy mô rộng lớn này. Mục tiêu của nghiên cứu lập bản đồ là để có những tài liệu về những xu hướng, những mẩu hình định cư đô thị cũng như nhận dạng những khu vực có 2 ] Bảng 1: Sơ lược về Tp. Hồ Chí Minh Diện tích (Ha) Số quận/ huyện 24 - Quận/ huyện nội đô 19 - Quận/ huyện ven đô (nông thôn) 5 Dân số 6,650,492 - Sống trong quận/ huyện nội đô 5,640,288 - Sống trong quận/ huyện ven đô (nông 1,010,654 thôn) - Nữ 3, 466, Nam 3,184,175 Tốc độ gia tăng dân số (%) Quận/ huyện nội đô Quận/ huyện ven đô (nông thôn) NGUỒN: Thống kế thường niên Tp Hồ Chí Minh
10 nhu cầu lớn nhất về nhà ở, nước sạch và vệ sinh. Rút ra kết luận từ những thông tin này, báo cáo này đề xuất những vị trí thích hợp của Thành phố Hồ Chí Minh mà trên đó HFHIV sẽ thành lập một chương trình phát triển ở đô thị. PHẦN 1 - NGHÈO ĐÔ THỊ VÀ NHÀ Ở Nghèo ở Việt Nam thường tiêu biểu như một hiện tượng ở nông thôn. Về tỉ lệ, ở nông thôn, dân số xếp vào loại nghèo cao hơn so với giàu, tuy nhiên về số lượng người nghèo ở đô thị lại cao hơn nhiều so với người nghèo ở nông thôn và đang ngày càng gia tăng. Ở mức độ quốc gia, Việt Nam đã tạo được một sự tiến bộ đáng chú ý trong việc giảm tỉ lệ nghèo cả nước qua hai thập niên, từ 58.1% vào năm 1993 xuống 24.1% vào năm Tuy nhiên, thời gian gần đây, nghèo đô thị gia tăng. Dữ liệu về hiện trạng nghèo đô thị tại Thành phố Hồ Chí Minh nhìn chung khác nhau. Trong năm 2008, có khoảng 17,000 hô dân được xếp loại sống dưới ngưỡng nghèo được điều chỉnh vào năm 2008, 4 theo thống kê chính thức, chiếm 1.37% dân số của thành phố. Tuy nhiên, số liệu này đã ngoại trừ số dân nhập cư từ nông thôn vào thành thị và cho thấy rằng khả năng những tính toán này thấp hơn mức độ và chiều sâu thực tế của nghèo đô thị (theo Ngân hàng thế giới, 2004:1). Để so sánh, những nguồn thông tin khác chỉ ra rằng tỉ lệ dân 3 Nghèo tỉ lệ người sống dưới $1/ ngày; (CIEM 2006:91), 4 Sở Lao động, Thương Binh và Xã hội 10 số sống trong khu ổ chuột hay nhà tạm bợ là từ 15-25% (Theo Ngân hàng thế giới 2006: trang 4/ World Bank 2004/A) 5. Nhu cầu về nhà ở trong đô thi theo cách tính này thì thật là to lớn. PHẦN 2 - BỐI CẢNH CỦA THÀNH PHỐ HỒ CHÍ MINH Để xem xét Nghèo đô thị trong bối cảnh hiện tại, báo cáo này thể hiện Thành phố Hồ Chí Minh từ các góc nhìn về địa lý, qui hoạch, và kinh tế-xã hội. Về mặt địa lý, Thành phố Hồ Chí Minh là đô thị lớn thứ hai của Việt Nam sau Thành phố Hà Nội, và cũng là một trong những trung tâm đang phát triển lớn nhất khu vực 6. Để phục vụ cho báo cáo này, 24 quận huyện hành chánh của thành phố đã được phân loại thành đô thị, bán đô thị và nông thôn tùy theo mức độ của việc đô thị hóa. Phát triển đô thị là môt trong những thành phần chủ yếu dẫn tới tốc độ gia tăng của Nghèo đô thị tại Thành phố Hồ Chí Minh. Điển hình cho những trung tâm đô thi hóa nhanh chóng, Thành phố Hồ Chí Minh đã bộc lộ những tính chất như: tốc độ di dân từ nông thôn lên thành thị cao, sự thiếu hụt không gian nhà ở, giá đất tăng, việc thay đổi mục đích sử dụng đất, sự gia tăng chênh lệch kinh tế - xã hội giữa đổi mới đô thị và hiện đại hóa. Dân số Thành phố Hồ Chí Minh gia tăng nhanh hơn mức 5 25% vào năm 2002, 15% vào năm Tốc độ gia tăng bình quân 3.1% ( ; HCMC-SO 2007:23) độ mở rộng cơ sở hạ tầng. Như thế, những vần đề như môi trường bền vững và vệ sinh đô thị là những vấn đề chính mà thành phố đang đối mặt. Những người nghèo đô thị có bất lợi đặc biệt cho việc tiếp cận những hạ tầng kỹ thuật và tiện ích cơ bản. Nhiều nhà ở không được trực tiếp cung cấp nước và việc kết nối hê thống nước thải còn hạn chế. Trên góc độ của qui hoạch, Định hướng phát triển không gian đô thị đến năm 2020 đã thể hiện chiến lược phát triển cơ sở hạ tầng cũng như việc chỉ định những khu vực được nâng cấp lên đô thị và các trung tâm đô thị mới. Mặc dù chưa được hoàn thiện đến mức độ như đã được qui hoạch ban đầu, song nó vạch ra những mục tiêu cho các hành lang phát triển kinh tế và đô thị. Quy hoạch và cơ sở hạ tầng đã có những ảnh hưởng chính đằng sau các dự án tái định cư cho các khu ổ chuột đô thị của thành phố, đặc biệt dọc các kênh rạch và sông ngòi. Về kinh tế, Thành phố Hồ Chí Minh đã phát sinh lợi ích khổng lồ từ việc chuyển sang nền kinh tế thi trường, nhận 85% từ Đầu tư trực tiếp của nước ngoài (FDI) (Ngân hàng thế giới 2007). Tuy nhiên, sự hình thành các khu công nghiệp và kinh tế mới như là một tình trạng đổ thêm dầu vào lửa cho việc di cư từ nông thôn sang thành thị, và kế đến điều này đã làm tăng tốc sự phát triển của các khu ổ chuột đô thị.
11 PHẨN 3 - NHỮNG THÁCH THỨC TRONG CÁC KHU ĐÔ THI MỚI Trong hoàn cảnh kinh tế và đô thi hóa phát triển nhanh chóng ngày nay, những thách thức chính cho việc cung cấp đầy đủ nhà ở, nước sinh hoạt và điều kiện vệ sinh cho người nghèo tại Thành phố Hồ Chí Minh liên quan đến 2 vần đề then chốt sau: việc di dân từ nông thôn sang thành thị và việc tái định cư. Ước tính có từ 20-30% dân số Thành phố Hồ Chí Minh là những người nhập cư hoặc tạm cư (theo Waibel, 2007), nhiều người trong số đó sống trong nhà cho thuê tạm thời, chật hẹp, tù túng, hoặc trong những khu định cư không phép, đặc biệt ở các vùng ven đô thị. Ngược lại, khu ổ chuột đô thị và định cư trong khu ổ chuột có xu hướng tập trung ven kênh rạch, các hạ tầng kỹ thuật công cộng trong các khu đô thị hiện hữu đang được tái định cư sang các quân-huyện bán đô thị hay nông thôn để tạo mặt bằng cho các dự án phát triển cơ sở hạ tầng và các đô thị mới. Như vây, có một nhu cầu lớn cho việc cải thiện nhà ở, nước sinh hoạt và điều kiện vệ sinh trong nhiều khu vực khác nhau của thành phố này. PHẦN 4 NGHIÊN CỨU THIẾT LẬP BẢN ĐỒ NGHÈO ĐÔ THỊ CỦA THÀNH PHỐ HỒ CHÍ MINH Mục đích của phần này là khảo sát những động lực hình thành và những mẩu hình nhà ở của người nghèo tại thành phố Hồ Chí Minh trên một quy mô rộng lớn. Hai giai đoạn của nghiên cứu lập bản đồ này được đảm nhiệm là một nghiên cứu phân tích không gian trên bản vẽ sử dụng Cảm nhận từ xa (Remote Sensing - RS) qua hình ảnh và ảnh chụp từ trên không (không ảnh) bằng phương pháp Phân tích trực quan và Phân tích định tính dựa trên khảo sát thực tế. Trong trường hợp đầu, phân tích không gian được sử dụng để định dạng những khu định cư ổ chuột từ không ảnh. Cách này đã thể hiện xu hướng đáng chú ý về mẩu hình định cư của Thành phố Hồ Chí Minh. Ở các khu đô thị và bán đô thị, nhà ổ chuột có vị trí ở ven kênh rạch và giáp ranh với các hạ tầng cơ sở công cộng. Ở các quận/ huyện nông thôn, mẩu hình này rải rác hơn là tập trung và như vậy khó phân biệt chỉ bằng cách phân tích không gian. Vì thế, việc khảo sát thực tế đã đảm nhiệm việc sử dụng môt tập hợp các tham số trực quan được xác định để nhận dạng các khu ổ chuột và khu định cư không hợp lệ. Việc phân tích trực quan này đã xác nhận những mẩu hình nhà ổ chuột như đã được định dạng qua phương pháp phân tích không gian nhưng còn cho phép phân tích xa hơn loại hình nhà ở đô thị và hoàn cảnh tồn tại của các khu ổ chuột. Như trong giai đoạn 1 đã tìm thấy, nhà ổ chuột đô thị tập trung ven kênh rạch là những nhà đơn lẻ, rải rác kháp nơi. Trong khu vực bán đô thị và nông thôn, cũng có sự ảnh hưởng cao của nhà cho thuê tạm thời chật hẹp cho người nhập cư đô thị thuê, nhiều nơi có dấu hiệu biểu hiện đều kiện sống tù Ảnh 1: Bản đồ vị trí Tp. Hồ Chí Minh, Viêt Nam túng và thiếu vệ sinh. Qua việc phân tích không gian và trực quan, có thể kết luận rằng vấn đề mấu chốt ảnh hưởng đến nhà ở nghèo nàn, nước sinh hoạt và vệ sinh kém tại Thành phố Hồ Chí Minh là: Tính bền vững của công trình xây dựng Vị trí xây dựng nhà ở nguy hiểm Thiếu không gian sống Thiếu khả năng tiếp cận nước sinh hoạt và thiếu vệ sinh Nhu cầu đủ nhà cho thuê tạm thời cho những người nhập cư. Nhu cầu đủ nhà ở cho cộng đồng tái định cư. Nghiên cứu này không dừng lại trên một quận/ huyện đăc biệt nào có nhu cầu lớn nhất, mà trên những quận/ huyện trong mỗi khu vực đô thị, bán đô thị và nông thôn đã được xác định như là những ưu tiên cho các chương trình của HFHIV, để đảm bảo việc khảo sát xa rộng hơn nữa. 11
12 i INTRODUCTION 12
13 PURPOSE OF STUDY The purpose of this study is to broadly assess the causes and distribution of urban slums, slum settlements and poverty housing in Ho Chi Minh City. Existing data on poverty in Ho Chi Minh City is limited, and much of what is available is now outdated or generalised at the province level. This report is a response to a need for more detailed information on poverty in Ho Chi Minh City and how it impacts the housing, water and sanitation needs of the urban poor. A set of definitions referred to in this report can be found in Annex A. BACKGROUND Habitat for Humanity International believe that simple, decent housing is a basic human right as well as matter of conscience and action. Habitat for Humanity International Vietnam (HFHI-V) has been working towards the goal of eliminating poverty housing in Vietnam since Beginning with a small pilot project in Central Vietnam s main city of Danang, HFHI-V has developed successful programs in Kien Giang, Tien Giang and Dong Nai Provinces in collaboration with a variety of local and international partners. To date HFHI-V has served approximately 3,850 families in Vietnam. As HFHI-V expands, it has the opportunity to broaden its focus as an organization develop ways to advocate for quality low income families in urban areas, and to meet pressing housing and development needs in Ho Chi Minh City. HOUSING AND THE MILLENIUM DEVELOPMENT GOALS Housing improvement is a catalyst for poverty alleviation that works to improve many other areas of human development: decent housing prevents injury, disease, provides socio-economic stability, and increases household and national income (Duncan, 2007: 4). It also contributes to meeting the Millennium Development Goals (MDGs; Table 2) that seek to eradicate extreme poverty and hunger, promote gender equality, improve maternal health and combat disease by Millennium Development Goal 7, target 11 By 2020, to have achieved a significant improvement in the lives of at least 100 million slum dwellers 1 is of particular concern to HFHI-V. VIETNAM DEVELOPMENT GOALS AND NA- TIONAL POVERTY REDUCTION TARGETS Based on the MDGs, Vietnam have set up its own 12 development goals to be achieved by 2010 (Vietnam Development Goals - VDGs). HFHI-V is also committed to meeting these targets through 1 its programs. Of particular relevance to this report are the following goals 1, 7, 8 and 11 which relate to percentage of poor households, environmental sustainability, infrastructure development and land use rights certificates respectively (Table 3). Table 2: Millenium Development Goals Goal 1: Goal 2: Goal 3: Goal 4: Goal 5: Goal 6: Goal 7: Goal 8: Eradicate extreme poverty and hunger Achieve universal primary education Promote gender equality and empower women Reduce child mortality Improve maternal health Combat HIV/AIDS, malaria and other diseases Ensure environmental sustainability Develop a Global Partnership for Development Source: 13
14 Migrant Housing in Binh Tan District Vietnam has made steady progress towards the MDG targets and associated Vietnam Development Goals. Vietnam s Goal 7 on Environmental Sustainability has been addressed through its Comprehensive Poverty Reduction and Growth Strategy (CPRGS) 1. Furthermore Vietnam has adopted or revised a number of laws, decrees, and strategies to integrate the principles of sustainable development into country policies in accordance with the MDG Goals 7 and 8 (Table 2). National policy statements relating to sustainable development include: Strategic Orientation for Sustainable Development in Vietnam (Vietnam Agenda 21, approved in 2004); National Rural Clean Water Supply and Sanitation Strategy to 2020 (RWSS Strategy; approved in 2000); Second National Strategy and Action Plan for Disaster Mitigation and Management in Vietnam HFHI-V aims to address and mitigate poverty housing in Vietnam and provide adequate water and sanitation for those in need. By doing so it is also working towards helping Vietnam meet the MDGs, the Vietnam Development Goals, the CPRGS and other national targets. Table 3: Selected Vietnam Development Goals relating to Poverty, Housing, Water and Sanitation Goal 1: Reduce the percentage of poor households Target 1. Reduce by 50% the percentage of people living an international accepted poverty line between 2001 and 2010 that means from 32% in 2000 to 15-16% in Goal 7: Ensure Environmental Sustainability Target 3. Basically have achieved the improved and upgraded water sewerage systems in all cities, industrial parks and export processing zones have access to standardized waste water treatment systems, 80-90% of solid waste collected, 60% hazardous waste and 100% hospital waste treated; environmental problems in all rivers are basically addressed. Target 4. Ensure that 85% of the rural population and 95% of the urban population have access to clean and safe water by Goal 8. Ensure pro-poor infrastructure development Target 1. Improve, upgrade, expand and build essential infrastructure constructions (e.g. small irrigation works, schools, health clinics, rural roads, lighting power, clean water, market places, post offices, and community meeting houses ); ensure that 100% of poor communes have access to essential infrastructures. Target 2. Ensure that, by 2010, 85% of the rural population has access to safe water with the amount of 60 litres/person/day; and 75% of rural families have sanitary latrines. Goal 11. Reduce vulnerability and develop social safety nets to support the poor and the disadvantaged Target 3. Ensure that, by 2010, all families living in urban areas are granted land use right certificates and ownership certificates of the houses built on lawful land. Source: 1 Approved by the Prime Minister at Document No. 2685/VPCP-QHQT, May
15 1 PART 1 POVERTY AND HOUSING 15
16 URBAN POVERTY IN HO CHI MINH CITY Urban poverty in Ho Chi Minh City is an issue of increasing magnitude. While the opening up of the economy to global capital has generally improved peoples living conditions, rapid urbanisation combined with soaring land prices (over 500% since 1990s; World Bank 2007:1) and an influx of rural-urban migration has accelerated the growth of urban slums. Affordable, decent housing is an especially large and growing problem. Typical of many East Asian countries, poverty is in rural areas of Vietnam in higher than in urban areas. In 2000, 19.7% of the total rural population were classified as poor. By contrast 7.8% of urban people were classified as poor (CPRGS, 2002). However, while the percentage of population classified as poor in higher in rural areas, the absolute number of poor is greater in cities and urbanized provinces. Moreover, the population of Hanoi, Hai Phong and Ho Chi Minh City are expected to triple by 2020 (World Bank 2007:1), making urban poverty a more urgent problem. To add to this, despite a remarkable decrease in national poverty rate from 58.1% in 1993 to 24.1% in , urban poverty is rising 2. 1 Poverty as the percentage of people who live below $1 a day (CIEM 2006:91) 2 Vietnam Household and Living Standards Surveys (VLSS) note increase in urban poverty from 6.6% to 10.8% between 2002 and 2004 (Waibel 2007:60). 16 For the purposes of this report poverty will be defined as those living below to Ho Chi Minh City s 2008 poverty baseline of 500,000 VND/per capita/ month (Table 4). This differs from the official National poverty line which is 390,000 VND/per capita/month for other urban areas (Table 5). Both poverty lines are calculated based on basic daily food needs and the cost of clothing and accommodation, health care, education, travel and social communication. Comparing urban and rural poverty in absolute numbers can therefore be difficult as the poverty line is Ho Chi Minh City and both rates are scaled to inflation. According to the Comprehensive Poverty Reduction and Growth Strategy (CPRGS 2002) and subsequent reports 3, the official percentage of urban poor fell dramatically from 25% in 1993 to 7.8% in 2002 and then to 3.6% in 2004, equating to approximately 300,000 households. By contrast, there were only 17,033 households living below the 2008 re-adjusted poverty line in Ho Chi Minh City in mid 2008, according to the Department of 3 Including Vietnam: Growth and Reduction of Poverty - Annual Report of Table 4: Vietnam Poverty Line Over Time Table 5: Ho Chi Minh City Poverty Line Poverty Line Amount (VND/per capita/ month) , predicted 1,000,000 (urban areas) re-adjustment 830,000 (suburban areas) Source: Vietnam News (21 July 2008) Labour, War Invalids and Social Affairs, accounting for 1.37% of city households. The Department wants to reduce this rate to 0.6 % by the end of 2008 with an impressive target of zero by However, these figures exclude urban migrants who do not have residential status in the city and as such are likely to underestimate the actual level and depth of urban poverty (World Bank, 2004:1). According to the World Bank, approximately 15% of Ho Chi Minh City s population would be considered poor if rural-urban migrants were included in the statistics (World Bank 2004/A). Although there is a huge variation in statistics, most reports including the VHLSS note an increasing trend in urban poverty in Ho Chi Minh City Residence Urban 102, , , , , , ,000 Rural 76, , , , , , ,000 VND/per capita/month Source: Vietnam 20 Years of Renovation and Development; Vietnam News (7th August 2008)
17 POVERTY AND HOUSING As urban population and urban poverty increase expand, and population increases, so does the demand for adequate housing and basic infrastructure. Vietnam divides its housing into three broad categories: simple or temporary, semipermanent and permanent (Table 6). According to the Vietnam Living Standards Survey (VLSS, 2004), most of Vietnam lives in semi-permanent housing. By this same survey, 16% of housing the South East region (Including Ho Chi Minh City) was considered simple or temporary (Figure 2). This figure is higher than the Red River Delta (including Ha Noi) (4.4%), the North Central Coast (13.5%) and the South Cental Coast (14.1%). However, it remains significantly lower than the Mekong River Delta (47.6%). Despite this, the population density of Ho Chi Minh City is up to seven times greater than the Mekong River Delta Region, making the absolute number of simple/temporary houses in the area a significant growing need. According to the World Bank in 2002, 25% of urban housing in Ho Chi Minh City was classified as slums or temporary housing (World Bank 2006:4), even though its poverty rate was only 3% (Vietnam News; 2002). More recently, the Department of Land and Housing estimates there to be 300,000 simple/temporary houses (2006) in the city. This suggests that income or even the poverty rate is not necessarily a good indicator of housing condition, and the need for adequate housing is very great. Moreover, statistics show that traditionally, Vietnamese prefer to own their house rather than rent (Valdivia and Thrasher; 2005:16) but increasingly people, especially migrants, are renting. Over 81% of migrants in Ho Chi Minh City rent (GSO/ UNPFA;2004). As such, the city is seeing the development of a rental class, many of whom live in cramped living conditions in transitional boarding houses. Provision of adequate low cost rental accommodation is a growing need in the city. In terms of water and sanitation, 90.48% of households in the South East region had access to a toilet, according to the VLSS While this is higher than the National Average (86.17%), by population it still equates to 1.2 million people who do not have access to a toilet in and around Ho Chi Minh City. In considering an urban program, Habitat for Humanity Vietnam will need to consider a number of factors that extend beyond a traditional own and build model. In addition to providing adequate shelter to replace simple/temporary housing units, access to decent rental accommodation and water and sanitation are key issues for the urban poor. Mekong River Delta South East (includes Ho Chi Minh City) Central Highlands South Central Coast North Central Coast Red River Delta (includes Hanoi) North West North East 0% 20% 40% 60% 80% 100% Simple House Semi-Permanent House Permanent House Figure 2: Housing Quality Rates Compared by Region 17
18 Table 6: Housing Classifications in Vietnam Simple/Temporary House Semi-Permanent Housing Permanent Housing Scavenged, impermanent materials, no permanent foundation. Bearing columns, resting or slightly buried Some durable materials, such as a poured foundation, possible also permanent bearing columns, but walls and roof are flimsy/temporary. Durable, permanent materials, usually concrete or brick in the city and occasionally high quality wooden construction in rural areas. Source: Vietnam Living Standards Survey
19 2 PART 2 HO CHI MINH CITY IN CONTEXT 19
20 ADMINISTRATIVE BOUNDARIES AND UR- BAN HIERARCHIES Ho Chi Minh City is Vietnam s second largest metropolitan area after greater Hanoi, covering ha, and is also one of the region s fastest growing urban centres in the South East Asian region 1. Ho Chi Minh City is divided into 24 administrative areas (Figure 3). Officially, these are divided into 19 Urban Districts and 5 Rural Districts. For the purposes of this report, the urban districts have been divided into urban and semi-urban to more accurately reflect the level of urbanisation and development in the city (Table 7; refer also definitions Annex A). URBANIZATION AND SPATIAL EXPANSION Urbanisation is one of the key contributors to increasing rates of urban poverty in Ho Chi Minh City. While natural population growth has been a contributor, rural-urban migration is the major factor. Ho Chi Minh City exhibits many the characteristics common to rapidly urbanising centres: high rates of rural-urban migration, shortage of housing space, increasing land prices, changes in land use, increasing socio-economic disparities together with urban renewal and modernisation. Figure 3: Map of Ho Chi Minh City Administrative Boundaries 1 Average growth rate 3.1% ( ; HCMC-SO 2007:23) 20
21 Table 7: Urban Hierarchy of Districts in Ho Chi Minh City Administrative Boundaries Urban Hierarchy Districts Characteristics Urban Semi-Urban Rural 1, 3, 4, 5, 6, 10, 11, Phu Nhuân 8, Bình Thanh, Gò Vap, Tân Bình and Tân Phu. Districts 2, 7, 9, 12, Binh Tan and Thu Duc Cu Chi, Hoc Mon, Binh Chanh, Nha Be and Can Gio Ho Chi Minh City s official population sits at just over 6 million people (HCMC-SO, 2007), but this does not take into account rural-urban migrants who do not have residential registration as such the actual population of Ho Chi Minh City is somewhere around 7-8 million (Jones, 2002). Ho Chi Minh City has experienced steady urban growth over the past 20 years. Its settlement area has more than doubled since 1996 (Waibel et. Al, 2007;61) (Figure 4) and in recent years it has expanded even beyond its own geographic boundaries into surrounding provinces such as Dong Nai and Binh Duong. The main reason for this is the - The old inner centre - High level of development - High level of urbanization - Areas immediately on the periphery of urbanareas - A mix of urban, industrial and rural land use - Undergoing rapid urbanization - Districts outside of the metropolitan area that are still within the administrative boundaries of Ho Chi Minh City - Low population density - A mix of urban, industrial and rural land use new industrial/economic zones that have been established in these provinces (Waibel et. al, 2007). In recent years it is the semi-urban districts that have experienced the highest growth rate (Figure 5). This is of interest to this report as the correlation between urbanisation and urban slums would suggest that urban poverty is also high in these areas. From 1999 to 2005, the highest rates of population growth were recorded in: District 12 (+ 77%), Thu Duc (+64%) and Binh Tan (+58%) ( HCMC-SO 2006: 17; Waibel et al 2007). Inner urban districts, by contrast, have observed a much lower increase or even a decrease in population. This is due to a number of factors, notably: the conversion of residential buildings to office space, the establishment of new suburban areas outside the city centre and urban upgrading programs (Waibel 2). The latter often includes the relocation of inner urban marginal settlements, particularly along canals and waterways, for infrastructure projects. Resettlement will be discussed later in this chapter. The settlement of urban areas is dense with an average of 11, 265 people/km2 (HCMC-SO; 2007). The density is greatest in urban districts, the highest overall density in district 5 with 45,865 people/ km2 (HCMC-SO: 2007). Urban density is of relevance to this study as inadequate living area is often a characteristic of urban slums. In dense urban areas it is more likely for living areas to be insufficient. As the city expands, slum settlements have emerged throughout the city. In urban areas, slums and squatter settlements have appeared on flood plains, canals and rivers (Waibel, 2006). In semi-urban and rural districts, they have developed around new industrial zones and construction sites, as well as on public land (Waibel et al, 2007). 21
22 Can Gio District Nha Be District Binh Chanh District Hoc Mon District Cu Chi District Binh Tan District Thu Duc District Phu Nhuan District Binh Thanh District Tan Phu District Tan Binh District District Go Vap District District 12 District 11 District 10 District 9 District 8 District 7 District 6 District 5 District 4 District 3 District 2 District , , , , , ,000 Population Figure 4: Expansion of Ho Chi Minh City s urban area over time 22 Figure 5: Ho Chi Minh City population growth over time
23 Slum settlements in District 6 INFRASTRUCTURE Ho Chi Minh City s population is growing faster than its level of infrastructure is able to expand. Environmental sustainability and urban sanitation are major issues facing the city. The urban poor are particularly disadvantaged in their access to basic infrastructure and services. Despite the fact that 76% of Vietnam s urban population has access to hygienic latrines (GSO:VHLSS;2004), few of Vietnam s cities or towns treat wastewater. In Ho Chi Minh City, the majority of the urban poor live in areas where access to safe water, sanitation, drainage, electricity and waste collection is limited (World Bank, 2004/A). Many houses do not have direct water supply and virtually no sewage connections exist. Moreover, many toilets discharge directly into waterways which creates significant health concerns for settlements located around canals and waterways. The Vietnam Development Goals set out clear targets for improvement, but there remains a lot of work is to be done if 95% of the urban population is to access safe water and 100% of wastewater is treated by 2010 (Table 8). However, if infrastructure and services are to be improved in poor urban areas it is essential that links to primary and secondary infrastructure are identified to ensure the effectiveness of the improvements. URBAN PLANNING The absence of clear planning controls prior to land reforms in 2004 have accelerated infrastructure shortages. During this time approximately 80% of houses were owner-constructed without requirements for adequate supporting infrastructure (World Bank 2006; viii). The Orientation Masterplan Urban Development 2020, Figure 7 approved in 1998, identified urban infrastructure for Ho Chi Minh City but does not to set out concrete objectives or an implementation strategy. The general objectives of the masterplan that are relevant to this report include: - To reduce population densities in the centre of the city by developing satellite cities - Promoting growth on the urban fringe. - Limit growth of Hanoi and Ho Chi Minh City and reduce population density - Develop New Urban Centers - In Ho Chi Minh City this is notably the Thu Thiem New Urban Area planned for District 2 and the continuation of Phu My Hung New City Centre in district 7. The 2020 Masterplan was under review at the time of writing this report. The new Masterplan, expected to be released in late 2008, will propose a number of changes. Table 8: Current access to improved water and sanitation compared with the Vietnam Development Goal target Vietnam Household and Living Standard Survey Rural population with access 58 % (2004) 85% to clean water Urban population with access 78% (2002) 95% to safe water Rural population with access 25% (2002) 75% to hygienic latrines Urban population with access to hygienic latrines 76% (2002) No target set Source: GSO/VHLSS (2004); GSO/VLSS (2002); vdg.gso.gov.vn/ Target 2010 Vietnam Development Goals 23
24 Planning factors can have a large impact on settlement patterns and housing needs. For example, the establishment of Industrial zones (Figure 8) are likely to accelerate urbanization in rural districts exacerbating the need for migrant housing, while the development of new urban centers is likely to fuel resettlement programs as well as inflate land prices, such that the urban poor will need to move further out. These patterns of settlement will influence how and where HFHI-V can work to improve housing, water and sanitation. Figure 7: Ho Chi Minh City Orientation Masterplan for Urban Development Figure 8: Existing and proposed Industrial Zones in and around Ho Chi Minh City Source: Ho Chi Minh City Orientation Masterplan for Urban Development 2020
25 Canal Settlements in District 4 SOCIO-ECONOMIC DIMENSIONS Vietnam is one of the fastest growing economies in Asia 1. Its growth over the past two decades has been underpinned by its transition from a centralised state planning system to a market-oriented economy after the Doi Moi economic reforms in Similar to many South East Asian cities, Ho Chi Minh City accounts for a disproportionate share of economic growth. For example, it has received 85% of all the Foreign Direct Investment (FDI) coming into Vietnam (World Bank 2007) and maintains the highest per capita income in the country (GSO, 2007). Nationally, economic growth over the past two decades has lifted over 20 million people have been lifted out of poverty in Vietnam (World Bank 2006;4) which is no small achievement. But the wealth is not always shared equally. Rapid economic growth typically brings with it social stratification, inequality, urbanization and the growth of urban slums. While living conditions have generally improved, social inequality is increasing. Ho Chi Minh City demonstrates the widest gap between rich and poor in Vietnam. The World Bank (2008/A) has noted that according to the Gini coefficient, a measure of income inequality, Vietnam s inequality is lower than other emerging countries. While this is positive, the presence of inequality is still very real and the differences in overall living standards show the greatest extremes in the cities. The majority of the urban poor in Ho Chi Minh City continue to work in the informal sector with unstable jobs/incomes, but increasing numbers of people, particularly migrants, are working in and around industrial zones. For example in % of Ho Chi Minh City s GDP came from Industry and Construction, (HCMC-SO 2007;39). To date there are over 500 enterprises which are located in two Export Processing Zones (EPZs) and twelve Industrial Zones (IZs) in Ho Chi Minh City (Le Van Thanh 2007:9). There is an identified need for low cost housing in and around these areas, particularly for rural-urban migrants, but also for resettled communities. The Orientation Masterplan Urban Development 2020, for example, identifies a number of new resettlement zones adjoining industrial areas, particularly in rural districts Binh Chanh, Hoc Mon and Cu Chi (Figure 8). Unless there is provision of adequate low cost housing in these areas, particularly in the designated resettlement zones, there is likely to be a development of slum settlements in rural districts. 1 Vietnam has recorded an average annual GDP growth of 7.5% over the last decade and 8.5% in 2007 (ADB, 2008:1) 25
26 3 PART 3 NEW URBAN CHALLENGES 26
27 HOUSING SHORTAGES Housing shortages in Ho Chi Minh City are one of the city s greatest challenges. According to official statistics, Ho Chi Minh City currently has approximately 1 million housing units in urban districts and 140, 000 in rural districts (Duong; 2). Since 2000 the housing space has increased by over 3 million sqm/year (Nguyen 2007;1) but housing remains cramped with 30% of population having less than 3m2 per capita (World Bank 2007). For comparison, the Ministry of Construction has set a target of 15m2 per capita by As a core economic region, Ho Chi Minh City has a high demand for residential housing, particularly low income housing, but with soaring land prices and increasing construction costs there is little incentive for developers to build low cost housing. Housing shortage is a major challenge for the city, particularly for students, migrant workers and those requiring resettlement from development projects. RURAL-URBAN MIGRATION Between percent of Ho Chi Minh City s population are estimated to be migrants or temporary residents (Waibel, 2007). Ho Chi Minh City s economic growth has brought migrants from all parts of Vietnam and as a result it is experiencing the strongest migration pressure of all cities in Vietnam (Waibel, 2007). Migrants have played and continue to play an important role Vietnam s economic growth. However, as they rarely have residential registration in the city, they are a particularly vulnerable group when it comes to housing. Without official registration they are not entitled to support services allocated for the poor: credits from hunger eradication and poverty reduction program; school fee reduction or exemption; free medical care booklets, etc. In 2005, there were approximately 1.9 million migrants are living in Ho Chi Minh City (Waibel et. al 2007) who in most cases could not afford to buy living space in formal housing markets. Many migrants have found housing in boarding houses which are transitional, rented, multi-shared small housing units. Boarding houses are considered overpriced and overcrowded (Figure 10). Many share rooms to save money and may have up to 6 people in an area of 8-10 sqm (Waibel; 2007) which leads to precarious living conditions. Although most migrants are male, the level of female migration is increasing and the number of women moving to urban area and industrial zones has begun to exceed the number of men (UNPFA, 2007:10). The 2004 survey (GSO/UNPF 2005) also reported that the main difficulty that migrants face is related to housing, where more than 50 percent reported that their housing conditions were worse after migration compared to the situation before migration (GSO/UNPF 2005: 4). At the time of the survey, 62 per cent of migrants were living in semipermanent housing, with over 55 per cent living in Figure 9: Figure 9: Difficulties faced by Migrants* *45% of migrants reported a difficulty Source: Migration Survey 2004: General Findings 27
28 boarding houses or similar rented accommodation. And compared to non-migrants, migrants were less likely to have access to good sanitation and water. (UNPFA,2007: 16). The need for affordable housing, whether rented or owned, for migrant populations is a major challenge facing the city. While HFHI-V s traditional housing model works around home ownership, it will be important to consider the rental sector when working in urban areas, as a large percentage of slums and slum settlements are inhabited by rural-urban migrants without residential registration. Figure 10: Photo of transitional rental accommodation for rural-urban migrants 28
29 RESETTLEMENT As infrastructure needs in the city grow, slum settlements that encroach on inner city areas, canals and waterways are increasingly under pressure. Urban upgrading projects for infrastructure improvement have occurred in a number of areas of Ho Chi Minh City, and have involved the resettlement of thousands of inhabitants. Resettlement in Vietnam has been carried out with varying degrees of success. Resettled people are often placed in vulnerable situations. Displacement is common when slum dwellers are resettled far from their places of employment, which is particularly important for those working in the informal sector. Policy Framework Laws on resettlement have come a long way in the last decade. Among a series of the relevant Decrees and Circulars on Resettlement, the most relevant are firstly the 2003 reformed Land Law which outlines requirements for Compensation, Resettlement and Rehabitation Action Plans 1 and Decree 197/2004/ND/CP (2004) On Compensation, Support and Resettlement When Land is Recovered by the State 2. Decree 197 provides for a wider eligibility for compensation, as well as measures for livelihood stabilization, assistance for displaced people, change of occupation etc. In 1 Article No. 42, Law No 13/2003/QH11 2 Decree 197/2004/ND/CP has replaced Decree 22/CP (1998) Ho Chi Minh City Regulation 106 is used in place of Decree 197, but it regulates similar policies and procedures. The Asian Development Bank and the World Bank have both produced policies on involuntary resettlement in Vietnam 3. While there remain some discrepancies between Government standards and ADB/World Bank policy, the 2003 Land Law and new Decree 197 went a long way towards aligning the principles of the two. The aim of the ADB Policy on Involuntary Resettlement (ADB, 1995) is to avoid or minimize the impacts on people, households, businesses and others affected by compulsory land acquisition. Where resettlement is not avoidable, such as in instances where households have settled on hazardous areas (e.g. canal banks, railway lines) or where the functioning of, for example natural watercourses, the ADB policy is to compensate and assist affected people to restore their living standards to levels equal to, if not better than, that which they had before the project. Resettlement in Ho Chi Minh City There are an estimated 25,044 dwelling units are located in hazardous areas along Ho Chi Minh City s inner city canals (Nguyen; 2007). In 2001 the Ho Chi Minh City People s Committee issued 3 World Bank (2003/A) has produced a Resettlement Policy Framework ; ADB Policy on Involuntary Resettlement (ADB R , 1998, revised 2002) action plan 4 for the relocation and resettlement program of 10,000 households living on and along canals. The Resettlement projects are associated with: - The development of the East-West Highway (29 projects to build 5,077 apartments and housing plots). - Improvement of the water environment of Tau Hu-Ben Nghe Canal (10 projects to build 2,258 apartments and housing plots). - Improvement of the water environment of the Tan Hoa-Lo Gom-Ong Buong canal net 4 Decision No. 61/2001/QD-UB Figure 11: Resettlement appartments in District 6 (photo taken July 2008) 29
30 work (six projects to build 2,317 apartments and housing plots). - Improvement of the water environment of other canals (11 projects to build 1,619 apartments and housing plots). Figure 12 shows the location of the 22km Saigon East-West Highway Project and the Tan Hoa- Lo Gom Canal improvement project, together with the associated resettlement sites. Twenty nine resettlement projects are associated with the East-West Highway project, which are still being implemented. As many of Ho Chi Minh City s slum settlements are located along canals or in hazardous locations, large scale resettlement projects are likely only to increase. HFHI-V s work in meeting the needs of Ho Chi Minh City s urban poor will, as such, be very much influenced by plans for development and resettlement. It is however important that a comprehensive approach is adopted to address adequate housing as well as social and economic needs for displaced communities in the city. The Tan-Hoa-Lo Gom Canal Improvement Project is an interesting case as it has involved both onsite upgrading as well as resettlement. Meanwhile, Districts 2 and 7 are undergoing rapid transformation associated with Thu Thiem New Urban Area (District 2) and the continuation of Phu My Hung New City Centre in District 7 (Figure 13). The map below shows the indicative location of resettlement projects associated with the Thu Thiem Development. While there are examples of very successful resettlement projects, others leave room for improvement. For example, the resale of subsidized resettlement apartments at higher market prices has been very common. A study in 2002 found the resale rate of resettlement housing projects in Ho Chi Minh City was between % within the first three years (VeT 2002:14). Figure 12: Location of resettlement projects associated with the Saigon East-West Highway Project 30
31 Figure 13 (above): Indicative location of resettlement projects associated with the Thu Thiem New City Centre in District 2. Source: gov.vn/eng/news/ Figure 14 (right): Artists Illustration of proposed Thu Thiem New City Centre Source: hochiminhcity.gov.vn/english/index 31
32 SUMMARY This chapter has outlined information on the geographic, social, economic and environmental factors that impact on Ho Chi Minh City s urban poor and which influence the pattern of slums and slum settlements in the city. From this information we can conclude that some of the major challenges for Ho Chi Minh City s urban poor are: - Rapid Urbanisation, particularly in semi-ur ban districts Thu Duc and District 12 where population growth is highest. - Increasing economic inequality. Economic growth has brought both positive and negaztive change to Ho Chi Minh City. While living conditions have generally improved, social inequality is increasing. Ho Chi Minh City demonstrates the widest gap between rich and poor in Vietnam; - The extension of existing and the planning of new Industrial Zones on the urban fringe will accelerate urbanisation in Ho Chi Minh Cities semi-urban and rural districts, particularly Cu Chi and Binh Chanh Districts. Providing adequate housing for urban migrants and resettled people in and around Industrial Zones is also a major challenge; - The distribution of infrastructure, water and sanitation disadvantages the urban poor. While the Vietnam Development Goals set targets for improvement, infrastructure development has not been able to keep up with population growth. - Changes in land use related to urban upgrading and urban renewal programs will affect settlement patterns in the City. In Districts where new urban centers are planned such as Thu Thiem in District 2 or Phu My Hung in District 7 the urban poor are likely to face resettlement. - There are massive shortages of low cost housing in Ho Chi Minh City and 30% of households inadequate living space. - Rural-Urban migration and Resettlement are major housing challenges for the city. The following chapter provides an overview of findings from Habitat for Humanity s broad scale map- 32
33 4 PART 4 HO CHI MINH CITY MAPPING REPORT 33
34 OVERVIEW AND OBJECTIVES From June- August 2008 Habitat for Humanity Vietnam undertook a broad scale mapping study of Ho Chi Minh City s urban slums, slum settlements and squatter settlements. The objectives of this study is to: - Examine the dynamics and settlement pat terns of urban poverty housing in Ho Chi Minh City on a broad scale; - To improve understanding the impact of urbanisation on urban space and living conditions; - To document urban slum housing typologies in Ho Chi Minh City; - To generally assess access to water and sanitation in slums and sum settlements; - To provide recommendations for areas of the city in which HFHI-V s work can be most effective. Following general discussions on the background and context of urban poverty in Ho Chi Minh City above, this section presents the findings from a broad scale mapping study of the city s slums, slum settlements and squatter settlements. In brief, this study is a visual and qualitative analysis of the entire city with conclusions drawn from spatial analysis from aerial photographs and remote sensing (RS) imagery as well as field visits. This report provides a framework for Habitat for Humanity International-Vietnam (HFHI-V) as it expands its existing program into urban areas. SCOPE OF WORK As a preliminary study, all 19 urban and semi-urban districts of Ho Chi Minh City and two representative rural districts (Cu Chi and Binh Chanh) were visited. Preliminary investigations of Districts 1, 3, 5 10 and Phu Nhuan revealed low levels of apparent poverty housing compared with other urban districts. This was confirmed through spatial analysis from Remote Sensing (RS) images (Refer Methodology). To streamline the project these districts were excluded from further investigation. This is not to say that poverty and poverty housing do not exist in these districts, but that preliminary studies indicated that the need for simple decent housing, water and sanitation was greater elsewhere. Due to the size and scope of the rural districts, Cu Chi and Binh Chanh were visited as representative examples. A total of 16 districts were surveyed (Figure 15) as part of this study. This included: - Nine urban districts (Districts 4, 6, 8, 9, 11 Binh Thanh, Go Vap, Tan Binh and Tan Phu); - All six Semi-Urban districts (Districts 2, 7, 9 12, Bình Tân and Thu Duc) - Two rural districts (Cu Chi and Binh Chanh). 34
35 METHODOLOGY Stage 1 of the mapping survey comprised two phases: a desktop spatial analysis study using Remote Sensing (RS) imagery and aerial photography followed by a visual and qualitative analysis based on field surveys. Spatial Analysis Using Remote Sensing (RS) imagery Ho Chi Minh City, patterns of slum settlements could be clearly identified (Figure 16). The primary data sources were: IKONOS RS Imagery for 2001, 2005 (urban districts only), RS Imagery from 2003 and Google Earth Version 4.3 (visited July/August 2008). Areas of slum settlements were identified on the basis of: - High density of living; - Small living units; - General absence of organised access way/ street structure - Building materials Field Surveys and Visual Analysis A visual and qualitative analysis of slum settlements was undertaken on a district-by-district basis. This involved driving through 40-60% of the streets in each district surveyed and ensuring that a hierarchy of streets was included (highways, side roads, laneways etc). Where it was not possible to view settlements by vehicle, they were investigated on foot. The map below illustrates routes taken (Figure 17). Figure 16: Example of Spatial Analysis undertaken using remote sensing in Binh Thanh district (left) and Districts 4 and 7 (right) 35
36 Figure 17: Map of routes driven during the mapping exercise 36
37 Table 9: Visual Parametres for the Mapping Survey Slum Definition Parameter (UN Habitat 2006:19) Visual Indicators Risks/Assumptions Visual Parameters The criteria used to define visual parameters for identifying slums were based on the United Nation s definition of a slum household (UN Habitat 2006:19): A slum household is defined as a group of individuals living under the same roof lacking one or more of the conditions below: - Access to improved water (Sufficient amount of water for family use at an affordable price) - Access to improved sanitation (Private toilet or public toilet shared with reasonable number of people) - Sufficient-living area (Maximum 3 people/ room) - Durability of housing (non-hazardous location, structure that protects inhabitants from climatic conditions) - Security of tenure (right to effective protection against forced evictions) Since information on secure tenure was not available at the time of the survey, only the first four indicators were used to define slum household. The visual parameters are described in the table below Table 9. Access to improved water Access to improved sanitation Sufficient Living Area Durability of housing Other Parameters Evidence of water supplied to house Evidence of access to drinking water Evidence of private toilet Evidence of public toilet Average size of living area: Low <10m2 Medium m2 High >30m2 Location: Canal/Waterways Public/Private land Effective/ineffective protection from flood hazardous location Building Materials Corrugated iron/timber/bamboo/recycled materials/ organic materials/cardboard/steel Construction quality of housing: High: Non-Hazardous location Some compliance with building codes Structure appears permanent Evidence of structural durability (piles/flooring/ faming) Medium: Hazardous location Structure appears semi-permanent Low/No compliance with building codes Some structural durability Low: Hazardous Location Structure appears temporary No compliance with building codes No evidence of structural durability Evidence of access to electricity such as TV aerials, electrical wires. Difficult to ascertain due to the large scale of the survey Difficult to ascertain due to the large scale of the survey No Knowledge of how many people per household Visual indicators and building materials will not always be conclusive of durability of housing. 37
38 Housing Typologies To put urban poverty in context across different areas of the city, visual analysis included a brief observation of the existing urban character and housing typology in the district. Risks and Assumptions The scale of the survey is so broad that it will only provide general, indicative information that will be supplemented with further research such as community interviews. Specific limitations faced in data collection included: Unavailability of high resolution RS imagery for semi-urban and rural districts; Inaccessibility of some areas of the city; Housing and building materials are not al ways indicative of poverty; 38 New housing in District 12
39 SUMMARY OF FINDINGS Spatial Analysis Spatial analysis from aerial photography showed notable trends in the pattern of slum settlements in Ho Chi Minh City. A map of the findings from the Spatial Analysis can be found in Annex B. As shown on the map, areas of the city were excluded from the study based on unavailability of data at suitable resolution. The pattern of slum settlements is summarised below and in Table 11. In urban districts, slum settlements were typically high density, linear communities located along canals and waterways. There appeared to be high concentrations of slum settlements in Districts 4, 6, 8, particularly along the Kinh Te, Rach Ben Nghe and Kinh Doi Canals. There were no apparent concentrations of slum settlements in districts 1, 3, 5, 10 and Phu Nuan. This is not to say that they do not exist, but spatial analysis was not conclusive of large areas of urban poverty. In semi-urban districts the slum settlements followed a similar pattern - along canals and waterways, however they were not always linear. Slum settlements were fragmented and discontinuous. In some instances communities appeared to be large, irregular shaped and more than 1-2 streets/ laneways deep. The settlement patterns in rural districts showed a sharp contrast to urban and semi-urban districts. The density of housing was lower, and settlement patterns appeared to be fragmented rather than concentrated. For this reason it was difficult to identify areas of slum settlements. There were a number of single detached dwellings, however due to the low resolution of the RS images, it was not possible to tell whether these were indicative of urban poverty or not. The table below summarises findings from Spatial Analysis (Table 10). Table 10: General Findings, Spatial Analysis District Category Districts with apparent high concentrations of slum settlements Districts with apparent low concentrations of slum settlements Cannot distinguish Urban Districts 4, 6, 8, Binh Thanh, Go Vap 1, 3, 5, 10, Phu Nhuan, Tan Bin, 11, Tan Phu Semi-Urban Districts Rural Districts 7, 12 2, 9, Thu Duc, Binh Tan Cu Chi, Bình Chánh, Hóc Môn, Nhà Bè, Cân Gio 39
40 Table 11: Overview of typical settlement pattern from spatial analysis Urban Districts Semi-Urban Districts Rural Districts Linear settlements along Canals and Waterways Fragmented settlements along canals and Waterways Fragmented settlement patterns with individual dwellings of low construction quality 40
41 FIELD SURVEYS AND VISUAL ANALYSIS The field surveys and visual analysis confirmed the slum settlement patterns that were identified through spatial analysis and allowed for further analysis of urban housing typologies and the context in which urban slums exist. A map of the overall findings is attached as Annex C. Trends in the settlement pattern of slums has been summarised in Table 12, a full list of observations is attached in Annex D. In urban areas, urban slum settlements were almost exclusively along canals and waterways. The housing units were of moderate size compared with outer districts and they also appeared to well established. Some canals/waterways such as Lo Gom in District 6 or Ben Nghe in Districts 4, 6, 8 are in the process of being upgraded and a number of settlements have been recently removed/ relocated from this area. It is probable that further urban upgrading projects will put slum settlements along urban canals under pressure. The semi-urban districts are undergoing rapid transition and there is a diversity of urban housing typologies and slum settlements. The areas of slum settlements were also predominantly along canals and waterways. However, unlike the urban districts, the settlements pattern was more fragmented with smaller clusters of 5-10 houses rather than long, liner communities identified in urban districts. Poverty housing was also identified around public infrastructure such as bridges, railways and new roads under construction. Furthermore, there was a lot of low cost transitional housing for urbanrural migrants. In general the dwellings were smaller and appeared more temporary than their urban counterparts. In some instances, particularly around construction projects, it is assumed that slum settlements have arisen due to accommodation needs for migrant workers. It is likely that many of the communities will undergo further transition in coming years, particularly in areas such as district 2 which will be developed as the Thu Thiem New Urban Area. Rural districts show a contrast in settlement pattern again. There is a diversity of land use including residential, agricultural, industrial and commercial. A number of new housing developments have sprung up, particularly around industrial areas. They are also areas with high rates of rural-urban migration. Of note, a number of urban slum settlements have been relocated from inner districts to rural districts such as Binh Chanh as part of urban and infrastructure upgrading programs. Poverty housing is prevalent, but sparse. By contrast to inner areas there are not large communities of slum housing, but rather single detached dwellings of poor construction quality. In general there appeared to be a lack of access to basic services such as water and sanitation due to the low density of housing. In industrial areas low cost transitional migrant housing was observed. As a number of new and relocated industrial areas are planned for Ho Chi Minh City s rural districts in the 2015 industrial zone master plan, it is likely that we will see an increase in rural-urban migration and with it an increase in slum settlements in rural districts in coming years. 41
42 Table 12: Table 1: Summary of Findings, Visual Analysis District Urban Housing Typology Pattern of slum Settlements Urban Districts Semi-Urban Districts Rural Districts High density, medium rise 3-6 storey attached row housing High rise apartments Medium density, low-medium ruse attached row housing Single detached dwellings New high rise apartments part Low cost migrant transitional housing Low density single detached dwellings 1-2 stories Low cost migrant transitional housing Canals and Waterways Canals and Waterways Around public infrastructure such as bridges/power stations/railway lines Canals and Waterways Around industrial zones Fragmented settlement patterns with Individual dwellings of low construction quality 42
43 5 DISTRICT SUMMARY 43
44 Ho Chi Minh City s smallest district (geographically), District 4, is a well established urban area. The area is characterised by low-medium rise (3-5 storey) row housing, with some newly built apartment towers along Ben Van Don Street in the north. Our survey in July found the urban slum settlements are concentrated along the canals that surround the district. In particular, along the Te Canal in the south west. There may have been more slum areas along the Benh Nghe Canal but they have been relocated to make way for the construction of the new Saigon East West Highway project, which also affects districts 6 and 8. URBAN: DISTRICT 4 The slum settlements appeared well established, and of moderate size. In some instances, the slum areas were extensions to existing buildings along Ton That Thuyet and Ben Van Don Streets. With the exception of some dwellings which appeared to have collapsed into the canal, the durability of construction was higher than in adjoining districts 7 and 8, with some houses on concrete and timber piles. Construction materials included brick, concrete, corrugated iron and recycled materials. 44 Slum settlements along canals in District 4
45 District 6 is a well established urban area, but also an area in transition. It is densely built up, with predominantly low-medium rise row houses but unlike district 4 there are no high-rise to date. Lo Gom Canal which bisects the district was known for its large concentrations of slum settlements, but these have been recently relocated as part of the Lo Gom Canal Upgrading project financed by Belgian Foreign Aid. Similarly, slum settlements along the Ben Nghe Canal have been relocated/cleared for the Saigon East West Highway project. URBAN: DISTRICT 6 Our survey in June identified two areas of slum settlements. The first along a tributary canal to Lo Gom, in the west of the district. Although in poor condition, these dwellings were moderate size, well established, some with relatively good structural support from sand bags and pylons. Some dwellings were also businesses dealing with fruit and vegetable cargo from the Mekong Delta. The second area was along another tributary canal that runs between District 6 and Tan Phu District. In this instance, we found small groups of dwellings scattered along the canal bank, rather than a linear community as in the first instance. Slum settlements along a tributory canal to Lo Gom (above) and temporary settlements in an unoccupied lot (below) 45
46 District 8 is considered one of the old inner districts but it also extends west and south adjoining rural district Binh Chanh. It therefore shows a degree of contrast in its settlement pattern from high density, inner urban row housing to low rise and detached dwellings in outer areas. Similar to other urban districts, our survey in June found the slum settlements to be concentrated along canals and waterways. Like District 4 and 6 slum settlements along Ben Nghe canal have been relocated for the Thi Nghe Highway project. Scattered slum settlements were located along the Kinh Doi canal. These appeared to be well established URBAN: DISTRICT 8 46
47 District 11 contains a mix of residential and industrial use. A large concentration of waste sorting facilities area located, although these are likely to soon be located further out from the city centre. Urban density is high, with low-medium row housing and scattered small factories. Our survey in June did not identify and areas of urban slum settlements only isolated, individual dwellings in impoverished condition. URBAN: DISTRICT 11 Typical landeway in District 11 47
48 URBAN: BINH THANH DISTRICT This large district, like district 8 shows a variety of settlement types from inner urban high density residential areas to less developed semi-urban characteristics on the adjoining island. There are also a number of high rise apartment buildings in to the south west and south. In July our survey identified a large number of slum settlements. Predominantly, these were located along canals and waterways, but smaller urban poor communities were also found around infrastructure projects. In particular, under cau Kinh and cau Binh Trieu Bridges. Some isolated slum dwellings were also found along the Railway line parallel to Luong Ngoc Quyen Street. Slum settlements along the canals appeared well established and of moderate size. By contrast the dwellings beneath the bridges appeared temporary, constructed of organic material such as leaves and branches. Canal slum settlements (above) and temporary housing under the Kinh bridge (below) 48
49 Go Vap has been more recently urbanised than inner districts (4, 6, 8 Binh Thanh for example) but is still densely populated. It is characterised by low rise residential dwellings of 1-2 stories, with row housing as well as single detached dwellings. There are also some remnant plots of agricultural land. Patterns of slum settlements were found to be fragmented. Although they were generally located along rivers and canals, dwellings were scattered and not in large concentrations compared with inner districts. Dwellings appeared temporary, constructed from organic and recycled materials. There were also number of transitional housing blocks for rural-urban migrants with small single rooms for rent. In general the size of living area in slum settlements was smaller than identified in Binh Thanh District and Districts 4, 6, and 8. URBAN: GO VAP DISTRICT Slum settlements along the and the Cho Moi canal (above) Ben Cat River (below) 49
50 Tan Binh and Tan Phu show little of the urban poverty apparent in other urban districts. This is not to conclude that it does not exist, but was not apparent on the surveys undertaken in June/July. It should be noted that both Tan Binh and Tan Phu were part of the World Bank Urban Upgrading Project and it is possible that slum settlements have been relocated or upgraded. As a newly urbanised area it has some new high rise under construction and predominantly low-medium rise row houses URBAN: TAN BINH AND TAN PHU DISTRICTS 50
51 SEMI-URBAN: DISTRICT 2 District 2 is developing rapidly. It will soon also be home to the Thu Thiem New Urban Area which will bring with it a huge change in the dynamics of the urban settlement. At present the district is a contract between new, high-end urban developments in An Phu and Thao Dien in the north, rural lots and industrial development in the east and south. Slum settlements are scattered throughout the district. Our survey in July identified a heavier concentration along the eastern bank of the Saigon River, particularly around the river crossings, but the density is low. These settlements will be moved as part of the Thu Thiem development. The majority of poverty houses are single detached dwellings on rural lots, or make shift houses around construction areas, presumably to accommodate migrants. Although building conditions are precarious, living space is sufficient compared with urban districts. 51
52 SEMI-URBAN: DISTRICT 7 District 7 is experiencing many of the dynamics common to District 2. Over the past 10 years the area has changed dramatically with the South Saigon/Phu My Hung New Urban Centre Development, which continues to expand. In addition to this, the eastern portion of the district along the Saigon River and Nha Be Rivers The housing typology is a mix of new high rise and low rise housing developments, detached houses on small lots and some rural lots. Poverty housing is scattered throughout. Dense slum settlements are located along the Kinh Te canal opposite District 4. Dwellings on the District 7 side are in comparatively better condition than on the District 4 side. They appear well established and are of moderate size. From our surveys in June and July there appeared to be a mix of residential housing and businesses along the riverfront. Slum settlements were identified along other waterways, but were sparsely populated. In addition to this a number of detached dwellings or small clusters of poverty housing were observed alongside road/building construction sites, presumably home to migrant construction workers. These houses were small, constructed of organic and recycled materials and appeared to be temporary. 52
53 Compared with the other semi-urban districts, district 9 remains sparsely populated. There is a lot of industrial activity with large manufacturing and machinery plants along Xa Lo Ha Noi Highway and smaller industry, predominantly brick kilns in the east of the district. Off the main highway the roads are unsealed and in bad condition. The housing typology is predominantly single storey detached dwellings, located along road sides or on agricultural lots. Poverty housing is distributed throughout the district, predominantly as single detached dwellings. A number of low cost transitional housing rooms have been constructed around industrial areas and these have been extended using recycled materials, timber and organic material. Poverty housing appeared smaller and more temporary than in urban areas. SEMI-URBAN: DISTRICT 9 Slum settlements along a minor waterway 53
54 District 12 experienced the fastest growth rate of any districts in Ho Chi Minh City over the past 10 years. Much of this is due to new software and industrial parks, and industry that has been relocated from urban districts. The housing typology is predominantly low rise 1-3 story that varies between attached row housing and detached houses. Poverty housing is scattered throughout with some concentrations along canals and waterways to the north. In addition to this a number of temporary houses have been assembled around industrial zones. There are also many migrant houses/rooms for rent, many of which are overcrowded with inadequate living space. SEMI-URBAN: DISTRICT Slum settlements along a minor waterway (above) and temporary settlements in a newly urbanised area (below)
55 Binh Tan district is characterised by low rise residential dwellings together with industrial areas. There is still a large amount of open space, but less agricultural activity was observed than in other districts of similar location such as District 9. On our survey in August, individual poor dwellings were located throughout the district, with some higher concentrations around industrial areas. Dwellings appeared to be small and temporary with little structural soundness. SEMI-URBAN: BINH TAN DISTRICT Slum settlements in semi-urban area. Housing reamins interdispersed with small scale agriculture and industrial areas. 55
56 Similar to District 12, Thu Duc has grown rapidly over the past 10 years. There is a lot of infrastructure under construction such as new roads and electricity lines. There are a lot of industrial areas, particularly along the Xa Lo Ha Noi Highway shared with District 9. Some rural lots remain. There were no large areas of slum settlements observed on our survey in July but rather individual houses scattered throughout. There were also many small houses and rooms for rent for migrants, most of which were overcrowded on observation. SEMI-URBAN: THU DUC DISTRICT 56 Slum settlements around industrial areas in Thu Duc
57 RURAL: HUYEN CU CHI The Orientation for Masterplan Urban Development 2020 identifies Cu Chi as a satellite city for HCMC and an industrial centre. A number of large industrial areas already exist and more are planned. At the time of the survey, the character of the district was observed to be one in transition. A number of rural areas remain but urban growth is expanding around industrial areas. Housing typology remains predominantly single detached dwellings with larger complexes of low cost rooms for rent for urban migrants. Poverty housing is fragmented with individual dwellings on rural lots and roadside areas. Temporary housing is not spatially separated from low and high cost housing. The houses appear temporary and are predominantly constructed from organic and recycled materials. The density of poverty housing remains sparse so it is unlikely that these dwellings have access to improved water and sanitation. Poverty housing is scattered throughout Cu Chi district with temporary houses on individual lots (above). New housing in urbanizing areas of the district (below) 57
58 Similar to Cu Chi, Binh Chanh district is marked as an area for future growth. The Orientation for Masterplan Urban Development 2020 suggests the development of several new industrial zones as well as residential areas and hosing resettlement sites. Already a number of housing resettlement sites have been established in Binh Chanh district. The housing typology and settlement pattern is similar to Cu Chi. There are a number of single detached dwellings and areas of migrant housing. Poverty housing is scattered throughout characterized by single dwellings constructed from organic and recycled materials. RURAL: HUYEN BINH CHANH 58 Poverty housing is scattered throughout Binh Chang district with temporary houses on individual lots such as those shown here.
59 6 MAJOR FINDINGS AND CONCLUSION 59
60 MAJOR FINDINGS: HOUSING NEEDS In Chapter 1, growing levels of urban poverty and massive shortages of low income housing were discussed. Having surveyed districts across the city, the major issues relating to poverty housing in Ho Chi Minh City have been identified as follows: 1. Durability of building construction Across the city, regardless of its level of urbanisation. the housing conditions for the urban poor are substandard. Many structures appeared temporary, but even in well established slum areas such as District 4, houses had collapsed into adjacent canals. Building materials ranged from corrugated iron to brick to organic materials but are in most instances unsafe and did not offer protection from heavy rains, strong wind or typhoons. 2. Hazardous Housing Location Slum settlements, particularly in urban areas, are concentrated along canals and waterways. This poses a risk of flooding, but also health risks from polluted water. In other areas there is a prevalence of slum housing adjacent to public infrastructure such railway lines, bridges and roads. In many instances these locations are also deemed hazardous, particular adjacent to electricity stations or under bridges Inadequate Living Space Inadequate living space was an indicator identified in all areas of the city. In urban areas, the housing units were larger but the density of settlement high so that the area of available living space was still cramped. In semi-urban/rural districts housing units were small, some houses as low as 6 sqm, well below the national target of 15 sqm/person by Inadequate access to water and sanitation and other services Chapter 1 noted that the distribution of services, particularly water and sanitation, disadvantages the poor in Ho Chi Minh City. The scale of the study was not conclusive as to whether houses had access to water and sanitation or not. It is however assumed that slum settlements and poverty housing have limited or no access to water and sanitation. The reason for this is that firstly, without residential registration or land use rights certificates it is not possible to acquire water or electricity meters. Many living in slums, particularly migrant workers, do not have such permits. Although many make illegal connections it is likely that access to services is still extremely limited. In addition to this, in rural and semi-urban areas, poverty housing if sparse and it is unlikely that there would be existing services given the distances between dwellings. Other research (SOURCE) tells us that even in urban areas access to water and sanitation is inadequate. 4. The need for Transitional Rental Housing for Migrants One of the greatest housing needs in Ho Chi Minh City is the need for rental properties/rooms for rural-urban migrants. Migrants coming to the city without official residential registration have difficulty to find adequate accommodation. A large number of rooms for rent were observed in semi-urban and rural districts with inadequate living space. In addition, many of the temporary houses observed were adjacent to industrial areas and construction sites which would suggest the workers are migrants. This type of housing has to date been excluded from Habitat for Humanity s programs as land use rights certificates are required for beneficiaries to be eligible. This does not completely exclude HFHI-V s involvement with migrant housing, but it warrants further investigation into the needs and types of housing during stage Housing Relocation Housing relocation projects have occurred a number if inner urban districts, particularly districts 4, 6, and 8 and more are likely to follow, particularly in areas where new urban developments have been planned such as districts 2 and 7. Many settlements are relocated outside of urban areas to semi-urban and rural areas such as Binh Chanh district. Without sufficient infrastructure or support
61 relocated settlements can evolve to slums. This study only discusses relocation generally. It is however noted as a major factor affecting slum settlements and poverty housing in Ho Chi Minh City. Masterplans for Ho Chi Minh City s urban development, and plans for relocation need to be investigated as part of Stage Rapid Urbanisation One of the key factors accelerating the development of slum settlements is urbanisation. The impact of urbanisation was observed as part of the study. It is particularly evident in semi-urban districts and rural districts where there were large numbers of migrant housing as well as new urban developments. In districts where urbanisation is occurring rapidly such as districts 12 and Thu Duc, it is likely that housing needs will continue to grow. Temporary housing (left) and migrant boarding houses (right) in District 12 61
62 C LOCATION OF URBAN SLUMS AND SLUM SETTLEMENTS B Our surveys have identified areas of poverty housing, in some form, in almost every district of the city, but in varying forms and levels of intensity. A combined map showing the location of slum communities identified from both spatial and visual analysis is attached in ANNEX 2. Although poverty housing is widespread, there are three main areas of concentrated slum communities which are of note (Refer Figure 18). These are: A Along the Doi/Te canal in districts 4, 7 and 8; Along canals and waterways and around public infrastructure in Binh Thanh District Around industrial zones and public infrastructure in District 12, Thu Duc and Go Vap A DOI/TE CANAL B BINH THANH DISTRICT 62 Figure 18: Major locations of slums and slum settlemenst in Ho Chi Minh City C DISTRICT 12/THU DUC
63 RESETTLEMENT AND URBAN SLUMS We discussed in Chapter 3 that resettlement is one of the largest housing needs in Ho Chi Minh City. As resettlement is often associated with new developments, it is pertinent to look at areas of the city in which major new developments will be undertaken, as areas of priority for Habitat for Humanity. C Figure 19 shows the spatial association of slums and slum settlements identified in the mapping survey and the following areas of major new developments: South Saigon including Phy My Hung New Urban Centre (District 7, 8); The Saigon East-West Highway Development (Districts 4, 5, 6, 8) and Lo Gom Canal upgrading project. Thy Thiem New City Centre (District 2) B A There is some association with planned new developments and slum settlements in District 2 and District 7 (Figure 18), and this warrants further investigation in terms of the extent of resettlement and the housing need, as part of a further stage of mapping. There is limited association with the Saigon East- West Highway, desite the high density of settlements along the nearby Doi and Te Canals. It is assumed that and slum settlements along the Highway site have already been relocated. Figure 19: The location of identified slums and slum settlements compared with areas of new urban development A B C SOUTH SAIGON DEVELOPMENT (PHU MY HUNG) SAIGON EAST-WEST HIGHWAY THU THIEM NEW CITY CENTRE 63
64 MAJOR FINDINGS: PRIORITY LOCATIONS Figures 18 and 19 demonstrate the need for housing along canal areas in districts 4, 7, and 8 and Binh Thanh district, in semi-urban areas District 12, Thu Duc District and parts of Go Vap District and associated with new urban developemnts in Districts 2 and 7. To further assess and refine the priorities for Habitat for Humanity s program in Ho Chi Minh City, a set of criteria have been developed. As described in Table 13, High,Medium and Low priority criteria have been used to catagorise observations and analysis. Table 14 shows a priority matrix. Table 13: Prioritiy locations for Habitat for Humanity Priority High Medium Low Description High concentrations of slums Most slums in hazardous location Dense living condition Unsafe Building Materials High rates of urbanisation Risk of relocation high Inadequate access to improved water and sanitation Moderate concentration of slums Unsafe Building Materials Moderate rates of urbanisation Risk of relocation low Inadequate access to improved water and sanitation Low incidence of poverty housing Unsafe Building Materials Majority of poverty housing in non-hazardous location Some access to water and sanitation 64
65 Table 14: Priority Matrix District Concentration of Urban Slums Hazardous Location Unsafe Building Materials Density of Living Lack of improved water and Sanitation Rate of Urbanization Risk of Relocation Priority for Habitat for Humanity URBAN District 4 High District 6 High District 8 High District 11 Low Binh Thanh High Go Vap Moderate Tan Binh Low Tan Phu Low SEMI URBAN District 2 High District 7 High District 9 Low District 12 High Bin Tan Moderate Thu Duc Moderate RURAL Cu Chi Moderate Binh Chanh Moderate High Moderate Low 65
66 CONCLUSION Background research combined with the survey of a broad sample of urban, semi-urban and rural districts has demonstrated the prevalence of urban poverty in Ho Chi Minh City and the challenge to improve precarious living situations across the entire city. While the need across the city is great, it is noted that the settlement patterns of poverty housing in urban, semi-urban and rural districts show marked differences, which warrant further investigation. The distribution and type of pov- erty housing is a physical indicator of the different dynamics affecting poverty across Ho Chi Minh City. As such, any intervention to improve housing, water and sanitation must address the complex factors that affect different areas of the city. While slum settlements were not identified in every district surveyed, this does not conclude the absence of poverty in these areas, but it may indicate that the need is greater in other districts. To be effective in meeting housing and development needs in the city, therefore, it is important that Habitat for Humanity focuses on priorities identified above. Based on the table above, HFHI-V have concluded from the Mapping Study that the areas of priority to mitigate urban poverty in Ho Chi Minh City are inner urban districts 4, 6, 8, and Binh Thanh, as well as semi-urban districts 2, 7, 12 and Thu Duc These are summarised in Table 15. Our recommendation is that HFHI-V work with local partners to further refine this selection, and to undertake a second phase of mapping in 1-2 districts to determine more specific housing, water and sanitation needs. Table 15: Summary of Priority areas for Habitat for Humanity in Ho Chi Minh City Proposed District Justification Urban District 4, 6, 8, All show similar characteristics/risks associated with high risk of relocation Binh Thanh High concentration of urban slums Semi Urban Districts 2, 7 Both show similar characteristics/risks these areas both likely to undergo major change with the development of new urban centers in these districts. Districts 12, Thu Duc Both show similar characteristics with very high rates of urbanization, high concentrations of migrant housing and industrial areas. 66
67 CONCLUDING STATEMENT Habitat for Humanity International - Vietnam committed to providing simple, decent housing as well as improved water and sanitation solutions to Vietnam s poor. As the organization moves to establish an urban program, there are a number of points to consider. This report has outlined some of the major challenges for the urban poor and looks to direct a new phase of HFHI-V s program. Urban poverty in Ho Chi Minh City is multi-dimensional and complex, and the scope of this report is such that it only touches on some aspects. A number of solutions are available to help mitigate housing problems and access to water and sanitation in the city. HFHI-V plan to work together with local partners and community to improve living conditions in Ho Chi Minh City. 67
68 REFERENCES Asian Development Bank (ADB) (2008) Asian Development Bank Vietnam 2008: A Fact Sheet Asian Development Bank, March 2008 Asian Development Bank (ADB) (2001) Technical Assistance to the Socialist Republic of Vietnam for Enhancing the Resettlement Legal Framework and Institutional Capacity -- TA No VIE Asian Development Bank, September 2008 Asian Development Bank (ADB) (1998/2002) Policy on Involuntary Resettlement R Asian Development Bank Cities Alliance (2002) Cities Alliance in Action: Citywide Slum Upgrading Cities Alliance CIEM, Central Institute for Economic Management (2006): Vietnam s Economy in 2005 (A reference book). The Publishing House of Political Theory, Hanoi Duong Lanh (no date provided) Housing Development in Ho Chi Minh City Case Study: Bong Sao Residential Area Project Working Paper pp GSO, General Statistics Office of Vietnam (2007) Statistical Yearbook 2007 PII National Account visited July 2008 GSO, General Statistical Office of Vietnam/UNPFA, United Nations Population Fund (ed.) (2005): The 2004 Vietnam Migration Survey: Major Findings. Hanoi. GSO, VHLSS General Statistics Office of Vietnam (2002) Vietnam Household and Living Standards Survey, visited July 2008 GSO, VHLSS General Statistics office of Vietnam (2004) Vietnam Household and Living Standards Survey visited July CGPRS, Comprehensive Growth and Poverty Reduction Strategy (2003) Approved by the Prime Minister at Document No. 2685/VPCP-QHQT, date 21st May 2002 and at Document No. 1649/CP-QHQT, dated 26th November, Duncan, J (2007) A Right to a Decent Home: Mapping Poverty Housing in the Asia-Pacific Region Habitat for Humanity International. Ho Chi Minh City Peoples Committee (2001) Saigon East-West Highway Project Seminar, Highway visited Ho Chi Minh City Statistical Office (HCMC-SO) (2007) Statistical Yearbook 2007 Statistical Publishing House, Ha Noi 2008 Ho Chi Minh City Statistical Office (HCMC-SO)
69 (2006) Statistical Yearbook 2006 Statistical Publishing House, Ha Noi 2007 Jones, G (2002) Southeast Asian urbanization and the growth of mega-urban regions Journal of Population Research November 2002 LÊ Van Thanh (2007) Economic Development, Urbanization And Environmental Changes in Ho Chi Minh City, Vietnam: Relations and Policies Paper presented to the PRIPODE workshop on Urban Population, Development and Environment Dynamics in Developing Countries LÊ Van Thanh (2005) Urbanization, environment, development and urban policies in Ho Chi Minh City, Vietnam XXV IUSSP International Population Conference Tours, France July 2005 Nguyen Van Hiep (2007) The track records and challenges of housing problem in Ho Chi Minh City at present and up to 2010 Working Paper pp 1-5 Thu Thiem New Urban Area hochiminhcity.gov.vn last visited Socialist Republic of Vietnam (2004) Decree No. 197/2004/Nd-Cp Of December 3, 2004 On Compensation, Support and Resettlement When Land is Recovered by the State Socialist Republic of Vietnam (2002) Comprehensive Poverty Reduction and Growth Strategy Socialist Republic of Vietnam Approved by the Prime Minister at Document No. 2685/VPCP-QHQT, 21st May 2002 Socialist Republic of Vietnam (2003) The law on Land Law No 13/2003/QH11, Pursuant to the 1992 Constitution of the Socialist Republic of Vietnam, amended and supplemented by Resolution 51/2001/QH10 of 25 December, 2001 by the National Assembly of 10t h Legislature at its 10th Session Srinivas, H Defining Squatter Settlements Last visited UN-Habitat (2006) State of the World s Cities Report 2006/7. UN-Habitat UN Millennium Development Goals un.org/millenniumgoals/ Last visited UN Commission on Human Rights, Adequate housing as a component of the right to an adequate standard of living Report of the Special Rapporteur on adequate housing as a component of the right to an adequate standard of living, and on the right to non-discrimination, 27 March E/CN.4/2003/5/Add.3. Online. UNHCR Refworld, available at: docid/3f462aa64.html [accessed 11 September 2008] UNPFA (2007) Internal Migration in Vietnam: The Current Situation United Nationals Population Fund pp 1-31 Valdivia, I and Thrasher, P. (2005) Four walls and a Roof: Understanding the context of Housing and Micro finance in Vietnam and Cambodia Habitat for Humanity Vietnam Verschure, H; Hasan, A; Boonyabancha, S; Nguyen, M.H; Tran (2006) Final Report Evaluation & Recommendations For Infrastructure & Resettlement Pilot Project Tan Hoa-Lo Gom Canal Sanitation And Urban Upgrading Vietnamese-Belgian Bilateral Cooperation Project Vietnam Development Goals (VDGs) vdg.gso.gov. vn/ Last visited Vietnam News Daily ( ) Poverty line adjusts with rising inflation vnagency.com.vn/ Last visited Vietnam News Daily ( ) HCM City to meet poverty eradication target by year end Last visited Vietnam News Daily ( ) Last visited VeT - Villes en Transition, French Embassy in So- 69
70 cialist Republic of Vietnam, World Bank PMU - Vietnam Urban Upgrading Programme. Ludovic Dewaele, Roger Metzger. (2002) Analysis of Low Cost Housing Standards in Ho Chi Minh City Villes en Transition pp201 Waibel, M (2007) Migration to Greater Ho Chi Minh City in the course of Doi Moi Policy Spatial Dimensions, Consequences and Policy Changes with special reference to Housing Working Paper, University of Hamburg Waibel, M; Eckert, R; Bose, M; Martin, V (2007) Housing for Low-income Groups in Ho Chi Minh City between Re-Integration and Fragmentation Approaches to Adequate Urban Typologies and Spatial Strategies ASIEN 103 (April 2007), S Wailbel, M (2006) The production of Urban Space in Vietnams Metropolis in the course of Transition Trialog 89-2/2006 pp Waibel, M (2004) The development of Saigon South New Urban Area a sign of an increasing internalization and polarization in Vietnamese society Pacific News 22 July/August 2004 pp World Bank (2008) visited World Bank (2008)/A Vietnam s Impressive Development Rate Article by Ajay Chibber - World 70 Bank s country director for Vietnam for The Banker February 04, 2008 World Bank (2007) Issues and Dynamics: Urban Systems in Developing East Asia Urbanization Dynamics and Policy Frameworks in Developing East Asia East Asia Infrastructure Department, The World Bank. Pp. 1-2 World Bank/Coulthart et. al (2006) Urban Development Strategy: Meeting the challenges of rapid urbanization and the transition to a market oriented economy World Bank Vietnam. World Bank (2004) Vietnam Urban Upgrading Project Project Information Document (PID) Report No: AB854 World Bank (2004)/A Project Appraisal Document for the Urban Upgrading Project 20 February 2004, The World Bank. World Bank (2003) Urban Poverty in East Asia a review of Indonesia, the Philippines, and Vietnam Working Paper No. 11 Urban Sector Development Unit East Asia Infrastructure Department The World Bank. World Bank (2003)/A Resettlement Policy Framework policy guiding the compensation, resettlement and rehabilitation of project affected persons. Vietnam Urban Upgrading Project. Working Paper pp World Bank et. al. (1999) Vietnam Development Report 2000: Attacking Poverty, Joint report of the Government of Vietnam Donor NGO Poverty Working Group, Hanoi, 1999.
71 A1Adequate Housing Rights The right to adequate housing is considered a core human right. The United Nation s Universal Declaration of Human Rights of 1948 Article 25 states: DEFINITION OF TERMS Everyone has the right to a standard of living adequate for the health and well-being of himself and of his family, including food, clothing, housing, medical care and necessary social services, and necessary social services, and the right to security in the event of unemployment, sickness, disability, widowhood, old age and other lack of livelihood in circumstances beyond his control Adequate Housing A widely accepted definition of adequate housing set forth in General Comment 4 to Article 11(1) of the International Covenant of Economic, Social and Cultural Rights (adopted by UN Committee on Economic, Social and Cultural Rights in 2001) requires at a minimum of tenure security, affordability, adequacy, accessibility, proximity to services, availability of infrastructure and cultural adequacy. (Duncan 2007:5). Poverty International Poverty Definition The international community distinguishes between three levels of poverty: extreme, moderate and relative poverty (Duncan 2007:7): Extreme poverty according to the World Bank is an income index of less than US$1 per person per day. Moderate poverty means that households barely meet basic needs living from $1-$2 per person per day. Relative Poverty is generally defined as an income level below a given propor tion of average national income (Sachs 2005: 20) Vietnam Poverty Definition Since 1997 Vietnam has used a classification method to define poverty by the National Targeted Program on Hunger Eradication and Poverty Reduction established by the Ministry of Labour, Invalids and Social Affairs. This sets two poverty lines one for urban and one for rural areas. Ho Chi Minh City has also developed its own poverty line based on two criteria: average per capita income and the capability to gain access to and utilise services. In 2008 the Ho Chi Minh City Peoples Committee set a new poverty baseline such that any city resident earning 12 million VND (750 USD) or less a year and a rural resident earning 10 million VND (625 USD) will be considered poor. For comparison poor households under the former poverty line used from are those with an income of no more than 6 million VND a year (375 USD). The readjustment was made by the city to reflect rising costs in Vietnam s economy. For the purposes of this report poverty will be defined as those living below to Ho Chi Minh City s 2008 poverty baseline. 71
72 Slum A slum household as defined by UN Habitat is a group of individuals living under the same roof in an urban area which lacks one or more of the following five conditions. Access to improved water (Sufficient amount of water for family use at an affordable price) Access to improved sanitation (Private toilet or public toilet shared with reasonable num ber of people) Sufficient-living area (Maximum 3 people/ room) Durability of housing (non-hazardous loca tion, structure that protects inhabitants from climatic conditions) Security of tenure (right to effective pro tection against forced evictions) (UN Habitat 2006:19) Slum Settlements In some literature slums are referred to as continuous settlements rather than individual housing units (World Bank;2008). This report makes a distinction between a slum household which is an individual dwelling characterised by lack of access to the conditions described above, and a slum settlement which is an agglomeration or community of slum households which collectively lack access to the conditions described above. Both are confined to urban/semi-urban areas Slum settlements are also referred to as Informal settlements. Squatter Settlements Squatter settlements and informal settlements are often used interchangeably. However slum often denotes a physical and social state of deterioration while squatter settlement refers to legal status (Srinivas: 4). Overcrowding UN-Habitat defines overcrowding as no more than three persons per room (UN-Habitat 2006: 69). The Vietnam government has set a target: 15m2 floor/person by 2010 and 20m2 floor/person in Urban This report uses the UN definition for urban agglomeration which is: The built-up or densely populated area containing the city proper, suburbs and continuously settled commuter areas. It may be smaller or larger than the metropolitan area: it may also comprise the city proper and its suburban fringe or thickly settled adjoining territory (UN- Habitat 2006:5). By this definition, Ho Chi Minh City s urban agglomeration includes urban and semi-urban districts. The Ho Chi Minh City Statistical Office divides districts into urban and rural. Urbanisation For the purposes of this report Urbanisation is defines as: the increase in the proportion of the population residing in towns, brought about by migration of rural populations into towns and cities, and/or the higher urban levels of natural increase resulting from the greater proportion of people of childbearing age in cities (this, in turn, reflects patterns of migration). Urbanization indicates a change of employment structure from agriculture and cottage industries to mass production and service industries. Urban Districts For the purposes of this report the urban districts have been divided into urban and semi-urban to more accurately reflect the level or urbanisation and development in the city. The urban districts are 1, 3, 4, 5, 6, 10, 11, Phu Nhuân 8, Bình Thanh, Gò Vap, Tân Bình and Tân Phu. Semi Urban Districts Semi-Urban, also called peri-urban areas are areas of the city immediately on the periphery of urban areas. Typically they contain a mix of urban and rural land use and are undergoing rapid urbanisation. For the purposes of this report semi-urban districts are Districts 2, 7, 9, 12, Binh Tan and Thu Duc. Rural Districts Definitions of rural vary extensively. While rural is typically defined as areas outside of the city characterised by a lower density of population and lower socio-economic status, this may not always be the case. The metropolitan area of Ho Chi Minh City extends beyond the urban to include five rural districts: For the purposes of these report rural district is a term applied to districts on the edge of the city, still within the administrative boundaries of Ho Chi Minh City. These are: Cu Chi, Hoc Mon, Binh Chanh, Nha Be and Can Gio,
73 A2 12 TD GV 9 BT TB PN TP BT SPATIAL ANALYSIS MAP LEGEND SLUM COMMUNITIES IDENTIFIED DISTRICT BOUNDARIES EXLUDED AREAS (SOURCE BASE IMAGE GOOGLE EARTH 2008) 73
74 A3 VISUAL ANALYSIS MAP LEGEND SLUM COMMUNITIES IDENTIFIED DISTRICT BOUNDARIES DISTRICTS OUTSIDE OF SCOPE OF WORK 74
75 A4 12 TD GV 9 BT TB PN TP BT COMBINED MAP LEGEND SLUM COMMUNITIES IDENTIFIED (Field Surveys/Visual Analysis) SLUM COMMUNITIES IDENTIFIED (Spatial Analysis) DISTRICT BOUNDARIES DISTRICTS OUTSIDE OF SCOPE OF WORK 75
76 A5 OBSERVATIONS URBAN DISTRICTS Slum Definition Parameter Access to improved water Access to improved sanitation Sufficient Living Area Durability of Housing Other Other Comments District Date of Survey Evidence of water supplied to house Access to Toilet Estimated Living Area Location Building Materials Construction Durability Access to Electricity District 4 18/7/08 N/A N/A N/A Medium Along Te and Ben Nghe Canals Slums in flood prone area. District 6 20/6/08 N/A N/A N/A Medium Along tributary canals to Lo Gom in the South west of the district Corrugated iron, timber, brick, concrete, recycled materials Corrugated iron, timber, brick, concrete, recycled materials Medium Houses built on timber and concrete piles over canal. Some houses have partially collapsed into canal. Medium Houses built over Canal on Sandbags and timber piles. Yes Yes Area undergoing development - Several new high rise apartment buildings along Ben Van Don St. Construction of new highway along Ben Nghe canal slums have been cleared/relocated Slums along the Lo Gom canal have recently been cleared/relocated. Other slum housing appears to have been there for many years. 76
77 District 8 20/6/08 N/A N/A N/A Medium High density, decent size Concentrations of slums along Kinh Doi, Rach Xom Cui Apart from canals/ waterways area well built up. Corrugated iron, Medium Over Canal - Fairly well established Construction of new highway along Ben Nghe slums have been cleared/ relocated. District 11 20/6/08 N/A N/A N/A N/A N/A N/A N/A N/A No Slums identified on Survey Diverse land use including Factories, Industry and waste sorting facilities. Go Vap 18/7/08 N/A N/A Some shared toilets identified Low Along tributary canals to Song Ben Cat. More slums identified in the east and north of the district. Corrugated iron, timber, recycled materials, palm fronts and organic materials. Low many temporary dwellings constructed from branches and A lot of small rooms for rent for migrants observed. Tan Binh 17/7/08 N/A N/A N/A N/A N/A N/A N/A N/A Newly developed area, no evidence of informal settlements at the time of survey Tan Phu 17/7/08 N/A N/A N/A N/A N/A N/A N/A Newly developed area, no Nevidence of informal settlements at the time of survey Binh Thanh 17/7/08 N/A N/A N/A Medium Along most canals and waterways Around public infrastructure: railway line near Luong Ngoc Quyen St Underneath Bridges, particularly Cau Kinh and Cau Binh Loi Setttlements on canals comprised of corrugated iron, brick, timber and recycled materials Settlements under bridges predominantly comprosed of organic materials Medium Along Canals Low Under Bridges Yes High numbers of urban informal settlements compared with inner urban districts 4, 6 and 8 77
78 SEMI-URBAN DISTRICTS Slum Definition Parameter District Date of Survey Access to improved water Evidence of water supplied to house District 2 31/7/08 N/A Assumed little/no access because sparsely populated District 7 24/7/08 Water unlikely along canals because sparsly populated Evidence of access to drinking Water N/A Assumed little/no access because sparsely populated Access to improved sanitation Access to Toilet Sufficient Living Area Estimated Living Area Durability of Housing Location N/A High Along small river, detached houses on more rural lots, scattered, very poor along Saigon River N/A N/A Medium- High Some on canals homes and business along river add/ons Homes on canals sparsely populated Building Materials Recycled materials, timber, wooden crates Corrugated tin, bamboo branches Construction Durability Low on river edges Medium on rural lots Unstable Along Kinh Te apparently Access to Electricity Some Some Other Comments Developing rapidly. Plan for new city centre settlements will be moved, still living there Single detatched dwellings, scattered throughout. Migrant temporary around infrastructure projects roads etc. Shanty houses migrants in an area for new developments a lot businesses in the front with homes at back Industrial areas along Saigon river not residential. Less built up. Sound homes characterise district. Quality along kinh te apparently better than D4 side. 78
79 District 9 District 12 29/7/08 24/6/08 Assumed little/no access because sparsely populated Assumed little/no access because sparsely populated Binh Tan 08/08/08 Assumed little/no access because sparsely populated Assumed little/no access because sparsely populated Assumed little/no access because sparsely populated Assumed little/no access because sparsely populated N/A Medium Distributed throughout district n roadsides, on individual rural lots. Higher concentration around construction sites N/A N/A Low- Medium Districuted throughout. Higher concentration along waterways. A number of migrant houses for rent Many along roadsides and around industrial areas but no clear pattern. Recycled materials, organic materials including palm fronds/ bamboo Corrugated iron, brick, organic materials Corrugated iron, brick, organic materials, recycled materials Low Medium. Some appear temporary, othets more permanent and better constructed but still using same building matreials Low, house small and some falling down. Some Yes High numbers of Migrant Housing. A lot of industry has been moved to this area. Low some A lot of heay industry along main roads Thu Duc 31/7/08 Assumed little/no access because sparsely populated Assumed little/no access because sparsely populated N/A Medium Distributed throughout district n roadsides, on individual rural lots and swamp areas. Recycled materials, organic materials Medium some Individual houses, no large areas of informal settlements. Some rural farmers. Infrastructure developing new roads, new electricity lline Many small migrant housing for rent 79
80 RURAL DISTRICTS Slum Definition Parameter Access to improved water Access to improved sanitation Sufficient Living Area Durability of Housing Other Comments District Date of Survey Evidence of water supplied to house Evidence of access to drinking Water Access to Toilet Estimated Living Area Location Building Materials Construction Durability Access to Electricity Binh Chanh 01/08/08 n/a n/a n/a Medium single detatched dwellings on small rural lots Low - Migrant housing Fragmented settlement pattern, scattered throughout, many slum households still rural and on agricultural land. Others surround industrial areas. Organic materials palm fronds/ bamboo. Recycled materials brick, corrugated iron Medium construction technique not durable but location less hazardous than inner urban areas. Some Some Industry established and this is likely to increase with plans for the area. Cu Chi 01/08/08 n/a n/a n/a Medium single detatched dwellings on small rural lots As above Recycled materials brick, corrugated iron, organic materials As above some A lot of heavy industry established. Many houses for rent. Low Migrant housing 80
81 81
C1 Tổng quan về SharePoint 2010
SharePoint 2010 1 C1 Tổng quan về SharePoint 2010 SharePoint là gì? SharePoint là một nền tảng (Platform) của việc trao đổi thông tin và làm việc cộng tác trong nội bộ doanh nghiệp và trên nền Web. SharePoint
TIỀM NĂNG TẠO VIỆC LÀM XANH Ở VIỆT NAM THE POTENTIAL FOR CREATING GREEN JOBS IN VIETNAM
VIỆN NC QUẢN LÝ KINH TẾ TW TRUNG TÂM THÔNG TIN TƯ LIỆU THÔNG TIN CHUYÊN ĐỀ TIỀM NĂNG TẠO VIỆC LÀM XANH Ở VIỆT NAM THE POTENTIAL FOR CREATING GREEN JOBS IN VIETNAM SỐ 9 2012 CIEM, Trung tâm Thông tin Tư
PHAT TRIEN TAI CHINH VI MO Of KHU VITC NONG MMlh N01S THOi 1 ~
Chu bien: TS. NGUYiN KIM ANH PHAT TRIEN TAI CHINH VI MO Of KHU VITC NONG MMlh N01S THOi 1 ~ IN THE AGRICULTURAL AND RURAL AREAS OF VIETNAM B 376792 NHA XUAT BAN THONG KE HANOI-2010 MUC LUC LQI NOIOAU 3
LIST OF BAO VIET INSURANCE S DIRECT BILLING NETWORK
LIST OF BAO VIET INSURANCE S DIRECT BILLING NETWORK Ha i 3 4 5 Hanoi Medical University Hospital * Add: Ton That Tung, Dong Da Dist., Hanoi Tel: (04) 3 853 798 ex:483 Fax: (04) 3 5748 69 Hong Ngoc Hospital
Citibank Credit Card Terms and Conditions.
Có hi u l c t ngày 02 tháng 06 n m 2014 Citibank Credit Card Terms and Conditions. Effective 02 June 2014 Trân tr ng c m n Quý khách đã l a ch n s d ng Th Tín d ng Citibank. Vi c đ c và hi u các Đi u kho
CHƯƠNG I: LÀM QUEN VỚI OUTLOOK 2010
[Type text] CHƯƠNG I: LÀM QUEN VỚI OUTLOOK 2010 1. Làm quen Outlook 2010 a. Quản lý nhiều tài khoản e-mail từ một nơi Bạn có thể dễ dàng quản lý e-mail từ hộp thư nhiều. Đồng bộ hóa các loại email của
Như ng kiê n thư c câ n biê t vê giâ y phe p cư tru điê n tư (eat)
Như ng kiê n thư c câ n biê t vê giâ y phe p cư tru điê n tư (eat) www.bamf.de/eaufenthaltstitel Mu c lu c Mu c lu c 1 Giâ y phe p cư tru điê n tư 5 2 Tâ m a nh va ca c dâ u ngo n tay 7 3 Ca c qui đi
HEALTH, INSURANCE, & YOU: New Options For Health Insurance. Presented by SEIU Local 521
HEALTH, INSURANCE, & YOU: New Options For Health Insurance Presented by SEIU Local 521 The Affordable Care Act Federal law that changes our health care system: Ensures that health insurance is: 1. High
THE EFFECT OF HUMAN RESOURCE COMPETENCIES ON PROJECT PERFORMANCE IN VIETNAMESE INFRASTRUCTURE PROJECTS
TẠP CHÍ PHÁT TRIỂN KH&CN, TẬP 10, SỐ 08-2007 THE EFFECT OF HUMAN RESOURCE COMPETENCIES ON PROJECT PERFORMANCE IN VIETNAMESE INFRASTRUCTURE PROJECTS Cao Hao Thi (1), Fredric William Swierczek (2) (1) University
Land Used for the Construction of Golf Courses and Related Concerns in Vietnam
Land Used for the Construction of Golf Courses and Related Concerns in Vietnam Key words: land used, golf course, construction of golf courses, Vietnam SUMMARY In recent years, golf courses have been constructed
MEASURING SERVICE QUALITY IN SOFTWARE OUTSOURCING AT QUANTIC Co., Ltd- A DIMENSION-BY-DIMENSION ANALYSIS
MEASURING SERVICE QUALITY IN SOFTWARE OUTSOURCING AT QUANTIC Co., Ltd- A DIMENSION-BY-DIMENSION ANALYSIS Ha Nam Khanh Giao (2), Huynh Ba Duy (1) (1) International University- Vietnam National University
LIST OF CLINICS AND HOSPITALS
LIST OF CLINICS AND HOSPITALS The following is a list of both international and Vietnamese clinics and hospitals in Ho Chi Minh City and in the provinces. The list is by no means exclusive. Many of the
Waste Management and Contaminated Site Treatment
Mastercourse Waste Management and Contaminated Site Treatment TU Dresden Hanoi University of Science and further cooperation of the IAA with asian countries 2 3 4 Introduction - Academic Partnership with
Die Geschichte vom Zappel-Philipp The Story of Fidgety Philip
Hoi Chung Suy Tap Trung va Nang Dong. I. QUA TRINH LICH SU CUA HOI CHUNG SUY TAP TRUNG VA NANG DONG (STTND): Die Geschichte vom Zappel-Philipp The Story of Fidgety Philip "Ob der Philipp heute still Wohl
ANALYSIS MARKETING AND FORECASTING RICE PRICE IN THE MEKONG DELTA OF VIETNAM
Omonrice 18: 182-188 (2011) ANALYSIS MARKETING AND FORECASTING RICE PRICE IN THE MEKONG DELTA OF VIETNAM ABSTRACT Rice is considered to be the most important crop in Vietnam. In 2009, Vietnam exported
Vietnamese Student Fulbrighters ( by year)
Vietnamese Student Fulbrighters ( by year) Le Thi Van Hue Tufts University Urban & Environmental Policy 92 Le Quoc Hung University of Minnesota Public Administration 92 Luong Thi Quynh Huong University
Vietnamese Student Fulbrighters (by year)
Vietnamese Student Fulbrighters (by year) 1 Le Thi Van Hue Tufts University Urban & Environmental Policy 92 2 Le Quoc Hung University of Minnesota Public Administration 92 3 Luong Thi Quynh Huong University
Space Technology Institute, Vietnam Academy of Science and Technology, 18 Hoang Quoc Viet, Hanoi, Vietnam
Estimation of biomass for calculating carbon storage and CO 2 sequestration using remote sensing technology in Yok Don National Park, Central Highlands of Vietnam Ước lượng sinh khối cho tính toán lượng
LIST OF HOSPITALS/FAMILY MEDICAL CENTRES Last updated: October 2014 ORGANISATION ADDRESS REMARKS
LIST OF HOSPITALS/FAMILY MEDICAL CENTRES Last updated: October 2014 Please note that this list is provided for the information of Australian travellers and those needing medical assistance in Vietnam.
ĐẠI HỘI LINH MỤC VIỆT NAM HÀNH TRÌNH EMMAUS VI VIETNAMESE PRIESTS CONVOCATION EMMAUS VI - ATLANTA 2015
THE FEDERATION OF VIETNAMESE CATHOLICS IN THE U.S.A ĐẠI HỘI LINH MỤC VIỆT NAM HÀNH TRÌNH EMMAUS VI VIETNAMESE PRIESTS CONVOCATION EMMAUS VI - ATLANTA 2015 "Shepherds living with the smell of the sheep"
GRANTEES OF THE FULBRIGHT VIETNAMESE STUDENT PROGRAM (BY YEAR)
GRANTEES OF THE FULBRIGHT VIETNAMESE STUDENT PROGRAM (BY YEAR) 1 Le Thi Van Hue Tufts University Urban & Environmental Policy 92 2 Le Quoc Hung University of Minnesota Public Administration 92 3 Luong
MEDICAL SERVICES MEDICAL SERVICES INITIATIVE
COUNTY OF ORANGE HEALTH CARE AGENCY MEDICAL SERVICES MEDICAL SERVICES INITIATIVE MARK A. REFOWITZ AGENCY DIRECTOR RICHARD SANCHEZ ASSISTANT DIRECTOR HOLLY A. VEALE ACTING DIRECTOR MEDICAL SERVICES ANTHONY
MEDICAL SERVICES MEDICAL SERVICES INITIATIVE
COUNTY OF ORANGE HEALTH CARE AGENCY AGENCY DIRECTOR ASSISTANT DIRECTOR ACTING DIRECTOR ADMINISTRATOR MAILING ADDRESS: SANTA ANA, CA 92702 TELEPHONE: (714) 834-6248 November 19, 2013 To: All MSI Providers
FULBRIGHT VIETNAMESE STUDENTS TO THE U.S. (1992-2015)
FULBRIGHT VIETNAMESE STUDENTS TO THE U.S. (1992-2015) 1 Le Thi Van Hue Tufts University Urban & Environmental Policy 92 2 Le Quoc Hung University of Minnesota Public Administration 92 3 Luong Thi Quynh
LIST OF ATTORNEYS AND TAX CONSULTANT IN HO CHI MINH CITY AND AREA
U.S. Consulate General - Ho Chi Minh City American Citizen Services Unit 4 Le Duan Blvd, District 1, Ho Chi Minh City Tel: (84-8) 8229433 Fax: (84-8) 8245571 Website: http://hochiminh.usconsulate.gov Email:
SOME TREATMENT RESULTS OF GYNAECOPATHY BY USING LOW POWER SEMICONDUCTOR LASER
SOME TREATMENT RESULTS OF GYNAECOPATHY BY USING LOW POWER SEMICONDUCTOR LASER Bùi Phương Anh, Trần Minh Thái, Cẩn Văn Bé, Trần Trung Nghĩa Laser Technology Laboratory Faculty of Applied Science HCMC University
Holy Trinity Times Faith, Hope and Love
HOLY TRINITY PRIMARY AND ELC 18-20 THEODORE E STREET, ET, CURTIN Holy Trinity Times Faith, Hope and Love I have come so that they may have life and have it to the full John 10:10 Term 4, Week 4 5 November,
Social Health Insurance in Viet Nam
Social Health Insurance in Viet Nam Nghiem Tran Dung Health Insurance Dept, Ministry of Health Ha Noi,, 12 Oct. 2010 1 Outline of presentation Background information Development (summary) of SHI in Viet
Progress of Water Environmental Governance/Management and Future Challenges in Vietnam
Progress of Water Environmental Governance/Management and Future Challenges in Vietnam The Second International Workshop and the Sixth Annual Meeting for Water Environmental Partnership in Asia (WEPA)
IMPLEMENTATION OF ONE MUST AND FIVE REDUCTIONS IN RICE PRODUCTION, IN AN GIANG PROVINCE
Omonrice 19: 237-249 (2013) 237 IMPLEMENTATION OF ONE MUST AND FIVE REDUCTIONS IN RICE PRODUCTION, IN AN GIANG PROVINCE Truong Thi Ngoc Chi 1, Tran Thi Thuy Anh 1, Tran Quang Tuyen 1, Florencia Palis 2,
CHỈ NAM SỨC KHỎE THỤY SĨ
Bằng 18 ngôn ngữ CHỈ NAM SỨC KHỎE THỤY SĨ Tóm lược hệ thống tổ chức y khoa Thụy Sĩ Hướng dẫn dành cho những người di dân tại Thụy Sĩ SỨC KHỎE Thông tin về vấn đề di dân và sức khỏe: migesplus.ch Diễn đàn
LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM. Tran Thi Trieu, Nguyen Hieu Trung, Le Anh Tuan
LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM Tran Thi Trieu, Nguyen Hieu Trung, Le Anh Tuan THE MEKONG RIVER DELTA Mekong River Delta is in the most southern of Vietnam. The MD is considered as a biggest
CURRENT STATUS OF WIND POWER DEVELOPMENT IN VIETNAM
MINISTRY OF INDUSTRY AND TRADE General Department of Energy CURRENT STATUS OF WIND POWER DEVELOPMENT IN VIETNAM Pham Trong Thuc Director of Department of New and Renewable Energies June 2015 AGENDA 1.
20. Shalala. AceKaraoke.com 1-888-784-3384 Vietnamese Karaoke DVD Catalog June, 2002
0 GIO ROI - TROI XANH VOI XANH CO KARAOKE DVD 18 ID: SHAMGR18VK Price: $18.95 1. Truc Nguyen - Khong Gio Roi / Troi Sanh Voi Sanh Co 2. Mong Thy - Canh Cong Rau Dang 3. Truc Quyen - Gio Nayanh O Dau 4.
LIST OF ATTORNEYS AND TAX CONSULTANTS IN THE HO CHI MINH CITY AREA
U.S. Consulate General - Ho Chi Minh City American Citizen Services Unit 4 Le Duan Blvd, District 1, Ho Chi Minh City Tel: (84-8) 8229433 Fax: (84-8) 8245571 Website: http://hochiminh.usconsulate.gov Email:
1.2. Chemicals, insecticidal or germicidal preparations for domestic and medical use.
1) CIRCULAR No. 08/2006/TT-BYT OF JUNE 13, 2006, GUIDING THE IMPORT OF VACCINES, MEDICAL BIOLOGICALS; CHEMICALS, INSECTICIDAL OR GERMICIDAL PREPARATIONS FOR DOMESTIC AND MEDICAL USE; AND MEDICAL EQUIPMENT
Effects of Water Invasion to Design and Production Procedure in Fractured Basement Reservoir, SuTu Den oil Field and Prevention Solutions
VNU Journal of Science : Earth and Environmental Sciences, Vol. 31, No. 1 (2015) 49-66 Effects of Water Invasion to Design and Production Procedure in Fractured Basement Reservoir, SuTu Den oil Field and
Programme for celebrating the 60th Anniversary of the Establishment of Diplomatic Relations between Hungary and Vietnam -2010-
With great thank to these sponsors Đặc biệt cảm ơn nhà tài trợ: Programme for celebrating the 60th Anniversary of the Establishment of Diplomatic Relations between Hungary and Vietnam Ch ng tr nh kû niöm
ENVIRONMENTAL RECLAMATION AND POST-MINING LAND USE PLANNING
ENVIRONMENTAL RECLAMATION AND POST-MINING LAND USE PLANNING Katrin Brömme EE+E Institute of Environmental Engineering+Ecology, Ruhr-University of Bochum Harro Stolpe EE+E Institute of Environmental Engineering+Ecology,
A Comprehensive Framework for Grid Data Management* Một Khung Sườn Toàn Diện Cho Việc Quản Lý Dữ Liệu Trên Lưới
A Comprehensive Framework for Grid Data Management* Tran Khanh Dang, Thi Thanh Huyen Phan, Hoang Tam Vo Faculty of Computer Science & Engineering HCMC University of Technology National University of Ho
Second Quarterly Report for the period January March 2011
Second Quarterly Report for the period January March 2011 Project: Bidding package: Technical assistance for enhancement capacity of HFIC and project owners financed under AFD s credit line (HCE Project)
CORPORATE GOVERNANCE IN VIETNAM : A SYSTEM IN TRANSITION. I. The Historical Background of Vietnamese Company Law and Corporate Governance 1
Corporate governance in Vietnam : a Title transition Author(s) Hai, Bui Xuan; Nunoi, Chihiro Hitotsubashi journal of commerce an Citation 42(1): 45-66 Issue 2008-10 Date Type Departmental Bulletin Paper
TL-WR740N 150Mbps Wireless N Router
Rev: 1.0.0 1910010682 COPYRIGHT & TRADEMARKS Specifications are subject to change without notice. is a registered trademark of TP-LINK TECHNOLOGIES CO., LTD. Other brands and product names are trademarks
List of Medical Facilities/Practitioners in Ho Chi Minh City
List of Medical Facilities/Practitioners in Ho Chi Minh City Updated: Jan 2015 Prepared by British Consulate-General in Ho Chi Minh City www.gov.uk The following list of medical facilities/practitioners
HOA SEN GROUP S BULLETIN 4 th QUARTER OF FISCAL YEAR 2011-2012 (July 01 st, 2012 September 30 th, 2012)
HOA SEN GROUP S BULLETIN 4 th QUARTER OF FISCAL YEAR 2011-2012 (July 01 st, 2012 September 30 th, 2012) HOA SEN GROUP No.09, Thong Nhat Boulevard, Song Than 2 Industrial Park, Di An Ward, Di An Dist. Binh
Approaching the Overview of Human Resource Training in Tourism Based on Social Demand in Vietnam
Approaching the Overview of Human Resource Training in Tourism Based on Social Demand in Vietnam Loan Thuy Bui Hieu Tin Nguyen Ton Duc Thang University Abstract Tourism development is one of the important
Vietnam. The Party vs. Legal Activist Cu Huy Ha Vu H U M A N R I G H T S W A T C H
Vietnam The Party vs. Legal Activist Cu Huy Ha Vu H U M A N R I G H T S W A T C H Vietnam: The Party vs. Legal Activist Cu Huy Ha Vu Copyright 2011 Human Rights Watch All rights reserved. Printed in the
Q4 2015 MARKET INSIGHTS OFFICE SECTOR HO CHI MINH CITY
215 MARKET INSIGHTS OFFICE SECTOR In 215, Vietnam has benefited from stability in the macroeconomic Gross Domestic Product (GDP) in 215 increased 7.1% year on year (y-o-y), bringing the overall GDP growth
Faculty/University: School of Government, University of Economics Ho Chi Minh City (UEH) Email address: [email protected]
(Photo) Luu Trong Tuan BA (English, University of Ho Chi Minh City, Vietnam) (TESOL, Victoria University, Australia) PhD (Management, Asian Institute of Technology (AIT), Thailand) Faculty/University:
Tìm hiểu Microsoft Office 2007
GIÁO TRÌNH Tìm hiểu Microsoft Office 2007 Tìm hiểu Microsoft Excel 2007 LÊ VĂN HIẾU 2009 VIỆ T NAM MỤC LỤC PHẦN I: LÀM QUEN VỚI EXCEL 2007... 6 1. Làm quen nhanh với Excel 2007... 6 a. Những thuật ngữ
SCIENCE AND TECHNOLOGY DEVELOPMENT IN VIETNAM AND INTERNATIONAL COOPERATION POLICY
SCIENCE AND TECHNOLOGY DEVELOPMENT IN VIETNAM AND INTERNATIONAL COOPERATION POLICY Dang Bao Ha Centre for Information Analysis National Agency for Science and Technology Information - NASATI 24 Ly Thuong
VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province
Due Diligence Report November 2014 VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province Quyet Tien Upper Secondary School Prepared by the Ministry of Education and Training,
INTRODUCTION OF POWER TRADING VIETNAM CHINA BY 220kV LINES HANOI 04/2014
INTRODUCTION OF POWER TRADING VIETNAM CHINA BY 220kV LINES HANOI 04/2014 1 Contents: 1 Overview 2 Electricity import from China by 220kV Overhead line 3 Trading and operating issues 2 Overview of Vietnam
Alstom in Vietnam. Over 20 years of contribution to energy and transport infrastructure development. Alstom s Presence
Over 20 years of contribution to energy and transport infrastructure development Alstom s Presence Alstom Representative Office Son La Power Project site Alstom Grid Vietnam Alstom Vietnam Ltd. Transport
Report Overview Vietnam Hotel Survey 2015
Report Overview Vietnam Hotel Survey 2015 This is an Executive Summary of the full 60 page Hotel Survey Report. Full copies can be obtained from Grant Thornton Vietnam. Grant Thornton Vietnam Page 1 Introduction
A Risk Management Framework for Aquaculture: The Case of Vietnamese Catfish Farming
A Risk Management Framework for Aquaculture: The Case of Vietnamese Catfish Farming A thesis submitted in fulfilment of the requirements for the degree of Doctor of Philosophy Cong Tru Le Bachelor of Science,
LIST OF ATTORNEYS IN THE HO CHI MINH CITY AREA
U.S. Consulate General - Ho Chi Minh City American Citizen Services Unit 4 Le Duan Blvd, Tel: (84-8) 3520-4200 Fax: (84-8) 3520-4231 Website: http://hochiminh.usconsulate.gov Email: [email protected] LIST
Poverty and Inequality Maps for Rural Vietnam
Public Disclosure Authorized Policy Research Working Paper 5443 WPS5443 Public Disclosure Authorized Public Disclosure Authorized Poverty and Inequality Maps for Rural Vietnam An Application of Small Area
Forum on Wind Energy Development between Germany and Vietnam, June 4 th, 2012, Ho Chi Minh City
Wind Energy Market development in Vietnam - Potentials and status quo Forum on Wind Energy Development between Germany and Vietnam, June 4 th, 2012, Ho Chi Minh City 1 Wind power resources and measurement
Meeting Urban Development Challenges
Discussion Draft Meeting Urban Development Challenges Its importance for both growth and poverty calls for a coherent national framework toward urbanization. The objective of such a framework should be
C onsistent growth JOINT STOCK COMMERCIAL BANK FOR FOREIGN TRADE OF VIETNAM. Báo cáo thường niên 2009. 198 Tran Quang Khai, Hoan Kiem, Hanoi, Vietnam
JOINT STOCK COMMERCIAL BANK FOR FOREIGN TRADE OF VIETNAM 198 Tran Quang Khai, Hoan Kiem, Hanoi, Vietnam 198 Tran Quang Khai, Hoan Kiem, Hanoi, Vietnam * Telex: 411504/411229 VCB VT Tel: 84-4-39343137 *
THE MBA PROGRAM INTERNATIONAL UNIVERSITY
THE MBA PROGRAM INTERNATIONAL UNIVERSITY The MBA program at International University is designed to help high potential candidates realize their full business and management visions. They will be equipped
Fixed-Income Research. Fixed-Income Report. Weekly report June 21 st,2016. Round-up
Fixed-Income Research Weekly report June 21 st,2016 Fixed-Income Report June/13 th 17 th /2016 In this issue Round up Bond market Interest rates Round-up Primary market remained active. Trading volume
How To File A Workers Compensation Claim In Texas
Texas Department of Insurance Division of Workers Compensation 7551 Metro Center Drive, Suite 100 MS-96 Austin, TX 78744-1645 (800) 372-7713 phone (512) 804-4146 fax Employer Notice of No Coverage or Termination
Addendum. Summary. Samenvatting (Dutch summary) Tóm tắt (Vietnamese summary) Acknowledgments. List of Publications.
Addendum Summary Samenvatting (Dutch summary) Tóm tắt (Vietnamese summary) Acknowledgments List of Publications Curriculum Vitae Previous Dissertations of SHARE Summary Medication safety is an issue worldwide.
TẬP HUẤN PHÁT TRIỂN MÔ HÌNH KINH DOANH RRR - HÀ NỘI 2014 -
TẬP HUẤN PHÁT TRIỂN MÔ HÌNH KINH DOANH RRR - HÀ NỘI 2014 - (RRR: Reduce - Reuse - Recycle : Giảm thiểu và Tái sử dụng năng lượng) Thông báo tới các Doanh nghiệp và Chuyên gia đào tạo cewas, tổ chức quốc
Itinerary for University of Montana Vietnam Study Abroad Program. 28 December 2014 to 20 January 2015
Itinerary for University of Montana Vietnam Study Abroad Program 28 December 2014 to 20 January 2015 Sunday 28 December 9:50 am 11:40 pm Monday 29 December 8:45 am 9:45 am 10:00 am 1:30 pm 3:30 pm 5:30
Urban governance performance combined approach for medium sized city in Vietnam
Urban governance performance combined approach for medium sized city in Vietnam Dr. Nguyen Ngoc Hieu 1 and M.A. Le Thu Hoai 2 Abstract: This article attempts to describe how to measure the performance
Weekly Report. Cassava and Starch Market. Making Sense of Vietnam Market
Weekly Report It is rumored among traders that the Ministry of Finance will soon release decision on export cassava chip duty by the end of this week Export cassava starch prices of Vietnam by seaway are
Lista rządowych planów rozwoju poszczególnych sektorów i dziedzin w gospodarce Wietnamu 25/02/2011
Lista rządowych planów rozwoju poszczególnych sektorów i dziedzin w gospodarce Wietnamu 25/02/2011 Nr Data Nazwa dokumentu 1 175/QD-TTg 27/01/2011 Decision of Prime Minister on Overall Development Strategy
and the finishing process of textiles / Phần đồng hội thảo KÉO SỢI (Phòng: )
Programme German Technology meets Vietnamese Textile Forum & B2B Matchmaking Chương trình Hội thảo: Công nghệ Đức đáp ứng Công nghiệp Dệt may Việt Nam Diễn đàn kết nối doanh nghiệp B2B 5 July 2016, Hanoi,
VIETNAM: SOCIAL HEALTH INSURANCE: CURRENT ISSUES AND POLICY RECOMMENDATIONS
SERIES: SOCIAL SECURITY EXTENSION INITATIVES IN EAST ASIA VIETNAM: SOCIAL HEALTH INSURANCE: CURRENT ISSUES AND POLICY RECOMMENDATIONS ILO Subregional Office for East Asia Decent Work for All Asian Decent
Building Capacity to Make Transport Work for Women and Men in Vietnam
EAST ASIA AND PACIFIC REGION Social Development Notes INNOVATIONS, LESSONS, AND BEST PRACTICE Building Capacity to Make Transport Work for Women and Men in Vietnam Gender and Transport Challenges Women
How To Understand The Market For Telecommunications In Vietnam
Vietnam Market for Telecommunications Equipment and Services By U.S. Commercial Service Vietnam June 2014 Overview 2012 2013 2014 2015 (estimated) (estimated) Total Market Size 4,600 5,000 5,750 6,600
Ex-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: Socialist Republic of Viet Nam Project: Regional and Provincial Hospital Development Project (II). Loan Agreement:
LIST OF ATTORNEYS IN THE HO CHI MINH CITY AREA
U.S. Consulate General - Ho Chi Minh City American Citizen Services Unit 4 Le Duan Blvd, Tel: (84-8) 3520-4200 Fax: (84-8) 3520-4231 Website: http://hochiminh.usconsulate.gov Email: [email protected] LIST
Waste Management in Vietnam Potential for power generation
Waste Management in Vietnam Potential for power generation Nguyen Thanh Lam Head of non-hazardous waste management division Waste Management and Environment Improvement Department www.renewables-made-in-germany.com
THE ETHNIC MINORITIES DEVELOPMENT PLAN OF AN GIANG PROVINCE
THE ETHNIC MINORITIES DEVELOPMENT PLAN OF AN GIANG PROVINCE I. OVERVIEW 1. Project overview The Vietnam: Improved Land Governance and Database project aims to provide better access to land information
How To Prevent Dementia In Old People
1 2 MINISTRY OF EDUCATION AND TRAINING MINISTRY OF HEALT Work completed at The National Institute Epidemiology (NIHE) of Hygiene and NATIONAL INSTITUTE OF HYGIENE AND EPIDEMIOLOGY -----------------*-----------------
ACCREDITATION COUNCIL FOR BUSINESS SCHOOLS AND PROGRAMS ACBSP ACCREDITATION FOR FACULTY OF ECONOMICS AND COMMERCE
ACCREDITATION COUNCIL FOR BUSINESS SCHOOLS AND PROGRAMS ACBSP ACCREDITATION FOR FACULTY OF ECONOMICS AND COMMERCE Vung Tau City Winter 2014 Outline What is accreditation? What is ACBSP? Why is ACBSP accreditation
Modernization of. Acupuncture on. scientific Reseach. and experiences of. acupuncture clinic. Work summary. By Prof.
Work summary Modernization of Acupuncture on scientific Reseach and experiences of acupuncture clinic By Prof. Nguyen Tai Thu Vice president, The World Federation of Acupuncture-Moxibustion Societies (W.F.A.S.)
THE 1 ST TRAINING COURSE ON TUNNELLING IN URBAN AREAS WEDNESDAY 09 FRIDAY 11 APRIL, 2014 1401 HALL RAILWAY PROJECT MANAGEMENT UNIT (RPMU)
Sponsored by ITA/CET THE 1 ST TRAINING COURSE ON TUNNELLING IN URBAN WEDNESDAY 09 FRIDAY 11 APRIL, 2014 AREAS HANOI, VIET NAM 1401 HALL RAILWAY PROJECT MANAGEMENT UNIT (RPMU) Plot D20 Ton That Thuyet Street,
How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam
FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,
Plan on establishment of National Committee on Geographical Names and Spatial Data Infrastructure in Viet Nam *
UNITED NATIONS E/CONF.104/IP.23 ECONOMIC AND SOCIAL COUNCIL Twentieth United Nations Regional Cartographic Conference for Asia and the Pacific Jeju, 6-9 October 2015 Item 7(b) of the provisional agenda
National technical regulation for bottled/packaged natural mineral waters and drinking waters
QUY CHUẨN KỸ THUẬT QUỐC GI ĐỐI VỚI NƯỚC KHOÁNG THIÊN NHIÊN VÀ NƯỚC UỐNG ĐÓNG CHI National technical regulation for bottled/packaged natural mineral waters and drinking waters I. QUY ĐỊNH CHUNG 1. Phạm
ABORTION IN PRESENT DAY VIETNAM
ABORTION IN PRESENT DAY VIETNAM Nguyen Thanh Binh Ph.d student, Free University of Berlin, Germany E-mail: [email protected] Abstract In recent years, the abortion rate in Vietnam has been likely
A preliminary analysis of flood and storm disaster data in Viet Nam
A preliminary analysis of flood and storm disaster data in Viet Nam Oanh Luong Nhu, Nguyen Thi Thu Thuy, Ian Wilderspin and Miguel Coulier March 2011 1 A preliminary analysis of flood and storm disaster
Productive Strategies for Poor Rural Households to Participate Successfully in Global Economic Processes Counrty Report for Vietnam
Productive Strategies for Poor Rural Households to Participate Successfully in Global Economic Processes Counrty Report for Vietnam Research Themes Emerging themes: According to the Director of the Insitute
OUTLINE OF VIETNAMESE HISTORY
Rice Fields at Bac Hamlet by Phan Ke An OUTLINE OF VIETNAMESE HISTORY RESISTANCE TO THE CHINESE 1st Millennium B.C. 2nd Century B.C. Period of the Hung Kings, Bronze Age Annexation by the Han Chinese Empire
Annex 5.1. Example Waste Management Strategy
Annex 5.1 Example Waste Management Strategy This Annex presents an example Waste Management Strategy prepared during field testing of a draft of this Strategic Planning Guide. The Strategy is for the cities
List of Lawyers in Ho Chi Minh City Updated: January 2015
List of Lawyers in Ho Chi Minh City Updated: January 2015 Prepared by British Consulate-General in Ho Chi Minh City www.gov.uk The following list of lawyers has been prepared by the British Consulate-General
How To Write A Patent In Vietnam
Intellectual Property Vietnam & Indochina Team 225784-v v2\handms A member firm of Baker & McKenzie, BMVN International LLC ("BMVN") is a fully licensed law firm and Intellectual Property ("IP") agent
--o0o-- VIETNAM FORUM 2016 VIETNAM: THIRTY YEARS OF DOI MOI AND BEYOND
--o0o-- VIETNAM FORUM 2016 VIETNAM: THIRTY YEARS OF DOI MOI AND BEYOND Thursday Friday, 7-8 April 2016 ISEAS-Yusof Ishak Institute Seminar Rooms 1 & 2 Singapore DRAFT PROGRAMME (as of 29 February 2016)
Intellectual Property
Intellectual Property Vietnam & Indochina Team 247916-v3A\HANDMS A member firm of Baker & McKenzie, BMVN International LLC ("BMVN") is a fully licensed law firm and Intellectual Property ("IP") agent in
VIETNAM FORUM ON LIFELONG LEARNING: BUILDING A LEARNING SOCIETY. ILO Director Ms. Rie Vejs-Kjeldgaard Hanoi, 6-8 December 2010
VIETNAM FORUM ON LIFELONG LEARNING: BUILDING A LEARNING SOCIETY ILO Director Ms. Rie Vejs-Kjeldgaard Hanoi, 6-8 December 2010 Deputy Prime Minister Nguyen Thien Nhan, cum Chairman of the National Steering
INDEPENDENT AUDITOR S REPORT THU DUC TRADING AND IMPORT EXPORT JOINT STOCK COMPANY
Audit and Consulting Co., Ltd. Member of Reanda International Head office: 156 158 Pho Quang, ward 09, Phu Nhuan district, HCMC. Registered Office: 33 Phan Van Khoe street, ward 13, district 5, HCMC. Tel:+84
To address the effect of organic fertilizers on rice insect pests and diseases, an experiment was carried out in Cuulong Delta Rice Research
Omonrice 13: 26-33 (2005) EFFECTS OF ORGANIC FERTILIZERS ON INSECT PEST AND DISEASES OF RICE Luong Minh Chau 1 and K.L Heong 2 1 Cuullong Delta Rice Research Institute Co Do, Can Tho, Vietnam 2 International
