When fitting anodes to wooden or GRP hulled vessels remember: Hull Anode Installation
|
|
|
- Angelica Terry
- 9 years ago
- Views:
Transcription
1 When fitting anodes to wooden or GRP hulled vessels remember: The anode should be position on the outside of the hull below the waterline. The anodes can "see" the parts to be protected. The fixing studs are located above the bilges. The anode location ensures the minimum run of bonding cable to the parts to be protected. There must be reasonable internal access to the studs. The anode should not be positioned forward of or in line with Echo Sounding Transducers or log Impellers. Hull Anode Installation Stiffen the inside of the hull where the anode is to be fitted if necessary. Drill holes to take the fixing studs at the appropriate centres. On wooden hulled vessels studs should be sleeved or painted to insulate them from the surrounding timber. When sleeving the stud either use a heat shrink tube or ensure that the inside of the sleeve is packed with a suitable marine grade sealant. Before inserting and securing each stud assembly, apply a generous amount of marine grade sealant to the shank and collar where the stud touches the hull to ensure a good seal. Whenever an anode is fitted to a GRP or wooden hull an anode backing sheet must be used to control the wastage of the anode and protect the hull. The anode backing sheet should be replaced each time the anode is replaced. Always ensure that the anodes are fitted with MGDUFF Fan Disc Washers under the securing nuts which will help to assure the contact between anode and cathodic protection system. The fan disc washers and nuts should be replaced each time the anode is replaced. Protect the anode fixing studs on assembly with paint or grease inside and outside the vessel. DO NOT PAINT THE WORKING SURFACE OF THE ANODE
2 Bonding the Cathodic Protection system The correct bonding of the cathodic protection system is imperative. Use 4mm2 PVC Insulated Multi-Stranded Copper Cable or larger. Ensure that all connections are clean and tight. The best way to bond the anode to the shaft is by using a MGDUFF Electro Eliminator as well as bonding the anode to the gear box or Engine casing. Insulated Flexible Couplings should be bridged by using a short length of bonding cable or a copper strap to carry through the contact between anode shaft and propeller. Bronze and Stainless Steel Rudders, Rudder Hangings and Shaft Brackets should also be bonded to the main anodes. Trim Tabs should be protected with separate anodes. Do not bond the same anode to ferrous and non-ferrous metals. Steel Rudders must be protected with separate anodes. Timber hulled vessels may be prone to electro-chemical decay and owners are recommended to contact MGDUFF for specialist advice or visit our website for more details. Fitting Instructions for Steel Hulled Vessels The main points to remember are: The anode should be position on the outside of the hull below the waterline under the turn of the bilge. ठʻ The anode should not be positioned forward of or in line with Echo Sounding Transducers or log Impellers.
3 Anodes may be welded or bolted to a steel hull NOTE: When fitting and replacing Bolt-On Anodes always ensure that the serrated fan disc washers are replaced. ठʻ DO NOT PAINT THE WORKING SURFACE OF THE ANODE To provide the best protection to the stern gear the shaft should be fitted with an MGDUFF Electro Eliminator Brush and earthed to the hull. Additionally the gearbox should be bonded to the hull using 4mm2 multi strand cable and any flexible couplings in the shaft should be bridged with a copper strap or cable.. The MGDUFF Electro-Eliminators offer the most effective shaft bonding solution. Running directly onto the propeller shaft the electro eliminator puts the anode on constant low resistance contact with the propeller shaft. The copper graphite brushes will give at least 2000 running hours under normal conditions. The electro eliminators will also remove the irritating interference to electronic equipment caused by the rotating shaft. Fitting Instructions for Aluminium Hulls NOTE: When fitting and replacing Bolt-On Anodes always ensure that the serrated fan disc washers are replaced.
4 To provide protection to the stern gear the shaft should be fitted with an MGDUFF Electro Eliminator Brush and earthed to the hull. Additionally the gearbox should be bonded to the hull using 4mm2 multi strand cable and any flexible couplings in the shaft should be bridged with a copper strap or cable. Anode Positioning 1. Position anodes around underwater hull as shown Below. Positions may be adapted slightly to suit individual vessels. 2. Prepare and paint the hull in accordance with a reputable paint manufacturers specification before anodes are fixed. 3. Fit anodes using galvanised mild steel set bolts with fan disc washer making sure that the anodes are pulled up tight against the hull. 4. No paint must be allowed to fall on the surface of the anode itself at any time. Maintenance To ensure correct level of protection anodes should be replaced when 80% consumed or if it is anticipated that they will be more than 80% consumed at the next scheduled docking. Ӂ Type ZD42 strip anodes This is a low profile zinc anode with a non reactive aluminium insert, ideally suited for fitting to high speed aluminium hulled vessels. The anode is not recessed but prominent on hull surface and can be attached after construction. Each anode requires 3 or more fixing positions:- ZD42/36" and ZD42/54" -3 fixing positions ZD42/72" -5 fixing positions (7 on fast craft). The ZD42 anode is supplied in 6ft (1830mm) lengths and may be cut to length. It can be supplied un-drilled or drilled and counter bored to standard centres, Fixing holes are drilled to suit 10mm studs and it is imperative that the fixing hole is counter bored down to the aluminium core. This shows a typical installation (suitable for attachment after construction).
5 This shows a typical installation (showing fitting arrangement for new buildings.) Hull mounted ZD55 Recessed Disc Anodes This 9" (225mm) diameter anode is generally utilised for flush mounting when minimum drag is required and is therefore normally incorporated on new construction where the circular recess can be arranged more easily Type ZD72B(M) Zinc Hull Anode This low profile cast anode is suitable for lower speed craft, where the surface ۉ仐 mounting will not result in excessive drag. It can be attached after construction. Fitting instructions for Ferrocrete vessels
6 (To be read in conjunction with the Anode Selection and Fitting Instructions for GRP Vessels) This type of construction requires some special consideration but in principal we recommend that vessels of this type are treated in the same way as a GRP hull but with regard to the following: As far as possible the hull steel reinforcement must be isolated from any metal work that is connected to the cathodic protection system. e.g. shaft brackets rudder bearings and glands as well as the anode itself. It is unlikely that the hull steel reinforcement can be completely isolated and it will put some demand on the sacrificial anode. It is important to select a big enough anode to provide sufficient protection for this. We recommend that when selecting the correct anode for your boat you refer to the Anode selection page for GRP Hulls in Salt Water and select the anode which is a size larger than that recommended for conventional GRP hulled vessels of the appropriate class. Mild Steel Rudders, Skegs and Bilge Keels should be protected using the ZD58 Zinc Disc Anode. When installing the anode on a ferrocrete hull ensure that: ەp (a) The anode fixing studs are isolated from the hull steel reinforcement by fitting a plastic insulating sleeve to the shank of the stud and applying a generous amount of marine grade sealant. (b) The Anode fixing stud collar should be bedded in several layers of Glass Fibre and Epoxy Resin. (c) The Anode should be fitted with a rubberised foam backing pad. (d) Always ensure that the anode is fastened with serrated washers under the fixing nuts to ensure a good connection. (e) The anode should be bonded in accordance with the instructions for a GRP hulled vessel as detailed in the above brochure.
7 Fitting Instructions for Copper Sheathed and Copper Clad Vessels. ( To be read in conjunction with the Anode Selection and Fitting Instructions for GRP Vessels ) The copper must be cut back to 20mm clear of the anode fixing studs collars. A pad of 6mm thick marine plywood is to be fitted between the rubberised anode backing sheet and the copper sheathing. The pad must be painted with an epoxy resin paint system or similar and is to be well bedded with marine grade sealant. The pad should extend at least 15mm clear of the anode and over the area where the copper has been cut back clear of the studs. ەp The copper must not be allowed to be in contact with any metal work which is being cathodically protected. The copper must be cut back from the outer end of the stern tube and any other metal fittings that are bonded into the cathodic protection system e.g. shaft brackets rudder bearings and glands if these are to be protected. It is advisable to check that the cathodic protection system is isolated from the copper using a suitable multi-meter. Where the copper has been cut back areas of exposed hull especially wooden hulls should be well painted with an appropriate epoxy resin paint system or similar. Metallic based anti-fouling must not be used on the plywood pad or on the areas where the copper has been cut back.
8 When selecting the correct anode for your boat please refer to the page for Cathodic Protection for GRP vessels in Salt Water and select the anode which is a size larger than that recommended for conventional GRP hulled vessel. Fitting Electro Eliminators Whether your boat is steel or GRP to provide the best protection to the stern gear the shaft should be fitted with an MGDUFF Electro Eliminator Brush. The MGDUFF Electro-Eliminators offer the most effective shaft bonding solution. Running directly onto the propeller shaft the electro eliminator puts the anode on constant low resistance contact with the propeller shaft. The copper graphite brushes will give at least 2000 running hours under normal conditions. The electro eliminators will also remove the irritating interference to electronic equipment caused by the rotating shaft. Electro Eliminator Number 1 for up to 2" diameter shafts (includes support bracket as shown) ەp Electro Eliminator Number 2 for 2" - 8" diameter shafts. (A support bracket must be fabricated to suit the installation of the unit, not supplied) Fitting Instructions for Shaft Anodes MGDUFF offer the widest range of shaft anodes in terms of type and size and material. It should be understood that this format of Cathodic protection although simple to fit affords a far lower degree of protection to the systems listed elsewhere on the website. In order to afford maximum protection the surface area of the anode must relate in ratio to that of the surfaces it is endeavouring to protect. A standard often impossible to achieve due to the products design. The fitting of more than one shaft anode can sometimes overcome this problem.
9 MGD - Super shaft anode, unlike the ZSA this shaft anode has a built in core bar which holds the anode firmly in place through the duration of its life. Available in Zinc & Aluminium ZSA - Standard shaft anode. Available in Zinc. 㖀 ی ZSC - Shaft Collars, designed for installation where only a minimum amount of shaft is visible.
Transducer Installation
Transducer Installation This document covers the installation of all 83/200kHz, 50/200kHz and Downscan transducers using transom and shoot-thru hull installation methods, where applicable. This manual
1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.
MINI BIKE PLANS Page 1 INTRODUCTION Before starting to build your Mini-Bike, be sure that you have all the parts shown on the material list. You will note that tubing has been used in the construction.
Traditional Sonar and DSI Sonar Installation
Traditional Sonar and DSI Sonar Installation This document covers the installation of the transducer and display unit installation, which includes connecting the unit to power and installing the unit on
RAUFOSS EXPLOSIVE COMPRESSION FITTINGS
INSTRUCTION MANUAL FOR RAUFOSS EXPLOSIVE COMPRESSION FITTINGS Box 7 2831 Raufoss Norway Tlf.: +47 61 15 17 87 Fax: +47 61 15 25 56 25 January 2013, rev 2 Available on www.vpmetall.no Page 1 CONTENTS GENERAL
Crevice Corrosion on Stainless Steel Propeller Shafts
Crevice Corrosion on Stainless Steel Propeller Shafts A Quick Summary: What is it? How to Prevent it. How to Repair it. Stainless steel propeller shafts and running gear are subject to pitting & crevice
Shaft grounding. Carbon brushes for shaft grounding are used in turbo-generators, in distinct AC- and DC motors and as a special application in Ships.
"Modern AC-Motors don't need carbon brushes and are maintenance free " Until some years ago this thrilling statement could be heard from motor OEM's. Nowadays SCHUNK supplies carbon brushes and brush holders
CATHODIC PROTECTION SYSTEM DESIGN
CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of
The Ford Model A Water Pump
The Ford Model A Water Pump George Washington Chapter, Inc. 3903 Old Lee Highway Fairfax, VA 22030 1 Table of Contents Introduction/Specifications.. 3 1. Water Pump Inspection and Removal. 4 a. Removal..
Video Camera Installation Guide
Video Camera Installation Guide The intent of this guide is to provide the information needed to complete or modify a video camera installation to avoid lightning and induced power surge damage. This guide
INSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER
Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Please read before beginning Stainless steel hardware
Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions
ABS-Lock X / X - SR Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions The ABS-Lock X system was developed to provide both a secure single anchorage point for
Installation instruction CASAFLEX - Connecting piece DN 100
1 CASAFLEX - 11 10 114,3 x 4,5 3 5 2 4 1 7 6 8 12 9 Do not begin work until you have read the installation instruction carefully. 1 internal backing sleeve 2 graphite packing 3 connecting piece 4 thrust
TARIFF CODE and updates standard
TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of
2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure
2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure Derek Guenther 1/28/2015 Rev. Purpose The purpose of this document is to describe the procedure necessary to replace one of the ball nuts
Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing
Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
Volkswagen B3 Passat Manual Transmission 02A 34 Manual Transmission - Controls, Assembly (Page GR-34) 02A 5-speed. Gearshift cable/lever installing
34 Manual Transmission - Controls, Assembly (Page GR-34) 02A 5-speed Gearshift cable/lever installing Gearshift housing repairing Gearshift lever repairing lever/relay lever, installing Gearshift mechanism
Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
Awning Instructions. Standard Manual 1.5m to 4.5m
Awning Instructions Standard Manual 1.5m to 4.5m English Standard Manual Instructions Contents Warning 1.5m 3.0m Awnings 4 x Expansion bolts (2 per bracket)** 2 x brackets 1 x Awning 1 x Winder handle
Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls
Pre- insulated pipe systems ecoflex Wall Penetration installation guide Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls Pre-insulated Pipe Systems
CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page
CHAPTER 65 TAIL ROTOR DRIVE SYSTEM Section Title Page 65-00 Description........................................ 65.1 65-10 Tail Rotor Drive Fan Shaft.............................. 65.1 65-20 Tail Rotor
16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1
16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 BD Adjustable Track Bar w/bracket Dodge 2500-3500 4WD Models 1994-2002 Dodge 1500 4WD Model 1994-2001 P/N# 1032011-F
TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR
TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR 1.1.0 SCOPE : This specification covers design, manufacture, testing at manufacture s works before
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
StructureScan Installation
StructureScan Installation Contents Your StructureScan box is packed with the LSS-1 black box, a Power cable, StructureScan transducer, mounting bracket, 15 foot (4.5m) ethernet cable and a hardware kit.
0WKM070002 KENWOOD "EU" KM070 KENWOOD COOKING CHEF *901.400. 901400 ev ol 2012/06
*901.400 KENWOOD COOKING CHEF 1 2 3 4 5 6 63 43 44 45 46 29 13 40 42 7 8 39 9 38 11 37 49 50 47 10 53 14 15 16 54 17 21 18 19 36 35 34 55 56 57 22 20 23 33 28 62 60 58 27 26 59 61 25 24 76 108 107 103
Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors
Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...
Specifications for Programs: 737, 747, 757, 767, 777, 787
= Performed by GKN BAC 5000 AN General Sealing 6-262, 6-265, 6-267, 6-270 PSD for 787 Only: 6-242, 6-269, 6-271 PSD for 777 Only: 6-261,6-264, 6-266, 6-269, 6-271 BAC 5004 L Installation of Permanent Fasteners
10 deg 4 4.3 4.6 4.9 5.2 5.5 6 6.3 6.7 7.1 7.4 7.7 8 8.3 8.6. 12 deg 4.8 5.2 5.6 6 6.4 6.8 7.2 7.6 8 8.4 8.8 9.2 9.6 10 10.4
max-prop utomatic Feathering Propeller Installation Instructions TR L LSSI 1) INTROUTION: Thank you for having chosen a Max-Prop automatic feathering propeller for your vessel. This instruction booklet
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL
HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL Please read these instructions carefully and completely before attempting to install Hale Pet Doors; they will guide you through the steps
Terminal Boxes Series 8146
Series > Enclosures in shock-resistant glass fibre reinforced polyester resin > basic enclosure sizes various heights > Fitted according to the customer's requirements > For terminals up to max. 00 mm
Build Your Own Solar Car Teach build learn renewable Energy! Page 1 of 1
Solar Car Teach build learn renewable Energy! Page 1 of 1 Background Not only is the sun a source of heat and light, it s a source of electricity too! Solar cells, also called photovoltaic cells, are used
DTU Animal Cart Programme
DTU Animal Cart Programme TECHNICAL 21 RELEASE PIPE AND ROLLER DONKEY CART AXLES Development Technology Unit, Department of Engineering, University of Warwick, Coventry, CV4 7AL UK, tel: +44 (0)1203 523523
Anodes and Misc Equipment
Anodes and Misc Equipment Application: Platinised Titanium Anodes Platinised titanium anodes are recommended for use in the following electrolytic processes:- Precious metal electroplating - e.g. Au, Pt,
Dismantling and Reassembly Guide
Super X3 Mill Dismantling and Reassembly Guide A picture story book to help you dismantle and reassemble your Sieg Super X3 Mill Arc Euro Trade Ltd. 10 Archdale Street, Syston, Leicester, LE7 1NA. Web:
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
HOW TO MAKE A MOTOR BRACKET
HOW TO MAKE A MOUNTING BRACKET FOR AN ELECTRIC MOTOR Often, brackets supplied with purchased items (e.g. electric motors or servos) are not ideally suited for fitting into our models or they are not supplied
LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions
LORTONE LU6X-130 Item # 061-092 LU6X Basic Item # 061-090 LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions Introduction The LU6X is one the most versatile pieces of equipment
Drive shaft, servicing
Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,
NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE
B4 NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE AVAILABLE IN CARBON AND STAINLESS STEEL 23 THEORY
172 Holesaws Overview Bosch Accessories for Power Tools 09/10. 189 Diamond holesaw. with Power-Change adapter. 190 Diamond drill bits
Holesaw 172 Holesaws Overview Bosch Accessories for Power Tools 09/10 Overview 178 Progressor holesaw 189 Diamond holesaw 196 Hole cutters 183 Sheet Metal holesaw 190 Diamond drill bits 186 Multi Construction
Standard Sleep Pod Side Entry Assembly Instructions
Standard Sleep Pod Side Entry Assembly Instructions www.podtime.co.uk [email protected] Working House Ltd How to assemble your pod Pod assembly onsite is a relatively simple exercise for two people
1.8 CRANKSHAFT OIL SEALS
SERIES 60 SERVICE MANUAL 1.8 CRANKSHAFT OIL SEALS An oil seal is fitted between each end of the crankshaft and the bores of the flywheel housing and gear case cover to retain the lubricating oil in the
Sliding and Folding Door Fittings Sliding Door Accessories
Sliding door lock Toplock For 1- and 2-leaf sliding doors Suitable for toughened safty glass and laminated sheet glass Suitable for DIN left and DIN right Max. weight per door leaf 120 kg For glass thickness:
Annex 4: FRP CONSTRUCTION STANDARDS*
Annex 4: FRP CONSTRUCTION STANDARDS* 1.1 Definitions For the purpose of these recommendations, unless expressly provided otherwise, the following definitions apply: 1.1.1 readth ()** is the maximum breadth
Dometic turbo Direct expansion
Dometic turbo Direct expansion AIR CONDITIONING SYSTEMs installation manual Dometic Environmental Corporation Rev. 20140321 L-2484 DOMETIC TURBO DX AC INSTALLATION MANUAL CONTENTS Introduction 4 Installation
ROVs in a Bucket Building an Underwater Robot. 3.0 ROV Thrusters & Propeller Attachment. 3.1 Propulsion
3.0 ROV Thrusters & Propeller Attachment 3.1 Propulsion ROV s move forward and back, up and down, and to the left and right. They can make all of these moves without the benefit of a rudder. With three
PART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY
GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced
SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
SPECIFICATIONS FOR BOON EDAM TOMSED MODEL TUT-65TMB
SPECIFICATIONS FOR BOON EDAM TOMSED MODEL TUT-65TMB PRODUCT DESCRIPTION: BOON EDAM TOMSED MODEL TUT-65TMB STAINLESS STEEL BARCODE SCANNING ELECTRONIC REGISTERING TURNSTILE SCOPE OF OPERATION: A. The TUT-65TMB
Slide the new steering column shaft through the steering column from the driver compartment.
Slide the new steering column shaft through the steering column from the driver compartment. Push the column shaft through the steering column until the machined end is out past the column lower bushing.
PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES
PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES BUSHING WITH PLUG CONNECTION WITH OUTER CONE PPS CHARACTERISTICS The PPS bushing can be used as a fixed section for the entry of medium
Two most common lock nut groups: 1-Prevailing Torque Type Lock Nuts:
Two most common lock nut groups: 1. PREVAILING TORQUE a design feature of the lock nut produces friction between threads of mated components thereby increasing the force needed to tighten as well as loosen
Operating Instructions
Operating Instructions Cable Glands Ex d and Ex e with Compound > Contents 1 Contents 1 Contents...2 2 General Information...2 3 General Safety Information...3 4 Designated Use...4 5 Technical Data...4
WATER & SEWER CORROSIVE RESISTANT PRODUCTS
WATER & SEWER CORROSIVE RESISTANT PRODUCTS The Standard of Excellence in the Industry CASING SPACERS COUPLINGS & FLANGE COUPLING ADAPTERS REPAIR CLAMPS DUCTILE IRON SADDLES STAINLESS STEEL SADDLES TAPPING
DYNA RIDER FOOTBOARD KIT
-J0 REV. 0-0-0 DYNA RIDER FOOTBOARD KIT GENERAL Kit Number 000 Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com (English
POLE MOUNT SYSTEM-3 INSTALLATION
1 May 2014 POLE MOUNT SYSTEM-3 INSTALLATION The Pole Mount System-3 is an easy to install and flexible system designed to allow ONE SYSTEMS loudspeaker products to be mounted to pole structures. The only
)454, !,5-).)5- #!",% 3(%!4(3 #/.3425#4)/. ).34!,,!4)/.!.$ 02/4%#4)/. /& #!",%3!.$ /4(%2 %,%-%.43 /& /543)$% 0,!.43. )454 Recommendation,
INTERNATIONAL TELECOMMUNICATION UNION )454, TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU #/.3425#4)/. ).34!,,!4)/.!.$ 02/4%#4)/. /& #!",%3!.$ /4(%2 %,%-%.43 /& /543)$% 0,!.43!,5-).)5- #!",% 3(%!4(3
Atomic Structure. Atoms consist of: Nucleus: Electrons Atom is electrically balanced equal electrons and protons. Protons Neutrons
Basics of Corrosion Performance Metals Sacrificial anode manufacturer Specialize in aluminum alloy anodes All products made in the USA (Berks county, PA) ISO9001/2001 Certified Quality System Also traditional
STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES
GATE VALVE O.S. & Y 1.0 Periodic Inspections 1.1 The valve stem packing should be inspected at least monthly. If the stem packing shows signs of leakage, simply tighten the adjusting nuts to compress the
Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.
DIAMOND Gear Company, LTD. an ERIKS Company. Installation, Maintenance, & Operation Manual Declutchable Worm Gear
DIAMOND Gear Company, LTD. an ERIKS Company Installation, Maintenance, & Operation Manual Declutchable Worm Gear 2016 DECLUTCHABLE WORM GEAR INSTRUCTIONS This is an instructional manual which provides
TRITON CONTAINER INTERNATIONAL. Reefer Technical Bulletins. Version 4.0
TRITON CONTAINER INTERNATIONAL Version 4.0 February 2013 Table Of Contents (Hold Ctrl button and click on any item below to go directly to that section of the manual.) 1 INTRODUCTION... 3 2 REFRIGERATED
GPD Rubber Press Seals
GPD Rubber Press Seals Leading in in ideas SYSTEM-TECHNIK GPD Rubber Press Seals Design Available with a rubber thickness of 30 mm for sealing against non-pressing water and a rubber thickness of 60 mm
Embedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
TotalScan Transducer Installation manual
TotalScan Transducer Installation manual ENGLISH www.simrad-yachting.com www.lowrance.com 1 Preface Warning: It is your sole responsibility to install and use the instrument and transducer(s) in a manner
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X.
LK Wallbox UNI Push Only intended for LK PE-X Universal Pipe X. LK Wallbox UNI Push 16 Single Article no. 188 06 38 LK Wallbox UNI Push 20 Single Article no. 188 06 39 LK Distance template LK Wallbox UNI
Solstice/Sky Water Pump Replacement
Solstice/Sky Water Pump Replacement The water pump on the Solstice/Sky is starting to need replacement on some vehicles. This guide will help in replacing the water pump while the engine is still in the
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
Mechanical Installation
Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s
Front brakes (FN- 3), servicing
j a t Front brakes (FN- 3), servicing 46-1 Front brakes, servicing Note: Install complete repair kit. After replacing brake pads and before moving vehicle, depress brake pedal several times firmly to properly
New in the PFERD Product Line 204
COMBICLICK Fibre Discs COMBICLICK fibre discs Silicon carbide SiC D The silicon carbide SiC type is suitable for working on aluminium, copper, bronze, titanium, high-alloy steels and fibre reinforced plastics.
jbs nfb INSTALLATION INSTRUCTIONS AND OWNERS MANUAL Mechanical Steering for Inboard, Outboard, and Sterndrive Powered Vessels
MEMBER INSTALLATION INSTRUCTIONS AND OWNERS MANUAL Part # IS-SH5094, Rev 3, 04/204 www.seastarsolutions.com SH5294 DUAL SH5094 SINGLE jbs nfb Mechanical Steering for Inboard, Outboard, and Sterndrive Powered
3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form
3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO
Rebuild Instructions for 70001 and 70010 Transmission
Rebuild Instructions for 70001 and 70010 Transmission Brinn, Incorporated 1615 Tech Drive Bay City, MI 48706 Telephone 989.686.8920 Fax 989.686.6520 www.brinninc.com Notice Read all instructions before
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
Rollers. from the UK s largest roller manufacturer. Quality Performance Reliability
Rollers from the UK s largest roller manufacturer Quality Performance Reliability 42 Index Gravity Rollers Light to Medium Duty 4 Heavy Duty 5 Plastic Rollers 6 Stainless Steel Rollers 7 Grooved Rollers
Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)
17 Engine-Lubrication system (Page GR-17) Lubrication system components, removing and installing Oil pan, removing and installing Oil pressure and oil pressure switch, checking Dynamic oil pressure warning
MM 45 Charter Catamaran Subchapter "T" - 49 Passenger
MM 45 Charter Catamaran Subchapter "T" - 49 Passenger Make: MM 45 Charter Catamaran Model: Subchapter "T" - 49 Passenger Length: 45 ft Price: $ 600,000 Year: 2015 Condition: New Location: Portland, United
Installation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
Removable Aluminium posts
Post Solent Sail Shades Ltd 120 Billington Gardens Hedge End Southampton SO30 2RT Tel/Fax: 01489 788243 www.solentsailshades.co.uk Email: [email protected] Removable Aluminium posts Single Pole
FOR ANY QUESTIONS, PLEASE CALL US @ 727.347.9915 M-F 8:00a.m.-8:00p.m. EST. REAR BRAKES 1 AEROSPACE COMPONENTS 727.347.9915
REAR BRAKES 1 AEROSPACE COMPONENTS 727.347.9915 REAR BRAKES Before getting started, remove all stock braking components. Pre-assembly of parts: Clean the bolts and the threads in the hat with acetone.
How to build a Pizza Oven in 4 days
How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY
Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork
Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork HVAC - Fire protection of metal ductwork Fire protection Thermal insulation Isover ULTIMATE TM Protect - Fire protection
Seismic Installation for Attic Storage System
Your Performance Partner Seismic Installation for Storage System CONTENTS SSafety Precautions................................. 2 Required Tools..................................... 2 Parts and Fastener
MGB Chrome Bumper Conversion
MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different
Tremco Fire Protection Systems Group Technical Bulletin
Compartmentalization products and design play a key role in protecting lives and property from fire. Understanding the tools and techniques available for firestopping is of utmost importance to designers,
WiMo Antennen und Elektronik GmbH Am Gäxwald 14, D-76863 Herxheim Tel. (07276) 96680 FAX 9668-11
The I-PRO Traveller part no. 11440 Thank you for your purchase, please take your time to digest some of the important building tips and the essential matching/adjustment techniques. You will need 8m of
SERIES NG 1800 STRUCTURAL STEELWORK
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General
SPECIFICATIONS FOR TENDER NO: PSNR/SCP/VKS/E 1635 ANNEXURE I TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST
TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST ANNEXURE I Sl.No. Description for BHEL Requirement Offered Deviation Scope of supply, erection and commissioning: 1 The scope of this specification covers
Happy boating from the Yacht Thruster team!
Thank you for your purchase of the Yacht Thruster system. We are sure you will be pleased with its operation, reliability and durability. If we can be of assistance to you at any time please do not hesitate
Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 46 Brakes - Mechanical Components (Page GR-46)
46 Brakes - Mechanical Components (Page GR-46) Front brakes Brake pads, removing and installing Brake pads, removing and installing FN 3 brake caliper, servicing FS III brake caliper, servicing Rear wheel
Lead & Magnet Wire Connection Methods Using the Tin Fusing Method Joyal A Division of AWE, Inc.
Lead & Magnet Wire Connection Methods Using the Tin Fusing Method Joyal A Division of AWE, Inc. Abstract The technology for connecting lead and magnet wires for electric motors and electro mechanical devices
Solicitation DTFACN-11-R-00079 Attachment #9
These specs are only a general overview of the typical VOR Roof construction. These are for reference only. Each individual project will have its own specifications. 1 VOR Roof Projects IDIQ Solicitation