1 Report No. UT IN-SITU CULVERT REHABILITATION: SYNTHESIS STUDY AND FIELD EVALUATION Prepared For: Utah Department of Transportation Research Division Submitted By: The Utah Water Research Laboratory Utah State University Authored By: Travis Hollingshead Dr. Blake P. Tullis June 2009
2 In-situ Culvert Rehabilitation: Synthesis Study and Field Evaluation Final Report Prepared For: Utah Department of Transportation Research Division Submitted By: Utah Water Research Laboratory Utah State University Authored By: Travis Hollingshead Dr. Blake P. Tullis June 2009 ii
3 1. Report No. UT Technical Report Documentation Page 2. Government Accession No. LEAVE BLANK 3. Recipient's Catalog No. LEAVE BLANK 4. Title and Subtitle IN-SITU CULVERT REHABILITATION: SYNTHESIS STUDY AND FIELD EVALUTATION 7. Author Travis Hollingshead, Dr. Blake P. Tullis 5. Report Date June Performing Organization Code LEAVE BLANK 8. Performing Organization Report No. 9. Performing Organization Name and Address Utah Water Research Laboratory Utah State University 8200 Old Main Hill Logan, UT Sponsoring Agency Name and Address Utah Department of Transportation 4501 South 2700 West Salt Lake City, Utah Work Unit No. 8RD0838H 11. Contract or Grant No Type of Report & Period Covered FINAL, INTERIM, ETC. 14. Sponsoring Agency Code PIC No. UT Supplementary Notes Prepared in cooperation with the Utah Department of Transportation or U.S Department of Transportation, Federal Highway Administration 16. Abstract This synthesis study evaluated culvert rehabilitation (repair) methods involving trenchless technologies that may be appropriate for use in Utah. This report is not intended as a replacement for installation manuals provided by the manufacturers but rather provides a brief description of each method, installation procedures, and highlights the advantages and disadvantages of each. Segmental lining is cost effective in Utah and the most common method of culvert rehabilitation in most western state highway culverts. Cured-in-place pipe and fold-and-form methods are also common but the costs are higher than segmental lining. DOT maintenance personnel can often carry out segmental lining, while contractors with specialized skills and equipment are required for all other methods. This report also presents a survey of culvert relining project costs (western states) and a discussion on burial depth limitations and end treatments. The information provided was obtained through a literature review, surveys of various western State DOTs and interaction with the Utah Department of Transportation (UDOT). A flip chart and installation video were developed for segmental lining as part of this study, with the majority of effort coming from UDOT personnel. Table 1 at the end of the report summarizes the main disadvantages, advantages, and limitations for each culvert relining method. 17. Key Words culvert rehabilitation, segmental lining, fold-and-form, cured-in-place 18. Distribution Statement UDOT Research Division 4501 South 2700 West-box Salt Lake City, Utah Registrant's Seal LEAVE BLANK 19. Security Classification Unclassified 20. Security Classification Unclassified 21. No. of Pages Price LEAVE BLANK iii
4 DISCLAIMER The authors alone are responsible for the preparation and accuracy of the information, data, analysis, discussions, recommendations, and conclusions presented herein. The contents do not necessarily reflect the views, opinions, endorsements, or policies of the Utah Department of Transportation and the US Department of Transportation. The Utah Department of Transportation makes no representation or warranty of any kind, and assumes no liability therefore. iv
5 ACKNOWLEDGEMENTS The author wishes to acknowledge the following for their contributions: Utah Department of Transportation personnel (Michael Fazio, Kelly Burns, Jim Baird, and Denis Stuhff) and the State Departments of Transportation (Caltrans, Colorado, Arizona, Montana, Michigan, Oregon, Nevada, and Wyoming) v
6 TABLE OF CONTENTS DISCLAIMER... iv ACKNOWLAEDGEMENTS...v TABLE OF CONTENTS...vi LIST OF TABLES... vii LIST OF FIGURES... viii 1.0 Executive Summary Introduction Study Objectives Background General Culvert Rehabilitation Segmental Lining Sprial Wound Lining Expanding Liner Fixed-Diameter Liner Cured-In-Place Lining Fold-and-Form Pvc Lining Deformed-Reformed HDPE Lining Cement-Mortar-Spray-On Lining Structural Requirements End Treatments Cost Analysis Conclusion Recommendations and Implementation References Glossary...24 vi
7 LIST OF TABLES Table 1. Table of all methods, their limitations, advantages and disadvantages...17 Table 2. Cost analysis for culvert rehabilitation vii
8 LIST OF FIGURES Figure 1. Example of collapsed culvert...3 Figure 2A. A deformed culvert...3 Figure 2B. Round culvert with rusted invert...3 Figure 3. Inlet of segmental lined culvert...4 Figure 4. Optional cleaning device for culverts...5 Figure 5A. Cutting out nose cone...6 Figure 5B. Nose cone...6 Figure 6A. Oakum being soaked in urethane sealant...7 Figure 6B. Inlet sealed with Oakum...7 Figure 7. Model of CMP lined with HDPE liner...8 Figure 8. Plan view of model setup for grouting process...8 Figure 9. Figure 10. Rib Loc lining system...9 Spiral wound expanding system...10 Figure 11A. Full bore travel expanding machine...11 Figure 11B. Steel reinforce lining...11 Figure 12A. Figure 12B. Figure 13. Pulled-in-place method...12 Inverted method...12 Outlet end of inverted liner...12 Figure 14A. Flat shape liner (4- to 12-inch)...13 Figure 14B. H- shape liner (15- to 30-inch)...13 Figure 15A. Cutting liner...14 viii
9 Figure 15B. Pneumatic plug with steam and air supply line...14 Figure 16. Inlet of fold-and-form rehabilitated culvert...14 Figure 17A. Liner on a spool...15 Figure 17B. Figure 18. On-site deforming equipment...15 Steam being introduced into a 30 inch HDPE liner...16 Figure 19A. Lining machine for non-man entry culverts...16 Figure 19B. Large diameter cement-mortar lining...16 Figure 20. Maximum culvert burial depth based on state and culvert type...19 Figure 21. Total cost/ft of projects from Table ix
10 1.0 Executive Summary A review of six trenchless culvert relining technologies or methods (i.e., segmental lining, foldand-form, cured-in-place, cement-mortar spray-on lining, deformed-reformed, and spiral-wound liner) with potential for application in the state of Utah is presented in this report. It also includes maximum culvert relining size, liner material types, culvert length limits, installation requirements (e.g., specialized training and/or equipment), cost, maximum burial depths, and general advantages and disadvantages for each rehabilitation method. As there are distinct advantages and disadvantages associated with each method, the culvert rehabilitation method best suited for individual projects will vary by project. The aim of this synthesis report is to provide designers and project managers with a general culvert relining knowledge base to aid in the decision making process. Based on a cost survey of culvert relining projects in Utah and surrounding states, segmental lining is typically the least expensive relining method of the six reviewed. No specialized equipment is required and most department of transportation (DOT) maintenance crews can be trained to do the work. In an effort to aid in the training of segmental-liner installation crews, UDOT and Utah State University personnel produced a training video and pocket-reference flip chart, which are available at Relative to segmental lining, fold-and-form and cured-in-place methods are preferable when the host or existing culvert contains bends, pipe offsets due to misaligned joints, junctions, or when the cross-sectional area of the rehabilitated culvert needs to be maximized. Due to the relatively short history associated with culvert rehabilitation, insufficient data are available for distinguishing variations in the expected life of the different relining techniques/materials. No data were found specific to the structural strength of relined culverts. Consequently, the new culvert direct burial depth limits associated with various western DOTs are presented for the same (or similar) materials used in relining. In general, the composite structural strength associated with a segmental lining and host culvert, joined via a grouted annular space, likely exceeds the burial depth limit of the liner s direct-burial depth. In the absence of specific relined 1
11 culvert load limit data, designing rehabilitated culvert burial depth limits based on direct-burial limits likely represents a conservative approach. 2.0 INTRODUCTION 2.1 Study Objectives The purpose of this report is to provide pertinent information regarding trenchless culvert rehabilitation (repair) methods that may be applicable in Utah. This manual is not meant to replace the installation manual provided by the manufacturer, but rather to provide a brief description of each method, installation procedures, and highlight the advantages and disadvantages of each method. This manual was developed based on a literature review, interaction with the Utah Department of Transportation (UDOT), and survey data provided by other western DOTs. A glossary of terms can be found at the end of the report, providing definitions for the bold-face terms throughout the report. 2.2 Background Many aging culverts in the State of Utah and elsewhere have deteriorated to the point where replacement or repair is warranted. As a rule-of-thumb, it is typically more cost effective to repair over replace when the average daily traffic exceeds 1000 vehicles, the maximum cover over a culvert is more than 4 feet, and/or the detour drive time is greater than 20 minutes (UDOT, 2008). Prior to making a culvert replacement vs. rehabilitate decision, the structural integrity of the host pipe should be made. In many cases, if the existing or host pipe is incapable of sustaining design loads, it should be replaced rather repaired (see Figure 1). 2
12 Figure 1. Example of collapsed culvert ( In cases where the host culvert cross-section is deformed, as shown in Figure 2A, the culvert can still be relined, particularly when using liners that adapt to the shape of the host culvert (i.e., fold-and-form or cured-in-place). A rigid-pipe segmental liner can also be used, however, the diameter of the new liner pipe will have to be appreciably smaller than the host culvert, relative to the original, a non-deformed, host pipe diameter (see Figure 2B), significantly reducing the discharge capacity. Figure 2A. Deformed culvert Figure 2B. Round culvert with rusted invert Like traditional culverts, rehabilitated culverts can operate under inlet or outlet control depending on the culvert slope, end treatments and flow conditions. When a culvert is relined, the cross-sectional area reduces relative to the host pipe. If the slip-lined culvert is hydraulically smoother than the host pipe and operates under outlet control, the decreased flow area will likely be offset by the reduction in flow resistance, resulting in a similar discharge capacity. 3
13 If the slip-lined culvert operates under inlet control, then an improved end treatment may be required to minimize the amount of flow reduction associated with the smaller diameter inlet. Currently, most slip-lined culverts have projecting end treatments with squared off ends. Little information is currently available regarding the hydraulic characteristics of end treatments specific to slip-lined culverts; however, in many cases they may not be considerably different from traditional projecting inlets (see Figure 3). Figure 3. Inlet of segmental-lined culvert 3.0 GENERAL CULVERT REHABILITATION Culvert rehabilitation is typically much faster, easier, and more economical than culvert replacement, particularly when deep fills or large traffic volumes are present. Deteriorated culverts are most commonly rehabilitated by inserting a rigid-wall or flexible liner pipe inside the existing culvert barrel, with the liner held in place by either grout (rigid-wall liner) or a pressure/heat-based curing process (flexible liner). The following six culvert relining techniques represent the common methods currently applied in practice. 1. Segmental Lining 2. Spiral Wound Lining 4
14 3. Cured-In-Place Lining 4. Fold-and-Form PVC Lining 5. Deformed-Reformed HDPE Lining 6. Cement-Mortar Spray-On Lining An overview of each method is provided in this report and summary information (e.g., liner materials and advantages/disadvantages of each technique) is presented in Table 1. Note that segmental lining is typically the only relining method that may not require a contractor with specialized training and equipment. With a minimum amount of training, DOT maintenance personnel can typically handle segmental liner culvert rehabilitation projects in-house. Prior to relining, the project site must be cleared to provide appropriate access to the culvert inlet and outlet; the host culvert must also be cleared of debris. A vacuum truck is recommended for most culvert cleaning operations, however, a small section of pipe, capped on one end and attached to a rope via a three-point connection, can be pulled through the host culvert to remove debris (see Figure 4) if a vacuum truck is not available. If man-entry is possible and appropriate from a safety standpoint, visual inspection is recommended to check for obstacles or irregularities (e.g., misaligned joints, evidence of excessive piping, junctions, etc). Culvert cleaning should take place with in a few days of relining to prevent further debris from collecting in the host culvert. Figure 4. Optional cleaning device for culverts 5
15 ( 3.1 Segmental Lining Segmental lining uses a rigid-walled pipe as the liner for the host culvert. Two types of liner pipe are commonly used, pipe with bell-and-spigot joints or butt-welded joints. In most cases, the liner pipe is moved into the culvert one section at a time. With butt-welded pipe, the entire unit may be prefabricated on site and installed as a single pipe. The liner is pushed or pulled with jacks or construction machinery. Rigid-walled liners with smooth exteriors are typically easier to insert when the host pipe has a corrugated interior wall profile. Host culvert alignment variations can become control or pinch points for the insertion process. If alignment variations exist and the segmental liner technique is used, the diameter of the liner may have to be significantly reduced, relative to an optimal relining project. When slip-lining a host culvert with alignment variations, a pulling head or nose cone is recommended (see Figure 5A and 5B) to help facilitate the insertion process. When the liner is in place, the annular space is grouted. Almost any type of culvert can be slip lined with an appropriately sized liner pipe. The specifications, materials, advantages, and disadvantages of slip lining are summarized in Table 1. Figure 5A. Cutting out nose cone ( Figure 5B. Nose cone Grouting of the annular space is recommended to reduce seepage, further deterioration of the host culvert, soil migration, as well as create a structural connection between the liner and the host pipe. For host culverts with rusted-inverts or mis-aligned joints, voids in the embankment materials often develop. In cases where the soil loss is not sufficiently extensive to warrant a 6
16 culvert replacement, the grout will typically fill those voids, improve the culvert/embankment structural connection, and reduce the risk of sink-hole development. Prior to grouting, the annular space must be sealed at both ends using bulkheads. Bulkhead seals keep the grout in and water, if present, out. Cement-mortar bulkheads are common and usually require a curing time of several days prior to grouting. When water is present within the culvert (e.g., live stream or wetlands), Oakum soaked in water-activated urethane sealant can be used as the bulkhead material (see Figures 6A and 6B). The hydrated Oakum requires only a few minutes to cure. Figure 6A. Oakum being soaked in urethane sealant Figure 6B. Inlet sealed with Oakum Grout may be either gravity fed or pumped through a hose or small diameter pipe (1-1/2 in to 2 inch PVC) placed in the annular space. The grout is typically a low-density foam concrete consisting of Portland cement and fly ash. This mix allows the grout to flow easily and fill the entire annular space (see Figure 7). If standing water is present in the annular space, a higherdensity grout may be required to displace the water. Grouting in lifts is recommended when using high-density grout or when grouting a culvert with a significant change in elevation between inlet and outlet to avoid collapse of the liner via excessive external loads from the grout. 7
17 Figure 7. Model of CMP lined with HDPE liner When preparing to pump grout, these steps are recommended: Three grout feed tubes should be used running 75%, 50%, and 25% of the total length of the liner. The number and lengths of feed tubes can vary depending on the culvert length. The grout feed tubes of differing lengths are strapped to the exterior of the liner pipe segments using metal banding. Short pieces of dimensional lumber (e.g., 2x4 blocks) are placed adjacent to the tubes and under the metal bands to minimize direct pressure on the grout tubes from the banding. Air tubes are placed at approximately the three, nine and twelve o clock positions in each bulkhead to expel air during the grouting process. The grouting process is stopped when grout discharges from all of the air vents. Following grouting, the air and grout feed tubes are capped (see Figure 3). A two dimensional schematic of the grouting assembly is shown in Figure 8. Figure 8. Plan view of model setup for grouting process. 8
18 3.2 Spiral-Wound Method The Spiral-Wound method is another solid-wall liner technique. It differs from the segmental liner method in that the liner is formed on the site as a continuous liner. Inter-locking polyvinyl chloride (PVC) profile material is fed through a winding machine that mechanically forces the material to interlock, forming a smooth, continuous, spirally-wound liner (see Figure 9). During the interlocking process, a sealant is applied to make the seam watertight. As the material is wound, it is fed into the existing culvert as shown in Figure 9. There are two common types of spiral-wound liners: A) Expanding liner: Inserted as a fixed diameter and then expanded until it presses against the interior surface of the existing pipe. B) Fixed-diameter liner (PVC or Steel Reinforced): Inserted into the host culvert and the annular space is grouted. Figure 9. Rib Loc lining system Left: ( Right: ( 9
19 3.2.1 Expanding liner The spiral-wound liner is inserted as a fixed-diameter pipe. When the liner reaches the termination point of the host culvert, the liner is expanded one of two ways (depending on the type of liner used); either a wire that runs through the entire spiral joint is pulled, allowing the liner to expand (see Figure 10) or a rotating machine is run through the inside of the liner (see Figure 11A). This expanding liner system utilizes a water activated polyurethane adhesive joint sealant. Steel reinforcement can be added to the liner wall to increase the structural strength of the liner. No annular space grouting is required (no annular space), however, the ends of the liner are often grouted into place. Both flexible and rigid pipes can be rehabilitated with this system. Figure 10. Spiral wound expanding system ( Fixed-Diameter Liner (PVC or Steel Reinforced) The fixed-diameter liner system creates a PVC pipe with a ribbed external profile. This produces an integrated structure with the PVC liner "tied" to the original pipe through the grout similar to a segmental liner. A steel reinforced PVC lining system is also available, which includes a continuous strip of profiled reinforcing steel added to the outside of the plastic pipe (see Figure 11B). The resulting liner has a smooth plastic internal surface with increased stiffness from the steel reinforcing profile. Both flexible and rigid pipes can be rehabilitated with this system. The specifications, materials, advantages, and disadvantages of spiral wound lining are discussed in Table 1. 10
20 Figure 11A. Full-bore expanding machine ( Figure 11B. Steel Reinforce Lining ( 3.3 Cured-In-Place Lining Cured-in-place lining installations involve the insertion of a flexible fiber tube coated with a thermo-setting resin into the host culvert. The tube is pushed into the host pipe using compressed air (inverted method) or pulled into place using a winch. Cured-in-place linings are available in felt-based, woven hose, and membrane type tubes. Feltbased liners are produced from non-woven polyester felt and coated on one face with a layer of elastomer. The wall thickness of the felt-based tubes can be varied to accommodate various application requirements. In some cases, two liners are inserted, one inside the other. Woven hose systems, manufactured out of a circular, woven, seamless, polyester fiber hose and coated on one face with a layer of elastomer, are primarily designed to rehabilitate pressure pipelines. Membrane linings are composed of very thin elastomers and are commonly used to rehabilitate existing or protect new low-pressure gas mains. For the pulled-in-place method, a winched cable is placed inside the host pipe. The resinimpregnated liner is connected to the free end of the cable and pulled into place between drainage structures or culvert ends. The cable is disconnected, the ends plugged, and the liner is inflated and cured with hot water or steam (see Figure 12A). 11
21 Figure 12A. Pulled-in-place method ( Figure 12B. Inverted method ( For the inverted installation method, the polyester felt tube saturated in a liquid thermo-setting resin is inserted inside-out using compressed air as shown in Figures 12B and 13. Following insertion, the thermo-setting resin layer is on the outside of the liner. Next both ends are plugged and pressurized hot water or steam is used to expand the flexible liner until it confirms to the inside of the host pipe wall. The heated water/steam also activates the thermo-setting resin, causing the flexible liner to harden and maintain its expanded shape. Figure 13. Outlet end of inverted liner If water is used for curing the liner, a water source must be accessible at 12
22 the site and the water must be heated continually and circulated during the curing process. The resin will harden in a few hours, forming a jointless pipe-within-a-pipe. When required, remote controlled cutters can be used to trim the liner to reinstate host pipe junctions and laterals. Once cured, the resins become the primary structural component of the cured-in-place system and are categorized as unsaturated polyester, vinyl ester or epoxy. Unsaturated polyester resins are the most widely used resins in cured-in-place lining systems. Some thermo-setting resins contain styrene. Due to potential environmental concerns associated with styrene (particularly with fish), a capture and disposal system may be required for the styrene-contaminated water. The specifications, materials, advantages, and disadvantages of cured-in-place lining are discussed in Table Fold-and-Form Lining The fold-and-form lining method uses a PVC liner that has been folded (flat and H-shapes are common, as shown in Figure 14), manufactured to length, and delivered to the job site on reels. The flat-shape is used for lines in the 4- to 12-inch diameter range (diameter dimension corresponds to the liner when the cross section is round). The H-shape is used for liners in the 15- to 30-inch diameter range. Figure 14A. Flat-shape liner Figure 14B. H-shape liner (4- to 12-inch) ( (15- to 30-inch) 13
23 The liner is inserted by covering the coiled liner with a tarp and pre-heating it with steam until malleable. A winch cable is fed through the host pipe, attached to the end of the liner, and the liner is pulled through at a rate of 40 to 50 feet per minute depending on field conditions. Once Figure 15A. Cutting liner Figure 15B. Pneumatic plug through, the spool-end of the liner is cut and both ends are sealed with pneumatic plugs (see Figure 15). Pressurized steam is supplied to the liner via a port in the pneumatic plug until the liner expands tightly against the inside wall of the host pipe. The steam is replaced by compressed air to cool the liner while maintaining its shape. Once cooled, the ends of the liner are trimmed to the desired length (typically projecting some distance beyond the end of the host pipe as shown in Figure 16). This overall process typically requires roughly one full work day per installation. The time required to heat the liner (twice) will vary with ambient temperature conditions and the length of the liner. The specifications, materials, advantages, and disadvantages of cured-in-place lining are discussed in Table 1. Figure 16. Inlet of fold-and-form rehabilitated culvert 14
24 3.5 Deformed-Reformed Lining The deformed-reformed lining method, which is similar to the fold-and-form method, uses a high density polyethylene (HDPE) solid wall pipe which is deformed by mechanical force. If the nominal diameter of the HDPE liner is 18 inches or smaller, it is delivered to the job site folded on a spool as shown in Figure 17A. Larger diameters are brought to the job site in individual sections and then butt-fused or welded and deformed onsite into a U-shape by means of thermomechanical deforming equipment as shown in Figure 17B. Each pipe is made specifically for the culvert so grouting is unnecessary. Figure 17A. Liner on a spool Figure 17B. On-site deforming equipment ( After the liner is pulled or pushed through the existing culvert, the ends are plugged and heat is introduced into the folded liner using pressurized steam to expand it tightly against the inside wall of the host pipe (see Figure 18). A remote controlled cutter reconnects laterals without excavation. The specifications, materials, advantages, and disadvantages of deformed-reformed lining are discussed in Table 1. 15
25 Figure 18. Steam being introduced into a 30 inch HDPE liner ( 3.6 Cement-Mortar Spray-On Lining Method Cement-mortar spray-on liners consist of lining the inside of the host pipe with cement mortar. This method is usually applied to steel and iron pipe to provide protection against corrosion. For small diameter pipe, mortar is supplied via a high-pressure hose and applied by the rotating head of an electric or air-powered machine (see Figure 19A). A lining of uniform thickness is applied as the machine travels through the existing culvert at a constant speed. The thickness of the liner applied is directly related to the travel speed of the machine. After the lining has been applied, rotating or conical drag trowels provided a smooth troweled finish. Unless reinforced, cementmortar spray-on lining adds little or no structural integrity to the existing culvert. Figure 19A. Lining machine for non-man entry culverts ( Figure 19B. Large diameter cementmortar lining ( 16
26 TABLE 1. Summary of trenchless rehabilitation methods. α Method Segmental Lining Cured-in- Place Pipe Fold-and- Form Diameter (inches) Length (feet) 4 to 158 Up to 5248 HDPE, PE, PP, PVC, GRP 4 to 108 Up to 3000 Thermosetting Resin/ Fabric Composite Material Advantages Disadvantages -Capable of large radius bends -Flow diversion not necessary during installation -Simplistic method -Low cost/less training -Applicable to all types of existing culvert materials -Access pits not required -Capable of bends and varying diameters within the pipe -Grouting not required -Minimal or no reduction in flow capacity -Non-circular shapes possible -No joints 4 to 30 spool Up to 1000 PVC -Little excavation -Minimal or no reduction in flow capacity -Few or no joints -Fast installation -No grouting required -Capable of large bends -Excavation required for access pits -Grouting necessary for annular space -Existing culvert must be longitudinally uniform -Flow bypass is required -Tubing must be specifically constructed for each project -Styrene monomer-based resins used in curing the liner are toxic to fish when discharged -Flow bypass is required -High material and training cost -Pipe must be specifically constructed for each project Cement- Mortar Spray-on Lining Spiral- Wound Liner 3 to 276 Up to 1476 Cement, Mortar -Does not block lateral and service connections -Protects against corrosion -Low cost 4 to 120 Up to 1000 PE, PVC, PP PVDF -Liner formed on site -No or little excavation -Flow bypass may not be necessary -Accommodates diameter changes -Grouting not required if expandable liner is used -Flow bypass is required -Existing culvert must be completely dry prior to applying the cement -Long curing time (up to seven days) -Generally fails to enhance the structural integrity of the existing pipe -Application of cementmortar may be inconsistent -Trained personnel required -Grouting may be required if fixed diameter is used -High material and training cost -Continuous fusion or sealant for joints required α (Purdy, 2005) Table 1 Acronyms CIP: Cast Iron Pipe PE: Polyethylene PVDF: Poly-Vinylidene Fluoride PP: Polypropylene RCP: Reinforced Concrete PVC Polyvinyl Chroride GRP: Glass-Fiber-Reinforced Polyester HDPE: High-Density Polyethylene 17
27 Reinforced cement-mortar spray-on lining is limited to large diameter culverts (see Figure 19B). Installations are limited by pipe diameter, valve locations, bends, and length of supply hose. The specifications, materials, advantages, and disadvantages of cement-mortar lining are discussed in Table STRUCTURAL REQUIREMENTS As a culvert degrades, the structural strength (ability of the culvert to support external loads) degrades also. By relining a deteriorating host culvert with a new rigid pipe liner, the structural integrity of the host culvert is increased. No maximum external load data, however, have been found specific to the various rehabilitated culvert techniques. Since many of the culvert lining materials are consistent with traditional culvert materials [i.e., HDPE, PVC, Corrugated Metal Pipe (CMP), etc.], a survey of various DOTs was taken to identify burial depth limits for the various culvert materials. A summary of this information is presented in Figure 20. Until rehabilitated culvert-specific burial depth data becomes available, use of the data in Figure 20 is recommended as a guide. It is possible that the structural strength rehabilitated culverts could exceed that of new culverts of the same material due to the combined influence of the liner, host pipe, and any annular space grouting that may take place. Insituform CIPP has a design guide calculator on their website for burial depth (Insituform, February 2009), which calculates how thick the new liner will need to be. State DOTs do not have specifications for this particular material and it therefore was not included in Figure 20. CIPP, according to Insituform, can be placed at any burial depth and extra layers can be added to give the new pipe more structural strength. Figure 20 shows how burial depth specifications vary by state and by culvert material. These specifications were obtained from the respective DOT websites. The burial depth data survey was limited to states in the western region of the United States. Not all states have specifications available on their websites for all culvert materials. For the CMP culverts, the wall thickness requirements varied from state to state, which influenced the recommended maximum burial depth. 18
28 (ft) th p e l D ria u B e ip P m u x im a M h ta U n g o re O ia rn a lifo C a n ta n o M o a h Id a v a d e N CMP 2 2/3" x 1/2" Corrugations h ta U n g o re O ia rn a lifo C HDPE a n ta o n o a h M Id Figure 20. Maximum culvert burial depth based on State and culvert type (see Burial Depth Specifications in references) h ta U n g o re O ia rn a lifo C PVC 5.0 END TREATMENTS The end treatments for most segmental slip-lined culverts are generally projected a short distance beyond the end of the host culvert, as shown in Figure 3. Poly Systems recommends to their contractors that the liner project 6 to 12 inches beyond the host pipe (Poly Systems, 2009). In some cases the liner is cut off flush with the headwall. For CIPP, Insituform recommends that at least 4 inches of liner projects on each end, but it is up to the contractor to do what they think is necessary (Insituform, January 2009). No end treatment specification was found for the foldand form liner. Where appropriate, the end sections for both fold-and-form and the cured-inplace liners could be flared into a bell shape by placing pneumatic plugs, used to seal the liner during the curing process, at the appropriate locations while the liner is still malleable. There is very limited information regarding rehabilitated culvert end treatments, specifically regarding their hydraulic efficiency. Consequently there are no specifications for end treatments thus far for repaired culverts in Utah, but the topic warrants further study. 19
29 6.0 COST ANALYSIS A limited Western States DOT cost survey of culvert rehabilitation was conducted; the results are compiled in Table 2. Data were provided by the DOTs on a cost-per-foot of culvert length basis. For all liners, the cost increases with increasing diameter. According to the data in Table 2, cured-in-place-pipe is generally the most expensive alternative. As a general rule, the installation cost/ft tends to decrease with increasing culvert length (compare CDOT 24-in vs. MDOT 24-in in Table 2). The project location can also have a bearing on the cost (distance from supplier, weather factor, etc.) The cost in general can vary due to labor, ease of installation, delays, and other factors HDPE Liner Cured-In-Place-Pipe Cost Per Linear Foot in 30-in 36-in 48-in Host Pipe Diameter Figure 21. Total cost/foot of projects from Table 1 20
30 Method of Rehab Table 2. Culvert relining cost comparison summary Host Pipe and Size Pipe Length (ft) Reference Liner $/ft Total $/ft Concrete liner in bottom of pipe; placed TRPL.-137" x 87" SSPPA 220 MDT (2008) 87 Cured-in-Place-Pipe 18-in Liner Pipe 661 MDT (2008) 190 Cured-in-Place-Pipe 24-in CMP 185 CDOT (2004) Cured-in-Place-Pipe 24-in CMP 187 UDOT (2009) 131 Cured-in-Place-Pipe 24-in CMP 758 MDT (2008) 190 Cured-in-Place-Pipe 30-in CMP 507 UDOT (2009) 142 Cured-in-Place-Pipe 36-in CMP 632 UDOT (2008) 293 Cured-in-Place-Pipe 36-in CMP 512 UDOT (2009) 191 Cured-in-Place-Pipe 54-in CMP 600 CDOT (2004) 635 Fold-and-Form 24-in CMP 200 UDOT 135 Fold-and-Form 24-in CMP 245 UDOT 135 HDPE Liner 24-in CMP 75 UDOT HDPE Liner 24-in CMP 85 UDOT HDPE Liner 36-in CMP 237 CDOT (2004) 180 HDPE Liner 36-in CMP 65 Caltrans 111 HDPE Liner 36-in CMP 281 UDOT (2009) 144 HDPE Liner 36-in CMP 80 UDOT HDPE Liner 36-in CMP 80 UDOT 125 HDPE Liner 48-in CMP 596 CDOT (2004) HDPE Liner 48-in CMP 196 UDOT (2009) 177 HDPE Liner 78-in CMP 224 CDOT (2004) 500 Shotcrete 36-in CMP 335 CDOT (2004) 136 Shotcrete 36-in CMP 224 CDOT (2004) 126 Shotcrete 72-in CMP 241 CDOT (2004) 200 Figure 21 shows the total cost/ft of six projects. This gives a general idea of the total costs for CIPP and segmental lining for the different diameters of pipe with the given lengths from Table 2. 21
31 7.0 CONCLUSION Culvert rehabilitation is becoming more common in Utah. Segmental lining is cost effective in Utah and the most common method of rehab in most states. Cured-in-place-pipe and fold-and-form methods have been used and are effective, but costs are higher. Contractors with specialized skills and equipment are required for all method other than segmental lining. DOT maintenance crews can be trained to carry out segmental lining culvert repair projects. A survey of existing culverts, site conditions and cost considerations will help determine which rehabilitation method is most appropriate. 8.0 RECOMMENDATIONS AND IMPLEMENTATION There are no recommendations in this manual. A flipchart and installation video for segmental lining are products of this study and contain suggestions for this method of rehabilitation. These documents can be found at 22
32 9.0 REFERENCES Caltrans. (2003). General Culvert Barrel Rehabilitation Techniques. DIB < Central Federal Lands Highway Division. (2005). Culvert Pipe Liner Guide and Specifications. < Hydro Tech Inc. July 17, Insituform Technologies. < February 3, Insituform Technologies. Evans, Chantel. Personal Communication, January 21, 2009 Isco Industries Inc. Snap-Tite. < Poly Systems. Boswell, Julie. Personal Communication, January 28, Purdy, Diane. Penn State Trenchless Technology Alternatives for Pipe Rehabilitation. LTAP Technical Information Sheet #116, Spring Utah Department of Transportation. Burns, Kelly. Personal Communication, March 11, Ultraliner Inc. < References specific to State DOT burial depth specifications Utah: Nevada: Oregon: Drainage California: 23
33 Montana: and_irrigation_design.pdf Idaho: GLOSSARY Annular space Space between two telescoped pipes. Bulkhead Walls that are placed at the end(s) of a culvert to seal the annular space. Cured-in-place-pipe A resin-impregnated flexible tube cured with heat. Deformed-reformed A HPDE pipe folded that is reformed by heat. Fly ash The powdery residue that remains after burning coal in a power plant. Laterals Smaller pipes that flow into larger pipes. Liner A material that serves as a lining inside of a host pipe. Oakum - Loosely twisted hemp or jute fiber for caulking seams. 24
Culvert Rehabilitation Practices
Culvert Rehabilitation Practices TABLE OF CONTENTS Report Objective...1 Introduction...1 General Culvert Rehabilitation...3 Culvert Cleaning...3 Grouting...4 REHABILITATION METHODS Slip Lining...5 Sprial
Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009
Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of
SPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014
Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers
TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING
TRENCHLESS TECHNOLOGIES RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION CLOSE FIT THERMOPLASTIC LINING NEW VERSION AUGUST 2005 1. OVERVIEW The use of liners that are deliberately deformed
REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
Rehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology
ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires
The Environmental Implications of Road Culvert Repair Technologies. Bridget Donaldson Senior Research Scientist
The Environmental Implications of Road Culvert Repair Technologies Bridget Donaldson Senior Research Scientist Presentation Overview Culvert repair technologies Past and ongoing research by VCTIR Cured-in-Place
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
Trenchless Technology for Drainage Structures
Trenchless Technology for Drainage Structures Richard S. Williammee, Jr., MSCE, P.E. District Materials Engineer Fort Worth District TxDOT 2011 Transportation Short Course October 11, 2011 There are textbooks
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
Pipeline Replacement using Relining
Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
Repair or Replacement - Band-Aids vs. Surgery
Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing
725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE
PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
Structural Lining for Water Mains. Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT)
Structural Lining for Water Mains Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT) 2015 PA-AWWA Annual Conference Thursday, April 23 rd, 2015 Agenda 1. Introduction 2. Purpose of Lining 3. Lining
INSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION
THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION Bridget Donaldson Research Scientist Virginia Transportation Research Council Transportation Infrastructure Deterioration of pipes is a growing
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
02780 LINER FOR SEWER REHABILITATION
Section 02780 Liner for Sewer Rehabilitation Page 02780-1 (Revised 11/06/09) 02780 LINER FOR SEWER REHABILITATION SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 GENERAL Part 2 PRODUCTS Part
GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS
GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION OF MASTERLINER CURED-IN-PLACE PIPE SYSTEMS 34 TABLE OF CONTENTS 1.00 INTRODUCTION 2.00 SITE WORK PREPARATIONS 3.00 THE PRODUCT AND COMPONENT MATERIALS
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION Le Val LUND 1 And P E M ASCE 2 SUMMARY A number of methods are discussed which can be used for lifeline pipeline rehabilitation and improving the seismic
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE
Introduction to Pressure Pipe Rehabilitation with CIPP
Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes
PIPE REHABILITATION Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes About Us An HDPE after mechanical insertion into an egg-shaped brick work sewer sized 1400 x 2100 mm (or 56
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe
TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,
by Leonard Friesenhahn, P.E.
by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a
Water Main Lining A Sustainable Alternative to Open Cut Replacement
Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction
Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY
Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm
IS THAT LINER THICK ENOUGH?
IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter
CHAPTER 850 PHYSICAL STANDARDS
HIGHWAY DESIGN MANUAL 850-1 CHAPTER 850 PHYSICAL STANDARDS Topic 851 - General Index 851.1 - Introduction This chapter deals with the selection of drainage facility material type and sizes including pipes,
Meeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,
Installation of Large Diameter Buried Pipes
Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS
REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS by Harald W. Van Aller, PE Geotechnical Engineer, Maryland Dam Safety
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
Native InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
APPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION
North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 APPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION Lynn Osborn 1 1 ArmourGRiP Product
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University
817 - PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS & END SECTIONS SECTION 817
SECTION 817 PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS AND END SECTIONS 817.1 DESCRIPTION Install the size and type of pipe culvert, erosion pipe, storm sewer, sanitary sewer, end section
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
Appendix A: Acceptable pipe and fitting materials
Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for
SECTION IX SLIP LINING PIPELINES
AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...
07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying
CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
Sewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Oil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University [email protected]
External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902
External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water
PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.
Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today
epros DrainLiner Program
epros DrainLiner Program All Liner Types At A Glance epros DrainLinerPP (mit PP-Beschichtung) 3 In trenchless rehabilitation methodology, a general distinction is made between sectional or part repairs
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
SECTION 221413 FACILITY STORM DRAINAGE PIPING
SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
Culvert Repair, Materials, and Structural Design 4.4-1
Culvert Repair, Materials, and Structural Design 4.4-1 4.4 Culvert Materials 4.4.1 General Culverts are primarily made with reinforced concrete, corrugated metal, and more recently, solidwall, profile
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
Application Data Important Safety Information
Application Data Important Safety Information Read this page before using any of the information in this catalog. This catalog is designed to be used as a guide in selecting the proper hose for the applications
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction