1 Construction Technology 3 D39 TA Revision Dr Mohamed Abdel-Wahab Edwin Chadwick Building, Room 1.16 m.abdel-wahab@hw.ac.uk

2 Week Topic 1 Introduction to the module Part I: On-site construction 2 Topic 1: Foundations for framed buildings 3 Topic 2: Basement construction 4 Topic 3: Structural frames in buildings 5 Topic 4: Advanced cladding 6 Topic 5: Long span roof construction Part II: Off-site construction 7 Topic 6: An overview of offsite construction 8 Topic 7: Case Studies, practical issues & factory production 9 Tutorial week and feedback Part III: Low carbon construction 10 Topic 8: An overview of low carbon construction 11 Topic 9: Low Carbon Technologies (Guest Lecturer) 12 Revision

3 A thorough site investigation is paramount before commencing construction work. 1. Site inspection 2. Desk study

4 Detailed knowledge of the nature and variability of the sub-soil is necessary

5 Boreholes

6 Soil characteristics and type of foundation

7 Pile foundations Displacement piles Pre-cast shell piles Cast in-situ piles

8 Replacement piles Bored piles

9 Economic and construction considerations when selecting an appropriate foundation system The selection of the most appropriate system is a bit of a balancing act. All of the engineering options can be juggled until an optimum is identified.

10 What are the main issues to be addressed for basement construction? 1. Getting the loads from the superstructure to the soil. 2. Providing an optimised open space for use. 3. Resisting lateral soil pressures. 4. Preventing the ingress of moisture

11 Approaches for basement construction 1. Temporary support to basement excavations 2. Permanent basement wall construction prior to excavation 3. Top down basement construction

12 What are the questions to be addressed when deciding on a frame type? 1. What material and method to use for constructing the frame? 2. How is the frame organised and stabilised? (Structural and construction efficiency) 3. What type of floor system will be used in the frame?

13 Non-composite floor

14 What can go wrong during the installation of noncomposite hollow core planks? Refer back to the Case study - entitled Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab Source:

15 Composite floor

16 What other questions should be addressed when deciding on an appropriate structural frame for a building? How much it is going to cost? How long would it take? (speed of construction) Is it appropriate to the size and nature of site? Does it meet the client requirements? What is the availability of labour and material?

17 Approaches for the installation of Cladding / Curtain walling

18 Stick system

19 Unitised curtain walling For detailed installation steps go to:

20 Lattice Beams, Trusses and Girders Large spans in excess of 25m can be formed using these systems.

21 Proprietary sections are manufactured in standardised section sizes, however, these may not be appropriate either in terms of achievable span, or in terms of architectural style. Therefore, many truss sections are bespoke, or built up specifically for specific building structures.

22

23 What are the factors that must be taken into account in the design and selection of a suitable roof structure? Function of the building Span of the roof Height of the space Aesthetic and design requirements Economic considerations Construction considerations. The environment

24 GREEN ROOFS Green roofs are vegetated layers that sit on top of the conventional roof surfaces of a building. Green roofs may also include additional layers such as a root barrier or drainage and irrigation systems

25 What are the types of offsite production? 1. Volumetric 2. Panellised construction systems 3. Hybrid construction 4. Sub-assemblies and components

26

27 What are the drivers for offsite production? What could be the clients perceptions of the benefits of offsite production? Source: Blismas et al., 2007

28 Labour and training 1. Do we have enough labour? 2. Are they are appropriately skilled and qualified?

29 Transport

30 Transport

31 Carbon footprint of on-road transport

32 Cranes

33 Site layout and access Site organisation

34 Natural resources Construction projects Waste and pollution

35

36 rationalisation Low carbon construction is about.. of energy consumption and thereby minimising the.. impact of construction activity on our planet.

37 How to attain low carbon construction? Do things differently and challenge existing ways of working and definitely there would be more potential for innovation.

38 Cut down waste - SWMP Use of renewable energy Minimise CO 2 emissions

39 More things to do Make the construction process more efficient Building design Materials used (performance and source) Energy refurbishment of buildings

40 Environmental audit: a case study Land use Ecology and nature conservation Landscape Air quality Cultural heritage Traffic noise and vibration Pedestrians and cyclists Vehicle travellers Pre-construction cost = 50m!

41

42 Drivers for low carbon construction Government intervention Incentives Legislation Promotion

43 Challenges when considering low carbon construction and the energy refurbishment of buildings Technology-related (performance and efficiency) Investment-related (Funding, ROI, Cost/Benefit analysis) Government initiatives (e.g. Feed-in-Tariffs) Improved data collection, reporting and use Development of new and better skills

44 What is the key performance shortcoming of renewable energy?

45 Development of new and better skills

46 Good Luck

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF IALN11006400 /05 01 19.06.13 FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF Dear Sir / Madam Re: 12/02994 BCA Sports Hall Condition

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

Civil Engineering and Architecture (CEA) Detailed Outline

Civil Engineering and Architecture (CEA) Detailed Outline Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust

BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

Code for Sustainable Homes Guidelines

Code for Sustainable Homes Guidelines Canoldir Penrhos Anglesey LL65 2TS Phone: 01407 860666 Email: saps@easonline.co.uk www.easonline.co.uk Code for Sustainable Homes Guidelines A CSH rating is the responsibility of the Developer/ Architect

More information

Hunter College school of Social Work Thesis Proposal

Hunter College school of Social Work Thesis Proposal Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing

More information

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

Introduction to Minimal Excavation Foundations

Introduction to Minimal Excavation Foundations Introduction to Minimal Excavation Foundations What is a minimal excavation foundation? A construction technique that minimizes disturbance of the natural soil profile within the footprint of the structure

More information

Modular Accommodation Solutions. Flexibility, efficiency and quality in one complete package

Modular Accommodation Solutions. Flexibility, efficiency and quality in one complete package Modular Accommodation Solutions Flexibility, efficiency and quality in one complete package Welcome Our Services Providing Your Solutions The clients who work with SEDAC Accommodation Solutions are extremely

More information

Green and Sustainable Buildings

Green and Sustainable Buildings Green and Sustainable Buildings Design Criteria and Application in Hong Kong Green building is the practice of increasing the efficiency with which buildings use resources energy, water and materials.

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

consulting engineers and scientists

consulting engineers and scientists consulting engineers and scientists Incorporating Sustainable Principles into Cleanups June 2014 Presented by: Rich Truax, PE GEI Consultants, 650 Personnel Nationwide Rich Truax, P.E. Sr. Program Manager

More information

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Page 1 of 6 INTRODUCTION Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Millennium Hall is described as

More information

Name of course: Residential Construction Site Management (RCSM) Level 1

Name of course: Residential Construction Site Management (RCSM) Level 1 Name of course: Residential Construction Site Management (RCSM) Level 1 Core (required courses) or Optional (elective course): Required Delivery Method: This is an online course only with no classroom

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

Modern Methods of Construction (MMC)

Modern Methods of Construction (MMC) Improving resource efficiency in construction product manufacture BeAware Supply Chain Resource Efficiency Sector Report Modern Methods of Construction (MMC) BeAware is a TSB 1 and industry funded project

More information

Elaine Harvie & Jeremy Cruickshank Jan 10

Elaine Harvie & Jeremy Cruickshank Jan 10 Elaine Harvie & Jeremy Cruickshank Jan 10 3 Assembly Square, Cardiff - EXCELLENT BREEAM International Introduction Elaine Harvie Mechanical Engineer BREEAM Assessor Offices School/Education Industrial

More information

Cody Park One of Ark s high integrity data centre campus sites

Cody Park One of Ark s high integrity data centre campus sites UKC COMMERCIAL Cody Park One of Ark s high integrity data centre campus sites Ark is a privately held company that design, build, operate and finance third party data centre solutions tailored to meet

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

Engineering Policy 146. Severe Weather Management Plans

Engineering Policy 146. Severe Weather Management Plans Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Analysis II Façade Redesign: Architectural Precast Panels

Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed

More information

Creating sustainable green construction in Malaysia

Creating sustainable green construction in Malaysia Zuhairi Abd Hamid, PhD Creating sustainable green construction in Malaysia Read Zuhairi Abd Hamid views on how Malaysia is creating sustainable standardized green construction. Sustainability is a New

More information

CONSTRUCTION SEQUENCE & PROGRAMME

CONSTRUCTION SEQUENCE & PROGRAMME CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone

More information

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber Fifteen years experience of design, production and assembling of pre-stressed Bridge decks in Timber P. Jacobsson 1 Fifteen years experience of design, production and assembling of prestressed Bridge decks

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

CLEAN GREEN & SUSTAINABLE NS1439215

CLEAN GREEN & SUSTAINABLE NS1439215 CLEAN GREEN & SUSTAINABLE NS1439215 1 Contents 2 Introduction Strategic Alignment 1 - Energy Efficiency 2 - Water Management 3 - Fleet and Plant Management 4 - Carbon Offsets 5 - Waste Management Everything

More information

Archant London Environmental Awards

Archant London Environmental Awards Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has

More information

HANLO The WELCOME HOME Experience.!! Simply better homes!!

HANLO The WELCOME HOME Experience.!! Simply better homes!! HANLO The WELCOME HOME Experience!! Simply better homes!! The Mission Our mission is to provide individual, sustainable and affordable homes to self builders and developers that can be built fast, efficient

More information

LOSS EXPERIENCE: Describe any losses having occurred in the past 5 years and state the date and value of each loss: Yes

LOSS EXPERIENCE: Describe any losses having occurred in the past 5 years and state the date and value of each loss: Yes [Construction Application] BUILDERS RISK / WRAP UP LIABILITY APPLICATION Providing detailed information and submission of all documents/plans requested will increase our efficiency and ability to obtain

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

Re: Damages to Alaska Building from Legislative Information Office Construction

Re: Damages to Alaska Building from Legislative Information Office Construction 510 L Street Suite 200 Anchorage, AK 99501-1949 (907) 274-22362236 Phone (907) 274-25202520 Fax www.bbfm.com July 22, 2015 Jim Gottstein Alaska Building 406 G Street, Suite 206 Anchorage, AK 99501 Re:

More information

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections. Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls

More information

APPLICANT / CONTACT:_

APPLICANT / CONTACT:_ New Single Family House Permit Application Office Use Only SECTION 1 PERMIT INFORMATION Project Address: (Provide at least one of the following) Please note: it can not be an intersection PROJECT ADDRESS

More information

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE Multi-storey Precast Concrete Framed Structures Kim S. Elliott BTech, PhD, CEng, MICE Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE WI LEY Blackwell Contents Preface Notation Precast Concepts, History

More information

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

Knock Down Rebuild. Building Process Building process - knock down rebuild 1 Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of

More information

Bloomsbury Colleges Environmental Policy Statement

Bloomsbury Colleges Environmental Policy Statement 15 December 2011 P a g e 1 Bloomsbury Colleges Environmental Policy Statement The Bloomsbury Colleges are committed to the responsible use of energy, water and other resources with the aim of minimising

More information

Ping An: Insurance and Tall Buildings

Ping An: Insurance and Tall Buildings Ping An: Insurance and Tall Buildings Wai Ming (Thomas) Tsang, CEO, Ping An Financial Centre Yongmin (Stephen) Yuan, General Manager Risk Management Department, Ping An Life Insurance Company of China

More information

The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects

The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects Contents The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects September 2014 Japan International Cooperation Agency (JICA) i Contents ii Contents The Guidance for the

More information

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction Building Engineer UK Registration Board n.075077h Design and Access Statement for Application for Planning Permission for demolition of a garage and construction of an extension to an existing Victorian

More information

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION Table of Contents Executive Summary... 1 Introduction... 1 Installing

More information

Standards Committee T echnical Technical Conference

Standards Committee T echnical Technical Conference Standards Committee Technical Conference Agenda Overview of claims costs Years 0 2 claims and resolutions Years 3 10 claims What are we commonly seeing now? An example of what we might see in future? Summary

More information

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical

More information

Designing out Waste: a design team guide for buildings

Designing out Waste: a design team guide for buildings Uniclass A42: N462 CI/SfB (Ajp) (T6) Designing out Waste: a design team guide for buildings Less Waste, sharper design Halving Waste to Landfill Clients are making construction waste reduction a priority

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Design Development Quality Management Phase Checklist Project Phase Checklist Series Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA

More information

Rainwater Harvesting

Rainwater Harvesting Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth

More information

HONG KONG ZHUHAI MACAO LINK

HONG KONG ZHUHAI MACAO LINK Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 1485 1492 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction HONG KONG ZHUHAI MACAO LINK N.HUSSAIN

More information

City and Energy Towards a sustainable development

City and Energy Towards a sustainable development City and Energy Towards a sustainable development Prof. Ing. Francesco RUGGIERO CNI Prof. Ing. Francesco RUGGIERO Politecnico di Bari Energy Workgroup National Council of Engineers Brescia 29-9-2014 1

More information

The city of Malmö, Sweden

The city of Malmö, Sweden The city of Malmö, Sweden 1. Introduction Malmö is a municipality of 280 000 inhabitants located in Southern Sweden. It is the third largest city in Sweden. It developed from a garrison town in the late

More information

FLOOD DAMAGE PREVENTION ORDINANCE

FLOOD DAMAGE PREVENTION ORDINANCE FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS FO FACT, PURPOSE, AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of Washington has in RCW delegated

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-

More information

Achieving Net Zero. Bradley Berneche, President Alouette Homes. National Marketing Committee Canadian Home Builders Association Ottawa, June 6, 2008

Achieving Net Zero. Bradley Berneche, President Alouette Homes. National Marketing Committee Canadian Home Builders Association Ottawa, June 6, 2008 Achieving Net Zero Bradley Berneche, President Alouette Homes National Marketing Committee Canadian Home Builders Association Ottawa, June 6, 2008 Overview Who Is Alouette Homes? The EQuilibrium Initiative

More information

Figure 5-11. Test set-up

Figure 5-11. Test set-up 5.5. Load Procedure A uniform load configuration was used for the load tests. An air bag, placed on the top surface of the slab, was used for this purpose, and the load was applied by gradually increasing

More information

Professional Engineers Providing Structural Engineering Services In Buildings

Professional Engineers Providing Structural Engineering Services In Buildings GUIDELINE Professional Engineers Providing Structural Engineering Services In Buildings 1995 Published by Association of Professional Engineers of Ontario Revised 12/11/98 CONTENTS INTRODUCTION...3 PART

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

APPLICATION for ISO Certification (All Standards)

APPLICATION for ISO Certification (All Standards) APPLICATION for ISO Certification (All Standards) Contents Section 1 General Information (Please complete this section for All standards) (Please complete ONLY the sections for the Standard(s) that you

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED

More information

90 Brighton Road, Surbiton, Surrey

90 Brighton Road, Surbiton, Surrey 90 Brighton Road, Surbiton, Surrey Civil and Structural Engineering Basement Feasibility Report Mixed Use Scheme 108802-REP-002 March 2015 Contents 1. Executive Summary... 3 2. Site Description and Constraints...

More information

INNOVATIVE CONSTRUCTION METHOD

INNOVATIVE CONSTRUCTION METHOD TRANSLATING INNOVATIVE CONSTRUCTION METHOD INTO COST SAVING by Ar Haji Abdul Halim Suhor HASA Arkitek Sdn Bhd Hollistic Approach Sustainable Architecture www.hasaarkitek.com What is innovative construction?

More information

Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction

Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction Current opportunities of sprayed waterproofing membrane Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction 1 What would we like to achieve? 2 What is desired? 3 and

More information

Demolition & Construction Management Plan

Demolition & Construction Management Plan Demolition & Construction Management Plan 72 76 Cadogan lane SW1 Demolition & Construction Management Plan Issue Date: March 2013 Contents: 1.0 Introduction 1.1 Objectives of the Plan 1.2 Project Overview

More information

Post-insulation of cellar ceiling and cellar walls

Post-insulation of cellar ceiling and cellar walls WP5 Education and Economic Promotion Post-insulation of cellar ceiling and cellar walls Educational product: New lecture material for training modules dealing with knowledge and skills how to apply suitable

More information

Scope of EN 1090-1 Clarification Document

Scope of EN 1090-1 Clarification Document Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

3.0 COST BENEFIT ANALYSIS

3.0 COST BENEFIT ANALYSIS 3.0 Key findings: Compared to a black roof, a 3-inch to 6-inch green roof covering 10,000 feet has a Net Present Value of $2.70 per square foot per year, Payback of 6.2 years and an Internal Rate of Return

More information

An Introduction to BREEAM and the Code for Sustainable Homes

An Introduction to BREEAM and the Code for Sustainable Homes www.islington.gov.uk An Introduction to BREEAM and the Code for Sustainable Homes Ropemaker, a BREEAM Excellent office development in South Islington 1 Two key methods for assessing the sustainability

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R Legislation passed by the 82 nd legislature has modified the Texas Engineering Practice Act and the Texas Architect Practice Act. In order to give the public a clearer understanding of these changes, the

More information

Construction and Demolition Waste

Construction and Demolition Waste Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADV-19 Buildings Department Practice Note

More information

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA: 705 671 6099

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA: 705 671 6099 Buying A New Home Presented in Partnership with Greater Sudbury Public Library PHONE SDHBA: 705 671 6099 1 Four Month Series DATES: Sept 13: Underground / Cash Deal Oct 11: Talking with Builder / Renovator

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

INSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, 2007. Perfonned By: Drew Schneider

INSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, 2007. Perfonned By: Drew Schneider INSPECTION FINDINGS for Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado Inspection Date: August 8, 2007 Perfonned By: Drew Schneider INSPECTRUM 27691 Moffat Road Evergreen, CO 80439 303.697.0990

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

BREEAM Europe. This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe.

BREEAM Europe. This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe. BREEAM Europe BREEAM Europe This presentation aims to give the reader a general overview of the operational and technical aspects of BREEAM Europe. Key objectives Provide consistency and comparability

More information

Conversion. 03 Re-Use and

Conversion. 03 Re-Use and 03 Re-Use and Conversion 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 Sustainability and the Historic Environment Preserve, Maintain and Enhance Locally Important Buildings Advantages of Re-Use Conservation Principles

More information

MULTI-RESIDENTIAL BUILDING SOLUTIONS

MULTI-RESIDENTIAL BUILDING SOLUTIONS MULTI-RESIDENTIAL BUILDING SOLUTIONS OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since

More information

Recycling & Energy Recovery Facility

Recycling & Energy Recovery Facility Recycling & Energy Recovery Facility Cross Green Industrial Estate Leeds Environmental Statement Volume 1: Non-Technical Summary The Proposed Development Project Background Leeds City Council (LCC) intends

More information

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1

More information

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design.

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design. A 0 NORTH 200 metres George Lane worksite North Strathfield Station worksite Strath eld Triangle A B Existing rail corridor Proposed underpass approach New/extended bridge Worksites Existing track Proposed

More information

Conceptual design and design examples for multi-storey buildings

Conceptual design and design examples for multi-storey buildings Brussels, 18-20 February 2008 Dissemination of information workshop 1 Conceptual design and design examples for multi-storey buildings Dr.-Ing. Christian Müller Dipl.-Ing. Matthias Oppe RWTH Aachen Overview

More information

Policy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders.

Policy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders. Vision Statement: Provide goals, objectives, and policies that preserve, improve, and promote responsible use and protect the City s natural and built environment. Goals, Objectives and Policies: Goal

More information

Proteus Waterproofing roof systems are tested to the most rigorous international standards, ensuring they will easily deal with our climate.

Proteus Waterproofing roof systems are tested to the most rigorous international standards, ensuring they will easily deal with our climate. INTRODUCTION Manufactured in the UK, the Proteus Waterproofing range of high performance roof & balcony systems has been engineered to meet the harshest of weather conditions and provide a lasting and

More information

Guidelines for Writing Reports in Engineering Engineering Faculty, Monash University

Guidelines for Writing Reports in Engineering Engineering Faculty, Monash University Guidelines for Writing Reports in Engineering Engineering Faculty, Monash University Key features of reports Reports: are designed for quick and easy communication of information are designed for selective

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information