1 Slide 1 Nantasket Beach, Hull, MA Seawall Impacts on Beach Erosion February 9, 2012 John H. Winkelman U.S. Army Corps of Engineers - New England District 696 Virginia Road, Concord, MA PH: (978) John.H.Winkelman@usace.army.mil
2 Slide 2 Presentation Overview Project Background - Location/Layout - Coastal Structures Brief history of Corps involvement Recent projects Beach survey results and implications Summary/Conclusions
3 Slide 3 Location Map Project Location
4 Slide 4 Allerton Hill Headland Beach System N Strawberry Hill Hingham Bay Atlantic Ocean Northern Bathhouse Phipps Street Rip Rap Revetment Rip RapRevetment Sagamore Hill Pavilion Atlantic Hill DCR Reservation Photo taken in 2001
5 Slide 5 Seawall Construction History 1826, development along Nantasket Beach involved public and private structures supported on timber piles with porches that projected over the high water line. Tidal flow under the main parts of the structures was limited by timber bulkheads, which were ultimately replaced by concrete walls and bulkheads. Construction approximately 1915 Length 5,400 Narrow structure designed to be partially buried - the sand volume in front of the wall to provide stability. Previous seawall failures close to existing failure location during early 1940 s and 1960 s a rehabilitation project added a 12-inch thick reinforced concrete facing to the wall. Existing seawall: - 15 feet tall from top to bottom (base at +2.0 NGVD29) - 4 feet high by 5.5 feet wide base - Crest of the wall (Elev. +17 ft NGVD) is 28-inches wide - Sidewalk on the landward side of the wall is located 2 feet below the crest - Weight of the structure is approximately 8,200 pounds per linear foot of wall
6 Slide 6 History of USACE Involvement With Nantasket Beach 1949 Beach Erosion Control Report on Cooperative Study of Metropolitan District Commission Beaches, MA, Part D Nantasket Beach - Concluded the beach was stable and that maintenance for recreation be funded by locals (this included covering or removal of cobble material) Beach Erosion Control Report on Cooperative Study of Revere and Nantasket Beaches, MA - Recommended placement of a 75 wide sand berm at elevation 12.0 NGVD. Project never completed due to lack of local cooperation/funds Reconnaissance Report, Nantasket Beach Shore Protection Study, Hull, MA - Recommended the initiation of Feasibility Study 1998 Corps study and design for repairs-in-kind to the Nantasket Beach seawall. The Corps completed the study report in August Due to review comments received as part of the ENF process, the DCR directed the Corps on August 19, 2002 to perform an Alternatives/Analysis Study (AAS) Draft Feasibility Report Nantasket Beach Hull, MA Section The report is currently being revised and updated to included new study data and information
7 Slide 7 Current/Recent Projects Nantasket Beach USACE - Section 103 Feasibility Study Center revetment feasibility report near completion (01/2012) Feasibility Report is being revised (middle section revetment proposed) Grain Size/beach profile investigation (completed in 2005) Seawall Replacement at Northern End with Revetment and TSF Revetments designed by Corps of Engineers Revetment has been constructed and accepted DCR Beach Committee Study Woods Hole Group worked for DCR looked at all possible alternatives
8 Slide 8 TSF
9 Slide 9 New Northern Revetment
10 Slide 10 Coastal Processes (Before Study) Headland beach system with both headlands armored Offshore drumlins were, and maybe a source of beach material Sediment transport from north to south Beach comprised of bi-modal grain size distribution (sand and cobble/gravel It was contended that the seawall was increasing the erosion rate in the DCR reservation and for the entire beach system by causing a sediment sink. Based upon literature, personal accounts, and various interest groups the beach experienced vertical erosion of 5 to 10 feet between the 1940 s and 2000 Between 1950 and 1968 more than 125,000 cubic yards (20+ yd 3 /ft of beach of cobbles and gravel had been reportedly removed over an 18- year period by beach maintenance crews.
11 Slide 11 Beach Surveys 1963 Beach Survey (USACE) - 8 profiles collected to below -30 ft- NAVD Beach Characterization Study (USACE Contract) Ocean Survey Incorporated from Old Saybrook, CT performed work. Sampling done mostly with Vibracores to 4 in depth Ponar (grab samples) used where bottom contained too much cobble Eight profiles surveyed from Seawall/Dune to -35 ft-navd88 During the previous summer the DCR and the Corps dug tests pits to determine extent of cobble and size Effort designed to match USACE survey and sampling effort from LIDAR data (USACE SHOALS system) 2010 LIDAR data (USACE CHARTS system)
12
13 #8 #1 #2 #3 #4 #5 #6 #7
14 #8 #1 #3 #5 # 7
15 2010 NCMP LIDAR Data
16 Elevation (ft-navd88) Nantasket Beach Profile 1963, 2005, and 2010 Comparison (2005 Profile #3) 1963 Profile #16 (Profile #3 in 2005 Survey) 2005 Profile # Profile # , , , , , Distance from Base Point (feet)
17 Elevation (ft-navd88) Nantasket Beach Profile 1963 and 2005 Comparison (2005 Profile #4) 1963 Profile # Profile # Profile # Profile # , , , , , *The extrapolated seawall base point elevation is highlighted in orange -50 Distance from Base Point (feet)
18 Elevation (ft-navd88) Nantasket Beach Profile 1963, 2005, and 2010 Comparison (2005 Profile #5) 1963 Profile #12 (Profile #5 in 2005 Survey) 2005 Profile # Profile # , , , , , *The extrapolated seawall base point elevation is highlighted in orange -40 Distance from Base Point (feet)
19 Elevation (ft-navd88) Nantasket Beach Profile 1963, 2005, and 2010 Comparison (2005 Profile #6) 1963 Profile # Profile # Profile # Profile # , , , , , , *The extrapolated seawall base point elevation is highlighted in orange -40 Distance from Base Point (feet)
20 Elevation (ft-navd88) 20 Nantasket Beach Profile 1963, 2005, and 2010 Comparison (2005 Profile #7) 1963 Profile #5 (Profile #7 in 2005 Survey) Profile # Profile # , , , , , , *The extrapolated seawall base point elevation is highlighted in orange -40 Distance from Base Point (feet)
21 Volume Calculations (1963 to 2005) Slide 21
22 Volume Calculations (1963 to 2010) Slide 22
23 Slide 23 Volume Change Summary
24 Slide 24 Study Findings Depth change or vertical beach change is very small when averaged over length of profile Very strong counter evidence to the claim that the seawall has accelerated beach erosion Woods Hole Group from Falmouth, MA concluded sediment transport is from south to north Presence of bi-modal sediment confirmed in 2005 study and similar to 1963 sampling effort Volume change of between 1963 and 2005 of 124,000 yds 3 is very similar to reported cobble volume removed of 125,000 yds 3 Significant change between 2005 and 2010 (LIDAR issue)
25 Slide 25 Summary/Conclusions Anecdotal evidence and personal accounts are important but actual data cannot be equaled Money spent on data collection well worth it even though it is expensive Once again shown that seawalls do not necessarily increase beach erosion
NANTASKET BEACH DCR Reservation Hull, Massachusetts
Coastal Storm Damage Reduction Report DRAFT Feasibility Report and Environmental Assessment NANTASKET BEACH DCR Reservation Hull, Massachusetts US ARMY CORPS OF ENGINEERS New England District May 2014
More informationEvaluating the Condition of Seawalls/Bulkheads
Volume 2 Evaluating the Condition of Seawalls/Bulkheads By: Coastal Systems International, Inc. Typical bulkhead under construction Seawalls and bulkheads (walls) provide shoreline stabilization for many
More informationUsing LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine
Geologic Site of the Month February, 2010 Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine 43 o 20 51.31 N, 70 o 28 54.18 W Text by Peter Slovinsky, Department of Agriculture, Conservation
More informationSITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN
SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN Performed February 2003 Performed by: Dr. Lee E. Harris, Ph.D., P.E. Associate Professor of Ocean Engineering & Oceanography
More informationOakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs
Oakwood Beach Storm Damage Prevention Project NJDEP- Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Branch Dwight Pakan, Project Manager, Philadelphia District The State of New Jersey
More informationSTATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL
STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting Coastal
More informationHurricane and Storm Damage Reduction Study
FLAGLER COUNTY FLORIDA Hurricane and Storm Damage Reduction Study Updated Project Management Plan - 2010 Presented by Dan Haubner Project Manager U.S. Army Corps of Engineers Jacksonville District R-1
More informationRaritan Bay and Sandy Hook Bay Highlands, New Jersey Coastal Storm Risk Management Feasibility Study. Appendix B Engineering July 2015
Raritan Bay and Sandy Hook Bay Highlands, New Jersey Coastal Storm Risk Management Feasibility Study Appendix B Engineering July 2015 This page is intentionally left blank. Raritan Bay and Sandy Hook Bay,
More informationFINAL REPORT FOR 2012 ON THE CONDITION OF THE MUNICIPAL BEACHES IN THE CITY OF BRIGANTINE BEACH, ATLANTIC COUNTY, NEW JERSEY
FINAL REPORT FOR 2012 ON THE CONDITION OF THE MUNICIPAL BEACHES IN THE CITY OF BRIGANTINE BEACH, ATLANTIC COUNTY, NEW JERSEY Photograph was taken November 3, 2012 from 10 th Street North looking south
More informationManaging Our Water Retention Systems
Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central
More informationBEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.
BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA. Claus Brøgger 1 and Poul Jakobsen 2 The present paper presents measurements and results from a three year full scale Pilot Project with the
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationCOST AND MAINTENANCE OF LIVING SHORELINES
COST AND MAINTENANCE OF LIVING SHORELINES Photo: C. Verlinde, University of Florida Sea Grant Extension Debbie L. DeVore South Florida Coastal Program Coordinator What are Living Shorelines? Shoreline
More information30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT
PUBLIC NOTICE Engineering/Planning 696 Virginia Road Concord, MA 01742 Date: 10 November, 2015 Comment Period Ends: 10 December, 2015 In Reply, Refer To: Robert Russo Or by e-mail: Robert.S.Russo@usace.army.mil
More informationStrategic Beach Management Plan Southeast Atlantic Coast Region
Page 1 of 66 Strategic Beach Management Plan Southeast Atlantic Coast Region Division of Water Resource Management Florida Department of Environmental Protection June 2015 Delray Beach Shore Protection
More informationIllinois Coastal Management Program 2011
4 Coastal Erosion Assessment and Planning The Lake Michigan coast is a dynamic setting influenced by waves, ice, and changing lake levels. The potential for coastal erosion exists along nearly the entire
More informationThe Coast of Crystal Cove Orange County, California
The Coast of Crystal Cove Orange County, California by Hany Elwany, Ph.D. Scripps Institution of Oceanography Megan Hamilton, M.Sc. Coastal Environments Robert Robinson Dept. of Parks & Recreation Headwaters
More informationSARASOTA COUNTY LIDO KEY HURRICANE & STORM DAMAGE REDUCTION PROJECT
SARASOTA COUNTY LIDO KEY HURRICANE & STORM DAMAGE REDUCTION PROJECT Information Presentation BOCC Joint Meeting City of Sarasota Sarasota County US Army Corps of Engineers 22 October 2013 Sarasota, Florida
More informationLower Breton Sound Sediment Diversion Conceptual Engineering Design Presentation
EXPERT PANEL ON DIVERSION PLANNING AND IMPLEMENTATION Lower Breton Sound Sediment Diversion Conceptual Engineering Design Presentation February 12, 2015 Topics I. Introduction II. Geotechnical Study III.
More informationTropical Storm Debby. Post-Debby Beach/Dune Damage Assessment Report Sarasota Florida. By Weiqi Lin P.E., Ph.D. Coastal Resources/Community Services
Tropical Storm Debby Post-Debby Beach/Dune Damage Assessment Report Sarasota Florida By Weiqi Lin P.E., Ph.D. Coastal Resources/Community Services June 29, 2012 BACKGROUND AND SUMMARY Tropical storm Debby
More informationTropical Storm Debby
Tropical Storm Debby Post-Debby Beach/Dune Damage Assessment Report (Draft) Sarasota Florida By Weiqi Lin P.E., Ph.D. Coastal Resources/Community Services June 28, 2012 BACKGROUND AND SUMMARY Tropical
More informationPOINTS TO CONSIDER WHEN BUYING SHORELINE PROPERTY
POINTS TO CONSIDER WHEN BUYING SHORELINE PROPERTY You re considering buying a piece of property. You ve found two properties which meet your needs and interest you. Both properties are about two acres
More informationUS Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
More informationREHABILITATION OF THE CHICAGO SHORELINE: A COASTAL ENGINEERING PERSPECTIVE
REHABILITATION OF THE CHICAGO SHORELINE: A COASTAL ENGINEERING PERSPECTIVE Michael Krecic, P.E. Senior Engineer Taylor Engineering, Inc. 9000 Cypress Green Drive Jacksonville, FL 32256 Mark Wagstaff, P.E.
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationSTAFF REPORT: CONSENT CALENDAR. Vasanth Venugopal. 367 Via Lido Soud, City of Newport Beach (County of Orange)
STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY CALIFORNIA COASTAL COMMISSION South Coast Area Office 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 (562) 590-5071 EDMUND G. BROWN, Jr., Governor F
More informationCOASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA
COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA Brendan J. Holden SOPAC Technical Secretariat July 1992 SOPAC Technical Report 148 Prepared for: South Pacific Applied Geoscience
More informationRESUME for Christopher G. Creed, P.E.
Page One of Five Current Position Senior Engineer / Vice-President for Olsen Associates, Inc. a coastal engineering consulting firm in Jacksonville, Florida. Education Master of Civil Engineering, 1992.
More informationREGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS. Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 INTRODUCTION
REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 ABSTRACT: Regional sediment management (RSM) requires the capability
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationTremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete
Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).
More information5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 2009 2010 2011 2012 2013 Year
Figures Wave Height (ft) 5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 2009 2010 2011 2012 2013 Year Figure 1. Annual mean wave height (feet) at the Massachusetts Bay A buoy. The red line is the 2001-2009
More informationInlets Online: A Tutorial for Evaluating Inlet/Beach Processes Using Aerial Photography
Inlets Online: A Tutorial for Evaluating Inlet/Beach Processes Using Aerial Photography by Mark R. Byrnes, Feng Li, and Julie D. Rosati PURPOSE: This Coastal and Hydraulics Engineering Technical Note (CHETN)
More informationLooking for property near the ocean?
Looking for property near the ocean? Questions and Answers on Purchasing Coastal Real Estate in Massachusetts This brochure focuses on questions you should ask as a potential purchaser of coastal real
More informationHurricane Sandy: Beach-dune performance at New Jersey Beach Profile Network sites
Hurricane Sandy: Beach-dune performance at New Jersey Beach Profile Network sites The Coastal Research Center (CRC) at the Richard Stockton College of New Jersey has been collecting beach and nearshore
More informationSHORELINE STABILIZATION RECOMMENDATIONS FOR PLAYA DEL SECRETO MAYA RIVIERA, Q.R., MEXICO
SHORELINE STABILIZATION RECOMMENDATIONS FOR PLAYA DEL SECRETO MAYA RIVIERA, Q.R., MEXICO NOVEMBER 2007 PHOTOGRAPH LOOKING SOUTH ALONG PLAYA DEL SECRETO PREPARED BY: Lee E. Harris, Ph.D., P.E. Consulting
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationBeach Management Funding Assistance Program
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER RESOURCE MANAGEMENT Beach Management Funding Assistance Program Local Government Funding Requests: Ranking Criteria for Beach and Inlet
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationNew Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012
New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection
More informationCH. 2 LOADS ON BUILDINGS
CH. 2 LOADS ON BUILDINGS GRAVITY LOADS Dead loads Vertical loads due to weight of building and any permanent equipment Dead loads of structural elements cannot be readily determined b/c weight depends
More informationProfile Locations: The following sites were surveyed during September and October 2012 and post-sandy by November 26, 2012 (Figure 1).
Introduction: An Assessment of Cape May County Beaches at the New Jersey Beach Profile Network (NJBPN) Sites After Hurricane Sandy Related to (DR-NJ 4086) The Richard Stockton College of NJ Coastal Research
More informationLOCATION: In Elliott Bay, Puget Sound at Seattle, King County, Washington.
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationFINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT
FINAL INTEGRATED GENERAL REEVALUATION REPORT AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT BREVARD COUNTY, FLORIDA HURRICANE AND STORM DAMAGE REDUCTION PROJECT MID-REACH SEGMENT U.S. Army Corps of Engineers
More informationLong Island s Dynamic South Shore
Long Island s Dynamic South Shore A Primer on the Forces and Trends Shaping Our Coast Jay Tanski Long Island s Dynamic South Shore A Primer on the Forces and Trends Shaping Our Coast Introduction Long
More information& Q A. on Purchasing Coastal Real Estate in South Carolina. S.C. Sea Grant Extension Program S.C. DHEC/Office of Ocean and Coastal Resource Management
& Q A on Purchasing Coastal Real Estate in South Carolina S.C. Sea Grant Extension Program S.C. DHEC/Office of Ocean and Coastal Resource Management 1 Questions and Answers on Purchasing Coastal Real Estate
More informationApplication of the Beach-fx Economic Model in St. Johns County, Florida
Application of the Beach-fx Economic Model in St. Johns County, Florida Jason Engle, P.E. Jacksonville District USACE US Army Corps of Engineers Beach-fx Introduction St. Johns County Study Area Overview
More information30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS
.-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin nae-pn-nav@usace.army.mil Programs/Project Management
More informationJune 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
More informationFiled: 6/2/11 W7a. 49th Day: 7/21/11 180th Day: 11/29/11 Staff: M.Ahrens-SD Staff Report: 7/22/11 Hearing Date: 8/10-12/11 CONSENT CALENDAR
STATE OF CALIFORNIA -- THE RESOURCES AGENCY CALIFORNIA COASTAL COMMISSION SAN DIEGO AREA 7575 METROPOLITAN DRIVE, SUITE 103 SAN DIEGO, CA 92108-4421 (619) 767-2370 Filed: 6/2/11 W7a 49th Day: 7/21/11 180th
More informationNew Coastal Study for Puerto Rico FIRMs. Paul Weberg, FEMA RII Mat Mampara, Dewberry Jeff Gangai, Dewberry Krista Collier, Baker
New Coastal Study for Puerto Rico FIRMs Paul Weberg, FEMA RII Mat Mampara, Dewberry Jeff Gangai, Dewberry Krista Collier, Baker September 2007 Project Team FEMA Region II Program Manager Collaboration
More informationFailing Coastal Wood Infrastructure on the Great Lakes
University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many
More informationGLOSSARY OF TERMINOLOGY
GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.
More informationMost informed people realize that cumulative impacts have had
Welcome to the First Issue of Rivers & Coast! The goal of the new Rivers & Coast newsletter is to keep readers well informed of current scientific understanding behind key environmental issues related
More informationLOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS
Concrete Repairs LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. The work will occur within the City of Lowell
More informationOwner's Manual & Assembly Instructions
Owner's Manual & Assembly Instructions PM01 BASE KIT Model No. FDN1014 717090311 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY
More informationCoastal Engineering Indices to Inform Regional Management
Coastal Engineering Indices to Inform Regional Management Lauren Dunkin FSBPA 14 February 2013 Outline Program overview Standard products Coastal Engineering Index Conclusion and future work US Army Corps
More informationOCEAN BEACH-GREAT HIGHWAY STORM DAMAGE PROTECTION PROJECT
OCEAN BEACH-GREAT HIGHWAY STORM DAMAGE PROTECTION PROJECT Final Report Prepared for: San Francisco Department of Public Works U.S. Army Corps of Engineers May 31, 2005 OCEAN BEACH-GREAT HIGHWAY STORM DAMAGE
More informationEstimating Trench Excavation
Estimating Excavation By Steven J. Peterson, PE, MBA Introduction excavation is often performed by hydraulic backhoe excavators. This is because hydraulic excavators are not only good at excavating below
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationSt Lucia. Wise practices for coping with. i b bea n Se a
Wise practices for coping with St Lucia Car i b bea n Se a Fisheries Department, St Lucia Physical Planning Department, St Lucia University of Puerto Rico, Sea Grant College Program Caribbean Development
More informationBMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
More informationSPCC Plan - Calculation Guidance
SPCC Plan - Calculation Guidance The following example compares two different design criteria: one based on the volume of the tank and one based on precipitation. Scenario: A 20,000-gallon horizontal tank
More informationRemote sensing for the MTS
Remote sensing for the MTS Jennifer M. Wozencraft Director, Program Manager, USACE National Coastal Mapping Program 24 June 2014, Innovative Technologies for a Resilient MTS Outline Background JALBTCX
More informationAPPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY
PORTLAND HARBOR RI/FS APPENDIX G VOLUME DETERMINATION DRAFT FEASIBILITY STUDY DRAFT Prepared for The Prepared by Anchor QEA, LLC TABLE OF CONTENTS TABLE OF CONTENTS... I LIST OF FIGURES... II LIST OF TABLES...
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
More informationPotential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report
Port of New York and New Jersey Feasibility Analysis for a Dredged Material Public Processing Facility Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic
More informationPALM BEACH COUNTY DEPARTMENT OF ENVIRONMENTAL RESOURCES MANAGEMENT
PALM BEACH COUNTY DEPARTMENT OF ENVIRONMENTAL RESOURCES MANAGEMENT ENVIRONMENTAL ENHANCEMENT & RESTORATION DIVISION 2014 PALM BEACH COUNTY DEPARTMENT OF ENVIRONMENTAL RESOURCES MANAGEMENT MISSION STATEMENT
More informationRESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS
RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons
More informationMONITORING STANDARDS FOR BEACH EROSION CONTROL PROJECTS
MONITORING STANDARDS FOR BEACH EROSION CONTROL PROJECTS May 2014 Edited: October 2014 Division of Water Resource Management Department of Environmental Protection State of Florida MONITORING STANDARDS
More informationCOSMOS 2012: Earthquakes in Action COSMOS 2012
COSMOS 2012 What is SFSI and why is it important? Soil issues in Earthquakes Structures where SFSI important Retaining structures (lateral earth pressure) Foundations (spread and pile footings, bearing
More informationFY14 LRD Lock Maintenance Meeting 11-13 February 2014. Rehabilitation of the Bird Island Pier Black Rock Lock, Buffalo, NY
FY14 LRD Lock Maintenance Meeting 11-13 February 2014 Rehabilitation of the Bird Island Pier Black Rock Lock, Buffalo, NY Paul Bijhouwer, PE, PMP Keith Jones, PE Buffalo District, Operations Branch US
More informationRole of Underwater Substructure Inspections in Bridge Management
Role of Underwater Substructure Inspections in Bridge Management R. RICHARD AVENT MOHAMED ALAWADY DAVID J. MUKAI Louisiana State University INTRODUCTION In the past, the condition of underwater substructures
More informationReport on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars
Report on Wind Resistance of Signs supported by Glass Fiber Reinforced Concrete (GFRC) Pillars Prepared for US Sign and Fabrication Corporation January, 2006 SUMMARY This study found the attachment of
More informationNantasket Beach Reservation Master Plan
Nantasket Beach Reservation Master Plan DCR Public Meeting January 27, 2016 7:00-8:30 p.m. Nantasket Beach Resort, 45 Hull Shore Drive Commonwealth of Massachusetts Governor Charlie Baker Lieutenant Governor
More information941 Key Street HPO File No. 140817 CERTIFICATE OF APPROPRIATENESS
Application Date: August 6, 2014 Applicant: Mary S Beaver, owner CERTIFICATE OF APPROPRIATENESS Property:, lot 10, block 220, East Subdivision. The property includes a historic 1,200 square foot one story
More informationRevere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.
Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part
More informationInterpreting Federal Emergency Management Agency Flood Maps and Studies in the Coastal Zone
Interpreting Federal Emergency Management Agency Flood Maps and Studies in the Coastal Zone Publication Date: October 2015 Table of Contents FEMA Flood Insurance Rate Maps and Flood Insurance Studies.
More informationBEACH STORM DAMAGE REDUCTION EASEMENT
STATE OF FLORIDA COUNTY OF WALTON WALTON COUNTY, FL HURRICANE & STORM DAMAGE REDUCTION PROJECT FILE/REACH#: PARCEL ID#: BEACH STORM DAMAGE REDUCTION EASEMENT KNOW ALL MEN BY THESE PRESENTS, that for and
More informationRuby River Grayling - Gravel Spawning Beds Monitoring Report January 2008
Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 In partnership with Montana Department of Fish, Wildlife, and Parks (FWP), American Wildlands, and Wildlife Forever, the Madison
More informationPenfield Pavilion Status Report
Penfield Pavilion Status Report October 30, 2014 Presented by: Penfield Building Committee - James Bradley, Chair Robert Bellitto, Vice Chair, Andrew Graceffa, Secretary Ian Bass, Jane Nelson, Ken Jones,
More informationOverview of the National Flood Insurance Program (NFIP) and Recent Flood Mapping Efforts. Richard Zingarelli
Overview of the National Flood Insurance Program (NFIP) and Recent Flood Mapping Efforts Richard Zingarelli State NFIP Program Coordinator Commonwealth of Massachusetts Department of Conservation and Recreation
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationFormwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
More informationRevision Notes Adult Numeracy Level 2
Revision Notes Adult Numeracy Level 2 Place Value The use of place value from earlier levels applies but is extended to all sizes of numbers. The values of columns are: Millions Hundred thousands Ten thousands
More informationCOASTAL SETBACK AND CONTROL LINES* * Cross References: Coastal construction code, 22-351 et seq.
CHAPTER 62, ARTICLE XII. COASTAL SETBACK AND CONTROL LINES* * Cross References: Coastal construction code, 22-351 et seq. Sec. 62-4201. Definitions and rules of construction. For the purpose of this article,
More informationSeven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio
Seven Easy Steps to Installing Your Own Walkway, Driveway and Patio Without Mortar or Concrete Brick is one of the world s oldest and most enduring building materials. Those same qualities also make it
More informationHow to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013
How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table
More informationhttp://www.nj.gov/dep/shoreprotection/storm.htmhris TUCKER
COASTAL STORM SURVEY NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF COASTAL ENGINEERING - TOMS RIVER NJ 12:00 P.M. TUESDAY, MARCH 1, 2005 NEW JERSEY COASTLINE INCLUDING RARITAN AND DELAWARE
More informationSTORAGE SPACE EFFICIENCY GUIDE A DEMONSTRATION IN SPACE
STORAGE SPACE EFFICIENCY GUIDE A DEMONSTRATION IN SPACE SAVING SPACE IS JUST THE BEGINNING Maximizing the efficiency and productivity of a facility is no simple task. With so many variables constantly
More informationOpenings in Foundation Walls for Buildings Located in Special Flood Hazard Areas
Openings in Foundation Walls for Buildings Located in Special Flood Hazard Areas in accordance with the National Flood Insurance Program FEDERAL EMERGENCY MANAGEMENT AGENCY FEDERAL INSURANCE ADMINISTRATION
More informationSAMPLE APPLICATION PACKAGE
SAMPLE APPLICATION PACKAGE For Transportation Related Projects Needing a Permit from Land and Water Management Division a) Tips on Filling out the Application b) Wetland Guidance c) Hydraulic Concerns
More informationRETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com
RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL 11 Featuring Highland Stone anchorwall.com TABLE OF CONTENTS 2 TABLE OF CONTENTS BEFORE YOU BEGIN............................
More informationE4055. Quiz. Soil Classification. Name: SOIL CLASSIFICATION QUESTIONS
E4055 Soil Classification Quiz SOIL CLASSIFICATION Name: Date: QUESTIONS 1 TRUE/FALSE 1. An average cave-in can drop five yards or 13,500 pounds of dirt. 2. A competent person should be knowledgeable of
More informationHydraulic Excavators
Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose
More informationNorfolk Flooding Strategy Update. Presentation to Norfolk City Council March 27, 2012
Norfolk Flooding Strategy Update Presentation to Norfolk City Council March 27, 2012 Presentation Overview The purpose of this presentation is to provide City Council an update on activities carried out
More informationGreater New Orleans Hurricane & Storm Damage Risk Reduction System
Greater New Orleans Hurricane & Storm Damage Risk Reduction System SLFPA-East Update Col. Robert Sinkler, Commander Hurricane Protection Office July 15, 2010 US US Army Army Corps Corps of of Engineers
More informationSECTION 10.0 MANAGEMENT UNIT 5: HORNSEA
10.1 Summary Information 10.1.1 Location SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA The limits of Management Unit 5, a 2.9km stretch of shoreline fronting the town of Hornsea on the Holderness coast, are