1 PROJECT DATABASE FOR SUB-SAHARAN AFRICAN COUNTRIES Prepared by Africa Project Access January 2014
2 Guide to Using the Africa Project Database 1. Africa Project Access provides two essential back-up services to the Projects supplied to subscribers via the Africa Project Database. In order to streamline the usage of these services, subscribers are kindly requested to refer to the Date and Description of each Project concerned. (There is therefore no need for an elaborate numbering system.) 2. The first service relates to contact persons for individual Projects carried. Most of the Project inserts include Contacts. These are contact persons who either know of the Project directly or who should be able to guide the enquirer in the right direction. In a few cases, where no contact person is provided, this is because the Project has originated from our associates and we therefore do not have direct knowledge of the Project. Nevertheless, the subscriber is most welcome to contact Africa Project Access directly (tel , fax , [email protected]) and we will undertake a search for an appropriate contact. It must be understood that communications systems in much of sub-saharan Africa leave much to be desired and data may change very quickly. Personnel in government institutions, utilities, companies etc also change frequently. Thus if the subscriber is not getting through, he or she should follow the procedure in The second service pertains to additional detail on the Project itself. Any formal publication (especially in the environment in which we operate) will be limited in that background intelligence relating to a Project may be difficult to publish in a multiuser system and may only be transmitted verbally. If a subscriber is particularly interested in a specific Project and feels that additional detail is required, he or she is welcome to contact Paul Runge at Africa Project Access who may or may not be in a position to provide additional intelligence, (as opposed to formal information.) It should be remembered that time is the most important factor in that subscribers wish to know of a Project as early as possible even before all the details are known. This is why we are sometimes brief and why we include Updates on some Projects. Note: Our service is not intended to fulfil the role of our some 200 subscribers, (mainly Business Development and Export Managers.) We provide only the initial leads, whereafter it is up to the subscriber to delve into the Project and secure the business. We can however suggest specialists who can assist further down the Project cycle with issues such as financial packaging, bid and performance bonds etc. 1
3 ANGOLA DESCRIPTION & LOCATION: Angola: Cambambe Hydro Power Station Expansion, Kwanza North Province, Northern Angola. SUBSECTOR: Power/Infrastructure CONTRACT DETAILS: The Cambambe Hydro Plant expansion on the Kwanza river entails the construction of a second power station with four additional turbines totalling 700 MW. The construction contract was awarded to Odebrecht. VALUE/LEVEL OF FUNDING: Unstated. MIGA cover is for USD 512 million. FINANCIAL & OTHER PARTIES: Ministry of Energy & Water, Ministry of Finance, Odebrecht of Brazil, MIGA of the World Bank Group has approved a 13-year guarantee for the Project. HSBC Bank. BHF-Bank. World Bank. ANCILLARY INFORMATION: Angola has a national power supply Programme that aims to increase generation capacity from 1,5 GW to over 5 GW. CONTACTS: Joao Baptista Borges, State Secretary for Energy, Ministry of Energy & Water, telephone Luanda or Laurence Clarke, Country Director: Angola, World Bank, telephone Luanda DESCRIPTION & LOCATION: Angola: Lucala Industrial Hub, Northern Kwanza Norte Province SUBSECTOR: Roads/Transport/ Power/Water & Sanitation/Infrastructure/Industrial/Commercial Property STAGE IN PROJECT CYCLE: Early Implementation CONTRACT DETAILS: Work has begun on the development of the Lucala Industrial Hub in northern Kwanza Norte Province. Infrastructure has been established in about 50 acres of the 830 reserved for the Project. Access roads as well as power and water supply are being installed. VALUE/LEVEL OF FUNDING: Total Unstated FINANCIAL & OTHER PARTIES: Ministry of Industry ANCILLARY INFORMATION: The Ministry of Industry is also developing industrial hubs in Viana (Luanda), Catumbela (Benguela) and Futila (Cabinda). Studies are underway for the development of Dondo (Kwanza Norte), Caala (Huambo) and Saurimo (Lunda Sul). CONTACTS: H.E. Mr. Abraão Gourgel: Vice Minister, Ministry of Industry, telephone Luanda / / John Rocha, Programme Manager, Regional Spatial Development Initiative Programme, Development Bank of Southern Africa (DBSA), telephone Johannesburg , cell: , [email protected] BOTSWANA DESCRIPTION & LOCATION: Botswana/DR Congo/Mozambique/Zambia/Zimbabwe/Regional: Fuel Pipeline SUBSECTOR: Oil & Gas CONTRACT DETAILS: Mining Oil & Gas Services (MOGS) of South Africa is promoting a fuel pipeline from Beira in Mozambique to three other southern African countries through Zimbabwe and Botswana. The intended route is from Beira to Harare and Bulawayo and then 2
4 south-west to Botswana, then north through Zambia to the DR Congo. The first phase would be the construction of the Beira-Harare link at an approximate cost of USD 1 billion. Construction would take about two years. Capacity could be 500 million litres of fuel per month. VALUE/LEVEL OF FUNDING: USD 1 billion for Beira-Harare link FINANCIAL & OTHER PARTIES: Mining Oil & Gas Services (MOGS) of South Africa/Royal Bafokeng Holdings ANCILLARY INFORMATION: It would run parallel with the Feruka oil pipeline linking Beira and Msasa depot in Harare. CONTACTS: Charl Morel, Head: Operations, Geoserve & MOGS, telephone Johannesburg , [email protected] CAMEROON DESCRIPTION & LOCATION: Cameroon: New Solar Power Plant SUBSECTOR: Power/Infrastructure CONTRACT DETAILS: GSE Energy is planning the development of a 500 MW solar power plant in Cameroon. The Project will increase national power distribution by 50%. VALUE/LEVEL OF FUNDING: The estimated cost is USD 2,2 billion. FINANCIAL & OTHER PARTIES: GSE Energy. The partners include Hatch Goba of South Africa and Canada, Sun Value of Germany and Austria and PLC Systems of Italy. ANCILLARY INFORMATION: Cameroon hopes to spend USD 12 billion to triple electricity production to MW by 2020 through a combination of hydro, solar and thermal Projects. CONTACTS: Craig Simmer: Director: Business Development, Hatch Goba, telephone Johannesburg , [email protected] Sun Value, telephone Ostermiething , [email protected] CONGO (DEMOCRATIC REPUBLIC) DESCRIPTION & LOCATION: Botswana/DR Congo/Mozambique/Zambia/Zimbabwe/Regional: Fuel Pipeline SUBSECTOR: Oil & Gas CONTRACT DETAILS: Mining Oil & Gas Services (MOGS) of South Africa is promoting a fuel pipeline from Beira in Mozambique to three other southern African countries through Zimbabwe and Botswana. The intended route is from Beira to Harare and Bulawayo and then south-west to Botswana, then north through Zambia to the DR Congo. The first phase would be the construction of the Beira-Harare link at an approximate cost of USD 1 billion. Construction would take about two years. Capacity could be 500 million litres of fuel per month. VALUE/LEVEL OF FUNDING: USD 1 billion for Beira-Harare link FINANCIAL & OTHER PARTIES: Mining Oil & Gas Services (MOGS) of South Africa/Royal Bafokeng Holdings ANCILLARY INFORMATION: It would run parallel with the Feruka oil pipeline linking Beira and Msasa depot in Harare. 3
5 CONTACTS: Charl Morel, Head: Operations, Geoserve & MOGS, telephone Johannesburg , COTE D IVOIRE DESCRIPTION & LOCATION: Côte d Ivoire: Felix Houphouët-Boigny International Airport Upgrade, Abidjan SUBSECTOR: Airports/Aviation/Roads/Transport/Infrastructure CONTRACT DETAILS: Upgrades will be required to Abidjan s Felix Houphouët-Boigny International Airport if it is to accommodate the planned Air France-KLM A seater super jumbo flights between Paris and Abidjan. In 2012, the French development finance institution, Proparco extended a loan of 15 million Euros to Aeria for an expansion and modernisation Programme. The Project includes the renovation of the international and charter terminals, refurbishment of the aircraft parking area, construction of a new parking lot and upgrade of access roads. VALUE/LEVEL OF FUNDING: 15 million Euros FINANCIAL & OTHER PARTIES: Agence Nationale d Aviation Civile (ANAC), Proparco, Aeria ANCILLARY INFORMATION: Abidjan is a major transport hub for West Africa. CONTACTS: Abonouan Jean Kouassi, Director General, Agence Nationale d Aviation Civile (ANAC), telephone Abidjan or , [email protected] or [email protected] DESCRIPTION & LOCATION: Côte d Ivoire: Commercial Zone, Abidjan International Airport SUBSECTOR: Airports/Transport/Infrastructure/Hotels/Commercial Property/Tourism CONTRACT DETAILS: There are plans to develop a new commercial zone at Abidjan international airport. Included are a convention centre and exhibition halls, office buildings, lodging for staff, a shopping centre and a free zone. VALUE/LEVEL OF FUNDING: Unfinalised. FINANCIAL & OTHER PARTIES: Agence Nationale d Aviation Civile (ANAC). ANCILLARY INFORMATION: Construction of a 252-room five-star Radisson Blu Hotel has recently begun and should take 24 months. CONTACTS: Abonouan Jean Kouassi, Director General, Agence Nationale d Aviation Civile (ANAC), telephone Abidjan or , [email protected] or [email protected] DESCRIPTION & LOCATION: Côte d Ivoire: National Fibre Optic Cable Network SUBSECTOR: ICT/Telecommunications/Infrastructure CONTRACT DETAILS: The Ministry of Economy, Finance and Budget has announced that Côte d Ivoire will have a national fibre optic cable network of kilometres. The kilometre San Pedro-Odienné link in the west of the country has already begun and is being undertaken by Huawaei of China. The remaining kilometres for the central and other regions will be initiated. 4
6 VALUE/LEVEL OF FUNDING: Total Unstated FINANCIAL & OTHER PARTIES: Ministry of Economy, Finance and Budget, Huawaei of China. The main implementing agency is the Ministry of Technology, Information and Communication. ANCILLARY INFORMATION: Construction of the 650 kilometre link from Grand Bassam to Abidjan to Bouna recently began. CONTACTS: Ni Zheng: Representative, Huawei Côte d Ivoire, telephone Abidjan , [email protected] ETHIOPIA DESCRIPTION & LOCATION: Ethiopia: Light Railway System, Addis Ababa SUBSECTOR: Rail/Transport/Infrastructure/Commercial Property/Hotels/Health CONTRACT DETAILS: The Ethiopian Railway Corporation is planning the development of a light railway system for Addis Ababa. The system will have 39 stations and at ten of these, new buildings comprising shopping centres, hotels, offices and clinics will be built. Proposed designs of the buildings were recently presented by six local and foreign companies. VALUE/LEVEL OF FUNDING: Total Unfinalised FINANCIAL & OTHER PARTIES: Ethiopian Railways Corporation, Ministry of Transport ANCILLARY INFORMATION: The income from the centres will help fund the rail system. CONTACTS: Dr Eng Getachew Betru: Chief Executive Officer, Abebe Mihretu, Head: Public Relations, Ethiopian Railways Corporation, telephone Addis Ababa or or DESCRIPTION & LOCATION: Ethiopia: Delbi Coal Mine Expansion, Jimma, Oromia State, South-Western Ethiopia SUBSECTOR: Mining CONTRACT DETAILS: Mayflower Mining of India will be investing USD 116 million in the expansion of the Delbi coal mine near the town of Jimma, Oromia State, south-western Ethiopia. The Indian company will acquire 70% while Delbi Mining of Ethiopia will retain 30%. The Tigray Fund (EEFORT) holds 53% of Delbi. The mine s estimated resource is 11,4 billion tons. The mine supplies coal mainly to local cement plants. VALUE/LEVEL OF FUNDING: USD 116 million FINANCIAL & OTHER PARTIES: Mayflower Mining Enterprise of India, Delbi Mining of Ethiopia, Tigray Fund (EEFORT) ANCILLARY INFORMATION: Much equipment will be sources and expertise recruited. CONTACTS: Shri Mohan: Managing Director, Mayflower Enterprises, telephone Tamil Nadi or , [email protected] or [email protected] GABON DESCRIPTION & LOCATION: Gabon: Mineral Sample Testing Facility, Libreville 5
7 SUBSECTOR: Mining STAGE IN PROJECT CYCLE: Early Implementation CONTRACT DETAILS: Set Point Laboratories of South Africa has established a satellite mineral sample testing facility in Libreville. Samples collected in Libreville will be crushed, weighed and packaged and then sent to the laboratories in Johannesburg for full analysis. The company also undertakes water testing. VALUE/LEVEL OF FUNDING: Unstated. FINANCIAL & OTHER PARTIES: Set Point Laboratories, Ministry of Mines, Petroleum & Hydrocarbons. ANCILLARY INFORMATION: The company also operates a facility in Botswana. CONTACTS: Gerrit Fouche, Regional Manager, Set Point Laboratories, telephone Johannesburg DESCRIPTION & LOCATION: Gabon: Mebaga Iron Ore Project, Northern Gabon SUBSECTOR: Mining CONTRACT DETAILS: The London-based junior, Ferrex has announced that Kumba Iron Ore and Anglo American will be financing further exploration at the Mebaga iron ore project in northern Gabon. A due diligence study will be undertaken and commercial terms finalised. The Ferrex team in Gabon will assist with the exploration. VALUE/LEVEL OF FUNDING: Total Unfinalised FINANCIAL & OTHER PARTIES: Ferrex of London, Kumba Iron Ore, Anglo American ANCILLARY INFORMATION: Original reconnaissance was done by BRGM in the early 1960 s. The 309 square kilometre concession is situated close to the major Belinga iron ore deposits. CONTACTS: Dave Reeves: Managing Director, Gus Simbanegavi, GM: South Africa, Ferrex PLC, telephone , [email protected] Dr Hennie Brummer: Business Development Manager: West and Central Africa, Kumba Iron Ore, telephone Pretoria , [email protected] GHANA DESCRIPTION & LOCATION: Ghana: Fabricating Factory, Tema, Southern Ghana SUBSECTOR: Construction/Industrial/Education CONTRACT DETAILS: Toyota Housing Corporation of Japan will be constructing a fabricating factory in Tema, southern Ghana. The Project is part of an initiative by Ghana Japan Oil (GJO) for support to a number of infrastructure Projects in the country beginning with the construction of 200 high schools. VALUE/LEVEL OF FUNDING: The estimated cost is USD 25 million. FINANCIAL & OTHER PARTIES: Toyota Housing Corporation of Japan, Ghana Japan Oil (GJO) ANCILLARY INFORMATION: A team of technical experts is currently identifying the availability of local materials. Training of building technicians is included. CONTACTS: Leslie Tamakloe: Managing Director, GJO, [email protected] DESCRIPTION & LOCATION: Ghana: Northern Rural Growth Project (NRGP) 6
8 SUBSECTOR: Agriculture/Agri-Business STAGE IN PROJECT CYCLE: Implementation CONTRACT DETAILS: The World Bank is supporting the Northern Rural Growth Project (NRGP) which aims to minimise rural-urban migration through a number of local agricultural Projects. VALUE/LEVEL OF FUNDING: Total Unfinalised FINANCIAL & OTHER PARTIES: Ministry of Food & Agriculture, World Bank. ANCILLARY INFORMATION: A recent example is a Project involving farmers in five districts along the Black Volta River in Upper West Region whereby they will be supported with equipment for access to water for vegetable crops. CONTACTS: Maurice Tanco Abisa-Seidu, Chief Director, Ministry of Food & Agriculture, telephone Accra or , [email protected] Yusupha Crookes, Country Director: Ghana, World Bank, telephone Accra , e- mail: [email protected] KENYA DESCRIPTION & LOCATION: Kenya: Heavy Fuel Plant, Nairobi Environs SUBSECTOR: Power/Infrastructure CONTRACT DETAILS: The Commercial Bank of China and Standard Bank of South Africa have concluded a financial package for the funding of an 83MW heavy fuel plant situated outside Nairobi. Kenya Power has signed a 20-year power purchase agreement with the Triumph Kenya that will build the plant. VALUE/LEVEL OF FUNDING: USD 108 million. FINANCIAL & OTHER PARTIES: Commercial Bank of China and Standard Bank Group of South Africa. Kenya Power. Triumph Kenya. Risk insurance has been obtained from the Multilateral Investment Guarantee Agency (MIGA). ANCILLARY INFORMATION: Kenya has an installed generating capacity of MW. CONTACTS: Kwame Parker, Head: Debt Solutions & Infrastructure Financing, CfC Stanbic Bank, telephone Nairobi , [email protected] Dr Ben Chumo, CEO, Kenya Power, [email protected] DESCRIPTION & LOCATION: Kenya: Unilever Manufacturing Plant SUBSECTOR: Industrial/Agri-Industrial CONTRACT DETAILS: Unilever will be investing in a new manufacturing plant in Kenya as part of a strategy for regional supply. The site for the new plant has to date not been specified. VALUE/LEVEL OF FUNDING: 17,4 billion Kenyan Shillings or about USD 204 million. FINANCIAL & OTHER PARTIES: Unilever, Ministry of Industry. ANCILLARY INFORMATION: The company also plans to expand its existing tea processing plants in Kericho. Unilever has identified Kenya as one of its three strategic hubs for sub-saharan Africa, the other two being Nigeria and South Africa. CONTACTS: Patricia Ithau, Marketing Director, Unilever Kenya, telephone Nairobi or , [email protected] 7
9 DESCRIPTION & LOCATION: Kenya: Garden City Mixed Use Property Development, Nairobi SUBSECTOR: Commercial Property/Housing STAGE IN PROJECT CYCLE: Early Implementation CONTRACT DETAILS: The Garden City mixed use property development is scheduled to open in It will be developed on a 32 acre site between Junctions 7 and 8 on the Thika Road in Nairobi. The Project comprises 420 apartments and townhouses, the largest retail mall in East Africa at square metres, an office area of square metres and a 3 acre central park. VALUE/LEVEL OF FUNDING: The cost of the Project is USD 250 million. FINANCIAL & OTHER PARTIES: The main financial arranger is the private equity firm, ACTIS. The property managers are the Broll Property Group. ANCILLARY INFORMATION: The Project has been granted Vision 2030 status. Kenya is seeing considerable commercial property development with two other major Projects in Tatu City and Konza City. CONTACTS: Frank Knight, Broll Property Group, telephone Asmi Shah, Broll Property Group, telephone Cape Town January 2014 Update: DESCRIPTION & LOCATION: Kenya/Regional: Mombasa-Nairobi Rail Line SUBSECTOR: Rail/Transport/Infrastructure STAGE IN PROJECT CYCLE: Early Implementation CONTRACT DETAILS: Kenyan President Uhuru Kenyatta has launched the first phase of the almost 500 kilometre standard gauge Mombasa-Nairobi Rail Line. This will be the first standard gauge rail in the region. Designs are being prepared for a second phase that would link Nairobi to Malaba with a branch line to Kisumu. VALUE/LEVEL OF FUNDING: USD 13,8 billion. FINANCIAL & OTHER PARTIES: Kenya Railways Corporation, Ministry of Transport. China Road & Bridge Corporation. Much of the funding is from the Chinese Government. ANCILLARY INFORMATION: There are also plans to connect the line to through Taveta to Arusha and onwards to Dar es Salaam. CONTACTS: Alfred Matheka, Acting Managing Director, Kenya Railways Corporation, telephone or , [email protected] MALAWI DESCRIPTION & LOCATION: Malawi: Kamuzu and Chileka Airports Upgrade, Lilongwe and Blantyre SUBSECTOR: Airports/Transport/Infrastructure CONTRACT DETAILS: Under its National Civil Aviation Programme, (ICAO), Malawi is planning to upgrade its two international Kamuzu and Chileka airports in Lilongwe and Blantyre. The company, Leading Edge Aviation Planning Professionals (LEAPP) has been responsible for a number of studies relating to Malawi s National Civil Aviation Development Plan. A number of other organisations have also assisted including UNCTAD. The European Union (EU) recently approved a 3 million Euro grant for civil aviation Projects and initiatives in Malawi. A cooperation agreement with the European Aviation Safety Agency will be concluded. VALUE/LEVEL OF FUNDING: Total Unfinalised. 8
10 FINANCIAL & OTHER PARTIES: The implementing agency is the Department of Civil Aviation falling under the Ministry of Transportation and Public Infrastructure. Leading Edge Aviation Planning Professionals (LEAPP), UNCTAD, European Union (EU), European Aviation Safety Agency, Ethiopian Airlines ANCILLARY INFORMATION: There are reports that Ethiopian Airlines will be making a substantial investment in the newly-created Malawi Airlines. In early 2013, there were strikes by Malawian airport workers. CONTACTS: Ben Chisamile: Director, Malawi Department of Civil Aviation, telephone Lilongwe , [email protected] DESCRIPTION & LOCATION: Malawi: Nut Production Outgrowers Programme SUBSECTOR: Agriculture/Agri-Industrial CONTRACT DETAILS: A UK-registered company is looking for USD 5 million to finance a nut production outgrowers programme in Malawi. The company also produces coffee and paprika from the country. The focus will be on exports. VALUE/LEVEL OF FUNDING: USD 5 million FINANCIAL & OTHER PARTIES: Afri-Nut is a joint venture of Twin, the National Smallholders Farmers Association, Ex-Agris, Cordaid and the Waterloo Foundation. The Programme is being supported by the specialised Africa investment bank, African Alliance. ANCILLARY INFORMATION: The consortium has opened a new groundnut processing plant in Lilongwe. CONTACTS: Afri-Nut, \: [email protected] Tony de Castro, Director, African Alliance, website: MAURITIUS January 2014 Update: DESCRIPTION & LOCATION: Mauritius: Mauritius Light Rail Transit System SUBSECTOR: Rail/Transport/Infrastructure CONTRACT DETAILS: The first phase of the Mauritius Light Rail Transit System (MLRT) is scheduled to start by October It will connect the inland centre of Curepipe to Port Louis. The system will cover a distance of 28 kilometres. VALUE/LEVEL OF FUNDING: Total Infinalised FINANCIAL & OTHER PARTIES: The implementing agency is the Mass Transit Unit within the Ministry of Public Infrastructure led by Dr Koshik Reesaul. Technical assistance is from the Singapore Government. ANCILLARY INFORMATION: The island is experiencing a considerable increase in traffic congestion especially in its northern areas. CONTACTS: Dr Koshik Reesaul, Chief Engineer, Ministry of Public Infrastructure: Land Transport Division, telephone Port Louis / , [email protected] DESCRIPTION & LOCATION: Mauritius: La Balise Marina, Black River Area, South-West Coast SUBSECTOR: Commercial Property/Tourism/Construction 9
11 CONTRACT DETAILS: The second phase of La Balise Marina in the Black River area on the south-west coast is scheduled to commence in April 2014 and should be completed by the end of 2016 depending on sales. The Project comprises 146 luxury residential units, 70 apartments and 14 villas with restaurant and recreational facilities. The Project has been developed by ENL Property and local contractor, General Construction Company was appointed for phase one. VALUE/LEVEL OF FUNDING: The total value is estimated at 4,7 billion Rupees or around USD 200 million. FINANCIAL & OTHER PARTIES: ENL Property, General Construction Company ANCILLARY INFORMATION: The Project forms part of the Integrated Resort Scheme Programme for the island. CONTACTS: Gilbert Espitalier-Noël: MD, ENL Group, telephone General Construction Company Head Office, telephone Cyprus , MOZAMBIQUE DESCRIPTION & LOCATION: Mozambique: Nacala Fuel Depot, Northern Mozambique SUBSECTOR: Oil & Gas/Industrial CONTRACT DETAILS: BP Mozambique has stated that it will be allocating USD 75 million over the next three years for the re-commissioning of the Nacala Fuel Terminal. The Project forms part of BP s Programme aimed at securing fuel supply for the country. Included are recapitalisations of the other two fuel terminals at Beira and Matolla as well as fuel station network refurbishment, storage depot refurbishment and enhancement of aviation fuel supply at Maputo airport. VALUE/LEVEL OF FUNDING: allocating USD 75 million over the next three years FINANCIAL & OTHER PARTIES: BP Mozambique, Goss & Balfe Construction of Durban ANCILLARY INFORMATION: BP took over national fuel supply after Shell left the country in It is reported that Goss & Balfe Construction of Durban was awarded the phase 1 commissioning of the Nacala fuel terminal. CONTACTS: Paddy Goss: Managing Director, Goss & Balfe Construction, telephone Durban , [email protected] BP Mozambique, telephone Maputo /5 January 2014 Update: DESCRIPTION & LOCATION: Mozambique: Ncondezi 300 MW Coal-Fired Power Plant, Zambezi Valley SUBSECTOR: Mining/Power/Infrastructure CONTRACT DETAILS: The UK-registered junior, Ncondezi has announced that it should conclude a Final Power Purchase Agreement with the Mozambican power utility, Electricidade de Mocambique (EDM) by the end of March 2014 for its 300 MW mine mouth coal-fired power plant in the Zambezi Valley. The company is undertaking an integrated coal mine and power plant. It is estimated that annual revenues from the plant will be around USD 200 million. An initial Power Framework Agreement was signed in April VALUE/LEVEL OF FUNDING: Total Unstated. An additional USD 15 million will be required to conclude the PPA. 10
12 FINANCIAL & OTHER PARTIES: Ncondezi of the UK, Electricidade de Mocambique (EDM) ANCILLARY INFORMATION: The coal operators of the Zambezi Valley are implementing mine mouth coal Projects for local and their own power requirements. CONTACTS: Dave Eshmade, Country Manager: Mozambique, Ncondezi Coal Company, telephone , Joaquim Ou-chim: Director, Electricidade de Mocambique (EDM), telephone Maputo , Herminio Abrao Lucas: North Distribution Director, Electricidade de Mocambique (EDM), telephone Nampula , Agostinho Mucauro: Electrical Engineer, Electricidade de Mocambique (EDM), Heber Janeiro: Project Manager & Electrical Engineer, Electricidade de Mocambique (EDM), Antonio Munguambe: Electrical Engineer & Planning, Electricidade de Mocambique (EDM), Carlos Yum: Division Director: Corporate Performance and New Business Development, Electricidade de Mocambique (EDM), telephone Maputo , DESCRIPTION & LOCATION: Mozambique: Residential Complex, Palma, Far North Coast SUBSECTOR: Commercial Property/Hotels/Construction STAGE IN PROJECT CYCLE: Early Implementation CONTRACT DETAILS: African Century Real Estate (ACRE) Mozambique is coordinating the construction of a residential complex in Palma on the far north coast of Mozambique near the Tanzanian border. PalmaResidences includes two-bedroom ensuite villas, a swimming pool and generators. The first phase is scheduled for completion in February Construction of the Palma Business Hotel is to begin in VALUE/LEVEL OF FUNDING: Total Unstated FINANCIAL & OTHER PARTIES: African Century Real Estate (ACRE), PalmaResidences, Palma Business Hotel ANCILLARY INFORMATION: The siting of the LNG plant near Palma will lead to a major influx into the small town. CONTACTS: Pedro Pinto: Executive Administrator, African Century Real Estate Mozambique (ACRE), telephone Maputo , [email protected] DESCRIPTION & LOCATION: Mozambique: Palma Industrial Park, Far North Coast SUBSECTOR: Industrial/Commercial Property CONTRACT DETAILS: African Century Real Estate (ACRE) Mozambique is coordinating the construction of the Palma Industrial Park on the far north coast of Mozambique near the Tanzanian border. The park will comprise twenty-one warehouses each with an area of 40x15 metres. VALUE/LEVEL OF FUNDING: Total Unstated FINANCIAL & OTHER PARTIES: African Century Real Estate (ACRE) ANCILLARY INFORMATION: Other Projects being undertaken by African Century are the Muitua Business and Logistics Park in Pemba further south and the Mahate Ridge Living and Business Resort also in Pemba. CONTACTS: Pedro Pinto: Executive Administrator, African Century Real Estate Mozambique (ACRE), telephone Maputo , [email protected] 11
13 DESCRIPTION & LOCATION: Mozambique: Maputo Piped Gas Network SUBSECTOR: Oil & Gas STAGE IN PROJECT CYCLE: Implementation CONTRACT DETAILS: The Mozambican national oil utility, Empresa Nacional de Hidrocarbonetos (ENH) has announced that the Maputo Piped Gas Network of 62 kilometres will be established by April or May Gas will be fed from the Pande and Temane fields to some of the city s residences, industries, hospitals, restaurants. VALUE/LEVEL OF FUNDING: The cost of the Project is estimated at USD 38 million. FINANCIAL & OTHER PARTIES: Empresa Nacional de Hidrocarbonetos (ENH) ANCILLARY INFORMATION: ENH began laying the pipeline system in March CONTACTS: Tavares Martinho: Exploration Manager and Senior Representative to the Chairman, ENH, telephone Maputo , [email protected] or [email protected] Guilhermino Fortes: Consultant, ENH, telephone Maputo , [email protected] DESCRIPTION & LOCATION: Botswana/DR Congo/Mozambique/Zambia/Zimbabwe/Regional: Fuel Pipeline SUBSECTOR: Oil & Gas CONTRACT DETAILS: Mining Oil & Gas Services (MOGS) of South Africa is promoting a fuel pipeline from Beira in Mozambique to three other southern African countries through Zimbabwe and Botswana. The intended route is from Beira to Harare and Bulawayo and then south-west to Botswana, then north through Zambia to the DR Congo. The first phase would be the construction of the Beira-Harare link at an approximate cost of USD 1 billion. Construction would take about two years. Capacity could be 500 million litres of fuel per month. VALUE/LEVEL OF FUNDING: USD 1 billion for Beira-Harare link FINANCIAL & OTHER PARTIES: Mining Oil & Gas Services (MOGS) of South Africa/Royal Bafokeng Holdings ANCILLARY INFORMATION: It would run parallel with the Feruka oil pipeline linking Beira and Msasa depot in Harare. CONTACTS: Charl Morel, Head: Operations, Geoserve & MOGS, telephone Johannesburg , [email protected] NIGERIA DESCRIPTION & LOCATION: Nigeria: New Deep-Sea Port, Port@Lekki Project, Lekki, Lagos, Southern Nigeria SUBSECTOR: Ports/Transport/Infrastructure CONTRACT DETAILS: A multi-purpose new deep-sea port is being planned at Lekki in southern Nigeria. The Project includes a 1,5 kilometre breakwater, a 6 kilometre long approach channel with 19,5 metre draught and a 1,5 kilometre quay wall. VALUE/LEVEL OF FUNDING: USD 1,6 billion. Completion is set for
14 FINANCIAL & OTHER PARTIES: The Project is being undertaken by the Tolaram Group s Lekki Port LFTZ Enterprise with the Nigeria Port Authority. Lagos State Government. ANCILLARY INFORMATION: The Project was approved by the Federal Executive Council despite arguments against the choice of Lagos which already has two of the country s largest ports. CONTACTS: Sonny Aswani, Managing Director, Lekki Port LFTZ Enterprise, Tolaram Group, telephone Lagos , [email protected] DESCRIPTION & LOCATION: Nigeria: Petrochemical and Fertilizer plant, OK-LNG Free Trade Zone, South-Western Nigeria SUBSECTOR: Oil & Gas/Industrial/Agriculture CONTRACT DETAILS: Dangote Industries Limited of Nigeria is working with local and foreign banks for the funding of a petrochemical and fertilizer plant to be located at the OK- LNG Free Trade Zone between Ogun and Ondo States, south-western Nigeria. The contract has been awarded to a subsidiary of Honeywell International of the USA, UOP and the management contract has gone to India Engineers Limited. Saipem of Italy has won the fertilizer plant contract. The complex will include a barrels per day refinery. VALUE/LEVEL OF FUNDING: The total cost of the complex is estimated at USD 9 billion. FINANCIAL & OTHER PARTIES: Dangote Industries Limited of Nigeria, Honeywell International of the USA, UOP, India Engineers Limited, Saipem of Italy ANCILLARY INFORMATION: Nigeria is planning to sell its four refineries by mid CONTACTS: Carl Franklin, Head: Investor Relations, Dangote Industries, telephone Lagos /6, [email protected] Saipem, telephone Milan , [email protected] India Engineers Limited, telephone New Delhi , [email protected] DESCRIPTION & LOCATION: Nigeria: Tier III Communications Data Centre, Lekki Peninsula, Lagos SUBSECTOR: ICT/Telecommunications/Infrastructure STAGE IN PROJECT CYCLE: Implementation CONTRACT DETAILS: The West African submarine cable company, MainOne is building a major Tier III Communications Data Centre on the Lekki Peninsula landing station in Lagos. It will occupy square metres. The centre will be completed by mid VALUE/LEVEL OF FUNDING: The cost is estimated at USD 25 million. FINANCIAL & OTHER PARTIES: MainOne ANCILLARY INFORMATION: The Project will reduce information technology costs. CONTACTS: Funke Opeke: Chief Executive Officer, MainOne, telephone Lagos , [email protected] Mrs Lynda Madu: Head: Corporate Services & Development, MainOne, telephone Lagos , [email protected] TANZANIA DESCRIPTION & LOCATION: Tanzania: Arusha-Kibanga-Kongwa Road, Northern Tanzania 13
15 SUBSECTOR: Roads/Transport/Infrastructure STAGE IN PROJECT CYCLE: Conceptual CONTRACT DETAILS: The Tanzanian roads utility, TANROADS has issued a Request for Expressions of Interest for the tarring of the 493 kilometre Arusha-Kibanga-Kongwa Road in northern Tanzania. Phase 1 comprises the feasibility study and environmental impact assessment and phase 2 is for the detailed engineering design and preparation of tender documents. VALUE/LEVEL OF FUNDING: Total Unfinalised FINANCIAL & OTHER PARTIES: TANROADS. The relevant authority is the Ministry of Works. ANCILLARY INFORMATION: The Arusha area is seeing a considerable increase in economic activity. CONTACTS: Eng Jason Rwiza, Tanzania National Roads Agency, telephone Dar Es Salaam , [email protected] Chrispianus Ako: Director: Projects, TANROADS, telephone Dar es Salaam /6, [email protected] Eng. Joseph Nyamhanga: Deputy Permanent Secretary, Ministry of Works, telephone Dar es Salaam , [email protected] UGANDA DESCRIPTION & LOCATION: Uganda: New Oil Refinery, Hoima District, Western Uganda SUBSECTOR: Oil & Gas/Industrial/Infrastructure. CONTRACT DETAILS: Five consortia and one major company have been short listed on a Request for Qualification (RFQ) basis for the planned barrels per day oil refinery. The 29 square kilometre site is in the Hoima District in western Uganda near the Lake Albert deposits. The next phase will be for a Request for Proposal that will require submission of a full, detailed plan. Support industries and facilities are included in the Project. VALUE/LEVEL OF FUNDING: Total Unfinalised FINANCIAL & OTHER PARTIES: The listed contenders are: the company, Marubeni Corporation with the consortia led by Petrofac, RT-Global Resources, SK Energy, China Petroleum Pipeline Bureau and Vitol. The implementing agency is the Ministry of Energy & Mineral Development. ANCILLARY INFORMATION: There have been considerable delays in the exploitation of the Lake Albert oil reserves. CONTACTS: F.A. Kabagambe-Kaliisa: Permanent Secretary, Ministry of Energy & Mineral Development, telephone / / DESCRIPTION & LOCATION: Uganda: Kingfisher Oil Field, Lake Albert, Western Uganda SUBSECTOR: Oil & Gas/Roads/Transport/Infrastructure/Housing. CONTRACT DETAILS: China National Offshore Oil Corporation (CNOOC) will be developing the new Kingfisher oil field in Lake Albert over the next four years. The field has a resource of 635 million barrels and a production capacity of around barrels per day. The Project includes the construction of a 50 kilometre pipeline from Buhuka to Kabaale refinery area. The key 7-kilometre Ikamiro-Buhuka road will be constructed as well as other 14
16 access roads, airstrips and permanent camps. There are twenty fields in the Lake Albert basin which has a total resource of 3,5 billion barrels. VALUE/LEVEL OF FUNDING: The value of the contract is USD 2 billion. FINANCIAL & OTHER PARTIES: Ministry of Energy & Mineral Development, China National Offshore Oil Corporation (CNOOC), ANCILLARY INFORMATION: Commercial production of Ugandan oil is expected from The government is applying strict local content requirements. CONTACTS: Ernest Rubondo, Commissioner: Petroleum Exploration & Production Department, Ministry of Energy & Mineral Development, telephone Kampala or CNOOC Uganda, [email protected] CNOOC Limited, telephone China , fax: ZAMBIA DESCRIPTION & LOCATION: Zambia: Roma Park Development Project, Lusaka SUBSECTOR: Commercial Property/Roads/Transport/Water & Sanitation/Infrastructure STAGE IN PROJECT CYCLE: Implementation CONTRACT DETAILS: It is reported that to date the Roma Park Development Project in Lusaka has received investment of USD 17 million. The development will entail retail, wholesale and factory outlets over an area of 280 hectares. Access roads as well as power and water supply will be required. VALUE/LEVEL OF FUNDING: USD 17 million received investment. It is believed that the Project could attract total investment of USD 150 million. FINANCIAL & OTHER PARTIES: The developers are CPD Properties Limited supported by the Ministry of Commerce, Trade and Industry. ANCILLARY INFORMATION: The Project was initiated in CONTACTS: Neville Fox, CPD Properties Limited, telephone , [email protected] DESCRIPTION & LOCATION: Zambia: Mulobezi Railway Concession, Southern Zambia SUBSECTOR: Rail/Transport/Infrastructure STAGE IN PROJECT CYCLE: Implementation CONTRACT DETAILS: The Zambian government has revoked the 163 kilometre Mulobezi Railway Concession that was granted to Leasons General Contractors in The Ministry of Transport, Works & Supply has handed over the operation to Zambia Railways Limited (ZRL). The rehabilitation and development works will be financed from the USD 120 million grant to ZRL from the USD 750 million Eurobond. It is hoped that the line will be operational from early VALUE/LEVEL OF FUNDING: USD 120 million FINANCIAL & OTHER PARTIES: Leasons General Contractors, The Ministry of Transport, Works & Supply, Zambia Railways Limited (ZRL) ANCILLARY INFORMATION: The line was previously known as the Zambezi Sawmills Railway carrying timber from Mulobezi to Livingstone in the Southern Province. CONTACTS: Webster Mtambo: Technical Manager, Zambia Railways, telephone Kabwe or , [email protected] 15
17 DESCRIPTION & LOCATION: Zambia: Revival of Mansa Batteries & Manganese Processing Plant, Luapula Province, Northern Zambia SUBSECTOR: Industrial/Mining CONTRACT DETAILS: Negotiations are underway between the Ministry of Commerce, Delta Limited of South Africa and Bangweulu Batteries for the revival of the Mansa Batteries operation in Luapula Province, northern Zambia. The current owner of Mansa Batteries is Bangweulu Batteries. The intention is to add value to the area s substantial manganese deposits through the establishment of a manganese processing plant. VALUE/LEVEL OF FUNDING: Total Unfinalised FINANCIAL & OTHER PARTIES: Ministry of Commerce, Delta Limited of South Africa, Bangweulu Batteries, Mansa Batteries ANCILLARY INFORMATION: Power supply to the plant would be problematic. CONTACTS: EW van Zyl, Joint MD, Delta EMD Limited, telephone Johannesburg Davison Chilipamushi: Permanent Secretary, Ministry of Commerce, Trade & Industry, telephone Lusaka /9 DESCRIPTION & LOCATION: Zambia: New Power Plant, Ndola SUBSECTOR: Power/Infrastructure/Construction CONTRACT DETAILS: Dangote Cement of Zambia will be commissioning a new 30 MW power plant in early 2014 to feed electricity to its cement plant situated outside Ndola in the Copperbelt. The 1,5 million tons per annum cement plant is being constructed by Sinoma of China. VALUE/LEVEL OF FUNDING: The estimated cost is USD 50 million. FINANCIAL & OTHER PARTIES: Dangote Cement of Zambia, Sinoma of China, Zambia Development Agency (ZDA). ANCILLARY INFORMATION: The Project is supported by the Zambia Development Agency (ZDA). CONTACTS: Viveka Heblikar, General Manager, Dangote Zambia, telephone Dangote Global Services, London , [email protected] Joseph Silavwe: Exports Division, ZDA, telephone Lusaka , [email protected] Prudence Kaaya Sinkambe: Research Officer, Planning and Policy Division, ZDA, telephone Lusaka , [email protected] or [email protected] DESCRIPTION & LOCATION: Botswana/DR Congo/Mozambique/Zambia/Zimbabwe/Regional: Fuel Pipeline SUBSECTOR: Oil & Gas CONTRACT DETAILS: Mining Oil & Gas Services (MOGS) of South Africa is promoting a fuel pipeline from Beira in Mozambique to three other southern African countries through Zimbabwe and Botswana. The intended route is from Beira to Harare and Bulawayo and then south-west to Botswana, then north through Zambia to the DR Congo. The first phase would be the construction of the Beira-Harare link at an approximate cost of USD 1 billion. Construction would take about two years. Capacity could be 500 million litres of fuel per month. VALUE/LEVEL OF FUNDING: USD 1 billion for Beira-Harare link FINANCIAL & OTHER PARTIES: Mining Oil & Gas Services (MOGS) of South Africa/Royal Bafokeng Holdings 16
18 ANCILLARY INFORMATION: It would run parallel with the Feruka oil pipeline linking Beira and Msasa depot in Harare. CONTACTS: Charl Morel, Head: Operations, Geoserve & MOGS, telephone Johannesburg , ZIMBABWE DESCRIPTION & LOCATION: Zimbabwe: Greater Harare Transportation Master Plan SUBSECTOR: Roads/Rail/Transport/Infrastructure CONTRACT DETAILS: The Ministry of Transport and Infrastructure Development, the Zimbabwe National Roads Administration and the Harare City Council are reportedly about to sign a deal with a South African company, NEO Capital for the rehabilitation and maintenance of the roads of the city of Harare under the Greater Harare Transportation Master Plan. The Project could be expanded to include mass light rail, bus and taxi transport systems. The value of the deal which could be a 30-year concession is estimated at USD 400 million. The Environmental Management Committee of the Harare City Council has recommended the establishment of a special purpose vehicle to implement the deal. The possibility of a joint venture in the form of a Harare Roads Development Company has been mooted. VALUE/LEVEL OF FUNDING: USD 400 million. FINANCIAL & OTHER PARTIES: Ministry of Transport and Infrastructure Development, Zimbabwe National Roads Administration, Harare City Council, NEO Capital of South Africa, Harare Roads Development Company ANCILLARY INFORMATION: The city has about kilometres of tarred roads. CONTACTS: Vivien Natasen: CEO, Neo Capital, telephone Johannesburg , e- mail: [email protected] Dr Tendai Mahachi: Town Clerk, Harare City Council, telephone , [email protected] F Chitukutuku: CEO, Zimbabwe National Road Administration, telephone Harare , [email protected] DESCRIPTION & LOCATION: Zimbabwe: Three Solar Power Plants, Matabeleland Province, Western Zimbabwe SUBSECTOR: Power/Infrastructure CONTRACT DETAILS: The Zimbabwe Electricity Supply Authority (ZESA) has announced that it is planning the establishment of three solar power plants in the Matabeleland Province area of western Zimbabwe by the end of Each will have a capacity of 100 MW. VALUE/LEVEL OF FUNDING: The estimated cost is USD 540 million. FINANCIAL & OTHER PARTIES: Zimbabwe Electricity Supply Authority (ZESA) ANCILLARY INFORMATION: Sites previously mentioned include Plumtree and Gwanda. There is considerable pledged Chinese financial support for the Zimbabwean power sector. The country has a current demand of MW but only generates MW. CONTACTS: Simon Matumba: Senior Engineer: Business Development & Planning, ZESA Holdings, telephone Harare , [email protected] 17
19 DESCRIPTION & LOCATION: Botswana/DR Congo/Mozambique/Zambia/Zimbabwe/Regional: Fuel Pipeline SUBSECTOR: Oil & Gas CONTRACT DETAILS: Mining Oil & Gas Services (MOGS) of South Africa is promoting a fuel pipeline from Beira in Mozambique to three other southern African countries through Zimbabwe and Botswana. The intended route is from Beira to Harare and Bulawayo and then south-west to Botswana, then north through Zambia to the DR Congo. The first phase would be the construction of the Beira-Harare link at an approximate cost of USD 1 billion. Construction would take about two years. Capacity could be 500 million litres of fuel per month. VALUE/LEVEL OF FUNDING: USD 1 billion for Beira-Harare link FINANCIAL & OTHER PARTIES: Mining Oil & Gas Services (MOGS) of South Africa/Royal Bafokeng Holdings ANCILLARY INFORMATION: It would run parallel with the Feruka oil pipeline linking Beira and Msasa depot in Harare. CONTACTS: Charl Morel, Head: Operations, Geoserve & MOGS, telephone Johannesburg , [email protected] GENERAL/REGIONAL January 2014 Update: DESCRIPTION & LOCATION: Kenya/Regional: Mombasa-Nairobi Rail Line SUBSECTOR: Rail/Transport/Infrastructure STAGE IN PROJECT CYCLE: Early Implementation CONTRACT DETAILS: Kenyan President Uhuru Kenyatta has launched the first phase of the almost 500 kilometre standard gauge Mombasa-Nairobi Rail Line. This will be the first standard gauge rail in the region. Designs are being prepared for a second phase that would link Nairobi to Malaba with a branch line to Kisumu. VALUE/LEVEL OF FUNDING: USD 13,8 billion. FINANCIAL & OTHER PARTIES: Kenya Railways Corporation, Ministry of Transport. China Road & Bridge Corporation. Much of the funding is from the Chinese Government. ANCILLARY INFORMATION: There are also plans to connect the line to through Taveta to Arusha and onwards to Dar es Salaam. CONTACTS: Alfred Matheka, Acting Managing Director, Kenya Railways Corporation, telephone or , [email protected] DESCRIPTION & LOCATION: Botswana/DR Congo/Mozambique/Zambia/Zimbabwe/Regional: Fuel Pipeline SUBSECTOR: Oil & Gas CONTRACT DETAILS: Mining Oil & Gas Services (MOGS) of South Africa is promoting a fuel pipeline from Beira in Mozambique to three other southern African countries through Zimbabwe and Botswana. The intended route is from Beira to Harare and Bulawayo and then south-west to Botswana, then north through Zambia to the DR Congo. The first phase would be the construction of the Beira-Harare link at an approximate cost of USD 1 billion. Construction would take about two years. Capacity could be 500 million litres of fuel per month. VALUE/LEVEL OF FUNDING: USD 1 billion for Beira-Harare link 18
20 FINANCIAL & OTHER PARTIES: Mining Oil & Gas Services (MOGS) of South Africa/Royal Bafokeng Holdings ANCILLARY INFORMATION: It would run parallel with the Feruka oil pipeline linking Beira and Msasa depot in Harare. CONTACTS: Charl Morel, Head: Operations, Geoserve & MOGS, telephone Johannesburg , 19
Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager
Cornelder de Moçambique Port of Beira 22/06/12, Pretoria Félix Machado Sales & Marketing Manager Why Choose the Beira Corridor? Reason 1: Location & Costs Reason 1: Location & Costs Beira Corridor Reason
DAWEI Sea PROJECT Port Project DAWEI AND THE REGION
February 2012 DAWEI Sea PROJECT Port Project DAWEI AND THE REGION PROJECT LOCATION Kunming India Middle East / Europe Dawei Africa Asia Regional Hub DAWEI Sea PROJECT Port Project DAWEI PROJECT OVERVIEW
Japan s Initiative on Infrastructure Development in Africa and TICAD Process Fifth Ministerial Meeting NEPAD-OECD Africa Investment Initiative
Japan s Initiative on Infrastructure Development in Africa and TICAD Process Fifth Ministerial Meeting NEPAD-OECD Africa Investment Initiative Kei YOSHIZAWA Deputy Director,Office for TICAD Process Japan
Investment Brief for the Electricity Sector in Ghana
Investment Brief for the Electricity Sector in Ghana Overview Ghana s economy growth decelerated sharply to an estimated 4.2% in 2014, down from 7.4 % in 2013. Manufacturing and oil production from the
consulting Company Profile Immigration, Relocation and Expat Support Services
consulting Company Profile Immigration, Relocation and Expat Support Services Who are we? Expats On The Globe (EOG) is servicing beyond borders with a particular focus on Africa. Based in South Africa,
AfricaArray: A Public-Private Partnership for Building Geoscience Capacity
AfricaArray: A Public-Private Partnership for Building Geoscience Capacity Andy Nyblade, Professor, Dept. of Geosciences, Penn State University, University Park, PA USA Paul Dirks, Professor and Head,
Pendulum Business Loan Brokers L.L.C.
BUSINESS BROKERS DEVELOPING COMPONENT PART MANUFACTURING PARTNERSHIPS METAL PLASTIC ELECTRICAL Business Brokers Three (3) Component Part Manufacturing Partnerships Categories Hiram R. Davis Corporate Secretary
MOZAMBIQUE PORTS AND RAILWAYS, E.P. Fact Sheet. Corporate Restructuring
MOZAMBIQUE PORTS AND RAILWAYS, E.P. Fact Sheet Corporate Restructuring April/2006 SADC RAILWAY NETWORK POINTE NOIRE CONGO BRAZAVILLE KINSHASA HEBO DRC KINBU KABALO KIGOMA TABORA TANZANIA KENYA MOMBASA
Construction Services
Construction Services Construction Turning innovative ideas into delivered solutions At Golder Associates we strive to be the most respected global company providing consulting, design, and construction
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Presentation Outline COUNTRY PROFILE KEY POWER SECTOR PLAYERS OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA ZAMBIA ENERGY SITUATION PRESENTLY RESULT
Factoring in Africa: Opportunities and Challenges
Factoring in Africa: Opportunities and Challenges By Mrs. Kanayo Awani Director Trade Finance and Branches African Export-Import Bank Presented at the 2014 Afreximbank Seminar on Factoring Lusaka, Zambia
Sub-Sahara Capital African Real Estate Update July 2015. Our view:
Sub-Sahara Capital African Real Estate Update July 2015 Our view: Real estate is one of the best ways to benefit from two powerful African trends, population growth and urbanization. Between 2010 and 2025
Chart 1: Zambia's Major Trading Partners (Exports + Imports) Q4 2008 - Q4 2009. Switzernd RSA Congo DR China UAE Kuwait UK Zimbabwe India Egypt Other
Bank of Zambia us $ Million 1. INTRODUCTION This report shows Zambia s direction of merchandise trade for the fourth quarter of 2009 compared with the corresponding quarter in 2008. Revised 1 statistics,
GHANA. www.dlapiper.com 01
GHANA www.dlapiper.com 01 Introducing Reindorf Chambers and the Ghanaian legal environment Key information on Ghana Formerly known as the Gold Coast, Ghana is located in West Africa, and became independent
Domestic steel market overview
Domestic steel market overview Chifipa Mhango Chief Economist: ArcelorMittal South Africa Investor Session: Cape Town & Johannesburg September 2011 The Economy in a nutshell Global overview Advanced economies
Africa s external and intra-regional trade
Africa s external and intra-regional trade Dr Edward George Head of Soft Commodities Research, Ecobank Euromoney Global Commodities Finance Conference, Geneva, 5 June 2013 Section 1 Africa s external trade
SEACOM IP & MPLS Services. November 2013
SEACOM IP & MPLS Services November 2013 The Agenda is... SEACOM Overview IP Transit Services Ethernet Service Remote Peering Service Company Overview Launched 23 July 2009 privately funded and over three
INTERNATIONAL CIVIL AVIATION ORGANIZATION THE 8TH NAFISAT SUPERVISORY COMMITTEE MEETING (Mahe, Seychelles, 25-26 March 2013)
Revised 20 NAFISAT SVC/8 IP/7 INTERNATIONAL CIVIL AVIATION ORGANIZATION THE 8TH NAFISAT SUPERVISORY COMMITTEE MEETING (Mahe, Seychelles, 25-26 March 2013) Presented by NANSC Egypt NAFISAT In 2001, ATNS
AIO Life Seminar Abidjan - Côte d Ivoire
AIO Life Seminar Abidjan - Côte d Ivoire Life Insurance Market Survey of Selected African Countries Bertus Thomas Africa Committee of the Actuarial Society of South Africa Agenda SECTION 1 SURVEY OBJECTIVE
AID FOR TRADE CASE STORY: ZIMBABWE
AID FOR TRADE: CASE STORY ZIMBABWE Date of submission : 31 January 2011 Region : Southern Africa Country : Zimbabwe Type : Project Author : Ministry of Industry and Commerce CHIRUNDU ONE STOP BORDER POST:
Insolvency and. You think growth, we think strategy.
Insolvency and Restructuring You think growth, we think strategy. Our horizons are as broad as your business vision. Our Firm Bowman Gilfillan Africa Group is one of Africa s premier corporate law firms,
TALKING TRADE: ENTREPRENEURS IN AFRICA TRANSLATLANTIC BUSINESS STRATEGY. World Trade Week 13 May 2014 Michael Sudarkasa, CEO, ABG
TALKING TRADE: ENTREPRENEURS IN AFRICA TRANSLATLANTIC BUSINESS STRATEGY World Trade Week 13 May 2014 Michael Sudarkasa, CEO, ABG AFRICA BUSINESS GROUP (ABG) 2 ABG Background: Founded in 2005 and comprised
The SADC LAWYERS ASSOCIATION Annual General Meeting AND CONFERENCE IN ASSOCIATION WITH THE TANGANYIKA LAW SOCIETY.
The SADC LAWYERS ASSOCIATION Annual General Meeting AND CONFERENCE IN ASSOCIATION WITH THE TANGANYIKA LAW SOCIETY 20-23 August 2015 Julius Nyerere International Convention Centre (JNICC) Dar es Salaam-
Doing Business 2015 Fact Sheet: Sub-Saharan Africa
Doing Business 2015 Fact Sheet: Sub-Saharan Africa Thirty-five of 47 economies in Sub-Saharan Africa implemented at least one regulatory reform making it easier to do business in the year from June 1,
Success Factors for Investing in Modern Energy Enterprises
Success Factors for Investing in Modern Energy Enterprises Paul van Aalst, Director E+Co Europe www.eandco.net [email protected] Dakar 16 April 2008 1 E+Co Investment Company in Modern Energy Enterprises
TANZANIA REAL ESTATES INVESTMENT OPPORTUNITIES
TANZANIA REAL ESTATES INVESTMENT OPPORTUNITIES Nehemiah K.M. CEO - CBAT Africa Economy 2007 Macro-economic Indicators 2007 GDP 2007 Inflation Forecast 7.8% 8.0% 6.5% 9.6% 6.5% 6.7% 7.3% 8.4% 5.2% 5.7%
Standard Bank Approach
FINANCING AGRICULTURE & COMMODITY TRADE Standard Bank Approach Presented by: Douglas Joseph Turkson Outline Standard Bank/Stanbic Bank: Who Are We? Overview Standard Bank is the largest bank in Africa
INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR
INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR PROJECT 1 Introduction The Jubilee Filed oil is of light quality and has high gas content. For every 1,000 barrels of oil that is produced, there is an
Transaction Advice Corporate Finance
Transaction Advice Corporate Finance Introduction Transaction Advice Transaction Advice Our Corporate Finance Services Arup s Transaction Advice team integrates financial, technical and commercial expertise,
Foreign Assistance - A Review of China's Program
Report to Congress on Assistance by the People's Republic of China to Governments and Entities in Latin America and Africa Division J, Department of State, Foreign Operations, and Related Programs, Section
G4S Africa. Andy Baker Regional President. G4S Africa
Andy Baker Regional President G4S Africa 1 Macro-economic environment Over the last decade, six of the world s 10 fastest growing economies were in Africa. This is forecast to continue.. Diversity across
Benjamin Mugisha Resident Underwriter African Trade Insurance Agency (ATI) Central, East & Southern Africa
Benjamin Mugisha Resident Underwriter African Trade Insurance Agency (ATI) Central, East & Southern Africa Place your company logo here (i.e. replace the Spintelligent logo with your company s logo). NB:
Affordable Housing Finance New market development in Africa
1 Affordable Housing Finance New market development in Africa Kecia Rust Tuesday, 29 May 2012 Housing Finance in Emerging Markets 5 th Global Housing Finance Conference: Providing Shelter Creating Jobs
Factoring in Africa: Opportunities and challenges
Factoring in Africa: Opportunities and challenges By Dr. B.O. Oramah Vice President (Business Development and Corporate Banking) African Export-Import Bank Presented at the 2014 Afreximbank Seminar on
MADISON GENERAL INSURANCE COMPANY (Z) LIMITED (MGen) EXPORTING INSURANCE SERVICES TO TANZANIA: EXPERIENCE AND CHALLENGES
MADISON GENERAL INSURANCE COMPANY (Z) LIMITED (MGen) EXPORTING INSURANCE SERVICES TO TANZANIA: EXPERIENCE AND CHALLENGES INTRODUCTION Zambia is a landlocked country in Southern Africa. The neighboring
Corporate Overview Creating Business Advantage
Corporate Overview Creating Business Advantage 14 April 2013 Agenda The power of the group Our achievements Quick facts African regulatory environment Portfolio of offerings Creating value in Africa African
Michuki Mwangi! Regional Development Manager - Africa! ISOC! European Peering Forum (EPF) 7! Malta! 17 19 Sept 2012!
Michuki Mwangi! Regional Development Manager - Africa! ISOC! European Peering Forum (EPF) 7! Malta! 17 19 Sept 2012! Agenda! African Fiber Infrastructure! Status of Peering in Africa! The African Peering
Hallmark Solicitors. Business Growth: Doing Business in West Africa. Telephone: + 44 (0)845 6 808 251
Business Growth: Doing Business in West Africa Hallmark Solicitors Setting the Gold Standard in Corporate Legal Services 6 th June 2013 Mercure Hull Royal Hotel Hull, United Kingdom Telephone: + 44 (0)845
CURRICULUM VITAE. Kodzo Gadzekpo ADOMEY
CURRICULUM VITAE Kodzo Gadzekpo ADOMEY University of Ghana Computing Systems University of Ghana, Legon +233-203574626 +233-243574626 [email protected] [email protected] OBJECTIVE To secure the post
Company presentation January 2013
Company presentation January 2013 Gilat Satcom HQ in Israel, Main African subsidiary in Nigeria 3 international satellite teleports, 14 Hubs/PoPs in Africa, 2 PoPs in Europe, 2 Fibers Managing over 2.4Gb
Distance to frontier
Doing Business 2013 Fact Sheet: Sub-Saharan Africa Of the 50 economies making the most improvement in business regulation for domestic firms since 2005, 17 are in Sub-Saharan Africa. From June 2011 to
a growing market in an appealing business context with NO local competitors Wire and Cable Manufacturing in Rwanda
a growing market in an appealing business context with NO local competitors Wire and Cable Manufacturing in Rwanda Construction in Rwanda is Big & Growing Trends in construction & materials: Construction
BT Global Services. Announcing new investment in Turkey, Middle East and Africa. February 2012
BT Global Services Announcing new investment in Turkey, Middle East and Africa February 2012 BT a global leader in networked IT services Introduction Jeff Kelly CEO 2 2 BT Global Services BT, an introduction
Construction and Support Services WE KNOW THE LANDSCAPE
Construction and Support Services WE KNOW THE LANDSCAPE 1 WHAT IS SUNBIRD? WE KNOW THE LANDSCAPE Mozambique We know the landscape We are a specialist construction and support services company, operating
Executive Summary. Our focus is to serve corporate entities from both the public and private sector.
Executive Summary Pangani Real Estate Services Limited, a subsidiary of the Pangani Group, was established in 2013 with the aim of bringing world class property services and solutions to Tanzania and the
Raising Capital for Oil & Gas:
Raising Capital for Oil & Gas: Options, Opportunities & Outlook Presented By: Dolapo Oni Ecobank Research About Ecobank Group A Snapshot Facts Present in 39 countries worldwide Operating in 35 African
Regional Workshop on Asset and Liability Management UNCTAD - National Treasury South Africa - MEFMI Midrand, 30 September - 3 October 2013
UNCTAD - South Africa - MEFMI Ms. Lindy Bodewig Chief Director Accountant-General s Office Mr. Cornilious Deredza Programme Officer MEFMI (Macroeconomic and Financial Management Institute of Eastern and
Photovoltaic Energy in Mozambique Present and Future Outlook
REPUBLIC OF MOÇAMBIQUE MINISTRY OF ENERGY National Directorate of New and Renewable Energy Photovoltaic Energy in Mozambique Present and Future Outlook Presentation by Pedro Caixote www.exportinitiative.bmwi.de
Representatives from National and International Research Institutions;
OPENING SPEECH FOR DR. KHALID S. MOHAMMED PRINCIPAL SECRETARY SECOND VICE PRESIDENT OFFICE- ZANZIBAR DURING COUNTRY LAUNCHING OF MULTINATIONAL CGIAR PROJECT: SUPPORT TO AGRICULTURAL RESEARCH FOR DEVELOPMENT
Pöyry viewpoint: A Review of Industrial Forest Plantations in Africa
Pöyry viewpoint: AFRICAN PLANTATION FORESTRY A Review of Industrial Forest Plantations in Africa Background View of eucalyptus plantations in Angola. According to the FAO (2005) there are 10.8 million
The Royal Society of Chemistry. Pan Africa Chemistry Network
The Royal Society of Chemistry Pan Africa Chemistry Network We connect the global community to build capacity and enable excellence in the chemical sciences across Africa.. About us The Royal Society of
UNITED REPUBLIC OF TANZANIA TANZANIA INVESTMENT CENTRE INVESTMENT CLIMATE AND OPPORTUNITIES IN TANZANIA
UNITED REPUBLIC OF TANZANIA TANZANIA INVESTMENT CENTRE INVESTMENT CLIMATE AND OPPORTUNITIES IN TANZANIA PRESENTATION TO THE CDM WORKSHOP DAR ES SALAAM INTERNATIONAL CONFERENCE CENTRE 21 ST JANUARY,2008
Big Gets Bigger, Smaller Gets Smaller
latest thinking Big Gets Bigger, Smaller Gets Smaller The data centre market is entering a period of unprecedented transition. With this shift comes a number of significant and perhaps surprising changes.
Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016
Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion
SECTOR ANALYSIS. Egypt: Energy Sector. The Embassy of Denmark in Cairo
SECTOR ANALYSIS Egypt: Energy Sector The in Cairo March 2014 Keywords: Egypt, The in Cairo, energy, oil, gas, wind energy, solar energy, hydroelectric power. Resume: In this sector analysis you will find
Professional Surveyors
Professional Surveyors INITIO EARTH SCIENCES Unit 2 Rock Cottage Business Park Cnr John Vorster & Christiaan de Wet Roads Weltevreden Park, Gauteng South Africa Tel +27(0) 11 795 4007 Fax +27(0)11 795
Permanent Secretary Office of Environmental Services Lagos State Ministry of the Environment At. Dar es Salaam, Tanzania
By Permanent Secretary Office of Environmental Services Lagos State Ministry of the Environment At Dar es Salaam, Tanzania 1 LAGOS STATE WITHIN THE CONTEXT OF THE 36NOS FEDERATING STATES OF NIGERIA LAGOS
Investment forum on Phase II of the LHWP. Maseru (Lesotho) 14 July 2014
Investment forum on Phase II of the LHWP Maseru (Lesotho) 14 July 2014 Private and confidential About Standard Lesotho Bank 2 3 4 Standard Bank Overview 5 Key points Full Service Corporate & Investment
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION INVESTMENT AND TECHNOLOGY PROMOTION BRANCH INDUSTRIAL INVESTMENT AND TECHNOLOGY PROJECT PROFILE
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Vienna International Center P.O. Box 300, A-1400 Vienna, AUSTRIA INVESTMENT AND TECHNOLOGY PROMOTION BRANCH Tel: (43-1) 26026 4788 Fax: (43-1) 26026 6870
January 2015. PwC Research Services Survey on Retrenchment and Redundancy Practices
on Retrenchment and Redundancy Practices Contents Executive Summary 3......4..18 Executive Summary This survey has been prepared by Research Services for the purpose of providing market practice trends
Presented by: Rhonda Irby Business Development Ghazanfar Group. Ghazanfar Group. Afghanistan s Leading Energy Company
Presented by: Rhonda Irby Business Development Ghazanfar Group Ghazanfar Group Afghanistan s Leading Energy Company Overview of the Ghazanfar Group Presented by Rhonda Irby Business Development Manager
PETROLEUM RESOURCES L I M I T E D C O M P A N Y P R O F I L E
2 PETROLEUM RESOURCES C O M P A N Y P R O F I L E PETROLEUM RESOURCES PROFILE Deerfield Petroleum Resources Limited (DPRL), is a diversified company offering a comprehensive array of specialized services
Providing value-added solutions to an integrated energy, oil & gas industry. Energy, Oil & Gas Services
Providing value-added solutions to an integrated energy, oil & gas industry. Energy, Oil & Gas Services Contents Profile of Fidelity Bank Ghana Limited Energy Oil & Gas Downstream Oil & Gas Upstream Our
Infrastructure Development Funding and Financing
Infrastructure Development Funding and Financing 09 December 2013 2 Presentation outline 1. Role of infrastructure development 2. Public sector infrastructure investment 3. Funding options i. Recent airport
SUPPLY SUPPLY CHAIN MANAGEMENT
ANNOUNCES ANNOUNCES AN AN OVERVIEW OVERVIEW COURSE COURSE IN IN SUPPLY MANAGEMENT COURSE GOAL The availability of drugs and other essential supplies determines the success of any health program. Without
UNFCCC initiatives: CDM and DNA Help Desks, the CDM Loan Scheme, Regional Collaboration Centres
UNFCCC initiatives: CDM and DNA Help Desks, the CDM Loan Scheme, Regional Collaboration Centres Africa Carbon Forum 03 July 2013 - Abidjan, Côte d Ivoire Ms. Flordeliza Andres Programme Officer, UNFCCC
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
FISEA: Investment and Support Fund for Businesses in Africa. Getting involved and investing in African businesses. Paul Kabré
FISEA: Investment and Support Fund for Businesses in Africa Paul Kabré Getting involved and investing in African businesses PROMOTING GROWTH AND EMPLOYMENT IN AFRICA FISEA is an investment fund that makes
PRESS RELEASE FOR IMMEDIATE RELEASE
PRESS RELEASE FOR IMMEDIATE RELEASE Bujagali Wins Africa Power Deal of the Year for 2007 Kampala, Uganda, 11 March 2008. Bujagali Energy Limited (BEL) today announced that its Bujagali Hydropower Project
Council of Great Lakes Governors
Council of Great Lakes Governors Regional Impact Global Leadership Mexico City, Mexico Québec: A Market of Opportunity and Collaboration for Great Lakes Companies Presenters: Catherine Tadros Director
Global conglomerate China Sonangol buys 15 million OKP Holdings shares; move prepares ground for future business collaboration
China Sonangol International (S) Pte Ltd No. 6 Tagore Drive 9 Temasek Boulevard #42-01 #B1-06 Tagore Building #42-01, Suntec Tower 2 Singapore 787623 Singapore 038989 Tel: (65) 6456 7667 Tel: (65) 6808
ICT Development for Childline Kenya Enhancing effectiveness of the National Child Helpline 116 to deliver quality services to Kenyan children
ICT Development for Childline Kenya Enhancing effectiveness of the National Child Helpline 116 to deliver quality services to Kenyan children Client Profile Childline Kenya is a National Non-Governmental
Ministry of Information and Communication Technology EXPRESSION OF INTEREST
EXPRESSION OF INTEREST Consultancy Services for SubmarineFibre Optic Connectivity in Rodrigues (Authorised under Section 24(2) of the Public Procurement Act 2006) Reference No. : MICT/Q3/2012/EOI 1.0 Introduction
Hybrid Wide-Area Network Application-centric, agile and end-to-end
Hybrid Wide-Area Network Application-centric, agile and end-to-end How do you close the gap between the demands on your network and your capabilities? Wide-area networks, by their nature, connect geographically
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
Sustainable Solutions. Switch to future thinking
Switch to future thinking Increased global competition, rapid advances in technology, risks from natural disasters, resource shortages today s business leaders must adapt to operating in a changing world,
Agriculture-associated diseases List of partners by category
Agriculture-associated diseases List of partners by category The agriculture-associated diseases component of the CGIAR Research Program on Agriculture for Nutrition and Health works in partnership with
Mpeketoni Electricity Project
Session 4.1 Mpeketoni Electricity Project Mr Danson Mwangi Kinyanjui & Mr Paul Mutinda Kituku Rural Electrification Workshop March 1-3, 2006 Nairobi Mpeketoni Electricity Project Community Based Electricity
Holman Fenwick Willan CONSTRUCTION CAPABILITY
Holman Fenwick Willan CONSTRUCTION CAPABILITY WHY CHOOSE HFW FOR YOUR NEEDS IN CONSTRUCTION? HFW s construction law team is one of the largest specialist international groups in the market. The partners
Economic and trade policy overview by Taku Fundira, tralac Researcher
South Africa has a population of over 45 million people and an estimated GDP (PPP) of US$ 524 billion in 2010 (CIA, 2011). The country employs a mixed economy to address the legacies of apartheid, with
The Trade Finance Bank for Africa
The Role of Afreximbank and of IFG Africa Chapter in the development of Factoring in Africa By Chairperson, Africa Chapter. B.O. Oramah and Executive Vice-President (AFREXIMBANK) Presentation at the First
PROJECT DATABASE FOR SUB-SAHARAN AFRICAN COUNTRIES
PROJECT DATABASE FOR SUB-SAHARAN AFRICAN COUNTRIES Prepared by Africa Project Access October 2013 Guide to Using the Africa Project Database 1. Africa Project Access provides two essential back-up services
LOGISTICS EXPERIENCE CUTTING EDGE EXPERTISE
LOGISTICS EXPERIENCE Unmatched knowledge and experience gives us the ability: to deliver vehicles safely to deliver vehicles efficiently to deliver vehicles cost-effectively to deliver vehicles to even
Contacts in Africa CÔTE D IVOIRE GHANA
Contacts in Africa Tata Africa Holdings (SA) Pty Limited Corporate office 39, Ferguson Road Corner Rivonia and Ferguson Road Illovo 2196 Phone: +27 (11) 459 1700 Fax: +27 (11) 459 1710 Email: [email protected]
Abdul Zakariya August 29, 2015
Market Summary The All-Share Index declined 3.56 percent this week. Similarly, all the Indices finished lower during the week with the exception of the NSE ASeM Index that closed flat. Zenith International
Global Fuel Economy Initiative Africa Auto Club Event Discussion and Background Paper Venue TBA. Draft not for circulation
Global Fuel Economy Initiative Africa Auto Club Event Discussion and Background Paper Venue TBA Draft not for circulation Launched on March 4, 2009 by the United Nations Environment Programme (UNEP), the
Africa s Emerging Technologies
Africa s Emerging Technologies August 2015 Africa's population will double and its economy quadruple in exactly the coming age of hyper-connectivity, robotics, genomics, and space colonisation. But Africa
ENH-KOGAS, Mozambique. Project. Wednesday. September 23,
ENH-KOGAS, SA S.A. Mozambique Natural Gas Distribution ib i Project Wednesday September 23, 2015 Contents Project Introduction - Project Introduction including company, history, and any details Benefits
We understand the unique challenges and opportunities that exist in the recruitment market in Africa
We understand the unique challenges and opportunities that exist in the recruitment market in Africa TABLE OF CONTENTS CA Global Group Corporate Structure 2 CA Global Group Websites 3 About CA Global Headhunters
Flexible Cloud Services to Compete
white paper Service Providers Need Flexible Cloud Services to Compete Enterprise Customers Demand Flexible Cloud Solutions When the concept of cloud services first came about, there was a great deal of
EXPORT-IMPORT BANK OF INDIA: Catalysing India s Trade and Investment. July 01, 2015
EXPORT-IMPORT BANK OF INDIA: Catalysing India s Trade and Investment July 01, 2015 INDIAN ECONOMY SNAPSHOT PARAMETER FY 2010 FY 2013 FY 2014 FY 2015 GDP (current prices, US$ bn) 1365.4 1835.8 1875.9 2050.6
Brazilian Aviation Agenda 2020
Brazilian Aviation Agenda 2020 1 Mission To encourage the habit of flying in Brazil by planning, implementing, and supporting actions and programs to promote the growth of civil aviation in a consistent
The challenge of financing Africa s food trade. Dr Edward George Head of Soft Commodities Research, Ecobank 4 June 2014, Geneva
The challenge of financing Africa s food trade Dr Edward George Head of Soft Commodities Research, Ecobank 4 June 2014, Geneva Section 1 Drivers of Africa s food demand Sub-Saharan Africa is heavily dependent
Globe 24-7 Onsite Recruitment Process Outsourcing
Onsite Recruitment Process Outsourcing Successfully managing large-scale staffing programs for start-up and expansion projects within the global resources industry. www.globe24-7.com Globe s designated
The Energy Market in Cyprus: Natural Gas Changing the Picture
The Energy Market in Cyprus: Natural Gas Changing the Picture NATURAL GAS PUBLIC COMPANY (DEFA) CYPRUS NEEDS an environmentally friendly Energy System which will ensure Security of Supply and will provide