Installation Manual LUXURY VINYL FLOORING. Imagined to Match Your Lifestyle
|
|
|
- Morgan Perry
- 9 years ago
- Views:
Transcription
1 Installation Manual LUXURY VINYL FLOORING Imagined to Match Your Lifestyle
2 Get to Know Konecto Konecto features revolutionary Grip-Strip Technology. Installation requires only a few simple hand tools, and is fast, easy, quiet and clean. Konecto is intended for interior use only and is suitable for above-grade, on-grade and below-grade applications. However, Konecto should not be installed in locations where the substrate beneath the building structure is exposed to the elements. Konecto is a floating floor and should be allowed to expand and contract freely. It must not be glued, nailed, or fastened to the substrate in any way. Install permanent cabinets, vanities, island counters and similar items first, then cut in Konecto around them, leaving a ¼-inch space for expansion and contraction. Fill expansion spaces around potentially wet areas such as refrigerators, tubs and appliances with premium waterproof 100% silicone caulk. Acclimate and install Konecto in climate-controlled structures consistently maintained at temperatures no lower than 65 F and no higher than 85 F before, during and after installation. Ambient relative humidity should be maintained between 35% and 85%. Direct sunlight may cause Konecto to fade or the grip-strip to separate. Protect Konecto from direct sunlight using window treatments or UV tinting on windows. Konecto is not recommended for use in sunrooms. Although Konecto is water resistant, constant exposure to excessive moisture may affect the product. Moisture issues must be addressed and corrected at the job site prior to installation. Effective: July 20, 2015 metroflorusa.com 2
3 PRE-INSTALLATION ESSENTIALS Your job will be smooth, fast and easy when you follow the essentials every time you install Konecto. EVALUATE THE JOB SITE Exterior Damage caused by water and high humidity should be addressed prior to installing Konecto. Examine the driveway and landscaping surrounding the building. Be sure that they slope and direct water away from the foundation. Inspect gutters, down spouts and drains for blockage. Remove clogs caused by leaves, dirt and debris, allowing runoff to flow freely away from the foundation. Check crawl spaces for cross-ventilation air vents equaling at least 1.5% per 100 square feet of floor space. Crawl spaces should measure a minimum of 18 inches high and should be insulated according to the latest building code requirements. The ground should be covered with a minimum 6-mil vapor barrier. Interior Although Konecto is water resistant, moisture issues must be identified and corrected at the job site prior to installation. Examine the installation site for leaky plumbing, including leaks from water heaters, dishwashers, washing machines, or any other water-bearing fixtures or pipes. Inspect substrates for level. They must be sturdy, sound, and flat within 3 16 of an inch within a 10-foot radius. The substrate should not slope more than 1 inch per 6 feet in any direction. Test concrete substrates for relative humidity, moisture and ph before installing Konecto. Test results must not exceed 85% relative humidity (RH). The Calcium Chloride Test for moisture should be no more than 8lbs per one-thousand square feet in 24 hours MVER, (Moisture Vapor Emission Rating) and ph tests for alkalinity levels should register between 7 and 9. Check wood substrates for moisture. Obvious signs of moisture issues include warping, peaking, degradation of the integrity of the substrate, rusted fasteners, and rusted floor registers. Even if obvious signs are not present, the material should be tested using an invasive moisture meter and moisture levels should not exceed 14%. IDENTIFY YOUR SUBSTRATE Approved Substrates Konecto is suitable for use over a wide variety of substrates. Concrete Concrete substrates must be prepared in accordance with the most current version of ASTM F710 (Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring). Concrete substrates must be sturdy, sound, and flat within 3 16 of an inch within a 10-foot radius. The substrate should not slope more than 1 inch per 6 feet in any direction. Allow new concrete, including lightweight and gypsum toppings, to cure for at least 90 days before conducting moisture tests. Regardless of the age or grade of the concrete, always perform the most current version of either RH Test ASTM F2170 or Calcium Chloride Test ASTM F1869 and ph Test ASTM F710 prior to installation. RH Test results must not exceed 85% relative humidity. The Calcium Chloride Test for moisture should measure no more than 8lbs per one-thousand square feet in 24 hours MVER, and ph tests for alkalinity levels should register between 7 and 9. Always use Prevail Moisture Vapor Barrier or Prevail Universal Sound Solution Underlayment when installing Konecto over concrete. If moisture levels exceed 85% RH or 8lbs per 1,000sf in 24 hours MVER, the moisture issues must be corrected by using a moisture mitigation system before installing Konecto. NOTE: Gypsum toppings must be primed prior to installation using Prevail 1000 Primer-Sealer. Call Technical Services at for details. Radiant Heat Radiant heating systems must be cast ½-inch below the surface of the concrete slab, and should be operating at least 2 weeks before installing Konecto. Set the temperature of the radiant heating system to 68 F 48 hours before, during, and 72 hours after installation. The temperature of the radiant heat floor may be increased gradually 72 hours after installation, but the surface temperature should never exceed 85 F. Contact the manufacturer of your radiant heating system for further recommendations. Effective: July 20, 2015 metroflorusa.com 3
4 Plywood, OSB, Particleboard & Chipboard Wood substrates must be A.P.A. approved with a minimum grade of BB or CC. They must be sturdy, sound, and flat within 3 16 of an inch within a 10-foot radius. The substrate should not slope more than 1 inch per 6 feet in any direction. Always perform a test for moisture prior to installation. Moisture readings should never exceed 14% for plywood, OSB, particleboard and chipboard substrates. If moisture readings exceed 14%, correct moisture issues before installing Konecto. 6 mil poly moisture vapor barriers should never be used over wood substrates. Tile, Terrazzo, Asbestos Tile, Resilient Tile, Non- Cushion Sheet Vinyl, & Metal Existing floors must be firmly attached to the structural floor. They must be sturdy, sound, and flat within 3 16 of an inch within a 10-foot radius. The substrate should not slope more than 1 inch per 6 feet in any direction. Fill in grout lines on ceramic tiles, terrazzo, quarry tiles and similar floors with cementitious leveling and patching compound. UNACCEPTABLE SUBSTRATES Remove the floors noted below and remove old adhesive before installing Konecto. Encapsulate adhesive and cutback residue using Prevail 1000 Primer-Sealer. Parquet Hardwood Cushion Back Sheet Vinyl Engineered Hardwood Over Concrete Carpeting/Carpet Pad Floating Floors Sleeper Substrates NOTE: Various Federal, State and Local government agencies have regulations governing the removal of in-place asbestos-containing material. If you contemplate the removal of a resilient floor covering structure that contains (or is presumed to contain) asbestos, you must review and comply with all applicable regulations. Do not sand, dry sweep, dry scrape, drill, saw, bead blast, or mechanically chip or pulverize existing resilient flooring, backing, lining felt, asphalt "cut-back adhesive, or other adhesive. These products may contain asbestos fibers and/or crystalline silica. Avoid creating dust. Inhalation of such dust is a cancer and respiratory tract hazard. Smoking by individuals exposed to asbestos fibers greatly increases the risk of bodily harm. Unless positively certain that the product is a non-asbestos containing material, you must presume it contains asbestos. Regulations may require that the material be tested to determine asbestos content. RFCI 's Recommended Work Practices for Removal of Resilient Floor Covering are a defined set of instructions addressed to the task of removing all resilient floor covering structures. For further information, visit the Resilient Floor Covering Institute website at ATTENTION: Mold and mildew grow only in the presence of moisture. Moisture issues must be addressed and corrected at the job site prior to installation. Please visit for information about safely preventing and removing mold, mildew and other biological pollutants. PREPARE THE JOB SITE Careful preparation is the key to outstanding results. All Trades Must Finish Before Installing Konecto. Install Permanent Exterior Doors and Windows Turn on HVAC at Least One Week Prior to Installation Room temperature should be maintained between 65 F and 85 F at least 48 hours prior to installation. Allow all other Trades to Finish Perform Required Moisture and ph Tests See the Identify Your Substrate section of this manual for further information about the required tests. Level Uneven Surfaces Fill large cracks and voids with cementitious leveling and patching compound. Substrates must be sturdy, sound, and flat within 3 16 of an inch within a 10-foot radius. The substrate should not slope more than 1 inch per 6 feet in any direction. Remove Floor Moldings Quarter round and wall base should be carefully removed before installation begins. It will be used to conceal the ¼-inch expansion space once the job is finished. Fill Grout Lines Skim coat grout lines on ceramic tile, terrazzo, quarry tile and similar surfaces using cementitious leveling and patching compound. Remove Unapproved Substrates Remove or Encapsulate Old Adhesive Old carpet and vinyl adhesives should be scraped up, skim coated or encapsulated using Prevail 1000 Primer-Sealer. Effective: July 20, 2015 metroflorusa.com 4
5 Undercut Wood Door Casings Wood door casings should be undercut so that Konecto will fit neatly beneath them, concealing the ¼-inch expansion space. To undercut door casings to the proper height, remove the under-edge from a scrap piece of plank (See Image A). Position the plank on the substrate against the door casing. Lay the handsaw flat against the scrap plank and carefully cut the door casing to the height of the plank (See Image B). If installing over Prevail Universal Underlayment, place a piece of the underlayment beneath the 6-inch piece of plank before undercutting the door casing to the proper height (See Image C). Cut Around Metal Door Casings Do not cut metal door casings. Cut Konecto around them, leaving a ¼-inch expansion space. After installation, fill the space with a coordinating premium waterproof 100% silicone caulk. Clean Up the Job Site Remove all debris, sweep and vacuum the floor. Smooth, non-porous floors should be damp-mopped after vacuuming and allowed to dry thoroughly before installing Konecto. All dust must be removed prior to installation. In addition, Metroflor Corp. recommends the use of Prevail 1000 Primer-Sealer, Prevail Universal Sound Solution Underlayment or Prevail Moisture Vapor Barrier to control fine dust particles. Do not use Prevail Moisture Vapor Barrier over wood substrates. CHECK RUN NUMBERS AND MANUFACTURE DATE Locate the run number on the short end of each carton and verify that all of the material for your job is from the same run. Minor shade variations within the same run number contribute to the natural look of Konecto. To avoid noticeable shade variations, do not install material from different runs across large expanses. Prevail 30-GS Adhesive may be used any time to strengthen Konecto grip strip joints and reinforce splines. However, it is required for use on Konecto products older than 24 months. To determine manufacture date, locate the run number on the short end of the carton. It is the eight-digit number separated by decimal points beginning with the two-digit day, then the two-digit month, and finally the four-digit year. Run Number/Manufacture Date DAY.MONTH.YEAR ACCLIMATE THE PRODUCT Correct acclimation prevents Konecto from expanding and contracting excessively after installation. Move Konecto to the job site and allow to acclimate at least 48 hours prior to installation. Spread unopened cartons no more than 3 cartons high and at least 4 inches apart. Cartons should be stacked away from heating and cooling ducts and direct sunlight. Maintain a constant room temperature between 65 F and 85 F before, during and after installation. Maintain ambient relative humidity between 35% and 85% at all times. A B C Effective: July 20, 2015 metroflorusa.com 5
6 INSTALLATION Always start with a clean job site. Carefully inspect each plank for defects prior to installation, and do not install damaged planks. Be sure to check run numbers/manufacture dates prior to installing, as noted in the Pre-Installation Essentials section of this manual. Run Number/Manufacture Date DAY.MONTH.YEAR STEP 1: Identify the Starting Wall Select your starting wall. For instance, choose the longest wall in the room, or a wall running towards a window or natural source of light. Facing the starting wall, installation will move from left to right beginning in the left corner. The under-edge side of the first row of planks should face the open field (See Image 1). TIP: If using Prevail Moisture Vapor Barrier or Prevail Universal Sound Solution Underlayment, unroll from left to right, and position prior to installing the first row of planks. Install each length of underlayment row-by-row as the installation of the planks progresses. STEP 2: Begin the First Row Remove the over-edge from the long and short sides of the first plank. Trim off the over-edge from ONLY the long side of each additional plank as you install the entire first row (See Image 2). TIP: When starting a new row with a full plank, always remove the over-edge from the short side only (See Image 3). STEP 3: Position the First Plank Create an even ¼-inch expansion space between the perimeter planks and the wall using spacers. The expansion space will allow the floating floor to expand and contract freely after installation. Position the first plank in the left hand corner of the starting wall against the spacers (See Image 4). TIP: You can make ¼-inch spacers by sandwiching three 2-inch lengths of the trimmed over-edge together, sticky side in (See Image D). Position the spacers along the starting wall as you go, and at the beginning and end of each row. Leave the spacers in place until installation is complete, and never install the material tight to the wall. STEP 4: Install the First Row Secure the planks in the first row by angling and connecting the short ends. The over-edge is always placed on top of the underedge. Use one hand to hold the plank in position and the other hand to guide the edge into place for a tight, gap-free fit. The long under-edge must be perfectly aligned from plank to plank (See Image 5). Immediately use the Prevail Grip-Strip Roller to roll the joints as they are installed. Always roll as you go (See Image 6). Continue placing the spacers along the wall as you install the first row. TIP: If a plank is not aligned perfectly, it may be slowly and carefully separated and repositioned prior to rolling. Apply not more than a ¼-inch bead of Prevail 30-GS Adhesive to the short under-edge to reinforce the joint and reposition promptly. Remove excess adhesive and residue using Prevail Remove-All. Immediately hand roll the joint. D STEP 5: Measure the Last Plank of the First Row Place a spacer against the wall at the end of the first row. Measure the distance from the spacer to the decorative edge of the last full plank on the first row. Make note of this measurement (See Image 7). under-edge over-edge Effective: July 20, 2015 metroflorusa.com 6
7 Transfer the measurement onto a new plank starting from the short over-edge side and mark using a marker or pencil (See Image 8). Use a straight edge and utility knife to score across the plank (See Image 9). Snap the plank, using your knee as leverage (See Image 10). TIP: Mark and score the plank away from the newly installed floor to prevent accidental damage. STEP 6: Install the Last Plank of the First Row After measuring and cutting the last plank, position and install it, following the same procedure used for the previously installed planks on the first row (See Image 11). Hand roll the joint using the Prevail Grip-Strip Roller. TIP: If the last plank measures 6 inches or less in length, it must be reinforced using Prevail 30-GS Adhesive. Apply no more than a ¼-inch bead of adhesive in the center of the grip strip. (See Image 12). Position and install as noted above. Application of excessive adhesive may result in the adhesive oozing from the joint. Remove excess adhesive and residue using Prevail Remove-All. Apply to a soft, lint-free cloth and wipe the affected surface until clean. DO E F DON T STEP 7: Begin the Second Row Maintain a minimum 6-inch end-joint stagger from row-to-row throughout the entire installation (See Image E). Do not stair-step the end joints (See Image F). If the leftover piece from the end of the first row measures 6 inches or more, it may be used as-is to begin the second row. Otherwise, select a new plank. Position it with the under-edge facing you, then measure 1 3 the length of the plank from the right-hand short edge. Mark, score, and snap. Position a spacer against the wall to maintain a ¼-inch expansion space. Place the cut edge against the spacer and align the long over-edge on top of the under-edge. Guide the edge into place for a tight, gap-free fit (See Image 13). Hand roll the joint using the Prevail Grip-Strip Roller. TIP: To reduce waste, partial planks measuring over 6 inches may be used to begin and finish each row. STEP 8: Install the Second Row To install the second plank in the second row, angle and connect the short over-edge into the short under-edge of the first plank. While pushing them together, press and rotate the long over-edge downward into the long under-edge of the first row. Be sure that the two planks are aligned perfectly prior to rolling (See Image 14). The planks should fit together tightly along the short and long sides and all edges should be even, with no separation or gapping. Immediately use the Prevail Grip-Strip Roller and roll as you go (See Image 15). Follow the same procedure along the entire row. TIP: If a plank is positioned incorrectly and the joints are not tight, it may be slowly and carefully separated and repositioned prior to rolling. Apply not more than a ¼-inch bead of Prevail 30-GS Adhesive to the long and short under-edge to reinforce the joint. Promptly and carefully reposition the plank, and then hand roll. Remove excess adhesive and residue using Prevail Remove-All. Apply to a soft, lint-free cloth and wipe the affected surface until clean Effective: July 20, 2015 metroflorusa.com 7
8 STEP 9: Install the Remaining Rows Follow the steps noted for the second row and repeat for the entire installation. Carefully observe the recommended spacing and stagger pattern throughout the job. Consistently hand roll the joints using the Prevail Grip-Strip Roller, and always roll as you go. TIP: Avoid stair stepping or lining up joints from one row to the next. NOTE: If using Prevail Universal Sound Solution Underlayment, continue to unroll one length at a time as you go. STEP 10: Install the Last Row The final row of planks will be cut to fit along the wall. Measure the width of the final row and make note of the measurement. Maintain the expansion space using ¼-inch spacers (See Image 16). Continue to observe the suggested staggering method for the last row of planks. Transfer the measurement from the long over-edge side of each new plank intended for the last row (See Image 17). Score, (See Image 18) then snap (See Image 19). Fit the last row into place for a tight, gap-free fit (See Image 20). Hand roll the joints using the Prevail Grip-Strip Roller. TIP: Measure the final row of planks from the ¼-inch spacers and not from the wall. When installation is complete, remove the spacers and roll the entire floor in both directions using a 100-pound three-section roller (See Image 21). You may fill the ¼-inch expansion space around high-moisture areas like tubs, showers and appliances using premium waterproof 100% silicone caulk. Cover the expansion space with wall base, making sure not to trap or pin down the floor in any way Effective: July 20, 2015 metroflorusa.com 8
9 GENERAL CARE & MAINTENANCE ROUTINE CARE & MAINTENANCE Sweep, dust mop or vacuum daily. Do not use vacuums with any type of beater bar assembly. Lightly damp mop with Prevail Neutral Cleaner. Remove excess soil by carefully scrubbing with a soft nylon brush or magic eraser sponge and Prevail Neutral Cleaner. Remove scuffs using Prevail Black Scuff and Adhesive Remover and a soft nylon brush or magic eraser sponge. Heavily soiled floors may require an occasional deep cleaning using Prevail Neutral Cleaner and a low-speed buffer not exceeding 300 RPM. Fit the buffer with a red or white scrubbing pad and work the solution over the floor. Remove the dirty residue by damp mopping with clear water. Remove standing water, pet urine and other liquids promptly. Follow with Prevail 1-Step Neutral Cleaner or Prevail Ready to Use Neutral Cleaner. PREVENTIVE CARE Use walk-off mats at all outside entrances. Use flat glides at least 2" in diameter under furniture legs to prevent indentations and scratches. Use broad surface non-staining casters at least 2" in diameter on rolling furniture. Do not use vinegar, polishes, waxes, oil soaps, abrasive cleaners, harsh detergents, mop and shine products or solvents. Do not use rubber-backed mats. Do not expose to direct sunlight for prolonged periods. Do not use steam cleaners. Do not flood floor or subject to standing liquids including pet urine. WARRANTY REGISTRATION To register and activate your product warranty, please visit and click on the Warranty/Maintenance tab. The registration information you provide will be used only to register your purchase and for no other purpose. For further information, please call Metroflor Technical Support Services at (888) , or visit our website at metroflorusa.com. Effective: July 20, 2015 metroflorusa.com 9
Armstrong Do-It-Yourself Tile Installation System
Armstrong Do-It-Yourself Tile Installation System What tools will I need to install my tile floor? You'll need just the basics: - floor tile (make sure you have enough tile to finish the job) - adhesive
Laminate Flooring T-Lock Angle-Drop Installation Instructions
TECHNICAL SERVICE Laminate Flooring T-Lock Angle-Drop Installation Instructions March 23, 2012 Read all instructions carefully before beginning installation. Make sure that the instructions are the most
Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation
Bella Cera Engineered Hardwood Flooring Installation Instructions Check for Proper Color Selection Prior to Installation 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully
VINYL CLICK FLOORING INSTALLATION GUIDE
VINYL CLICK FLOORING INSTALLATION GUIDE Owner/Installer Responsibility Prior to installing a single board, you or the installer must determine that the job-site environment and the sub-surfaces meet the
Fiberglass-Reinforced Sheet Flooring Installation System
Fiberglass-Reinforced Sheet Flooring Installation System Product Adhesive Comments Residential Use Only CushionStep Value Good Better Best FlexStep Duality Premium Premium Plus Modified loose lay method
INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING
INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING Introduction Laminate flooring is designed to be a floating floor that may be installed over virtually any type of sub floor. It is not nailed or glued to
Vinyl Composition Tile Installation System
Vinyl Composition Tile Installation System Product Gauge Size Vinyl No-Wax (Dry Back) Urethane No-Wax (Dry Back) 0.045" (1.1 mm) 0.080" (2.0 mm) IMPERIAL TEXTURE 0.094" (2.4 mm) STONETEX ChromaSpin COMPANION
How to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
Grand Mesa Plus LAMINATE - WIRE BRUSHED. GAGVGM81012A Prairie. GAGVGM80012NA Colorado. GAGVGM84012A Pecan Rustic. GAGVGM85012A Saddle Walnut
MARCH 2015 Grand Mesa Plus LAMINATE - WIRE BRUSHED Specifications 12.3mm 6.5 wide x 47-13/16 long 19.42 sf/ctn 48 ctn/plt Triple Plate Embossing Wire Brushed Texture Micro-Bevel & Waxed Edges Warranty
Carpet Tile Installation Guidelines
NOTICE FAILURE TO FOLLOW THESE GUIDELINES CAN RESULT IN VOIDING THE CARPET WARRANTY. Installation Guidelines The following instructions should be reviewed prior to installation. Shaw Industries will not
Country Series. 12.3mm V-Groove Edge Engineered Laminate Flooring. Laminate Flooring Care and Maintenance. Routine Cleaning
Country Series 12.3mm V-Groove Edge Engineered Laminate Flooring Laminate Flooring Care and Maintenance Routine Cleaning Simply dust mop or vacuum with a soft brush or wood-floor accessory to keep your
Installation System. Existing Resilient Sheet Floors
Vinyl Composition Tile Installation System Product Adhesive/Full Spread Adhesive/Tile-On Comment Imperial Texture MultiColor RAVE Stonetex Companion Square Feature Tile/Strips ARTEFFECTS SAFETY ZONE Vinyl
BENTLEY ELEMENTS COLLECTION LVT
This document refers to the following products: Product Size Installation direction Seams treatment Elements Tiles See specifications 90 None Elements Planks See specifications Stair Step None Note: This
Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.
1. TEKA Soft Loc Installation Guide Thank you for having chosen TEKA Parquet. To guarantee a constant quality product TEKA engineered hardwood flooring is made out of selected wood species and runs only
Installation Instructions for staple/nail down applications
Installation Instructions for staple/nail down applications General Notes Inspect all materials carefully before installation. Warranties do not cover materials with visible defects once they are installed.
INSTALLATION IMPORTANT INSTALLER/OWNER RESPONSIBILITY TOOLS & EQUIPMENT NEEDED FOR INSTALLATION PRE-INSTALLATION PROCEDURES & JOBSITE CONDITIONS
IMPORTANT It is important that you read & understand the following information and instructions in their entirety before proceeding with installation. Please thoroughly inspect all Flooring products in
installation Mannington Works. 800 241 2262 manningtoncommercial.com Mannington Commercial Luxury Vinyl Tile Installation Instructions GENERAL
GENERAL These instructions cover all fully adhered s of Mannington Commercial LVT; Assurance Squared, Create, Nature s Paths, Nature s Paths Select and Walkway luxury vinyl flooring. Nature s Paths LockSolid
Fiberglass-Reinforced Sheet Flooring Installation System
RESIDENTIAL USE ONLY Fiberglass-Reinforced Sheet Flooring Installation System Product Gauge Comments FlexStep Value FlexStep Good 0.055" (1.4 mm) 0.065" (1.65 mm) Modified loose lay method: Acrylic double-faced
RESIDENTIAL HARDWOOD WARRANTIES
RESIDENTIAL HARDWOOD WARRANTIES Limited Warranties for Prefinished Solid and Engineered Hardwood Floors Manufacturing Defects Century Flooring* ("Century") hereby warrants to the original buyer ("Buyer"),
The length of this warranty varies by product. Please see product sample or your retailer for duration of this warranty on specific products.
RESIDENTIAL ENGINEERED HARDWOOD LIMITED WARRANTY Limited Warranties for Q Wood Brand Locking Engineered Hardwood Floors with Opulux Performance Enhanced Finish Manufacturing Defects Q Wood by Quick Step
HARDWOOD WARRANTIES Limited Warranty for Prefinished Solid, Engineered, and Longstrip Floors Manufacturing Defects Finish Warranty
HARDWOOD WARRANTIES Limited Warranty for Prefinished Solid, Engineered, and Longstrip Floors Manufacturing Defects Mohawk* ("Mohawk") hereby warrants to the original buyer ("Buyer"), the goods to be free
Commercial/Residential Linoleum Sheet Installation System
Commercial/Residential Linoleum Sheet Installation System COMMERCIAL USE ONLY Product MARMORETTE GRANETTE COLORETTE UNI WALTON LINORETTE Gauge 0.080" (2.0 mm) 0.100" (2.5 mm) 0.125" (3.2 mm) 0.100" (2.5
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Tip: Check for proper color selection and style prior to Installation. No claims will be accepted after installation Important Information before
Installation Guidelines for Modular Carpet
Installation Guidelines for Modular Carpet Ecoflex Urethane Cushion Backed Carpet Tiles PVC Backed Carpet Tiles Thermoplastic Backed Carpet Tiles Self Lock Carpet Tiles 1975 West Oak Circle Field Services
Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.
i This instruction sheet describes the proper methods for installing Eucatex decorative wall paneling. Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in
ENGINEERED FLOORING INSTALLATION
ENGINEERED FLOORING INSTALLATION ATTENTION! INSTALLER/OWNER RESPONSIBILITIES Beautiful hardwood floors are a product of nature and, therefore, they will show variations in color, grain, texture, and appearance.
Shower Walls and Tub Surrounds
Reverso en español TEC Skill Set How-To Project Guide Shower Walls and Tub Surrounds 3 Steps to a Beautiful Tile Surface! 1. Prepare the surface 2. Set the tile 3. Grout and caulk H.B. Fuller Construction
Pergo Installation Essentials Guide For Laminate Flooring
Pergo Installation Essentials Guide For Laminate Flooring SECTION SECTION 1. Floating Floor Definition & Benefits 2. What You Need To Know Expansion/Contraction 3. Before Starting Estimates 4. A Basic
Installation Instructions Waterproof Core Vinyl Planks
Installation Instructions Waterproof Core Vinyl Planks Products Included Approved Grade Levels Approved Installation Methods Waterproof Core Vinyl Planks Click Lock Joint Above Grade. On Grade. Below Grade.
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions
Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions Thank you for choosing ARK Floors Exotic Hardwood Flooring. In order to meet warranty
Euro Oak Installation
STYLE TIMBER FLOOR Bring your life in style Euro Oak Installation Before Starting Installation Your floor has been manufactured with the best possible care. However we would still advise you to check the
Pergo Installation Essentials Guide For Laminate Flooring
Pergo Installation Essentials Guide For Laminate Flooring SECTION SECTION 1. Floating Floor Definition & Benefits 10. Other Subfloor Requirements 2. What You Need To Know Expansion/Contraction 11. New
LAMINATE LAMINATE FLOOR CARE AND MAINTENANCE. Routine Maintenance. Minor Repair Instructions: Glueless Laminate Board Replacement Repairs
LAMINATE FLOOR CARE AND MAINTENANCE Routine Maintenance 1. Use a damp cloth to blot up spills as soon as they happen. Never allow liquids to stand on your floor. 2. For tough spots, such as oil, paint,
WATER AND WOOD DON T MIX KEEPING YOUR TRIÂNGULO HARDWOOD FLOOR BEAUTIFUL SCRATCHES, INDENTATIONS AND GOUGES
WATER AND WOOD DON T MIX Using any of the following items to maintain your wood floor will void all manufacturer warranties! Water Oil Soap Vinegar, Ammonia Household Detergent Wax Furniture Polish Dust
INSTALLATION INSTRUCTIONS
INSTALLER/OWNER RESPONSIBILITIES Hardwood flooring is a product of nature and its inherent beauty stems from the fact that each piece is unique with no two pieces the same. Due to the fact that this flooring
How To Level A Subfloor
Skill Level: INTERMEDIATE Give these projects a try if you're a confident DIYer with a good working knowledge of a variety of tools. They can take a day or more to complete. If you can build a birdhouse
Herringbone Pattern Flooring
Herringbone Pattern Flooring If it s not marked NOFMA, it s not certified. Handling, Storage, Installation and Tips Herringbone is generally manufactured from 3/4 x 2 ¼ or ¾ x 1-1/2 standard tongue & groove
How To Insure Against Problems With Your Home Warranty
Subcontractor Warranty Policy ALL WARRANTY REQUESTS MUST BE IN WRITING. Please submit all warranty requests online by visiting: www.rigginscustomhomes.com/customerservice.html Please fill out the form
VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised
Page 1 of 6 instructions VC 104+ Rigid Grade / VC 104+ Rigid Grade Imagine / (for the rest of this document referred to as VC 104) can be applied to new and used trucks and trailers with painted rigid
How To Warranty Shawfloors
HARD SURFACE WARRANTIES, CARE & MAINTENANCE LAMINATE shawfloors.com 1 CONTENTS LAMINATE Care & Maintenance 3 Warranty 4 Shaw represents a promise of outstanding performance, unique styling and overall
Installation Instructions, Care and Maintenance Guide & Warranty Information for Engineered Woods
Installation Instructions, Care and Maintenance Guide & Warranty Information for Engineered Woods We thank you very much for selecting EarthWerks Hardwood Flooring. We sincerely hope your new environment
Installation for Wood Flooring
Installation for Wood Flooring Tarkett wood flooring offers a beautiful variety of options from species and colour, to plank widths and finishes. We developed enhanced locking system, T-lock, and the best
How To Install Hardwood Flooring
phone: 1.855.Ludaire e-mail: [email protected] Solid Flooring Installation Instructions These Instructions and Guidelines are for the typical installation of ¾ Pre-finished Solid Hardwood Flooring manufactured
Columbia flooring will resist fading from exposure to sunlight or artificial light.
LIMITED LIFETIME WARRANTY AND MAINTENANCE FOR RESIDENTIAL USE Columbia is so confident in the design and durability of our Columbia flooring products and accessories, that we back them with a Limited Lifetime
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Glue: All profiles Nail: 3/8", 1/2", 3/4" Staple: 3/8", 1/2" Float: 1/2" Engineered Planks and Strips can be installed over most subfloors, and are
INSTALLATION GUIDE. Imago Installation Guide - January 2008 1
INSTALLATION GUIDE IMAGO Floors are very sensitive to ambient humidity conditions, since all wood flooring will expand and contract as relative humidity varies. In order to keep the flooring manufacturer
These instructions apply to the DREAM HOME Laminate collection
These instructions apply to the DREAM HOME Laminate collection These instructions apply to the DREAM HOME Laminate collection. Avoid costly mistakes, please read instructions carefully before beginning
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Glue Down / Float Engineered Planks can be installed over most subfloors, and are constructed to be dimensionally stable, making them suitable for
Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)
INSTALLATION INSTRUCTIONS FOR GTI CONNECT TILES This document refers to the following products: Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking) 635 X 635 mm 25.5 x 25.5
THINGS YOU SHOULD KNOW
INSTALLATION INSTRUCTIONS Value Sized Roll The quickest, easiest, cleanest way to install tile. No Mortar, No Mixing, No Mess Complete Your Project in a Day No Waiting Between Setting and Grouting THINGS
Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2" Engineered
Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2" Engineered Thank you for choosing IndusParquet ½" Engineered Hardwood Flooring. Protect your investment; review and adhere to the flooring
Cleaning guide for senior living facilities
Cleaning guide for senior living facilities Altro s recommended cleaning and maintenance guidelines for senior living facilities. Introduction Most senior living facilities require commercial cleaning
FLOOR MAINTENANCE GUIDE EXPECTATIONS AVOIDING PROBLEMS
No. 8 Brands Hatch Close Kyalami Business Park Kyalami Tel: 011 466 0701 Fax: 011 466 2919 Email: [email protected] FLOOR MAINTENANCE GUIDE EXPECTATIONS AVOIDING PROBLEMS Please keep this folder
Care and Warranty Guide
Care and Warranty Guide Keeping Your Olive Wood Floor Beautiful for Generations C a r i ng Fo r Yo u r T u s c a n y Olive Wo o d Fl o o r Tuscany Olive Wood flooring can last for generations with minimal
RESILIENT TILE FLOORING INCLUDING SOLID VINYL AND LINOLEUM FLOOR TILE
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
0800 30 50 90 www.bamboodirect.co.nz
Guide To Bamboo Flooring 1. Frequently Asked Questions 2. Installation Tips 3. Maintaining your Bamboo Floor 4. Why Bamboo Direct? COPYRIGHT 2009 BAMBOO DIRECT Frequently Asked Questions 1. Are Bamboo
Amtico and Spacia Commercial Maintenance Guidelines
Amtico and Spacia Commercial Maintenance Guidelines Amtico flooring along with all types of floor coverings require appropriate cleaning and maintenance in order to provide long term durability, safety
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Glue: All profiles Nail: 3/8", 1/2", 3/4" Staple: 3/8", 1/2" Float: 1/2" Engineered Planks and Strips can be installed over most subfloors, and are
Care and Maintenance for Wood Flooring
Care and Maintenance for Wood Flooring The finishing technology used for Tarkett wood floorings makes them the best choice for easy maintenance. To preserve all the beauty of your Tarkett wood flooring,
Aspect Metal Peel & Stick Tile Installation Guide
Aspect Metal Peel & Stick Tile Installation Guide Proper surface preparation is essential for a successful project Failure to follow recommended surface preparation instructions may void the warranty Read
Engineered Hardwood Flooring. Installation, Care and Warranty Guide
Engineered Hardwood Flooring Installation, Care and Warranty Guide Warranty coverage may be lost due to failure to strictly abide by all the installation instructions and recommendations in this manual.
Moisture and Resilient Floor Covering
Moisture and Resilient Floor Covering Moisture related failures of resilient floor coverings installed over concrete have focused unfairly over the years on the premise that the flooring product itself
Hardwood Flooring. Urbania Flooring
Engineered Hardwood Flooring Installation Guide for Urbania Flooring BEFORE STARTING THE INSTALATION - Please take the time to read and ensure that you understand the information contained in this document.
ECOfit Interlocking Tile
ECOfit Interlocking Tile INSTALLATION AND MAINTENANCE MANUAL Manufactured in the U.S.A. by: Revised 09/04/2014 Supersedes all previous versions. Check website for updates. 877-258-0843 www.ecorecommercialflooring.com
COMMERCIAL RESILIENT INSTALLATION GUIDELINES
COMMERCIAL RESILIENT INSTALLATION GUIDELINES GENERAL INFORMATION All substrates to receive moisture sensitive floor covering require proper moisture testing. Use only Portland based patching and leveling
Engineered T&G Hardwood Flooring. Installation, Care and Warranty Guide
Engineered T&G Hardwood Flooring Installation, Care and Warranty Guide Warranty coverage may be voided due to failure to strictly abide by all the installation instructions and recommendations in this
Guide Specifications for Maple Flooring Systems
Guide Specifications for Maple Flooring Systems MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Purpose This Guide Specification is designed to assist in the production of actual
The Mohawk Group Installation Guidelines for
The Mohawk Group Installation Guidelines for Uniplus System II Double Stick Unibond RE Wet Set The Mohawk Group 1975 West Oak Circle Marietta, GA 30062 800-554-6637 www.themohawkgroup.com Field Services
3/4 Solid Hardwood Flooring Installation Instructions
3/4 Solid Hardwood Flooring Installation Instructions Solid Hardwood Flooring can be installed over most properly prepared subfloors, making them suitable for installation on or above grade levels where
Lock&Fold Locking Laminate Planks - Wood and Tile Visuals Installation Instructions
Lock&Fold Locking Laminate Planks - Wood and Tile Visuals Installation Instructions A. LAMINATE TOOLS & MATERIALS Laminate Flooring Armstrong Quiet Comfort Premium Underlayment S-1836 (if pad not attached)
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
Annapolis Valley - Engineered Floors - Installation Instructions
Annapolis Valley - Engineered Floors - Installation Instructions OWNER/INSTALLATION TECHNICIAN RESPONSIBILITIES: Order Quantity: When the flooring is ordered, a minimum of 5% (recommended 7% - 10%) must
Division 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
Choosing the Right Floor Protectors
Choosing the Right Floor Protectors You ve made the investment in new flooring for your home. So what can you do to help ensure your flooring stays looking like new? One of the biggest flooring maintenance
Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings
SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS
PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED
Congratulations! Quality products for quality floors
Congratulations! By choosing Mirage hardwood flooring, you have made the best decision for your home. Thanks to Mirage s unparalleled quality, unique finishing process and your proper care, the beauty
CHAPTER 3 MOISTURE TESTING
CHAPTER 3 MOISTURE TESTING Part I - Moisture Testing for Wood Subfloors A. Testing Requirements 1. Test for moisture at several locations in the room a minimum of 20 per 1,000 square feet and average the
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:
Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos
DUROCK Brand Cement Board. installation guide. Substrate and ceramic tile installation for walls, floors, countertops and wall shields.
DUROCK Brand Cement Board installation guide Substrate and ceramic tile installation for walls, floors, countertops and wall shields. DUROCK Brand Cement Board... Strength beneath the surface A ceramic
DIY CABINET REFACING INSTALLATION GUIDE
DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
Daybreak Acacia. 25yr Residential Wear Warranty
- Wide Leaf Acacia - Handsculpted - Tongue & Groove - Random Lengths - 8 Layer Urethane Finish - High Color Variation JANUARY 2013 HARDWOOD - WIDE LEAF SOLID Daybreak Acacia 3/4 Solid Handsculpted, Tongue
GigaCrete Specification PlasterMax
GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam
SOLID FLOORING 3/4 INSTALLATION GUIDELINES
SOLID FLOORING 3/4 INSTALLATION GUIDELINES Thank you for choosing Cikel Exotic Hardwood Flooring, a responsible choice. Please thoroughly review and adhere to the following installation instructions to
BLACK JACK ALL WEATHER ROOF COATING
PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.
HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY
HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard
Shingle Installation Guide
Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of
Engineered Installation Instructions
Engineered Installation Instructions Please read all instructions carefully before attempting installation. Improper installation may void the warranty. PRODUCT USE DIVINE Flooring Engineered products
Amorim Rubber Flooring Specifications
Amorim Rubber Flooring Specifications Test Method Amorim Typical Value Durometer, Shore A, points of hardness ASTM D2240-97 60 Density, lbs/ft 3 ASTM D297-93 Part A, Section 16.3 64 Compressibility @ 100
12 POLYURETHANE ADHESIVE (PU 105)
12 POLYURETHANE ADHESIVE (PU 105) DISCLAIMER: Refer to page 5 of this document. 12.1 DESCRIPTION PU 105 is a high performance two-part polyurethane adhesive for both indoor installations of Mondo rubber
Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap
Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet
Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104
Black Wolf TM POCKET BILLIARD TABLE INSTALLATION MANUAL www.brunswickbilliards.com SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104 51-905710-000 SEPTEMBER 2010 NOTE: Please use the instructions in this
