Root Cause Analysis Report for the Tank 650 seal fire
|
|
- Annice Hancock
- 7 years ago
- Views:
Transcription
1 April 5, 2011 Mr. Randy Sawyer Director, Hazardous Materials Division Contra Costa Health Services 4585 Pacheco Blvd. Martinez, CA Via Fax: (925) Original will follow in the mail. Subject: Root Cause Analysis Report for the Tank 650 seal fire Dear Mr. Sawyer: The is submitting a Root Cause Analysis report for the October 10, 2010 Tank 650 seal fire. The investigation is complete and the Root Cause Analysis report is attached. This Root Cause Analysis report is submitted in satisfaction of the requirements set forth in County Ordinance 98-48, the Industrial Safety Ordinance for root cause analysis reports. If you have any questions regarding this report, please call me at (925) or Ms. Sabiha Gokcen at (925) Sincerely, Richard Leland Health and Safety Manager Cc: Ms. Cho Nai Cheung
2 Root Cause Analysis Report Summary of Event: At 12:20 PM, a seal fire was reported on Tank 650, which contains concentrated sour water with a 3 foot hydrocarbon top layer. Maintenance activities were being performed on the tank seals at the time of the incident. A CWS Level 1 was issued at 12:28 and later elevated to a CWS Level 2 at 12:50 once the smoke plume became visible from offsite. Emergency Response crews responded with firefighting equipment and the Emergency Operations Center (EOC) was also activated. Notifications were made to the requisite outside agencies and to Golden Eagle personnel. The Bay Area Air Quality Management District, Sheriff s Department, Tesoro Industrial Hygiene and Odor Science and Engineering conducted community monitoring. No odors or impact of smoke were reported. No reportable quantities of hazardous compounds were released. At 15:00 hours, the fire was extinguished and there were no reports of visible smoke offsite. The incident was declared localized at 15:23 and all clear at 16:10. A brief timeline follows: 12:20 hrs: Fire at TK650 seal 12:23 hrs: CWS level 1 notification sent over terminal 12:45 hrs: One contractor taken off site for smoke inhalation 12:51 hrs: CWS level 2 notification sent over terminal 13:38 hrs: Contra Costa Sheriff arrives at EOC 14:00 hrs: Secured tank area to set up fire fighting 15:00 hrs: Fire extinguished 15:20 hrs: Contractor released from offsite treatment 15:23 hrs: Incident declared localized by Tesoro IC 16:10 hrs: All Clear issued Agency Notification and Response: The following agencies were immediately notified: Contra Costa Health Services (CCHS) via the CWS, the Bay Area Air Quality Management District (BAAQMD) via the CWS and phone, Contra Costa Fire Protection District, and the Contra Costa County Office of Emergency Services. The following agencies responded with personnel to the scene: CCHS, BAAQMD, Contra Costa Fire and Contra Costa Sheriff. [Note: Notifications over the CWS terminal: CWS level 1 notifies CCHS, Contra Costa OES, and the Contra Costa Sheriff with a specific message. Additional notice informs BAAQMD, Contra Costa Fire Protection District, Martinez Police, Antioch Police, Pinole Police and Richmond Police. CWS level 2 notifies CCHS, Contra Costa OES, Contra Costa Sheriff and BAAQMD with a specific message. Additional notice informs Contra Costa Fire Protection District, California Highway Patrol, California Dept. of Page 2 of 6
3 Health, San Ramon Valley Fire, Martinez Police, Antioch Police, Pinole Police and Richmond Police.] Emergency Response Actions: Emergency response team members applied fire fighting foam to the tank seal on top of the tank. Material Released: The material that burned was mixed hydrocarbons; hydrocarbons are used as a cap on the sour water to suppress odors. A tank gauge the next day showed no level change in the tank. The final amount of hydrocarbon estimated to be combusted is 3 barrels. Note: this calculation was revised downward because the original estimate assumed the entire surface of the tank was involved. Only about one-third of the seal area was actually involved in the fire. Meteorological Conditions: The weather was clear with wind direction varying from the NW with a wind speed of 8-12 mph. The temperature was about 78 degrees F. Injuries: One contractor employee suffered hyperventilation due to the incident (this was initially reported as a smoke inhalation in earlier reports). The contractor was taken to an off-site medical facility for observation and was subsequently discharged. Community Impact: The smoke plume was visible from offsite, but air monitoring by Tesoro Industrial Hygiene yielded non-detect levels of hydrocarbons. Monitoring performed by Odor Science and Engineering and the Bay Area Air Quality Management District did not detect any off site odors. Incident Investigation of the event: A seal fire occurred on Tank 650 while contractors were working on the tank repairing the primary and secondary seals. Tank seals are part of the tank roof and are designed to prevent hydrocarbon emissions from the tank while still allowing the tank roof to move up and down as the tank level changes. Tank 650 holds concentrated sour water with a hydrocarbon layer on top which is used to suppress any potential odors from the sour water. Note: tank seal work is a specialty task performed by highly specialized contractor companies. Page 3 of 6
4 The fire began at the north side of the tank, at about the 1 o clock position using the ladder platform as reference at the 6 o clock position. There were four contractor employees on the tank roof, one on the platform serving as hole-watch and one on the platform serving as a spotter for the evacuation man-basket and crane. Two employees were working on either side of the location where the fire first ignited, one was on the east side, the other was on the west side near where a foam eductor was found. The investigation focused on the causes of the incident, with particular attention to the possible ignition source. A tank seal repair or replacement involves specific precautions to prevent ignition of the tank contents. The contractor s procedure for the seal replacement contained these precautions; specifically, the procedure required the application of a foam layer and performing an LEL check to verify the foam application was adequate to keep hydrocarbon vapors suppressed. As part of the investigation, it was found that while the seal replacement was in progress, no foam had been applied per procedure. The tank seal replacement project had been assigned to a Tesoro maintenance supervisor whose specialty was process unit maintenance rather than tank maintenance. However, Tank 650 was within his area and the current maintenance practice is to assign supervision of maintenance work based on area. The investigation team evaluated 7 different potential ignition sources. Based on the evidence gathered, it was concluded the ignition source was likely pyrophoric iron. Pyrophoric iron readily reacts with air and that reaction generates a fair amount of heat, which is sufficient to ignite any hydrocarbons present. Pyrophoric iron must be kept wet with water or foam to prevent reaction with air. Pyrophoric iron occurs in equipment where H 2 S vapor reacts with the iron in the equipment walls and forms Iron Sulfide (pyrophoric iron). Tank 650 contains sour water, which contains H 2 S. Even though Tank 650 is labeled as possibly containing pyrophoric material, the presence of pyrophoric iron in the tank and the tank seals was not recognized during preparation for the repair of the tank seals. The Hazardous Materials Warning Sheet (HMWS), which is the primary equipment-specific reference of hazards, did not contain information regarding the hazard of the pyrophoric iron nor the hydrocarbon layer. The Rules and Standing Instructions (R&SIs) pertinent to tank maintenance also did not contain information about pyrophoric iron or specify any special requirements for tanks that may contain pyrophoric material. In addition, R&SI 8-7 Pyrophoric Vessels is specific for process vessels and does not address tank precautions, nor does it list tanks or tank seals as potential locations for pyrophoric iron. Each of these documents affects the planning of maintenance tasks to ensure they are executed safely. Root Causes: Root Cause # 1: The Contractor s procedure Working on External Floating Roofs with Tank in Service was not followed. The procedure requires application of a foam layer. Page 4 of 6
5 The foam layer was not applied to prevent the ignition of the hydrocarbon layer. The procedure also required an LEL check after foam application to verify there is an adequate layer of foam to prevent ignition. Root Cause # 2: There was a lack of Tesoro supervisory oversight to verify the contractor s compliance with the site s procedures and the approved contractor procedure. Root Cause # 3: The Tesoro Rule and Standing Instruction (R&SI) 8-6 Tank Requirements was not followed regarding the application and maintenance of the foam blanket during tank seal replacement. Root Cause #4: The hazard was not recognized. Tesoro R&SI 8-6 Tank Requirements, R&SI Tank Seal Replacement, and R&SI 8-7 Pyrophoric Vessels do not address potential pyrophoric hazards in storage tanks. This was one factor in why the hazards of the job were not recognized. Root Cause #5: The hazard was not recognized. The Tank 650 Hazardous Materials Warning Sheet (HMWS) did not include precautions for potential for pyrophoric material. This was one factor in why the hazards of the job were not recognized. Root Cause #6: The hazard was not recognized. The Tank 650 HMWS did not include precautions for the hydrocarbon layer. This was one factor in why the hazards of the job were not recognized. Root Cause #7: The hazard of pyrophoric material on Tank 650 was not recognized by the Operations Supervisor, the Maintenance Supervisor, and the Operations Shift Supervisor that signed the HERA for Tank 650, nor by the responsible operator that issued the entry permit for Tank 650 despite the label on the tank noting it as containing pyrophoric material. Corrective Actions: Corrective Actions Anticipated Date Root Cause of Completion 1 Follow up with HMT on why they failed to follow their procedure and reset the expectations that they do so 6/1/ Modify the Tesoro Execution oversight philosophy for high risk work. Modify the MWP work process binder and train maintenance supervision on changes. Modify R&SIs 8-6 Tank Requirements and Tank Seal Replacement to include consideration 3 of possible pyrophoric iron presence in tanks and add a requirement for a pyrophoric material 9/1/2011 2, 3 4, 7 Page 5 of 6
6 management plan before beginning work that could potentially involve pyrophoric material. Modify R&SI 8-7 Pyrophoric Vessels to include tanks and tank seals in its scope. Require job specific work execution plans for repairs of in-service tanks or other high risk work reviewed and approved by the Tesoro representative for the job. As part of the job specific work execution plan, add a section for Health & Safety to review emergency response aspects of the job Correct the HMWS for Tank 650 to include pyrophoric considerations and the hydrocarbon layer. Review the HMWS for other tanks and vessels in similar service to ensure that pyrophoric considerations are noted. Review of R&SI for modification as follows: 1) inclusion of limits for LEL and toxics and 2) consideration of the following concepts when replacing tank seals (these should be included in the contractor s procedure to replace the seal): a) Continuous atmospheric monitoring of the tank annular space wherever the seal has been removed. b) Adequate application of Firefighting Foam, including specifying amount and frequency of application, c) Approval of the firefighting foam being used and documentation of approval in the job specific work execution plan Complete Root Cause Analysis Report 4, ,6 7 3 Page 6 of 6
EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM
EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29CFR1910.36-29CFR1910.38-29CFR1910.157-29CFR1910.165 NFPA-10 BASIS: The OSHA Emergency Action Planning and the
More informationEAST BAY REGIONAL PARK DISTRICT FIRE DEPARTMENT POINT PINOLE GRASSLAND RESTORATION PRESCRIBED FIRE AND SMOKE MANAGEMENT PLAN
EAST BAY REGIONAL PARK DISTRICT FIRE DEPARTMENT POINT PINOLE GRASSLAND RESTORATION PRESCRIBED FIRE AND SMOKE MANAGEMENT PLAN February 11, 2014 TABLE OF CONTENTS Section 1 REVIEW AND APPROVAL 2 Section
More informationContingency Plan. Facility Name
Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes
More informationPOINT UNIVERSITY CAMPUS SECURITY Emergency Response Plan
POINT UNIVERSITY CAMPUS SECURITY Emergency Response Plan Introduction The Point University Emergency Response Plan establishes guidelines for campus-wide communication, service coordination and safety
More informationHOT WORK PERMIT PROGRAM TRAINING. John Braun
HOT WORK PERMIT PROGRAM TRAINING John Braun 1.0 INTRODUCTION 1.2 Purpose The Hot Work Permit Program has been developed for University employees that work on or around hot work activities. This program
More informationALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
More informationThe following is a six-step approach for complying with the standard. Although there are only six main steps, each involves many smaller steps.
Hazard Communication The Occupational Safety and Health Administration (OSHA) hazard communication standard (HCS), also known as the employee right-to-know standard, is found at 29 CFR 1910.1200 of the
More informationALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.1200 HAZARD COMMUNICATION SECTION: 1700 REVISION DATE: 2/3/2012 REVISION: 4 NUMBER:
OSHA REGULATION: 29 CFR 90.200 HAZARD COMMUNICATION 700 : DATE: /3/200 DATE: 2/3/202 A. POLICY. This procedure follows requirements set forth in 29 CFR 90.200. 2. It is the policy of Alvernia University
More informationEXHIBIT A SCOPE OF WORK
EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,
More informationOn-Site Risk Management Audit Checklist for Program Level 3 Process
On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:
More informationINDUSTRIAL SAFETY ORDINANCE ANNUAL PERFORMANCE REVIEW AND EVALUATION REPORT
INDUSTRIAL SAFETY ORDINANCE ANNUAL PERFORMANCE REVIEW AND EVALUATION REPORT By Contra Costa Health Services Hazardous Materials Programs Table of Contents Introduction...1 Annual Performance Review and
More informationWork Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?
A Health and Safety Guideline for Your Workplace What is a Work Permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done,
More informationLiberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use
Liberty Mutual Insurance RISK ENGINEERING PROCEDURE REP 07 Incident Planning For external use Risk Engineering Procedure Incident Planning CONTENTS Page PURPOSE... 3 BACKGROUND... 4 INCIDENT PLANNING PREPARATION...
More informationBODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR
BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR CERTIFICATION EXAMINATION November 2015, March 2016, July 2016 and November 2016 (Replaces October 2013) This API Individual Certification Examination is
More informationPresented by: Rich Perry Marsh Risk Consulting
Flammable and Combustible Liquids Presented by: Rich Perry Marsh Risk Consulting What s the Big Deal? Flammable and combustible liquids are easily ignited Ignite with explosive force Burn readily and give
More informationSuffolk County Department of Health Services. Division of Environmental Quality
Suffolk County Department of Health Services Division of Environmental Quality Guidelines For the Construction of Storage Areas for Portable Containers ~~~~ Clare B. Bradley, M.D., M.P.H. Suffolk County
More informationRancho Cucamonga Fire Protection District Prevention Bureau Standard
Rancho Cucamonga Fire Protection District Prevention Bureau Standard Title: Fire Alarm and Monitoring Systems Standard # 9-3 Effective: May 2002 Number of Pages: 7 Revised: January 2014 INTENT The intent
More informationHealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?
work permits What is a work permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done, the hazards involved, and the necessary
More informationANNUAL PERFORMANCE REVIEW & EVALUATION INDUSTRIAL SAFETY ORDINANCE
ANNUAL PERFORMANCE REVIEW & EVALUATION INDUSTRIAL SAFETY ORDINANCE December 9, 2014 Table of Contents Executive Summary... 3 Public Participation... 3 Audits... 4 Major Chemical Accidents or Releases...
More information1.0 Purpose... 4. 2.0 Definitions...4. 3.0 Hot Work Operations. 5
HOT WORK PROGRAM Introduction The University of Kentucky recognizes a potential for fire from hot work operations. For that reason this program should be implemented in all departments at the University
More informationFire Safety Risk Assessment Checklist for Residential Care Premises
Checklist for Residential Care Premises Name of Premises: Address of Premises: Name of Responsible Person: What area / location does the assessment cover? Does the assessment cover the whole site YES or
More informationMAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS
FIRE DEPARTMENT Bureau of Fire Protection and Life Safety www.cityofsanmateo.org 1900 O Farrell, Suite 140 San Mateo, CA 94403-1332 (650) 522-7940 FAX: (650) 522-7941 TDD: (650) 522-7047 MAINTENANCE AND
More informationCONFINED SPACE PROGRAM
California Institute of Technology CONFINED SPACE PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028 Email:
More informationEMS Environmental Emergency Response Plan EXAMPLE
Page 1 of 11 EMS Environmental Emergency Response Plan EXAMPLE Page 2 of 11 ENVIRONMENTAL EMERGENCY RESPONSE PLAN TABLE OF CONTENTS INTRODUCTION EMERGENCY SPILLS/DISCOVERY POLICIES AND GUIDING PRINCIPLES
More informationNational Transportation Safety Board Washington, D.C. 20594
E PLURIBUS UNUM NATIONAL TRA SAFE T Y N S PORTATION B OAR D National Transportation Safety Board Washington, D.C. 20594 Safety Recommendation Date: February 15, 2002 In reply refer to: R-02-4 Mr. Garry
More informationDirector, National Institute for Occupational Safety and Health. California Fatality Assessment and Control Evaluation (CA/FACE) Program
TO: FROM: SUBJECT: Director, National Institute for Occupational Safety and Health California Fatality Assessment and Control Evaluation (CA/FACE) Program A Chemist Dies from Burns Caused by Mixing Chemicals
More informationCONSTRUCTION FIRE SAFETY PLANNING GUIDELINES
CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.
More informationTABLE OF CONTENTS 10. ANNEX D... 10-2
TABLE OF CONTENTS 10. ANNEX D... 10-2 10.1 PURPOSE...10-2 10.2 SITUATION AND ASSUMPTIONS...10-2 10.2.1 SITUATION...10-2 10.2.2 ASSUMPTIONS...10-2 10.3 GENERAL PROCEDURES AND RESPONSIBILITIES... 10-3 10.3.1
More informationDirector, National Institute for Occupational Safety and Health. California Fatality Assessment and Control Evaluation (CA/FACE) Program
TO: FROM: SUBJECT: Director, National Institute for Occupational Safety and Health California Fatality Assessment and Control Evaluation (CA/FACE) Program An Automotive Mechanic Dies from Thermal Burns
More informationSARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS
SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS I. APPLICATION AND DEFINITIONS 1.01 Authorization for Standards 1.02 Application of Standards 1.03 Definitions
More informationSAFETY AND HEALTH PROGRAM
PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of
More informationOVERVIEW SCOPE DEFINITIONS
Procedure No 400.10 Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: March 2008 Distribution All Employees Review Date: April 2008 Purpose: To establish
More informationContingency Plan Template. Hazardous Materials and Waste Management Division (303) 692-3300
Contingency Plan Template Hazardous Materials and Waste Management Division (303) 692-3300 October 2008 Contingency Plan A Large Quantity Generator of hazardous waste must have a written contingency plan
More informationContingency Plan. Community College of Denver - Auraria Campus Facility Name
Contingency Plan Community College of Denver - Auraria Campus Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility
More informationNFPA Fire Fighter II
State of Oregon Department of Public Safety Standards and Training NFPA Fire Fighter II Task Book Task Book Assigned To: Name DPSST Fire Service # Department Name Date Initiated Signature of Department
More informationBWC Division of Safety and Hygiene
BWC Division of Safety and Hygiene SAMPLE WRITTEN PROGRAM EMERGENCY RESPONSE PROCEDURES NOTE: Companies should not attempt any hazardous waste operations unless employees have been trained in accordance
More informationADMINISTRATIVE SERVICES MANUAL
Purpose Responsibilities Proper Storage and use of flammable liquids can significantly reduce the possibility of accidental fires and injuries. To minimize risk to life and properly, the requirements of
More informationName Of Occupancy Date. Yes No Describe
FIRE PREVENTION INSPECTION CHECKLIST For Class A Occupancy (For Assembly Buildings, Bars, Restaurants, Gyms, Churches, Arenas, Theatres or wherever people gather) Name Of Occupancy Date Physical Address
More informationHIGH SCHOOL GRADUATE STUDY
TABLE OF CONTENTS CONTRA COSTA COLLEGE HIGH SCHOOL GRADUATE STUDY ENROLLMENT, PLACEMENT AND SUCCESS OF RECENT GRADUATES FROM AREA HIGH SCHOOLS 2013 2014 Prepared by Office of District Research Contra Costa
More informationTOOELE COUNTY EMPLOYEES EMERGENCY SAFETY HANDBOOK 2012 REVISION
TOOELE COUNTY EMPLOYEES EMERGENCY SAFETY HANDBOOK 2012 REVISION This handbook has been developed for four reasons: 1) to save lives 2) to assist county officials in meeting OSHA requirements for fire safety
More informationMOTOR FUEL DISPENSING SAFETY
STRATEGIC OUTCOMES PRACTICE TECHNICAL ADVISORY BULLETIN January 2010 MOTOR FUEL DISPENSING SAFETY Fire! Not an alarm anyone wants to hear, especially not when the fire is burning at a major fuel source.
More informationTAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
More informationHAZARD CONTROL TECHNOLOGIES, INC. Coal Silo-Bunker Firefighting Procedures
HAZARD CONTROL TECHNOLOGIES, INC. Coal Silo-Bunker Firefighting Procedures This article was written in the May, 2012 edition of Coal People magazine and reviews the basic procedures for locating and mitigating
More informationGeneral Fire Code Requirements Within Commercial Tenant Spaces
FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding
More informationSTATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT
--.--~.-------------------------------- STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean
More informationHow To Handle A Train Accident In Whitefish
Drawing by Marty Two Bulls BAKKEN OIL SURE HAS US LOOKING AT OUR DISASTER PLANNING We can t say, Not in our backyard! We can t say rail accidents don t happen here in Whitefish area. Derailment in Olney
More informationNatural Gas Emergencies
Natural Gas Emergencies Purpose To protect the personnel within the department, and citizens from the hazards involved in a natural gas emergency. The Incident Commander is to use his/her best judgment
More informationTEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY
Page 1 of 7 ISSUED: 5/00 REVISED: 08/06 1. Potential Releases of Radioactive Materials to Unrestricted Areas The Environmental Health and Safety Department (EHRS) must be notified immediately if an emergency
More informationVehicle Fire Protection. An Ownerʼs Manual for ANSUL Fire Suppression/Detection Systems
Vehicle Fire Protection An Ownerʼs Manual for ANSUL Fire Suppression/Detection Systems 002792 Off-road vehicles do have fires Statistics show that off-road vehicles burn with alarming frequency. These
More informationAfter the Fire. Fire Department Activities
Caroline County Department of Fire-Rescue & Emergency Management 17202 Richmond Turnpike P.O. Box 447 Bowling Green, VA 22427 Phone: 804-633-9831 Fax: 804-633-9832 After the Fire This information has been
More informationHOT WORK PERMIT PROCEDURES
COLUMBIA UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY MEDICAL CENTER February 2010 1 TABLE OF CONTENTS A. PURPOSE 3 B. SCOPE 3 C. POLICIES AND PROCEDURES 3-4
More informationCode Compliance Guideline: Swimming Pool Chemicals
A publication of Fairfax County, Virginia CODE COMPLIANCE GUIDELINE SWIMMING POOL CHEMICALS AND FIRE SAFETY REQUIREMENTS RELATED TO POOL OPERATIONS This publication outlines the Fire Prevention Code requirements
More informationCoastside County Water District Board of Directors
To: From: Coastside County Water District Board of Directors David Dickson, General Manager Report Date: February 5, 2014 Subject: District Office Fire Recovery Recommendation: None. Information only.
More informationChemical Assisted Suicides
Chemical Assisted Suicides Presented by Captain Rich Christensen Bellevue Fire Department Coordinator, Eastside Hazardous Materials Team Course Goal To offer first responders and other public safety officials
More informationFIRE PREVENTION & INVESTIGATION DIVISION 125 Idylwyld Drive South Saskatoon, SK S7M 1L4 Phone: (306) 975-2578 Fax: (306) 975-2589.
FIRE PREVENTION & INVESTIGATION DIVISION 125 Idylwyld Drive South Saskatoon, SK S7M 1L4 Phone: (306) 975-2578 Fax: (306) 975-2589 Bulletin 16-12 Fire Drills This guideline was developed to assist persons
More informationSafe Operating Procedure
Safe Operating Procedure (Revised 07/09) HOT WORK PERMIT OPERATIONS (For assistance, please contact EHS at (402) 472-4925, or visit our web site at http://ehs.unl.edu/) Authority In recognition of the
More informationExplosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy
Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy UVCE Storage tank Hydrocarbons Steam coil Corrosion Steam Instrumentation
More informationJune 27, 2013. Project GSA1570019. Rhonda Rance U.S. General Services Administration 450 Golden Gate Avenue, Floor 4 San Francisco, California 94102
June 27, 2013 Project GSA1570019 Rhonda Rance U.S. General Services Administration 450 Golden Gate Avenue, Floor 4 San Francisco, California 94102 Subject: Determination of Asbestos Conditions Former USDA
More informationPressure Testing (Hydrostatic / Pneumatic) Safety Guidelines
The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)
More informationMechanical Systems Competency 1.20
Competency 1.20 Mechanical systems personnel shall demonstrate a working level knowledge of the safety and health fundamentals of mechanical systems and/or components. 1. Supporting Knowledge and Skills
More informationLEAK DETECTION ALARM SYSTEM GUIDELINES FOR TOXIC HAZARDOUS/MATERIALS STORAGE
Suffolk County Department of Health Services Division of Environmental Quality LEAK DETECTION ALARM SYSTEM GUIDELINES FOR TOXIC HAZARDOUS/MATERIALS STORAGE ~~~~ Mary E. Hibberd, M.D., M.P.H. Suffolk County
More informationHERNANDO COUNTY FIRE ALARM GUIDELINES
HERNANDO COUNTY FIRE ALARM GUIDELINES To be used for all commercial building fire alarm system plan review. The procedures set forth in this document are the minimum requirements necessary to ensure a
More informationBay Area and Northern California Environmental Firms. the East Contra Costa County Habitat Conservancy
To: Bay Area and Northern California Environmental Firms EAST CONTRA COSTA COUNTY HABITAT CONSERVANCY From: East Contra Costa County Habitat Conservancy Date: October 26, 2015 Subject: On Call Preserve
More informationLIQUEFIED PETROLEUM GASES
CHAPTER 38 LIQUEFIED PETROLEUM GASES SECTION 3801 GENERAL 3801.1 Scope. Storage, handling and transportation of liquefied petroleum gas (LP-gas) and the installation of LP-gas equipment pertinent to systems
More informationFIRE CHIEF / ADMINISTRATOR
FIRE CHIEF / ADMINISTRATOR Purpose The primary purpose of this position shall be to administer and coordinate the daily operations and activities of the Eastwood Fire Protection District (the Fire District
More informationMATERIAL SAFETY DATA SHEET according to the (US) Hazard Communication Standard (29 CFR 1910.1200)
Revision Date 08/21/2013 Version 1.1 SECTION 1. Identification Product identifier Product number 103753 Product code 103753 Relevant identified uses of the substance or mixture and uses advised against
More informationBased on the initial size-up and any information available, Command will formulate an action plan to deal with the situation.
Hazardous Materials Response Clear Creek Fire Authority This plan provides a basic philosophy and strategic plan for hazardous materials situations. All Clear Creek Fire policies and procedures, unless
More informationMATERIAL SAFETY DATA SHEET
MATERIAL SAFETY DATA SHEET SECTION 1 : PRODUCT AND COMPANY IDENTIFICATION 1.1.Product Details Product Name: Ferrofluid Name: APG 2100 series Chemical Name: Proprietary product Chemical Formula: Mixture
More informationNATURAL GAS EMERGENCY PROCEDURES AND ACCIDENT PREVENTION
NATURAL GAS EMERGENCY PROCEDURES AND ACCIDENT PREVENTION Fire and Life-Safety Group (FLS) I. EMERGENCY PROCEDURES The emergency procedures for natural gas emergencies are similar to that for fire emergencies.
More informationINSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT
CITY OF SPRING LAKE PARK Code Enforcement Department 1301 81 st Avenue NE Spring Lake Park MN 55432 Business Phone 763-784-6491 Fax 763-792-7257 INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS
More informationHow To Evacuate The University Of California Building
University of California Washington Center Emergency Evacuation Plan UC Washington Center 1608 Rhode Island Ave., NW Washington, DC 20036 Revised February 16, 2012 I. Purpose of the Plan II. Building Description
More information3M MATERIAL SAFETY DATA SHEET NO. 4004, 4008, 4026 AND 4032 DOUBLE COATED URETHANE FOAM TAPE 07/29/2002
Material Safety Data Sheet Copyright, 2002, Minnesota Mining and Manufacturing Company. All rights reserved. Copying and/or downloading of this information for the purpose of properly utilizing 3M products
More informationEnviro Safety Products Resource Center. OSHA Checklist for General Industry
Enviro Safety Products Resource Center OSHA Checklist for General Industry The Occupational Safety and Health Administration (OSHA) require many standards to be met by businesses and industries. OSHA sets
More informationABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN
ABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN The purpose of this plan is to provide detailed instructions for slug prevention and control. A complete copy of this plan is maintained
More informationWildland Fire Position Descriptions
Wildland Fire Position Descriptions This document gives brief position descriptions. The career tracks and career timelines are color coded to the Fire Management Career Ladders graphic. Operations Early
More informationFall Protection Plan for Residential Roofing Construction. Tim Graboski Roofing, Inc.
Fall Protection Plan for Residential Roofing Construction Tim Graboski Roofing, Inc. This Fall Protection Plan Is Specific For the Following Project: Location of Job: Date Plan Prepared or Modified: Plan
More informationMATERIAL SAFETY DATA SHEET HelioBond PVA 301AT
Page 1 of 5 MATERIAL SAFETY DATA SHEET HelioBond PVA 301AT Section One Product Information Manufacturer's Name: ADCO Products, Inc. Business Phone No: 1-517-764-0334 Manufacturer's Address 4401 Page Ave.,
More informationIX. EMERGENCY PLANNING
IX. EMERGENCY PLANNING EMERGENCY PLANNING, SPILL RESPONSE & REPORTING Any unexpected event or accident situation that occurs during the transport, storage or use of hazardous materials constitutes a potential
More informationEMERGENCY PREPAREDNESS
EMERGENCY PREPAREDNESS Page 1 SECTION 11 EMERGENCY PREPAREDNESS CONSIDERATIONS FOR APPROPRIATE EMERGENCY PREPAREDNESS...3 EMERGENCY PREPAREDNESS POLICY Emergency Preparedness Policy - Sample...5 EMERGENCY
More informationFire Alarm and Protection Impairment Policy and Procedures
1.0 Policy Statement The University of New Haven has developed a Fire Alarm and Protection Impairment Plan in accordance with the National Fire Protection Associations (NFPA) codes. Specific codes referenced
More informationFranklin County Emergency Management Department (FCEMD) All County Emergency Response Team (CERT) Agencies. Table of Contents
Concept of Operations Lead Agency Support Agency Standard Operating Procedures Emergency Operations Center (EOC) Franklin County Emergency Management Department (FCEMD) All County Emergency Response Team
More information: Sharpie King Size Permanent Markers. 3500 Lacey Road, 10th Floor Downers Grove, IL 60515 USA 800-323-0749 or 630-829-2500
PRODUCT DATA SHEET Section 1. Identification Product name : Sharpie King Size Permanent Markers Material uses : Writing instruments Manufacturer : Newell Brands 3500 Lacey Road, 10th Floor Downers Grove,
More informationFire Safety PROCEDURES January 2011
Fire Safety PROCEDURES January 2011 firesafety@uwo.ca Campus Phones EMERGENCY Dial 911 Fire Safety Service is the focal point for the coordinated administration of the University Fire Safety program and
More informationThe Orange County Farmers Museum Emergency Preparedness Plan
The Orange County Farmers Museum Emergency Preparedness Plan TABLE OF CONTENTS Section Page Introduction. 2 1. Coordination with an Emergency Response Agency. 2 2. Policies of the Board 2 3. Procedures
More informationPATHWAYS DRAIN TREATMENT. Use only for the purpose on the product label.
SAFETY DATA SHEET PATHWAYS DRAIN TREATMENT Section 1. Chemical product and company identification Product name Recommended use and restrictions PATHWAYS DRAIN TREATMENT Drain Cleaner Use only for the purpose
More informationChapter XIV OCCUPATIONAL SAFETY AND HEALTH ACT. The Occupational Safety and Health Act (the Act ), 29 U.S.C. 651, et seq., is
Chapter XIV OCCUPATIONAL SAFETY AND HEALTH ACT The Occupational Safety and Health Act (the Act ), 29 U.S.C. 651, et seq., is administered by the Occupational Safety and Health Administration ( OSHA ) of
More informationGeneral Confined Space Awareness
Confined Spaces General Confined Space Awareness Confined spaces can be found in many industrial settings, from steel mills to paper mills, from shipyards to farms, and from public utilities to the construction
More informationGuide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools
APPENDIX II Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools (Prepared by Environmental Protection Department) 1. Introduction The Waste Disposal (Chemical
More informationNEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY
NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT ERIC ROOD ADMINISTRATION BUILDING 950 Maidu Avenue, Suite 170 Nevada City, California 95959-8617 Phone (530) 265-1222 HOME BUSINESS PERMIT
More informationTank Farm and Bulk Storage Fire Incidents
Instructor Manual Module 7 Tank Farm and Bulk Storage Fire Incidents Module Objective Upon the successful completion of this module, participants will be able to develop plans to fight or contain fires
More informationCHAPTER 12 Occupational Safety & Health and Environmental Protection Programs
CHAPTER 12 Occupational Safety & Health and Environmental Protection Programs Introduction Although PrintSTEP does not include OSHA regulations, worker health and safety programs required by the Occupational
More informationTown of Amherst Flood Plan Annex
Town of Amherst Flood Plan Annex The following document is an annex to the Town of Amherst Disaster Plan and is specifically used as a guideline for Flooding events Flood Plans can enable a flexible response
More informationSchool pipeline safety information WHAT S INSIDE
School pipeline safety information WHAT S INSIDE Emergency Response Plan/Management Guide Call Before You Dig How To Recognize The Location Of A Pipeline Recognizing A Pipeline Leak Pipelines are near
More informationEmergency Operations Plan ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS. Item #: 1, 4, 46, 53, 54
ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS Item #: 1, 4, 46, 53, 54 II. PURPOSE The purpose of this annex is to describe the organization, operational concepts and responsibilities
More informationUCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS
Fire Safety Technical Guide UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS 1.0. BACKGROUND 1.1. The Regulatory Reform (Fire Safety) Order (known Fire Safety Order) applies to England and Wales (Northern
More informationNo. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974
The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.
More information02B00215-09.p65 Hazardous Materials Exercise Evaluation Forms Prepared for the Department of Energy Office of Transportation and Emergency Management
02B00215-09.p65 cise Evaluation Forms Prepared for the Department of Energy Office of Transportation and Emergency Management This page intentionally left blank table of contents planning tools Objective
More informationNSPS Subpart OOOO: Applicability and Compliance Basics
NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com
More informationEnvironmental Incident Response Plan Farm A
Environmental Incident Response Plan Farm A Table of Contents Environmental Incident Response Plan Summary Incident Response Procedures: Personal Injury / Fire Emergency Accidental Entry to Manure Storage
More information