1 GUIDELINES FOR MINE HAUL ROAD DESIGN Dwayne D. Tannant & Bruce Regensburg School of Mining and Petroleum Engineering Department of Civil and Environmental Engineering University of Alberta 2001 SMART Surface Mining Association for Research and Technology 1
2 1 SURVEY OF HAUL TRUCKS & ROADS FOR SURFACE MINES Introduction Haul Trucks and Construction/Maintenance Equipment Haul Road Length Haul Road Geometry Haul Road Construction Materials Symptoms and Causes of Haul Road Deterioration Haul Road Maintenance Evolution of Haul Road Design at Syncrude Layer Thickness Haul Road Geometry Construction Techniques Summary HAUL ROAD PLANNING AND ALIGNMENT General Key Road Planning and Alignment Factors Haul Truck Stopping Distance Sight Distance and Vertical Curves Road Width Curves and Switchbacks Super-Elevation Super-Elevation Runout Optimal Grades Maximum Sustained Grade Runaway Provisions Combination of Horizontal and Vertical Alignment Safety Berms and Ditches DESIGN OF HAUL ROAD CROSS-SECTION Introduction Design Based on CBR Modifications to CBR Design Method Design Based on Critical Strain and Resilient Modulus Critical Strain Limit Design Procedure Comparison of the Two Methods Correlation Between the Vertical Strain and Surface Deflection Summary ROAD SURFACE Introduction Roughness Traction Rolling Resistance Measuring Rolling Resistance Typical Rolling Resistance Values Economic Impact of Rolling Resistance Haul Road Trafficability and Cycle Time Road Maintenance and Repair Drainage Requirements Dust Suppressants
3 5 ROAD CONSTRUCTION MATERIALS Surface Course Materials Compacted Gravel and Crushed Stone Asphaltic Concrete Roller Compacted Concrete Materials for Base and Sub-Base Courses Material Properties Fly Ash Compaction Requirements HAUL ROAD ECONOMICS Introduction Costs Associated with Road Building Pre-Road Construction Preparation Road Construction Costs Road Removal Costs Fleet Productivity Road Maintenance Extra Fleet Operating and Maintenance Costs Other Considerations Climate Application of Larger Trucks Comparison of Temporary and Semi- Permanent Roads Temporary Road Semi Permanent Road Conclusion Example of Full Life Cycle Economics Applied to a Haul Road Temporary Road Semi-permanent Road Summary REFERENCES...76 APPENDICES HAUL TRUCKS AND TIRES Haul Trucks Rimpull-Speed-Gradeability Curves Haul Truck Retarder Curves Truck Tires BEARING CAPACITY AND VERTICAL STRAIN Introduction Bearing Capacity Analysis Finite Element Strain Analyses Effect of Layer Stiffness on Vertical Strain Effect of Layer Thickness on Vertical Strain Effect of Tire Interaction Summary and Recommendations QUESTIONNAIRE DETAILS
4 Preface The idea of developing a haul road manual or collection of guidelines was initiated by the late Professor Muirhead at the University of Alberta in Support and financial contributions for this work were obtained from NSERC, SMART (Surface Mining Association for Research and Technology) ATCO Power, and Finning. Both Syncrude Canada Ltd. and Suncor Ltd. provided access to road design data and methodologies. Syncrude Canada Ltd. s internal reports were instrumental in verifying the strain-based design approach for haul roads that is advocated in this manual. Two closely related documents form a basis for this manual. The oldest is the report by Kaufman and Ault (1977) entitled Design of Surface Mining Haulage. Monenco (1989) took the Kaufman and Ault report and updated it to reflect conditions relevant to Canadian mines. The Monenco report is unpublished and difficult to obtain. The questionnaire survey that is found in the Monenco report was repeated in 1999 for this document. Content from the M.Sc. thesis by Kumar (2000) is also used in this document, especially in sections dealing with design of a haul road cross-section. Bruce Regensburg put together the section on haul road economics. In addition, haul road design issues were also gathered from various published sources that are referenced in these Guidelines for Mine Haul Road Design. This manual is not meant to be comprehensive, rather it is intended to cover most of the issues important to haul road design for rear-dump trucks that have payloads greater than about 200 tonnes. This document is meant as an aid to Mining Engineers, Geotechnical Engineers and Management to construct quality haul roads. Haul road design is usually the product of a plan from the Mining or Civil Engineer with construction specifications from the Geotechnical Engineer. The Mining Engineer will work on the geometric parts of the haul road including vertical and horizontal curves, widths, super-elevation and location of the road while the Geotechnical Engineer will provide the material specifications and placement criteria. Good haul road construction and maintenance practices are a key part of operating a cost-efficient fleet of trucks. Haul roads should be considered an important asset to a mining operation, in the same manner as trucks and shovels. While much effort was expended to verify equations, graphs, and tabular data adopted from other sources, errors may have been missed. Therefore, users of this document are encouraged to contact the authors if errors are discovered. This will enable the first version of this manual to be improved and will allow it to evolve to better meet the needs of the mining industry. Dwayne D Tannant, Ph.D., P.Eng. School of Mining & Petroleum Engineering Depart. of Civil & Environmental Engineering University of Alberta Edmonton, Alberta CANADA T6G 2W2 tel: (780) fax: (780) [email protected] 4
5 EXECUTIVE SUMMARY A common element of every surface mine that uses haul trucks is the construction of haul roads. These haul roads tend to be the lifeline of the production system and road problems will immediately impact on the productivity and/or costs of the mine. Haul road design is usually the product of a plan from the Mining or Civil Engineer with construction specifications from the Geotechnical Engineer. The Mining Engineer will work on the geometric parts of the haul road including vertical and horizontal curves, widths, super elevation and location of the road while the Geotechnical Engineer will provide the material specifications and placement criteria. This document is meant as an aid to Mining Engineers, Geotechnical Engineers and Management to construct quality haul roads. Mine Survey Results A questionnaire was sent to 37 Canadian mines requesting information on mine equipment used, method and procedures for road construction, and road maintenance procedures. Replies were received from 13 mines. These mines had a total of 50 km of in-pit roads with an average life expectancy of 1.4 years and 100 km of ex-pit roads with an average life expectancy of 8 years. Equipment used by these mines included cable and hydraulic shovels and haul trucks ranging in capacity from 35 tons to 360 tons. The geometry of the haul roads varied as to the size of haulage trucks used. Maximum road grades tended to be 8% to 10% with the lower value being favoured. Superelevations were limited to a maximum of 4% and road crowns varied between 1.5% and 4% with 2% being considered the best. Haul road construction materials ranged from mine waste through to crush stone and, in some cases, geotextiles. Haul road deterioration resulted in potholes, rutting, settlement, wash-boarding, and frost heaving. Damage was caused mostly by precipitation/runoff, heavy traffic volume, spring breakup, and poor compaction. Vehicle spillage was another major road problem. Major maintenance activities were in the area of grading, plowing/scarifying/sanding and resurfacing. Dust suppression was mainly accomplished with water sprinkling (100%), calcium chloride (27%) and oil sprinkling (9%). Haul Road Alignment Road widths are usually designed to be 3 to 4 times the width of the largest haulage unit (for 2 way traffic) with extra width employed on the curves. Horizontal curves are designed to ensure the driver of the haul truck can negotiate the curve safely at a given speed. Super elevations and their transitions are designed to minimize the centrifugal 5
6 forces on the haul truck while negotiating the curve. Super-elevations should be in the range of 4% to 6% depending on the curve radius and equipment speed. In the design of both horizontal and vertical curves, line-of-sight and stopping distance are key design criteria. Curves are designed so that the line-of-sight of the driver is equal to or longer than the stopping distance of the haul truck. Grades (steepness) usually vary from 20% to + 20%. However, grades over 10% are used only for short distances in temporary situation. Haul road grades are usually dictated by mine plans and economics. The preferred maximum grade appears to be 8%. Other salient points of road alignment are as follows: Sharp horizontal curves should not be designed at the top or bottom of hills. Intersections should be located at flat, straight alignments of the haul road. Road surface cross-slopes should be approximately 1:25 (4%) for good drainage Curve radii should always exceed the minimum turning radius of the equipment. Haul Road Design Half Running Width = 15m Safety Berm 3H:1V 0.5m 2 % crowning Surface Course 1.0m Base Course 2H:1V 1.5m Sub Base Not to Scale Sub Grade or Pre-existing Surface Typical haul road cross-section. A haul road cross-section can be divided into four distinct layers, namely sub-grade, subbase, base course and surface or wearing course. The sub-grade is the existing ground surface on which road fill is placed. The sub-base, base course and surface course are layers of fill of increasing quality that are successively placed above the sub-grade to form the embankment fill. Sub-grade: The sub-grade can consist of native in-situ soil or rock, previously placed landfill or mine spoil, muskeg, marsh or other existing surface over which a road is to be placed. Where the sub-grade comprises hard, sound rock or dense, compact gravel, little or no fill may be necessary as haul trucks can travel on the sub-grade surface. At the other end of the spectrum, soft clays and muskeg will require substantial quantities of fill to help spread the heavy wheel loads and prevent rutting, sinking or overall road deterioration. Such adverse conditions, if allowed to occur, pose a serious threat to vehicular controllability and create unsafe haul road segments. If the sub-grade lacks the 6
7 required bearing capacity, then it needs to be altered through suitable measures such as compaction or the use of geotextiles. Sub-base: Sub-base is the layer of a haul road between sub-grade and base course of the road. It usually consists of compacted granular material, either cemented or untreated. Run of mine and course rocks are the general components of this layer. Apart from providing structural strength to the road, it serves many other purposes such as preventing intrusion of sub-grade soil into the base course and vice-versa, minimizing effect of frost, accumulation of water in the road structure, and providing working platform for the construction equipment. Base course: The layer of haul road directly beneath the surface course of the road is called the base course. If there is no sub-base then the base course is directly laid over the sub-grade or roadbed. Usually high quality treated or untreated material with suitable particle size distribution is used for construction of this layer. Specifications for base course materials are generally considerably more stringent for strength, plasticity, and gradation than those for the sub-grade. The base course is the main source of the structural strength of the road. Surface course: The uppermost layer of the haul road that comes directly in contact with tires is known as the surface course. A haul road surface is generally constructed with fine gravel with closely controlled grading to avoid dust problems while maintaining proper binding characteristic of the material. Apart from providing a smooth riding surface, it also distributes the load over a larger area thus reducing stresses experienced by the base course. The design of the road can be optimized by using the California Bearing Ratio (CBR) or a newer method based on a critical strain criterion and the construction material s resilient modulus. In both cases an understanding of haul truck tire interactions is necessary. Recent work in Australian coal mines and Syncrude Canada Ltd s oil sands mines indicate the designs based on a critical strain criterion (maximum vertical deformation) are better than CBR designs for haul roads. Road Surface When designing the surface layer of the road, the two major concerns will be the adhesion to the road and the rolling resistance. Adhesion is important from a safety aspect of keeping the haul truck from sliding off the road and rolling resistance is important from the aspect of truck speed and productivity. Another consideration is the dusting properties of the surface material. If the material is easily broken down by traffic or naturally has an abundance of loose fines then dust suppression will become a major road maintenance factor. When considering surface material for construction of haul roads, the following types of material can be used: Compacted gravel 7
8 Crushed stone Asphaltic concrete Roller compacted concrete (RCC) Stabilized earth Adhesion of the equipment to the road is a major safety consideration and materials that maintain good traction in wet or freezing conditions are desirable. Rolling resistance in surface mines can vary from 1.5 % to 20+% depending on the quality of the roads. Roads that afford rolling resistances of less than 3% result in haulage equipment working at its ultimate capacity whereas rolling of resistances of above 20% can bring some types of haulage equipment to a complete stop. Using the right materials and construction methods for road surfaces can decrease the rolling resistance significantly and result in increased productivity and lower costs. Another safety and environmental hazard caused by road surface is the dusting problem. Roads should be designed with enough fines to act as binders for the larger particles. However, an excess of fines will result in these particles being released to the atmosphere when repeated stress is applied by the equipment tires. All haul roads that do not have a sealed surface, will create dust. The dust problem is mainly dealt with by application of water. However, some mines use calcium chloride or oil mixtures to reduce the dust. Research is ongoing in this area to find a better solution to the problem. Haul Road Economics Haul road construction is a necessary cost in all surface mines that use mobile equipment. The cost of haul road construction varies in different types of mines and even from mine to mine in the same industry. Hard rock mines tend to have an abundance of sub-base and base materials, while soft rock mines must select good in-mine material, import or manufacture these materials. In almost all mines, materials for the surface layer must be imported and/or manufactured. Haul roads can be classed from a quality point of view into the following categories Temporary Roads Short life Minimum thickness Low specification material Inexpensive to build Used mainly for shovel or dump access Semi-Permanent Roads Medium life Engineered to desired thickness High specification material Relatively expensive to build Used for main haul roads in pits and out-of-pit hauls in non-final pit walls 8
9 Permanent Haul Roads Long life Engineered to ultimate thickness High specification material (may even be paved) Expensive to build Used for final out-of-pit haul roads and roads on surface The economics of haul road construction is much more complicated than just calculating the cost of road construction. For a true understanding of haul road economics, full lifecycle costs must be considered. Included in the life cycle costs of a haul road are the following items: Road construction costs Road removal costs Impact on productivity of the fleet Differential road maintenance costs Extra fleet operating and maintenance costs Extra stripping costs Time value of money When considering the quality of the road to construct, the most important items are: Life of road Use of road (amount of production over the road) Location of road (is it permanent or does it have to be removed?) In most mines, road construction practices are based on previous practices rather than economics. In many cases, previous practices have produced cost effective roads since they are based on experience and judgmental (empirical) background. For instance, mines tend to place temporary roads (low cost construction) to shovel faces, semipermanent roads (medium cost construction) for main in-pit haul roads and permanent (higher cost construction) for out-of-pit haul roads. From a time of use perspective, this may make sense since economic analysis of haul road construction would indicate the same choices. However, the road type selection may not be optimized without a true economic evaluation. Summary This manual is designed for the engineers and management who are involved in design, construction and maintenance of roads. Information available within the manual is based on existing reports, empirical data and geotechnical theory. 9
10 For further information or to purchase a copy of the Guidelines contact: Dwayne D Tannant, Ph.D., P.Eng. School of Mining & Petroleum Engineering Department of Civil & Environmental Engineering University of Alberta Edmonton, Alberta CANADA T6G 2W2 tel: (780) fax: (780) [email protected] Prices have been reduced; the cost including shipping is: $150 CDN for shipments within Canada $150 US for shipments internationally 10
Caterpillar Haul Road Design and Management. Pete Holman 2006 Big Iron University St. Charles, IL
Caterpillar Haul Road Design and Management Pete Holman 2006 Big Iron University St. Charles, IL Overview Caterpillar Haul Road Design and Management Introduction The haul road is either the mine s greatest
CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
APPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
The Most Advanced Name in Drainage Systems. Geotextile Products
The Most Advanced Name in Drainage Systems Geotextile Products ADS MEETs YOUR Geotextile NEEDS Advanced Drainage Systems, Inc. (ADS) single wall and N12 dual wall pipe have become the industry standard
4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing
Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide
APPENDIX G SETTLEMENT
APPENDIX G SETTLEMENT TABLE OF CONTENTS G.1 IN T R O D U C T IO N... 1 G.2 MATERIAL PLACEMENT AND COMPACTION... 1 G.2.1 Incom pressible M aterials... 1 G.2.2 Compressible Materials... 2 G.2.3 Soil P lacem
PVC PIPE PERFORMANCE FACTORS
PVC PIPE PERFORMANCE FACTORS PVC pipe, like all flexible pipe products, is very dependent on the surrounding soil for its structural capacity, in addition, the pipe material must have sufficient inherent
Aggregates for Path Construction
Aggregates for Path Construction Technical Information Note No. 7 October 2011 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
AGREGADOS RECICLADOS MITOS Y REALIDADES
The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material
IV. INDUSTRIAL TRACK DESIGN
IV. INDUSTRIAL TRACK DESIGN 4.01 GENERAL The following sections govern the criteria to be used in the designing of industry tracks served, or to be served, by the Railway Company. Any deviation from these
CHAPTER 8 ROAD SURFACE PROPERTIES
CHAPTER 8 ROAD SURFACE PROPERTIES 230 8.1 Introduction: The road user desires a road surface where he can drive safe and comfortable. This requires a pavement structure with enough stiffness, a fast run-off
SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS
TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
The full range of Kilsaran products are manufactured to fully meet all requirements of all current British and European Standards.
The extensive range of paving products available from Kilsaran will provide a full range of solutions for any project whether commercial, civic, industrial or a residential scheme. appraisal purposes Generally
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for
INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6
03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
CID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
ROAD CONSTRUCTION. Pavement Base Reinforcement Subgrade Stabilization
ROAD CONSTRUCTION Pavement Base Reinforcement Subgrade Stabilization TM Road Construction applications have specific needs and objectives. No one understands that better than Road construction applications
Lecture Notes CT 4860 Structural Pavement Design. Design of Flexible Pavements
Lecture Notes CT 4860 Structural Pavement Design Design of Flexible Pavements Prof.dr.ir. A.A.A. Molenaar Delft, March 2007 Table of contents Preface 3 1. Introduction 4 2. Major defect types in flexible
THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS
Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material
GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design
GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1
TRUCKS AND HAULING EQUIPMENT
CHAPTER Construction Planning, Equipment, and Methods TRUCKS AND HAULING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 10 By Dr. Ibrahim Assakkaf
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1
INTRODUCTION TO SOIL MODULI By Jean-Louis BRIAUD 1 The modulus of a soil is one of the most difficult soil parameters to estimate because it depends on so many factors. Therefore when one says for example:
Greening our Roads. Approach
Greening our Roads Approach To create a Sustainable Future for the world, by achieving Resource Extension economically, by reducing usage of limiting resources and extending life cycle Ensuring Green Roads
Division 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
Stabilenka HUESKER. and Separation. Engineering with Geosynthetics SKER HUESKER HUESKER HUESKER HUESKERHUES
HUESKER Engineering with Geosynthetics rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr rhuesker HUESKER Woven HUESKER HUESKER Fabrics HUESKER HUESKERr SKER HUESKER HUESKER HUESKER HUESKERHUES rhuesker
Otta Seal BACKGROUND GENERAL DESCRIPTION DESIGN ASPECTS. Category : Technical Information/On-carriageway/
Otta Seal Category : Technical Information/On-carriageway/ BACKGROUND An Otta seal is a thin bituminous seal comprising graded gravel or crushed aggregate containing all sizes and either a cut-back or
PAVEMENT STRUCTURE DESIGN GUIDELINES
PAVEMENT STRUCTURE DESIGN GUIDELINES Technical Circular T- 01/15 (Replaces Technical Circular T-01/04) Final Update: Jan. 26, 2015 Geotechnical, Materials and Pavement Engineering TABLE OF CONTENTS 1.0
PRIMA 100 FWD. Comparative measurements and experience with the portable PRIMA light FWD
PRIMA 100 FWD Comparative measurements and experience with the portable PRIMA light FWD Carl Bro Pavement Consultants 0 CONTENTS 1. Introduction and background Measuring equipment Static plate bearing
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS
HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness
SECTION 3.3 - PAVEMENT DESIGN
SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2
Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05
Dimensional and Structural Data for Elliptical Pipes 21/09/05 Page 1 of 15 1. Foreword This document details a method for the structural design of Stanton Bonna Elliptical pipes for the common conditions
Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
Module 7 (Lecture 24 to 28) RETAINING WALLS
Module 7 (Lecture 24 to 28) RETAINING WALLS Topics 24.1 INTRODUCTION 24.2 GRAVITY AND CANTILEVER WALLS 24.3 PROPORTIONING RETAINING WALLS 24.4 APPLICATION OF LATERAL EARTH PRESSURE THEORIES TO DESIGN 24.5
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...
The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).
Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State
METHODS FOR ESTABLISHING SAFE SPEEDS ON CURVES
Page 1 of 4 PRACTICES PART SECTION SUB-SECTION TRAFFIC OPERATIONS General Collision exposure is usually greater along horizontal curves than along tangent sections of a highway. The potential for collisions
In-Pit Crushing and Conveying Phil Morriss
In-Pit Crushing and Conveying Phil Morriss AGENDA 1. Introduction - what is In-Pit Crushing and Conveying (IPCC)? 2. What does a quarry need from IPCC? 3. Why and when should we consider using it? 4. How
Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia
Roller-Compacted Concrete Pavement: Design and Construction Pavement Thickness esign and RCC-Pave Software Gregory E. Halsted, P.E. Pavements Engineer Portland Cement Association October 24, 2006 Atlanta,
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements
Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements Author: Harry Sturm, P. Eng. Stantec Consulting Ltd. 16-77 Mississauga Road Mississauga, ON L5N 7G2 Phone: (95) 817-296
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
GRADATION OF AGGREGATE FOR CONCRETE BLOCK
GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published
Chapter 10. Hauling Equipment
Chapter 10 Hauling Equipment The most common hauling equipment used for Army construction work are the 5- and 20-ton dump trucks, both of which are organic to most engineer units. Equipment trailers are
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
SECTION 5 - STREET CONSTRUCTION AND DESIGN
SECTION 5 - STREET CONSTRUCTION AND DESIGN 1. SPECIFICATIONS FOR STREET CONSTRUCTION AND DESIGN All residential subdivision streets built within the unincorporated area of Riley County shall be built so
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
SD95-16-G2. SD Department of Transportation Office of Research. Rural Road Design, Maintenance, and Rehabilitation Guide
SD95-16-G2 SD Department of Transportation Office of Research Rural Road Design, Maintenance, and Rehabilitation Guide Prepared by ERES Consultants, Inc. 505 West University Champaign, IL 61820-3915 September
Installation PowerPoint for Grasscrete Formers
Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold
Liner system design for tailings impoundments and heap leach pads
Liner system design for tailings impoundments and heap leach pads John F. Lupo, Ph.D., P.E. AMEC E&E TAILINGS & MINE WASTE 08, VAIL Liner Systems Liner systems Environmental containment of process solutions
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
Use of Marginal Materials & Fly ash in Road Works
Use of Marginal Materials & Fly ash in Road Works U.K.Guru Vittal Sr. Principal Scientist Central Road Research Institute New Delhi 110 025 [email protected] Introduction Issue Development Vs. Environment
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
Moisture and Resilient Floor Covering
Moisture and Resilient Floor Covering Moisture related failures of resilient floor coverings installed over concrete have focused unfairly over the years on the premise that the flooring product itself
Engineering Road Note 9 May 2012
Engineering Road Note 9 May 2012 PROCEDURE FOR THE DESIGN OF ROAD PAVEMENTS 1. INTRODUCTION This Note outlines the procedure to be used for the design of road pavements under the control of the Commissioner
Building Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES
Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING
SECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
DUPLEX ROLLERS AND TRENCH COMPACTORS. LP range
DUPLEX ROLLERS AND TRENCH COMPACTORS LP range GET IT DONE Customers look to you for great compaction. Our job is to provide equipment that help you deliver. Together we create quality. A customer that
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
DESIGN GUIDELINES FOR EARTH RETENTION
DESIGN GUIDELINES FOR EARTH RETENTION Strata Systems, Inc. 380 Dahlonega Rd., Suite 200 Cumming, GA 30040 USA www.geogrid.com TABLE OF CONTENTS MECHANICS OF RETAINING WALLS... 3 THE STRATAWEB SOLUTION...4
Why Maintain Your Asphalt?
Asphalt Maintenance Why Maintain Your Asphalt? Asphalt pavement is basically sand, gravel and glue. The glue used to keep the sand and gravel together is asphalt, a heavy by-product of oil refining. While
1.5 Concrete (Part I)
1.5 Concrete (Part I) This section covers the following topics. Constituents of Concrete Properties of Hardened Concrete (Part I) 1.5.1 Constituents of Concrete Introduction Concrete is a composite material
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT 1. BACKGROUND There has been an increasing awareness of design features, which produce poor whole-of-life costs. These poor whole-of-life costs manifest
Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance
Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance Rongzong Wu, David Jones, Hui Li and John Harvey University of California Pavement Research Center Prepared
GUIDELINE FOR HAND HELD SHEAR VANE TEST
GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
How to Install Pavers
1 of 6 9/11/2012 10:41 AM How to Install Pavers Looking to give your property a durable driveway, a whimsical walkway, or a patio with pizazz? If you're reading this article, you're probably already on
CHAPTER 5 OPEN CHANNEL HYDROLOGY
5.4 Uniform Flow Calculations 5.4.1 Design Charts CHAPTER 5 OPEN CHANNEL HYDROLOGY Following is a discussion of the equations that can be used for the design and analysis of open channel flow. The Federal
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to
Stabilization of Soil with Self-Cementing Coal Ashes
2005 World of Coal Ash (WOCA), April 11-15, 2005, Lexington, Kentucky, USA http://www.flyash.info Stabilization of Soil with Self-Cementing Coal Ashes Scott M. Mackiewicz, 1 E. Glen Ferguson, 2 1 & 2 Kleinfelder,
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
TAC Primer Pavement Asset Design and Management
Transportation Association of Canada TAC Primer Pavement Asset Design and Management Introduction Transportation infrastructure plays an important role in the social and economic development of a country,
NRC INSPECTION MANUAL
NRC INSPECTION MANUAL INSPECTION PROCEDURE 88001 LLUR ON-SITE CONSTRUCTION PROGRAM APPLICABILITY: 2600, 2801 88001-01 INSPECTION OBJECTIVES 01.01 To determine by direct observation if on-site construction
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
Software Development (PAKPAVE) for Flexible Pavement Design
Software Development (PAKPAVE) for Flexible Pavement Design Rafi Ullah Khan, Muhammad Imran Khan and Afed Ullah Khan Abstract In today s world, the road and surface failure of the flexible pavement has
What is a Horizontal Curve?
Paul Deutsch What is a Horizontal Curve? Provides a transition between two tangent lengths of roadway. PI PC PT PC (Point of Curvature at beginning of curve) PI (Point of Intersection of tangents) PT (Point
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS Paul W. Wilke, P.E. Applied Research Associates, Inc. August 11, 2014 Words: 3,280 Figures: 3 Tables: 0 Photographs: 3 ABSTRACT
Mechanically stabilized layers in road construction
Mechanically stabilized layers in road construction Zikmund Rakowski, Jacek Kawalec Tensar International, UK, Technical University of Silesia, Poland Abstract: Effective and economical technologies are
Technical Presentation: Follow up on HVS testing of Roller Compacted Concrete and Ultra-thin reinforced concrete test sections
Technical Presentation: Follow up on HVS testing of Roller Compacted Concrete and Ultra-thin reinforced concrete test sections Louw du Plessis 12 Febuary 2015 Objectives UTRCP Previous round of HVS testing
Construction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October