1 Appendix Q Appendix Q Supplier Quality Requirements The latest issue to this document is the version that is available on the Lockheed Martin Aero website: *Revised **Added ***Removed TABLE OF CONTENTS TITLE PAGE Table of Contents Quality Requirements Quality System Changes & Relocation Language Counterfeit Parts Prevention Certificate of Conformance Records Government-Industry Data Exchange Program (GIDEP) Membership Certified Materials Calibration Buyer-Furnished, Seller-Manufactured, or Seller-Owned Tooling 4 Table 1 Quality System Requirements by Commodity 5 Table 2 Additional Quality Requirements by Commodity Point of Acceptance Facility Access Control & Processing Nonconforming Material & Corrective Action Material Review Authority, Requests and Reporting QCS-001 Requirements for Buyer-Designed Items QCS-001 Requirements for Seller-Designed Items Maintenance, Repair, or Overhaul 10 The terms Item(s), PO, Seller, and Buyer as used herein, have the same meaning as the terms Work, Contract, SELLER, and LOCKHEED MARTIN, respectively. Questions regarding this Appendix Q or the applicability of this Appendix Q shall be addressed to Buyer s Supplier Quality Engineer located at: > Quality Requirements > Information. Buyer-unique documents (e.g., Q2A, Q30, TMS-MC-015, etc.) referenced in this PO are available from Buyer or Buyer s website at: Copies of Aerospace Standards (AS/EN documents) from the Society of Automotive Engineers may be obtained at: * 1.0 Quality Requirements: Seller shall meet the requirements of the latest revision of Appendix Q and all applicable requirements therein in effect as of the date of this PO. Seller shall: a. ensure all applicable Q requirements herein and other quality requirements in this PO are imposed upon Sellers and manufacturing facilities at all tiers working on Buyer s product; and 1 of 11
2 Appendix Q b. have and maintain Internet access for obtaining requirements of this PO; and c. ensure its quality system is third party registered by an International Aerospace Quality Group / Americas Aerospace Quality group approved registrar to the appropriate certification according to Seller s activities/commodities as defined in Table 1; and d. Comply with the additional quality requirements contained in Table 2, as applicable. * 1.1 Quality System Changes & Relocation: Seller shall notify Buyer s Supplier Quality Engineer, in writing, within 10 days of any of the following: a. change in its quality system status; or b. loss of third party registrar s certification status; or c. change in Seller s quality organization, process or procedures that affects conformity of any Item; or d. adverse action taken by Seller's customer, the Government, the Federal Aviation Agency ( FAA ), or the Civil Aviation Agency ( CAA ) to include any of the following: i. Issuance of a Level II Corrective Action Request ( CAR ) associated with Buyer Items ii. Issuance of any Level III CAR iii. Suspension of Government Source Inspection ( GSI ) * Seller shall notify Supplier Quality Engineer and Buyer, in writing, at least 90 days in advance of any sale, relocation, or transfer of Seller's manufacturing operations. Seller shall include the following, as a minimum, in the written notification: purpose of the relocation, address of the new location(s), assessment of actual or potential impact to current POs, risk mitigation plan to ensure compliance to existing requirements, plan defining the identification, storage, protection, retrieval and retention of records, master schedule and timeline of relocation activities, and relocation Coordinator/Point of Contact 1.2 Language: Upon request by Buyer, Seller shall provide all Seller records, reports, specifications, drawings, inspection and test results and other documentation in English. *** * 1.3 Counterfeit Parts / Material Prevention: Seller shall establish and maintain a Counterfeit Parts / Material Prevention and Control Plan using AS-5553 (Ref. elements of Section 4) and/or AS6174 (Ref. elements of Section 3) to ensure that Counterfeit Work is not delivered to Buyer. The purpose of Seller s Plan shall be to develop a robust process to prevent the delivery of counterfeit commodities and control commodities identified as counterfeit a) For purposes of this clause, Work consists of those commodities delivered under this Contract that are the lowest level of separately identifiable items (e.g., articles, components, standard hardware, goods, raw materials and assemblies). "Counterfeit Work" means Work that is, or contains, items misrepresented as having been designed and/or produced under an approved system or other acceptable method. The term also includes approved Work that has reached a design life limit or has been damaged beyond possible repair, but is altered and misrepresented as acceptable. b Seller shall only purchase products to be delivered or incorporated as Work to Buyer directly from the Original Component Manufacturer (OCM)/Original Equipment Manufacturer (OEM), OCM/OEM authorized distributor chain, Aftermarket Manufacturer, or Authorized Reseller. These products shall have verification that Work is traceable to OCM/OEM; OCM/OEM 2 of 11
3 Appendix Q authorized distributor chain, Aftermarket Manufacturer, or Authorized Reseller that identifies the name and location of all the supply chain intermediaries from the part manufacturer to the direct source of the product for the Seller. Work can only be acquired from independent distributors or brokers in cases of diminishing material supply (DMS) or obsolescence and shall be subjected to a screening process appropriate to the commodity in accordance with the Counterfeit Parts / Material Prevention and Control Plan. If traceability is not obtainable, written notice shall be provided to the Supplier Quality Engineer and Buyer prior to delivery with records of evidentiary tests and inspections performed and conformance of the product to specified acceptance criteria that ensures verification activities taken to assure authenticity. Written notice is not required for raw material and standard hardware purchased from independent distributors or brokers, but products must be able to provide commodity level traceability to the Original Manufacturer. c) Seller shall notify Supplier Quality Engineer and Buyer in accordance with 2.2 with the pertinent facts if Seller becomes aware or suspects that it has furnished Counterfeit Work. Seller shall provide to Supplier Quality Engineer and Buyer, upon request, the supply chain traceability to an Original Manufacturer or authorized distributor chain that identifies the name and location of all the supply chain intermediaries from the part manufacturer to the direct source of the product for the Seller. d) Seller shall include this clause or equivalent provisions in lower tier subcontracts for the delivery of items that will be included in or furnished as Work to Buyer. Sellers eligible for utilization of the Government-Industry Data Exchange Program ( GIDEP ) shall utilize the GIDEP process to alert the industry of encountered counterfeit parts. *** * 1.4 Certificate of Conformance: Seller shall: a. prepare a certificate of conformance ( CoC ) to assert the Items contained with the shipment are in compliance with all applicable requirements of this PO; and b. annotate in the delivery package any exceptions, e.g. variances, Supplier Quality Assurance Report ( SQAR ), Advanced Engineering Authorization ( AEA ), etc; c. ensure the CoC is signed by a Seller s quality representative, and d. include a copy of the CoC inside the shipping container and with shipping documents. ** Provision for Alternate Acceptance DD250 Process: When authorized in writing by Buyer s customer, Seller shall ship with a Certificate of Conformance any supplies for which the contract would otherwise require government inspection at source. The CoC shall be in the format outlined in FAR * 1.5 Records: Seller shall: a. maintain complete records of the following: all manufacturing, inspection, test, CoC, and shipping; and process capability or tooling controlled per TMS-MC-015, if applicable; and all nonconforming material, dispositions, assignable causes, corrective and preventive actions, and effectiveness of corrective actions; and b. make records available for at least three (3) years after completion of this PO or for longer periods if specified elsewhere in this PO; and c. maintain records of all QCS-001 Work performed and/or procured in accordance with 2.5 for at least seven (7) years after completion of this PO or for longer periods if specified elsewhere in this PO; and 3 of 11
4 Appendix Q d. upon Buyer s request, forward records to Buyer at no additional cost, price, or fee to Buyer. 1.6 Government/Industry Data Exchange Program ( GIDEP ) Membership If Seller is eligible for GIDEP membership, Seller is required to be a member of GIDEP. *** * 1.7 Buyer-Certified Materials: Seller shall establish and maintain controls to prevent the use of noncertified materials when Buyer-certified materials (e.g. Engineering Materials and Approved Products [EMAPs]) are required. * 1.8 Calibration: Seller shall maintain a documented calibration system for the calibration and maintenance of tools, jigs, inspection and test equipment. Seller shall have and maintain a calibration system compliant to ISO 17025, ISO , or ANSI Z540. *** * 1.9 Buyer-Furnished, Seller-Manufactured or Seller-Owned Tooling: A. Seller shall include in its documented quality system written procedures for the control, maintenance, and calibration of special tooling, jigs, inspection and test equipment, and other devices used in manufacturing processes. B. Seller shall comply with the requirements of Buyer s tooling manual (TMS-MC-015). 4 of 11
5 Appendix Q * TABLE 1 Quality System Requirements by Commodity Commodity / Product Quality Management System NOTE: Seller shall have a current third party certification to ISO9001 or AS/EN9100 from an ANSI-ASQ National Accreditation Board ISO9001 AS/EN AS9120 ( approved registrar LM Aero Build-to-Print Metallic and Non-Metallic Parts, Castings & Forgings (including finished castings and forgings), Sheet Metal, Machined Parts, Structural Assemblies/Details, Honeycomb Core, Composite Parts (Includes Certified Parts Providers- CPP) Metallic Raw Materials (Bar, Rod, Plate, Sheet, Extrusions, etc.), including Cutto-Size Non-Metallic Raw Materials (Chemicals, Paints, Adhesives, Lubricants, Tapes), Composite Materials Electrical Hardware/Components, Standard Hardware, LM Aero Special Hardware, or Miscellaneous Hardware and Bearings, Detail Parts Controlled Under Manufacturer's Part Number, Support Equipment (SE) and Details of SE Ground Support Equipment Electrical, Mechanical, Avionics (equipment, assemblies, sub-assemblies, details, harnesses and major components), including jet engines and propellers AS9110 See Note above for third party certification requirements Where multiple s appear for a commodity, only one of the indicated standards is required. # Suppliers acting as Non-value added distributor with AS9100 certificates must have a scope of approval that includes distribution, if AS9120 certification is not held 5 of 11 Distributors Only Aviation Fuel/Oil Perishable Tooling Distributors Only Tooling Software Service Providers Definition: A company whose specialty and core business is integration and management of supply chain operations. Services may include, without limitation, kitting, transportation, distribution and warehouse management, inventory management tasks such as tactical inventory forecasting and optimization, supplier management for selected classes of supplies, and global material deployment and distribution. Maintenance, Repair, or Overhaul Definition: An Organization that performs Maintenance, overhaul, repair, or modification of an aircraft or an aircraft component/article that is performed after completion of manufacturing and initial airworthiness certification by the applicable Authority; and for Original Equipment Manufacturer (OEM) organizations with maintenance, repair and overhaul operated autonomously or that are substantially different from their manufacturing/production operations. (See 2.6.) Stockist Distributors / Contract Service Agency Definition: (1) Distributor is defined as any Seller that is buying Items from other suppliers and selling them to Buyer without adding value to Items. A Distributor cannot act as a Service Center unless the Distributor has a license in place. Repackaging shall not be considered a value-added task for the purpose of this definition. (2) Contract Service Agency is considered to be a Distributor + Beginning July 1, 2013 all suppliers with commodities marked with shall be certified to AS9100 (or at current certification expiration date) + Suppliers performing Alternate Repair Activity on Non OEM product: AS9100 certificates scope of approval description must include M.R.O activity, if AS9110 Certification is not held. #
6 Appendix Q ** Table 2 Additional Quality Requirements by Commodity Commodity / Product Fit Check Software FAI FOD Tooling Inspection Requirements LM Aero Build-to-Print Metallic and Non- Metallic Parts, Finished Castings & Forgings, Sheet Metal, Machined Parts, Structural Assemblies/Details, Honeycomb Core, Composite Parts Metallic Raw Materials (Bar, Rod, Plate, Sheet, Extrusions, etc.), including Cut-to-Size Non-Metallic Raw Materials (Chemicals, Paints, Adhesives, Lubricants, Tapes), Composite Materials Q3R (C-130 & P-3 Only) Q6R Buyer s quality clause Q6R applies to both deliverable and nondeliverable software Q2A and AS/EN 9102 Q2B (M.R.O) Raw Castings & Forgings Variability Reduction Q4R Q16 Q30 (Measurement Plan) AS9103 (Variability Reduction) (F-35) Q30 and AS9103 Electrical Hardware/Components, Mil-Spec Standard Hardware, LM Aero Special Hardware, or Miscellaneous Hardware and Bearing, Detail Parts Controlled Under Manufacturer's Part Number, Support Equipment (SE) and Details of SE Ground Support Equipment Electrical, Mechanical, Avionics (equipment, AS9103 assemblies, sub-assemblies, details, harnesses and major components), including jet engines and propellers Aviation Fuel/Oil Perishable Tooling Tooling Software Service Providers (See Table 1 for Definition) Maintenance and Overhaul Centers (See Table 1 for Definition) See for FAI/MPV Distributors (See Table 1 for Definition) * 2.0 Point of Acceptance: The point of acceptance is indicated on each PO issued. When this PO requires Buyer Accept at Source, Buyer acceptance can involve periodic surveillance by Buyer of Seller s quality system, manufacturing processes or physical Item, including work at Seller s sub-tiers. Based on Seller s performance, Buyer acceptance activities may result in the requirement for full-time oversight of Seller s and/or Seller s sub-tier suppliers. The location of performance of Buyer acceptance, prior to shipment, shall be the Seller s facility address referenced on Buyer s PO. If Seller s Item manufacture, acceptance and/or shipment will be at or from a location other than the contracted PO address, Seller shall: 6 of 11
7 Appendix Q a. provide Buyer s Supplier Quality Engineer with Seller s written plan at least 30 days prior to manufacturing activities that, as a minimum, contains the following: name and location of Seller s sub-tier and/or manufacturing site, how Seller will be performing acceptance of product from a sub-tier location and/or manufacturing site, upon request, example of Seller s purchase order to validate appropriate flow down of Buyer s requirements, date that manufacturing activity will begin, assessment of actual or potential impact to current POs, and risk mitigation plan to ensure compliance to existing requirements, b. obtain Buyer's Supplier Quality Engineer written acknowledgement and concurrence, prior to any manufacturing activity. c. reflect Seller s contracted Supplier name and location, regardless of the point of final acceptance or delivery, in Seller s shipping document and C of C Prior to shipment of Items designated BUYER ACCEPT AT SOURCE, Seller shall: a. obtain final acceptance from Buyer s Supplier Quality Engineer, or b. request and obtain authorization from Buyer s Supplier Quality Engineer for shipment, or c. sign and/or stamp and date Seller s shipping document to indicate acceptance of Item(s) by Seller s quality assurance personnel, when Buyer has delegated end item acceptance to Seller Prior to shipment of Items designated BUYER AND GOVT ACCEPT AT SOURCE, Seller shall comply with and obtain final acceptance from the assigned Government representative When Buyer has not provided Seller with prior written authorization to act on Buyer s behalf, Seller shall notify Buyer s Supplier Quality Engineer normally servicing Seller s facility, not more than five (5) days after receipt of this PO, when PO calls for BUYER ACCEPT AT SOURCE or GOVT & BUYER ACCEPT AT SOURCE. Seller s notification shall include PO number, date of scheduled shipment and any special security clearance required to perform Buyer activities When Buyer has not provided Seller with prior written authorization and/or electronic notification to act on Buyer s behalf, Seller shall notify Buyer s Supplier Quality Engineer a minimum of two (2) working days prior to Items being ready for shipment, when this PO calls for BUYER ACCEPT AT SOURCE or BUYER AND GOVT ACCEPT AT SOURCE, Seller shall not claim entitlement to an increase in the PO price, cost, or fee based upon an assertion that BUYER ACCEPT AT SOURCE or GOVT & BUYER ACCEPT AT SOURCE imposes additional cost(s) or task(s) on Seller. * 2.1 Facility Access: A. Regardless of Buyer s or Buyer's Customer Point of Acceptance on this PO or whether Buyer's Customer has issued a delegation for this PO, Seller shall provide or obtain for Buyer, Buyer s customers and regulatory agency personnel, access to any and all facilities where work is being performed or is scheduled to be performed, including those facilities of Seller s subcontractors, in order to perform Item inspections, surveys or system/process 7 of 11
8 Appendix Q surveillance as part of verification of conformance to the requirements of this PO. Seller s denial of any such access may result in inactivation of Seller s approval. Seller shall include the provisions of this facility access requirement in its POs with its subcontractors, for this PO. B. Seller shall provide the following, at no increase in price, cost or fee to Buyer, Buyer s customers or regulatory agencies: i. suitable facilities at Seller and Seller s subcontractors manufacturing locations for Buyer, Buyer s Supplier Quality Engineer, Buyer s customer and regulatory agency representatives to perform Item inspections, surveys or system/process surveillance, and ii. Buyer s Supplier Quality Engineer with high speed internet access (DSL or wireless). *** * 2.2 Corrective Action, Preventive Action, Request and Reporting: Seller shall: a. ensure effective corrective and preventive action is taken (including repetitive nonconformances dispositioned Use-As-Is or Repair by Buyer s or Seller s Material Review Board [ MRB ] actions) to prevent, minimize, or eliminate non-conformances; and b. evaluate each nonconformance for its potential to exist in previously produced Items and notify Buyer, in writing, within 24 hours of potential or verified non-conformances impacting flight safety on Items in transit or delivered to Buyer; and c. notify Buyer in writing within 5 working days of all other potential or verified nonconformances by utilizing the on-line system located at : under Quality Requirements > Corrective Action to make this notification; and d. provide effective corrective and preventive action upon request by Buyer and, when requested by Buyer, provide trend data; and e. assess all Buyer-identified non-conformances, whether or not Item(s) was/were returned to Seller, and take appropriate actions ensure causes of non-conformance are corrected; f. perform the following actions when Seller has tested any returned Item and Seller cannot verify a Buyer reported non-conformance: i. initiate a SPaR to Buyer for additional verification testing and disposition, ii. process non-verified failure Items according to the SPaR, and iii. not return non-verified failure Items unless authorized by Buyer. * 2.3 Control of Nonconforming Product / Material Review Process, Buyer and Buyer s customers have the right to refuse to accept any and all Seller nonconformances Seller shall ensure Seller s quality system has capability to report nonconformance(s) on CSI in full compliance with Defense Federal Acquisition Regulation Supplement ( DFARS ) * When Buyer s customer has delegated oversight/surveillance of Buyer s work to a cognizant Government representative at Seller s facility, Seller shall submit all material review dispositions for Buyer-related work to the cognizant Government representative, regardless of ownership of design and regardless of tier level for concurrence Buyer has the right to limit or eliminate Material Review processing on work defined by this PO. 8 of 11
9 Appendix Q * MR for Seller designed or Buyer-designed Items is not applicable to Buyer-Furnished Equipment (BFE). BFE is equipment or Items provided to Seller from Buyer; therefore not procured or built by Seller. Seller s continued processing, prior to obtaining Buyer s MR disposition, of any nonconforming BFE shall be at Seller s risk. Seller shall request Buyer MR disposition of BFE in accordance with Buyer instructions located on Buyer s website at: > Quality Requirements > Supplier Quality Management System. Seller shall identify equipment or Items as BFE within the request. A User Guide is available from Buyer s website. * For Seller-designed Items, Material review dispositions are limited to non-conformances that do not affect a parameter controlled by Buyer drawing or specification, where form, fit or function, interchangeability, Critical Safety Characteristic (CSC) related to Critical Safety Item (CSI) service life or reliability is affected. Seller shall submit requests for recommended disposition of non-conformances, if any, affecting any such parameter(s) to Buyer for Major Variance approval as defined in this PO. * For Buyer-designed Items, Seller Material review process is limited to scrapping of Items, eliminating the nonconformance by rework to engineering, or returning to vendor. Seller shall request repair or Use-as-Is disposition from Buyer s MRB. Seller s continued processing shall be limited to subsequent operations that do not hide, alter or limit the ability to inspect, disposition or repair Item unless Seller has received written approval from Buyer. When Buyer has delegated MR to Seller for Buyer-designed Items, Seller s process shall be limited to the scope provided in the MR delegation. Seller s request for Buyer MR disposition of Seller or Buyer-designed Items shall be submitted in accordance with Buyer instructions located at: > Quality Requirements > Supplier Quality Management System When requested by Buyer, Seller shall provide Buyer's Supplier Quality Engineer with Seller s MRB disposition information related to Buyer s Item(s). 2.4 QCS-001 Requirements for Buyer-Designed Items: QCS-001 sets forth both the process sources and the processes that require Buyer approval, prior to use for Items delivered to Buyer. A controlled process is an operation performed on an Item where the operation cannot be readily verified subsequent to its conclusion. Controlled processes have verifiable controls inherent to the process, e.g. heat treat, plating, nondestructive testing, etc. * Seller and Seller s sub-tiers shall meet all requirements of the latest version of Appendix QJ in effect as of the date of this PO when Seller or Seller s sub-tiers are performing any Buyercontrolled process identified in QCS-001. NOTE: Sellers providing perishable tooling and Tool Service Requirements List ( TSRL ) Items are not required to use QCS-001 approved process sources or provide QCS-001 Quarterly Usage Reports. 9 of 11
10 Appendix Q Seller s utilization of Buyer-approved sources does not relieve Seller from the obligations to ensure subcontracted sources are in full compliance with applicable process specifications and to deliver conforming Items. * 2.5 QCS-001 Requirements for Seller-Designed Items: Seller has the authority and responsibility to approve and control its special processing sources including in-house processes. Seller is not required to use those sources or specifications listed in QCS-001. Buyer shall have the right to withdraw Seller s authority to approve both internal and external special processes and special process sources. If such authority is removed the Buyer may direct Seller at no increase in price, cost or fee to Buyer to use only those sources listed in QCS-001 and also meet all of the requirements of Quality Appendix QJ including the Addendum to QJ. Buyer is not be obligated to add any additional special process source or specification to QCS-001as a result of a Seller s authority to approve special process sources being removed. ** 2.6 Maintenance, Repair, or Overhaul Activities: (Including Alternate Repair Sourcing) Additional Requirements: This section is applicable to Sellers performing Maintenance, Repair, or Overhaul Activities on Non-OEM product and/or Original Equipment Manufacturer (OEM) organizations with maintenance, repair and overhaul operated autonomously from their manufacturing/production operations Quality Management Systems: a) A FAA certified repair station must establish and maintain a quality control system acceptable to Lockheed Martin that ensures the airworthiness of the articles on which it or any of its contractors performs maintenance, preventive maintenance, repairs or alterations. The quality management system process shall cover (military articles) the Quality requirements that meet the intent of AS9110. b) QMS Surveillance: Buyer acceptance can involve periodic surveillance by Buyer of Seller s quality system, manufacturing processes or physical Item, including work at Seller s sub-tiers. Approval can be suspended based on surveillance results or Seller s performance. c) Processing Nonconforming Material and Corrective Action: Seller shall report in accordance with section 2.2; any defect in any product, part, process, or article produced by Seller that it determines has escaped their quality system Outsourcing of Repair Items: Sellers receiving Purchase Orders for repair Items shall perform repair at Seller s facility. Outsourcing of work related to tear down, repair, re-assembly, and functional test of the end item or detailed components is prohibited unless authorized in advance by Buyer QMS-ARR requirements for approved capability sources: Seller shall only have authority to perform repairs of Items for which it has a capability rating listed in QMS-ARR. QMS-ARR sets forth both the capability sources and the capability approval focus area that requires Buyer approval, prior to use for Items delivered to the customer QCS-001 Controlled Processes and Approved Processors For requirement instruction, reference Section of 11
11 Appendix Q Sellers Performance of QCS-001 Processes: When performing QCS-001 Controlled Processing in Seller s facility, Seller shall accomplish QCS-001 processes in accordance with applicable process specifications and the current revision of Appendix QJ. Seller must have approval from the Buyer for any Lockheed Martin special process performed at the Sellers facility If Seller performs or directs its sub-tier to perform processes controlled by QCS-001 without Buyer s prior approval, Buyer shall have the right to disapprove Seller s quality system Data Requirements: Technical data shall be licensed or provided by contract. If the design of the article was obtained by a licensing agreement, the applicant must provide evidence of that agreement. Updates must be maintained/updated to latest revision Maintenance Process Verification (MPV): New maintenance processes shall be documented, qualified and approved by the customer and/or authority. A Maintenance Process Verification (MPV) is a complete, independent, and documented physical and functional inspection process to verify that prescribed repair and overhaul methods have produced an acceptable item as specified by engineering drawings and specifications, planning, and other applicable design documents. This is similar to a First Article Inspection that is typically performed on new production parts. The MPV shall be performed and updated as specified for repair to verify the Compliance with Original Equipment Manufacturers (OEM) design documentation, specifications and performance requirements, repair processes, repair workmanship. The process shall be repeated by the seller when changes occur that invalidate the original results. A partial MPV is required for any amended work scope after the original MPV has been conducted Training: Seller must ensure that personnel performing maintenance, repair, or overhaul services and release of articles are qualified and certified in accordance with Authority and customer contract requirements Teardown Report and Maintenance Release: Seller shall provide Buyer and SQE with the following for each unit repaired/overhauled and tested: a. Teardown Report (electronic version) 1. If the repair/overhaul results in a change in the configuration (i.e., dash number, revision or part number) documentation stating compatibility with the original part must accompany the teardown report. 2. The teardown report must contain the following: i. Parts number ii. Serial number, if serialized iii. Parts removed and replaced iv. If the part was Repaired or Overhauled v. Test reports, if applicable vi. Technical Order ( T.O. ) or repair/overhaul manual used to repair the Item including the revision level of the T.O. or repair/overhaul manual b. Maintenance Release - A maintenance release/return to service certification or equivalent is required (e.g., FAA8130 (where applicable), DD1574, maintenance release certificate, etc.) 11 of 11
Appendix QX. Supplier Quality Requirements
Supplier Quality Requirements The latest issue to this document is the version that is available on the Lockheed Martin Aero website: http://www.lockheedmartin.com/us/aeronautics/materialmanagement.html
Purchase Order Clauses and Conditions
Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:
Q2A First Article Inspection (FAI) AS9102 * Revised ** Added
Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the
QCI 012.4 Counterfeit Avoidance and Mitigation Procedure
Page 1 of 6 Dept.: Quality Number: Counterfeit Avoidance and Mitigation Procedure Date Issued: 5/13/14 Supersedes Issue Dated: 2/13/14 Issued By: Lorenzo Belluccia, Quality Engineer Issuing Dept. Approval:
Supplier Quality Requirements F16 Program
ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY
Q2A First Article Inspection (FAI) AS9102
Page 1 of 7 Q2A First Article Inspection (FAI) AS9102 A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network.
Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E
9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier
Supplier Quality Requirements and Clauses
Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion
GLOBAL AEROSPACE PROCEDURE
1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to
Chandler-Arrow Division Arrow Supplier Quality Requirements
AQR-1 QUALITY SYSTEM Supplier must maintain a quality system that meets, as a minimum, the requirements of ISO9001-2008, unless otherwise directed by Chandler-Arrow Division QA organization. Immediate
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
INTRODUCTION: PURPOSE:
UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found
Supplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts
Approved By: Elliott Major Date: 11-19-09 Page 1 of 9 Rev ECO Date Approve Rev ECO Date Approve A R01_13541 07-23-10 DWL B R01_14787 12-15-11 DWL C R01_14910 03-07-12 DWL D R01_14964 04-16-12 DWL 1.0 Purpose
L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance
Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and
ATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES
1 of 8 Q0. Instructions: Review your Purchase Order for any Q clauses listed below. Specific clauses other than Q0 apply only when listed on the PO. All certifications provided to CAI are to be complete,
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.
PPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
Self-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
Product Order Quality Requirements Meggitt (Orange County), Inc.
Product Order Quality Requirements Meggitt (Orange County), Inc. Reference QP8-051, Purchase Order Quality Requirements QP8-055, Review/Control Supplier Documentation PP-401, Quality Assurance Codes 50-2-351,
Turbo Resources International Quality Procedure
TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE
Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5
Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 3.5 Original Issue: March 1994 Revision 3.5 Release Date: September 1, 2008 Effective Date: November 1, 2008 Copyright 1994-2008
Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0
Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 4.0 Original Issue: March 1994 Revision 4.0 Release Date: August 1, 2015 Effective Date: August 24, 2015 Copyright 1994-2015
Bogue Machine Company, Inc. Business Instruction
Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,
Gulfstream Production Certificate Operations
SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.
IEC Electronics Terms and Conditions
IEC Electronics Terms and Conditions 1. General: This Purchase Order is placed subject to these terms and conditions including those within the Purchase Order. The terms of any proposal referred to in
AEROSPACE QUALITY MANAGEMENT SYSTEM - 9100
AEROSPACE QUALITY MANAGEMENT SYSTEM - 9100 Dale K. Gordon Rolls-Royce Royce North America Past Chairman Americas Aerospace Quality Group April 11th, 2003 Edinburgh General Assembly 1 of 24 Aerospace Quality
Purchase Order Attachment 1600 Revision 02 June-2006. Raytheon Aircraft Company Supplier Quality Requirements Document
Purchase Order Attachment 1600 Revision 02 June-2006 Raytheon Aircraft Company Supplier Quality Requirements Document Issued by: Raytheon Aircraft Company Supply Chain Management Quality Assurance 101
AS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
Supplier Quality Assurance Requirements Manual
1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0
Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division
Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...
Surgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System
1. Purpose This document defines requirements for suppliers providing aerospace and defense materials, products and services to Electromech Technologies. Supplier acceptance of a purchase order from Electromech
VENDOR QUALIFICATION APPROVAL FORM
COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit:
PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS
PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS Approved By Claude Rigsby Sourcing Manager Approved By Doug Nixon Manager,Quality Assurance PPG Industries, Inc. - PPG Aerospace Transparencies 1719
SUPPLIER QUALITY PROGRAM, V (U)
FEDERAL MANUFACTURING & TECHNOLOGIES PQR 1060 PAGE 1 OF 17 SUPPLIER QUALITY PROGRAM, V (U) CHANGE HISTORY ISSUE DESCRIPTION OF CHANGE AUTHOR DATE E CORRECTED CHANGE HISTORY S. L. HALTER 10/18/2000 F UPDATED
MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F
MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions 1. Acceptance- This writing, together with any attachments incorporated herein, constitutes the final, complete, and exclusive contract
Quality Assurance Provisions
Page 1 of 5 1. Purpose and Scope. The purpose of this document is to define the Quality Assurance Provisions FLIR Systems Inc. requires for inventory material received from Suppliers. This document applies
Supplier Quality Assurance
Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT
How To Ensure Quality Assurance
1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written
PURCHASE ORDER APPENDIX QP 7.0-09 PROCUREMENT QUALITY CLAUSES
PURCHASE ORDER APPENDIX QP 7.0-09 PROCUREMENT QUALITY CLAUSES Buyer" = PCA Aerostructures Company "Seller" = Vendor, Supplier, Subcontractor, and/or Agents/Representatives 1.0 PURPOSE This document establishes
SUPPLIER QUALITY REQUIREMENTS MANUAL
SUPPLIER QUALITY MANUAL This Document is the exclusive property of Airbus Helicopters, Inc. and the reproduction of this document without written authorization is strictly forbidden. Airbus Helicopters,
Quality Requirements for Suppliers
ESC9100 Rev D Quality Requirements for Suppliers This document is the property of The United Technologies Aerospace Corporation and is loaned with the understanding that neither this document, nor any
QUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.
QS-PR-024 Anti-Counterfeit Control Plan Approved by: Chuck Amsden Approved 1/19/15 This procedure is current and approved when viewed on-line. The procedure becomes uncontrolled when printed. Uncontrolled
QP-740. Supplier Management Handbook
QP-740 Supplier Management Handbook Revision H Revision Date Reason Signature - 2/02/08 Initial Release Avis Rosenfield A 12/10/10 Complete update Ritchie Lacson B 4/14/11 Add sections: 6.4, 6.5, 9.9,
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision - New Program Quality Requirements for Suppliers Rev.
AS9100:2016 Transition Guide
AS9100:2016 Transition Guide Updated August 24, 2016 AS9100 Series Overview AS9100 Aerospace Management Systems is a widely adopted and standardized quality management system for the aerospace industry.
Quality Management System Manual ISO9001:2008
Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1
AS9100C Revised Standard Improves Aerospace Quality
AS9100C Revised Standard Improves Aerospace Quality Customer satisfaction is one of the newest changes to the international quality management standard for aerospace. By Christian Lupo, Business Unit Manager
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,
GE Power Electronics Business Total Quality Management for Suppliers
GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler
Plan QAQ-82-001 Supplier Quality Requirements (Rev 10)
1.0 Purpose To outline Insitu s quality management system requirements for suppliers. 2.0 Scope This document applies to suppliers and subcontractors that provide products and/or services that affect the
How To Manage A Plant
MALAT 9100 QUALITY REQUIREMENTS For Suppliers of Category 12, 13 This Document is located in the Internet site http://www.iai.co.il/sip_storage/files/2/35782.pdf Date: March 2012 Prepared by : S. Migdal
Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011
Aerospace Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 The SPOC Manual is controlled in Electronic format as presented on the Supplier Portal and Honeywell Intranet.
SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
ALL PRODUCTS MFG & SUPPLY
ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY
Quality Management System Quality Manual
1788 Northpointe Rd. Columbia, TN 38401 & 5456 E. McDowell Rd. Suite 109 Mesa, AZ 85215 & 647 Westport Pkwy Grapevine, TX 76051 USA 1-800-635-5342 www.wiremasters.net Quality Management System TABLE OF
AMETEK Airtechnology Group Ltd
Page 1 of 16 AMETEK Airtechnology Group Ltd Locations: Airscrew Muirhead Aerospace Traxsys Input Products 111 Windmill Road, Sunbury on Thames, Middlesex, TW16 7EF Oakfield Road, Penge London SE20 8EW
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER CONDITIONS AND INSTRUCTIONS A HARDCOPY OF THIS DOCUMENT MAY NOT BE THE DOCUMENT IN EFFECT. SEE CFMC DOCUMENT LIBRARY FOR CURRENT REVISION. 1.
AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE
AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised
AVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
Quality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES
1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction
Quality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
PERFORMANCE EXCELLENCE Procurement Standards
PERFORMANCE EXCELLENCE Procurement Standards AEROSPACE PRODUCTS Agile Revision: D Sparton Quality Policy: It is the goal of Sparton Corporation and it subsidiaries ( Sparton ) to deliver value through
Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme
Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme ISO/TS 16949 IATF Scheme rules 4 th edition areas that impact BSI Clients Copyright 2014 BSI. All rights reserved.
1) CERTIFICATE OF COMPLIANCE/CONFORMANCE
Standard Supplier Quality Requirements This document defines restrictions and quality system requirements applicable when goods and services are procured to SMART ELECTRONICS part numbers or Military,
SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE
1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior
NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS
NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS Edition A Version 1 April 2013 NORTH ATLANTIC TREATY ORGANIZATION ALLIED ADMINISTRATIVE PUBLICATION
This Business Management System Manual is based on ISO 9001:2008 requirements
Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with
Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3
TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL
Industry Assessment. Awareness and Industry Efforts to Combat Counterfeits in Aerospace & Military Electronic Component Procurement
Electronic Supply Chain Solutions, Inc. 3023 Eastland Blvd., Bldg. H-109 Clearwater, FL 33761 (727) 723-8255 Industry Assessment Awareness and Industry Efforts to Combat Counterfeits in Aerospace & Military
Supplier Requirements Manual M M 0 3
Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.
Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1
Designation: E 1212 99 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Practice for
Lockheed Martin Supplier Quality Management Website
Lockheed Martin Supplier Quality Management Website The purpose of this document is to provide the user with information on the features and content of the Lockheed Martin Supplier Quality Management website
ArmstrongRM.com. Our team has worked hard to earn this accreditation that will be a major benefit as we sell into this market.
Armstrong RM is pleased to announce we have now received our AS9100 Rev C registration certificate and are eligible to bid on non-flight safety AS9100 contracts in the Aerospace market. Our team has worked
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
How DCMA Helps To Ensure Good Measurements
How DCMA Helps To Ensure Good Measurements Speaker/Author: Robert Field Defense Contract Management Agency 605 Stewart Avenue Garden City, New York 11530 Email: [email protected] Phone: (516) 228-5886;
Counterfeit Parts Prevention
Counterfeit Parts Prevention 1 Introduction / Objectives Counterfeiting is an age-old issue, but is growing in exponential proportions with respect to the types of: Products being counterfeited Industries
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme
How to apply for and maintain UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme Contents 1. General information 2 2. IRCA Aerospace auditor authentication grades 3 3. Criteria
True Product Lifecycle Management Begins When Design Ends. strategy may dictate involvement in all or just a few implemented according to design
ARC PROFILE By Greg Gorbach April 2006 True Product Lifecycle Management Begins When Design Ends Consider that the end-to-end lifecycle of a product begins with the first spark of innovation and ends when
2. CANCELLATION. AC 20-62D, Eligibility, Quality, and Identification of Approved Aeronautical Replacement Parts, dated May 24, 1996, is canceled.
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Eligibility, Quality, and Identification of Aeronautical Replacement Parts Date: 12/23/10 Initiated by: AFS-300
SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST
General Information SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST Vendor Code: Phone Fax: Vendor Name: Vendor Address: Completed by: Title: Signature: Date: Management Name: Title: Products/Services Description
Quality Assurance Manual. QAM-2013-Rev2
QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality
QUALITY MANAGEMENT SYSTEM FOR THE AEROSPACE INDUSTRY
I International Symposium Engineering Management And Competitiveness 2011 (EMC2011) June 24-25, 2011, Zrenjanin, Serbia QUALITY MANAGEMENT SYSTEM FOR THE AEROSPACE INDUSTRY Branislav Tomić * Senior Quality
GENERAL TERMS AND CONDITIONS OF PURCHASE Supplement 2 Government Contract Provisions from the Department of Defense FAR Supplement TC-003 ( 10/15)
GENERAL TERMS AND CONDITIONS OF PURCHASE Supplement 2 Government Contract Provisions from the Department of Defense FAR Supplement TC-003 ( 10/15) 1. When the materials, and products ( goods ) or services,
Purchase Order Clauses
Purchase Order Clauses Supplier are requested to comply with all of following quality clauses, additional clauses are listed with the purchase order as determine by Impresa Aerospace LLC. (IA.). Buyer
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared
PURCHASE ORDER TERMS AND CONDITIONS FOR MANUFACTURING MANAGEMENT PROGRAMS MIL-STD-1528A APPENDIX 2
08/27/91 PURCHASE ORDER TERMS AND CONDITIONS FOR MANUFACTURING MANAGEMENT PROGRAMS MIL-STD-1528A APPENDIX 2 1. The Seller, upon acceptance of this purchase order, shall establish and/or maintain a Manufactured
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
Supplier Quality Requirements Manual SQRM
Supplier Quality Requirements Manual SQRM Approval: Signature on File: 5/25/2016 Beverly Green Director of Corporate Quality Signature on File: 5/25/2016 Brian McCarthy Executive Director of Material Page