1 Culvert and Drainage Inlet/Outlet Safety Guidelines
2 Page 1 Culvert and Drainage Inlet/Outlet Safety Guidelines 1.0 Preface 1.1 The purpose of these standards is to identify general and specific requirements for the design of stormwater management systems within the City of Winnipeg to improve the safety of these systems and eliminate hazards that may expose the public to an unnecessary level of risk. 1.2 These standards cannot anticipate all of the situations that will arise in the design and operation of drainage systems and it is incumbent upon the individual designer to consider thoroughly, all aspects of public and operations personnel safety throughout the planning, design, and construction process. It is imperative that consideration not only be given in design to satisfying the requirements of a design event but logically to extreme events that could reasonably be anticipated to occur. 1.3 s a basic concept in design, the design professional should consider that drainage facilities that are normally accessible to the public should not present a hazard, particularly to children. Ditch flows should neither be excessively deep nor at excessively high velocities. ccess to potential hazards should be restricted, where possible, by fencing or other suitable means. Inlet gratings and openings should not present hazards to cyclists, pedestrians, or operational personnel. 1.4 In terms of their duty to the public, the designer should be guided by the principle that it is not enough to react to a dangerous situation after the fact of a major accident. It is the professionals duty to be aware of the different kinds of hazards, both man-made and natural and of the treatments which will reduce the magnitude of the hazard or protect the public from that hazard. 2.0 Definitions 2.1 Culverts are relatively short sections of drainage pipe that facilitate drainage between open channel drainage courses (e.g. ditches) under roads or railway embankments, etc. culvert, by definition, cannot be connected to a closed conduit drainage system. 2.2 Ditch inlets are catch basins or other suitably engineered inlet devices that facilitate the safe drainage of a ditch or major drainage channel to a closed conduit drainage system or an outfall pipe. 2.3 Hazard exposure classifications are a measure of the public s exposure to a particular drainage system component and are defined consistent with Chapter IX of the USBR publication Design of Small Canal Structures (8) as follows: Class Class B Drainage courses and structures adjacent to schools and recreational areas, such as playgrounds, subject to frequent visits by children. Drainage courses and structures nearby or adjacent urban areas or highways and subject to frequent visits by the public.
3 Page 2 Class C Class D Drainage courses and structures nearby or adjacent rural development or highways which could be subject to visits by children seeking recreation such as swimming. Drainage courses and structures that are far removed from any dwelling, subject to infrequent visits by operating personnel. 2.4 Street classifications are as defined by the Transportation ssociation of Canada (TC) as follows: 1.) Local - local street is a minor traffic carrier within a neighborhood characterized by one or more moving lanes and parking along curbs, with no through traffic moving from one neighborhood to another. Traffic control may be by use of stop or yield signs. 2.) Collector - collector street collects and distributes traffic between arterial and local streets. There may be from two to four moving traffic lanes and parking may be allowed adjacent to curbs. Traffic on collectors has right-of-way over traffic from adjacent local streets. 3.) rterial - n arterial street permits rapid and relatively unimpeded traffic movement. There may be from four to six lanes of traffic, and parking adjacent to curbs may be prohibited. The arterial traffic normally has right-of-way over collector streets. Construction of an arterial street will often include a median strip with traffic channelization and signals at numerous intersections. 4.) Freeway - Freeways permit rapid and unimpeded movement of traffic through and around a city. ccess is normally controlled by interchanges at major arterial streets. There may be four or more traffic lanes frequently separated by a median strip. Parking is not normally permitted within the freeway right-of-way. 3.0 System ccess Guidelines 3.1 The inlets and outlets of all closed conduit systems shall be provided with protective devices to preclude unauthorized or inadvertent entry to the system. ll outfalls shall have debris grates conforming to the requirements of Section 4.0 of these guidelines. 3.2 Ditches that outlet to closed conduit sewers, shall do so through a suitably designed ditch inlet device. Ditch inlets shall conform to the technical requirements of Section 6.0 of these guidelines. 3.3 Culverts, 400 mm diameter and larger in Class hazard exposure classification areas shall be provided with protective inlet grating devices to prevent small children from gaining access in accordance with the technical requirements of Section 7.0 of these guidelines. Culverts less than 400 mm diameter in Class hazard exposure classification areas shall be reviewed on a case-by-case basis to determine the
4 Page 3 advantages and disadvantages of debris/safety racks and the designer shall make a recommendation to the pproving uthority accordingly. Culverts of all diameters in Class B to E exposure classification areas shall be reviewed on a case-by-case basis to determine the advantages and disadvantages of debris/safety racks and the designer shall make a recommendation to the pproving uthority accordingly. The designer s review shall, as a minimum, address the advantage and disadvantage considerations outlined in Section 7.0 and where inlet devices are deemed to be required, they shall conform to the technical requirements, outlined therein. 4.0 Outfalls and Outfall Structures 4.1 Outfalls debris/safety grates shall generally consist of horizontally placed bars with a maximum clear space of mm between bars. The use of cage type racks is discouraged due to their poor debris handling characteristics. Where vertical reinforcement is required based on structural considerations it shall be kept to a minimum. 4.2 Outfall grating for up to 1800 mm diameter shall be designed such that the full diameter of the outfall pipe can be accessed for periodic maintenance. Gratings shall be secured with tamper-proof bolts, a locking device, or other means as may be determined by the pproving uthority. Conceptual configurations for outfall grates are presented in ppendix B. Outfall gratings for outfalls greater than 1800 mm shall require site specific designs addressing the general design concepts presented herein. 4.3 Debris grating must have sufficient clear space to minimize the impact of clogging on hydraulic capacity and the horizontal bars shall be designed to minimize the occurrence of clogging. For non-symmetrical bars, the thinnest portion of the bar, shall be pointed at the direction of flow. 4.4 Debris grating shall be structurally designed with a break away feature such that the the grating will break open under the design condition of a 40% reduction in cross sectional area ND the anticipated velocities from a 10 year synthetic storm event. The outfall grating shall be designed such that the grating is not lost when the break-away feature is utilized. This may be accomplished by the use of hinges with one break-away side, a chain, or by other suitable means as may be determined by the designer. 4.5 Non-submerged outfalls and outfall structures shall be fenced or equipped with handrails to prevent accidental access to the receiving water course. Fencing and handrails shall conform to the requirements of Chapter IX of USBR publication Design of Small Canal Structures (8) based on the appropriate hazard exposure classification. Handrails shall be a minimum of 1050 mm high with a three rail configuration (see typical in Figure -1) in Class to Class C exposure areas and a two rail configuration in Class D and E exposure areas as per Figures 9-11 and 9-10, respectively, in the USBR manual. Handrails that will be subject to exposure to ice break-up on the river shall have removable posts and rails to facilitate their removal and temporary replacement with
5 Page 4 snow fencing during the spring break-up of the river. The designer shall advise the pproving uthority requirements accordingly during the design process. Figure -1 Typical Three Rail Handrail 4.6 Site grading adjacent to outfall structures that are exposed under normal summer water level conditions shall consist of mild slopes, 7H:1V or flatter, or have provision for a 1.50 m wide safety ledge on all sides exposed to the public, to eliminate the risk associated with the public or operations personnel accidentally falling into the receiving course. Where site geometry precludes the provision of safe slopes or a safety ledge, these areas shall be fenced off to preclude access and warning signs should be posted accordingly. 4.7 End treatment at outfall works shall provide sufficient protection against erosion, both due to the outlet velocities associated with the stormwater discharge and natural flow of the receiving course. The erosion protection due to the stormwater discharge shall be based on anticipated exit velocities for a 25 year synthetic rain storm. 5.0 Inlet Design for Traffic Safety 5.1 Design location and spacing of inlets for pavement drainage according to the following general rules: Intersections - Provide inlets at intersections to intercept 100% of runoff and prevent cross street flow which could cause a traffic hazard. Inlets should generally be placed on tangent curb sections and near corners. Superelevation transitions - Provide inlets where street cross slopes begin to superelevate to reduce the traffic hazard of street cross flow to the opposite side of the street.
6 Page 5 Side drainage - Place inlets immediately downstream from where side drainage enters streets (e.g. drainage from parking lots or other major runoff sites) to prevent overloading gutter capacity. Developments greater that 1000 m 2 shall have internal drainage systems to preclude side drainage from entering the street or limit it to an acceptable level at the discretion of the pproving uthority. 5.2 Do not generally locate inlets in driveways or directly in front of commercial/industrial doorways in areas where those doorways are in close proximity to the street. Ensure there is an adequate number of inlets to utilize the intended land drainage or combined sewer capacity. Note that the intended land drainage or combined sewer capacity may utilize inlet restriction devices to intentionally limit capacity. The designer should familiarize himself/herself these requirements prior to carrying out design modifications in an existing area. 5.3 In inlet selection consider hydraulics, potential for clogging, nuisance to traffic, safety, and cost. Consider the following in inlet selection: Likelihood of clogging Traffic considerations Safety of pedestrian and vehicular traffic The requirement for inlet restriction to limit peak runoff capacity 5.4 Provide recognized allowances in flow capacity for interception capability of inlets and to account for a minimum amount of debris being present at the inlet grate during design events. Suitable design procedures are presented in RTC, Drainage Manual - Volume 2, 1987, pp (35) and the Urban Drainage Criteria Manual - Volume 1 (3). Consider relevant site specific conditions in design. 5.5 Maximum gutter flow or ponding intrusion into traffic under minor and major storms shall not exceed the performance standards noted in Tables -1 and -2. Table -1 Maximum Combination of Gutter Flow Depth and Velocity Water Velocity (m/s) Maximum Permissible Depth (m)
7 Page 6 Table -2 Inlet Design Requirements for Traffic Safety Roadway Classification Design Speeds in km/h Urban Rural Traffic Volume (vehicles per day) Urban Rural Design Criteria Minor Storms Concept Pavement Encroachment Flow Depth Cross-flow Major Storms Concept Pavement Encroachment Ponding Depth Cross-flow Other Issues Note 1 - Maximum permissible gutter velocity for pedestrian safety as per Table -1. Note 2 - Preferable to divert drainage away from intersections rather than permit cross-flow. Note 3 - Where retrofitting with inlet restriction, ensure that any intrusion onto private property is minor and precludes the possibility of property damage. Local 30 to to 100 < 1,000 < 3,000 5 year Ponding and Street Storage permitted. Flow may spread to crown. Curb overtopping permitted. mm maximum. 25 year or greater Ponding permitted. Flow may spread over crown. Flow depth not to encroach on private property (see Note 3) 300 mm maximum. Collector 60 to to 80 < 5,000 1,000 to 12,000 5 year Ponding permitted. Road must remain passable. One travel lane open. No curb overtopping. Controlled cross-flow permitted. 25 year or greater Ponding permitted. Pavement must remain passable to emergency vehicles. Flow may spread over crown. 300 mm maximum over gutter. 300 mm maximum. rterial 80 to to 100 < 12,000 5,000 to 30, year, 25 year for depressed roadway Ponding not permitted. One travel lane open in each direction. No curb overtopping. Not permitted. 50 year Pavement must remain passable. Flow may spread over crown. mm maximum over crown. mm maximum over crown or centreline. Freeway 100 to to 120 > 8,000 > 20, year or greater Ponding not permitted. No encroachment into travel lanes. No curb overtopping. Not permitted. 50 year or greater Pavement must remain passable. One travel lane open. mm maximum over crown during storm peak.. mm maximum over crown or centreline. 6.0 Ditch Inlets 6.1 Inlet grating protection is mandatory for all ditch inlets to closed conduit drainage systems or systems where the point of egress is restricted or undesirable. Ditch inlets
8 Page 7 shall be designed as either beehive type grates, inclined catch basin type grating structures, inclined inlet grates on flared inlet sections, or inclined inlet grate structures as per the conceptual ditch grating options depicted in ppendix B. 6.2 Ditch inlet grating selection requires that the designer carry out site specific design. Without limiting this requirement, the ditch inlet types identified in 6.1 are generally applicable to the diameter ranges listed in Table -3. Table -3 Ditch Inlet Type Guidelines Type Ditch Inlet Type Diameter Range of Outlet Pipe Type I Beehive grates up to 600 Type II Inclined catch basin type up to 1200 Type III Inclined inlet grates on flared inlet section 500 to 1200 Type IV Inlet structures greater than Inlet grate bars for Type II-IV grates shall generally be parallel to each other and aligned vertically, for safety and to facilitate ease of maintenance, with no exposed horizontal bars. Where horizontal bars are required as a structural consideration, it is preferable to recess the bars from the surface of the grate such that they do not impede the efforts of a person trying to remove themselves from the grating. Recessed bar are mandatory for Type IV inlet structures. The maximum clear space between vertical bars shall be 140 mm as a safety consideration to children. Where Type II or III grates are to placed in areas that are subject to vehicular or pedestrian traffic, a special grating design will be required to make the inlet grating vehicle and/or pedestrian safe. This may include the use of honeycomb type grates, conventional bicycle safe type grates or other designs that are suitable appropriate for the specific location. The designer shall carefully consider all aspects of public and operational staff safety in the design of specialized grates as well as the maintenance aspects of the grate design. Preference for all inclined inlet grate type designs are the features that minimize pinning forces, incorporate the concept of self cleaning, and do not present a hazard in terms of human limbs becoming caught up in the grating structure itself. 6.4 Where inlets are placed across a ditch or major drainage channel and are accessible by vehicular traffic, they shall be inclined such that they do not protrude from the ditch slope. The most desirable slopes, from the perspective of traffic safety, are slopes of 6H:1V or flatter. Inlet structures should not pose a risk to vehicular traffic that may inadvertently leave the road surface. The designer s attention is drawn to the TC manual Treatment of Roadside Hazards (16) for guidance. 6.5 In selecting the type of inlet that is applicable to each location the designer shall consider: The debris potential of the drainage course.
9 Page 8 Whether a sump would be appropriate or not, based on the debris potential of the drainage course and the pproving uthority s stated frequency for catch basin sump cleaning. The hydraulics of the inlet, the impact it would have on safety, and the significance of debris blockage in terms of flooding adjacent properties. The anticipated pinning forces associated with the inlet when operating under its design condition. In addition to the design event utilized to size the inlet, the designer shall review the performance of the inlet under spring snowmelt conditions and the assumption of utilizing all available headwater in the ditch with no backwater effect from the closed conduit drainage system. 6.6 Where Type III or IV inlet structures are used on inlets 900 mm diameter and larger, the design shall conform to the following general requirements: Debris/safety racks should have a removable feature to permit access to to the inlet pipe for cleaning, and should slope at 3:1 to 5:1 (horizontal to vertical) to permit debris to ride up as the water level rises and to facilitate egress from the structure The debris/safety racks should be located a considerable distance out from the entrance to the pipe to ensure that entrance velocities will be low enough that a person will be able to lift himself/herself off the grating. The required velocity will vary with design flow depth, however, velocities less than or equal to 1.00 m/sec are not likely to pose any significant risk to the public Bar spacing should be such that a child will not be able to pass between the bars (maximum 140 mm clear spacing) The net open surface area of the debris/safety racks should be at least four times the cross sectional area of the pipe. 6.7 Where Type IV inlet structures are utilized on inlets larger than 2000 mm (height, width, or diameter), parabolic grates shall be utilized and the design shall also conform the following geometric and structural requirements: Geometric guidelines for the grate include: Width of pipe or culvert = b verage width of channel = B, and b 04. B Distance of grate from edge of pipe along headwall = d, and d 05. B Length of vertical parabola = L, and L H = H 2h where, H = height of the pipe h = 0.4 m for H 3 m, and
10 Page 9 h = 1.2 m for H > 3 m l Length of flat top of grate = l, and b 10. Review the design flow water surface profile to ensure that the length of the flat top of the grate (l) equals the distance from the headwall to the onset of the drop in water surface profile approach the pipe entrance (e.g. ensure that the localized increase in velocity near the pipe inlet occurs within the grating). The vertical parabola (see Figure -2) geometry should be, 2 y = 2hx 0 x L 0 y H Bars may be used in the horizontal plane up to a height of 500 mm ll remaining bars should be parallel and in the vertical plane Horizontal strutting must be recessed behind the vertical bars to avoid catching any protruding human limbs ny drops in channel invert or other energy dissipating device must be behind the grating. The designers attention is drawn to the references provided in Section in terms of additional requirements which should be addressed as design considerations to minimize potential operational problems and improve public safety relative to the design of large inlet structures. 7.0 Culvert Inlets/Outlets 7.1 Culverts shall be reviewed for safety based on the following primary considerations: Culverts and culvert drainage structures shall be adequate to avoid hazardous flooding and failures of road or embankment structures. The required level of protection to prevent road flooding shall be consistent with the design requirements of Table -2. The level of protection required for other embankment structures shall be reviewed on a case-by-basis and the designer shall advise the pproval uthority accordingly In determining the required hydraulic capacity of the culvert the designer shall review the debris potential of the drainage course, the pproving uthority s stated frequency of maintenance and make an allowance in design capacity to account for anticipated debris blockage. The designer s attention is drawn to Design and Construction of Urban Stormwater Management Systems, SCE Manuals and reports of Engineering Practice No. 77, WEF Manual of Practice FD-20 (15) for guidance.
11 Page Culvert end sections and their associated drainage structures shall be located or configured such that they do not pose a hazard to traffic. The designer s attention is drawn to the TC manual Treatment of Roadside Hazards (16) for guidance djacent site geometry in the vicinity of the culvert entrance and exit shall be designed or modified to minimize the possibility of someone inadvertently falling into the drainage course. While this should be evaluated for all sites, it becomes an increasingly critical factor to consider at ditch depths and culvert diameters of 900 mm and greater. Where due to site constraints, undesirable entrance geometry must be constructed, the area shall be fenced off based on the prevailing exposure classification of the site to ensure that the culvert entrance/exit does not pose an undo risk to vehicles or pedestrians. The designer attention is drawn to Chapter IX of USBR publication Design of Small Canal Structures (8 for guidance on recommended entrance geometry and specific methods to discourage access based on the degree of risk and exposure classification When assessing the prevailing exposure classification the designer shall, to as great a degree as is practicable, anticipate future conditions with respect to adjacent land use, etc In sizing the culvert the designer shall make a thorough review of entrance and exit velocities versus the culvert diameter and recognize the balance that must be achieved in terms of minimizing entrance velocities to reduce risk exposure and erosion potential, yet achieving sufficient velocities to minimize maintenance requirements. Where site constraints or other conditions dictate that an undesirable combination of flow depth and entrance velocity must prevail, the designer shall recommend suitable warning signing and restrict access to the culvert entrance/exit for a suitable distance by fencing or other means that may be satisfactory to the pproving uthority. The designer may use Table -1 as a guideline with respect to undesirable combinations of design flow depth and entrance velocity When analyzing conditions of safe entrance velocities the designer shall give consideration to spring runoff conditions as well as the governing design event In Class exposure areas, all culverts 400 mm and larger shall be provided with inlet and outlet protection devices to prevent children from accessing the system in accordance with 7.3. For all other culverts, in all other exposure classifications the designer shall consider the advantages and disadvantages of providing inlet/outlet protection devices as outlined in Where the designer carries out a review of the requirement for inlet/outlet debris/safety racks, they shall consider the following: Carry out a thorough review of the drainage course to acquire the necessary information on design flows, debris potential, public exposure, existing and future land use, and other relevant conditions.
12 Page Based on the above information, examine the risks associated with inadvertent access (e.g. generally a function of existing and future land use), the hazards associated with a person(s) entering the drainage course (e.g. generally a function of flow depth, velocity, culvert size, culvert length, available free space in the culvert under the design flow condition, and the suitability of the point of egress), and the risks associated with installing debris or safety grating at that particular location (e.g. flooding potential, icing problems, debris accumulation, etc.) Based on the above review, the designer shall make a recommendation to the pproving uthority on whether debris/safety grates would be recommended on a case-by-case basis. The rationale for this review shall be a recommendation on how the interests of the public would best be served given what is often a conflicting set of objectives in terms of maintaining sufficient hydraulic capacity for the culvert while minimizing the public exposure to drainage hazards. The designer shall clearly advise in their recommendation of the assumptions utilized in analysis, the ramifications of installing or not installing debris/safety grates in each case, and any additional design features that should be employed to address safety issues. 7.3 Where safety/debris grates on culverts are required by this standard to be utilized or deemed to be required based on the design professional s review, the following guidelines shall apply: ny culvert that is provided with inlet protection shall be provided with outlet protection and vice versa For inlet grates for use on culverts up to and including 600 mm diameter (or the largest dimension of a box, arch, or elliptical cross section culvert), inlet grates can be vertical grates. The basic design must incorporate a hinge or other device to permit periodic access for maintenance. They shall be provided with a suitable security device to prevent unauthorized access as detailed in 4.2. The general design shall conform to Figure B1 in ppendix B except that that bars shall be orientated vertically rather than horizontally to maximize hydraulic efficiency. The maximum clear spacing between grates shall be 140 mm, such that a child will not be able to pass between the bars For inlets larger than 600 mm diameter (or the largest dimension of a box, arch, or elliptical cross section culvert) up to and including 2000 mm diameter Type III or Type IV inlet structures shall be provided as outlined in the appropriate sections of 6 for Ditch Inlets For inlets larger than 2000 mm diameter (or the largest dimension of a box, arch, or elliptical cross section culvert) Type IV inlet structures shall be provided as outlined in the appropriate sections of 6 for Ditch Inlets The designer s attention is drawn to the following references regarding safe design procedures for inclined inlet gratings on large inlet structures :
13 Page 12 Metropolitan Toronto Task Force on Storm Inlet Grating Design, Study of Culvert Inlet Gratings, Metropolitan Toronto Task Force, Toronto, ON, May, Weisman, R.N., Model Study of Safety Grating for Culvert Inlet, Journal of Transportation Engineering, Vol.115, No. 2, published by the SCE, March bt, S.R., Brisbane, T.E., et al, Trash Blockage in Supercritical Flow, Journal of Hydraulic Engineering, Vol. 118, No.12, published by the SCE, December, llred-coonrod, J.E., Safety Grates in Supercritical Channels, Journal of Irrigation and Drainage Engineering, Vol. 120, No. 1, published by the SCE, January/February 1994.
14 Page 13 Figure -2 Standard Geometry for Type IV Inlets > 2000 mm HEDWLL CULVERT B b PLN HEDWLL L l CULVERT y h H x ~0=45 ELEVTION
15 Conceptual Representations of Ditch/Culvert Inlet and Outlet Grating Options
16 Page 1 Conceptual Representations of Ditch/Culvert Inlet and Outlet Grating Options Figure B-1 Figure B-2 Figure B-3 Figure B-4 Figure B-5 Figure B-6 Figure B-7 Typical Outfall Debris Grating Detail Neenah Foundry - Typical Beehive Grate and Frame (Type I Ditch Inlet) Typical Type II Ditch Inlet - Inclined Catch Basin Type (up to 400 mm diameter pipe, high debris potential ditch) Typical Type II Ditch Inlet - Inclined Catch Basin Type (up to 400 mm diameter pipe, low debris potential ditch) Typical Type II Inclined Catch Basin Type (up to 1200 mm diameter pipe, high debris potential) Typical Type III Flared End Section Inlet (up to 1200 mm diameter pipe, low to no debris potential or alternate means of debris control) Typical Type IV Inlet Structure (> 2000 mm diameter or height)
17 Page 2 O.D. Pipe + mm O.D. Pipe + mm Size 25 steel rods embedded mm and 100mm beyond the front face of the concrete headwall Rods at mm c/c mm dia. bolt threaded 50mm at the end to receive washer and nut 125 See Note Employ break away feature (typ.) Frame 13x50mm medium steel 75 PIPE DI mm dia. steel rods at mm c/c Break away feature (typ.) No. of RODS IN FRME PIPE DI. No. of RODS IN FRME NUMBER OF FIXED RODS PIPE DI. No. of RODS TYPE - PIPE DI. up to 1200mm TYPE B - PIPE DI to 1800mm Frame 13x50mm medium steel Drill 25mm dia. Drill 25mm dia. 25mm dia. steel rods at mm c/c TOP VIEW 22mm dia. bolt threaded 50mm at the end to receive washer and nut Face of Headwall Weld 250 Hinge strap Mounting bracket FRONT VIEW SIDE VIEW SSEMBLY HINGE STRP (4 Req d) MOUNTING BRCKET (4 Req d) SSEMBLY ND HINGE STRP DETILS FOR TYPE & B NOTES: 1. Grate to be secured by either a bolt and nut or locking device as specified. 2. ll dimensions are in millimetres unless otherwise shown. Figure B-1 Typical Outfall Debris Grating CONCEPTUL (not to be used for construction)
18 Page 3 Figure B-2 Neenah Foundry - Typical Beehive Grate and Frame (Type I Ditch Inlet)
19 Page 4 Concrete recess 775mm Grating Vertical bar orientation at 140mm clear spacing (see note 3) B Concrete recess 775mm Hold down bolts B Outlet See Note mm overlap Outlet See Note Varies FRONT VIEW Granular SECTION - NOTES: 1. Maximum outlet hole size 400mm diameter, location as required. 2. Where inlet is placed across ditch and is accessible to vehicular traffic, grating slope should match existing side slope. 3. Where inlet likely to be accessed by vehicular or pedestrian traffic, special grating design required as per ll dimensions are in millimeters unless otherwise shown. Slope of Grating 2:1 3:1 4:1 6:1 8:1 10:1 Dimensions B Figure B-3 Typical Type II Inlet Grate (up to 400 LDS outlet low debris potential)
20 Page B Grating vertical bar orientation at 140mm clear Concrete recess 775mm B Hold down bolts WWF 185mm /m each way Outlet See Note 1 overlap mm 1220 Outlet See Note 1 Granular SECTION - FRONT VIEW TYPE B Dimensions B Slope of Grating : : : : : : Horizontal Figure B-4 Typical Type II Inlet Grate (up to 400 LDS outlet high debris potential) overlap mm B WWF 185mm /m each way Outlet See Note B Grating vertical bar orientation at 140mm clear (see note 3) Concrete recess 1350mm Hold down bolts Outlet See Note 1 overlap mm Granular SECTION - FRONT VIEW TYPE Dimensions B Slope of Grating : : :1 NOTES: Maximum outlet hole size 400mm diameter, location as required. Where inlet is placed across ditch and is accessible to vehicular traffic, grating slope should match existing side slope. Where inlet likely to be accessed by vehicular or pedestrian traffic, special grating design required as per 6.3. ll dimensions are in millimeters unless otherwise shown overlap mm
21 Page 6 Grating Vertical bars at 140mm clear spacing. 2 hinged lockable maintance doors. Fixed trash rack panel (typ) Grating Precast 1800 ID manhole sections OUTLET Precast 1800 ID manhole base OUTLET 100 Compacted granular bedding Undisturbed ground FRONT VIEW SECTION Figure B-5 Typical Type II Inlet Grate (up to 1200 LDS outlet)
22 Page 7 Elevate grate to minimize "wedging effect" Flared end section Inlet pipe Grating Bars at 140mm clear spacing (max.) Inlet Channel Figure B-6 Typical Inclined Grates on Flared End Section (500 to 1200 LDS outlet)
23 Page 8 Figure B-7 Typical Type IV Inlet Structure (> 2000 mm diameter or height)
8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:
. Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
2011 HYDRAULICS MANUAL
STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following
STORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS
TDOT DESIGN DIVISION DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS August 1, 2012 CHAPTER 7 STORM DRAINAGE SYSTEMS SECTION 7.01 INTRODUCTION 7.01 INTRODUCTION...7-1 SECTION 7.02 DOCUMENTATION PROCEDURES
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
Storm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
Homeowner s Guide to Drainage
Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
Gas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
Chapter 9 - Storm Drains
Chapter 9 - Storm Drains TABLE OF CONTENTS CHAPTER 9 - STORM DRAINS... 9-1 9.1 Introduction... 9-1 9.1.1 Objective 9-1 9.2 Design Policy... 9-2 9.2.1 Definition 9-2 9.2.2 General Policies... 9-2 9.3 Design
STREETS/INLETS/STORM SEWERS
DRAINAGE CRITERIA MANUAL (V. 1) CONTENTS Section Page ST- 1.0 INTRODUCTION... 1 1.1 Purpose... 1 1.2 Urban Stormwater Collection and Conveyance Systems... 1 1.3 Components of Urban Stormwater Collection
1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
CHAPTER 4. STORM SEWER SYSTEM DESIGN
CHAPTER 4. CONTENTS Section Page ST- 1.0 OVERVIEW... 1 1.1 Purpose of the Chapter... 1 1.2 Chapter Summary... 1 2.0 STREET DRAINAGE... 2 2.1 Street Function and Classification... 2 2.2 Minor Storm Design
Drainage DR-701. Materials Field Sampling. Purpose of the Guidance Manual. General DR 701-1
DR-701 Chapter Materials Field Sampling Drainage Subject INLETS INTRODUCTION & STORM SEWERS General Purpose of the Guidance Manual DR 701-1 STORM SEWER DEFINITION KYTC defines a storm sewer as two or more
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
City of La Quinta Public Works Department - Storm Drain Plan Review Checklist
Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently
CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 800 STORM SEWER SYSTEMS TABLE OF CONTENTS
CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 800 STORM SEWER SYSTEMS TABLE OF CONTENTS 801 INTRODUCTION 803 802 DESIGN PARAMETERS 804 802.1 - Allowable
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) I. An Example Culvert Design Design a concrete culvert using the
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal
Lecture 21 Culvert Design & Analysis Much of the following is based on the USBR publication: Design of Small Canal Structures (1978) I. Cross-Drainage Structures Cross-drainage is required when a canal
CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS
CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS Note: All questions and comments should be directed to the Hydraulics Unit Supervisor, Environmental Services Section. Revised November 2015 Road Storm Drainage Systems
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS
June 27, 2011 Chapter 9 Storm Drainage Design and Stormwater Quality Regulations Table of Contents CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS Table of Contents Chapter 9 Storm Drainage
Session 3: Guardrail Design and Sitespecific. Considerations
FHWA Roadway Departure Technology Transfer Roadside Safety Systems Installer Training : Guardrail Design and Sitespecific Installation Considerations 3-1 Course Topics Session 2 Testing Requirements and
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
CHAPTER 4 STORM DRAINAGE SYSTEMS
CHAPTER 4 STORM DRAINAGE SYSTEMS 4.1 Overview... 4-1 4.1.1 Introduction... 4-1 4.1.2 Inlet Definition... 4-1 4.1.3 Criteria... 4-1 4.2 Pavement Drainage... 4-2 4.2.1 Introduction... 4-2 4.2.2 Storm Drain
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
Chapter Thirty-six... 5 36-1.0 OVERVIEW... 5 36-1.01 Introduction... 5 36-1.02 Inadequate Drainage... 5 36-2.0 POLICY AND GUIDELINES... 6 36-2.
Chapter Thirty-six... 5 36-1.0 OVERVIEW... 5 36-1.01 Introduction... 5 36-1.02 Inadequate Drainage... 5 36-2.0 POLICY AND GUIDELINES... 6 36-2.01 Introduction... 6 36-2.02 Bridge Decks... 6 36-2.03 Curbs,
Chapter 13 - Storm Drainage Systems Publication 584 2010 Edition CHAPTER 13 STORM DRAINAGE SYSTEMS
CHAPTER 13 STORM DRAINAGE SYSTEMS 13.0 OVERVIEW A. Introduction. This chapter provides guidance on storm drain design and analysis. The quality of a final inplace system depends upon careful attention
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:
Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
Cast iron swing grate in cast iron frame. 300x300 ID concrete chamber. Available chamber depths 400mm or 600mm deep. K&C Roadway SITE PLAN
Cast iron swing grate in cast iron frame Nominal 90 mm inlet SECTION x ID concrete chamber. vailable chamber depths 400mm or 600mm deep CHMBER PLN Stormwater pipe House Chamber location in vehicle cutdown
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
CHAPTER 13 STORM DRAINS
CHAPTER 13 STORM DRAINS TABLE OF CONTENTS 13.1 OVERVIEW...3 13.1.1 Introduction...3 13.1.2 Symbols And Definitions...4 13.1.3 Concept Definitions...5 13.2 GENERAL DESIGN CRITERIA...7 13.2.1 Introduction...7
CHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
CHAPTER 5 STORMWATER DRAINAGE SYSTEM DESIGN. Table of Contents SECTION 5.1 STORMWATER DRAINAGE DESIGN OVERVIEW
CHAPTER 5 STORMWATER DRAINAGE SYSTEM DESIGN Table of Contents SECTION 5.1 STORMWATER DRAINAGE DESIGN OVERVIEW 5.1.1 Stormwater Drainage System Design...5-1 5.1.1.1 Introduction...5-1 5.1.1.2 Drainage System
What is a Horizontal Curve?
Paul Deutsch What is a Horizontal Curve? Provides a transition between two tangent lengths of roadway. PI PC PT PC (Point of Curvature at beginning of curve) PI (Point of Intersection of tangents) PT (Point
Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18
Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall
APPENDIX D INLET CAPACITY AND SPACING. The capacity and spacing design of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 3-D- PPENDIX D INET CPCITY ND SPCING.0 Introduction The capacity and spacing design of storm drainage inlets are presented in detail in this ppendix. 2.0 Design Recurrence Interval and Spread
VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items
VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design
SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect
Gas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
Architectural Processing and Inspections for Home Mortgage Insurance
Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect
IV. INDUSTRIAL TRACK DESIGN
IV. INDUSTRIAL TRACK DESIGN 4.01 GENERAL The following sections govern the criteria to be used in the designing of industry tracks served, or to be served, by the Railway Company. Any deviation from these
VERTICAL SPEED CONTROL DEVICES
H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements
Chapter 7 Street, Inlets, and Storm Drains
Chapter 7 Street, Inlets, and Storm Drains Contents 1.0 Introduction... 1 1.1 Purpose and Background... 1 1.2 Urban Stormwater Collection and Conveyance Systems... 1 1.3 System Components... 2 1.4 Minor
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
Paul Deutsch. NDDOT Office of Project Development Conference November 9, 2010
Paul Deutsch NDDOT Office of Project Development Conference November 9, 2010 What is a Horizontal Curve? Provides a transition between two tangent lengths of roadway. PI PC PT PC (Point of Curvature at
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
CHAPTER II - STORM DRAINAGE
CHAPTER II - STORM DRAINAGE 201 General 201.1 Use of Chapter II 201.2 Triggers for Drainage Report 201.3 Relationship to Chapter on Storm Water Quality 202 Design Guidelines 202.1 Hydrology 202.1.1 General
Chapter 9 Storm Sewers
Contents 1.0 Introduction... 1 2.0 Design Storms... 1 2.1 Minor Event... 1 2.2 Major Event... 1 3.0 Pipe Material and Size... 2 3.1 Pipe Material... 2 3.2 Minimum Pipe Size... 2 3.3 Service Life... 2 3.4
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN
Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,
SKT-SP Tangent Terminal
Assembly Instructions for SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435
CHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
CHAPTER 14: GUARDRAIL and BARRIERS
CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
ORDINANCE NO. 2013 -
ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
ACO Water Management: Civils + Infrastructure
ACO Water Management: Civils + Infrastructure Technical data Introduction to The unit provides an aesthetically pleasing solution when linking proprietary conveyance drainage systems to vegetated infiltration
Chapter 5: Drainage, Ditches, and Culverts
Chapter 5: Drainage, Ditches, and Culverts chapter contents Characteristics of Good Drainage 82 Elements of Good Surface Drainage 82 Crown 82 Shoulders 82 Slope 82 Ditches 83 Culverts 83 Inlets 83 Optimal
SECTION 5 - STORM DRAINS
Drainage Criteria Manual SECTION 5 - STORM DRAINS 5.1.0 GENERAL This The purpose of this section discusses briefly is to consider the hydraulic aspects of storm drains and their appurtenances in a storm
STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD
STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD TABLE OF CONTENTS 1.00 2.00 3.00 4.00 GENERAL REQUIREMENTS MATERIALS DESIGN LAYOUT STANDARD PLATES Page No. 1 1 3 5 STANDARD
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
SECTION 6: TRANSPORTATION
6.0 INTRODUCTION SECTION 6: TRANSPORTATION This section covers the design of the transportation system including but not limited to roadways, lanes, sidewalks and pathways located within road right of
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY
SECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
Stormwater Drainage Design for Parking Lots
PDHonline Course C201 (4 PDH) Stormwater Drainage Design for Parking Lots 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org www.pdhcenter.com
City of West Linn Public Works Design Standards 2010. Table of Contents
City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
STREET LIGHTING CONSTRUCTION DESIGN CRITERIA
STREET LIGHTING CONSTRUCTION DESIGN CRITERIA DC9-001 GENERAL. Proposed street lighting construction in the city of Olathe shall in all respects conform to the technical criteria for analysis and design
CHAPTER 14 SECTION 1
SECTION 1 S SECTION 1 S JANUARY 6, 006 S CH14-100 SECTION 1 S TABLE OF CONTENTS SECTION 1 S 1.1 INTRODUCTION... CH14-103 1. HYDRAULIC DESIGN... CH14-104 1..1 ALLOWABLE STORM WATER CAPACITY...CH14-104 1..
9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.
Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and
JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012
JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN Presentation to Insurance Companies 19 January 2012 Topics of Discussion Investigation Levels of Service Cause of Flooding Analysis Undertaken