1 Gauging Guide for Passenger Rolling Stock Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 1 of 20

2 Index 1. Purpose Scope Background Overall Principle of vehicle/infrastructure compatibility Funding Gauging Methodology Applicable standards Reference Documents NR contact details Appendices... 6 Appendix A Gauging Process Flowchart... 6 Appendix B Introduction Process... 8 Appendix C RACI Chart... 9 Appendix D Alignment to the GRIP process Appendix E Hierarchy of Solutions Model for Infrastructure Changes Appendix F Class XXX Gauging Compatibility Strategy Appendix G Other disciplines to be considered for vehicle compatibility Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 2 of 20

3 1. Purpose This document is written as a guide to parties involved with the introduction to operation on Network Rail managed infrastructure of: New designs of passenger rolling stock Modifications to passenger rolling stock which affect their gauge compatibility with the infrastructure Cascades/Route Extension of passenger rolling stock onto routes which they have not previously operated over Network Rail wishes to alert introducers of new, modified or cascaded vehicles to the advantages of early discussion with Network Rail to assist with ensuring that their vehicle is compatible with the infrastructure. This note is written without prejudice to contractual rights, Railway Group Standards and published clearances or approved exceptions. This document and associated documents are available on the Network Rail website. 2. Scope Note that this document covers gauging aspects of vehicle introductions only. All other elements of infrastructure compatibility will also need to be fulfilled prior to operation on Network Rail managed infrastructure as outlined in GE/RT8270. The operational clearances for existing vehicles are as published in the Sectional Appendix (NESA) Route Clearance Tables. Network Rail is committed to providing operators of existing vehicles with the clearances shown in these tables. 3. Background This document has been developed with the support of stakeholders from several different rolling stock introduction projects and is intended to provide examples of best practice and decision support tools to enable efficient and timely completion of rolling stock introduction or cascade projects. It is intended to be used as a guide only and compliance must be achieved to all applicable standards relating to rolling stock introduction and operation. 4. Overall Principle of vehicle/infrastructure compatibility The following is taken from GERT8270: a) A railway undertaking is responsible for ensuring that its rolling stock is compatible with the infrastructure it operates over and with other rolling stock that operates on that infrastructure b) An infrastructure manager is responsible for ensuring that its infrastructure is compatible with the rolling stock that operates over it and any other infrastructure with which it interfaces. What this means in practice in terms of responsibilities is as follows: Manufacturers/introducers: Need to decide the extent of the network over which the vehicle is intended to operate. If network-wide operation is not a requirement this can reduce the amount of infrastructure which has to be assessed for compatibility Need to identify any delivery and testing routes for vehicles Need to identify depot access routes including access to wheel lathes and heavy maintenance depots Need to identify and consult with other parties affected by the new/modified vehicle Need to demonstrate compatibility with infrastructure and other rolling stock applicable to the routes of intended operation Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 3 of 20

4 Need to agree with Network Rail on the gauging methodology to be followed by the introduction project Network Rail: Need to provide infrastructure data for the entire Network Rail managed network, for gauging this is done via the National Gauging Database (NGD) Will produce a Summary of Compatibility document once the introducer has provided all evidence to demonstrate compatibility with infrastructure Need to thereafter maintain the infrastructure to maintain compatibility with vehicles on the routes which they are cleared for and published in the NESA (available through the NESA website) Operators: Need to operate the vehicle in accordance with compatibility criteria, including any agreed operational restrictions 5. Funding Network Rail is funded to maintain the infrastructure to be compatible with the rolling stock and freight which is cleared to operate over the routes, as defined within the NESA route clearance tables. Where there is a requirement to amend infrastructure to be compatible with new rolling stock, the principle is that the introducer of that new rolling stock pays for the infrastructure amendments. There are 2 main ways this can be done as follows: Network Rail led project NR project manages design and implementation of infrastructure modifications and off-charges all project costs to the vehicle introducer Introducer led project the vehicle introducer manages design and implementation of infrastructure modifications, note Network Rail usually still has a role of asset ownership/protection during such projects, depending on which assets are being modified Any increased monitoring regimes required as a result of less than normal clearances to newly introduced rolling stock require both agreement at Network Rail Route level and to be funded for the future prior to implementation. 6. Gauging Methodology Projects should agree a gauging strategy and clearance methodology with NR at the start of the project, (see GE/RT8270 appendix C and appendix F of this document for example gauging strategy) for which the options are: 1. Apply absolute gauging methodology. This is the recommended solution as it eliminates all doubts as to the dynamic size of vehicles and their suitability for use on all infrastructure. Please note that this method requires a ClearRoute compatible vehicle model to be created. 2. Build to standard vehicle gauges (i.e. loco gauge, W6A etc). This allows vehicles to run over the routes that are clear to the standard gauge but will cause operational restrictions (usually prohibitions) to apply over the routes that are not clear to the standard gauge. All current applicable restrictions to the standard gauge will be inherited by the new vehicle. 3. Apply comparative gauging (i.e. the vehicle is the same size or smaller than an existing vehicle). The new vehicle will be limited to operation over routes cleared for the comparator vehicle and any existing restrictions to the comparator will also apply to the new vehicle. Candidate and comparator vehicle models should be developed with comparable methodologies and the swept envelope for both Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 4 of 20

5 vehicles should comply with GM/RT2149. An existing comparator vehicle has to pass the test of operating in significant and regular traffic which may not be the case for some existing vehicles. 4. Apply hybrid gauging (i.e. a mix of comparative gauging and absolute gauging for parts of a new vehicle which sit outside the swept envelope of the comparator vehicle) Combinations of the above methodologies may be permissible to achieve route clearance. See the following for more details: Appendix A for details of the gauging process Appendix B for introduction process Appendix C for suggested roles and responsibilities Appendix D for Alignment to the NR GRIP Process Appendix E for suggested solutions to infrastructure changes Appendix F for example gauging strategy Appendix G for other disciplines to be considered 7. Applicable standards GERT8270 Iss2 Assessment of Compatibility of Rolling Stock and Infrastructure GERT8073 Iss2 Requirements for the Application of Standard Vehicle Gauges GMRT2149 Iss3 Requirements for Defining and Maintaining the Size of Railway Vehicles GCRT5212 Iss1 Requirements for Defining and Maintaining Clearances 8. Reference Documents GEGN8573 Iss3 Guidance on Gauging ATOC guide to vehicle change RSSB guide to interoperability NESA 9. NR contact details Gauging issues; Mark Ward, Gauging Manager, Network Rail [email protected] Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 5 of 20

6 10. Appendices Appendix A Gauging Process Flowchart (1) Propose Vehicle and routes of operation Yes (2) Is vehicle built to standard gauge? No (3) Is standard gauge cleared for route? No (5) Are restrictions acceptable? No (6) Suitable comparator identified? No Yes (4) Undertake Standard Gauge clearance process Yes Yes (8) Undertake Comparative Gauging clearance process Yes (7) Are restrictions acceptable? No (9) Are infrastructure changes cost effective? (10) Undertake Absolute Gauging clearance process No (11) Does vehicle model exist? No (12) Create/Amend vehicle model Yes Yes (13) Analyse vehicle model over proposed route infrastructure data (17) Amend vehicle design (16) Amend infrastructure Vehicle (14) Are Clearances/ restrictions Acceptable/practical? No (15) Amend infrastructure or vehicle? Infrastructure Yes (18) Demonstrate gauge compatibility (19) Undertake Compatibility Assessment (20) Bring vehicle into service Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 6 of 20

7 1. Propose vehicle and routes of operation - proposer to decide routes where vehicle is to operate (including passenger operation, ECS and delivery routes, depot access routes including access to wheel lathes and heavy maintenance depots) and initiate vehicle change process. > (2) 2. Is the vehicle built to a standard gauge or same as existing vehicles in operation on the route? Yes = (3), No = (6) 3. Is the standard gauge fully gauge cleared for the route? Yes = (4), No = (5) 4. Undertake Standard Gauge clearance process. > (18) 5. Are any restrictions on the route acceptable? Yes = (4), No = (6) 6. Is a suitable comparator vehicle identified? This would be a vehicle which is currently cleared over the route, is in significant and regular use on the route and has a vehicle model which complies with requirements set out in GM/RT2149. Yes = (7), No = (9) 7. Are any restrictions on the route acceptable? Yes = (8), No = (9) 8. Undertake Comparative Gauging clearance process > (18) 9. Are infrastructure changes cost effective> Yes = (16), No = (10) 10. Undertake Absolute Gauging clearance process > (11) 11. Does a vehicle model exist? Yes = (13), No = (12) 12. Create or Amend the vehicle model creation of a vehicle model which can be used within approved gauge clearance software to analyse clearances, this would include information on size, profile and dynamic characteristics of vehicle. At time of writing there is a proposal for standard vehicle data format RIS-2773-RST (format for gauging data) which will enable capture of all required data to create a model. This will be published on the RSSB website once approved. > (13) 13. Analyse vehicle model over proposed route infrastructure data vehicle model to be analysed for both structure clearances and passing clearances over the National Gauging Database (NGD) data for the proposed routes of operation (including passenger operation, ECS and delivery routes, depot access routes including access to wheel lathes and heavy maintenance depots). > (14) 14. Are clearances/restrictions acceptable/practical? The analysis may result in a list of structures with less than normal clearances to the vehicle. The project team and Network Rail will need to discuss whether the reduced clearances and/or restrictions to the operation are acceptable and/or operationally practical e.g. if there is a restriction in one bay platform it may not represent an operational issue. Yes = (18), No = (15) 15. Amend infrastructure or vehicle? - The project team and Network Rail need to decide on the most efficient and effective way to gain gauge clearance for the vehicle. Infrastructure = (16), Vehicle = (17) 16. Amend infrastructure if the vehicle model is found to be foul to only a few structures it may be more cost effective to amend those structures (see appendix E of this document for optioneering advice). > (13) 17. Amend vehicle design if the vehicle model is found to be foul to a large number of difficult to modify structures it may be more cost effective to amend the vehicle design and the model. > (11) 18. Demonstrate gauge compatibility once clearances are acceptable. > (19) 19. Undertake Compatibility Assessment for other disciplines. The vehicle has to be proven to have compatibility between both itself and the infrastructure and itself and other vehicles on the routes where it is intended to operate. This relates to not just gauging but to a number of other disciplines, examples of which are given in the appendices of this document. > (20) 20. Bring into service begin using the vehicles on the infrastructure once all certification and commercial issues are resolved. Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 7 of 20

8 Appendix B Introduction Process Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 8 of 20

9 Appendix C RACI Chart This outlines some of the roles and responsibilities involved with the gauging element of a vehicle introduction project. The numbers relate to the introduction process outlined above. Head of RAM Infra. Works Delivery Lead Vehicle Compatibility Specialist Chart number Activity Client Sponsor CRE Network Planner Project Manager Gauging Engineer Route Director Vehicle Builder Gauging Consultant Advise NR of 1 Proposal A,R C C Seek RSPG endorsement and 2 secure sponsor I C A,R I I I I Inform Vehicle compatibility team A,R I C Appoint vehicle designer and builder A,R I I C I Prepare vehicle design A C I C A,R C Appoint gauging consultant A,R I I C Agree project requirements (PRS documents), Gauging strategy (routes, methodology, activities, timescales) C A,R I I C C C I C C I Secure development funds & project manager I A,R I I C I I I I I Provide NR infrastructure data R A C C C I C Produce vehicle profile, assess gauge compatibility and review as required C I I C C A,R C Review consultant report(s) with respect to potential noncompliant clearances and advise as required I I I A,R I C I ROSCO Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 9 of 20

10 Infra. Works Delivery Lead Vehicle Compatibility Specialist Chart number Activity Client Sponsor CRE Network Planner Project Manager Gauging Engineer Head of RAM Route Director Vehicle Builder Gauging Consultant Identify which locations are acceptable and any required risk mitigation with 12 regards to gauging I C C A,R C I C I co-ordinate all reviews and endorsements required for formal acceptance of vehicle proposal C C I C C C I I A,R Review consultant report(s) with respect to platform stepping distances Revise vehicle design A,R (TOC) I I C I C I if required C I C C A,R C I I Agree works required to achieve route clearance A,R C I C C C I C I I ROSCO Secure funding & other approvals for infrastructure works C A,R I I I C I I C Oversee options, surveys and designs I C A C C I R I Endorse works designs/mitigation measures I I I A,R C C C C Oversee implementation of infrastructure works I I A R Endorse as-built drawings I I C A,R C I Issue gauging certificate I I I A,R I I I I C Review compatibility reports C I I I I A,R I Issue summary of compatibility C C I I I I I I I I I A,R I R = Responsible, A = Accountable, C = Consulted, I = Informed CRE NR customer relations executive, RAM Route Asset Management, ROSCO Rolling Stock Operating Company Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 10 of 20

11 Appendix D Alignment to the GRIP process Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 11 of 20

12 Appendix E Hierarchy of Solutions Model for Infrastructure Changes The following is an example of the decision chain to support infrastructure works where required. It is based upon costs in increasing order to enable introduction projects to be carried out with cost efficiencies in mind as it starts with the cheapest solution and escalates to the more expensive options. Some of these options could be applicable to a vehicle introduction project. Is the survey up to date? Can the site be excluded from scope, e.g. by a platform prohibition? Can temporary clearance be gained by measures such as tare condition only (for delivery or testing), or a ban on deflated condition, or a specific speed restriction? Can the site be resolved by a spot platform coper alteration? Is the site already in somebody's renewal or enhancement plan, and can they resolve at zero cost? Can the site be resolved by a localised track slew (if necessary by manual means or jacking? Can the site be resolved by removal of the problem section (such as a local demolition of a redundant platform)? Can the site be resolved by a design track alignment implemented by tamping? Where track lowering is required: Can the site be resolved by lowering with ballast cleaner? Can the site be resolved by lowering through scarifying ballast and installing steel sleepers? Can it be resolved by a track lowering and reinstate existing track components? Can it be resolved by a full drainage and renewal of track and ballast at a lower datum? Can it be resolved by a bridge reconstruction (Most expensive, but the most permanent solution)? Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 12 of 20

13 Class XXX Gauging Strategy Project: XXX 12/12/2012 Issue XX Rev XX Appendix F Class XXX Gauging Compatibility Strategy Prepared By Agreed By Approved By Approved By Signature Signature Signature Signature Name: Job Title: Project Manager Date: Name: Job Title: Senior Gauging Engineer Date: Name: Job Title: Date: Name: Job Title: Date: Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 13 of 20

14 Class XXX Gauging Strategy Project: XXX 12/12/2012 Issue XX Rev XX Management Summary This Class XXX Gauging Compatibility Strategy sets out the rationale and actions undertaken to facilitate the Gauge Clearance of the Class XXX in respect to the Routes as required by the project. This Strategy shall give details of the Class XXX Kinematic Envelope, the various means by which Gauging assessment is carried out, and how results will be presented. The Strategy will also detail the clearances required, updating of surveys, site work packages and validation of As Built results. Included within this strategy shall also be the means by which responsibility for any infrastructure alterations or increased maintenance works is determined. This document does not cover electrical or signalling interface works. DISTRIBUTION LIST COPY ISSUED TO TITLE /LOCATION TEL NO No 01 Distribution list should include representatives from the manufacturer, NR Route Directors, Gauging Engineer, Project manager and Sponsor, TOC and ROSCO as appropriate 02 Contents Management Summary Distribution List 1. Introduction and Scope 2. Stakeholders and Responsibilities 3. Gauging Assessment Criteria 4. Stepping Distances 5. Site Surveys / Site Works 6. Contracting Strategy 7. Notifications and Approvals 8. Recommendations and Sign-Off Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 14 of 20

15 Class XXX Gauging Strategy Project: XXX 12/12/2012 Issue XX Rev XX 1. Introduction and Scope 1.1 This Gauge Clearance Strategy details the scope and methodology that is to be utilised to attain gauge clearance for the Class XXX vehicle over designated routes. This Strategy shall provide the means by which the gauge clearance activities of assessment and works are agreed with Network Rail such that Gauge Clearance Certificate(s) may be issued. 1.2 This Strategy addresses the Gauge Clearance validation only, and does not address any other issues associated with the permission to operate the Class XXX (e.g. Signalling, Power Supply, DOO(P), and Platform Lengths). However this Strategy does include attainment of electrical clearances as defined in the Gauging Group Standards (if applicable). 2. Stakeholders and Responsibilities List of key Stakeholders affected by the project to go here and a brief background on the origin and objectives of the project to be included. 3. Gauging Assessment Criteria 3.1 Standards The Gauge Clearance assessments, works and validation shall be in accordance with the following Railway Group Standards: GERT8270 Iss2 Assessment of Compatibility of Rolling Stock and Infrastructure GERT8073 Iss2 Requirements for the Application of Standard Vehicle Gauges GMRT2149 Iss3 Requirements for Defining and Maintaining the Size of Railway Vehicles GCRT5212 Iss1 Requirements for Defining and Maintaining Clearances GE/GN8573 iss3 Guidance on Gauging 3.2 Vehicle Details The Vehicle Kinematic details used are as follows:- Class XXX manufacturer and KE version no (Laser Rail File Ref.) Design KE (VAMPIRE Format) This KE will be reassessed upon completion of the first unit build with dimensional check and sway test results incorporated to validate the Design KE and re issue as As Built. It should be recognised that all current assessments and work / maintenance packages (where required) undertaken using the Design KE will need to be reassessed if the As Built KE differs. Any such rework will be entirely at the expense of manufacturer. Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 15 of 20

16 Class XXX Gauging Strategy Project: XXX 12/12/2012 Issue XX Rev XX 3.3 Routes to be Assessed The Routes to be assessed are as follows- Route type ELR Description Priority Notes Primary DBP1 London Road Jn - Kingsbury Jn Secondary DBP2 Kingsbury Jn. - Water Orton East Jn. Testing ECM2 Shaftholme Jn to Temple Hirst Jn ECS LTN1 Liverpool Street - Trowse Jn Depot/service LTN2 Trowse Jn - Norwich Delivery SPC3 Wellingborough - Wigston South Jn. P1 P2 P1 P3 P2 P1 Slow lines only Not Burton on Trent Platform 1 Fast lines only Avoid Up loop Priority Dates P1: 01/01/2014 P2: 01/06/2014 P3: 01/12/2015 ECS: 01/01/2014 Delivery: 01/11/2013 Depot/Service: 01/12/2013 Unless stated specifically otherwise all Platforms along each route shall be assessed for Clearance. Both Primary and Secondary routes shall be assessed for full passenger operation clearances. Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 16 of 20

17 Class XXX Gauging Strategy Project: XXX 12/12/2012 Issue XX Rev XX 3.4 Permissible Clearances Clearances to all Structures on the routes shall be assessed in accordance with the Categorisation of Clearances as set out in GC/RT5212 as follows: Upper Sector (Above 1100mm ARL) Clearance Category Action 100mm Normal Assessed as clear no action required 50mm to < 100mm Reduced Action to be agreed by project and GE > 0mm and < 50mm Special Reduced Lower Sector (Up to 1100mm ARL) Action to be agreed by project and GE 50mm Normal Assessed as clear no action required 25mm to < 50mm > 0mm and < 25mm Reduced Special Reduced Action to be agreed by project and GE Action to be agreed by project and GE Notes: All the above criteria relate to line speeds up to 125mph Any anomaly clearances (i.e. less than 0mm clearance) will require infrastructure works 3.5 Details of Assessment Assessment of clearances shall be undertaken using Absolute Gauging assessment techniques against all structures as listed in the National Gauging Database (NGD) Dated 00/00/00 for the relevant ELRs or part thereof, as set out in the routes listed in Section 3.3. This Assessment is to be undertaken on behalf of Client X by Consultant Y. In this respect the definition of structures is as per Group Standard. Note that any changes to the KE version will require a re-assessment of clearances using the latest NGD. Additionally Consultant Y will carry out a review of the Assessment Results to confirm completeness of both Structure and Passing locations (See Section 3.7 below). 3.6 Determination of Works Where deficient clearances occur mitigation works shall be considered as first option. Such works shall be funded by the Project, through a formal Agreement set in place prior to these works, in accordance with the Route classification. Generally Surveys will be updated by Network Rail where it is considered that the existing survey is outdated. This shall not include locations where more accurate or detailed specifics surveys are requested. Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 17 of 20

18 Class XXX Gauging Strategy Project: XXX 12/12/2012 Issue XX Rev XX Gauge Clearance works of a standard nature typically comprise of the following: Platform Coper Realignment Platform Coper re-levelling Platform Coper replacement with thin copers Track Slewing / Lifting / Balancing. (Including Re Stressing). Removal / Modifications to Platform Step Ups Track Stabilisation (Strutting). These mitigation works shall be undertaken by the project. Datum Plates will also be updated to reflect works undertaken and all data handed over to the route maintenance team. 3.7 Presentation and Assessment of Results The clearance assessment results need to be formatted by ELR (or part thereof) to accord with the order and Priority of Routes as listed in 3.3, and will also need to confirm the assessment criteria used (absolute/comparative, tolerances, KE version etc) and the mode of vehicle operation (Passenger or ECS). The results need to show the clearances assessed in mm for each structure indicating the key structure positions as well as Passing Clearances to other vehicle(s) permitted on that Route. These results will be issued on a Route Priority basis, and will be reviewed by the Gauging Engineer and the Project Manager. The Project Manager will check these results for completeness of Structures and Platforms per Route, and also collate the Passing Clearance results into a Summary Report of locations identified as deficient. 4. Stepping Distances 4.1 All assessments and works shall be in accordance with GI/RT Stepping Distances shall only be required to be assessed and actioned at locations where the Class XXX is booked to stop. At all other locations (including diversionary routes) on train announcements to Mind the Gap will be made. (TOC responsibility). 5. Site Surveys / Site Works 5.1 All works undertaken will be subject to the Construction, Design and Management(CD&M) Regulations for which Network Rail will undertake the duties of Planning Supervisor. 5.2 Prior to any site works being undertaken a validation survey shall be undertaken to confirm the workscope. Similarly upon completion of the works, the As Built dimensions will be recorded and used to confirm (by submitting to the Gauging Engineer for assessment) that adequate clearances have been attained. In this respect the Gauging Engineer will issue a letter of confirmation. 5.3 It should be noted also, that where works to platform copers exceed 1/3 of the platform length, then to comply with the Disability Discrimination Act the works will include the installation of Tactile Paving to the entire platform length where they are not already installed. See GI/RT7016 for further detail. Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 18 of 20

19 Class XXX Gauging Strategy Project: XXX 12/12/2012 Issue XX Rev XX 6. Contracting Strategy 7. Notifications and Approvals 7.1 The Project shall notify the Route Asset Manager (Track) of any site works that may alter existing clearances. 7.2 As-built survey data shall be provided to Network Rail for all sites where infrastructure works are undertaken to enable updating of the National Gauging Database. 8. Recommendations and Sign-Off 8.1 This Gauging Strategy has been agreed with Network Rail and is to be submitted by the Sponsor for endorsement as part of the Deliverables of the Services Agreement to progress these works. Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 19 of 20

20 Appendix G Other disciplines to be considered for vehicle compatibility In addition to gauging, there are several disciplines which need to be considered when gaining approval for rolling stock operations on the Network Rail managed infrastructure, including but not limited to: Stepping distances the distance between passenger footsteps (driver footsteps are not considered) and the edge of operational platform coping stones on the routes it is intended to operate Signalling compatibility the ability of the rolling stock to interface and operate with the signalling system on the routes it is intended to operate Power supply compatibility the capacity of the existing power supply infrastructure to supply enough traction current for the rolling stock in its intended deployment timetable on the routes it is intended to operate Electrical clearances Mechanical interface with electrification system(s) Electromagnetic compatibility how EM emissions from the rolling stock affects the infrastructure (e.g. signalling and power supplies) and vice versa Route availability the axle weights of the rolling stock have to be under the maximum rating for the route (capacity of under-bridges usually the limiting factor) Aerodynamics how the rolling stock and infrastructure interact in tunnels, cuttings etc Attainable speed Braking and acceleration characteristics Signal sighting distances Platform Lengths Depot routes where the depot route is not on the operational route but passes over NR infrastructure Fire protection of rolling stock, particularly in tunnels Emergency arrangements Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 20 of 20

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013 Briefing Note The Use of Standard Gauges for New Non-Passenger Rail Vehicles March 2013 1. Purpose This briefing note is written to guide the manufacturers and introducers of non-passenger rail vehicles

More information

The complete provider for. Gauging Products and Measurement Systems

The complete provider for. Gauging Products and Measurement Systems The complete provider for Gauging Products and Measurement Systems The Gauging Requirement Effective clearance assessment is something that concerns all railways and demands for significantly increased

More information

Uncontrolled When Printed. Documents for Buildings package of station infrastructure standards New and revised documents

Uncontrolled When Printed. Documents for Buildings package of station infrastructure standards New and revised documents Documents for Buildings package of station infrastructure standards New and revised documents Interface between Station Platforms, Track and Trains Document No: GI/RT7016 Issue: 2 Safety in Railway Tunnels

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document comes into force on 05/12/15 Supersedes GKRT0075 Iss 3 on 05/12/15 Date September 15 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that must be provided

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document to be withdrawn as of 03/12/11 To be superseded by GKRT0075 Iss 2 published on 03/09/11 Date March 11 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS Economic and Social Council Distr. GENERAL E Informal document No. 14 20 September 2002 ENGLISH ONLY ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE Ad hoc Meeting of the Multidisciplinary

More information

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations Guidelines for the Application of Asset Management in Railway Infrastructure Organisations INTERNATIONAL UNION OF RAILWAYS (UIC) 16 rue Jean Rey - F-75015 PARIS Tel: +33 (0)1 44 49 20 20 Fax: +33 (0)1

More information

Network Certification Body

Network Certification Body Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56 Contents 1 Normative

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

Rail Network Configuration Management

Rail Network Configuration Management Division / Business Unit: Function: Document Type: Enterprise Services Engineering Procedure Rail Network Configuration Management Applicability ARTC Network Wide SMS Publication Requirement Internal /

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

Spatially Enabling an Asset Management Database

Spatially Enabling an Asset Management Database Spatially Enabling an Asset Management Database John Woollett, GIS Manager (Operations) Tube Lines Ralph Diment Intergraph UK Helen Neaves Intergraph UK Bruce Aquila Intergraph Introduction Background

More information

ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators

ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators Submitted by --------------------------------------------------------- Gary Cooper Director, Ops., Engineering & Major

More information

System operation. A consultation on making better use of the railway network. August 2015

System operation. A consultation on making better use of the railway network. August 2015 System operation A consultation on making better use of the railway network August 2015 Contents Executive summary 3 1. Introduction 4 Purpose of this document 5 Context 5 Structure of this document 6

More information

Applicable standards in CR Rolling stock - Freight wagons TSI (2006/861/EC)

Applicable standards in CR Rolling stock - Freight wagons TSI (2006/861/EC) Applicable standards in CR Rolling stock - Freight wagons TSI (2006/861/EC) Click here to enter text. ERA 1.0 Page 1/13 Standards or other documents referred to in the rolling stock- freight wagons TSI

More information

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard UNIVERSITY COLLEGE LONDON Engineering, Maintenance & Infrastructure

More information

TECHNICAL USER MANUAL for STANDARD HALF THROUGH UNDERBRIDGES Z TYPE

TECHNICAL USER MANUAL for STANDARD HALF THROUGH UNDERBRIDGES Z TYPE NR/CIV/TUM/1200 Rev D May 2010 TECHNICAL USER MANUAL for STANDARD HALF THROUGH UNDERBRIDGES Z TYPE Standard Detail and Design Drawings Page 1 of 38 NR/CIV/TUM/1200 Rev D May 2010 Summary This technical

More information

Certificate of Acceptance

Certificate of Acceptance Product Description Product Image < Scope of Acceptance Full Acceptance / Trial Acceptance (delete as appropriate) Network

More information

Railway Business Strategy and R&D in Europe

Railway Business Strategy and R&D in Europe Railway Business Strategy and R&D in Europe Hitachi Review Vol. 61 (2012), No. 5 190 Keith Jordan Yoichi Sugita, Dr. Eng. Takayoshi Nishino Toshiaki Kono Kiyoshi Morita OVERVIEW: Hitachi s European railway

More information

RISQS Audit Protocol: Network Rail On-Track Plant Operations Scheme (POS) module.

RISQS Audit Protocol: Network Rail On-Track Plant Operations Scheme (POS) module. Services for professional procurement. Be better informed, make better decisions. RISQS Audit Protocol: Network Rail On-Track Plant Operations Scheme (POS) module. Contents Contents... 2 Preface... 3 Issue

More information

Thameslink new Class 700 trains

Thameslink new Class 700 trains Thameslink new Class 700 trains Your questions answered 1. When will the new trains enter service? The first trains are expected to enter passenger service in spring 2016 on the existing Bedford to Brighton,

More information

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015 GE/RT8000/M3 Rule Book Module M3 Managing incidents, floods and snow Issue 2 September 2015 Comes into force 5 December 2015 Published by: RSSB The authoritative version of this document is available at

More information

Superseded by T MU AM 04001 PL v2.0

Superseded by T MU AM 04001 PL v2.0 Plan T MU AM 04001 PL TfNSW Configuration Management Plan Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by

More information

Management Incentive Plan Statement

Management Incentive Plan Statement Management Incentive Plan Statement (Effective from 1 April 2009) Management Incentive Plan Statement Page 1 of 10 Contents Management Incentive Plan Statement... 2 Participants 2 Principal terms and underlying

More information

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008 Network Rail Consultation on Traction Electricity Consumption Rates for Train Operating Companies August 2008 2 1 Introduction... 3 Context & background... 3 2 Calculation of The New Electricity Consumption

More information

Guide for the application of the CR LOC&PAS TSI

Guide for the application of the CR LOC&PAS TSI European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1.00 Date: 26 August 2011 Document prepared by Document type:

More information

Tram-train in the UK?

Tram-train in the UK? Tram-train in the UK? INCOSE 25 th February 2009 By Giles Thomas What is a tram train? a light rail vehicle capable of operating on a street tramway and a conventional railway What is tram train? A combination

More information

Procurement & Contracting Division. Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock")

Procurement & Contracting Division. Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock (Rolling Stock) Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock") November 2013 1 Request for Information ( RFI ) Concerning the Procurement of Electrified Rolling Stock

More information

M&EE Networking Group

M&EE Networking Group COP0007 Issue 5 May 2014 Code of Practice for On and Off Tracking of Road-Rail Vehicles M&EE Networking Group No COP0007 M&EE Networking Group Code of Practice for Issue 5 On and Off Tracking of Road-Rail

More information

RIS RIS-0386-CCS. Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment. Rail Industry Standard. Issue One: December 2014

RIS RIS-0386-CCS. Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment. Rail Industry Standard. Issue One: December 2014 RIS Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited RIS-0386-CCS Issue One: December 2014 Rail Industry Standard Issue record

More information

BANGALORE METRO RAIL CORPORATION LIMITED

BANGALORE METRO RAIL CORPORATION LIMITED BANGALORE METRO RAIL CORPORATION LIMITED Application for Contract Appointment - O & M WING for the post of : General Manager (F&A) Passport size photograph Sl. Copy of 1. Name Address Phone / Mobile Email

More information

DIRECTIVE NUMBER: 141.03.04.001 v2.0. SUBJECT: Correctional Integration Systems Change Management Plan

DIRECTIVE NUMBER: 141.03.04.001 v2.0. SUBJECT: Correctional Integration Systems Change Management Plan DEPARTMENT OF CORRECTION SUPPORT Management Services DIRECTIVE NUMBER: SUBJECT: Correctional Integration Systems Change PAGE NUMBER: 1 of 10 Adopted: 12-15-03 01.00.00. POLICY OF THE DEPARTMENT It is the

More information

La Trobe University is committed to maintaining a comprehensive and effective Compliance Framework.

La Trobe University is committed to maintaining a comprehensive and effective Compliance Framework. La Trobe University Compliance Framework Introduction The Compliance Framework documents the system and Compliance Process through which La Trobe University can monitor, review and comply with its legislative

More information

Chapter 3. Track and Wheel Load Testing

Chapter 3. Track and Wheel Load Testing Chapter 3 Track and Wheel Load Testing This chapter describes the track, truck, and testing equipment that were used by the Transportation Technology Center, Inc. (TTCI) for collecting the data that was

More information

AWS and TPWS Interface Requirements

AWS and TPWS Interface Requirements Railway Group Standard AWS and TPWS Interface Synopsis This document defines the track / train and driver / machine interface requirements for the Automatic Warning System (AWS) and the Train Protection

More information

ITS specification Handover and commissioning process (ITS-10-01)

ITS specification Handover and commissioning process (ITS-10-01) ITS specification Handover and commissioning process (ITS-10-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

Telephone number: 01904-382050 Telephone number: 0870 140 7010 Fax number: n/a Fax number: 020 7833 8449

Telephone number: 01904-382050 Telephone number: 0870 140 7010 Fax number: n/a Fax number: 020 7833 8449 22 Application for ORR s specific approval of an amendment to a freight track access agreement or consultation for an amendment proposed to be made under general approval 1. Introduction Form This form

More information

POSITION INFORMATION DOCUMENT

POSITION INFORMATION DOCUMENT South Australia Police POSITION INFORMATION DOCUMENT Stream : Vehicle Examiner Career Group : Engineering and Construction Discipline : Metal Trades Classification : OPS4 Service : Operations Support Service

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction

More information

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee LIFT MANAGEMENT Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee This is a controlled document. It should not be altered in any way without the express permission of the author

More information

No. BMRCL/ 272 / ADM / 2016/ O&M Date: 11.4.2016 NOTIFICATION FOR CONTRACT APPOINTMENT

No. BMRCL/ 272 / ADM / 2016/ O&M Date: 11.4.2016 NOTIFICATION FOR CONTRACT APPOINTMENT BANGALORE METRO RAIL CORPORATION LIMITED (A Joint Venture of Govt. of India & Govt. of Karnataka) III Floor, BMTC Complex, K.H.Road, Shanthinagar, Bangalore 27 No. BMRCL/ 272 / ADM / 2016/ O&M Date: 11.4.2016

More information

1 Flexitank/Container Combination Rail Impact Test Criteria

1 Flexitank/Container Combination Rail Impact Test Criteria 1 Flexitank/Container Combination Rail Impact Test Criteria 1.1 General 1.1.1 This test method is intended to prove the ability of Flexitanks and their installations in ISO shipping containers to withstand

More information

Rail Services. Creating tomorrow s railways

Rail Services. Creating tomorrow s railways Rail Services Creating tomorrow s railways Profile A new approach Colas Rail is a part of the Colas Group, a global leader in infrastructure construction and maintenance, which in turn is part of the French

More information

GENERAL CONTRACT OF USE FOR WAGONS GCU

GENERAL CONTRACT OF USE FOR WAGONS GCU GENERAL CONTRACT OF USE FOR WAGONS GCU Edition dated 1 January 2016 CONTENTS PREAMBLE 5 CHAPTER I OBJECT, SCOPE OF APPLICATION, TERMINATION, FURTHER DEVELOPMENT OF THE CONTRACT, DISCONTINUANCE OF BEING

More information

Guideline for Professional Services Contractor Performance Reporting

Guideline for Professional Services Contractor Performance Reporting ` Guideline for Professional Services Contractor Performance Procedure Applicable to: Transport Projects Quality Management System Status: Approved Division: Transport Projects Version: 10 Date of issue:

More information

RHEDA MRT The ballastless track for underground and surface commuter transit

RHEDA MRT The ballastless track for underground and surface commuter transit RHEDA MRT The ballastless track for underground and surface commuter transit 2 3 Cities on the move Living and working today confront people with increasing demands for mobility. Planners and engineers

More information

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions 1. Change Control Principles Schedule 24: Change Control

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

CONFORMED COPY. Method Statement Helpdesk Services. Revision History. Revision Date Reviewer Status. 23 March 2007 Project Co Final Version

CONFORMED COPY. Method Statement Helpdesk Services. Revision History. Revision Date Reviewer Status. 23 March 2007 Project Co Final Version CONFORMED COPY Method Statement Revision History Revision Date Reviewer Status 23 March 2007 Project Co Final Version Table of Contents 1 Objectives... 3 2 Management Supervision and Organisation Structure...

More information

Common Safety Method for risk evaluation and assessment

Common Safety Method for risk evaluation and assessment Common Safety Method for risk evaluation and assessment Guidance on the application of Commission Regulation (EU) 402/2013 March 2015 Contents 1. Introduction 4 Background 4 Purpose of this guidance 5

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX C - 59 Speed Limit Policy Isle of Wight Council June 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1

More information

ICAEW TECHNICAL RELEASE GUIDANCE ON FINANCIAL POSITION AND PROSPECTS PROCEDURES

ICAEW TECHNICAL RELEASE GUIDANCE ON FINANCIAL POSITION AND PROSPECTS PROCEDURES TECHNICAL RELEASE ICAEW TECHNICAL RELEASE TECH 01/13CFF GUIDANCE ON FINANCIAL POSITION AND PROSPECTS PROCEDURES ABOUT ICAEW ICAEW is a professional membership organisation, supporting over 140,000 chartered

More information

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014 for Inspecting and Certifying Buildings and Works Building Control Regulations 2014 February, 2014 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1 1.3 Application

More information

Engineering Inspection Plans For Entity in Charge of Maintenance Certificates. May 2012

Engineering Inspection Plans For Entity in Charge of Maintenance Certificates. May 2012 Engineering Inspection Plans For Entity in Charge of Maintenance Certificates May 2012 Contents 1. Introduction 4 Engineering Inspection Plans 4 The Assessment Process 5 Proportionality 5 Assessment Timescale

More information

Fit for the European Rail Market Training Competence - Certification

Fit for the European Rail Market Training Competence - Certification SIAFI Europe Seminar Paris, 29 September 2008 Fit for the European Rail Market Training Competence - Certification European Railway Agency Interoperability Unit n 1 EU Rail Policy: The Core Aim To adapt

More information

Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC

Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC TRANSPORT SCOTLAND TRUNK ROAD & BUS OPERATIONS TS INTERIM AMENDMENT 40/11 Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC Summary This Interim Amendment provides guidance to ensure

More information

Adequate Records Management - Implementation Plan

Adequate Records Management - Implementation Plan GPO Box 2343 Adelaide SA 5001 Tel (+61 8) 8204 8773 Fax (+61 8) 8204 8777 DX:467 [email protected] www.archives.sa.gov.au Adequate Records Management - Implementation Plan October 2012 Version

More information

Safety. Standards. Asset Management Planning Inspection and Assessment Route asset planning Contracting strategy Annual work plans

Safety. Standards. Asset Management Planning Inspection and Assessment Route asset planning Contracting strategy Annual work plans Section 8 Output Monitoring Having identified the key network outputs it is important that we develop a clear and concise methodology to ensure that what is actually delivered is measured against what

More information

Commentary Drive Assessment

Commentary Drive Assessment Commentary Drive Assessment Time start: Time finish: Candidate s Name: Candidate s Email: Date of Assessment: Location: Candidate s Supervisor: Supervisors Contact Number: Supervisors Email: Assessor s

More information

Rail Accident Report. Freight train derailment near Gloucester 15 October 2013

Rail Accident Report. Freight train derailment near Gloucester 15 October 2013 Rail Accident Report Freight train derailment near 15 October 2013 October 2014 This investigation was carried out in accordance with: the Railway Safety Directive 2004/49/EC; the Railways and Transport

More information

Project and Programme Management Capability Improvement Study

Project and Programme Management Capability Improvement Study irresistible creativity to inspire and change the world Project and Programme Management Capability Improvement Study Independent Reporter (Part C) Mandate CN/025 Office of Rail Regulation and Network

More information

Contractor Safety Management Program Guidebook

Contractor Safety Management Program Guidebook Engineering & Construction Contractor Safety Management Program Guidebook E&C Contractor Safety Management Program Page 1 E&C Contractor Safety Management Guidebook Table of Contents Section 1.0 Introduction.

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

OHS Training Guidelines

OHS Training Guidelines 1. Introduction... 2 2. Legislative Requirements... 2 3. Definitions... 2 4. Responsibilities... 2 4.1. Senior Executive, Deans and Directors... 2 4.2. Management of Academic/Administrative Units... 3

More information

Appendix 1: Course Amendment Process Diagram 11 Appendix 2: Amendment Matrix 12

Appendix 1: Course Amendment Process Diagram 11 Appendix 2: Amendment Matrix 12 Procedure Course Amendment Contents Introduction 2 Purpose of Amendments 2 Nature of Amendments 2 Consultations 4 Amendment Process 5 Course Amendment Panel (CAP) 5 Membership of CAP 6 Roles and Responsibilities

More information

ClearRoute 2 Training Courses

ClearRoute 2 Training Courses Training Courses To support the software we have introduced a new certification Gauging with. This is equivalent to the Basic and Professional certifications for ClearRoute Classic. It covers how to use

More information

Level 2 Award in Principles of Manual Handling

Level 2 Award in Principles of Manual Handling Level 2 Award in Principles of Manual Handling Qualification specification 2014 For examinations in 2014 Version 1 Accredited by the Qualifications Regulators at Level 2 in the Qualifications and Credit

More information

Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell

Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell Road Asset Management vs Pavement Management A new Paradigm Arthur Taute Stewart Russell Contents Background Definitions Improvements over PMS TMH22 elements Conclusions BACKGROUND Municipal AMS GRAP17

More information

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL OUR UNIQUE SOLUTION TO YOUR UNIQUE SITUATION SGS is recognised as the global benchmark for quality and integrity. We

More information

Construction and Civil Work Management

Construction and Civil Work Management STANDARD LME-12:001901 Uen Rev A Contents 1 Introduction... 3 2 Definitions... 3 3 Requirements... 4 3.1 General... 4 3.2 Responsibilities... 4 3.3 OHS Safety Plan... 5 3.4 Start of Construction Phase...

More information

Platform train interface strategy. January 2015

Platform train interface strategy. January 2015 Platform train interface strategy January 2015 1 With an increasing number of people using the railway, modern hectic lifestyles, and the pervading use of technology, we need to act now to respond to existing

More information

CCG: IG06: Records Management Policy and Strategy

CCG: IG06: Records Management Policy and Strategy Corporate CCG: IG06: Records Management Policy and Strategy Version Number Date Issued Review Date V3 08/01/2016 01/01/2018 Prepared By: Consultation Process: Senior Governance Manager, NECS CCG Head of

More information

Quality Handbook. Part D: Regulations. Section 16A: Common Assessment Regulations for Bachelor s and Integrated Master s degrees.

Quality Handbook. Part D: Regulations. Section 16A: Common Assessment Regulations for Bachelor s and Integrated Master s degrees. Nottingham Trent University Quality Handbook Part D: Regulations Section 16: Common ssessment Regulations for Bachelor s and Integrated Master s degrees Contents 1. Principles behind the regulations...

More information

Align Technology. Data Protection Binding Corporate Rules Controller Policy. 2014 Align Technology, Inc. All rights reserved.

Align Technology. Data Protection Binding Corporate Rules Controller Policy. 2014 Align Technology, Inc. All rights reserved. Align Technology Data Protection Binding Corporate Rules Controller Policy Contents INTRODUCTION 3 PART I: BACKGROUND AND ACTIONS 4 PART II: CONTROLLER OBLIGATIONS 6 PART III: APPENDICES 13 2 P a g e INTRODUCTION

More information

Strategic evolution of railway corridor infrastructure: dual approach for assessing capacity investments and M&R strategies

Strategic evolution of railway corridor infrastructure: dual approach for assessing capacity investments and M&R strategies Strategic evolution of railway corridor infrastructure: dual approach for assessing capacity investments and M&R strategies Y. Putallaz & R. Rivier EPFL Swiss Federal Institute of Technology, Lausanne

More information

DOCUMENT CONTROL PAGE

DOCUMENT CONTROL PAGE DOCUMENT CONTROL PAGE Title: Preceptorship Policy Title Version: Reference Number: Supersedes Supersedes: All previous preceptorship prior to this date Significant Changes: Originator or modifier Ratification

More information

Guernsey International Insurance Association

Guernsey International Insurance Association Guidance on the formation and management of insurance & reinsurance special purpose vehicles ( SPV ) in Guernsey. Background Guernsey has a thriving sector for the use of licensed insurance vehicles (often

More information

Public Transport Vehicle Management System. Request for Information

Public Transport Vehicle Management System. Request for Information Public Transport Vehicle Management System Request for Information Public Transport Authority Western Australia Page 2 of 11 Table of Contents 1 INTRODUCTION... 3 1.1 Information for Respondents... 3 1.2

More information

DRIVING AFTER STROKE STROKE FACT SHEET G

DRIVING AFTER STROKE STROKE FACT SHEET G STROKE FACT SHEET G DRIVING AFTER STROKE Introduction This fact sheet is designed to tell you how to go about returning to driving; the sort of car you may need and how to get it modified if necessary.

More information

CSci application information for self-guided route

CSci application information for self-guided route Outline To become a Chartered Scientist through the you must complete the following stages of application: 1. Application To meet the application requirements you must: be a paid-up Full (voting) Member

More information

Policy Statement: Licensing Policy in respect of those activities that require a permit under the Insurance Business (Jersey) Law 1996

Policy Statement: Licensing Policy in respect of those activities that require a permit under the Insurance Business (Jersey) Law 1996 Policy Statement: Licensing Policy in respect of those activities that require a permit under the Insurance Business (Jersey) Law 1996 Issued: 11 February 2011 Glossary of terms: The following table provides

More information

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers

More information

Rail Accident Report. Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005

Rail Accident Report. Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005 Rail Accident Report Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005 Report 03/2006 This investigation was carried out in accordance with: The Railway

More information

Position Description

Position Description To apply for this position, please provide an up to date resume, covering letter, and statement addressing the Key Selection Criteria in section 6 of this Position Description. Your application will not

More information

Track and Track Drainage Renewals Programme

Track and Track Drainage Renewals Programme Board Date: 26 March 2015 Item 14: Track and Track Drainage Renewals Programme This paper will be considered in public 1 Summary Track and Track Drainage Renewals Programme Existing Estimated Existing

More information

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues

More information

Partners in Protection / C-TPAT Supply Chain Security Questionnaire

Partners in Protection / C-TPAT Supply Chain Security Questionnaire Partners in Protection / C-TPAT Supply Chain Security Questionnaire Dear: Supply Trade Partner As you are aware there have been several changes in the transportation industry over the past few years. One

More information

to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015

to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015 D to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015 This page has been left blank intentionally Page 2 of 24 Page 3 of 24 This page has been left blank intentionally Page 4 of 24 Strategic

More information

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy Section 8 Output monitoring Inputs Customer requirements Safety standards Outputs and funding SRA and Government Policy Network stewardship strategy Asset and operational policies Maintenance & renewal

More information

Skip and container safety in waste management and recycling

Skip and container safety in waste management and recycling Skip and container safety in waste management and recycling Introduction This best practice guidance was written in consultation and with the support of the Waste Industry Safety and Health Forum (WISH).*

More information

BUILDING INFORMATION MODEL (BIM) PROTOCOL

BUILDING INFORMATION MODEL (BIM) PROTOCOL BUILDING INFORMATION MODEL (BIM) PROTOCOL 2013 Standard Protocol for use in projects using Building Information Models The CIC acknowledges the technical input and leadership provided by the BIM Task Group

More information

Stakeholder relations code of practice Investing in the Network

Stakeholder relations code of practice Investing in the Network Stakeholder relations code of practice Investing in the Network Document version: 1.1 Stakeholder relations code of practice investing in the network Page 2 of 42 Contents 1. Introduction... 3 2. Overview...

More information