1 Documents for Buildings package of station infrastructure standards New and revised documents Interface between Station Platforms, Track and Trains Document No: GI/RT7016 Issue: 2 Safety in Railway Tunnels Requirements for Lighting Document No: GI/RT7019 Issue: 1 Guidance on Lighting of Railway Premises Document No: GI/GN7520 Issue: 1 Rail Industry Standard for Station Infrastructure Document No: RIS-7700-INS Issue: 1 Documents withdrawn Infrastructure Requirements at Stations Document No: Issue: 1 (February 2004) Interface between Station Platforms, Track and Trains Document No: GI/RT7016 Issue: 1 (February 2004) Lighting of Railway Premises Document No: GI/RT7010 Issue: 1 (October 2002) Fire Safety of Materials at Operational Premises Document No: GE/RT8005 Issue: 1 (April 2001) Recommendations for the Fire Safety of Materials at Operational Premises Document No: GE/RC8505 Issue: 1 (April 2001) Escalators & Passenger Conveyors on Railway Stations Document No: GM/RT1201 Issue: 1 (September 1996) Escalators & Passenger Conveyors Registration & Periodic Examination Details & Records Document No: GM/RT1251 Issue: 1 (December 1994) Standards Committees: Infrastructure (lead) Traffic Operation and Management Rolling Stock Plant Energy Issue/withdrawal date: 01 December 2007 Documents come into force/cease to be in force: 02 February 2008 Page 1 of 6 GIRT7016~iss 2 & GIRT7019~iss 1 & RIS7700INS~iss 1 & GIGN7520~Iss 1 BN
2 BACKGROUND The Railway Group Standards, Guidance Note and Code of Practice listed above comprise proposal 04/061 which is a suite of standards relating principally to station infrastructure but includes requirements for other operational premises. The standards within this proposal have been reviewed as part of the planned implementation of the Strategy for Standards Management; a copy of which can be found on the RGS website ( The principles of the Strategy for Standards Management have been applied to all the standards listed. This identified: Requirements retained as mandatory in GI/RT7016 issue 2 and GI/RT7019 issue 1 Requirements retained in a non-mandatory Rail Industry Standard RIS-7700-INS Requirements retained as guidance in GI/GN7520 Requirements withdrawn. A broad disposition of requirements is indicated in Annex 1. The requirements that are withdrawn are those that do not meet the risk scope test set out in the Railway Group Standards Code issue two, SCOPE The key stakeholders affected by the withdrawal/issue of these documents are infrastructure managers and railway undertakings. KEY CHANGES It should be noted that the scope of the current project, undertaken as part of the implementation of the Strategy for Standards Management, has been, primarily, to remove those requirements that do not satisfy the risk scope test set out in the Railway Group Standards Code. The retained measures are, therefore, largely unchanged from those currently documented. During the course of the project a number of suggestions have been made for enhancement or amendment of the technical requirements set out in GI/RT7016 issue 2, GI/RT7019, GI/GN7520 and RIS-7700-INS. Whilst the scope of the current project did not include a technical review of the requirements set out in the standards, the suggestions made have been documented, to be used at such time as the next review takes place. The changes introduced by the re-distribution of requirements indicated above and in Annex 1 will not require infrastructure managers or railway undertakings to do anything differently. They will continue to comply with the requirements of their safety management systems, internal company standards and procedures and relevant legislation. However, in future, only requirements contained in GI/RT7016 issue 2 and GI/RT7019 will be mandatory on infrastructure managers. In order to bring all requirements for platform lighting into one document, the DOO lighting requirements currently contained in GE/RT8060, Technical Requirements for Dispatch of Trains from Platforms, have been transferred to GI/RT7016 issue 2, with the correction of one value as explained in the impact assessment. When GE/RT8060 is reviewed as part of the Strategy for Standards Management these lighting requirements will be withdrawn from that document. RIS-7700-INS Rail Industry Standard for Station Infrastructure is available should infrastructure managers or railway undertakings wish to mandate the contents on themselves, and adopt the requirements as part of their safety management system. It replaces previously mandatory requirements from GE/RT8005,, GM/RT1201 and GM/RT1251, and recommendations from GE/RC8505. All the new or revised documents are published in the new formats, agreed by Industry Standards Coordination Committee in 2006, for all future Railway Group documents. It should be noted, therefore, that the structure of the documents are different to that of previous Railway Group documents. All withdrawn documents continue to be available on the RSSB website, in the withdrawn documents section, but will not, in future, be maintained by RSSB. Page 2 of 6
3 COMPLIANCE REQUIREMENTS The documents withdrawn cease to be in force from 02 February The new/revised documents come into force from the same date, 02 February 2008, as shown in sections 1.3 of GI/RT7016 issue 2 and GI/RT7019 issue 1. IMPACT OF PROPOSED CHANGES ON NOTIFIED NATIONAL TECHNICAL RULES (NNTRs) RGS Clause NNTR Status Reason TSI Clause GE/RT8005 All Withdrawn GE/RT8005 was proposed for notification pending review of technical specifications and European standards. Now considered not necessary to notify GE/RT GE/RT8005 All Withdrawn No equivalent requirement for fire safety in draft CR INF TSI GE/RT8005 All Withdrawn Review shows scope of GE/RT8005 was not appropriate for notification against SRT TSI as it is not relevant to tunnels. Also, the SRT TSI will be in force within 6 months and no new tunnels are anticipated during this period GE/RT8005 All Withdrawn Review shows scope of GE/RT8005 was not appropriate for notification against SRT TSI as it is not relevant to tunnels. Also, the SRT TSI will be in force within 6 months and no new tunnels are anticipated during this period CR INF SRT SRT Infrastructure Energy D1, D2, D3 and D4 Revised Replaced by GI/RT7016 issue 2 clauses 7.2, 7.4, 7.5 and 7.6 Intermediate Report G6 Revised Replaced by GI/RT7016 issue 2 clause Intermediate Report M2 and M4 Revised Replaced by GI/RT7016 issue 2 clause 10.2 Intermediate Report All Withdrawn Now covered by GI/RT7016 entries CR INF All Withdrawn Review shows original notification was not appropriate CR PASS PRM E1 and E2 E2 and E4 Revised Replaced by BS8300:2001 PRM Revised Replaced by BS8300:2001 PRM Part M Revised Replaced by GI/RT7016 issue 2 Part 10 G6 Revised Replaced by GI/RT7016 issue 2 clause PRM PRM Page 3 of 6
4 RGS Clause NNTR Status Reason TSI Clause GI/RT7016 C4.1 Revised Replaced by GI/RT7016 issue 2 clause 4.1 GI/RT7016 C4.2 Revised Replaced by GI/RT7016 issue 2 clause 4.2 GI/RT7016 C3 Revised Replaced by GI/RT7016 issue 2 Part GI/RT7016 All Revised Replaced by GI/RT7016 issue 2 CR INF GI/RT7016 All Withdrawn Review shows original notification was not appropriate CR PASS Usable width of platform GI/RT7010 Part C Revised Replaced by GI/RT7019 issue 1 SRT Infrastructure PRM GI/RT7010 All Withdrawn Now covered by GI/RT7016 entries CR PASS PRM DEVIATIONS AUTHORISED BY RSSB The status of all authorised deviations, when these documents are introduced/withdrawn, is as follows: Still in force against GI/RT7016 issue 2 Deviation number Original applicant Topic 04/213/DGN Network Rail GI/RT7016 issue 1. C1.1. Wolverhampton platform 4. Noncompliant track curvature. 04/241/DGN Network Rail GI/RT7016 issue 1. C1.1 and C1.2. London Marylebone station platforms 5 & 6. Non-compliant track curvature. 04/244/DGN Network Rail GI/RT7016 issue 1. C1.2. Birmingham New St bay platform 4c. Non-compliant track gradient through platform. 04/245/DGN Network Rail GI/RT7016 issue 1. C3.5. Birmingham New St bay platform 4c. Non-compliant platform width. 04/247/DGN Network Rail GI/RT7016 issue 1. C3.4. Birmingham New St bay platform 4c. Non-compliant platform width. 04/273/DGN Network Rail GI/RT7016 issue 1. C3.4 (b). Wolverton Station platform 2. Noncompliant platform width. 05/072/DGN Network Rail GI/RT7016 issue 1. C5. Certain WCML platforms on fast lines. Non-compliant stepping distances. 05/074/DGN Network Rail GI/RT7016 issue 1. C1.1. Birmingham New St bay platform 4c. Non-compliant track curvature. 01/379/DGN Railtrack GC/RT5161 issue and Manchester Airport Station platform 2. Encroachment into overrun risk zone. 04/246/DGN Network Rail issue 1. D7. Birmingham New St bay platform 4c. Encroachment into overrun risk zone. 05/030/DGN Network Rail issue 1. D1. Wembley Central Station. Reduced clearance from staircase to platform edge. Page 4 of 6
5 Deviation number Original applicant Topic 05/182/DGN Network Rail issue 1. D1 (b). Cannon Street Station. Reduced clearance from columns to platform edge 06/054/DGN Network Rail issue 1. D7. Cannon Street Station. Encroachment into overrun risk zone. Not applicable to GI/RT7010 issue 1 Deviation number Original applicant Topic Reason 03/201/NC Network Rail C Throughout Network Rail s infrastructure. Noncompliant vertical illuminance. Addressed by revised requirement (clause in GI/RT7016 issue 2). Page 5 of 6
6 ANNEX 1 Other Premises GE/RT8005 Fire Safety of Materials at Operational Premises WITHDRAW Other Premises GE/RC8505 Recommendations for the Fire Safety of Materials at Operational Premises Stations Stations New RIS (RIS-7700-INS) Rail Industry Standard for Station Infrastructure plus Advisory Annexes GM/RT1201 Escalators & Passenger Conveyors on Railway Stations GM/RT1251 Escalators & Passenger Conveyors - Registration & Periodic Examination Details & Records Infrastructure Requirements at Stations GI/RT7016 Interface between Station Platforms, Track and Trains (up-issue) GE/RT8060 Technical Requirements for Dispatch of Trains from Platforms (clauses C1.5 to C1.8 only) GI/RT7016 Issue 2 Interface between Station Platforms, Track and Trains plus Non-Mandatory Appendices GI/RT7010 Lighting of Railway Premises New RGS (GI/RT7019) Safety in Railway Tunnels - Requirements for Lighting (initially lighting only but to be progressively expanded to match SRT TSI scope) New GN (GI/GN7520) Guidance on Lighting of Railway Premises Page 6 of 6
Lineside Signal Spacing and Speed Signage
Document comes into force on 05/12/15 Supersedes GKRT0075 Iss 3 on 05/12/15 Date September 15 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that must be provided
High Visibility Clothing
GORT3279 Iss 7 on 07/12/2013 Railway Group Standard Date December 2013 High Visibility Clothing Synopsis This document sets out the minimum specification for high visibility clothing. Copyright in the
Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013
Briefing Note The Use of Standard Gauges for New Non-Passenger Rail Vehicles March 2013 1. Purpose This briefing note is written to guide the manufacturers and introducers of non-passenger rail vehicles
Lineside Signal Spacing and Speed Signage
Document to be withdrawn as of 03/12/11 To be superseded by GKRT0075 Iss 2 published on 03/09/11 Date March 11 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that
GO/GN3677. Guidance on Operational Criteria for the Provision of Lineside Telephony. Following GSM-R Introduction. Rail Industry Guidance Note
GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2010 Rail Safety and Standards Board Limited GO/GN3677 Guidance on Operational Criteria for the Provision of Lineside Telephony
Economic and Social Council
UNITED NATIONS Economic and Social Council Distr. GENERAL E Informal document No. 14 20 September 2002 ENGLISH ONLY ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE Ad hoc Meeting of the Multidisciplinary
RIS RIS-0386-CCS. Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment. Rail Industry Standard. Issue One: December 2014
RIS Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited RIS-0386-CCS Issue One: December 2014 Rail Industry Standard Issue record
Gauging Guide for Passenger Rolling Stock
Gauging Guide for Passenger Rolling Stock Gauging Guide for Passenger Rolling Stock V1.0 10/12/12 Page 1 of 20 Index 1. Purpose... 3 2. Scope... 3 3. Background... 3 4. Overall Principle of vehicle/infrastructure
NIR-Online Getting Started Guide
NIR-Online Getting Started Guide The purpose of this document is to provide new users with some basic information about NIR-Online and their clyx.net account. The following areas will be covered by this
Certificate of Acceptance
Product Description Product Image < Scope of Acceptance Full Acceptance / Trial Acceptance (delete as appropriate) Network
COMMISSION REGULATION. of 5.5.2011
EN EN EN EUROPEAN COMMISSION Brussels, 5.5.2011 C(2011) 2962 final COMMISSION REGULATION of 5.5.2011 on the technical specification for interoperability relating to the subsystem 'telematics applications
Network Certification Body
Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56 Contents 1 Normative
La Trobe University is committed to maintaining a comprehensive and effective Compliance Framework.
La Trobe University Compliance Framework Introduction The Compliance Framework documents the system and Compliance Process through which La Trobe University can monitor, review and comply with its legislative
LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee
LIFT MANAGEMENT Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee This is a controlled document. It should not be altered in any way without the express permission of the author
IRIS International Railway Industry Standard
English Addendum, 19th June 2008 IRIS International Railway Industry Standard Hier kann ein kleiner Text stehen Hier kann ein kleiner Text stehen Hier kann ein kleiner Text stehen Chapter 1 3 IRIS Certification
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude
INTEROPERABILITY UNIT
INTEROPERABILITY UNIT MODULES FOR THE PROCEDURES FOR ASSESSMENT OF CONFORMITY, SUITABILITY FOR USE AND EC VERIFICATION TO BE USED IN THE TECHNICAL SPECIFICATIONS FOR INTEROPERABILITY Reference: Version
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT No. Dated: October, 2009 NOTIFICATION (DRAFT) In exercise of powers conferred under sections 61, 66,
Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC
TRANSPORT SCOTLAND TRUNK ROAD & BUS OPERATIONS TS INTERIM AMENDMENT 40/11 Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC Summary This Interim Amendment provides guidance to ensure
Document Title: Trust Approval and Research Governance
Document Title: Trust Approval and Research Governance Document Number: SOP034 Staff involved in development: Job titles only Document author/owner: Directorate: Department: For use by: RM&G Manager, R&D
BUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Document Type Corporate Policy Unique Identifier CO-038 Document Purpose To provide a structure through which: i. A comprehensive business continuity management system (BCMS)
AUSTRALIAN HUMAN RIGHTS COMMISSION NOTICE OF DECISION ON APPLICATION FOR TEMPORARY EXEMPTIONS: AUSTRALASIAN RAILWAY ASSOCIATION
AUSTRALIAN HUMAN RIGHTS COMMISSION DISABILITY DISCRIMINATION ACT 1992 (Cth), Section 55 DISABILITY STANDARDS FOR ACCESSIBLE PUBLIC TRANSPORT 2002 (Cth), Section 33A.1 DISABILITY (ACCESS TO PREMISES BUILDINGS)
Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES
Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES 1.0 Background An unopened road allowance as defined by the Municipal Act is a public highway that has not been opened and assumed for
Certificate of Acceptance
Critical Rail Temperature Monitor 3000 Product Description Product Image The CRTM 3000 (Critical Rail Temperature Monitor) monitoring system enables people to monitor rail temperature in real time. The
WA Food Regulation: Temporary and Mobile Food Businesses
WA Food Regulation: Temporary and Mobile Food Businesses This document contains information on the application of the Food Act 2008 (the Act) in relation to temporary and mobile food businesses. It is
This is a free 9 page sample. Access the full version online. AS/NZS ISO 31000:2009 Risk management Principles and guidelines
AS/NZS ISO 31000:2009 Risk management Principles and guidelines AS/NZS ISO 31000:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee OB-007, Risk Management. It was
Guidance for Authorised representatives
Guidance for Authorised representatives How to act in accordance to Swedish legislation Version A Updated 2015-02-25 Contents 1 INTRODUCTION 2 1.1 Authorised representative 3 1.2 Producer definition 3
This is a free 9 page sample. Access the full version online. AS/NZS ISO 31000:2009 Risk management Principles and guidelines
AS/NZS ISO 31000:2009 Risk management Principles and guidelines AS/NZS ISO 31000:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee OB-007, Risk Management. It was
COMMISSION REGULATION (EU)
L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and
Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited
Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited Introduction This is the consultation response by Birmingham
Risk Management Within an Organisation
COUNTY DURHAM AND DARLINGTON FIRE AND RESCUE SERVICE Administration and General Order No. AD/1/TBC CORPORATE RISK MANGEMENT POLICY 1. INTRODUCTION 1.1 County Durham and Darlington Combined Fire Authority
APES 325 Risk Management for Firms
APES 325 Risk Management for Firms Prepared and issued by Accounting Professional & Ethical Standards Board Limited ISSUED: December 2011 Copyright 2011 Accounting Professional & Ethical Standards Board
Guide for the application of the CR LOC&PAS TSI
European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1.00 Date: 26 August 2011 Document prepared by Document type:
VEHICLE CROSSOVER INFORMATION PACK
VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)
Railway Safety Directive 2004/49/EC
Railway Safety Directive 2004/49/EC Dragan JOVICIC Safety Assessment Sector Slide n 1 Content 1. Existing railway context & 1 st steps for establishing a EU railway area 2. Objectives of the European Union
Insurer audit manual
Insurer audit manual Disclaimer This publication may contain work health and safety and workers compensation information. It may include some of your obligations under the various legislations that WorkCover
PLANNING POLICY 3.3.5
PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family
BSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012
To: From: Subject: Status: Date of Meeting: BSO Board Director of Human Resources & Corporate Services Business Continuity Policy For Approval 28 February 2012 The Board is asked to agree the attached
WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES
WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties
Firm Registration Form
Firm Registration Form Firm Registration Form This registration form should be completed by firms who are authorised and regulated by the Financial Conduct Authority. All sections of this form are mandatory.
Fire Protection Industry Scheme Reference SP205 Part 1
BAFE Scheme: SP205 Version 4(a): July 2015 Fire Protection Industry Scheme Reference SP205 Part 1 Life Safety Fire Risk Assessment BAFE (British Approvals for Fire Equipment) The Fire Service College,
Site visit inspection report on compliance with HTA minimum standards. London School of Hygiene & Tropical Medicine. HTA licensing number 12066
Site visit inspection report on compliance with HTA minimum standards London School of Hygiene & Tropical Medicine HTA licensing number 12066 Licensed under the Human Tissue Act 2004 for the storage of
Standard Operating Procedure
Standard Operating Procedure Title: Production and Control of Standard Operating Procedures Purpose The purpose of this SOP is to describe the procedure to be followed to ensure that SOPs are produced
UMBRELLA CLIMATE CHANGE AGREEMENT FOR THE STANDALONE DATA CENTRES Agreement dated 11 th July 2014
THIS AGREEMENT is made the 11 th day of July 2014 BETWEEN: (1) the Environment Agency ( the Administrator ); and (2) the Sector Association set out in Schedule 2 ( the Sector Association ). RECITALS (A)
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT No. Dated: -12-2011 NOTIFICATION In exercise of powers conferred under sections 61, 66, 86(1)(e)
Responses to CP8/13 (No. 2)
Policy Statement PS1/14 Responses to CP8/13 (No. 2) January 2014 Prudential Regulation Authority 20 Moorgate London EC2R 6DA Prudential Regulation Authority, registered office: 8 Lothbury, London EC2R
Insurance Review: Consultation November 2006
November 2006 Published by the Office of Rail Regulation Contents Executive summary...1 1. Introduction...3 Context...3 Purpose...3 Structure...3 Responses and timetable...4 2. Background...5 Regulatory
CCMS Software Provider Business Assurance Statement Deed Poll
CCMS Software Provider Business Assurance Statement Deed Poll I, the of (Name of CCMS Software Provider s representative) (insert position/title) ( the Software Provider ), (insert legal entity name and
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission
Trust accounting for law practices under the Legal Profession Act 2007 (Tasmania)
Trust accounting for law practices under the Legal Profession Act 2007 (Tasmania) Part 1: About this seminar paper The purpose of this seminar paper is to summarise the key legislative changes to the handling
Emily House, Kensal Road, London W10 5BN
JOB SCRIPTION Role: epartment: Location: Reporting to: Supervising: Fire Safety Officer Secretariat mily House, Kensal Road, London W10 5BN Health and Safety Manager No direct line management Grade: The
For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems
BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression
Health & Safety Management System Manual
Health & Safety Management System Manual Document Information Document Number Description HSMSM This manual describes the Health & Safety Management System elements of the Integrated Management System
Preparation of a Rail Safety Management System Guideline
Preparation of a Rail Safety Management System Guideline Page 1 of 99 Version History Version No. Approved by Date approved Review date 1 By 20 January 2014 Guideline for Preparation of a Safety Management
Catalogue of Network Rail Standards
Catalogue of Network Rail Standards NR/CAT/STP/001 ISSUE 90 07 December 2013-28 February 2014 This document is the property of Network Rail Infrastructure Ltd. It shall not be reproduced in whole or in
Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government
Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests
Clause 1. Definitions and Interpretation
[Standard data protection [agreement/clauses] for the transfer of Personal Data from the University of Edinburgh (as Data Controller) to a Data Processor within the European Economic Area ] In this Agreement:-
A new rail route to Oxford - Chiltern Railways plans
A new rail route to Oxford - Chiltern Railways plans Contents Chiltern Railways Evergreen 3 project A new line to Oxford Route and train services Benefits Main works and stations Programme Stakeholder
Appointment as Non-executive Director Auckland International Airport Limited
PO Box 73020 Auckland Airport Manukau 2150 New Zealand. Appointment as Non-executive Director Following our recent discussions, I am very pleased to confirm my invitation to you to join the Board of (Auckland
MOTION NO. M2015-63 WSDOT Task Order for Final Design Services PROPOSED ACTION
MOTION NO. M2015-63 WSDOT Task Order for Final Design Services MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee 07/09/15 Final Action Ahmad Fazel, DECM Executive Director Ron Lewis, East
Risk management systems of responsible entities: Further proposals
CONSULTATION PAPER 263 Risk management systems of responsible entities: Further proposals July 2016 About this paper This paper sets out our proposals to provide guidance to responsible entities on our
Common Safety Method for risk evaluation and assessment
Common Safety Method for risk evaluation and assessment Guidance on the application of Commission Regulation (EU) 402/2013 March 2015 Contents 1. Introduction 4 Background 4 Purpose of this guidance 5
WHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
PAYMENT OF UNION SUBSCRIPTIONS THROUGH CHECK OFF. Guidance
PAYMENT OF UNION SUBSCRIPTIONS THROUGH CHECK OFF Guidance 2006 Introduction...3 SECTION 1: The employer: making lawful check off deductions...4 A. WRITTEN CONSENT...4 B. WITHDRAWING CONSENT...4 C. THE
(UNOFFICIAL TRANSLATION)
Readers should be aware that only the original Thai text has legal force and that this English translation is strictly for reference. The Stock Exchange of Thailand cannot undertake any responsibility
DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Part Two Part One Not Protectively Marked DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy. The Dorset & Wiltshire Fire and Rescue Authority (DWFRA)
GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities
GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities Office of Government Procurement Building Control (Amendment) Regulations 2014 Procurement
GENERAL CONTRACT OF USE FOR WAGONS GCU
GENERAL CONTRACT OF USE FOR WAGONS GCU Edition dated 1 January 2016 CONTENTS PREAMBLE 5 CHAPTER I OBJECT, SCOPE OF APPLICATION, TERMINATION, FURTHER DEVELOPMENT OF THE CONTRACT, DISCONTINUANCE OF BEING
Tender for. Provision of Risk Management Services for the Eyre Peninsula Local Government Association and Member Associations
Tender for Provision of Risk Management Services for the Eyre Peninsula Local Government Association and Member Associations Select request for tenders Table of Contents Page No 1. Structure of this RFT...
RISQS Audit Protocol: Network Rail On-Track Plant Operations Scheme (POS) module.
Services for professional procurement. Be better informed, make better decisions. RISQS Audit Protocol: Network Rail On-Track Plant Operations Scheme (POS) module. Contents Contents... 2 Preface... 3 Issue
ILM Guide to the External Quality Assurance Policy for Centre and Providers. V April 2013
ILM Guide to the External Quality Assurance Policy for Centre and Providers Contents Document Change History 3 Scope 4 Activity Planning with your External Verifier 9 External Verifier Sampling 6 The Centre
GUIDANCE. Using the template interface agreement for rail or road crossings
GUIDANCE Using the template interface agreement for rail or road crossings Contents Background...3 What is the purpose of the interface coordination provisions of the Rail Safety National Law 2012?...3
Comparison between EU-OPS Subpart Q and the new EU FTL
1 Brussels, 3 March 2014 Comparison between EU-OPS Subpart Q and the new EU FTL I. Introduction What are we comparing? The FTL rules known as Subpart Q have been implemented in the European legislation
International Payment Service Terms and conditions
International Payment Service Terms and conditions Welcome to the International Payment Service (the Service) from Capita Registrars Limited (Capita). This document, together with your Application and
Death Verification of Death and Medical Certificate of Cause of Death
Policy Directive Ministry of Health, NSW 73 Miller Street North Sydney NSW 2060 Locked Mail Bag 961 North Sydney NSW 2059 Telephone (02) 9391 9000 Fax (02) 9391 9101 http://www.health.nsw.gov.au/policies/
Betting Existing Operators
Gambling Act 2005: Betting Guidance To operate a betting shop after 1 September 2007 you will need: an operating licence apply to the Gambling Commission between 1 January and 27 April 2007; a premises
Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations. w w w. platformscreendoors.
R a i l V e h i c l e S y s t e m s P l a t f o r m S y s t e m s A p p l i c a t i o n s Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations
Big Sleep Hotel, Cardiff Bute Terrace, CF10 2FE. Offers Around 2m Long Leasehold CONTACT US. Stylish hotel in capital city location
Big Sleep Hotel, Cardiff Bute Terrace, CF10 2FE CONTACT US Stylish hotel in capital city location 81 letting bedrooms Over 230 years on lease at low rent Revenue of around 1m net, of which 90% is B&B Viewing
2Y: Student Enrolment, Registration and Maintenance of Records
Title: Student Enrolment, Registration and Maintenance of Records Document Type: Policy Location: Academic Handbook Section 2Y Version: 1.6 Publication date: Author: Approved by: Academic Board Last updated:
Information Governance Strategy :
Item 11 Strategy Strategy : Date Issued: Date To Be Reviewed: VOY xx Annually 1 Policy Title: Strategy Supersedes: All previous Strategies 18/12/13: Initial draft Description of Amendments 19/12/13: Update
Guidance for Electrical Contractors on Emergency Lighting Legislation
Guidance for Electrical Contractors on Emergency Lighting Legislation Issued in the interests of safety by in conjunction with the Industry Committee for Emergency Lighting ECA / ICEL Guidance For Electrical