A6 Motorway, Croatia
|
|
|
- Rosa Wells
- 9 years ago
- Views:
Transcription
1 A Motorway, Croatia WHY READ THIS CASE STUDY? A The particular composition of the SVP created to develop and manage the A: the fully stated owned concession company ARZ. B A motorway construction was realized within the time schedules and the estimated cost and ARZ is one example supporting that Croatia has certainly advanced with high speed in the area of PPP ventures, which have driven motorway densities to record levels. C M is a brownfield project. ARZ received under the concession agreement an existing road and is in charge of its upgrade to a full motorway standard. D It is an interesting example of a toll collection system evolution. Country background Croatia stands out among transition countries as it has developed a large number of PPP projects despite the small size of its economy. The strategy was, however, mainly statedriven with few true commercial projects. After the violent break-up of the former Yugoslavia, Croatia began to ponder a coherent road development strategy only in the second half of the 990s. At that time, the country had an extensive public road network, though of poor quality due to a long period of insufficient maintenance. In 00, the government recognized the need to rapidly rehabilitate and extend Croatia s highway network, including major transport corridors within Croatia and with its neighbours, notably EU countries. To achieve this goal, the Croatian government passed the "Program of Construction and Maintenance of Public Roads in the Period from00 to 00" bill, which among other things put in place a new model for financing road transport infrastructure and a new structure for the management of this sector. Management of the existing road network was to be fully financed from public expenditures, whereas the management and construction of new highways was to rely primarily on foreign long-term loans and private participation. The Croatian government considers PPPs important for raising private capital for the highway sector. The 00 public road program estimated investment requirements at EUR. billions, of which budgetary funding could cover only EUR 80 million. Several projects were earmarked for private concessions reflecting their advanced stage. However, contrary to the initial objective, the bidding process was replaced by direct negotiations between the Ministry and the companies. By 0, Croatia expects to have a highway network totaling, kilometers. This represents an increase of kilometers or 87% in ten years. Most of this growth is : Tools Updated march 009
2 supposed to come in the form of tolled highways, with opportunities for development using some form of PPP concession arrangement. Administrative Organization Following the approval of the above mentioned law, a new administrative organization was set up. The Ministry of Maritime Affairs, Transport and Communications decides over the realization of projects and two fully state owned incorporated companies have been created for the implementation of the projects: Croatian Road Authority (Hrvatske ceste d.o.o. - HC), responsible for the financing, construction, and maintenance of state roads which are not tolled; Croatian Motorways Ltd. (Hrvatske autoceste d.o.o.) (HAC) responsible for the operation, construction and maintenance of Croatian motorways which are under concession. According to the law, 0. Kuna (about EUR 0.0) from the retail price of each litre of fuel sold on the market is dedicated to motorway construction financing in (about EUR 7 million/year) and are at the disposal of HAC, completing toll revenues (about EUR 8 million/year). It was expected that sovereign loans (EUR,80 million for the whole period) would complete the financing plan. The intended budget was the following. FINANCING STRUCTURE OF THE CROATIAN ROAD MAINTENANCE AND CONSTRUCTION PROGRAM FOR Maintenance, reconstruction and construction of State, country and local roads Funding source Budgetary resources (00) Revenue from fuel tax (EUR 0.07/l) Annual revenues from vehicle registration EUR million % Funding source.8 Budgetary resources (00) 7 9. Revenue from fuel tax (EUR 0.0/l) 8 9. Revenues from tolls Construction and management of toll motorways managed by Hrvatske AutoCeste (HAC) EUR million % Loans 7 8. Loans,80 9. Total 9 00 Total,99 00 Note: based on EUR.0 = Kuna 8.0 exchange rate. Source: Ministry of Maritime Affairs, Transport and Communications In Croatia, besides Hrvatske autoceste d.o.o. three other concession companies have been established to build and manage toll motorways: BINA-ISTRA d.d. Pula (operates the so called Istrian Upsilon - A8 and A9), Autocesta Zagreb-Macelj d.o.o. (AZM for A). : Tools Updated march 009
3 and Autocesta Rijeka-Zagreb d.d. (ARZ for A) NETWORK LENGTH (KM) Company 00 total 00 not tolled 00 total 00 not tolled HAC d.o.o , ARZ d.d BINA-ISTRA d.d AZM d.d TOTAL,00. 0,8,08. 0 A Project Overview The Zagreb-Rijeka Motorway consisted of the Building, Financing, Operation and Transfer (initial concession of 8 years) of 7 km of the A Motorway between the Croatian capital Zagreb to the largest seaport in Rijeka. The Zagreb-Rijeka Motorway forms part of the Budapest-Varazdin-Zagreb-Rijeka highway, European Road E-. The roadway connects Central European countries with Croatia s largest port Rijeka and on towards other Mediterranean countries. The Budapest-Zagreb- Rijeka highway is contained within the north-south Trans-European Motorway Project (TEM) and the Rijeka-Zagreb-Budapest route constitutes part of the Pan-European Transport Corridor VB. In addition to its role in the European context, A motorway is an essential part of the Croatian road network, being part of the main road from Gorican-Cakovec-Varazdin- Zagreb-Karlovac-Rijeka-Pula. Zagreb acts as the central transport node from which traffic flows are directed towards the main industrial and urban centres in the central region. On the coast in the Croatian part of the Adriatic, Pula, Rijeka, Zadar, Sibenik and Split, act as significant tourist destinations. The Rijeka to Zagreb highway therefore represents a crucial connection between both the continental and the littoral parts of Croatia. The Rijeka-Zagreb-Gorican highway corridor ranks among the highest priority road traffic corridor in Croatia and the completion of motorway construction along this route has been the main strategic goal of Croatia and a top priority in the national motorway network improvement plans. In order to develop a more rapid and efficient construction of the Rijeka to Zagreb motorway, the Croatian government established the company ARZ to be responsible for the operation and maintenance of the existing sections of the motorway as well as development activities (the upgrade to full motorway profile current single lanes road section). The Concession Contract between the Government of the Republic of Croatia (Conceding Authority) and Autocesta Rijeka-Zagreb d.d. (Concessionary) was signed in 998 for 8 years of concession duration. : Tools Updated march 009 7
4 Key dates: The "Rijeka-Zagreb Motorway" public limited company Autocesta Rijeka-Zagreb d.d. (ARZ) was established by Government Resolution on December, 997. The Concession Contract relating to construction and operation of the Zagreb Rijeka motorway (tollgate Orehovica - tollgate Lučko) was concluded in June 998. The building activities to develop the motorway under the concession agreement started in 00 (Phase II) with the upgrade of roughly 70 km to full motorway profile. Phase II of building activities started in 007 to upgrade to full motorway profile km of the existing network. In August 007 the Government decided to extend the concession: > > From Rijeka towards the north until the the Slovenian border (0 km). > > From Rijeka towards the south until the Krk bridge (0 km). Parts of this new section are full motorway profile when other parts gather single road to be upgraded by ARZ to full motorway profile during the concession period. ARZ had to pay for those new highways section a concession fee to the State of EUR 00 M and the concession period was extended from 8 years to years in order to avoid that this asset transfer jeopardizes future ARZ financial situtation. Financing: Phase I > > long-term funding is provided by KfW (EUR 98 M), EBRD (EUR 8 M), EIB (EUR 0 M) and ZAGRABANKA. > > Short-term funding is provided by Barclays, KfW and RijekaBank. > > Guaranty of the state for the long-term funding. Phase II > > EBRD loan (EUR 0 M), EIB (EUR 0 M) and DEXIA (EUR 0 M) to complete the construction upgrading to full motorway profile between Kikovica and Stara Susica. > > KFW loan (EUR 0 M) to finance the equipment and construction of two interchanges. Addendum to the concession contract > > DEXIA loan (EUR 00 M) to pay the extension concession fee. Loan refinancing > > KFW (EUR. M) to refinance the repayment of the ZAGRABANKA/KFW loans. To sum up, the total long-term debt amount to be repaid by ARZ is EUR 9. M. Subsidies: Financial subsidies. Transfer of 7 km of existing highway ( km semi-motorway profile and km full motorway profile). : Tools Updated march 009 8
5 Toll Rate: Toll rates are fixed by the Government. There is no tariff revision formula in the concession contract. The last toll rate increase was in 00. The traffic has been increasing significantly each year since the beginning of the concession (0% between 999 and 00). ARZ project history From 999 to 007: upgrading of the existing 70 km highway to a full motorway. In order to develop a rapid and efficient realization of the Rijeka to Zagreb Motorway, the Rijeka-Zagreb Motorway public limited company (Autocesta Rijeka-Zagreb d.d.) was established by Government Resolution on December, 997. The company is responsible for all the operation and maintenance of the existing sections of the motorway as well as its upgrade to a full motorway profile along its whole network. The company ARZ started its operations in April 998 and in October 998 all activities related to the motorway operations were transferred from the road administration to the state-owned company. The Government granted to the company the concession right over the motorway sections. A concession agreement was signed on June, 998 for a period of a maximum of 8 years. The value of the concession right was made by an independent organization and used as the basis for the registration of the company s capital at the court. The concession value was estimated at Kn, million (EUR 00 millions). In March 00, the Government published the Programme of Construction and Maintenance of Public Roads for the period from 00 to 00. In accordance with this program, it was envisaged that the Rijeka-Zagreb motorway would be completed in the period up to 00, involving the expenditure of Kn.,900 million financed from "own resources and debt". The Rijeka-Zagreb motorway comprised initially a total length of. km which has been constructed in staged development of 0 sections over the past 0 years. THE RIJEKA-ZAGREB MOTORWAY SECTIONS No. Section Length (km) Profile Year of start up. Orehovica - Kikovica 0.0 motorway 97. Karlovac Lučko 8.0 motorway 97. Kikovica - Oštrovica 7. semimotorway 98. Oštrovica - Vrata. semimotorway 99. Vrata - Delnice 8.9 semimotorway 99. Delnice - Kupjak 7.9 semimotorway Vukova Gorica - Karlovac 8.0 motorway Kupjak - Vrbovsko 7.80 motorway & semimotorway Bosiljevo - Vukova Gorica 7.80 motorway Vrbovsko - Bosiljevo.0 motorway & semimotorway 00 Source: ARZ : Tools Updated march 009 9
6 Due to the great illiquidity situation prevailing at that time in Croatia, ARZ had to call upon short-term loans to finance long-term investments. The biggest fund sources were short and medium-term loans from foreign banks: Deutsche Bank, KFW and Barclays Bank. These loans were granted and withdrawn in 999 to finance the construction of the phase of the motorway. In 00, two other loans were concluded, partly to repay the installments of the previous loans, partly for the purpose of construction work on the motorway section from Karlovac to Vukova Gorica. The first loan was a syndicated loan from three local banks and the other one from the Rijeka Bank, one local bank of the syndicate. All the loans were guaranteed by the State of Croatia. In addition to the foreign loans, the Ministry of Finance granted in 999 to ARZ a loan to finance construction work on the motorway in the amount of, million EUR. ARZ has got also several non returnable donations from the State budget amounting to 70 million EUR. So far, the State has met its liabilities in paying the amounts due at the date due. The Rijeka, KFW, the Syndicated loan and the Barclays bank commercial loan have been totally paid off. In 00 and 00, four long-term loans from foreign banks were granted to ARZ to finance the construction of the motorway from the following banks: KFW, ZAGRABANKA, EIB and EBRD, each loan being allocated to specific portions of the motorway related to the construction of the Kupjak-Vrbovsko and Vrbovsko-Bosiljevo sections. The loans are guaranteed by the State of Croatia. The average rates accorded by the banks were between and %. In 007 Phase II, meant to upgrade the semi-motorway Stara Susica-Kikovica to a full motorway ( km), was launched. It will be financed through several new loans (KFW and DEXIA). It is interesting to note that KFW also provided ARZ with another loan to refinance the former KFW and ZABA loans signed to pay the Phase I works. From 007: extension of the road network and the period of the concession. In mid 007 the concession agreement between the State and ARZ was amended. The Government decided to extend the concession: From Rijeka towards the north until the the Slovenian border (0 km) From Rijeka towards the south untill the Krk bridge (0 km) Part of these new sections are full motorway profiles when another part gathers single road to be upgraded by ARZ to full motorway profile during the concession period. ARZ had to pay a concession fee to the State of EUR 00 M for those new highways sections (through a DEXIA new loan), and the concession period was extended from 8 years to years in order to avoid that this asset transfer jeopardize future ARZ financial statements. Toll system evolution The most important source of cost recovery for ARZ comes from the toll collection along A. However, since construction of the motorway began from its end points, Zagreb and Rijeka, it was impossible to consolidate the pay-toll system until the last section of the : Tools Updated march 009 0
7 motorway Vrbovsko-Bosiljevo was completed and the start up effected in June 00. During the period from 999 to 00, on the motorway Rijeka-Zagreb, depending on the degree of completion, whether traffic or pay-toll infrastructure, two pay-toll systems were used: "open" "closed" pay-toll system In an "open" pay-toll system, the toll is collected during the passage of the vehicle at a certain point. The toll is collected for use of the road notwithstanding the number of kilometers passed. In a "closed" pay-toll system the driver, entering the pay-toll system, takes a toll card and returns it at the exit. In such a way the toll for use of the appropriate section is collected per kilometre for a specified amount of money. Period Until June 00: closed with open pay-toll system Until June 00 the pay-toll system for use of semi-motorway was effected by the open system in Lepenica, while the closed pay-toll system was used in Vukova Gorica (Karlovac) Lučko. Period from July 00 to June 00: closed pay-toll system Upon completion of particular sections of semi-motorway together with the pay-toll system, the open pay-toll system in Lepenica was replaced by the closed one. The system started in Lepenica and ended in Vrbovsko. The sections belonging to that system were: Lepenica Vrata Delnice- Ravna Gora Vrbovsko. In that period two independent pay-toll systems existed (Figure ). They were connected by the old road section from Vrbovsko to Vukova Gorica (Bosiljevo ). : Tools Updated march 009
8 Period from July 00: closed pay-toll system After the contruction of the motorway between Vrbovsko and Bosiljevo, the two closed sytems merged in one. From 999 to 00, the number of vehicles along the A motorway has increased by roughly 0%. Road toll revenues have more than doubled over the period due to the traffic increase generated from the opening of new sections in 00, 00 and 00 making the motorway more attractive, the increase in the number of tourists, the growth rate of the GNP, the rise in the number of vehicles bought. : Tools Updated march 009
9 ARZ has no right to increase toll rates which are fixed by the Government. The last increase was in 00 and the toll rate per Km is the following: Source ARZ Category KN/Km EUR /Km Conclusions and lessons learned An efficient PPP scheme for a quick network development: A motorway construction was realized within the time schedules and the estimated cost and ARZ is one example supporting that Croatia has certainly advanced with high speed in the area of PPP ventures, which have driven motorway densities to record levels. Indeed, in Croatia a relatively large number of projects and highway kilometers have been carried out, involving either the modernization of existing highways or the construction of new ones. Despite the challenging construction work, most of the awarded projects were built on time and within budget. Since the Concession contracts have been awarded without tenders the procurement has been speeded up but the transparency of procurement, required by EU directives and IFI rules, may not be fully respected in practice. Financial high risks Due to the large debt amount supported by HAC and the other concession companies it is uncertain whether this strategy is sustainable given its large medium- to long-run fiscal burden. In fact, public debt is not negligible, and international financial institutions have argued strongly in favor of more fiscal discipline, including a cut in expenditure on highways. For instance there are criticisms raised by the European Commission, of the "Croatian model" of motorway financing and development. It is felt in particular that:. borrowing too much for infrastructure may jeopardize the public debt/gdp ratio considered as affordable for sustainable economic growth;. loans received by a fully State owned company, like HAC or ARZ should not be accounted for as off-budgetary borrowings; and. the risk transfer to the state is too high since the Croatian Government has guaranteed the loan received by ARZ and the other concession companies. : Tools Updated march 009
10 A strong traffic increase ARZ and generally speaking the Croatian motorway model success is mainly based on a strong traffic and toll revenues increase. First of all this can be explained because the long Dalmatian sea coast and the several dozen islands in the Adriatic sea located relatively close to Western Europe, well equipped, and offering affordable prices, are primary targets of foreign summer holiday tourists. They represent a huge traffic/revenue generating potential. A long experience with tolls The direct toll collection system has been in existence for many years (toll collection existed in the time of the Yugoslavia) and is well accepted by Croatian and foreign motorists. In contrast with EU new member States as Hungary or Poland, the Croatian motorway network is predominantly tolled, a concept generally well accepted by the public. A strong public involvement The government has maintained a considerable involvement, as witnessed by joint ventures between public entities and private partners or by a fully state owned concession company such as ARZ instead of typical PPP structures under which the public sector procures highway sector services. Some observers have noted that the lack of separation within the public sector (notably between the function of a PPP manager and a shareholder in the concession) can make unclear the responsibilities and interests of the Government. : Tools Updated march 009
Bina Istra Successful execution of the first project bond in the region
Driving the 1 st Project Bond to Success in Eastern Europe Adam Nicolopoulos, Executive Director, Infrastructure Group, UBS Investment Banking Division 3 September 2003 The concept of structuring and placing
PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) PROJECT INFORMATION DOCUMENT (PID)
A Users Guide to Tolling
A Users Guide to Tolling Content: 1. WHAT IS TOLLING AND WHY IS IT IMPORTANT? 2. WHAT ARE THE BENEFITS OF TOLLING? 3. WHAT IS OPEN ROAD TOLLING (ORT)? 4. HOW DOES ORT AND PAYMENT WORK? 5. WHAT ARE THE
Promoting Economic and Social Cohesion in Europe
Promoting Economic and Social Cohesion in Europe The EIB helps to deliver growth, jobs and cohesion in Europe by supporting the implementation of EU regional policy. Through a mixture of loans and advisory
Infrastructure Development Funding and Financing
Infrastructure Development Funding and Financing 09 December 2013 2 Presentation outline 1. Role of infrastructure development 2. Public sector infrastructure investment 3. Funding options i. Recent airport
Investment and Investment Finance in Croatia, how can the EIB contribute? Dario Scannapieco and Debora Revoltella European Investment Bank
Investment and Investment Finance in Croatia, how can the EIB contribute? Dario Scannapieco and Debora Revoltella European Investment Bank 24 March 2014 Outline EU and Croatia key challenges The Investment
Annual Borrowing Plan
20154 Bosnia and Herzegovina Federation of Bosnia and Herzegovina Federal Ministry of Finance Annual Borrowing Plan 2016 January 2016 www.fmf.gov.ba INTRODUCTION In order to increase transparency, fiscal
Deliverable 1 Task Report Case Study: Vienna-Budapest M1/M15 privately financed toll road
Contract No TREN/05/FP6TR/S07.41077/513499 Funding Infrastructure: Guidelines for Europe - FUNDING Instrument: Sixth Framework Programme Thematic Priority: Sustainable Surface Transport Deliverable 1 Task
Hungary. 1. Economic situation
2. COUNTRY NOTES: HUNGARY 125 1. Economic situation has faced considerable challenges to regain fiscal credibility. After almost a decade of persistent, high fiscal deficits and the building up of external
2. Definitions of Terms
PUBLIC DEBT LAW I. GENERAL PROVISIONS 1. Subject of the Law Article 1 This Law regulates conditions, manner and procedure under which the Republic of Serbia (hereinafter referred to as: the Republic) may
Financing PPPs: Project Finance June 2006
Financing PPPs: Project Finance June 2006 Index Section I. Section II. Section III. Project Finance Spanish Market Advantages Risk Matrix P. 2 Section I Project Finance Project Finance Definition Definition:
FREE FLOW TOLLING CASE STUDY M50 BARRIER-FREE TOLLING. Dublin-Ireland
CASE STUDY FREE FLOW TOLLING M50 BARRIER-FREE TOLLING Dublin-Ireland 1.1. THE CHALLENGE The National Roads Authority initiated a major upgrading project of the motorway and junction capacity to address
Main types of PPP. Basic principles
Main types of PPP Although concession s have been used for many centuries, notably in Europe, the first reference to the term Public-Private Partnership dates from the 950s in the United States and was
ASSESSMENT OF THE BILL ON THE 2015 BUDGET OF THE REPUBLIC OF SERBIA. Executive Summary
Republic of Serbia FISCAL COUNCIL ASSESSMENT OF THE BILL ON THE 2015 BUDGET OF THE REPUBLIC OF SERBIA Executive Summary The 2015 Budget Bill envisages a deficit at the central government level in the amount
Thierry Déau is Founder and Chief Executive Officer of Meridiam Infrastructure. This article is based on a keynote speech delivered by the author at
* * Thierry Déau is Founder and Chief Executive Officer of Meridiam Infrastructure. This article is based on a keynote speech delivered by the author at the OECD High-Level Financial Roundtable on Fostering
Greece. 1. Economic situation
2. COUNTRY NOTES: GREECE 119 1. Economic situation The Greek economy is in a recession in the wake of the economic and sovereign debt crisis, exacerbated by the impact that austerity measures are having
Public investment: recording in EDP statistics and treatment under the SGP
Public investment: recording in EDP statistics and treatment under the SGP Lourdes Prado Ureña 1 1 Eurostat, Luxembourg, Luxembourg; [email protected] Abstract This paper provides an overview
Developing a Public-Private Partnership Framework: Policies and PPP Units
Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework
Statistical Review of the Annual Report on the Performance of Maritime Safety Inspection in Croatia
Statistical Review of the Annual Report on the Performance of Maritime Safety Inspection in Croatia Tatjana Stanivuk a, Boris Medić a, Marta Medić b This paper provides a detailed analysis of the annual
The experience of an Export Credit Agency Oesterreichische Kontrollbank, Vienna
12 th Meeting of the OSCE Economic Forum Prague, 31 May 4 June 2004 1 Session B 4 Strengthening service and networking capacity of business organizations EF.DEL/2/04 30 May 2004 ENGLISH only The experience
Environmental Protection and Energy Efficiency Fund in financing EE and RES programs and projects
Republic of Croatia Environmental Protection and Energy Efficiency Fund Environmental Protection and Energy Efficiency Fund in financing EE and RES programs and projects Marija Šćulac Domac Assistant Director
Financial Performance and Financial Statement Projections
Financial Performance and Financial Statement Projections A. Introduction and Approach 1. The Georgian State Electrosystem (GSE), EA of the project, is a 100% state owned Limited Liability Company responsible
7. LAW ON LOCAL SELF-GOVERNMENT FINANCING. Pursuant to Article 88 item 2 of the Constitution of the Republic of Montenegro, I hereby issue the
Pursuant to Article 88 item 2 of the Constitution of the Republic of Montenegro, I hereby issue the Decree Promulgating the Law on Local Self-Government Financing (Official Gazette of the Republic of Montenegro
MOTORWAY TOLL EXPERIENCE IN HUNGARY
MOTORWAY TOLL EXPERIENCE IN HUNGARY Professor András TIMÁR PhD. DSc. Szabolcs NYIRI PhD. Student Budapest University of Technology and Economics ECMT Conference on Road User Charges London, 23 January
TRANSPORT INDUSTRY COUNCIL
TRANSPORT INDUSTRY COUNCIL Rates and Costs Schedule 2015-2016 1 Tonne Van Courier/Messenger RATES AND COSTS SCHEDULE 2015-2016 1 Tonne Van Courier/Messenger 1 Published by Industrial Relations Victoria
Financing the European Mobility Network with the Connecting Europe Facility
Financing the European Mobility Network with the Connecting Europe Facility Stéphane Ouaki, Head of Unit DG MOVE, European Commission Budapest, 22 January 2013 Key elements of the new TEN-T policy Support
Touristic Development Project. Hotel Zlatni Jelen, Rakovica, Republic of Croatia
Touristic Development Project Hotel Zlatni Jelen, Rakovica, Republic of Croatia Introducing Croatia Croatia (EU member) is well known as a touristic country and last couple of years is a hit destinantion,
HIGHLIGHTS FIRST QUARTER 2016
Q1-16 EUROPRIS ASA 2 CONTENTS / HIGHLIGHTS FIRST QUARTER 2016 HIGHLIGHTS FIRST QUARTER 2016 (Figures for the corresponding period of last year in brackets. The figures are unaudited.) Group revenues increased
> Erste Bank Croatia Building a retail bank with 15% market share and a meaningful contributor to group profits
> Erste Bank Croatia Building a retail bank with 15% market share and a meaningful contributor to group profits > 2 nd Capital Markets Day > Budapest > Sava Dalbokov, Member of the EBCR Managing Board
LAW ON PUBLIC DEBT MANAGEMENT
LAW ON PUBLIC DEBT MANAGEMENT THE NATIONAL ASSEMBLY - SOCIALIST REPUBLIC OF VIET NAM Independence Freedom Happiness - No. 29/2009/QH12 Hanoi, June 17, 2009 LAW ON PUBLIC DEBT MANAGEMENT Pursuant to the
Parking Infrastructure Development. in Santariskes Medical Campus (SMC), VILNIUS, LITHUANIA
Parking Infrastructure Development in Santariskes Medical Campus (SMC), VILNIUS, LITHUANIA Santariskes Medical Campus (SMC) main medical campus in lithuania 64 ha 6 public / 2 private medical institutions
THE CONTENT OF PRESENTATION. CETC Rout 65. What does it mean?
THE CONTENT OF PRESENTATION CETC Rout 65. What does it mean? The meaning of acronyms Brief history of the concept What does it mean in the European context? What does it meant for involved countries and
Public Sector and it s Functions. The framework. Why we need public sector? What is the public sector?
Public Sector and it s Functions The framework What is the public sector? Roles of the public sector, and its main functions Distribution of functions Why we need public sector? The market mechanism cannot
Speech at the annual press conference on the 2010 financial year Bonn, February 25, 2011
The spoken word shall prevail Speech at the annual press conference on the 2010 financial year Bonn, February 25, 2011 Timotheus Höttges Chief Financial Officer Deutsche Telekom AG Thank you, René Obermann!
The Economics of Public-Private Partnerships
The Economics of Public-Private Partnerships Teresa Ter-Minassian Director, Fiscal Affairs Department International Monetary Fund OECD Working Party of Senior Budget Officials Symposium on Agencies and
SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1
Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1 1. Sector Performance, Problems, and
Defense Technical Information Center Compilation Part Notice
UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP013438 TITLE: Pharmaceutical Waste Disposal in Croatia DISTRIBUTION: Approved for public release, distribution unlimited This
CONCEPT AND BACKGROUND TO PUBLIC PRIVATE PARTNERSHIP (PPP) / PRIVATE FINANCE INITIATIVE (PFI) UK EXPERIENCE
CONCEPT AND BACKGROUND TO PUBLIC PRIVATE PARTNERSHIP (PPP) / PRIVATE FINANCE INITIATIVE (PFI) UK EXPERIENCE Professor Mustafa Alshawi 11/20/2009 Chairman Iraq Institute for Economic Reforms (IIER) Baghdad,
Good Practice N 04. Cargo Centre Zagreb. Crokombi, 04/2013
Good Practice N 04 Cargo Centre Zagreb Crokombi, 04/2013 Contents Good practice form Introduction (summary) Starting position (gaps and challenges) Concept and components Application cases Conclusions
MEMORANDUM OF UNDERSTANDING THE EUROPEAN COMMISSION, THE EUROPEAN INVESTMENT BANK together with the EUROPEAN INVESTMENT FUND,
MEMORANDUM OF UNDERSTANDING between THE EUROPEAN COMMISSION, THE EUROPEAN INVESTMENT BANK together with the EUROPEAN INVESTMENT FUND, and THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT in respect
Anti-Crisis Stimulus Package for Economic Recovery
Anti-Crisis Stimulus Package for Economic Recovery (Developing Efficient State Debt Management Policy) The project is implemented in the framework of The East-West Management Institute s (EWMI) Policy,
The IMF believes that Latvia will be able to pay back the loan
The IMF believes that Latvia will be able to pay back the loan The International Monetary Fund (IMF) has not started any particular talks with Latvia about the repayment of the international loan, which
LABOUR S PLAN FOR A STRATEGIC INVESTMENT BANK
LABOUR S PLAN FOR A STRATEGIC INVESTMENT BANK Table of Contents Executive Summary...3 Overview...3 Operation...3 Introduction...5 An investment economy...5 The Long-term Case for a Strategic Investment
River Basin Management in Croatia
River Basin Management in Croatia 2. INTERNATIONAL RIVER BASIN MANAGEMENT HIGH LEVEL SYMPOSIUM Cappadocia/NEVŞEHİR, Turkey 16-18 April 2013 2 Water sector responsibilities are shared among: Croatian Parliament
Surface Transport in India
Brochure More information from http://www.researchandmarkets.com/reports/845404/ Surface Transport in India Description: Spending on logistics in India is estimated to be around 13% of GDP, which amounts
Tirana International Airport SHPK Tirana International Airport Nënë Tereza Administration Building, Rinas Tirana, Albania Phone: +355 4 2381 600 Fax:
Tirana International Airport SHPK Tirana International Airport Nënë Tereza Administration Building, Rinas Tirana, Albania Phone: +355 4 2381 600 Fax: +355 4 2381 545 E-Mail: [email protected] Web
Budget 2014 26 February 2014
1 Budget 2014 Budget 2014 26 February 2014 The Minister of Finance, Mr Pravin Gordhan, today announced a revised consolidated net tax revenue estimate for 2014/2015 of R997,7 billion and a slightly reduced
DEVELOPMENT STRATEGY FOR INLAND WATERWAY TRANSPORT IN THE REPUBLIC OF CROATIA (2008-2018)
REPUBLIC OF CROATIA MINISTRY OF THE SEA, TRANSPORT AND INFRASTRUCTURE DEVELOPMENT STRATEGY FOR INLAND WATERWAY TRANSPORT IN THE REPUBLIC OF CROATIA (2008-2018) April, 2008 Contents page 1 Introduction.
LAW OF THE REPUBLIC OF TAJIKISTAN ON LIMITED LIABILITY COMPANIES
LAW OF THE REPUBLIC OF TAJIKISTAN ON LIMITED LIABILITY COMPANIES CHAPTER 1. GENERAL PROVISIONS CHAPTER 2. FOUNDATION OF LIMITED LIABLITY COMPANY CHAPTER 3.AUTHORIZED CAPITAL OF A COMPANY CHAPTER 4. PROPERTY
CROATIAN ASSOCIATION OF COURT EXPERT WITNESSES AND VALUERS WELCOME ADDRESS OF HDSVIP PRESIDENT
. CROATIAN ASSOCIATION OF COURT EXPERT WITNESSES AND VALUERS WELCOME ADDRESS OF HDSVIP PRESIDENT SPRING TEGOVA MEETING BERLIN 2015 mr.sc.,melita Bestvina,d.i.g. stalni sudski vještak za graditeljstvo predsjednica
Railway Reform in Europe: from endangered species to sustainable systems?
Railway Reform in Europe: from endangered species to sustainable systems? International workshop on railway reform Ankara, 8 October 2009 Paul Guitink 09 July 2009 1 Content of this presentation representing
Concessions and PPPs. Brief 18. Public Procurement. August 2011
Brief 18 August 2011 Public Procurement Concessions and PPPs C O N T E N T S What are concessions? Different use of the term concession under national laws Does the Directive apply to concessions? What
COMPARISON OF LITHUANIAN AND BULGARIAN ROAD NETWORK MANAGEMENT PRACTICES UNDER THE WORLD BANK INITIATIVES
The XXVIII International Baltic Road Conference COMPARISON OF LITHUANIAN AND BULGARIAN ROAD NETWORK MANAGEMENT PRACTICES UNDER THE WORLD BANK INITIATIVES Dr Virgaudas Puodziukas Vilnius Gediminas Technical
INTERIM REPORT 1.1.-30.6.2004
INTERIM REPORT 1.1.-30.6.2004 RAUTE OYJ 1 (9) RAUTE OYJ S INTERIM REPORT FOR JANUARY 1 JUNE 30, 2004 Net sales MEUR 41.9 (MEUR 33.0) and operating profit MEUR 4.1 (MEUR -7.4) increased. Net sales of current
Classification and Presentation of Data on Claims and Liabilities
CNB BULLETIN NOTES ON METHODOLOGY 1 Classification and Presentation of Data on Claims and Liabilities The Croatian National Bank has begun to implement the ESA 2010 standard in its statistics, which also
Impact of Public Internal Financial Control on Public Administration in Croatia
Theoretical and Applied Economics Volume XVII (2010), No. 4(545), pp. 71-86. Impact of Public Internal Financial Control on Public Administration in Croatia Vesna VAŠIČEK University of Zagreb [email protected]
Ratios from the Statement of Financial Position
For The Year Ended 31 March 2007 Ratios from the Statement of Financial Position Profitability Ratios Return on Sales Ratio (%) This is the difference between what a business takes in and what it spends
TEN-T guidelines and CEF
TEN-T guidelines and CEF 2e TEN-T CONFERENTIE Duurzame samenwerking in de logistieke sector Nederland Noordrijn-Westfalen Horst Herald Ruijters MOVE B1, 30 October 2014 What is the new trans-european transport
PPP Basics and Principles of a PPP Framework
Note 1 May 2012 PPP Basics and Principles of a PPP Framework This note is the first in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership
Housing finance in Italy
Housing finance in Italy Defining characteristics One of the salient features of the Italian housing market is the high rate of ownership. According to data from the 2001 census, 71% of Italian households
Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives
Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives Timisoara - 13 th of September 2012 1 The European Vision for Railway Transport The European Commission's
Gebze Izmir Motorway & Izmit Bay Crossing Project
Gebze Izmir Motorway & Izmit Bay Crossing Project F.Mehmet Coşan CFO Haluk BÜYÜKBAŞ Secretary General, TCA Gebze Orhangazi Izmir Project is the landmark transaction for the infrastructure sector in Turkey
Get the facts. What every homeowner who is at least 62 years of age should know about reverse mortgage loans
Get the facts What every homeowner who is at least 62 years of age should know about reverse mortgage loans Dino Guadagnino Reverse Area Sales Manager PHL Federal Reserve Meeting December 1, 2010 1 What
Abacus Wodonga Land Fund
Abacus Wodonga Land Fund DISCLOSURE OF INFORMATION The Australian Securities and Investments Commission (ASIC) has developed six benchmarks and eight disclosure principles for unlisted property trusts
Fiscal policy and pension expenditure in Portugal
Fiscal policy and pension expenditure in Portugal Cláudia Rodrigues Braz 1 1. Introduction From the end of the 1990s until 2005 (with a break in 2002), there was a gradual deterioration in the structural
A better way your parents can help you into your first home.
A better way your parents can help you into your first home. exclusively from You ll never need to ask your parents to guarantee your home loan. Almost half of first home owners get financial help from
FINANCIAL PERFORMANCE AND PROJECTIONS
Samarkand Solar Power Project (RRP UZB 45120) FINANCIAL PERFORMANCE AND PROJECTIONS A. Introduction 1. An analysis of the historical financial performance and financial statements projection of the State
PPI 1 in IDA Countries, 2009 to 2014
PPI 1 in IDA Countries, 2009 to 2014 This note is a product of the Public-Private Partnership Group of the World Bank, and the Private Participation in Infrastructure Database (PPI Database), written by
IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE?
IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE? Rita Raudjärv, Ljudmilla Kuskova Energy is a resource without which it is hard to imagine life in today's world. People seem to take it for granted that energy
A Beginner s guide to Bridging Finance
A Beginner s guide to Bridging Finance Tel: 023 8045 6999 bridging-booklet-v4.008022016 Contents Introduction What is a bridging loan? How do bridging loans work? Why are people using them? When would
Economic Planning in China by Gregory C. Chow, Princeton University CEPS Working Paper No. 219 June 2011
Economic Planning in China by Gregory C. Chow, Princeton University CEPS Working Paper No. 219 June 2011 Economic Planning in China Gregory C. Chow This paper provides an up-to-date study of economic planning
UNECE PPP Healthcare Standard
INTERNATIONAL SPECIALIST CENTRE OF EXCELLENCE ON PPPs IN HEALTH MANILA, PHILIPPINES UNECE PPP Healthcare Standard Questions on lessons learned in the development of Public-Private Partnership ( PPP ) programmes
Operating Budget Data
J00A04 Debt Service Requirements Maryland Department of Transportation Operating Budget Data ($ in Thousands) FY 14 FY 15 FY 16 FY 15-16 % Change Actual Working Allowance Change Prior Year Special Fund
Vietnam's Experiences in Strengthening. Procurement and Public Financial Management Systems. in Harmonization, Alignment and Capacity Development
Vietnam's Experiences in Strengthening Procurement and Public Financial Management Systems in Harmonization, Alignment and Capacity Development Mr. Chairman, Ladies and gentlemen, Dr. Duong Duc Ung Director
Risk Management. Risk Identification
Management This part provides guidance on the treatment of risks on a PPP project, and; Identifies the major risks common to many PPP projects across all sectors; Allocates the identified risks between
DEBT FUNDING GUIDELINES FOR LOCAL GOVERNMENT
DEBT FUNDING GUIDELINES FOR LOCAL GOVERNMENT The Context Local government financial statements, like those of other sectors of government and the corporate sector, include many items of considerable financial
Interview Vedrana Jelušić Kašić Director for Croatia European Bank for Reconstruction and Development (EBRD) Croatian Real Estate Newsletter
Croatian Real Estate Newsletter Volume 88, December 2013 TOPIC OF THIS ISSUE: Interview Vedrana Jelušić Kašić Director for Croatia European Bank for Reconstruction and Development (EBRD) So far, EUR 2.7
Alstom Transport supplier of Tram Systems in PPP schemes
Alstom Transport supplier of Tram Systems in PPP schemes Arnaud de Monts 04/04/2014 Various procurement schemes A tramway system can be procured in various schemes, each of them have been experimented
1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3
TABLE OF CONTENTS 1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3 4 DETAILED OVERVIEW OF THE PROGRESS... 4 4.1 Progress on Component 1 -
Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport. Report
Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport Report CENTRAL EUROPE Programme Project CHAMPIONS February 2012 Development of a Concept for the Public
Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas
Transportation Association of Canada Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas The transportation funding and governance frameworks of Canada s metropolitan regions
The Positive Role of Audit in Public Debt Management in China
The Positive Role of Audit in Public Debt Management in China (for the 1 st ASOSAI-EUROSAI Joint Conference) September 2011, Turkey By Dr. DONG Dasheng, the first Deputy Auditor Introduction Since 2008,