1 The Economics of Public-Private Partnerships Teresa Ter-Minassian Director, Fiscal Affairs Department International Monetary Fund OECD Working Party of Senior Budget Officials Symposium on Agencies and Public-Private Partnerships Madrid, July 5-7, 2006
2 Structure of the Presentation Preliminary Considerations Key Features of Successful PPPs Fiscal Risks and Fiscal Accounting 2
3 Preliminary Considerations PPPs: Arrangements where the private sector supplies infrastructure assets and services that traditionally have been provided by the Government. PPP contracts stress long-term service delivery rather than asset creation; services can be provided to the government or directly to final consumers. Country experiences suggest that PPPs are best suited for economic infrastructure, such as highways and ports. However, in some countries (e.g., U.K.) they have also been used successfully for certain social infrastructures, such as hospitals, schools and prisons. 3
4 Preliminary Considerations PPPs offer significant potential benefits: Efficiency from private sector involvement Internalize the benefits from building high quality physical assets Likelihood of better maintenance of assets Contrary to widespread beliefs, financing considerations should not be key. For PPP benefits to be realized, incentives have to be right. Experience shows that institutional and legal factors play an important role in ensuring the success of PPPs. 4
5 Key Features of Successful PPPs 1. An appropriate legal and institutional environment: A clear and sound legal framework establishing the basic requirements for PPPs and mechanisms for dispute resolution and cancellation of contracts. Strong political commitment, good governance, and a well-functioning judicial system (needed to assure investors that contracts will be honored). Appropriate administrative structures within the government, including skilled staff dedicated to overseeing the design and implementation of PPPs. 5
6 Key Features of Successful PPPs 2. Well-Informed Decision Making: Systematic use of sound cost-benefit analysis of proposed projects, to ensure adequate rates of economic and social return. Systematic use of public sector comparators, to inform the choice between PPPs and direct public procurement. 6
7 Key Features of Successful PPPs 3. Clear, unambiguous contracts, to help reduce the risk of lengthy and costly renegotiations. Contracts should define in detail: Features and quality of PPP outputs Allocation of risks Rules for dealing with unforeseen events Step-in rights in the event of default of private partner Conflict resolution mechanisms. 4. Open, competitive, and transparent procedures for bidding and awarding of contracts. 5. A predictable and non-discriminatory regulatory environment. 7
8 Key Features of Successful PPPs 6. Appropriate sharing of risks between the public and the private partners. Basic rule: governments should not go for maximum risk transfer to the private partners; instead, they should shift the risks that the private sector is better equipped to bear. Typically: Construction risk Availability (performance) risk Normal commercial risks Governments should bear political risk and risk related to policy and regulatory uncertainty. Circumstances may advise sharing demand risk; in this case, the government s share must be transparently reflected in the fiscal accounts. Inappropriate sharing of risks reduces value for money for the government. 8
9 Fiscal Risks and Fiscal Accounting Risk-sharing in PPPs will be affected by the institutional setting, sometimes with adverse results. In particular, public accounting rules for PPPs may create incentives that skew the allocation of risks, resulting in an inefficient design of the partnership. Current public accounting rules tend to set up tests for classifying a PPP fully in the public or the private sector. This may create incentives for governments to design PPPs (including risk sharing) so as to move them off their books, even at the cost of reducing value for money. International accounting standards should be developed that reflect transparently in the fiscal accounts the costs and risks entailed by PPPs for the government. 9
10 Fiscal Risks and Fiscal Accounting: Eurostat Eurostat decision of 2004: PPPs should be classified as private investment if the private partner bears most of the construction risk, and of either availability risk or demand risk. General problem: Since the private partner typically bears construction and availability risk, most PPPs are likely to be classified as private investment, even though the government may bear many other risks. Specific problem: these rules are applied in a context where governments are trying to minimize fiscal deficits and debts, to meet SGP targets. Eurostat rules, plus the incentive to show low deficits, may result in: Some projects being done as PPPs just to classify them as private, even though the government may bear sizable risks. Some projects which are well suited for PPPs being designed suboptimally just so they can be classified as private. 10
11 Fiscal Risks and Fiscal Accounting: Eurostat (continued) Implications: Contingent liabilities for the public sector arising from investments that are not on the public sector s books Budgetary rigidities, as future revenues are in fact being pre-committed, without this being evident in the balance sheet Eurostat rules reduce the likelihood that PPPs are carried out for the right reason, i.e., to capture efficiency gains. 11
12 Fiscal Risks and Fiscal Accounting: The IMF Proposed Approach Approach proposed by the IMF aims at mitigating incentive problems and clarifying fiscal implications of PPPs, even when they are classified as private: Emphasis on the comprehensive disclosure of the known and potential future costs of PPPs for the public finances. Incorporation of these costs into medium-term budgetary projections, and into the assessment of medium-term public debt sustainability. 12
13 Fiscal Risks and Fiscal Accounting: Disclosure For each PPP project or group of similar projects, information should be provided in the budget documents on: Future payment obligations of each partner, certain and/or contingent, for the following periods: 1 5 years; 5 10 years; years; over 20 years. Significant terms of the project that may affect the amount, timing, and certainty of future cash flows, valued to the extent feasible. Contract renewal and termination options. Obligations to provide, or rights to expect, provision of services. The nature and extent of rights of each partner to use specified assets. Any arrangements to transfer specified assets at the end of the concession period. 13
14 Fiscal Risks and Fiscal Accounting: Disclosure (continued) Whether the PPP assets are included on the government s balance sheet, and how the project affects the reported fiscal balance and public debt. Whether the PPP assets are included either on the balance sheet of special purpose vehicles, or in the private partner s financial statements. Any preferential financing for PPPs provided through government on-lending or via public financial institutions. Future expected or contingent government revenue, such as lease receipts, revenue or profit-sharing arrangements, or concession fees. Any project financing or off-balance sheet elements involving entities owned or controlled by government. 14
15 Treatment of PPPs in Medium-Term Fiscal and Debt Scenarios Bringing PPPs into medium-term scenarios For PPPs that are classified as private: Future payments by the government under PPP contracts and expected future costs of guarantees should be counted as primary spending in medium and long term fiscal projections The potential costs of the contingent liabilities associated with PPPs should be explored with multiple scenarios and stress tests For PPPs that are classified as public: Register investment as public spending and its financing as public debt upfront Clearly separate the future payments by the government into its economic components. Those for services provided on an ongoing basis as primary spending, Those representing costs of financing as interest, The rest as amortization of the financing implicitly provided by the private partner Work with multiple scenarios. 15
Developing a Public-Private Partnership Framework: Policies and PPP Units
Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework
Public investment: recording in EDP statistics and treatment under the SGP
Public investment: recording in EDP statistics and treatment under the SGP Lourdes Prado Ureña 1 1 Eurostat, Luxembourg, Luxembourg; [email protected] Abstract This paper provides an overview
Lao PDR Public-Private Partnership Policy
Lao PDR Public-Private Partnership Policy Supported by the Asian Development Bank GRANT-0309 LAO Governance and Capacity Development in Public Sector Management Program (Public Private Partnerships) Table
CAPITAL PLANNING GUIDELINES
CAPITAL PLANNING GUIDELINES 1. INTRODUCTION... 2 2. EXTENSION OF EXISTING INFRASTRUCTURE PROJECTS... 2 3. NEW CAPITAL PROJECTS... 2 4. MINIMUM INFORMATION REQUIRED... 3 5. PREPARATORY WORK... 3 5.1 NEEDS
Public Governance of Public-Private Partnerships
Recommendation of the Council on Principles for Public Governance of Public-Private Partnerships May 2012 Cover Photo Credit: Thinkstock/ Connection Recommendation of the Council on Principles for Public
Subnational Borrowing Framework Lili Liu Lead Economist Economic Policy and Debt Department
International Seminar on Building New Countryside and Promoting Balanced Regional Development for a Harmonious Society Haikou, China 2006 年 8 月 21-26 日 Subnational Borrowing Framework Lili Liu Lead Economist
CONTRACT MANAGEMENT FRAMEWORK
CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...
PPP Basics and Principles of a PPP Framework
Note 1 May 2012 PPP Basics and Principles of a PPP Framework This note is the first in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership
FREEDOM INVESTMENTS, INC. STATEMENT OF FINANCIAL CONDITION AS OF JUNE 30, 2015 (UNAUDITED)
FREEDOM INVESTMENTS, INC. STATEMENT OF FINANCIAL CONDITION AS OF JUNE 30, 2015 (UNAUDITED) ****** Index Page(s) Statement of Financial Condition. 2 Notes to Statement of Financial Condition. 3-5 Statement
OECD Best Practices for Budget Transparency
OECD Best Practices for Budget Transparency OECD, 2002. Software: 1987-1996, Acrobat is a trademark of ADOBE. All rights reserved. OECD grants you the right to use one copy of this Program for your personal
INTEGRATION OF THE CHART OF ACCOUNTS AND BUDGET CLASSIFICATION
INTEGRATION OF THE CHART OF ACCOUNTS AND BUDGET CLASSIFICATION While the budget process defines a government s policy priorities, budget execution and accounting seeks to ensure the budget is delivered
In recent years, fiscal policy in China has been prudent. Fiscal deficits
1 Fiscal Policy in China STEVEN DUNAWAY AND ANNALISA FEDELINO* In recent years, fiscal policy in China has been prudent. Fiscal deficits have been lower than budgeted, because revenue overperformances
FINANCIAL REPORTING COUNCIL GOING CONCERN AND LIQUIDITY RISK: GUIDANCE FOR DIRECTORS OF UK COMPANIES 2009
FINANCIAL REPORTING COUNCIL GOING CONCERN AND LIQUIDITY RISK: GUIDANCE FOR DIRECTORS OF UK COMPANIES 2009 THE PRINCIPLES ASSESSING GOING CONCERN 1 Directors should make and document a rigorous assessment
Public-Private Partnerships
Public-Private Partnerships Closing Critical Issues Washington, Background In limited recourse finance, the primary source of debt service is the cash flow generated by the Project will evaluate all factors
Infrastructure Development Funding and Financing
Infrastructure Development Funding and Financing 09 December 2013 2 Presentation outline 1. Role of infrastructure development 2. Public sector infrastructure investment 3. Funding options i. Recent airport
CONCEPT AND BACKGROUND TO PUBLIC PRIVATE PARTNERSHIP (PPP) / PRIVATE FINANCE INITIATIVE (PFI) UK EXPERIENCE
CONCEPT AND BACKGROUND TO PUBLIC PRIVATE PARTNERSHIP (PPP) / PRIVATE FINANCE INITIATIVE (PFI) UK EXPERIENCE Professor Mustafa Alshawi 11/20/2009 Chairman Iraq Institute for Economic Reforms (IIER) Baghdad,
Trends in Institutional Arrangements for Public Debt Management
First Annual Meeting of Latin American and Caribbean Public Debt Management Specialists Rio de Janeiro, March 17-19, 2005 Trends in Institutional Arrangements for Public Debt Management Elizabeth Currie
AFM 391 Case Concepts
AFM 391 Case Concepts a. Why do companies lease assets rather than buy them? 1. 100% financing at fixed rates. Leases are often signed without requiring any money down from the lessee, which helps to conserve
Agreements, bonds and guarantees
Agreements, bonds and guarantees SPV Formation The Special Project Vehicle (SPV) may take a variety of forms, including a corporation, limited liability company, general partnership, limited partnership,
INTRODUCTION TO PUBLIC-PRIVATE PARTNERSHIPS
INTRODUCTION TO PUBLIC-PRIVATE PARTNERSHIPS WITH AVAILABILITY PAYMENTS Dr. Silviu Dochia, Senior Associate Michael Parker, Managing Director SUMMARY Public-private partnerships ( P3s ) can provide the
Capital Works Management Framework
POLICY DOCUMENT Capital Works Management Framework Policy for managing risks in the planning and delivery of Queensland Government building projects Department of Public Works The concept of the asset
Third Party Relationships
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 A B D INTRODUCTION AND PURPOSE Background Yes/No Comments 1. Does the credit union maintain a list of the third party
Dumfries Mutual Insurance Company Financial Statements For the year ended December 31, 2010
Dumfries Mutual Insurance Company Financial Statements For the year ended December 31, 2010 Contents Independent Auditors' Report 2 Financial Statements Balance Sheet 3 Statement of Operations and Unappropriated
6. Financial Model. 6.1. Financial Model Overview. 6.2. Evaluating Project Finance & Delivery Alternatives
Exhibit 6.2 Modeling Approach Multiple Container Volume/ Lease Scenarios Multiple Capital Elements & Operating Strategies Modeling/Analysis Approach 1. Public Financing 2. Hybrid P3 Approaches 3. P3 Concession
Alberta Infrastructure and Transportation. Management Framework:
P3 Public Private Partnerships Alberta Infrastructure and Transportation Management Framework: Assessment Process September 2006 Table of Contents P3Public Private Partnerships Section 1 Introduction...1
The IMF s Fiscal Affairs Department has developed a suite of
IMF Fiscal Assessment Tools The IMF s Fiscal Affairs Department has developed a suite of standardized assessment tools to strengthen the conceptual and analytical basis for fiscal surveillance. These tools
DAVID THOMAS LTD GUIDE TO COMPANY INSOLVENCY
DAVID THOMAS LTD GUIDE TO COMPANY INSOLVENCY Ver 1 Feb 2015 Phone : 09-215-6893 07-576-8832 021-124-6689 Email: [email protected] Introduction Welcome to our guide to liquidations. This guide is
A case study of the Dabhol Power Plant
A case study of the Dabhol Power Plant Agenda 1. The Dabhol Case Case Facts Demand for power in India was set to grow in 1995 Growth of the Indian Power Sector Capacity (MW) 160000 140000 120000 100000
DECLARATION ON STRENGTHENING THE FINANCIAL SYSTEM LONDON SUMMIT, 2 APRIL 2009
DECLARATION ON STRENGTHENING THE FINANCIAL SYSTEM LONDON SUMMIT, 2 APRIL 2009 We, the Leaders of the G20, have taken, and will continue to take, action to strengthen regulation and supervision in line
Strengthening the banking union and the regulatory treatment of banks sovereign exposures Informal ECOFIN, April 22, 2016 Presidency note
Strengthening the banking union and the regulatory treatment of banks sovereign exposures Informal ECOFIN, April 22, 2016 Presidency note Introduction One of the key priorities of the Dutch Presidency
Code of Conduct for Persons Providing Credit Rating Services
Code of Conduct for Persons Providing Credit Rating Services June 2011 Appendix A 1 Table of Contents Introduction 1 Part 1 Quality And Integrity Of The Rating Process 2 Quality of the Rating Process 2
Assurance and accounting A Guide to Financial Instruments for Private
june 2011 www.bdo.ca Assurance and accounting A Guide to Financial Instruments for Private Enterprises and Private Sector t-for-profit Organizations For many entities adopting the Accounting Standards
Greece. 1. Economic situation
2. COUNTRY NOTES: GREECE 119 1. Economic situation The Greek economy is in a recession in the wake of the economic and sovereign debt crisis, exacerbated by the impact that austerity measures are having
NATIONAL FINANCIAL SERVICES LLC STATEMENT OF FINANCIAL CONDITION AS OF DECEMBER 31, 2015 AND REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
STATEMENT OF FINANCIAL CONDITION AS OF DECEMBER 31, 2015 AND REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM Report of Independent Registered Public Accounting Firm To the Board of Directors of
ESCO Financing. State of Israel Ministry of National Infrastructure. Pierre Baillargeon. March 2007 ECONOLER INTERNATIONAL
ESCO Financing State of Israel Ministry of National Infrastructure Pierre Baillargeon March 2007 Agenda Evaluation of the EE market Introduction to the ESCO concept Introduction to performance contracts
University of Washington. Debt Management Policy. Statement of Objectives and Policies. Approved by the Board of Regents, September 19, 2002
University of Washington Debt Management Policy Statement of Objectives and Policies Approved by the Board of Regents, September 19, 2002 Amended July 16, 2004 and May 15, 2008. Overview This statement
Management Discussion and Analysis as of March 31, 2015
THE ATTACHED AUDITED YEAR END FINANCIAL STATEMENTS FORM AN INTEGRAL PART OF THIS MANAGEMENT DISCUSSION AND ANALYSIS AND ARE HEREBY INCLUDED BY REFERENCE Management Discussion and Analysis as of March 31,
Transparency, disclosure and conflicts of interest in the commercial insurance market
Transparency, disclosure and conflicts of interest in the commercial insurance market SECTION 1 INTRODUCTION 1.1 The Financial Services Authority s (FSA) increased emphasis on disclosure, transparency
Statement of Guidance: Outsourcing All Regulated Entities
Statement of Guidance: Outsourcing All Regulated Entities 1. STATEMENT OF OBJECTIVES 1.1. 1.2. 1.3. 1.4. This Statement of Guidance ( Guidance ) is intended to provide guidance to regulated entities on
How To Write An Audit On Jet Airways Training Academy
INDEPENDENT AUDITOR'S REPORT TO THE MEMBERS OF JET AIRWAYS TRAINING ACADEMY PRIVATE LIMITED Report on the Standalone Financial Statements We have audited the accompanying financial statements of JET AIRWAYS
UNECE PPP Healthcare Standard
INTERNATIONAL SPECIALIST CENTRE OF EXCELLENCE ON PPPs IN HEALTH MANILA, PHILIPPINES UNECE PPP Healthcare Standard Questions on lessons learned in the development of Public-Private Partnership ( PPP ) programmes
2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines
2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines Introduction The guidelines below provide departments and entities with information to make budget submissions for capital projects
INTERNATIONAL STANDARD ON AUDITING 570 GOING CONCERN CONTENTS
INTERNATIONAL STANDARD ON AUDITING 570 GOING CONCERN (Effective for audits of financial statements for periods ending on or after December 31, 2000, but contains conforming amendments that become effective
Part One: Introduction to Partnerships Victoria contract management... 1
June 2003 The diverse nature of Partnerships Victoria projects requires a diverse range of contract management strategies to manage a wide variety of risks that differ in likelihood and severity from one
Advisory Guidelines of the Financial Supervisory Authority. Requirements regarding the arrangement of operational risk management
Advisory Guidelines of the Financial Supervisory Authority Requirements regarding the arrangement of operational risk management These Advisory Guidelines have established by resolution no. 63 of the Management
IAS - 17. Leases. By: http://www.worldgaapinfo.com
IAS - 17 Leases International Accounting Standard No 17 (IAS 17) Leases This revised standard replaces IAS 17 (revised 1997) Leases, and will apply for annual periods beginning on or after January 1, 2005.
INTERNATIONAL STANDARD ON REVIEW ENGAGEMENTS 2410 REVIEW OF INTERIM FINANCIAL INFORMATION PERFORMED BY THE INDEPENDENT AUDITOR OF THE ENTITY CONTENTS
INTERNATIONAL STANDARD ON ENGAGEMENTS 2410 OF INTERIM FINANCIAL INFORMATION PERFORMED BY THE INDEPENDENT AUDITOR OF THE ENTITY (Effective for reviews of interim financial information for periods beginning
[ 2 ] Basic Securitization Structure. [ 1 ] Securitization and Monetization. Ⅰ Basic Structure of Real Estate Securitization. Structured finance
Ⅰ Basic Structure of Real Estate Securitization [ 1 ] Securitization and Monetization Asset securitization is where a financial institution or other business that owns assets places those assets in a structure
INTERNATIONAL MONETARY FUND. Manual on Fiscal Transparency (2007) Abbreviations and Acronyms...3
INTERNATIONAL MONETARY FUND Manual on Fiscal Transparency (2007) Contents Page Abbreviations and Acronyms...3 Revised Code of Good Practices on Fiscal Transparency (2007)...4 Overview...8 I. Clarity of
LEASE ACCOUNTING FOR STATE & LOCAL GOVERNMENTS
LEASE ACCOUNTING FOR STATE & LOCAL GOVERNMENTS April 7, 2015 Overview of GASB s Reexamination of Lease Accounting Guidance Andy Richards, CPA Partner [email protected] 1 TO RECEIVE CPE CREDIT Participate
IAS 1 Presentation of Financial Statements current/non-current classification of debt
IFRS Interpretations Committee Meeting Staff Paper Agenda reference 11 Date November 2010 Project Topic New items for initial consideration IAS 1 Presentation of Financial Statements current/non-current
Financial Stability Forum Recommends Actions to Enhance Market and Institutional Resilience
FINANCIAL STABILITY FORUM Press release Press enquiries: Washington +41 76 350 8430 Basel +41 76 350 8421 [email protected] Ref no: 7/2008E Financial Stability Forum Recommends Actions to Enhance Market
ICAAP Required Capital Assessment, Quantification & Allocation. Anand Borawake, VP, Risk Management, TD Bank [email protected]
ICAAP Required Capital Assessment, Quantification & Allocation Anand Borawake, VP, Risk Management, TD Bank [email protected] Table of Contents Key Takeaways - Value Add from the ICAAP The 3 Pillars
Development of Money Markets
Development of Money Markets Mats Filipsson International Monetary Fund Monetary and Exchange Affairs Department Workshop on Developing Government Bond Markets in APEC Economies Shanghai, November 12 15,
JER INVESTORS TRUST INC. PROVIDES COMPANY UPDATE AND 2009 ANNUAL STATEMENT OF AFFAIRS
JER INVESTORS TRUST INC. PROVIDES COMPANY UPDATE AND ANNUAL STATEMENT OF AFFAIRS McLean, VA June 4, 2010: JER Investors Trust Inc. (Pink Sheets: JERT.PK, JERT or the Company ) released its annual Statement
NEED TO KNOW. IFRS 9 Financial Instruments Impairment of Financial Assets
NEED TO KNOW IFRS 9 Financial Instruments Impairment of Financial Assets 2 IFRS 9 FINANCIAL INSTRUMENTS IMPAIRMENT OF FINANCIAL ASSETS IFRS 9 FINANCIAL INSTRUMENTS IMPAIRMENT OF FINANCIAL ASSETS 3 TABLE
Financial Statements December 31, 2014 and 2013 Josephine Commons, LLC
Financial Statements Josephine Commons, LLC www.eidebailly.com Table of Contents Independent Auditor s Report... 1 Financial Statements Balance Sheets... 3 Statements of Operations and Members Equity...
IOPS GOOD PRACTICES IN RISK MANAGEMENT OF ALTERNATIVE INVESTMENTS BY PENSION FUNDS
. IOPS GOOD PRACTICES IN RISK MANAGEMENT OF ALTERNATIVE INVESTMENTS BY PENSION FUNDS June 2010 1 GOOD PRACTICES IN RISK MANAGEMENT OF ALTERNATIVE INVESTMENTS BY PENSION FUNDS 1 Introduction 1. The objective
NOVEMBER 2010 (REVISED)
CENTRAL BANK OF CYPRUS BANKING SUPERVISION AND REGULATION DIVISION DIRECTIVE TO BANKS ON THE COMPUTATION OF PRUDENTIAL LIQUIDITY IN ALL CURRENCIES NOVEMBER 2010 (REVISED) DIRECTIVE TO BANKS ON THE COMPUTATION
Insurance Guidance Note No. 14 System of Governance - Insurance Transition to Governance Requirements established under the Solvency II Directive
Insurance Guidance Note No. 14 Transition to Governance Requirements established under the Solvency II Directive Date of Paper : 31 December 2013 Version Number : V1.00 Table of Contents General governance
Insurance Contracts Project Update
International Financial Reporting Standards Insurance Contracts Project Update March 2015 The views expressed in this presentation are those of the presenter, not necessarily those of the IASB or IFRS
Accounting developments
Flash Accounting developments New standards for business combinations and non-controlling interests In January 2009, the Accounting Standards Board (AcSB) of the Canadian Institute of Chartered Accountants
PSAB AT A GLANCE Section PS 1201 Financial Statement Presentation
PSAB AT A GLANCE Section PS 1201 Financial Statement Presentation November 2015 Section PS 1201 - Financial Statement Presentation GENERAL REPORTING PRINCIPLES Effective Date This Section applies in the
Credit Card Agreement Visa Platinum Rewards
Credit Card Agreement Visa Platinum Rewards Part I: Interest Rates and Interest Charges Visa Platinum Annual Percentage Rate (APR) for Purchases 8.25% to 13.25% This APR will vary with the market based
New Brunswick Electricity Business Rules
New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and
CODE OF CONDUCT FUNDAMENTALS FOR CREDIT RATING AGENCIES
CODE OF CONDUCT FUNDAMENTALS FOR CREDIT RATING AGENCIES A CONSULTATION REPORT OF THE CHAIRMEN S TASK FORCE OF THE TECHNICAL COMMITTEE OF THE INTERNATIONAL ORGANIZATION OF SECURITIES COMMISSIONS OCTOBER
PPP Models. Ownership of capital assets Responsibility for investment Assumption of risks, and Duration of contract.
PPP Models The PPP models vary from short-term simple management contracts (with or without investment requirements) to long-term and very complex BOT form, to divestiture. These models vary mainly by:
PUBLIC PRIVATE PARTNERSHIP HANDBOOK
PUBLIC PRIVATE PARTNERSHIP HANDBOOK VERSION 2 March 2012 1 CONTENTS Section 1: Introduction to Public Private Partnerships... 3 1.1 What is Public Private Partnership?... 4 1.2 Typical PPP Delivery Models...
MANAGEMENT S DISCUSSION AND ANALYSIS U308 CORP. (A DEVELOPMENT STAGE COMPANY) THREE AND SIX MONTHS ENDED JUNE 30, 2007 (UNAUDITED)
MANAGEMENT S DISCUSSION AND ANALYSIS U308 CORP. THREE AND SIX MONTHS ENDED JUNE 30, 2007 (UNAUDITED) Prepared by: U3O8 Corp. 69 Yonge St. Suite 310 Toronto ON M5E 1K3 www.u3o8corp.com Table of Contents
Republic of the Union of Myanmar: Support for Strengthening Public Debt Management
Technical Assistance Report Project Number: 47225 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Union of Myanmar: Support for Strengthening Public Debt Management The views
HIGHWOOD GOLF AND COUNTRY CLUB. FINANCIAL STATEMENTS Year Ended October 31, 2010
FINANCIAL STATEMENTS Index to Financial Statements AUDITORS' REPORT 1 Page FINANCIAL STATEMENTS Balance Sheet 2 Statement of Loss and Deficit 3 Statement of Cash Flows 4 Notes to Financial Statements 5-10
Case Western Reserve University Consolidated Financial Statements for the Year Ending June 30, 2001
Contents Report of Independent Accountants 1 Part 1 Consolidated Financial Statements Consolidated Balance Sheet 2 Consolidated Statement of Activities 3 Consolidated Statement of Cash Flows 4 Part 2 Summary
Concessions and PPPs. Brief 18. Public Procurement. August 2011
Brief 18 August 2011 Public Procurement Concessions and PPPs C O N T E N T S What are concessions? Different use of the term concession under national laws Does the Directive apply to concessions? What
Non-consolidated financial statements. Harbourside Commercial Park Inc. March 31, 2012
Non-consolidated financial statements Harbourside Commercial Park Inc. March 31, 2012 Contents Page Independent auditors report 1-2 Non-consolidated statement of financial position 3 Non-consolidated statement
STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION. BALANCE SHEET As of
STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BALANCE SHEET As of ASSETS CURRENT ASSETS Cash and Cash Equivalents Cash - Restricted Accounts Receivable - Trade Accounts Receivable
International Monetary Fund Washington, D.C.
2006 International Monetary Fund February 2006 IMF Country Report No. 06/64 Italy: Report on the Observance of Standards and Codes Fiscal Transparency Module Update This update to the Report on the Observance
Financing PPPs with project bonds
European PPP Expertise Centre European PPP Expertise Centre European PPP Expertise Centre European PPP Expertise Centre European PPP Expertise Centre Financing PPPs with project bonds Issues for public
SECTOR ASSESSMENT (SUMMARY): FINANCE 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 2015 SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The finance sector in Bangladesh is diverse,
For the Period: Calendar Year 2015 Compliance Calendar Year 2016 Compliance
Request For Proposals To Provide NEPOOL-GIS Certificates in Compliance With The Massachusetts Renewable Energy and Alternative Energy Portfolio Standards For the Period: Calendar Year 2015 Compliance Calendar
Preparing Agricultural Financial Statements
Preparing Agricultural Financial Statements Thoroughly understanding your business financial performance is critical for success in today s increasingly competitive agricultural environment. Accurate records
Types of Leases. Lease Financing
Lease Financing Types of leases Tax treatment of leases Effects on financial statements Lessee s analysis Lessor s analysis Other issues in lease analysis Who are the two parties to a lease transaction?
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 5 Initiating and Planning Systems Development Projects Multiple Choice Questions 1. As a rule of thumb estimate, what percentage of the entire development effort should be devoted to the project
PUBLIC-PRIVATE PARTNERSHIP IN INFRASTRUCTURE
A GUIDEBOOK ON PUBLIC-PRIVATE PARTNERSHIP IN INFRASTRUCTURE ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC This Guidebook was developed by Mr. Abdul Quium of the Transport Division of ESCAP. Its
PROJECT FINANCE & PPPs
PROJECT FINANCE & PPPs EIB Presentation, BOAD, 40 th Anniversary 1 14 November 2013 Definition of PPPs 1) An agreement between a government and one or more private partners whereby the private partner(s)
Risk Management. Risk Identification
Management This part provides guidance on the treatment of risks on a PPP project, and; Identifies the major risks common to many PPP projects across all sectors; Allocates the identified risks between
Comparison of Design Bid Build and Design Build Finance Operate Maintain Project Delivery
Comparison of Design Bid Build and Design Build Finance Operate Maintain Project Delivery By Bob Prieto Design Bid Build (DBB) and Design Build Finance Operate Maintain (DBFOM) project delivery differ
Criteria and Risk-Management Standards for Prominent Payment Systems
Criteria and Risk-Management Standards for Prominent Payment Systems Designation Criteria for Prominent Payment Systems The Bank of Canada has established five high-level criteria to help identify prominent