Robert B. Bittner, P.E., President, Ben C. Gerwick, Inc. San Francisco, CA, USA
|
|
|
- Marjory Newton
- 9 years ago
- Views:
Transcription
1 FLOAT-IN COFFERDAMS Robert B. Bittner, P.E., President, Ben C. Gerwick, Inc. San Francisco, CA, USA Large diameter piles (2 to 3-m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned off the bottom but usually still below water. Conventional cofferdams as shown in Figure 1 below are not suited to this type of pile cap. However, float-in cofferdams offer a viable alternative. This paper describes the float-in cofferdam system, its initial development for use on the Bath-Woolwich Bridge in Maine and its most recent application on the new Carquinez Bridge in California. Introduction Cofferdams are temporary structures used in the construction of bridge piers and other marine structures. Their primary purpose is to hold out water and unstable soil from the construction area, and thereby, allow in-the-dry construction of the permanent structure below the water line and quite often below the mud line. Typically, cofferdams consist of long interlocking steel sheet piles driven through water into the bottom of the waterway. The sheet piles form temporary exterior walls which are typically braced internally with wales and struts. The bottom of the cofferdam is typically sealed with tremie concrete or an impervious clay layer if one exists. This type of cofferdam is typically used for structures positioned at or below the mud line. of smaller piles. These larger piles with their higher stiffness make it possible from a design standpoint to position the pile cap at any point in the water column rather than at or below the midline as required with the use of smaller piles. In most cases, the pile-top structures are not positioned completely out of the water because of aesthetics and concern with splash-zone corrosion at the pile to pile cap connection. Therefore, the bottom of the pile cap is typically located at least a meter below low water line. For this type of off-the-bottom pile top structure, conventional bottom founded cofferdams may not be the best solutions. The cost of the cofferdam can represent a significant percentage of the total cost for constructing the underwater structure. At extreme depths, the cost of the cofferdam can exceed the cost of structure being built in the cofferdam. In addition, there are practical limits to the depth to which conventional cofferdams can be used. As an example, sheet piles over 100-ft in length are extremely difficult to transport and handle during installation. However, designers of marine structures are tending to use larger and larger diameter piles, both drilled shafts and driven piles. Designers are finding that piles in the range of 2 to 3-m diameter are more efficient than a high number Fig. 1 Conventional braced cofferdam 1
2 Float-In Cofferdam Concept The float-in cofferdam concept has been developed to specifically address the construction requirements for pile-top marine structures positioned below water but up off the bottom of the waterway. This concept is perhaps best described by its sequence of construction (See Figs. 2 through 8 for a plan view of a typical float-in cofferdam and construction sequence): 1. Piles or drilled shaft casings are installed through the water. Following completion of the pile installation, they are cut off underwater. 2. Concurrent with pile installation, a thin shell of the structure is pre-fabricated at an off-site location. This thin shell (and follower cofferdam if needed) is referred to as the float-in cofferdam. 3. Following completion of fabrication, the float-in cofferdam is launched and towed to the installation site. 4. Once at site, the float-in cofferdam is lowered down on to the pre-installed piles. 5. A seal is then formed between the piles and the bottom of the float-in cofferdam, and grout (or tremie concrete) is placed to lock the float-in cofferdam to the piles. 6. The float-in cofferdam is then dewatered. 7. All remaining work is then completed inthe-dry similar to a conventional cofferdam. This includes completion of reinforcement and concrete placement in the piles or drilled shafts, and placing reinforcement and concrete for the cap and pier shaft. 8. After completion of the shaft, if a follower cofferdam was used, the cofferdam area is re-flooded and the follower cofferdam is removed for re-use on the next pier. efficient lengths that standard sheet piles can be rolled, shipped and handled at the site. It offers the potential advantage of a reduced construction schedule by allowing the pile installation work to commence immediately rather than wait until the cofferdam has been designed, sheet piles ordered, bracing frames fabricated and cofferdams installed. This is a significant time advantage in that pile installation work is typically on the critical path and is the most common cause of delay on a marine construction project. Time is of course required to design, build and launch the float-in cofferdam. But all of this work can be performed concurrent with the pile installation work. This cofferdam method can offer significant cost savings by: 1) eliminating or reducing the length of sheet piles, 2) eliminating the conventional tremie seal that is used to resist hydrostatic uplift, The float-in cofferdam method of underwater construction offers the following significant advantages over conventional cofferdams: It can be used in essentially any water depth where the unsupported permanent foundation piles can serve their intended function. This is in comparison to conventional bottom-founded sheet pile cofferdam systems that are limited by the Fig. 2 Plan at top of precast pile shell 2
3 Fig. 4 Stage 2 Launch and position float-in cofferdam Fig. 6 Stage 4 Dewater cofferdam and construct pile cap Fig. 3 Stage 1 Pile installation andrkcut is off Fig. 5 Fig. 7 Stage 3 Land cofferdam, seal pile connection and place tremie concrete Stage 5 Construct pier shaft 3 Fig. 8 Stage 6 Strip follower
4 3) allowing the pile cap fabrication operation to be performed more efficiently at a centrally located fabrication site on shore or at dock side rather than at multiple in-water cofferdam locations, and 4) allowing for more competitive pricing for material and labor by enlarging the geographical area over which the shells can be fabricated. These cost savings are offset to some degree by the cost of the offsite fabrication and launch facility, however these are usually less than the cost associated with the savings listed above. It can reduce construction risk by minimizing the amount of time that the work is exposed to severe whether and fluctuating water levels. In addition, the critical operations such as float-in, positioning and landing can be timed to fit optimum weather and water level conditions. It can provided higher quality for the underwater concrete by allowing the exterior of the pile cap to be precast on shore in ideal conditions under tighter quality control. From a design point, this system allows elimination of the conventional tremie concrete seal. This reduces dead weight of the structure, and in areas of seismic risk, significantly reduces seismic loadings as well. Float-In Cofferdam Features The float-in cofferdam concept has the following typical features: Off-site prefabrication A thin steel or concrete shell which forms the exterior of the pile cap is pre-fabricated in a dry dock or on the deck of a barge with the barge positioned at dock side to allow construction support from a shore based crane. (See Figs. 2 and 4 for details of the float-in pile-cap shell used on the Bath-Woolwich Bridge.) This offsite fabrication is typically performed at a central location that allows an efficient flow of materials and effective monitoring for quality control. If the construction site is affected by severe weather conditions, it may be preferable to locate the fabrication facility indoors where higher labor efficiency can be obtained. Additionally, selection of the fabrication site should take into consideration the method of launching. (See launch method below for specific details.) Temporary bulkheads Temporary bulkheads are typically steel ribbed elements used to close off openings in the shell structure, making the shell water tight and allowing it to float after launch. These bulkheads are typically salvaged and re-used on following caps. The bulkheads are typically bolted in place and use compressible neoprene or rubber seals at the mating surfaces to maintain water tightness. (See Figs. 23 and 24 for a view of the temporary bulkheads used on the Carquinez Bridge float-in cofferdams.) Pile-top bulkheads Pile-top bulkheads can be classified as a special type of temporary bulkhead. They are inverted open-bottomed cans that are centered directly over the top of the circular openings in the bottom of the pre-fabricated shells. They allow the foundation piles to penetrate up into the interior of the shell while maintaining the watertight integrity of the float-in cofferdam. (See Figs. 10 and 22 for examples of pile-top bulkheads used on the Bath-Woolwich and Carquinez bridges respectively.) These blockouts are of course watertight except for the open bottom and can act as individual ballast compartments if compressed air hoses are attached to each compartment. By regulating the air pressure in each pile-top blockout, it is possible to level or trim the float-in cofferdam during launch and transport. (See Fig. 12 for a view of the air piping used on the Bath-Woolwich Bridge.) Follower steel cofferdams Follower cofferdams are required for pile-top structures that are positioned completely under water. Follower cofferdams extend the height of the prefabricated shell walls sufficiently to allow the pile cap to be lowered to final grade without allowing water to overtop the cofferdam. These are typically stripped at completion of the pier and re-used on following piers. (See Figs. 14, 15 and 18 for pictures of the follower cofferdam used on the Bath-Woolwich Bridge.) These follower cofferdams are very similar to conventional sheet pile cofferdams. They have the same 4
5 type of internal bracing consisting of steel wale frames and struts. The walls of the follower cofferdams can be steel ribbed panels, corrugated panels or even conventional steel sheet piles. All three types typically terminate in a flat bottom plate that bolts directly to the top of the pile-cap shell structure. Concurrent foundation and pile-cap shell construction The float-in cofferdam method of construction allows installation of foundation piles to run concurrently with fabrication of the pile-cap shell. This feature allows for a shorter construction schedule compared to conventional pier construction. Temporary pile-top cofferdams for underwater cut off of piles In order to float-in over the pre-installed piles, it is necessary to cut the permanent piles off to grade under water. This can be performed with divers, however it is expensive and risky to do so. It is preferable to cut the piles off in-the-dry using a temporary cofferdam that slips down around the permanent pile and seals to the side of the pile, thus allowing the annulus between the outer cofferdam and the exterior wall of the pile to be dewatered. Once the interior of the pile and the annulus have been dewatered above the cut off point, a worker is lowered into the interior of the pile, and the pile is cut off to precise grade. An alternate method which can be used when the drill casings are torqued into position is to use drilled shaft casings that have a reverse torque disconnect built into the wall of the casing. The disconnect point is pre-determined at each pile location, and each casings is fabricated with a disconnect at a pre-planned location. This method was used on the drilled shafts for the Bath- Woolwich Bridge. Cofferdam launch method There are many different potential ways to launch the float-in cofferdams. The launch method is usually tied to the method and location of the shell fabrication or casting. If the shell is fabricated in a dry dock, launching is performed by flooding the dry dock and exiting through a removable gate at the entrance to the dry dock. If the shell is cast on the deck of a flat-deck barge, it is typically launched by ballasting the barge out from under the shell and allowing the shell to float free. If this method is used, special consideration needs to be given to maintaining stability of the barge during all ballasting operation. The stability analysis for the launch operations should be performed and monitored by an engineer experienced at performing stability calculations or by a naval architect. The stability can be controlled by setting one end of the barge down on a pre-leveled bottom, or by attaching wing-tanks to the barge in order to provide sufficient water plane during all stages of launch. If the shell is light enough and heavy lift equipment is available, the shell can be lifted off and set in the water. (For an example of this method, see Fig. 11 for a photo of the float-in pile-cap shell being lifted off the deck of the casting barge at the Bath Ship Yard. If launch ways are available close to the installation site, they cap provide an alternate launch method. Method of transport Tugs are typically used to assist the floating cofferdams during their transit to the installation site. Positioning and guidance system Positioning and guidance systems are needed during the mating of the float-in cofferdam to the pre-installed foundation piles. These are particularly important when the tops of the foundation piles are several meters below water and out of site. These systems include mooring lines, anchors, and tapered guide structures to direct the cofferdam onto the permanent support piles. Temporary ballast system In order to sink the prefabricated pile-cap shell down to the cut-off piles, it is necessary to partially flood the cofferdam. During the sinking operation the cofferdam should be maintained relatively level. This requires an ability to add water to different areas of the pile-cap shell. The ballast system performs this function. Temporary support system In order to land the float-in cofferdam on the cut- off piles, a means of load transfer must be developed to carry the partial dead weight of the cofferdam. The required capacity for the system is relatively low and is only temporary until it is replaced by the tremie or grout closure pour. (See Figs. 19 and 20 for details of the temporary support beam, 5
6 shown in yellow, used as the temporary landing support on the Carquinez Bridge.) Bottom sealing system After landing of the float-in cofferdam, the foundation piles typically penetrate up into the bottom of the pre-fabricated pile- cap shell, and a grout or concrete placement is made in the bottom of the shell to lock the shell to the foundation piles. In order to place the grout or tremie concrete, it is first necessary to seal the bottom of the annulus between the outside wall of the pile and the hole in the bottom of the pre-fabricated shell. This seal does not have to resist the total hydrostatic head at that point but only the buoyant head of a few feet of the grout or tremie concrete. (See Fig. 20 for details of the temporary sealing system used on the Carquinez Bridge.) Grout or tremie closure The grout or tremie concrete placement is the primary sealing system to allow dewatering of the float-in cofferdam. It is also the primary load transfer element to resist the uplift buoyancy of the cofferdam after the cofferdam is dewatered and to support any net downward load immediately after placement of the first lift of concrete in the pile-cap shell. (See Fig. 5 for a schematic of the tremie concrete closure that was used on the Bath-Woolwich Bridge float-in cofferdams.) Specific Considerations In The Design Of Float-In Cofferdams Tolerances The float-in cofferdam method requires the mating of the float-in cofferdam to the top of the pre-installed piles. In order for this mating to succeed without punching a hole in the bottom of the float-in cofferdam, it is essential that the pile be properly located within a specified tolerance. Piles installed from floating equipment on anchor lines or spuds can typically meet installation tolerances of +/- 15 cm horizontally at the surface of the water and 1% in verticality. Piles installed through a bottom founded template can be installed to a tolerance of typically 6 cm at the surface of the water and 0.5% verticality. These tolerances need to be taken into account when designing the net clearance of the openings in the bottom of the float-in cofferdam relative to outside diameter of the pile. These clearances need to be large enough to take into account possible misalignment of the piles while maintaining the structural integrity of the bottom slab and providing a void space that can be effectively sealed off for grouting or tremie placement. The cut-off tolerance of the piles under water using a pile top cofferdam for access is typically about +/- 3mm. This tolerance may be necessary if the support bearing on landing is directly onto the pile cut-off surface. However an alternate way of leveling the float-in cofferdams after landing is to use flat-jacks attached at the bearing points in the float-in cofferdam. These jacks should be plumbed together to allow a three point landing system. Water Tightness During launch, transport and positioning of the pile-top cofferdams it is essential that the inflow of water into the cofferdam be controlled at all times. The joints between the float-in pile top structure and water tight bulkheads, follower cofferdam and pile top blockouts are all typically fitted with strips of compressible neoprene or rubber. These continuous strips are typically 5 to 8 cm wide and 1 cm thick. The durometer of the seal should be approximately 40 to 60. Compression of the sealing strip is provided by bolts on a typically about 30 cm. The strips should be positioned to compress with application of increased bolt tension and increased hydrostatic load on the outside of the cofferdam. If conventional steel sheet piles are used for the follower cofferdam, the interlocks should be treated with hydrophilic strips prior to attachment to the float-in cofferdam. If ballasting operations during sit-down operations require internal bulkheads to maintain stability, the water tightness of these bulkheads is essential and should be treated with the same level of importance as exterior bulkheads. Leaking interior bulkheads can cause loss of stability during ballasting operations and result in loss of the floating pilecap shell. Draft Limitations There may be several factors that will limit the allowable draft of the float-in cofferdam at launch. These may include the depth of dry dock where the float-in cofferdam is being fabricated, the depth of the navigation channel leading to the installation site 6
7 and finally, the cut-off elevation of the foundation piles at the installation site. If excessive draft is a problem, there are several potential ways of minimizing the draft: Decrease the thickness of the concrete walls and bottom slab. Use lightweight or semi-lightweight concrete for the shell. Blow all water out of the open-bottom pile top bulkheads. Attach supplemental buoyancy tanks. Floating Stability A floating stability check should be performed for all stages of launch, transport, positioning and landing of the float-in cofferdam. This is performed using standard naval architecture principles for calculation of meta-centric height and reserve stability. These calculations may show that a float-in cofferdam is unstable during the set-down or landing operation when water is pumped into the cofferdam in order to increase draft. This typically occurs when water is allowed to freely flow from one side of the cofferdam to another. This sloshing can create an unstable situation and is referred to as excessive free-surface effect. The standard way of reducing the freesurface effect is to partition the interior of the cofferdam with watertight bulkheads. If interior bulkheads are necessary their water tightness is critical to the stability of the cofferdam and tests should be conducted on their watertightness prior to launch of the float-in cofferdam. Installation Stresses The float-in cofferdam should be designed for all stages of launch, transport, positioning and landing as well as buoyancy forces and full hydrostatic forces that develop when the cofferdam is sealed off and dewatered. In a typical installation sequence for a float-in cofferdam, the vertical loading on the temporary support system will reverse during the course of construction. Upon landing on the foundation piles, the support system must support the partial dead weight of the float-in cofferdam. Once the grout or tremie concrete seal has been placed, cured and the interior of the cofferdam dewatered, the support system must then be able to resist the full upward buoyancy force of the float-in cofferdam. During placement of the first lift of footing concrete, the support system must resist the net difference between the buoyancy and the dead weight of the first lift. Examples Bath-Woolwich Bridge Ben C. Gerwick, Inc. (BCG) of San Francisco working for Flatiron Structures Company of Longmont, Colorado designed the floating cofferdam system used on the Bath-Woolwich Bridge across the Kennebec River at Bath, Maine. The Maine Department of Transportation awarded the design-construct contract for the 1,000m long four lane bridge to Flatiron Structures Company (FSC) and Figg Engineers in August of 1997, and shortly thereafter, FSC contracted with BCG to design a cofferdam system for the six main river piers. Figg s design for the six main river piers called for two size footings: 10.9m by 9.9m by 3.6m deep supported by four 2.44m diameter steel cylinder piles socketed into rock and 9.6m by 9.6m by 3.6m deep supported by three piles of the same size. The typical footings had a 2.7m deep tremie seal and was located in 13m of water with the top of the footing about 1.4m below mean tide. This cap design significantly reduced the water depth at which the footing were to be constructed, however, it created the problem of how to construct an underwater footing suspended 6m above the river bottom. In order to address this problem and reduce the amount of work in the river, BCG proposed the use of a floating cofferdam system (See plan view in Fig. 2 and sequence of construction shown in Figs. 3 through 8): Pre-install the drilled shafts using a two stage template. Construct a precast pile-cap shell on shore and attach a reusable temporary steel follower cofferdam. Launch the cofferdam and tow it to the bridge site. Position the cofferdam over the drilled shafts and fix it in position with four spud piles. Lower the cofferdam down over the preinstalled drilled shafts with jacks located on top of the spud piles. Lock the pile-cap shell to the drilled shafts by placing a 1.3m deep tremie seal. 7
8 Dewater the cofferdam and complete the pile cap and pier shaft in the dry. Flood and remove the follower cofferdam for reuse on the next pier. The floating cofferdam system and the above sequence substantially reduced in-water work and improved quality control by transferring the work to an offsite dock location. The system also saved 4 months in the construction of the foundations by allowing the drilled shaft installation to start immediately after contract award and to proceed concurrently with fabrication of the floating cofferdams. The final design for the precast pile-cap shell was a 5.182m deep box with 288mm thick walls and bottom slab. The typical precast box weighed 340 tons and was cast on the deck of a barge at dock side. (See Fig. 9.) Two 4.267m high steel followers were constructed of interlocking steel sheet piles and assembled on the deck of another barge. Two local shipyard cranes were used to lift the precast pile-cap shells off the deck of the casting barge and into the water. (See Fig. 11.) The precast shell was then leveled by using compressed air to vary the water level in the open bottomed 3m diameter pile top block outs. (See Fig. 12.) Once the segment was afloat and trimmed, one of the steel follower was lifted into Fig. 9 8 Casting pile-cap shell on deck of barge, Bath-Woolwich Bridge position on top of the precast pile-cap shell and bolted to the top lip of the shell. (See Fig. 14.) The floating cofferdam was then towed into position over the top of the preinstalled piles (See Fig. 13.) and locked in horizontal position with four 1m diameter spud piles driven through the pockets, attached to the corners of the cofferdam. (See Fig. 15.) One of the keys to the successful use of this technique was the installation tolerances of the 2.44m diameter drilled shafts. The drilled shafts had to be installed to a relatively tight tolerance or the holes in the bottom of the pre-cast shell would not have matched the layout of the preinstalled piles. For the Bath-Woolwich Bridge, the inside diameter of the holes in the bottom of the pile-cap shell was 3.15m. This provided a pile clearance of 355mm. The drilled shafts where successfully installed to a horizontal tolerance of +/- 150mm at the point of cut off, 5 m below mean water elevation. This tolerance was obtained by using a two piece template. The bottom steel frame was positioned with anchor winches to a tolerance of +/- 300mm and fixed in vertical and horizontal position with four 1m diameter spud piles. The upper guide slides on top of the bottom frame and were positioned to a tolerance of +/- 50mm before it was fixed to the lower frame. The drill casing was then stabbed through a guide sleeve attached to the top guide. Fig. 10 Pile-top bulkhead inside precast shell, Bath-Woolwich Bridge
9 Fig. 11 Lifting pile-cap shell off deck barge, Bath-Woolwich Bridge A second key to the successful installation was the initial temporary underwater connection between the float-in cofferdam and the preinstalled drilled shafts. This connection was made with a 1.22m deep tremie seal, and the vertical load was transferred through bond of the tremie seal to the sides of the drilled shaft casing. This bond was sufficient to resist the buoyancy of the dewatered float-in cofferdam at high tide and allowed placement of the pile cap reinforcing steel and first concrete lift in the dry. (See Figs. 16 and 17.) When the footing concrete was being placed in the pile-cap shell, and the tide was out, the vertical loading was reversed, and the bond supported the dead load of the fresh concrete. The allowable bond stress between the tremie concrete and the drilled shaft casing was calculated using the American Petroleum Institute (API) Code RP 2A, Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms. Fig. 12 Hooking up air lines to pile-top bulkheads, Bath-Woolwich Bridge 9 Fig. 13 Pre-installation of drilled shafts using two-stage template to set casings, Bath Woolwich Bridge Fig. 14 Mating follower cofferdam to pile-cap shell, Bath-Woolwich Bridge Fig. 15 Positioning and lowering float-in cofferdam, Bath-Woolwich Bridge
10 With this type of support system, if additional capacity is required, the bond area can be increased by deepening the tremie placement or the allowable bond stress be increased by adding weld beads to the outside of the casing in the zone of tremie concrete. The foundation design for the new bridge required six 3m diameter drilled shafts under each of the four main tower legs. Because of the very high lateral stiffness of these piles, it was possible to elevate the four tower footing blocks - 5.4m deep and 18m by 20m in plan - up off the bottom of the strait. At the north tower, the footing block is positioned 30m off the bottom with the lower edge of the footing at 2.34m below mean sea level. The original design by Caltrans was to cast the footing shells offsite, float them to the bridge and land them on preinstalled erection frames, or falsework. The footing shells were to be used as temporary cofferdams and as templates for the installation of drill shaft casings. Following completion of the pile cap, the pier shaft was completed to a point above the high water line and the follower cofferdam was stripped. (See Fig. 18.) New Carquinez Bridge The contract for the new bridge was awarded in early 2000 to a joint venture between FCI Constructors and Cleveland Bridge California, (FCI/CBC). Ben C. Gerwick, Inc. was selected by FCI/CBC to modify Caltran s float-in cofferdam concept and further reduce the amount of onsite work. Fig. 17 Placing pile-cap reinforcement, Bath- Woolwich Bridge Fig. 16 Dewatering float-in cofferdam, Bath-Woolwich Bridge Fig. 18 Stripping follower cofferdam from completed pier shaft, Bath-Woolwich Bridge BCG modified this concept by designing a temporary support system that allowed the floatin cofferdams to be landed directly on the preinstalled drill shaft casings. (See Figures 19 and 20 for details of the temporary support system, 10
11 shown in yellow.) This modified design offered significant advantages. First, it allowed drilled shaft installation, an activity which was on the critical path, to begin sooner, by allowing casing installation to start before the float-in cofferdams had been completed. Secondly, the modifications meant that the construction schedule was shortened by allowing casing installation to run independently of and concurrently with cofferdam fabrication. Fig. 21 Casting float-in cofferdam on deck of launch barge, Carquinez Bridge Fig. 19 Float-in cofferdam concept for Carquinez Bridge Fig. 20 Pile-top details for Carquinez Bridge Construction cost was reduced by completely eliminating the need for erection frame or temporary falsework support for the float-in cofferdam and infill concrete, and risk was also reduced as a result of decreasing exposure time of a partially completed cofferdam and footing to storm conditions. Fig. 22 Completed float-in cofferdam with pile-top bulkheads on deck of launch barge, Carquinez Bridge 11 Cofferdams and connecting ties were cast on a flat-deck barge, 22m wide by 76m long and 4.6m deep, which was positioned at the dockside within reach of a shore-based crane. (See Figs. 21, 22 and 23.) The surface of the barge was prepared by casting a 15cm concrete slab to provide a level and smooth casting surface. In order to ensure that the cofferdams would lift off the barge at launch, the surface of
12 the casting slab was sprayed with a bond breaker that created a polished surface. As an added precaution, water pressure was applied to the contact surface between the top of the slab and the underside of the cofferdams. This was performed about a week after casting and before the six 3.8m diameter pile top blockouts were flooded with a head of 3m for launching. Complete release from the casting bed was confirmed when water seeped out at the perimeter of the cofferdam. The modified design incorporated a number of features essential to the success of the project: First, the cut-off elevation of the drilled shaft Fig. 24 Float-in cofferdams floating in storage at dock side after launch, Carquinez Bridge casings was set at 1.55m below mean sea level, it was therefore necessary to limit the draught of the float-in cofferdams to 2m. This was accomplished by following modifications: Fig. 23 Completed precast shell of link-beam on deck of barge, Carquinez Bridge For the launch operation, a site was selected in the Carquinez Strait approximately 2-km upstream from the bridge. The primary criteria were that the site should have a level bottom and a water depth at low tide of about 6.7m. The barge was towed to the site and positioned alongside a derrick barge on anchors. In order to maintain sufficient stability of the casting barge and cofferdams during the launch, the barge was ballasted down one end at a time. The stern of the barge was first set down on to the bottom during low tide, and then, as the tide turned, the bow was gradually ballasted down allowing the cofferdams to float free one at a time. Following launch, each cofferdam was towed to the dockside and stored afloat until the drilled shafts at the first tower were completed. (See Fig. 24.) the wall thickness of the float-in cofferdam was decreased, semi-lightweight concrete with a specific gravity of 2 was used, Styrofoam blocks were used to form the bottom ribs of the cofferdam, and finally, each pile-top block-out in the bottom slab (located over the top of each pile position) was capped with airtight 3.8m diameter steel cylinder and the water was forced out of the pile compartments with compressed air. Secondly, Caltrans set the horizontal positioning tolerance for the 3m diameter drill shaft casings at +/- 150mm, but site conditions including water depths of up to 32m and tidal currents up to 3m/s made meeting these criteria difficult. In order to meet the specified tolerances under these conditions, a steel guide template with four spud piles was installed at the south tower and a template attached to the pile driving barge was used on the north tower. As an added precaution against fit-up problems during landing of the cofferdams, the size of the blockouts in the bottom of the float-in cofferdams was increased to 3.66m. This provided a 12
13 theoretical clearance around the pre-installed drilled shafts of 330mm. Third, the system for cutting off the drilled shafts under water included a 4.5m diameter cylindrical cofferdam that fitted over the top of the drilled shaft. The cofferdam sealed to the casing at about 1m below cut-off elevation by means of an inflatable rubber O-ring that fit inside a circular recess at the bottom of the cofferdam. Following inflation of the seal, the cofferdam was dewatered and the drilled shaft casing was cut off in the dry to a precise elevation. This cut-off cofferdam also allowed access for welding a steel ring to the exterior of the casing; the ring was used to provide the watertight seal between the float-in cofferdam and the drilled shaft casings. It also provided the necessary shear resistance for the support of the cofferdam during the concrete infill operation. (See Figs. 19 and 20 for details of the bottom seal.) Fourth, high tidal currents in the Carquinez Strait meant there was only about an hour of slack tide during which the cofferdams could be landed. Hence it was necessary to install a guide system to allow rapid positioning and landing. Because the water was more than 32m deep, the guide system was attached directly to the 3m diameter drilled shaft casings. The guides were L-shaped wide flange brackets attached to the casing just below the landing support bracket and extended above high tide so they could be used for visual positioning of the cofferdams. (See Fig. 25.) elevation. This provided an excellent bearing surface for the landing of the cofferdams. Caltrans initial design showed the top of the casing protruding through the 3.2m diameter holes in the bottom of the cofferdam and cut off flush with the bottom floor of the precast cofferdam. Landing support was provided by steel beams spanning across four of the bottom slab openings and bolted flush to the floor of the precast cofferdam. The actual bearing surface was the top edge of the drilled shaft casing and the underside of the steel beam. (See Figs. 19 and 20 for details of the bearing surface.) Fig. 26 Landed float-in cofferdam and accessing seals through through piletop bulkheads, Carquinez Bridge In order to dewater the cofferdam it was necessary to create a watertight seal between the six drilled shaft casings and oversized holes in the bottom of the cofferdam. This was accomplished by pre-welding doughnut-shaped steel rings - 12mm thick by 700mm wide - to the casings just below the cut-off elevation, at the finished bottom elevation of the cofferdam. These plates were attached in-the-dry by using the same 4.5m diameter cofferdam used for casing cut-off. Fig. 25 Positioning and landing float-in cofferdam at N. Tower, Carquinez Bridge The 4.5m diameter cylindrical cofferdam allowed the tops of the casings to be cut off to a precise At the outer edge of the steel doughnut, an inflatable O-ring was bonded to the plate. As the void space around each casing was dewatered the hydrostatic pressure pushed up on the bottom of the steel plates and the rubber O-rings provided the necessary seal. In areas where the 13
14 3.6m diameter holes in the bottom of the float-in cofferdam. (See Fig. 20 for a detail of the void space.) The 3.8m diameter cans positioned over the top of each hole provided access to this area and the seal system described above allowed the cans to be dewatered and the infill concrete to be placed in-the-dry. (See Fig. 27, showing removal of the lids of the pile top bulkheads.) Hanger rods 25mm in diameter and spaced at 600mm along the center of the void space provided shear reinforcement and the fillet weld connecting the 12mm plate to the drilled shaft casing provided the necessary shear resistance. Fig. 27 Float-in cofferdams and link-beam shell in place, ready for placement of reinforcing steel, Carquinez Bridge After the concrete in the void space had reached the specified strength, the entire cofferdam was dewatered, the 3.8m diameter cans were removed from each drilled shaft location, and the initial support beams were removed. At this point the area over the top of each drilled shaft casing was free and open for extending the drilled shaft vertical reinforcement up into the footing, and installation of the footing bottom reinforcement mat. (See Fig. 28 for a view of the cleared area inside the float-in cofferdam.) Conclusion The successful use of the float-in cofferdam system on two major bridges has demonstrated the effectiveness of this method for constructing pile-caps in deep water where the caps are located below water but elevated off the bottom. Fig. 28 Placing reinforcing cages in drilled shafts at Carquinez Bridge seal did not seal properly, vertical hanger bolts were available to pull the 12mm plate tight to the bottom of the cofferdam and compress the seal. (See Fig. 20 for details of the seal.) The initial support system for landing the cofferdams was simple and allowed a quick landing, but it was directly in the path of both the vertical extension of the drilled shaft reinforcement and the horizontal reinforcement in the bottom footing mat, hence it had to be replaced before the reinforcement could be installed. Final support was provided by placing infill concrete in the void spaces between the 3m diameter drilled shaft casings and the oversized Bibliography 1. Anderson, H. V.: Underwater Construction Using Cofferdams, 2. Bittner, R. B.: Tapping Technology, BRIDGE design & engineering, Issue No. 14, First Quarter 1999, pp Bittner, R. B. : Fast-track float-in, BRIDGE design & engineering, Issue No. 24, Third Quarter 2001, pp Ratay, R. T.: Handbook of Temporary Structures in Construction, Chapter 7, by Ben C. Gerwick, Jr. 5. Stubb, F. W., Jr.: Handbook of Heavy Construction, 3 rd Edition, Chapter 23, Cofferdams and Caissons, by Ben C. Gerwick, Jr. 14
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet
Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
Offshore Structures. Offshore Drilling Equipment
Offshore Structures Offshore Drilling Equipment The drill string is lowered through a conduit (riser). The drill string consists of a drill bit, drill collar and drill pipe. Drill pipe sections are added
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
Page & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
PANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
DESIGNING STRUCTURES IN EXPANSIVE CLAY
DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete
Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).
BUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
The minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.
Total project cost $2.5 billion (Canadian) Financed by tolls about $3 each direction. Total project length 37 km (McGill St in Vancouver to 216 th in Langley) The new Port Mann bridge 10 lanes (existing
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
FORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code
LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525
1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
Söderströmtunnel: immersion in downtown Stockholm, Sweden
Söderströmtunnel: immersion in downtown Stockholm, Sweden J. Glückert Dipl.-Ing, Züblin Ground Engineering, Stuttgart, Germany N.H.J. Vink MSe, M. Reijm BSc, P.T. van Westendorp BSc Strukton Immersion
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
Rehabilitation of Locks on the Kentucky River
Rehabilitation of Locks on the Kentucky River Joshua M. Repp, PE Bergmann Associates Presentation Overview River System History Evolution of Lock and Dams Structures Existing Condition of Structures Lock
High Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
PILE FOUNDATIONS FM 5-134
C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics
Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
Designed and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
The ACR : Advanced Design Features for a Short Construction Schedule
Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Paper # S01-3 The ACR : Advanced Design Features for
SECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
SKT-SP Tangent Terminal
Assembly Instructions for SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP 30 x45 bay provides maximum tenant flexibility and increases leasing marketability By David E. Eckmann AIA, S.E. P.E. SURGING DEMANDS FOR RENTABLE OFFICE
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION Table of Contents Executive Summary... 1 Introduction... 1 Installing
Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.
P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the
Now That s IDEAL. Now That s IDEAL. LISTEN. RESEARCH. DESIGN. DELIVER.
The Leading Edge SM At IDEAL, we try not to complicate things. We discover needs and problems, then work out solutions. It takes real teamwork to accomplish truly great things. That s you and us, working
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
SECTION 6. Glass Storefront Doors:
SECTION 6 Glass Storefront Doors: Table of Contents 3070 Storefront Door System Description & Dimensions 6070 Storefront Door System Description & Dimensions Door Leaf Detail Optional 10 Bottom Rail Detail
COMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations
from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and
Hunter College school of Social Work Thesis Proposal
Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing
Formwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
Value Engineering vs. Alternate Designs in Bridge Bidding
Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.
STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
How To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
Rehabilitation of an Aging Concrete Reservoir Adit Tower
Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco
Pro-Lift Steel Pile Foundation Repair
Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the
STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
Installation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
Laying the First Course. 1. Excavate the site and construct the footing.
Use QUIKRETE Mortar Mix or Mason Mix lay up a concrete block wall as shown. QUIKRETE Mortar Mix or Mason Mix Concrete block Mason's line Line blocks 4' level brick trowel Jointer Mason's hammer Stiff brush
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
Embedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada
Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract The methods for cable penetrations into modular industrial substations are
Lighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: [email protected] Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13
STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT
Davit Systems and Outriggers
Safety From The Top Down Davit Systems and Outriggers Suspended Access Systems and Fall Protection Davits Overview Standards in the United States and Canada require a building to provide certified anchorages
Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.
TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
During severe flood events, such as those
Recommended Practice for Home Heating Oil Tank Flood Resistance During severe flood events, such as those occurring from Hurricane Irene and Super- Storm Sandy, many coastal and low elevation inland areas
DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.
DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. Drilling since 1916 2215 Belknap Place Phone (210) 824-3800 San Antonio, TX 78212-1904 Fax (210) 824-9525 www.duderstadtfoundation.com ABOUT THE COVER: Drilled
CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
SECTION 15140 - PIPE HANGERS AND SUPPORTS
Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the
GLOSSARY OF TERMINOLOGY
GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
DOCKMASTER TRAINING MANUAL
DOCKMASTER TRAINING MANUAL By HEGER DRY DOCK, INC. June, 2005 DOCKMASTER S TRAINING SEMINAR TABLE OF CONTENTS LECTURE NOTES SECTION 1 DRY DOCK TYPES Page 1.1 Basin Dry Docks... 1-2 1.2 Floating Dry Docks...
Residential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR
TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an
Elevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural mezzanine design. In addition, it is to serve as