1 SCOPE OF WORK AND TECHNICAL DETAILS SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 1

2 1.0 INTRODUCTION AND PROJECT SITE SCOPE OF WORK M/s GAIL (India) Limited is operating LPG pipeline system from Jamnagar to Loni terminal near Delhi. JLPL LPG pipeline is world s longest (1365KM) cross-country pipeline. The LPG pipeline is operational since Oct The pipeline is used to supply LPG to various clients enroute such as IOCL, BPCL and HPCL GAIL does its pipeline integrity analysis time to time based on the best available techniques in the field of inline inspection. GAIL (India) Limited intend to do the inline inspection of the following pipeline using high resolution MFL tool (Corrosion detection Pig). Details of the pipeline are s mentioned below: Diameter: 6 inch NB, Length: 24 kms long (approx.) Location: EOL-DT(inside M/s ESSAR OIL refinery, Vadinar, Jamnagar) to RIL- DT (inside M/s Reliance refinery, Motikhavdi, Jamnagar ), Gujarat Pipeline material: API 5L Gr. B 6 NB pipeline from EOL DT Vadinar to RIL DT Jamnagar (24KM) was commissioned in Aug 2008, as phase II connectivity project. Cleaning pigging of this pipeline carried out in August-2011 successfully. M/s GAIL is desirous to generate the base line data about the pipeline using high resolution inspection pig so that present health of the pipeline is known in quantifiable terms and serves base data for future inspection runs. This survey shall help to take timely appropriate measures as this pipeline supplies LPG to several consumers and any interruption in LPG supply shall have cascading effects on the down stream industries besides the problems related to environmental pollution and public safety. All the pipelines are three-layer PE coated with Impressed Current Cathodic Protection System. Source of power for ICCP (impressed cathodic current protection) is state electricity board at terminals. Manual type Sectionalizing fullbore ball valves have been installed at 12.8 km chainage for the safety measures. Pipeline has been provided with the Tele-supervisory and telecommunication system for efficient and safe operation. Pipeline section is provided with Launcher & Receiver facilities at each end. 2.0 OBJECTIVE The objective of the present intelligent pigging program includes cleaning, electronic gauging (EGP) and In-line inspection (Corrosion detection using MFL technique) without disturbing process parameters) is to assess the heath of pipeline in quantifiable terms and to get the base data. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 2

3 3.0 TECHNICAL DETAILS OF PIPELINE The following is general overall technical information about EOL to RIL pipeline section under the present scope of work; however, the detailed technical information in the format has been enclosed for pipeline section at annexure-i of the bid document with relevant technical details. S.no 1 Pipe-Line Section EOL-DT to RIL-DT, JAMNAGAR Table -1 Dia. in Inch/Length in Km Nominal Wall Thickness in mm Produ ct Normal Product Flow range (MT/hr) Normal Operating Pr. Range (Kg/CM2) Velocity (Km/hr) 6 IN/24 KM 6.4 to 11.1 LPG to COMPOSITION OF LPG Composition (average) of LPG (conforming BIS-4576) being transported through this pipeline is as below. Composition % value may vary but specification of LPG shall conform to BIS Table -2 SR.NO components Butane Trans-2-Butene Ethane Propane Iso-Butylene C5+ UNIT(by volume) Value % % 15.5 % 0.4 % % % TECHNICAL SPECIFICATION OF PIPELINE: Pipe Line Name : Nominal Diameter of the Pipeline Total length of the Pipelines Age of Pipeline Wall thickness Pipeline Material of Construction Type of Welding Product Transported EOL-DT to RIL-DT 6 PIPELINE 6 INCH NB 24Kms Approx. Commissioned in August to 11.1mm API 5L Gr B SMAW Liquefied Petroleum Gas (LPG) SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 3

4 Coating Type : Type of Cathodic Protection Provided Type of Flow Flow rate Pressure Temperature Main Line Valve Type of Valve Tees and Branches Check Valve Loops and Expansion Bellows Bend Radius Launcher & Receiver Internal: Not applicable External : 3 Layer PE Coating Impressed Current Cathodic Protection System Turbulent 35 to 60 MT/hr. Maximum Operating Pr. 62Kg / Cm2. Normal operating pressure varies from 20 Kg/Cm2 to 50 Kg/Cm Degree C Full Bore gate Valve Yes. All tees are flow tee but branches are blinded Nil t d Nil All the Bends >= 3D Installed at EOL-DT & RIL-DT (sketch enclosed at Annexure-1) Pipe Cover Depth Average Pipe Cover Depth Meter ( at crossings) 1 to 1.5 Meter Pigging History Cleaning pigging carried out in July-August 2011 Other Information No failure reported so far. No operation problem experienced. No inhibitor used. HT CROSSINGS In couple of locations, above -ground HT crossings in are there in the pipeline segment under the scope of work. For CP, necessary action has been taken by installing polarization cell to minimize the effect of these crossings to maintain the PSP within 6.0 DETAILED SCOPE OF WORK The scope of work is under this tender include intelligent pigging of 6 inch Dia. Pipeline section of Jamnagar-Loni LPG pipeline (approximately 24 Km long) by running of adequate quantity foam pigs, gauge pigs, cleaning Pigs ( minimum 2- run of Magnetic, Brush pig), high resolution intelligent pig(corrosion Detection Pig) based on magnetic flux leakage(mfl) technique preceded by Cleaning, Gauging and Caliper (Geometry) pig runs to detect and quantify internal/external corrosion/mechanical defects and other anomalies. All facilities/ services which the CONTRACTOR feels necessary to fulfill the WORK (other than which has been specified in this contract are in the scope of the OWNER) shall have to be arranged by him at no extra cost and time to the OWNER. 5.1 MOBILIZATION Following activities shall be required but not limited to complete the entire job to the satisfaction of the OWNER. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 4

5 5.1.1 MOBILIZATION OF PIGGING & ITS ASSOCIATED MATERIALS Mobilization of all equipment e.g. High Density Foam Pigs, Cleaning pigs (Brush & Magnet Pigs), Gauging Pigs, Electronic geometry pig, Intelligent pigs (Corrosion Detection Pig) Pig locating device, pig tracking devices, magnetic markers, spares, accessories, consumables, communication, transportation of the same to work site and personnel to the WORK SITE. The personnel of the contractor not only includes experts( Professionally qualified & experience of HR MFL based intelligent job) for the intelligent pigging and data analyst but also personnel for Pig handling at launcher and receiver, Pig tracking personnel, and NDT personnel along with the equipments for dig verification, transport for transportation of contractor s man and machines at various sites etc. It is expressly understood that this does not limit the scope of work of the CONTRACTOR in any way. Personnel shall meet the following minimum qualifications (ref. ANSI/ASNT-ILI-PQlatest version. Team leader during ILI field activities: Level II Tool Operator for the applicable Technology. Data analysis and reporting: Level II Data Analyst for the applicable technology. Review of final Client report: Level III Data Analyst for the applicable technology. The review should include (but not limited to) e.g. a quality check of data analysis and reported results. The quantities to be mobilized for different equipment (different types of pigs, pig tracking device, pipeline/pig locator, Marker device, NDT equipments etc.), their accessories, spares, and consumables need to be carefully evaluated by the Bidder taking in to the consideration that in line inspection of pipeline shall be carried out without any constraint. CONTRACTOR is to mobilize all types of required pigs, accessories, spares, pig locating and tracking devices, in adequate number for completion of entire works within the contract price without depending turnaround time of bringing the pig received from previous run from receiving station to launching station. As such no turn around period shall be allowed due to operational constraints. All the gauge & cleaning Pigs (Brush & Magnet) shall be of bi-directional type (A) RESOURCES TO BE MOBILISED BEFORE COMMENCING THE JOB Sufficient quantities of Cleaning Pigs (Magnetic pig & brush pig-minimum 2 runs), foam Pigs along with electronic geometry Pigs & high resolution MFL tools (Corrosion Detection Pig) shall be mobilized by the bidder before commencement of the job. The Bidder shall mobilize adequate nos. of spares like Pig Cups/Brush/Magnets /Pig bodies etc. However, Bidder is expected to make their own assessment of actual resources required for them and shall mobilize accordingly (B) PIG TRACKING DEVICES AND TRANSMITTER FOR PIG TRACKING Contractor shall mobilize adequate numbers tracking personnel along with tracker for tracking of pig in the pipeline under scope of work without waiting for turn around time. Minimum (3) nos. pig tracking devices sufficient number of transmitters shall be mobilized by the contractor for tracking the pig during run. However SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 5

6 contractor shall be in position to mobilize additional tracking devices if required depending on terrain, accessibility to tracking location etc (C) CONSUMABLES The contractor shall mobilize sufficient quantity of spares & consumables (mechanical as well as electrical/electronic) However, bidder must ensure that in no case the site activities shall suffer due to shortage of spares. Following consumables (but not limited to) shall be mobilized in sufficient Quantity. Sealing discs, guide discs of cleaning Pigs. Sensors, batteries (suitable for minimum pig run life of 50 Km with min. allowable tool speed) and other electrical and electronic consumables. Rollers Connecting cables and clips, cords etc. as required Bolts and nuts, fasteners, pins, spacers and other similar mechanical consumables. Markers for placement (at every 2.0 Km intervals). Bidder shall note that markers shall not be retrieved back after completion of the job. All tools & tackles for pig preparation. Primary and secondary sensors assembly for the CDP. Cable cord, for electronic and sensors for each group of pipeline. Electronic assembly including electronic cords, tape recorder and cassette and other electronic components which can be replaced at the site by the field personnel. Set of all type of Batteries. Magnet & brush assemblies. Odometer wheel assembly including cables for each size of pipe. Backup software required for calibration of EGP / CDP. Spare battery backup for pig tracking devices and transmitters (D) TOOLS AND TACKLES Following Tools & tackles (but not limited to) shall be mobilized by the contractor At least two set of tools and tackles required for servicing of Cleaning, Gauge, Cleaning (Brush & magnetic), EGP, Corrosion Detection pigs. Two set of pusher rod for pushing the pig inside the barrel. Two sets of lifting sling suitable for each type of pig. 03sets of COME ALONG tackle for pulling the tool out of receiver barrel. Two sets of wheel mounted trolley for transporting Pigs to launcher and receiver and transportation of debris to a safer location. One set of non-sparking tools to work in the hazardous location. Other equipment required for downloading, interpretation of data of EGP, Corrosion Detection Pig (E) MANPOWER & VEHICLES During cleaning Pigging operations, team with adequate helpers and qualified personnel for launching, tracking & receiving shall be deployed by the contractor along with the tools and tackles & vehicle. All the tracking personnel shall have a proper communication device/ Cell phone. During EGP, CDP in addition to above the contractor shall deploy additional experts, if required. There shall be at least one project Manager to coordinate with Pigging team and GAIL. All facilities / SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 6

7 services, tools, consumables, man power and equipments which the CONTRACTOR feels necessary to fulfill the WORK apart from the facilities/ services mentioned under Owner s obligation (clause no. 18 of SCC) shall have to be arranged and transported to work site by him at no extra cost and time to the owner (GAIL) (F) MAGNETIC & ABOVEGROUND MARKERS The magnetic markers shall be supplied & installed by the contractor in advance before start of pigging activity. The magnetic markers shall be installed on the pipeline at approx. 2.0 Km interval, irrespective of availability of pipeline markers. The above ground markers (AGM-drawing attached-annexure-1) shall be installed to benchmark the magnetic markers. These above ground markers & magnetic markers shall not be retrieved back after completion of inspection work and shall not be taken back by Contractor. The maximum coating thickness on the pipeline is 3.0 mm. However, Contractor shall deploy markers of adequate strength so that same shall be detected by high resolution Inspection Pig during inspection at above coating thickness and gas velocities. The contractor has to submit the detail of the marker location. During installation of the markers, the representative of the contractor shall be present and ensure the proper installation. It shall be the Pigging contractor s responsibility in case of non-identifying the magnet markers by the contractor s tool. In addition to above, the contractor can bring its own above ground markers with GPS for identification of the defect location with no extra cost to GAIL. Bidder may sublet aboveground marker installation job to third party, however bidder shall supervise marker installation job & shall be fully responsible for quality job. 5.2 TOOL SPECIFICATIONS i) The intent of the specification is to set forth the requirements of the in-line inspection (CDP) of the 6 inch Dia. LPG pipeline of approximately 24 Km having one manual sectionalizing valve station (SV-71, village- Nani khavdi, Jamnagar at chainage 12.8 km from EOL DT). The contractor has to run their high resolution MFL Pigs after properly cleaning and gauging the pipelines without disturbing the process parameters to help the BIDDER to quote his unit rate PRICE in the schedule of rates in this document. ii) This requirement is not intended to be all inclusive and use of guidelines set-forth does not relive the CONTRACTOR to his responsibility to carry out all activities successfully as defined in scope of WORK and to obtain valid, interpretable and physical verifiable data from the intelligent pig runs about the condition of the pipeline. iii) Other than Foam Pig all the Gauge & Cleaning pigs (Brush & Magnetic) shall be Bidirectional type and the intelligent Pigs shall be of high resolution MFL type. iv) IS: shall be followed for this job. In case of any dispute between, IS: & this document, international standards & the clause of tender document shall prevail TECHNICAL SPECIFICATIONS OF HIGH DENSITY POLY PIGS a. Pig shall be made out of open cell polyurethane foam of uniform density 8-10 LBS/CU FT and coated with polyurethane ester synthetic rubber coating. The material for foam Pig shall confirm the standard ASTM 02240/ DIN 53505/ BS903. The SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 7

8 PIG shall withstand temperature range from 0 Deg to 80 Deg. C and upto 90 Deg C for short duration b Pig shall maneuver itself through 3D bends c. Pig shall be suitable for heavy wiping of internal surface of minimum 100 KM continuous run d Pig shall be able to successfully pass through up to 50% reduction in pipeline internal diameter e O.D of the poly pig & quantity shall be as per tendered Scope of work f Each pig shall be equipped with a pulling hook on front portion of the pig body. The hook may be made of nylon rope g. Weight, Length with complete technical details/datasheet of the pig must be given by the bidder TECHNICAL SPECIFICATIONS OF BI-DIRECTIONAL (BI-DI) GAUGE PIG a. Each Bi-Di Gauge pig shall essentially consist of four polyurethane sealing disc and two support/guide discs, mounted on a carbon steel body. Each disc shall be separated by suitable polyurethane spacers. Each pig shall be suitable for specific nominal diameter pipelines to be cleaned b Polyurethane Sealing discs. Support/ guide discs and polyurethane spacers: - i) All discs and spacers shall be made of polyurethane with large sealing surface area to accept wear during run. The sealing disc O.D and support / guiding disc O.D. shall be as per tendered specification of works. The maximum allowable tolerance on each disc O.D is +/- 2 mm. ii) Physical properties of polyurethane for sealing discs and supporting discs shall be as per ASTM 02240/ DIN 53505/BS903/ DIN53504/ DIN The PIG shall withstand temperature range from 0 Deg to 80 Deg.C and upto 90 Deg C for short duration c Carbon Steel Body a) Carbon steel body shall be made out of API-5L-Gr.B pipes. b) Carbon steel body shall be sand blasted, painted I coated with corrosion resistant epoxy paint suitable for marine environments, c) All welding on pig body shall be as per applicable API codes d Weight, Length with complete technical details/datasheet of the pig must be given by the bidder e Each pig/spare discs shall be suitable for pigging of 50 Km, continuous run of pipeline on each occasion, unless specified elsewhere f The pig shall be flexible enough to negotiate restrictions in internal diameter up to 15% g The pig shall be able to maneuver itself through 3D bends. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 8

9 5.2.2.h The pig shall have provision of bypass ports and shall be plugged with threaded plugs i The pigs shall be equipped with a pulling hook on front portion of pig body SPECIFICATIONS FOR MAGNETIC PIG a.The primary application of Magnetic Pig is to remove ferric debris left in the pipeline during construction or operations. The ferric debris includes welding rods, nuts, brushes & various solid steel objects. The Pig shall be Bi-directional type with all discs and body confirmed to the general specification of Bi-Di pigs. The following additional features are required: b Each Pig shall have adequate magnet packs made of permanent magnet, backing iron & housing to be suitable for mounting on the Bi-Di Pig. The housing shall have adequate strength to prevent the magnet from breaking and falling into the pipeline in case of impact c Each magnet pack shall have a lift capacity of minimum 3 Kg. Each magnet shall have minimum strength of 800 gauss. Quantity of magnet packs should be sufficient to ensure cleaning of pipeline ELECTRONIC GEOMETRY PIG RUNS a. The electronic geometry pig shall be capable of recording the entire length of each segment i.e. from launcher to receiver in one single run and therefore its electronic recorder system shall have requisite data storage capacity. Battery life therefore shall be adequate to commensurate with the run time required to travel the complete pipe length and the drive cups shall have requisite resistance to wear and tear to maintain effective seal throughout the entire run time. The measurement shall cover the entire 360 degree of internal pipe wall circumference using properly oriented and sufficient quantity of sensors. The tool shall be capable to identify and locate the following features as a minimum. Individual Girth weld Dent, ovality, buckles, or any other out of roundness, change in pipeline I.D. and difference of thickness. Bend with bend radius and degree of bend. Valves or any partially closed valves b. The detailed specifications of electronic geometry pig shall be furnished in the offer by Contractor DEFECT SIGNIFICANCE a. Defect sizing specifications (Tabular Form): The Electronic Geometry Pig shall have following specifications: FEATURES Dent & deformities Ovality/out-of roundness Bend radius CAPABILITY ±1% of pipe O.D. ±1% of pipe O.D. ±0.25 D SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 9

10 b LOCATIONAL ACCURACY (Tabular Form) A AXIAL a. WITH IN PIPE b. FROM MARKER M + 1.0M B CIRCUMFERENTIAL + 10 DEGREE CORROSION DETECTION PIG or MAGNETIC FLUX TOOL (high resolution MFL Tool) a. The Corrosion Detection tools used for on line Inspection for pipeline segment covered under Scope of Work in response to this bid shall be High resolution inspection tool based on Magnetic Flux leakage Technology bThe Corrosion detection Pig proposed by the BIDDER shall be capable of detecting, identifying & sizing the following anomalies keeping in view the defect significance detailed as given in coming pages:- Internal and External Dimensions Debris Dent Dent with metal loss Ovality Measuring Pipe wall thickness & thickness change Buckle Weld Grinding Gouge Corrosion Single event Corrosion group Corrosion external Internal Metal Loss Circumferential Cracks Longitudinal Cracks Pitting corrosion Locating metallic body / structure adjacent to pipeline Welds Incomplete Penetration Crack in Girth Weld Girth Weld Longitudinal weld cracks Longitudinal weld Spiral weld cracks Spiral weld Internal Crack Pipe Features Pipe Material De-lamination Bends: short & long radius Wrinkles Sleeve Repair Fittings (Valves, tees, Crosses) & Flanges Manufacturing Anomalies (slugs, scabs, slivers) Grounding Lug SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 10

11 Cold Working Mfg. Process (ERW, DSAW, seamless, etc.) Weld Repair Laminations Locating of pipeline features & anomalies within tolerance limit in bid document. Measuring pipe & spool lengths all along pipeline length. Sizing of anomalies with acceptable tolerance limit in bid document C. The detailed specifications of Intelligent Pigs shall be furnished in the offer by Contractor PULL THROUGH TEST Contractor is required to Conduct Calibration / Pull through test of Corrosion Detection Pigs at Contractor s work facilities prior to mobilization of pig at sites witnessed & certified by a reputed third party inspection agency at no extra cost to GAIL. Owner at their discretion reserves the right to witness and/or to appoint its authorized agency to witness the Pull through test to ascertain diagnostic capability, reliability etc. of the inspection tools to be deployed at site. During pull through test, the OWNER representatives shall be allowed to share the technical information related to the intelligent Pigs, including test pipe data, tool velocity, magnetization level achieved and metal loss inspection performance achieved during testing. Pull through test report for Corrosion Detection Pigs shall be submitted prior to start of pigging activity. The test certificates witnessed by the third party inspector (and duly certified by the OWNER s representative, if witnessed) shall be submitted to the OWNER in English language. All the charges for engaging & certification charges of the third party inspector shall be borne by the Contractor PRE CALIBRATION OF INSPECTION TOOL (INTELLIGENT PIG) CONTRACTOR is required to pre-calibrate the inspection tools with a reputed third party agency of their own country to perform the pilot/loop test at his inspection centre before mobilization of these inspection tools to SITE. GAIL at its discretion reserves the right to witness and /or to appoint its authorized agency to witness the above pre-calibration/pilot/loop tests to ascertain the diagnostic capability, mechanical performance requirements, reliability etc. of the inspection tools to be deployed at SITE. The cost for appointing the third party inspector & other associated charges shall be borne by the contractor. However, it is clearly and expressly understood by the CONTRACTOR that such association of the GAIL for witnessing the pre-calibration/pilot/loop tests shall in no way absolve the responsibility of the CONTRACTOR either for the performance of the inspection tool or his obligations under the CONTRACT. GAIL shall bear the expenses of his representative/authorized agency related to travel, (to and fro) boarding, lodging and other incidentals during the period of their stay for witnessing above tests of inspection tools at the inspection Centre of the CONTRACTOR. Pull through test report of Corrosion Detection pig shall be submitted prior to start of pigging activity DEFECT SIGNIFICANCE A. The following information/performance is expected out of the intelligent pig inspection. i) The external and internal metal loss/mechanical defects shall be identified, discriminated, sized (L x B x D) and suitably reported in a mutually agreed manner. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 11

12 ii) Inspection of entire length to be completed in one single run. iii) To check the effect of inter-active corrosion,if a cluster of pits are identified close to each other, values of L1, L2 W1, W2.. shall be reported (refer sketch below) and the location of each pit cluster is to be identified with reference to permanent pipeline feature. Sketch - 1 L Total W1 W total Metal Loss 1 L1 L2 L1 L2: Length of metal loss 1 & 2 Y W2 X Metal Loss 2 L2 X : Longitudinal distance between metal W1 W2: Width of metal loss 1 & 2 Y : Circumferential distance between 1 & 2 Two individual metal loss features interact, when the axial spacing between the metal loss feature edges is less than the smallest metal loss feature length and circumferential spacing is less than smallest metal loss feature width. iv) Any metal loss on weld joint, metal loss in the heat affected zone of the weld, cluster of anomalies shall be specifically highlighted in the report ACCURACY OF DEFECTS The best accuracy offered and guaranteed by the BIDDER for each category of defect shall be clearly spelt out. The BIDDER must define the pitting corrosion, general corrosion and the accuracy offered by vendor in each case for a) depth of corrosion, b) circumferential location of corrosion and, c) length, width of corrosion. SCC colonies and the accuracy offered by vendor in each case for length, width, depth & circumferential location CONFIDENCE LEVEL AND PROBABILITY OF DETECTION a. Confidence level: Confidence level of 80% is acceptable in defect sizing accuracy (i.e. guaranteed accuracy is acceptable for equal to or more than 80% confidence level metal loss features reported). b. Probability of Detection: The intelligent pigs shall have the probability of detection (POD) as equal or more than 90% with 80% confidence level. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 12

13 DETECTION CAPABILITY AND SIZING ACCURACY (Minimum Requirement). The intelligent pig shall have as a minimum the following the capabilities with 80% confidence level and 90% probability of detection. Table 3 IDENTIFICATION / CHARACTERISATI ON DEFECT GENERAL CORROSION ({W> 3t]) [L > 3t) PITTING CORROSION A < 1t X 1t B< 3t X 3t AXIAL GROOVING [W > 3t AND L > 3t] CIRCUMFERENTIA L GROOVING W > 3t CIRCUMFERENTIA L SLOTTING L>3t, W > 0.01t Min. 1 mm DENT Ovality Wall thickness Transition Absolute bore MINIMUM DETECTION CAPABILITY OF DEPTH AT 90% POD SIZING ACCURACY AT 80% CONFIDENCE LEVEL DEPTH LENGTH WIDTH 0.1t +0.15t +20mm +20mm Detectable 0.1t 0.15t / 0.15t 0.10t t +0.20t mm +20 mm mm +20 mm +0.15t +20 mm +20 mm 0.15t +0.20t +20 mm +10 mm 1% of pipe nominal O.D. 1% of pipe nominal O.D. ±0.72% of ±25 mm pipe nominal ±50mm O.D. ±1% of pipe nominal O.D. 0.9 mm at 80% confidence level ±1% of pipe nominal O.D. at 90% POD t: Thickness, A :Axial gap, W: Width, L :length, The MFL tool shall able to detect and locate the circumferential cracks if any LOCATIONAL ACCURACY (Tabular Form) A AXIAL a. WITH IN PIPE b. FROM MARKER M + 1.0M B CIRCUMFERENTIAL + 10 DEGREE MAXIMUM RUN LENGTH OF LIVE TOOL The BIDDER must specify in their offer the maximum length which can be inspected in one single continuous run by the tool proposed by them. It is required to complete the entire run length pipelines in a single run. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 13

14 APPENDIX (I) Table -4 PROFORMA FOR FOAM, GUAGING PIG, BRUSH CLEANING PIG, MAGNET CLEANING PIG DETAILS. DIAMETER OF TOOL Sr. Description Bidders details or No. Yes/No 1.0 HIGH DESNITY FOAM PIG 1.1 Minimum % of ID that the foam pig pass without damaging pig and pipe 1.2 Density of Foam Pig 1.3 Schematic sketch of Foam Pig enclosed. 1.4 Confirmation of adherence to GAIL s Specification Yes/No 1.5 Submission of material test certificate, technical specifications Yes/No prior to start of pigging job 2.0 BI-DI GAUGE PIG 2.1 Minimum % ID that the gauge pig pass without damaging pig and pipe. 2.2 Number of modules and length of tools 2.3 Weight of gauge pig 2.4 Bend radius able to negotiate 2.5 % diameter of Aluminum Gauge plate 2.6 Schematic sketch of foam pig enclosed indicating configuration 2.7 Confirmation of adherence to GAIL s Specification Yes/No 2.8 Submission of material test certificate, technical specifications Yes/No prior to start of pigging job 3.0 BI-DI BRUSH CLEANING PIG 3.1 Minimum % of ID that the BRUSH CLEANING pig pass without damaging pig and pipe. 3.2 Number of modules and length of tool 3.3 Weight of Brush cleaning pig 3.4 Bend radius able to negotiate 3.5 Number of brushes mounted on pig 3.6 Schematic sketch of BRUSH pig indicating configuration 3.7 Confirmation of adherence to GAIL s Specification Yes/No 3.8 Submission of material test certificate, technical specifications Yes/No prior to start of pigging job 4.0 BI-DI MAGNET CLEANING PIG 4.1 Minimum % of ID that the MAGNET CLEANING pig pass without damaging pig and pipe 4.2 Number of magnets mounted on pig 4.3 Number of modules and length of tool. 4.4 Weight of pig Total Number of magnets 4.5 Magnetic strength of each magnet(gauss) 4.6 Max. Ferrous debris than the magnet can hold. 4.7 Bend radius able to negotiate 4.8 Schematic sketch of magnet pig enclosed indicating configuration 4.9 Confirmation of adherence to GAIL s Specification Yes/No 4.10 Submission of material test certificate, technical specifications prior to start of pigging job Place: Signature of Bidders Authorized Signatory Date: Name, Designation, Seal SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 14

15 APPENDIX (II) Table-5 PROFFORMA FOR ELETRONIC GEOMETRY PIG DETAILS DIAMETER OF EGP.. Sr No. Description Bidders details or Yes/No ELECTORNIC GEOMETRY PIG 1.0 Weight of Tools 2.0 Number of Modules of tools and length of tool 3.0 Principle4 of Operation 4.0 Capability of inspecting Maximum length in single run. 5.0 Pressure range 6.0 Temperature range 7.0 Battery life 8.0 Capability of detecting 2% dent Yes/No 9.0 Able to carry out inspection at gas velocities mentioned in bid Yes/No documents 10.0 Speed range for data generation 11.0 Capability to identify following as minimum 12.1 Individual girth weld Yes/No 12.2 Dent and Ovality Yes/No 12.3 Out of roundness Yes/No 12.4 Valves or any partially closed valve Yes/No 13.1 Minimum % of ID that the EGP pig pass without damaging pig and pipe 13.2 Axial accuracy of locating defect from reference marker/pipeline feature 14.0 Accuracy of measurement (% of ID) 15.0 Bend radius the tool is able to negotiate 16.0 Schematic sketch enclosed indicating configuration 17.0 Any other tool specific information 18. Submission of catalogue/technical specification detail /sketch/drawings of EGP to meet accuracy level defined in bid document along with offer Place : Date : Signature of Bidders Authorized Signatory Name: Designation: Seal: SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 15

16 APPENDIX (III) Table-6 PROFFORMA FOR HIGH RESOLUTION MFL INSPECTION PIG DETAILS DIAMETER OF HIGH RESOLUTION MFL TOOL: Description Bidders Sr No. details Yes/No 1.0 Bidder to confirm that the MFL inspection tool is of High Resolution Yes /No tool which shall meet accuracy level defined in bid document. 2.0 Bidder to confirm that the HR MFL inspection tools is owned by him Yes/No 2.1 Submission of complete technical specification Yes/No details/catalogue/sketch/drawing of HR MFL based CDP tool to meet accuracy level defined in bid document along with offer. 2.2 Direction of magnetization (axial or/and circumferential) 3.0 Pipeline Wall thickness range in MM for full performance. 4.0 Magnetic level to be achieved in the different pipe thickness OR Magnetic field strength as a function of pipe wall thickness and pig speed, at pipe surface to meet the given POD & accuracy. 5.0a Speed range in M/s for data generation as per bid specification 5.0b Maximum speed M/s at which the tool can be operated 6.0 Device if proposed for pig speed control to achieve valid, interpretable and quality data as per detection and sizing specifications of tender document. 7.0 Temperature range for full performance. 8.0 Maximum pressure for full performance. 9.0 Minimum pressure for gas pipeline 10.0 Weight of tool 11.0 Number of Modules of tools and total tool length 12.0 Bend radius able to negotiate 13.0 Capability of inspecting Maximum length in single run 14.0 Axial sampling rate (frequency or distance) 15.0 Circumferential sampling rate 16.0 Total number of primary sensors 17.0 Total number of secondary sensors 18.0 Data storage capacity 19.0 Battery life 20.0 Maximum limit on adjacent sensors damage during the run in order to generate data as per bid specification 21.0 Maximum % of primary and secondary sensors damage permissible (<5%) during the run in order to generate the data as per bid specification 22.0 Minimum % of ID that the MFL inspection pig pass without damaging pig and pipe Capability to identify following as a minimum, mention POIprobability of identification for each feature/defect 23.1 General Corrosion ( mention POI) Yes/No 23.2 Pitting Corrosion ( mention POI) Yes/No 23.3 Circumferential Gouging ( mention POI) Yes/No 23.4 Axial Gauging ( mention POI) Yes/No or SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 16

17 23.5 Locating girth weld, valves and lateral joints ( mention POI) Yes/No 23.6 Circumferential crack ( mention POI) Yes/No 23.7 Proximity of any ferrous object to pipeline ( mention POI) Yes/No 23.8 Manufacturing defects ( mention POI) Yes/No 23.9 Corrosion cluster ( mention POI) Yes/No Dent & ovality ( mention POI) Yes/No Dent with metal loss ( mention POI) Yes/No Buckle ( mention POI) Yes/No Identification of external & internal corrosion ( mention POI) Yes/No 24.0 CAPABILITY OF MFL INSPECTION TOOL Yes/No 24.1 Axial accuracy of locating defect from reference marker (+/-) (1.0 m + 1% of the distance traveled) 24.2 Axial accuracy of locating defect within pipe from upstream weld joint Circumferential Accuracy 24.4 Shall be able to discriminate between external & Internal defects. Yes/No 24.5 Shall be able to size (LXBXD) all defects having depth 0.10 t and Yes/No more in case of General Corrosion defect. 24.5A General Corrosion (W>=3t AND L>=3t) (a) Minimum detection capability of depth at 90% POD (0.1 t ) (b) Sizing accuracy at 80% confidence level for depth (+/ t) (c ) Sizing accuracy at 80% confidence level for length (+/- 20mm) 24.5B AXIAL GAUGING (W>=3t AND L>=3t) (a) A<1t x 1t -Detectable (b) 1t x 1t< B <2t x 2t. The minimum detection capability of depth at 90% POD (0.15 t). Sizing accuracy at 80% confidence level for depth (+/- 0.20t) & Sizing accuracy at 80% confidence level for length (+/- t or 20 mm whichever is more) (c ) C> 2t x 2t <3t x 3t. The minimum detection capability of depth at 90% POD (0.15 t). Sizing accuracy at 80% confidence level for depth (+/- 0.2t) & Sizing accuracy at 80% confidence level for length (+/- t or 20 mm whichever is more) 24.5D CIRCUMFERENCTIAL GAUGING W>=3t (a) Minimum detection capability of depth at 90% POD (0.2 t ) (b) Sizing accuracy at 80% confidence level for depth (+/ t) (c ) Sizing accuracy at 80% confidence level for length (+/- 10mm) 25.0 Schematic sketch of HR MFL inspection tool Yes/No 26.0 TECHNICAL DEVIATION Yes/No 27.0 Submission of pull through test certified, inspected & witnessed by Yes/No third party before start of CDP run as per requirement of scope of work Submission of calibration certificate of high resolution MFL based CDP tool by third party before start of CDP run as per requirement of scope of work. Yes/No Place : Date : Signature of Authorized Signatory Name: Designation: Seal: SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 17

18 APPENDIX (IV) Resolution of measurement parameters requirement: Table-7 S.No. Definition Units Bidder s detail or Yes/No 1 Log distance 0.001m 2 Feature length& width 1mm 3 Feature depth 0.1mm or 1% 4 Wall thickness 0.1mm or 1% 5 orientation 0.5 degree or I minute 6 ERF Magnetic field strength(h) 0.1kA/m 8 Magnetic flux density(b) 0.1T(Tesla) 9 Axial sampling distance 0.1mm 10 Circumferential sensor spacing 0.1mm 11 Tool speed 0.1m/s 12 temperature 1 degc 13 pressure 0.01 MPa SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 18

19 6.0 EXECUTION 6.1 VELOCITY OF DIFFERENT PIGS CONTRACTOR shall be required to maintain the velocities of different pigs (by using various techniques to control the velocity of pigs) in such a manner that normal flow through pipeline while a particular pig is traveling is not required to be altered. The bidders proposed tool shall be capable to handle the flow variation because of any unforeseen process disturbance. The operating flow rates & velocity for are given in Clause No 3.0/Annexure I of the document HIGH DENSITY FOAM PIG, GAUGE AND CLEANING PIG RUNS Prior to launching of corrosion detection pigs, CONTRACTOR shall complete all activities required to check the piggability and cleanliness of pipeline and to verify the internal geometry of the pipeline with relation to ovality, dent etc. and to ensure that internal bore restriction at any location does not exceed the limitation of proposed tools to be used subsequently. For that purpose the contractor shall have to carry out high density foam pig run, gauging pig runs in pipeline covered under SCOPE OF WORK prior to running of cleaning pigs to make final assessment of the line piggability. The gauging pig shall be fitted with the gauging plate made of Aluminum and its diameter shall be 95% of minimum pipeline internal diameter. CONTRACTOR s cleaning and gauging pig assemblies shall be able to pass over or negotiate lateral tees or bends of sizes or radii given in the Annexure I of this document. After the satisfactory report of gauge pig run the contractor shall carry out cleaning pig run of any combination of Brush pig and magnetic pig or individually as decided by the OWNER in pipeline covered under SCOPE OF WORK including pig tracking DEGREE OF CLEANLINESS The degree of cleanliness of pipeline segment will be based on the following criteria: Maximum amount of debris coming out of the line shall be less than 24 Kg per 24 Km length of Pipeline Section. Magnets onto the magnet pig shall have collected less ferrous debris than the magnet can hold. If the Contractor feels those above criteria are not sufficient then contractor shall run extra cleaning pig at no extra cost to GAIL to achieve the cleanliness of Pipeline segment to obtained interpretable data by CDP run as per provisions of the Scope of Work EXTRA RUNS Extra cleaning Pig run (if necessary): if in pipeline the pigability /cleanliness as per the criteria mentioned above could not achieved after the above Pig runs, then the contractor has to run the required numbers of extra pigs (any type gauge /magnetic /brush pigs) to achieve the degree of cleanliness at no extra cost to GAIL. The intention of this cleaning is to get the interpretable data by CDP run. If the Contractor fills those above criteria are not sufficient then contractor shall run extra cleaning pig at no extra cost to GAIL to achieve the cleanliness of Pipeline segment to obtained interpretable data by CDP run as per provisions of the Scope of Work. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 19

20 The technical specifications of foam, gauge and cleaning pigs shall be as per the specifications provided in the tender document, which shall be confirmed by bidder in the offer. Bidder to furnish minimum % of ID that their cleaning pigs is capable to pass without any damage to tool and pipeline FOAM PIG RUN: Carrying out high density foam pigs runs in pipeline segments of covered pipeline under SCOPE OF WORK prior to running of cleaning pigs to make final assessment of the line pigability and provide detailed daily site report for each in the approved format before commencing the subsequent run GUAGE PIG RUN: Carrying gauging pig runs in each pipeline segment covered under SCOPE OF WORK prior to running of cleaning pigs to make final assessment of the line piggability and provide detailed daily site report for each in the approved format before commencing the subsequent run BRUSH & MAGNET PIG RUN: Carrying cleaning pig run of any combination of Brush pig and magnetic pig or individually as decided by the OWNER in each pipeline segment covered under SCOPE OF WORK including pig tracking EGP RUN : Carrying out adequate number of electronic geometry (caliper) pig runs in each pipeline segment covered under SCOPE OF WORK including pig tracking for each segment decided after findings of gauge pig run and analysis of data of the caliper survey to detect the nature, extent (in% ID of pipeline) and location of internal construction (dent) in the pipeline segment and provide detailed daily site report for each run before commencing the subsequent run. The contractor to submit typical data logs for EGP run along with site report and demonstrate that the minimum internal bore/maximum constriction detected in the pipeline do not exceed the limitation of High resolution Inspection tool. Detailed processed EGP logs shall be submitted along with the final Work Report CDP RUN: Upon completion of all preceding activities (foam, cleaning, gauging, caliper Runs) and based on their results CONTRACTOR shall intimate about his readiness for running the high resolution Corrosion Detection Pig. COMPANY shall indicate the exact time of launching the corrosion detection pig in consultation with CONTRACTOR. Carrying out adequate number of Corrosion detection pig runs in pipeline by running high resolution MFL tool including pig tracking to generate valid and physically verifiable data for identification of external and internal corrosion other defects/anomalies location of girth weld, valves, lateral joints and tees and submit the detailed daily report indicating the data is generated for the entire length of pipeline. The preliminary site report shall be submitted by Contractor along with the typical data logs of CDP. Bidder to note that no pig train shall be permitted in a pipeline due to operational constraints. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 20

21 6.3 PIG TRACKING The contractor has to deploy his tracking team along with the pig tracking device and along with the proper pig detection & communication system (cell phone) during the movement of any type of pig (except the foam pig) put into the line during pre-inspection or intelligent pigging and shall be required to be monitor along the pipeline length from launcher to receiver trap. The BIDDER shall detail out the complete methodology of pig tracking proposed to be deployed by him including complete technical details of the equipment and device proposed to be used for this purpose. The pig tracking is totally in the scope of party. GAIL & the CONTRACTOR shall mutually agree regarding the Pig Tracking intervals and locations as per standard practices but minimum pig tracking location shall cover road crossing, SV station & other main locations. 6.4 MODIFICATION OF RECEIVER & LAUNCHER TRAPS, IF REQUIRED, TO SUIT CONTRACTOR S TOOL DIMENSIONS. Bidder to satisfy himself that their pigging requirements are met. Any modification to the access area which the BIDDER feel essential shall be included in his BID and the BID shall also be evaluated by including the cost of such modifications as indicated by the Bidder. NO additional cost in this regard shall be payable. In case the modifications are required to be carried out, the contractor shall have to submit the detailed drawings of proposed modification and obtain approval of OWNER before commencement of work. Same shall have to be tested and inspected to the satisfaction of OWNER. Hot work shall be avoided site at the extent possible. 6.5 DEFECT VERIFICATION Contractor on completion of CDP run, to furnish a preliminary inspection report indicating the details of all the defects including sizing of defects, chainage of defects, circumferential location, distance from magnet marker/pipeline feature, pipe joint length etc. At the discretion of OWNER out of the identified defect a maximum of 05 (five) verification of detected defects shall be verified for pipeline. The excavation, removal of coating, cleaning of surface by excavating, removing the coating, recoating of the pipe (after defect verification by the contractor), restoration of ROU shall be done by the contractor and payment of crop compensation to the Farmers, if any, shall be in the scope of the Contractor. However, the coating materials will be provided by GAIL free of cost. Non-Destructive testing shall be done by the Contractor (including mobilization required instruments/equipment such as UT flaw detector etc.) to confirm the detected defect to Owner / their authorized third party inspection agency to the satisfaction of Engineer-In-Charge. However, while offering the defects for verification the Contractor shall follow the following guidelines :- - A maximum of 5 numbers of most injurious verifiable metal loss defects to be identified in pipeline. - General Corrosion defects with length and width greater than 3t X 3t and metal loss depth 20% of wall thickness or more. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 21

22 - Pitting corrosion defects with length and width greater than 2tX2t and metal loss depth 40% of pipe wall thickness or more. - Mill defects and other manufacturing defects which do not threaten the pipeline integrity shall not be considered for verification purpose MISMATCH OF INSPECTION RESULTS WITH ACTUAL DEFECTS DURING SITE VERIFICATION In case of variance between the results of physical defect verification and the results reported by the contractor on the basis of intelligent pigging (after considering the tolerance as provided in the contract) segment the CDP run shall be considered as unsuccessful run and no payment shall be made for both CDP run and defect verification (clause 21.1.iii & iv of the SCC). The contractor shall execute CDP re-run for the section concerned at no cost to GAIL. Defect verification shall be done to locate the defects and verification of defects through NDT shall be the responsibility of the contractor. However in case of re-run the time period for completion of the work shall not be negotiable (No time extension whatsoever shall be allowed). GAIL shall review the entire case in consultation with the contractor and shall reserve the right to terminate the contract at their discretion and the payment for the work done up to such stage shall be made as per SCC clause No 21.0 (Terms of payments.). 6.6 DEMOBILIZATION Demobilization of all contractors tools, personnel, equipment after successful completion of all pigging activities for the pipelines. However, Contractor can demobilize the high-resolution intelligent pig after sucussful completion of CDP run. However, if inspection survey of pipeline is declared unsuccessful in the defect verification then contractor to remobilize the high resolution tool at no extra cost to OWNER and within the time schedule as per contract to carry out inspection of pipeline, which is declared as unsuccessful. Before demobilizing, the contractor has to ensure proper cleanliness of the working sites, to the satisfaction of OWNER. Contractor shall keep custody of all their pigs, tools, tackles, equipments etc. required for pigging job and take proper care in handling against damage, GAIL shall not be responsible for such damage to pigs, equipments etc. 6.7 OPERATION MANUAL, PROCEDURE DOCUMENTS etc. Preparation and submission of Operation Manual and Work Procedure for execution of the field activities for the various Pigs and pipeline covered under scope of work before commencing the job for OWNER approval. Format for daily site reports, preliminary report, Defect Verification Report, Final report and Recommendation for Repair Report (RRR) and Fitness for Purpose (FFP) shall be submitted to GAIL before commencement of job for Owner Approval so as achieve mutual agreement on the format of the above said reports. 6.8 CONTINGENCY WORKS BIDDER will write down in his offer all foreseeable abnormal circumstances during the execution of the project for enabling the GAIL to take appropriate measures in time. The GAIL will prepare a contingency plan incorporating all abnormal situations to overcome such situations, if the same arise during the implementation SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 22

23 of the project. In the event of pig (upto gauge pig) getting stuck in the pipeline during the first time of pigging activity because of the anomaly in pipeline construction, CONTRACTOR shall assist GAIL in the retrieval of the tool. This assistance will be limited to his providing advice and help in operation for salvaging the tool and in putting back the pipeline in normal operating condition ABNORMAL SITUATIONS The objective of this section is to write down foreseeable abnormal circumstances for taking appropriate measures, when such a condition arises during implementation of Project. The GAIL has foreseen the following abnormal conditions. However, if the BIDDER foresees any other abnormal condition, he is free to make a mention of the same in his technical BID offer MAJOR MODIFICATION IN PIPELINE During execution of pigging for the pipeline defined in the Scope of Work of this document, if it is found that it is not feasible to proceed with subsequent stage of pigging in the pipeline, unless major rectification of certain areas of pipeline are completed, then, the GAIL and the CONTRACTOR shall hold discussion and come to a mutual agreement about revised pigging program for the pipeline. What constitute a major modification shall be decided by GAIL and communicated to the contractor TOOL FAILURE CONTRACTOR is required to get valid interpretable and physically verifiable data for pipeline. In case CONTRACTOR is not able to perform fully to the satisfaction of GAIL and generate valid data for pipeline covered under SCOPE OF WORK during the live runs of electronic geometry pig and live intelligent pig, the payment shall be made as per provision of clause 21.0 of SCC, (Terms of Payment). In case CONTRACTOR'S equipment fails to perform electronic geometry pre-inspection and/or intelligent pigging inspection to generate valid data for the pipeline segment, CONTRACTOR will make extra runs of Pigs to get valid and physically verifiable data. The scheduled completion date shall remain unaltered under such circumstances. The replacement/repair/modification of the CONSTRUCTIONAL PLANT AND EQUIPMENT shall be decided by the CONTRACTOR. The CONTRACTOR shall be responsible for all costs including but not limited to transport from/to India, re-export duty/ Custom duty for Import/re-Import of the replaced/modified/ repaired CONSTRUCTIONAL PLANT AND EQUIPMENT without any additional payment from the GAIL on this account and the completion time shall be inclusive of the time taken lapsed such cases STUCK - UP TOOL The BIDDER shall provide a contingency plan in his BID as proposed by him in case any of the pigs get stuck up. The plan shall identify procedure for exactly locating the stuck up pig, equipment including SPREAD and support facilities required to retrieve the pig and maintain the flow with minimum loss of time and optimum efforts. If gauge pig gets stuck due to some anomaly/reduction in diameter of pipeline then the cost of pig retrieval will be borne by Owner. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 23

24 However, locating the stuck pig is the responsibility of pigging contractor with an accuracy of +/- 10 meter. If gauge pig gets stuck due to contractors fault then replacement cost shall be borne by Pigging Contractor. After Gauge Pigging, any subsequent pig gets stuck then replacement cost shall be borne by Pigging Contractor. In case of stucking up of cleaning pig/egp/cdp, location & retrieval shall be totally in the scope of the contractor. Reverse flow is not possible. Pressure surges may be possible which need to be critically planned in consultation with GAIL and Contractor. In the event of pig getting stuck during subsequent pigging activity in the pipeline leading to reduction of pipeline flow capacity, locating and removal of the same shall be the sole responsibility of the Contractor. The Contractor shall be equipped with all the exigency measures to meet any emergency situation so that normalcy in Pipeline is restored within at earliest. If pig does not move from stuck up location, by any measure, then the pipeline section shall have to be cut for retrieval of pig. In case hot tapping is required to be carried out for retrieval of stuck pigs GAIL shall provide Hot tapping machine and line stopping equipments, fittings, line pipe and fittings for bypass arrangements, etc to the Contractor free of cost. However, Contractor will provide services like welding of the fittings in the pipeline, necessary NDT, hot tapping and stopping activities at no extra cost to GAIL. Digging of the site for hot tapping and bypass arrangements will be done by GAIL free of cost. In case of failure to normalize the pipeline flow within the stipulated time period, GAIL shall carry out the exigency measures at the Contractor s risk and cost. After retrieval of the Pig, decision to continue with the next phase of activities shall be taken by Owner. However, consequential damages shall not be charged from pigging Contractor. After fabrication & erection and resumption of flow, pigging Contractor shall run gauge pig to check internal restriction, if any. 7.0 DATA ANALYSIS OWNER shall participate in the analysis of the recorded data together with the engineering and other personnel of CONTRACTOR. This analysis shall be carried out at BIDDER s Analysis Centre to achieve the following objectives: a) To identify the locations of internal or external defects likely to jeopardize the normal safety and operation of the pipeline. b) To arrive at general methodology of repair to be followed. c) Short-term measures to be taken in view of potentially hazardous defects, if found in any of the pipelines. BIDDER shall provide all raw and processed data and his software package along with the operating system in WINDOW based platform. The software shall be licensed in the name of GAIL (India) Ltd. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 24

25 7.1 FINAL WORK REPORT The BIDDER shall include in his offer the most appropriate reporting procedure envisaged for the subject pipeline. This will have to be mutually agreed between the successful BIDDER and OWNER. Preparation and submission of daily site report after completion of each pigging activity. Preparation of Preliminary report based on results of Corrosion Detection Pigging giving location/sites for Dig verification. Analysis of the Corrosion Detection Pigging data at Contractor s works site. Preparation and submission of the final work report within 45 (forty five) days within contact duration (six month) after completion of field activities of for approval by the Owner. The final work report shall include foam, gauging, cleaning, caliper, corrosion detection pig runs details with operational and functional parameters, daily detailed site report of each run with observations, individual feature report, severity analysis, velocity plot of intelligent pig, defect distribution along the length of segment and report of dig verification etc. However, any reporting system shall include but not limited to the following: a) Preliminary site report for pipeline for each running of foam, cleaning, caliper, intelligent pig runs stating comments/observations of each run, pig condition, operating parameters and total time required. b) A detailed report for pipeline of running each of the pre-inspection tools such as cleaning pig, caliper pig. c) A detailed report on the geometry survey of pipeline segment incorporating the following supplemented with raw/processed data logs. i. List of installations. ii. List of Significances with 1. Feature Information 2. Feature type 3. Feature description 4. Feature log Distance 5. Feature Clock orientation 6. Feature length 7. Feature depth (Change in ID) iii. Installation references 1. Distance from next installation 2. Installation Distance 3. Installation type d) Velocity plot of EGP e) Temperature Plot if applicable. f) Survey Log and enlargement areas of special interest. g) Detailed report about running of the intelligent pig including but not limited to the operational and functional details. 1) Details describing the type, size, internal/external discrimination and location of individual metal loss defects. The location and orientation of each defect shall be suitably listed with reference to permanent pipeline features, girth weld no. relative and absolute distance and severity of the defect. 2) A detailed report in respect of each defect for which sizing has to be done indicating its length, width, depth, axial and circumferential location suitably referenced. 3) Depth based feature distribution against pipe length of all metal loss features. SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 25

26 4) Severity analysis for all metal loss features having metal loss greater than 20% for all detected features. 5) Individual evaluation feature report in great detail for 5 nos. significant metal loss features of pipeline. m) Suitable histograms between absolute distance of pipeline and no. of defects. 6) Report on the inter-active corrosion due to clustering of pits. 7) Velocity of the intelligent pig along the length of the pipeline. 8) Recommendation for Repair Report (RRR) 9) Fitness For Purpose (FFP) Report as per the latest standard of ASME B31G. 10) All the Reports and data generated by the CONTRACTOR shall be compiled in Hard copies along with CD ROM/ DVD having user-friendly operation on a PC along with the software necessary for review/analysis of data. This is required to facilitate selection of significant defects, their chainage and sizing. Contractor to provide Five sets of Hard copy along with CDROM/ DVD consisting all generated data along with compatible operating software. 11) The reports shall be compatible to any GIS platform. Reporting structure, Summary sheets of defects & statistical report for CDP tool, geometry tool & dig-up verification report shall be as per guideline of Specification and requirement for intelligent pigging of pipeline Latest version - Pipeline operator s forum (POF). 8.0 Recommendation for Repair Report (RRR) and Fitness for Purpose (FFP) The Contractor shall submit Recommendation for Repair Report (RRR) and Fitness for Purpose (FFP) report after the acceptance of Final Work Report by GAIL. GAIL shall take maximum of one (one) weeks time for acceptance of Final Work Report from the date of submission by contractor, which is included in the above Time of Completion. The FFP report shall be as per the guidelines of standard ASME B31G (latest edition). SCOPE OF WORK & TECHNICAL SPECIFICATION INTELLIGENT PIGGING Page 26

PIPELINE INSPECTION UTILIZING ULTRASOUND TECHNOLOGY: ON THE ISSUE OF RESOLUTION By, M. Beller, NDT Systems & Services AG, Stutensee, Germany

PIPELINE INSPECTION UTILIZING ULTRASOUND TECHNOLOGY: ON THE ISSUE OF RESOLUTION By, M. Beller, NDT Systems & Services AG, Stutensee, Germany ABSTRACT: PIPELINE INSPECTION UTILIZING ULTRASOUND TECHNOLOGY: ON THE ISSUE OF RESOLUTION By, M. Beller, NDT Systems & Services AG, Stutensee, Germany Today, in-line inspection tools are used routinely

More information

CEG/GP/1534/257/RFQ27016/ [01] Technical specification for NB 350 CB pipe :

CEG/GP/1534/257/RFQ27016/ [01] Technical specification for NB 350 CB pipe : [01] Technical specification for NB 350 CB pipe : Size :- NB 350 Plain End, ID 336 MM, OD 406 mm, Length - 5.3 meters +/- 25 mm Outer shell : Rolled and welded from 5 mm thick carbon steel coil / plates

More information

PATHFINDER FOAM CALIPER PIG Case Study 12 REFINED PRODUCTS PIPELINE, NAPLES ITALY. Pipeline Innovations Ltd. The Problem

PATHFINDER FOAM CALIPER PIG Case Study 12 REFINED PRODUCTS PIPELINE, NAPLES ITALY. Pipeline Innovations Ltd. The Problem PATHFINDER FOAM CALIPER PIG Case Study The Problem 12 REFINED PRODUCTS PIPELINE, NAPLES ITALY Exxon Mobil own a 12 x 3.5km refined products pipeline that runs from a dockside terminal to a tank farm on

More information

Specifications and requirements for intelligent pig inspection of pipelines

Specifications and requirements for intelligent pig inspection of pipelines Specifications and requirements for intelligent pig inspection of pipelines Version 2009 1 Contents Page 1. Introduction 4 2. Standardisation 4 2.1 Definitions 4 2.2 Abbreviations 7 2.3 Geometrical parameters

More information

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved

More information

PIPELINE INTEGRITY SOFTWARE By Valery V. Kotov, Weatherford P&SS, Lukhovitsy, Russia

PIPELINE INTEGRITY SOFTWARE By Valery V. Kotov, Weatherford P&SS, Lukhovitsy, Russia PIPELINE INTEGRITY SOFTWARE By Valery V. Kotov, Weatherford P&SS, Lukhovitsy, Russia ABSTRACT It is now commonly accepted that In-Line Inspection is one of the most reliable methods of ensuring pipeline

More information

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected]. Task Number Item Date(s) Recorded By

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected] PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is

More information

COATING & WRAPPING OF UNDERGROUND PIPING

COATING & WRAPPING OF UNDERGROUND PIPING CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification

More information

Specification for Rotary Drill Stem Elements

Specification for Rotary Drill Stem Elements Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004

More information

In-line inspection (intelligent pigging) of offshore pipeline. Birger Etterdal 2011-11-14

In-line inspection (intelligent pigging) of offshore pipeline. Birger Etterdal 2011-11-14 In-line inspection (intelligent pigging) of offshore pipeline Birger Etterdal Content Type of defects Different inspection tools Objective of any inspection Focus on corrosion mapping for submarine pipelines

More information

UGVCL/SP/591/11KV HT AB CABLE

UGVCL/SP/591/11KV HT AB CABLE TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched

More information

DEVELOPMENT OF THE PATHFINDER FOAM CALIPER PIG. By: Peter Ward, Pipeline Innovations Ltd, UK

DEVELOPMENT OF THE PATHFINDER FOAM CALIPER PIG. By: Peter Ward, Pipeline Innovations Ltd, UK DEVELOPMENT OF THE PATHFINDER FOAM CALIPER PIG By: Peter Ward, Pipeline Innovations Ltd, UK Background In 2005, Total were planning to carry out an inspection of two 32 gas and condensate pipelines running

More information

Flanged and Butt-= Weld Type

Flanged and Butt-= Weld Type Document : PG00 Year : 09 Product Group 00 Flanged and Butt-= Weld Type (LNG and LPG) Page 09 Document : PG00 Year : 09 Product Group 00 Cryogenic Butterfly valves The Cryogenic Butterfly Valve Design

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM 1. IS 15663(Part 1):2006 This code covers requirements and recommendations for the design, materials, construction and testing of pipelines made of steel

More information

TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR

TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR 1.1.0 SCOPE : This specification covers design, manufacture, testing at manufacture s works before

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

April 15, 2011 VIA ELECTRONIC TRANSMISSION

April 15, 2011 VIA ELECTRONIC TRANSMISSION Enbridge Pipelines (Lakehead) L.L.C. Shaun G. Kavajecz, Manager 119 N 25 th Street E Pipeline Compliance Superior, WI 54880 Tel 715 394 1445 www.enbridgepartners.com Fax 713 821 9428 [email protected]

More information

SMALL DIAMETER, MULTIPLE DATASET INSPECTION IN LOW FLOW AND LOW PRESSURE ENVIRONMENTS

SMALL DIAMETER, MULTIPLE DATASET INSPECTION IN LOW FLOW AND LOW PRESSURE ENVIRONMENTS WHITE PAPER 15-01 SMALL DIAMETER, MULTIPLE DATASET INSPECTION IN LOW FLOW AND LOW PRESSURE ENVIRONMENTS Chuck Harris T.D. WILLIAMSON HOUSTON, TEXAS [email protected] Mark Graves WILLIAMS OKLAHOMA

More information

CHAPTER 13 LOAD HOOKS

CHAPTER 13 LOAD HOOKS CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter

More information

James M. Pleasants Company

James M. Pleasants Company James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:

More information

Vertiline. Wireline-conveyed MFL inspection service reduces pipeline maintenance and rehabilitation costs. Baker Atlas

Vertiline. Wireline-conveyed MFL inspection service reduces pipeline maintenance and rehabilitation costs. Baker Atlas Vertiline Wireline-conveyed MFL inspection service reduces pipeline maintenance and rehabilitation costs Baker Atlas The Vertiline wirelineconveyed Magnetic Flux Leakage (MFL) instrument provides quantified

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

Oil and Gas Pipeline Design, Maintenance and Repair

Oil and Gas Pipeline Design, Maintenance and Repair Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University [email protected]

More information

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC) APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

External Visual Inspection Form

External Visual Inspection Form Tank ID Code Part 1 (a): Information on Registered Facility Name of Registered Facility: Address: Town: Postal Code: Province: Phone Number: Person Conducting the Inspection: Transport Canada Facility

More information

SCHEDULE ' A' TECHNICAL SPECIFICATION FOR 11/22/33KV H.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.

SCHEDULE ' A' TECHNICAL SPECIFICATION FOR 11/22/33KV H.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO. SCHEDULE ' A' TECHNICAL SPECIFICATION FOR 11/22/33KV H.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.MM/I/HTXLPE/2006) MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

PIPELINE INSPECTION USING INTELLIGENT PIGS AN SGA/BATTELLE WORKSHOP COLUMBUS, OHIO MAY 11-14, 2010 AGENDA

PIPELINE INSPECTION USING INTELLIGENT PIGS AN SGA/BATTELLE WORKSHOP COLUMBUS, OHIO MAY 11-14, 2010 AGENDA Day One PIPELINE INSPECTION USING INTELLIGENT PIGS AN SGA/BATTELLE WORKSHOP COLUMBUS, OHIO MAY 11-14, 2010 Westin Columbus Hotel 7:15 Continental Breakfast AGENDA Session 1 8:00 10:00 An Introduction to

More information

Instruments for the oil & gas industry

Instruments for the oil & gas industry Instruments for the oil & gas industry Instruments high-quality instruments make the difference The ROSEN Group supports industries, with a focus on integrity and maximizing asset lifespan. Our wide range

More information

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant).

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant). Fittings for CO 2 Pipe Threads Pipe thread references quoted in this catalogue conform with the requirements specified in the latest issue and amendments of the following ISO Standards: ISO 7-1 (BS21)

More information

Butt Fusion Welding of HDPE Pipes Work Procedure

Butt Fusion Welding of HDPE Pipes Work Procedure Butt Fusion Welding of HDPE Pipes Work Procedure A pipeline is as good as its weakest point. Accordingly it is not only important that quality pipes and components are used in a piping system, but also

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

Standard Hydraulic Piping Flushing Procedure

Standard Hydraulic Piping Flushing Procedure Page 1 of 6 1.0 Scope This procedure covers the minimum technical requirements for cleaning and flushing of Hydraulic and Piping, and related accessories. 2.0 Introduction In hydraulic fluid power systems,

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION THOMAS - G-FLEX GFLEX TECH SPEC CONNECTING INNOVATION JOHANNESBURG TEL: +27 11 794 7594 CAPE TOWN TEL: +27 21 556 5258 POLOKWANE TEL: 015 298 9142 DESIGNER, MANUFACTURER AND DISTRIBUTOR OF PIPE CONNECTION,

More information

T U R B I N E G A S M E T E R

T U R B I N E G A S M E T E R TURBINE GAS METER TURBINE GAS METER CGT 1 2 3 4 5 6 7 Design and function page 2 General technical data page 3 Measurement outputs page 4 Dimensions and weights page 5 Performance page 7 Pressure loss

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

V47 Series Temperature Actuated Modulating Water Valves

V47 Series Temperature Actuated Modulating Water Valves V47 Series Temperature Actuated Modulating Water Valves Master Catalog 125 Valves, Miscellaneous (Other Than Gas) Section V Product Bulletin V47 Issue Date 0286 Application The V47 modulating valves regulate

More information

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

POLYURETHANE LINING AND COATING ON PIPE RAW WATER POLYURETHANE LINING AND COATING ON PIPE RAW WATER PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2

More information

Pressure Vessel Assessment Report

Pressure Vessel Assessment Report Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899

More information

Mechanical Installation

Mechanical Installation Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s

More information

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation

More information

VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01)

VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01) VdS Guidelines for water extinguishing systems VdS 2100-09en Requirements and test methods VdS 2100-09en : 2011-05 (01) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln,

More information

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density

More information

Pipeline External Corrosion Analysis Using a 3D Laser Scanner

Pipeline External Corrosion Analysis Using a 3D Laser Scanner Pipeline Technology Conference 2013 Pipeline External Corrosion Analysis Using a 3D Laser Scanner Pierre-Hugues ALLARD, Charles MONY Creaform, www.creaform3d.com 5825 rue St-Georges, Lévis (QC), Canada,

More information

11. NONDESTRUCTIVE TESTING

11. NONDESTRUCTIVE TESTING 11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive

More information

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING 60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed

More information

SCHEDULE ' A ' TECHNICAL SPECIFICATION FOR SINGLE CORE,UNARMOURED L.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA

SCHEDULE ' A ' TECHNICAL SPECIFICATION FOR SINGLE CORE,UNARMOURED L.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA SCHEDULE ' A ' TECHNICAL SPECIFICATION FOR SINGLE CORE,UNARMOURED L.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.MM/I/ 1 X C-UA- LTXLPE/2006) MAHARASHTRA STATE ELECTRICITY

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at www.api.org/publications

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at www.api.org/publications Purchase API Spec online at www.api.org/publications 7.9.3 Forgings and Castings All repair welding shall be performed in accordance with the manufacturer s written welding specifications. WPSs shall be

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

DiscPlus DX195 and DX225 Air Disc Brakes

DiscPlus DX195 and DX225 Air Disc Brakes Revised 11-04 Technical Bulletin Revised 1 Technical 11-04 Bulletin DiscPlus DX195 and DX225 Air Disc Brakes Inspection, Installation and Diagnostics Air Disc Brake Inspection Intervals and Procedures

More information

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless

More information

CATHODIC PROTECTION SYSTEM DESIGN

CATHODIC PROTECTION SYSTEM DESIGN CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of

More information

Ultrasonic Guided Waves Evaluation of Trials for Pipeline Inspection

Ultrasonic Guided Waves Evaluation of Trials for Pipeline Inspection 17th World Conference on Nondestructive Testing, 25-28 Oct 2008, Shanghai, China Ultrasonic Guided Waves Evaluation of Trials for Pipeline Inspection Francisco C. R. MARQUES 1, Alessandro DEMMA 2 1 E&P

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,

More information

R310EN 2225 (2011.04) The Drive & Control Company

R310EN 2225 (2011.04) The Drive & Control Company Ball Rail Systems Resist NRII R310EN 5 (011.04) he Drive & Control Company R310EN 5 (011.04) Ball Rail Systems Resist NR II Bosch Rexroth AG 3 Ball Rail Systems Resist NRII General Product Description

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

GK Packing System Welding Instructions

GK Packing System Welding Instructions GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL [email protected], www.roxtec.de Welding instructions

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 *

SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 * SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 * PRODUCT: Polymer (Foam-Filled) Fuel Cells 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

M A N U A L 13-10-05

M A N U A L 13-10-05 Documentation The following information sheets illustrate the description below: 12-WW01-4G-E Sectional view of the lance with main dimensions 12-W101-6G-E Sectional view of the head of the lance with

More information

I BEAM TRACK INSTALLATION

I BEAM TRACK INSTALLATION PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Operating Instructions

Operating Instructions Operating Instructions Cable Glands Ex d and Ex e with Compound > Contents 1 Contents 1 Contents...2 2 General Information...2 3 General Safety Information...3 4 Designated Use...4 5 Technical Data...4

More information

OD 1401 9 PRECISION MEASURING INSTRUMENTS

OD 1401 9 PRECISION MEASURING INSTRUMENTS SUBCOURSE EDITION OD 1401 9 PRECISION MEASURING INSTRUMENTS PRECISION MEASURING INSTRUMENTS SUBCOURSE OD1401 EDITION 9 Unites States Army Combined Arms Support Command Fort Lee, VA 23801-1809 5 CREDIT

More information

NATIONAL INSTITUTE OF BIOLOGICALS

NATIONAL INSTITUTE OF BIOLOGICALS Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Vogt Valves The Connection Bulletin for Extended Body Forged Steel Valves Welded Bonnet, Bolted Bonnet, Class 800 & Class 1500 CB 22

Vogt Valves The Connection Bulletin for Extended Body Forged Steel Valves Welded Bonnet, Bolted Bonnet, Class 800 & Class 1500 CB 22 The Connection Bulletin for Extended Body Forged Steel Valves Welded Bonnet, Bolted Bonnet, Class 800 & Class 1500 CB 22 Extended Body Forged Steel Valves An extended body gate valve specifically designed

More information

Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories

Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories ACCREDITATION SCHEME FOR LABORATORIES Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories Technical Notes NDT 001, Apr 14 The SAC Accreditation Programme is managed

More information

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

DeZURIK 3-20 BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT Instruction D10386 August 2013 Instructions These instructions provide installation, operation and maintenance information for BAW Butterfly Valves.

More information

SPECIFICATIONS FOR STEEL PIPE

SPECIFICATIONS FOR STEEL PIPE SPECIFICATIONS FOR STEEL PIPE Published pipe standards serve three functions. 1. They dictate manufacturing and testing requirements and prescribed methods of measuring the required mechanical and physical

More information

SECTION 11014 WINDOW WASHING SYSTEMS

SECTION 11014 WINDOW WASHING SYSTEMS SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,

More information

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES 2013 DATA REPORT

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES 2013 DATA REPORT NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES 2013 DATA REPORT October 2014 Amended July 2015 Permission to Reproduce Materials may be reproduced for personal, educational and/or non-profit activities,

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

Select Radiators Installation Guide

Select Radiators Installation Guide Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall

More information

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE

More information

NORSOK Compact Flange Installation and Assembly Procedure

NORSOK Compact Flange Installation and Assembly Procedure NORSOK Compact Flange Installation and Assembly Procedure Hytorc Norway www.hytorc.no P.Nødland. Page 2 INTRODUCTION Scope The following main operations are covered in this section: Assembly/disassembly

More information

Section 6 Brake Drum Failure Analysis. Brake Drum Wear Conditions. What is Normal Wear? What is Deep or Excessive Wear? WARNING. Deep, Uniform Wear

Section 6 Brake Drum Failure Analysis. Brake Drum Wear Conditions. What is Normal Wear? What is Deep or Excessive Wear? WARNING. Deep, Uniform Wear Section Brake Drum 6 Failure Analysis WARNING To prevent serious eye injury, always wear safe eye protection when you perform vehicle maintenance or service. Figure 6.1 ASBESTOS AND NON-ASBESTOS FIBERS

More information

Mounting Instructions for SP4 Power Modules

Mounting Instructions for SP4 Power Modules Mounting Instructions for SP4 Power Modules Pierre-Laurent Doumergue R&D Engineer Microsemi Power Module Products 26 rue de Campilleau 33 520 Bruges, France Introduction: This application note gives the

More information

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test

More information

Concrete Pipes. Concrete Pipes

Concrete Pipes. Concrete Pipes Various Types of Manufactured and Supplied by the Wolfman Company 1. Data Concrete pipes of all types are manufactured at Wolfman according to IS-27 (May 2010). IS 27 is the Israeli Standard that adopted

More information

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,

More information

Mueller. Pipe Repair Products. A complete selection for all types of gas lines... all from a single source. GAS PRODUCTS DIVISION

Mueller. Pipe Repair Products. A complete selection for all types of gas lines... all from a single source. GAS PRODUCTS DIVISION Mueller Pipe Repair Products A complete selection for all types of gas lines... all from a single source. GAS PRODUCTS DIVISION MUELLER STAINLESS STEEL REPAIR CLAMPS Mueller offers a full line of stainless

More information

FOAM CHAMBER MODEL - FC

FOAM CHAMBER MODEL - FC FOAM CHAMBER MODEL - FC TECHNICAL DATA : MODEL SIZE WORKING PRESSURE FC 50, 65, 80, 100 &150 NB inlet Minimum 2.8 Kg. / sq. cm. (40 PSI) Maximum 7 Kg. / sq.cm. (100 PSI) FLANGE CONNECTION ANSI B16.5 Class

More information

Electro-Magnetic Flowmeters COPA-XT 2-Wire DT43

Electro-Magnetic Flowmeters COPA-XT 2-Wire DT43 Data Sheet Electro-Magnetic Flowmeters COPA-XT 2-Wire DT43 2-Wire Operation Significantly reduces installation costs when compared to a traditional 4-wire magmeter. ±0.5% of rate system accuracy. Patented

More information

Technical Report Example (1) Chartered (CEng) Membership

Technical Report Example (1) Chartered (CEng) Membership Technical Report Example (1) Chartered (CEng) Membership A TECHNICAL REPORT IN SUPPORT OF APPLICATION FOR CHARTERED MEMBERSHIP OF IGEM DESIGN OF 600 (103 BAR) 820MM SELF SEALING REPAIR CLAMP AND VERIFICATION

More information

FOAM CHAMBER MODEL - FCA & FCA-S HD FIRE PROTECT PVT. LTD. TECHNICAL DATA FEATURES APPLICATION. Carbon Steel Construction FCA-65, FCA-80 & FCA-100

FOAM CHAMBER MODEL - FCA & FCA-S HD FIRE PROTECT PVT. LTD. TECHNICAL DATA FEATURES APPLICATION. Carbon Steel Construction FCA-65, FCA-80 & FCA-100 MODEL - FCA & FCA-S HD FIRE PROTECT TECHNICAL DATA MODELS FCA-65, FCA-80 & FCA-100 Carbon Steel Construction FCA-S 65, FCA-S 80 & FCA-S 100 Stainless Steel Construction INLET SIZE 65, 80, 100 NB WORKING

More information

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This

More information

2013 Edition. Flanged fittings 30"-64" NSF. industrial Applications, water & Wastewater. Certified to ANSI/NSF 61

2013 Edition. Flanged fittings 30-64 NSF. industrial Applications, water & Wastewater. Certified to ANSI/NSF 61 30"-64" Ductile Iron industrial Applications, water & Wastewater 2 Table of Contents Flanged Fittings for Water 3 Flange Details 5 Flanged Fittings 6 90º and 45º Bend 6 22-1/2º and 11-1/4º Bends 7 Tees

More information

The Engineering Science of Oil Pipelines

The Engineering Science of Oil Pipelines The Engineering Science of Oil Pipelines From the Keystone XL pipeline project to spills and leaks in existing lines, pipelines are in the news. The SMCC has prepared this backgrounder on crude oil and

More information