1 TRANSPORT IMPACTS OF THE COPENHAGEN METRO Goran Vuk Danish Transport Research Institute, Lyngby, Denmark, Jane Ildensborg-Hansen TetraPlan A/S, Copenhagen, Denmark 1. INTRODUCTION The Copenhagen metro is the main improvement made to Denmark s urban public transport infrastructure in the last decade. Important arguments in favour of a new public transport system in the capital were to increase market share for public transport, thus reducing car traffic, and enhancing urban development, especially on the island of Amager, whose only previous link to the city was bus service. The focus of this article is an evaluation of the transport impact of the Copenhagen metro on traffic growth, induced traffic and choice of mode and destination. The effects were measured in two parts of the capital; an area called Frederiksberg and the corridor between islands Sjælland and Amager, so called Harbour corridor, in relation to the metro s phases 1, 2a and 2b. 2. METRO IN COPENHAGEN 2.1 City and traffic planning in Copenhagen The city of Copenhagen and the Greater Copenhagen Area have a long tradition of strategic planning with respect to both localization and traffic planning. A report existed as early as 1947 the so-called Finger Plan (Egnsplankontoret, 1947) describing the conditions for the future expansion of the city and surrounding region. The Greater Copenhagen Area was illustrated as a hand, with the palm covering the city while the fingers (radials) showed the populated areas outside the city. According to the report, the city s most important functions were administrative and cultural, while the clusters of smaller communities (towns) that developed along the radials fulfilled a residential function. These towns included institutions such as schools, banks, recreational centres and shopping malls. The radials were defined along the regional train network and the city train network (S-trains), which were either under construction in 1947 or planned for future construction. Each station defined the centre of a town cluster. Green areas were planned between the radials, with main roads built across them to provide better connections to the city centre. The 1947 Finger Plan thus assured the best possible passenger transport between the housing areas and inner-city jobs. Today, almost 60 years later, Copenhagen is a unique European capital without major traffic congestion. During these six decades, the radials have grown in both length
2 and width, as shown in Figure 1, where the small hand dates back to 1947 and the large hand is that defined in the 2003 Traffic Plan (Greater Copenhagen Authority, 2004). Figure 1. Greater Copenhagen Areas covered by the 1947 Finger Plan and the 2003Traffic Plan The 1947 Regional Plan underwent major revision in the 1973 and 1989 regional plans, (Peter Hartoft-Nielsen, 2002). The strong economic growth of the 1960s and 1970s resulted in an increase in car ownership, which rapidly exacerbated traffic conditions in the city centre. As a consequence, in the 1973 Regional Plan, the planning authorities proposed the development of a number of so-called terminal towns (e.g., Høje Taastrup and Måløv) along some of the radials, providing for park-and-ride activity on a large scale. The 1973 Regional Plan proposed also a number of ring road connections between the radials. The 1989 Regional Plan introduced the proximity to station policy, which permitted the building of industrial and service facilities in the cluster towns along the radials, where train stations are located within a 1- km radius (Peter Hartoft-Nielsen, 2002). This eliminated some commuter traffic to the city centre. Since the beginning of 1990s, the Copenhagen City authorities have focused their planning activities on minimising travel time in and out of the city. Two types of measure were proposed: the enlargement of the road and public transport infrastructure, and administrative measures. With respect to the enlargement of the public transport infrastructure, construction of the Copenhagen Metro started in 1994, while the comfort and fleet size of the bus and S-train networks have been brought up to date. The implemented administrative measures promote public transport modes at the expense of private vehicles. First, a fairly restrictive parking policy has been introduced for private cars, and second, electronic travel tickets for public transport modes
3 will be introduced in Electronic travel tickets ensure easier access to public transport by reducing travel costs and travel time. 2.2 The Copenhagen Metro Already in 1961, there were plans to build an S-train connection between the islands of Sjælland and Amager, on which Copenhagen is located (Steen Eiler Rasmussen, 2001). The alignment was a straight line between west Amager and the city. At that time, west Amager was unpopulated, and the plans proposed building some 40,000 new dwellings to ease the pressure on the fast-growing city centre. In 1992, the Danish Parliament passed the Ørestad Act permitting the construction of a new railway infrastructure in Copenhagen. The government thus endorsed the regeneration of public transport and the reduction of road congestion in the Danish capital. Of the three suggested public transport modes metro, light rail and tram the first option was chosen. Metro construction started in 1994 and the first phase was opened on 19 th October The construction costs of phase 1 of the metro amounted to DKK 6.7 billion (approximately EUR 900 million). Figure 2 shows the metro s alignment. The 11-km route consists of two metro lines connecting the island of Amager in the south with the city terminus at Nørreport on the island of Sjælland. Metro line 1 (M1) runs to a new town Ørestad in west Amager while metro line 2 (M2) runs to Lergravsparken in east Amager. The two lines meet on the Amager side of the harbour corridor, just before Knippelsbro bridge where the line goes underground. Figure 2. Alignment of the M1 and M2 metro lines
4 The alignment of the M1 metro line in west Amager largely corresponds to the 1961 plan. The new town Ørestad will expand over the next 20 years to an area of 310 hectare, providing 60,000 jobs, 20,000 education places and 20,000 dwellings. Some larger companies have built new offices in Ørestad: Telia, Copenhagen Energy, Keops and Ferring. The Danish Broadcasting Corporation transferred all its activities to a new television centre in Ørestad in The University of Copenhagen has been enlarged in the area, and the construction of an IT University is finalised. Phase 2 of the metro opened in two parts: phase 2a, between Nørreport and Frederiksberg, opened in May 2003, while phase 2b, between Frederiksberg and Vanløse opened in October Both metro lines continued their alignment in this phase from Nørreport to Vanløse. With phase 2 completed, the metro system has a total length of 16 km and consists of 17 stations, of which eight are underground. Phase 3, the last projected phase of the Copenhagen Metro, will continue line M2 from Lergravsparken station to Copenhagen s international airport at Kastrup. This phase will open for operation in autumn The full metro system will be a 22-km network, of which 11 km will be underground. The 2003 Traffic Plan also contains a proposal for phase 4 of the metro, the City Ring, with construction costs amounting to DKK 15 billion (approximately EUR 2.0 billion). Connecting areas close to the city centre, the City Ring will provide good opportunities for interchanging at major metro and S-train stations. Various alignments were proposed. Phase 4 will not be built until 2015 at the earliest. The Copenhagen Metro is fully automated and operated from a computer centre in Ørestad. The M1 and M2 lines operate with a 4-minute headway between trains during peak periods, which gives a 2-minute headway in the city centre. In the out of peak periods the M1 and M2 lines operate with a 6- minute headway. The operational system allows a minimum headway of only 85 seconds between trains. The metro operates in a self-contained network. As the metro network has been expanded, changes have been made to the bus service in the capital, including the introduction of a so-called A-line bus network. A-line buses are high-frequency city buses that operate without timetables. They cross the metro network frequently and therefore serve as an access/egress mode to/from the metro. Two corridors across the Frederiksberg and one, so-called, catchment area were defined in the metro impact study. The corridors were used for conducting traffic counts while the catchment area was used for identification of the respondents in the panel interviews. Figure 3 shows the geographical position of the corridors (the red lines) and the catchment area (the blue circle) where the dashed line shows the alignment of the M1 and M2 metro lines. The catchment area has the centre at the Frederiksberg metro station. The impact of the metro s phases 2a and 2b are measured in Frederiksberg.
5 The second part of the capital where the metro s impact is measured is so called the Harbour corridor, which is the sea channel between the islands of Sjælland and Amager. Figure 3 also shows the Harbour corridor. The corridor is defined by two bridges; the Langebro and Knippelsbro bridges (see Figure 1). The impact of the metro s phases 1, 2a and 2b are measured in the Harbour corridor. Figure 3. Traffic corridors and the catchment area in the project Vanløse Flintholm Lindevang Forum Nørreport Kongens Nytorv Solbjerg Frederiksberg Christianshavn Islands Brygge Amagerbro Lergravsparken Universitetet Sundby 3. DATA COLLECTION Bella Center Data from different sources were used in the analysis Ørestad and can be classified into traffic counts, panel data and postcard data. Traffic counts refer to the private car, bus, bicycle and metro modes. Table 1 shows the sources of the traffic counts used in the analysis. In addition, traffic counts were performed at checkpoints outside the research area to monitor general fluctuations in traffic over time. Copenhagen Municipality and the Danish Road Directorate collected these data for the period Panel surveys were conducted as part of the metro impact study in the sixmonth period before and after the opening of phase 1 (the Harbour corridor) and phase 2a (the area of Frederiksberg). The Harbour corridor sample consisted of respondents, recruited by postcard surveys which were completed ahead of the panel surveys. The Frederiksberg sample consisted of 500 respondents, which were recruited randomly from a catchment area
6 defined with a radius of 500 meters around the Frederiksberg metro station. Interviews were conducted by telephone. Table 1. Description of traffic counts Source Modes Time interval Type of count The Copenhagen metro impact study Road vehicles Manual The Copenhagen metro impact study S-train passengers Manual Copenhagen Municipality Road vehicles Manual/Automatic The Danish Road Directorate Road vehicles Automatic The Copenhagen bus company Bus passengers Automatic The Danish State Railways S-train passengers Manual The Copenhagen metro company Metro passengers Manual/Automatic 4. TRANSPORT IMPACTS OF THE METRO Table 2 shows the development of car traffic on the borders of the Copenhagen and Frederiksberg municipalities (checkpoints) since The roads selected are major roads from the north, west and south to the city centre. All counts are done automatically and refer to average workday traffic. We also present the development of the Danish GDP in the table because traffic development is closely related to economic activity. The figures in Table 2 show that, with some minor variations, car traffic in general has increased in the Greater Copenhagen area since 1998 as well as the GDP. Table 2. Observed car traffic at checkpoints on an average workday and GDP in the period (index 100 = year 2000) Year Englandsvej Roskildev ej Strandveje n Lyngbyveje n Amager motorway GDP Source: Copenhagen Municipality, the Danish Road Directorate and the Danish Statistical Bureau Table 3 summarises the transport effects of the Copenhagen metro in 2003 and 2004, relative to 2002 (the last year before opening of the metro). The impacts are based on the traffic counts. Data analysis in Frederiksberg shows that between the two corridors only the one crossing the metro alignment (the
7 North-South corridor) was affected by the metro. We refer therefore in the rest of the paper to this corridor where referring to the Frederiksberg area. The absolute figures, which lie behind the table figures, represent passenger transport (i.e. for each transport mode number of passengers transported is observed) for an average weekday, i.e. Monday to Friday. The rest of the paper explains the obtained impacts. Table 3. Transport impacts of the Copenhagen metro Frederiksberg Harbour corr. Frederiksberg Harbour corr. General growth +1% +1% +5% +6% General growth in the +7% +9% +19% +23% public transport General induced traffic +0% +1% +3% +4% Induced traffic in the public transport Induced traffic in the metro traffic +0% to 1% +0% to +2% +5% to +6% +8% to +10% +0% to +6% +1% to +3% +15% to +18% +15% to +18% Decrease in car transport -7% to -8% -3% to -4% -12% to -13% -4% to -5% Decrease in bus transport -18% to -21% -39% to -40% -21% to -26% -43% to -47% Decrease in S-train transport Decrease in bicycle transport 0% to -2% - -18% to -20% - 0% to -4% 0% to -4% 0% to -9% 0% to -9% 4.1 Traffic growth The analysis of the traffic counts in the Frederiksberg and Harbour corridors for the period shows an average annual total growth (i.e. all travel modes) of approximately 0,5-1%. The observed growth was 1%, which means that in the first year of the metro operation (phase 1) the metro did not generate any traffic that cannot be explained by ordinary economic figures such as increase in GDP. The general traffic growth in 2004 relative to 2002 was 5-6%, which is higher than expected in the case the metro was not built. This is to say that the metro has succeeded in generating new traffic across the two corridors, either in the form of induced traffic or changes in the destination choice. The historical tendency of the public transport development across the two corridors up to 2003 was negative. In 2003 the general growth in the public transport was turned to be positive, in the range between 7-9%. Therefore, even though both the bus and S-train traffic decreased from 2002 to 2003, the metro succeeded in lifting up the total public transport in the two corridors in
8 2003. This is partially explained by the modal shift (from non public transport modes to the metro) and partially due to the existence of induced traffic. The general growth in the public transport accelerated to 19-23% in 2004 relative to 2002 due to three factors: a) the metro network expanded in 2003, where both phase 2a and 2b opened, b) the reliability of the metro was improved dramatically in 2004 relative to 2003 and c) adaptation of the metro, as a new travel model, reached much further in the traveller s conscious in Induced traffic By induced traffic we mean the traffic that occurs due to the infrastructural improvements. In the first year of operation no general induced traffic occurred in the two corridors. In 2004 the general induced traffic was in a range 3-4%, which is to be expected due to the metro s enlargement in 2003 (opening of phases 2a and 2b). Accordingly, the public transport induced traffic was negligible in 2003, while in 2004 it reached 6% in Frederiksberg and 10% in the Harbour corridor. Finally, the metro s induced traffic was rather small in 2003 (3-6%), while quite substantial part of the total metro traffic in 2004, where the induced traffic part was between 15-18% in both corridors. There are two main reasons for the observed induced traffic in the corridors. The first reason is that travellers across the two corridors travel more in 2003/04 than in 2002 (increase in trip rate), and the second is changes in the destination choice. The panel surveys in the Frederiksberg area and the Harbour corridor confirm that the trip rate in the after-panels is higher that the trip-rate in the beforepanels. The analysis of the panel data in Frederiksberg shows a very clear picture: a) the trip rate rose from 3,17 trips per person per day in the beforepanel to 3,65 trips per person per day in the after-panel, and b) the trip rate for bicycle rose by 10%, the trip rate for car rose by 16%, while the public transport trip rate rose by 40% from before-survey to after-survey. The analysis of the Harbour corridor panel shows weaker tendencies that in Frederiksberg: a) the trip rate rose from 3,26 trips per person per day in the before-panel to 3,30 trips per person per day in the after-panel, and b) the trip rate for bicycle decreased by 15%, the trip rate for car rose by 6%, while the public transport trip rate rose by 33% from before-survey to after-survey. The further analysis of the panel data shows that the induced traffic occurs predominantly in respect to leisure activities, such as shopping, visiting friends/family and cultural/sport activities. 4.3 Modal changes Modal changes are presented in table 3 in intervals rather than as point values. One side of the interval represents the observed changes from 2002 to 2003/04, while the other side of the interval represent the changes between the extrapolated traffic in 2003/04 (i.e. the expected traffic in 2003/04 in the
9 case the metro was not existed) and the observed 2003/04 traffic. So, while the first value of the interval refers to the observed modal effect, the second value in the interval refers to the expected modal effect. Car traffic The car traffic (presented in number of persons travelled by car) decreased by 3-4% in 2003 relative to 2002 in the Harbour corridor, while the car traffic decrease was 7-8% in the Frederiksberg corridor. The main reason for that is differences in population density, where Frederiksberg is more densely populated than area around the Harbour corridor. Higher population density in Frederiksberg gives possibilities for both short and long car trips to be shifted to the metro. The tendency of car shift to the metro continued in 2004, where modal shift in the Harbour corridor was 4-5% relative to 2002 while in the Frederiksberg, the car shift was 12-13%. Again, larger population in Frederiksberg is the main reason for differences in car shift between the two areas. Bus traffic According to the literature, new infrastructures affect bus traffic in particular, e.g. about 50% of the Athens metro passengers are former bus users (Golias, 2002) while about 70% of Croydon Tramlink passengers are former bus users (Copley at al., 2002). The bus traffic decreased from 2002 to 2003 in Frederiksberg by 18-21%, while the corresponding decrease in the Harbour corridor was 39-40%. There are two reasons why the bus decrease was larger in the Harbour corridor than in Frederiksberg. The first one is that the Copenhagen bus authority (HUR) made changes in the bus service from 2002 to 2003 in order to accommodate for metro introduction, which were much more radical in the Harbour corridor area. Secondly, the area of Frederiksberg has a large portion of elderly people. They do not feel safe neither in metro, which is run automatically at the computer centre in Ørestad, nor at the Frederiksberg metro station, which is an underground station. In conclusion, the elderly bus travellers in Frederiksberg were reluctant to shift to the metro in 2003, and they rather stayed being bus passengers. The tendency of bus transport shift to the metro observed in 2003 continued in The decrease in 2004 relative to 2002 was 21-26% in Frederiksberg and 43-47% in the Harbour corridor. The observed changes in 2003 and 2004 show that the biggest part of those bus travellers who actually shifted to the metro did that already in S-train traffic There is about 200 km of S-train track in Copenhagen, which is a very well functional city railway network. The S-train does not cross the Harbour corridor (this system does not operate on the island of Amager), which means
10 that the modal shift from S-train to metro has been measured in the study only in Frederiksberg. In 2003, the metro alignment crossed the existing S-train network only at the station of Nørreport, which is though the busiest train station in the whole country. A moderate maximum of 2% of S-train passengers on the Frederiksberg corridor shifted to metro in In 2004, the metro alignment crossed the S-train network at three stations, i.e. Nørreport, Flintholm and Vanløse, where the last two stations were reached with opening of the metro phases 2a and 2b. In 2004, 18-20% of the 2002 S- train passengers on the Frederiksberg corridor shifted to metro. The reason for this rather large shift is that by changing to metro at Vanløse/Flintholm stations for those travelling to the city centre it is possible to obtain a significant gain in travel time, especially if the destination is a part of the city covered only by metro, e.g. Frederiksberg, Christianshavn and Kongens Nytorv. Bicycle traffic Bicycle traffic is rather substantial in the whole country and especially in Copenhagen, e.g. there were approximately bike trips over the Harbour corridor in an average weekday in 2004 and that is trips more than by bus and trips less than by metro. Bicycle counts in Copenhagen are rather unreliable. First of all, it is rather difficult to count bikers in rush hours. Secondly, most counts are done only once a year, e.g. Tuesday-Thursday in March or September, in a period between 6 a.m. and 6 p.m.. Depending on the weather conditions the bike traffic can vary substantially at the counting day, which is difficult to correct for when calculating for an average annual weekday. For the reasons above, we have developed a methodology for calculating the modal shift from bicycle to metro based on the combination of traffic counts and panel data. The methodology is common for both areas in the project. According to the applied method up to 4% of the bikers shifted to metro in 2003, while in 2004 up to 9% of the bikers in the two corridors shifted to metro. 4.4 Changes in choice of time of day Figure 4 shows the number of passenger trips by public transport across five time periods of the day, i.e. morning, morning peak, day, afternoon peak, evening, in 2002, 2003 and 2004 on the Frederiksberg corridor. According to the figure, the number of trips made by public transport in the afternoon and evening period rose with the introduction of metro. Actually, the more metro the more obvious this tendency is, i.e. the effect is larger in 2004 than in According to the existing literature regarding activity based modelling the travellers tend to combine their activities in the afternoon/evening period, e.g.
11 increase in leisure activities. According to figure 4 it seems that the traveller s mobility has increased after the introduction of metro. Figure 4. Changes in public transport in Frederiksberg in 2002, 2003 and 2004 across five time periods Antal ture per time Tidsperiode 4.5 Changes in destination choice The postcard analysis in Frederiksberg has shown that approximately 40% of the public transport leisure trips across the corridor in 2002 ended in the neighbouring city parts to Frederiksberg. In 2003 this share decreased to only 17%, while the destinations along the metro alignment rose sharply (e.g. city centre and Christianshavn). This change indicates that for leisure activities, such as shopping, travellers are prepared to travel longer in distance (which does not necessarily mean also longer in travel time) in order to reach more attractive destinations as a result of better accessibility. The panel survey in the Frederiksberg area show that while the average trip length is constant between the before panel and after panel, the average trip time has fallen. 5. CONCLUSIONS Analysis of the traffic counts, postcard data and panel data in the project for a period 1990 to 2004 in the Harbour corridor and the area of Frederiksberg shows that the introduction of metro in October 2002 (phase 1) and 2003 (phases 2a and 2b) changed travel patterns in the capital dramatically. This is related to both the number of impacts but also their magnitude. It is interesting to observe that while the changes in traffic growth and induced traffic are rather similar in the two areas, the modal changes are different in magnitudes in the two areas, e.g. while decrease in car traffic is approximately twice as big in Frederiksberg than across the Harbour corridor the opposite is true for the shift of the bus travellers. The main reason for this effect is that general (macro) effects, such as general traffic growth, are indifferent to the
12 population density, while the micro effects, such as shift of bus passengers to metro, are in function of the population density. Other reasons for this effect are the existing level of service, age/income structure of the population and the initial modal split in the areas. Already in 2007 the metro network will be enlarged by opening of the third phase, where metro line M2 will continue its alignment towards the International Airport Kastrup. By 2015 the metro s phase 4, the so called Metro City Ring, will be opened. It can be therefore expected that the transport impacts presented in the paper will continue in future. First, both the traffic growth and induced traffic will continue to increase in future as the travellers will continue to change their behaviour according to infrastructural changes. It is though expected that in future apart of increase in leisure trips also the commuting trips will increase across the defined screen lines because some travellers will choose the place of dwelling/work close to the metro s alignment, i.e. the effect of destination choice. Second, with the increase of the metro network one can expect that the peak periods will get wider in time-intervals. Especially the afternoon peak will increase and continue in the evening hours as a sign that the mobility has improved. Opening of the electronic ticket for public traveller by 2007 will enhance this effect. Third, the bus traffic has already been influenced strongly by the metro. However, the decrease of the bus traffic in the densely populated areas (such as Frederiksberg) was smaller than expected. There is therefore a potential for shifting more bus travellers to the metro in these areas. More generally though we can assume that with a more reliable metro service and with opening of new metro phases in 2007 and 2015 there will be more of the 2002 bus passengers who will shift to the metro. Finally, the future shift from car to metro is not only in function of the metro s enlargement but also of the traffic policies to be introduced in the future. These policies include parking policy, public transport ticket pricing and potentially introduction of road pricing. References Copley, G., Thomas, M. and Georgeson, N. (2002). Croydon Tramlink impact study. European Transport Research Conference. September Cambridge, UK. Egnsplankontoret (1947). Skitseforslag til egnsplan for Storkøbenhavn ( Finger Plan ). Tutein & Koch. Copenhagen, Denmark. Golias, J.C. (2002). Analysis of traffic corridor impacts from the introduction of the new Athens Metro system. Journal of Transport Geography. Volume 10, Issue 2, June Pages Greater Copenhagen Authority (2004). Traffic Plan Report nr Denmark.
13 Hartoft-Nielsen, P. (2002). Stationsnærhedspolitikken i hovedstadsområdet baggrund og effekter. Repport 18, Forskningscentret for Skov & Landskab. Report nr Denmark. Rasmussen, S. E. (2001). Steen Eiler Rasmussens København: Et bysamfunds særpræg og udvikling gennem tiderne. Gads Forlag. Copenhagen, Denmark.
TRANSPORT IMPACTS OF THE COPENHAGEN METRO
TRANSPORT IMPACTS OF THE COPENHAGEN METRO Jane Ildensborg-Hansen TetraPlan A/S, Copenhagen, Denmark ([email protected]) Goran Vuk Danish Transport Research Institute, Lyngby, Denmark, ([email protected]) 1. INTRODUCTION
The Danish Transport System. Facts and Figures
The Danish Transport System Facts and Figures 2 The Ministry of Transport Udgivet af: Ministry of Transport Frederiksholms Kanal 27 DK-1220 København K Udarbejdet af: Transportministeriet ISBN, trykt version:
Traffic and urban development in Kongens Lyngby
Traffic and urban development in Kongens Lyngby Henrik Brade Johansen, seniorconsultant and city councillor 1 - New lightrail around København - Urban vision and construction in Lyngby - Recreation of
11. Monitoring. 11.1 Performance monitoring in LTP2
178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the
2. The Copenhagen s metro
2. The Copenhagen s metro 2.1. Introduction Copenhagen, as the main urban area of the Nordic countries with more than one million people and its great situation linking Denmark with Sweden, makes the capital
Keywords: Passenger Costs, Railway Maintenance Planning, Railway Closure Time Evaluation
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 16039696 www.trafikdage.dk/artikelarkiv
GTA Cordon Count Program
Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends
Why build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
Transport Demand Management
CITIES ON THE MOVE WORLD BANK URBAN TRANSPORT STRATEGY REVIEW Regional Consultation Workshop ECA and MENA Budapest, February 28 - March 1, 2001 Transport Demand Management Selected Experiences from Germany
6 REGIONAL COMMUTE PATTERNS
6 REGIONAL COMMUTE PATTERNS INTRODUCTION One of the challenges for this study, which has a primary goal of looking at commute opportunities in MnDOT District 3, is that in some portions of the study area,
Ørestad Downtown Scandinavia. Facts on Ørestad. Contact Ørestad:
Facts on Ørestad Ørestad will be developed over the next 20 years Ørestad covers an area of more than three miles from the border of the City of Copenhagen to the Kalvebod Fælled nature reserve The width
Transport planning in the Stockholm Region
Stockholm County Council Office of Regional Planning and Urban Transportation Hans Hede Transport planning in the Stockholm Region METREX/Moscow International workshop June 2006 A region with great potential
INTEGRATION AND REGULATORY STRUCTURES IN PUBLIC TRANSPORT CASE STUDY BRUSSELS CAPITAL REGION
INTEGRATION AND REGULATORY STRUCTURES IN PUBLIC TRANSPORT CASE STUDY BRUSSELS CAPITAL REGION Brussels, July 2003 1- GENERAL INFORMATION ON THE CASE STUDY A/ General statistics on the case study - Area
Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study
Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Contact person: Ellen Blake Email: [email protected] Phone: 021 1067139 Date: 30 September 2013 About
Multifamily Housing: Sustainable Development in Efficient, Walkable Communities
Multifamily Housing: Sustainable Development in Efficient, Walkable Communities by the Greater Charlotte Apartment Association Multifamily rental housing is a critical piece of the housing market in the
Residential Development Travel Plan
Residential Development Travel Plan A Template for Developers Name of Development (Address) Name of Developer (Contact Details) Date of Travel Plan For office use: Planning reference.. /.. /.. Residential
Bus Users in Sydney. Transport Data Centre ISSUES PAPER 2002/02 DECEMBER 2002 ISSN 1325-9253 ISBN 0 7313 2821 3
ISSUES PAPER 2002/02 DECEMBER 2002 ISSN 1325-9253 ISBN 0 7313 2821 3 Bus Users in Sydney Bus Users in Sydney presents the latest information on bus travel and bus travellers living in the Sydney Statistical
BSM @ DSV - A Little Better Every Day Group IT, Gustaf Pilo April 2010 [email protected] http://dk.linkedin.com/in/gpilo
BSM @ DSV - A Little Better Every Day Group IT, Gustaf Pilo April 2010 [email protected] http://dk.linkedin.com/in/gpilo BSM @ DSV - Topics Main topics of today Organization Why BSM in DSV? You are in
and 7 Queensland Transport, Moving People Connecting Communities: A Passenger Transport Strategy for Queensland 2007 2017, 2006
and 7 Key result area 1 Shaping the future Developing new products and services, planning and behavioural change 1. Change behaviour to encourage sustainable transport choices To develop an awareness of
Introduction to the town of Vinge. Vibrant town. Ever-present nature 1
Introduction to the town of Vinge Vibrant town. Ever-present nature 1 2 Vinge Vibrant town. Ever-present nature 3 4 Vinge Introduction to the town of Vinge This publication is based on the masterplan for
Leicestershire County Council Transport Trends in Leicestershire 2014. Transport Data and Intelligence (TDI)
Leicestershire County Council Transport Trends in Leicestershire 2014 Transport Data and Intelligence (TDI) Table of Contents Contents List of Tables... 3 List of Figures... 3 Overview... 5 Traffic Growth...
Jana Eger Schrøder, Centre for Urban Development Finance administration, City of Copenhagen. 18. september 2009
Jana Eger Schrøder, Centre for Urban Development Finance administration, City of Copenhagen 18. september 2009 OUTLINE Introduction Urban planning in the City of Copenhagen Changing demographics Thinking
INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT
INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT MARK BRUSSEL CONTENTS Examples of integration from the Netherlands Rationale and principles of integration
Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area
Integrated Public Transport Service Planning Guidelines Sydney Metropolitan Area December 2013 CONTENTS 1. INTRODUCTION 3 1.1 Purpose 3 1.2 Background 3 1.3 Travel in Sydney Metropolitan Area 5 1.4 Objectives
National Travel Surveys in Finland
XXVII International Baltic Road Conference August 24-26, Riga National Travel Surveys in Finland Tytti Viinikainen Sociologist, MSocSc Finnish National Road Administration [email protected]
Recommendations for regional cycling developments of Budapest metropolitan area
Recommendations for regional cycling developments of Budapest metropolitan area European Union European Regional Development Fund Transport challenges in metropolitan regions: The Catch-MR project Transport
Getting people on board!
Getting people on board! Using active mobility consultancy to promote public transport use in rural areas www.smartmove-project.eu Growing challenges The EU-funded SmartMove project is working to advance
Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by
Evergreen Line Rapid Transit Project Business Case Executive Summary February 2008 Reviewed by Recommendation and Executive Summary The business case for the Evergreen Line Rapid Transit Project (the Project)
Making Sense of Urban Data
Making Sense of Urban Data Anil Yazici, PhD Camille Kamga, PhD Data Sim @ Hasselt, Belgium July 213 NEW YORK CITY Population, 211 estimate: 8,244,91 Land area in square miles, 21: 32.64 Persons per square
Transport demands in suburbanized locations
Agronomy Research 12(2), 351 358, 2014 Transport demands in suburbanized locations M. Lukeš *, M. Kotek and M. Růžička Faculty of Engineering, Czech University of Life Sciences Prague, 165 21 Prague 6
Copenhagen City of Cyclists BICYCLE ACCOUNT 2012
Copenhagen City of Cyclists BICYCLE ACCOUNT 2012 2012 FOREWORD Copenhagen is growing. Every year, more people move to the city and choose to stay. This is putting a strain on the cycling tracks. In 2012,
Examination of catchment areas for public transport
Examination of catchment areas for public transport Alex Landex, Research Assistant, M.Sc., [email protected] Stephen Hansen, Research Assistant, M.Sc., [email protected] Jonas L.E. Andersen, Research Assistant,
Cycle Strategy 2006 2011
Cycle Strategy 2006 2011 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 POLICY BACKGROUND... 2 3 BACKGROUND... 6 4 MAIN OBJECTIVES... 8 5 TARGETS... 9 6 THE CYCLE NETWORK... 10 7 CONCLUSION... 13 Appendix A:
BICYCLE TRENDS IN CAMBRIDGE
BICYCLE TRENDS IN CAMBRIDGE Cambridge promotes bicycling as a healthy, environmentally friendly way of getting around as an important part of the City's efforts to improve mobility and protect our environment.
PUBLIC TRANSPORT IN SMALL TOWNS AN AREA WITH GREAT POTENTIAL
PUBLIC TRANSPORT IN SMALL TOWNS AN AREA WITH GREAT POTENTIAL Andreas Persson Department of Technology and Society, Lund Institute of Technology Sweden 1. INTRODUCTION The project Attractive Public Transport
TRANSPORT ASSESSMENT GUIDANCE
TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4
THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS
What Forus will be CONTENTS WHY A JOINT PLAN FOR FORUS?... 3 WHAT IS A PLAN PROGRAMME?... 3 THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS... 3 THE PLAN AREA... 4 THE LONG-TERM GOALS FOR FORUS...
Ticketing and user information systems in Public Transport in Thessaloniki area
Ticketing and user information systems in Public Transport in Thessaloniki area ChrysaVizmpa, Transport Planner Engineer Thessaloniki Public Transport Authority «Technology, Mobility governance and Public
Analysing the Metro Cityring in Copenhagen
Computers in Railways XI 45 Analysing the Metro Cityring in Copenhagen A. H. Kaas & E. M. Jacobsen Atkins, Denmark Abstract When planning new infrastructure it is important that the infrastructure is well
Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited
Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited Introduction This is the consultation response by Birmingham
Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa
Integrated Public Transport National workshop on promoting sustainable transport solutions for East Africa Carly Koinange, GEF Sustran Consultant UN-HABITAT Urban Mobility Unit Urban Basic Services Branch
Median Bus Lane Design in Vancouver, BC: The #98 B-Line
Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway
City of Vantaa New Plans and Projects
City of Vantaa New Plans and Projects Smart Mobility for Better Cities Conference 12 May, 2011 Gilbert Koskela Project Engineer Marja-Vantaa project City of Vantaa has been a forerunner in Finland in studying
URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES
United Nations Forum on Climate Change Mitigation, Fuel Efficiency and Sustainable Urban Transport URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES S. MEHDI TASHAKKORI
We would be pleased to discuss these issues with you at your convenience.
Public Transport Users Association Inc. Ross House, 247 Flinders Lane Melbourne 3000 Reg. No. A-6256L Email: [email protected] Dear Councillor Queen Victoria Market Redevelopment Project The Public Transport
1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture
1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture Universitat Autònoma de Barcelona (UAB) 2nd-3rd, July 2015 Barcelona,
LIGHT RAIL ON RING 3 NOVEMBER 19 TH 2014. Supplier Workshop. Islevbro station (Rødov
LIGHT RAIL ON RING 3 NOVEMBER 19 TH 2014 Supplier Workshop Islevbro station (Rødov 1 Agenda In the Auditorium: 1. Welcome and programme; purpose of the day 2. Ring 3 in Brief 3. Vision of Light Rail on
HLJ 2015. Transport policy in Nordic urban regions - POLISE
HLJ 2015 Transport policy in Nordic urban regions - POLISE Tools for clarifying transport policies One of the starting point analyses conducted for the purposes of the Helsinki Region Transport System
Customer Satisfaction Index 2014
Customer Satisfaction Index 01 Contents Executive summary Customer satisfaction methodology Initiatives to improve customer satisfaction November 01 results Overall train network Overall bus regions Overall
Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division
Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion Siemens Rolling Stock Portfolio in Great Britain We have some of the most reliable trains in UK.. Over 350 trains
Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs
Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)
PUBLIC TRANSPORT NETWORK DESIGN AND APPRAISAL A CASE STUDY OF PORTO
Advanced OR and AI Methods in Transportation PUBLIC TRANSPORT NETWORK DESIGN AND APPRAISAL A CASE STUDY OF PORTO Álvaro COSTA 1, Pedro ABRANTES, Oana GROZAVU, Sílvia MAGALHÃES Abstract. The city of Porto
PISA. Agenzia Regionale per la Protezione ambientale della Toscana (ARPAT)
PISA City in Tuscany, Pisa is a city of nearly 90,000 inhabitants, that become around 200,000 considering also the residents in the surrounding municipalities. Pisa is known worldwide for its Leaning Tower
Bicycle and Public Transport Dream Team or Rivals? The Berlin Experience
Bicycle and Public Transport Dream Team or Rivals? The Berlin Experience Conference Integrated Urban Mobility Dresden, 12./13. March 2009 Burkhard Horn Senate Department for Urban Development, Berlin Overview
1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):
Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports
2012 King County Metro Transit Peer Agency Comparison on Performance Measures
2012 Peer Agency Comparison on Performance Measures Department of Transportation Metro Transit Division King Street Center, KSC-TR-0415 201 S. Jackson St Seattle, WA 98104 206-553-3000 TTY Relay: 711 www.kingcounty.gov/metro
Traveling to our farm on Lyø-island (Denmark) 1. Traveling to Faaborg
Traveling to our farm on Lyø-island (Denmark) On these pages you will find the following information: 1. Traveling to Faaborg (the city close to Lyø) 2. The ferry from Faaborg to Lyø-island 3. From Lyø
Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu
Development of Shanghai Integrated Transport (2010-2015) XIAO Hui and GU Yu Abstract This article summarises the general situation of Shanghai s integrated transport system and then determines the trends
Informal meeting of EU ministers for Transport Luxembourg, October 7th, 2015. Declaration on Cycling as a climate friendly Transport Mode
Informal meeting of EU ministers for Transport Luxembourg, October 7th, 2015 Declaration on Cycling as a climate friendly Transport Mode Preamble Innovation Cycling is a European success story i. Bicycle
Nearly 38,000 vehicles cross the Shinnecock Canal on Sunrise Highway (NYS Route 27) daily, during peak summer months.
2. Traffic Characteristics Traffic volumes have increased in concert with population growth in the Towns of Southampton and East Hampton. The New York State Department of Transportation (NYSDOT) maintains
NOTTINGHAM. Workplace Parking Levy
Workplace Parking Levy NOTTINGHAM About Nottingham Nottingham is an ambitious and vibrant city. It is designated as a core city and is ranked as a top ten UK retail centre. The Greater Nottingham economy
VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY
3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported
Policies and progress on transport access, including access for the rural population and low-income households
Transport Policies and progress on transport access, including access for the rural population and low-income households The newest long-term strategy of the Ministry of Transport and Communications Finland,
Denmark - on your bike!
Denmark - on your bike! The national bicycle strategy July 2014 Denmark - on your bike! The national bicycle strategy 4. Denmark - on your bike! Denmark - on your bike! Published by: Ministry of Transport
Ne w J e r s e y Tr a f f i c Co n g e s t i o n :
Ne w J e r s e y Tr a f f i c Co n g e s t i o n : A Growing Crisis January 2008 Cover photo : Route 3, Passaic County introduction A rising tide of traffic congestion threatens to increase roadway gridlock,
Background to the Norwegian Ministry of Transport and Communications support for the measures
TØI report 738/2004 Author(s): Nils Fearnley and Åse Nossum Oslo 2004, 45 pages, Norwegian language mary: Public transport packages of measures 1996-2000 Economic evaluations Background to the Norwegian
GENERAL INFORMATION FOR MEETING PARTICIPANTS AND OTHER VISITORS TO THE UN CITY COPENHAGEN
GENERAL INFORMATION FOR MEETING PARTICIPANTS AND OTHER VISITORS TO THE UN CITY COPENHAGEN Address: UN City Marmorvej 51 2100 Copenhagen Ø Denmark Telephone: (+45) 45 33 70 00 Telefax: (+45) 45 33 70 01
What are the physical characteristics of York? Why problems do you think there could be in York use map evidence.
What are the physical characteristics of York? Why problems do you think there could be in York use map evidence. 2 (c) (ii) What is the straight line distance, to the nearest km, from the road junction
RandstadRail: Increase in Public Transport Quality by Controlling Operations
RandstadRail: Increase in Public Transport Quality by Controlling Operations Niels van Oort HTM, Urban public transport, Research and development P.O. Box 28503, 2502 KM The Hague, The Netherlands, e-mail:
Sustainable Travel Demand
Sustainable Travel Demand Goodbody Economic Consultants Ballsbridge Park, Ballsbridge, Dublin Tel: 353-1-641-0482 Fax: 353-1-668-2388 www.goodbody.ie e-mail [email protected] In Association With
Case study summary TISSÉO - SMTC France
/ SUMMARY summary 2014 Ashden Award winner Supported by With the phenomenal 80% increase in public transport journeys that Tisséo-SMTC has achieved in just seven years, it is leading the way to a future
The Economic Benefits of Aviation and Performance in the Travel & Tourism Competitiveness Index
CHAPTER 1.4 The Economic Benefits of Aviation and Performance in the Travel & Tourism Competitiveness Index JULIE PEROVIC International Air Transport Association (IATA) The aviation industry supports tourism
Data Collection and Sampling issues -Preparing Low Carbon Mobility Plan
Department of Civil Engineering/TRIPP Indian Institute of Technology Delhi http://tripp.iitd.ac.in Data Collection and Sampling issues -Preparing Low Carbon Mobility Plan K. Ramachandra Rao, G. Tiwari,
d r a f t Division Street: 15.4 du/a Damen Avenue: 14.1 du/a Western Avenue: 12.8 du/a
Transit [take transit: We live in the City, people. We can t expect to have parking. ] The ability of people to travel by transit is not only an equity issue, it is a matter of economic vitality for the
FASTER. EASIER. COOLER.
FASTER. EASIER. COOLER. BiTiBi FACT SHEETS The sole responsibility for the content of this publication etc lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither
Welcome to our proposal for Greenwich Peninsula
Welcome to our proposal for Greenwich Peninsula To Blackwall Tunnel To O2 Arena To Charlton/Woolwich Proposed IKEA Store N To A2/Kent 0 10 20 40 60m site plan of the proposed ikea store IKEA is proposing
2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning
2 Integrated planning Chapter 2 Integrated Planning This chapter contains the following sections: Section No. Topic 2.1 Introduction to integrated planning 2.2 Transit s Integrated Planning Policy 2.3
Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport. Report
Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport Report CENTRAL EUROPE Programme Project CHAMPIONS February 2012 Development of a Concept for the Public
THE COHERENT CITY MUNICIPAL PLANNING STRATEGY 2014 FOR THE CITY OF COPENHAGEN
THE COHERENT CITY MUNICIPAL PLANNING STRATEGY 2014 FOR THE CITY OF COPENHAGEN THE COHERENT CITY Municipal Planning Strategy 2014 for The City of Copenhagen MADE BY: Made by a group of representatives from
01LG Corp. Overview. Korea Employee 125,000 Plants 40 R&D Center 70. Overseas Employees 88,000 Local subsidiaries 200 - Plants : 50 -R&D: 20
01LG Corp. Overview Korea Employee 125,000 Plants 40 R&D Center 70 Overseas Employees 88,000 Local subsidiaries 200 - Plants : 50 -R&D: 20 01LG Corp. Business Area z 12 14 31 02LG CNS Overview LG N-Sys
Abstract. {tkra, jbin, katha, oan}@transport.dtu.dk. DTU Transport, Technical University of Denmark. * Corresponding author
Using wearable GPS devices in travel surveys: A case study in the Greater Copenhagen Area Thomas Kjær Rasmussen*, Jesper Bláfoss Ingvardson, Katrín Halldórsdóttir, Otto Anker Nielsen {tkra, jbin, katha,
The city s green areas represent about 25% of the city s overall area and on
3. Green urban areas incorporating sustainable land use Provide the percentage of green and water areas (public and private) and soil sealing in relation to the overall city area, including trends over
1 st RESOLUTE Workshop Florence 15.12.2015
1 st RESOLUTE Workshop 15.12.2015 Dr. Alexandros Deloukas, Attiko Metro S.A. Evangelos Karagkounis, Metro Operations Expert Athens Metro System Overview System Description, Practices and Interdependencies
How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.
How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, www.miastadlarowerow.pl VeloForum, 16 Oct. 2010 th What has communism to do with cycling? No free flow
Growth of Addis Ababa
Growth of Addis Ababa Founded in 1887, and has expanded rapidly Now among the ten largest cities in Sub Saharan Africa Annual growth rate is 3.8% By 2020 population growth would reach to eight million.