Keywords: Passenger Costs, Railway Maintenance Planning, Railway Closure Time Evaluation
|
|
|
- Nancy Merritt
- 9 years ago
- Views:
Transcription
1 Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN The potential cost from passengers and how it impacts railway maintenance and renewal decisions Rui Li, [email protected] Alex Landex, [email protected] Otto Anker Nielsen, [email protected] DTU Transport Steen Nørbæk Madsen, [email protected] Rambøll Danmark A/S Abstract To plan Maintenance and Renewals (M&R) for the heavy railway lines, scheduling work possession time and deciding the closure of railway line are quite challenging for Infrastructure Manager (IM) at tactical planning level. As usual, the direct costs such as the materials costs, man power price and machinery costs are the important factors for IM to evaluate all the alternative schedules. At the same time, the potential cost from passengers is also crucial to minimize the impacts to the society. A phasebased planning toolkit is developed to help IM to plan and compare project proposals from a wider cost scope, integrating the passenger loss and direct costs into the comparison at planning stage. Passenger loss is estimated basing on the potential delay time values. The case study shows the potential cost from passengers is one of the key factors impacting the rank of M&R options. It even dominates the overall cost comparison for the busiest railway stations. In such case, the track closure time has to be decided according to the passenger loss instead of the direct costs. Sometime the best proposal for society might be the most expensive solution for IM. Therefore the potential passenger loss is not something that can be ignored at planning stage. Keywords: Passenger Costs, Railway Maintenance Planning, Railway Closure Time Evaluation 1. Introduction 1.1. Background Infrastructure Manager (IM) has been separated from the restructuring of railways in the last decades (1997 in Denmark). The objective of restructuring is to make railway more competitive. It mainly brings the following challenges to infrastructure managers. Trafikdage på Aalborg Universitet 2013 ISSN
2 Firstly, the better performance such as more trains per hour, longer operating hours and better punctuality is required by government and Train Operation Companies (TOCs). More Maintenance and Renewal work are needed to remain the railway infrastructures in good order. Secondly the restructuring transfers the rail network ownership to IM so that the focuses can be put on the railway infrastructure. The cost oriented policy was made for IM to improve the project cost efficiency. Under the increasing budget pressures, costs therefore become the most important factor impacting the choice of M&R implementation. At last, railway as the most safety reliable traffic mode transports millions of passengers on daily basis. Any closure of a railway lines on the maintenance and renewal purpose can delay a lot of passengers, creates traffic congestions and further impacts to the whole society Motivations When the total amount of the M&R work had been decided from the strategic planning, how to plan the possession working time and decide the closure time of the railway line are the main questions. Limiting the analysis only on the M&R direct costs such as the materials costs, man power and machinery costs will be risky to underestimate the railway project impacts. Because a low cost maintenance plan, for instance totally closing a line at rush hours, is not the most cost efficient solution at all for the passengers. If the railway is closed long enough, the impacted passengers could choose personal car to do the transport and leave the public transport in a long run. Therefore it is necessary to investigate how the potential cost from passengers impacts the ranking of alternative proposals from a wider cost scope. 2. Objective and Approach The main objective is to find an approach converting the passenger loss caused by maintenance and renewals into monetary costs. Integrating it into the cost comparison to investigate how it can impact the railway M&R decision at tactical level. A socalled railway phasebased planning toolkit is developed to plan and compare the railway infrastructure project proposals from a larger cost scope. The new planning toolkit calculates the construction costs by taking the working possession time into account. The passenger loss caused by the construction work is also integrated into the analysis. It is a phasebased approach in which different parts of the costs are calculated in separated phases. The idea is that the toolkit can be easily extended or research in details in particular phase. Passenger loss is built in Phase 8 and can be either included or excluded to the final cost comparison. How the passenger loss impacts the proposal ranking can be then investigated and discussed. In the framework, the planning processes and cost calculation are constructed into the following phases, Figure 1 The Tactical Planning Phases Trafikdage på Aalborg Universitet 2013 ISSN
3 3.1. Direct Cost Calculations The Greenfield market price (the price in the situation where people work 37 hours at workdays), will be used to calculate more accurate actual spends by considering the working possessions, job type and working efficient etc The calculation is divided into 7 stages indicated by the red arrows in Figure 1. It includes, Setting work possessions Calculating working efficiency Setting green field market price Calculating the price for each working possessions Estimating working speed and, Setting scenario and Estimating the actual costs It is very important to do the transfer because the same amount of workload can cost quite differently in different working possessions. It estimates from Fehmarn project that the difference can be up to 10% Passenger Loss Estimation The way to calculate passenger loss is based on the potential passenger delays. Value of Time (VoT) is used to transfer the delay minutes into monetary values. The following formula is showing the calculation of the potential loss for passengers. Number of passengers: It can be calculated according to the traffic density (from the passenger train timetable) and the average amount of passenger per train. The number of passengers is changing from time to time but has certain seasonality in a long term. The following chart is showing the Strain average amount of passengers at weekday in At this step, many assumptions such as passenger seasonality at implementation period, potential reduction of passengers due to maintenance, trainbus delays etc. need be made. Figure 2 Average Passengers at each hour (Strain at weekday in 2007) Cumulative Delays: It means the cumulated delay per passenger caused by the maintenance and renewal in the whole implementation period. It is estimated via train delay simulation according to the detailed possession plan. For example, if the line is totally closed and the trainbuses have been arranged, the additional travel time on trainbuses can be looked as delays. A cancelled train can be seen as a long time delay train. Simulation normally is used to estimate the delays at this step. Value of Time (VoT): In transport economics, VoT is the amount of money that a traveller would be willing to pay in order to save time, or the amount of money they would accept as compensation for lost time. Trafikdage på Aalborg Universitet 2013 ISSN
4 The passenger value of time is a complex estimation which depends on many factors like passenger type, age, income and day time etc. As an example shown in the following table, there are many statistics providing the VoT for public transport in Denmark. The average passenger VoT for particular railway project has to be estimated according to passenger type mixture and travel purpose. Table 1 Value of Time for Public Transports Value of Time Unit Unit Value of Time Public Transport Travel Time Household kr./hour pr. person Employee kr./hour pr. person Others kr./hour pr. person Waiting time and delay time Household kr./hour pr. person Employee kr./hour pr. person Others kr./hour pr. person Transit time Household kr./hour pr. person Employee kr./hour pr. person Others kr./hour pr. person Cost Comparison When all the direct costs and passenger loss are calculated for each possession plan, the cost comparison was normally used to identify the most costefficient plan. In the comparison, direct costs and passenger loss ranks the alternative proposals; the project time in calendar days is used to indicate the impact period. The comparison example chart can be seen in the following case study. 3. A Case Study 4.1. Case Brief Two of Strain stations, Allerød and Nørreport Stations, are used to illustrate how the planning toolkit estimates the costs from Infrastructure Manager and Passengers. Nørreport Station is the busiest station in the center of Copenhagen, serving 165,000 people on daily base. It is a main transit station connecting the intercity trains, Strains and the Metro. At the Strain layer, there operates six main lines on both directions in rush hours. Allerød Station is the Strain station in north of great Copenhagen, out of the urban city area. Line E is the only service line running through the station. There is no train transit in the station. Different from Nørreport station, the amount of passengers is small. The most passengers use the station in rush hours. Trafikdage på Aalborg Universitet 2013 ISSN
5 Figure 3 Strain Network in Copenhagen 4.2. Main Assumptions The assumption is made that a 500 meters track and drainage system need be renewed at Nørreport Station and Allerød station. The renewal can be done through two men and one machine. The direct cost is therefore calculated in the below structure. Table 2 Cost Structure Job Types Material Cost Machine Cost Man power Costs Total Tracks and drainage 10% 49% 41% 100% Trafikdage på Aalborg Universitet 2013 ISSN
6 There are 4 working possession plans as shown in the following table. Table 3 The Settings of Working Possession Time # Time Possession Type From To 1 Day Working In Internals Monday Friday 08:00 15: Hours Night Working Monday Friday 22:00 05:00 3 Weekend Working Friday 22:00 Monday 06:00 4 Total Closure All days 00:00 00:00 Day working in intervals: It means the renewals are implemented between running trains. The railway services are remained. The safety settlements are requires before and after every renewal work. The working efficiency is very low. It normally takes the longest days. Passengers will be partially impacted because the trains will run every 20 minutes instead of 10 minutes at Allerød station. It is not a feasible solution for Nørreport station because the interval time at Nørreport station is only 2 minutes. 7 hours Night working: The renewal is implemented in the night. The man power costs 200% of the market workday price; while the prices for machine and materials are unchanged. The working efficiency is relative low. Natural time loss is around 15% at night. The safety settlements are needed before and after the renewal work, twice per night. Trainbuses are arranged to replace train services. Weekend working: The renewal is implementing in the weekend. The tracks are closed from Friday evening to Monday morning. Man power costs 200% in the night and 150% in the weekend day time. There is natural time loss 15% at night. The safety settlements are required before and after the renewal work, twice per weekend. The working efficiency is relative high. Even the total working time is short but the project still takes long time in calendar days (The man and machine are still occupied between weekends). Passengers are impacted in the weekends. The trainbuses are arranged to carry passengers. Total closure: The track is totally closed for all days. The working speed is the fastest. The time loss due to the safety settlements is also the shortest. But passengers are impacted the most. They have to use either the trainbus or other transport modes to do the transport. The project can be done in the minimum calendar days. The average man power price is relative low (not equals to the greenfield market price). In general, it is the cheapest solution for Infrastructure Manager Passenger Loss The daily amount of passenger per hour can be calculated according to the train time table and average passengers on each train. The following table shows the result (for line E) at Nørreport Station. Figure 4 Daily Passengers for Working Possessions Daily Passengers per Possession 15:00 05:00 06:00 00:00 08:00 22:00 22:00 00:00 Day Working In Internals 7 Hours Night Working Weekend Working Totally Closure Trafikdage på Aalborg Universitet 2013 ISSN
7 The average passenger VoT per hour is estimated according to the mixture of passenger (Employee s time value is higher than household. In rush hours, most of passengers on the trains are for working purposes) and the transit activity (The value of transit time value is higher than normal travel time, at Nørreport Station the value of time per passenger is therefore higher than Allerød). The assumptions are made that the trainbus will delay each passenger 15 minutes. When the renewal is implemented between the running trains, each passenger is assumed have 5 minute delay caused by the increased interval time from 10 minutes to 20 minutes. The total number of passengers in general is decreasing when the trainbuses are arranged to replace the existing rail service. The case study doesn t count this to keep simple The Comparison Results Without taking the passenger loss into account, the direct costs comparison chart is showing in the following figure. Figure 5 Renewal Direct Costs Comparison Construction Cost and Calendar days 12,5 Scenario Total Closure Scenario Weekend Scenario Night Scenario Day Construction Cost Total Calendar days 12,5 48,0 84,0 91,0 48,0 84,0 91,0 100,0 90,0 80,0 70,0 60,0 50,0 40,0 30,0 20,0 10,0 It can be concluded that, The solution of total closure is the cheapest solution which takes only about 13 calendar days. Working in the weekend is the second best option where the renewal costs is slightly higher. It takes 6.3 weekends, around 48 calendar days in total. Night working is the most expensive solution, more than 10 times more expensive than the total closure solution. It takes long time, 84 nights to complete the renewal work. Renewing the line together with the running trains is the second expensive solution but with the longest implementation calendar days. If the passenger loss is included, it gives the different cost comparison result. At Allerød Station, the passenger loss is not as important as direct costs in general. The impacts only give to the total closure and weekend working scenarios. There are very few passengers in the night so that the passenger loss doesn t impact significantly. Working between the running trains keeps the passenger loss at low level but it is still a second expensive solution. Trafikdage på Aalborg Universitet 2013 ISSN
8 All in all, working in the weekend becomes the best solution replacing the total closure for Allerød station. Figure 6 Overall Cost Comparison at Allerød Station ,0 91,0 100,0 90, , , ,0 60,0 50,0 Construction Cost Passenger value ,0 Total ,0 Total Calendar days ,5 20, ,0 Scenario Total Closure Scenario Weekend Scenario Night Scenario Day When the traffic is heavy and the most passengers are doing transit, like Nørreport Station. The most costefficient solution is changing to night working scenario when counting the passenger loss. The following chart illustrates that the passenger loss is dominating the total cost comparison due to the higher VoT and more impacted passengers. It concludes that night working is a wise choice for Nørreport Station, even though it is the most expensive solution for IM. Figure 7 Overall Cost Comparison at Nørreport Station ,0 90,0 80,0 70,0 60, ,5 48,0 not feasible 50,0 40,0 30,0 20,0 10,0 Construction Cost Passenger value Total Total Calendar days Scenario Total Closure Scenario Weekend Scenario Night Scenario Day Trafikdage på Aalborg Universitet 2013 ISSN
9 4. Conclusion The restructuring of railways results in an increasing maintenance and renewal requirements, so that the good quality tracks can run more trains per hour, longer operating hours and achieve a better punctuality. However, the constant budget and increasing operation restriction put more and more pressures to infrastructure manager. IM has no choice but focusing on costs when planning work possession time and deciding the closure of railway line at tactical planning level. However, railway transports millions of passengers daily. Any closure of a railway lines on the maintenance and renewal purpose can delay a lot of passengers, and give the impacts to the whole society. The low cost maintenance and renewal plan is not always the best solution for passengers. In order to minimize the overall impacts, it is necessary to evaluate the alternative options from a larger scope, including the passenger loss into the overall costs to rank the proposals. The article introduces a phasebased planning toolkit which integrating the passenger loss and direct costs into the comparison at planning stage. Passenger loss is estimated basing on the potential delay time values. The case study of STrain stations shows the potential loss from passengers is one of the key costs impacting the railway closure decision. Especially for the busiest railway section, it even dominates the result of the overall proposals ranking. It is therefore required to plan the railway closure time according to passenger loss. It could be a very hard decision for infrastructure manager because in some case the chosen solution might be the most expensive one for them. Reference [1] Data og Modelcenter, Transportøkonomiske Enhedspriser, version 1.3, Instituation for Transport (July, 2010) [2] R. H. FISCHER and A. ZOETEMAN, Development of a quantitative performance model of track sections: A decision support tool for rail infrastructure maintenance policymakers, Delft University of Technology, the Netherlands (2008) [3] RAMBØLL, Notat prissætning af tillæg for sporspærringsscenarier, (2011) [4] R.LI, Framework for Railway Phase Based Planning, Master thesis, DTU Transport, Denmark (2012) [5] Larsen M. K., Coding long term forecasts pp. 29, GIS and Road Traffic Planning for MSc students, DTU Transport, Denmark (2010) [6] Elisabetta Cherchi, Discrete choice models, pp. 1722, Discrete choice models, DTU Transport, Denmark (2012) Trafikdage på Aalborg Universitet 2013 ISSN
Framework for Railway Phase-based Planning Rui Li, [email protected] Otto Anker Nielsen, [email protected] DTU Transport
Denne artikel er publiceret i det elektroniske tidsskrift Udvalgte Artikler fra Trafikdage på Aalborg Universitet (Selected Proceedings from the Annual Transport Conference at Aalborg University) ISSN
Danish Key Performance Indicators for Railway Timetables
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 16039696 www.trafikdage.dk/artikelarkiv
Environmental Performance Evaluation of Ro-Ro Passenger Ferry Transportation
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 163-9696 www.trafikdage.dk/artikelarkiv
TRANSPORT IMPACTS OF THE COPENHAGEN METRO
TRANSPORT IMPACTS OF THE COPENHAGEN METRO Jane Ildensborg-Hansen TetraPlan A/S, Copenhagen, Denmark ([email protected]) Goran Vuk Danish Transport Research Institute, Lyngby, Denmark, ([email protected]) 1. INTRODUCTION
Examination of catchment areas for public transport
Examination of catchment areas for public transport Alex Landex, Research Assistant, M.Sc., [email protected] Stephen Hansen, Research Assistant, M.Sc., [email protected] Jonas L.E. Andersen, Research Assistant,
Reliability of Railway Operation Alex Landex, [email protected] DTU Transport
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1603 9696 www.trafikdage.dk/artikelarkiv
RandstadRail: Increase in Public Transport Quality by Controlling Operations
RandstadRail: Increase in Public Transport Quality by Controlling Operations Niels van Oort HTM, Urban public transport, Research and development P.O. Box 28503, 2502 KM The Hague, The Netherlands, e-mail:
Analysing the Metro Cityring in Copenhagen
Computers in Railways XI 45 Analysing the Metro Cityring in Copenhagen A. H. Kaas & E. M. Jacobsen Atkins, Denmark Abstract When planning new infrastructure it is important that the infrastructure is well
Service Quality Performance Report 2013
NSB GJØVIKBANEN AS Service Quality Performance Report 2013 Passenger Rights Regulation 1371/2007 1. NSB Gjøvikbanen AS NSB Gjøvikbanen AS is a subsidiary in the NSB Group. The company is 100 % owned by
Implementation of CVIS ITS Application in a Driving Simulator Environment Kenneth Sørensen, [email protected] SINTEF
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1603-9696 www.trafikdage.dk/artikelarkiv
Capacity Statement for Railways
Capacity Statement for Railways Alex Landex, [email protected] Centre for Traffic and Transport, Technical University of Denmark 1 Abstract The subject Railway capacity is a combination of the capacity consumption
NETWORK EFFECTS IN RAILWAY SYSTEMS
NETWORK EFFECTS IN RAILWAY SYSTEMS Alex Landex Technical University of Denmark, Centre for Traffic and Transport Otto Anker Nielsen Technical University of Denmark, Centre for Traffic and Transport 1 ABSTRACT
What are the Impacts on Air Quality of Low Emission Zones in Denmark?
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1603-9696 www.trafikdage.dk/artikelarkiv
Simulation of modified timetables for high speed trains Stockholm Göteborg
17 18 May 2010, Opatija, Croatia First International Conference on Road and Rail Infrastructure Simulation of modified timetables for high speed trains Stockholm Göteborg H. Sipilä Division of Traffic
TRANSPORT IMPACTS OF THE COPENHAGEN METRO
TRANSPORT IMPACTS OF THE COPENHAGEN METRO Goran Vuk Danish Transport Research Institute, Lyngby, Denmark, ([email protected]) Jane Ildensborg-Hansen TetraPlan A/S, Copenhagen, Denmark 1. INTRODUCTION The Copenhagen
11. Monitoring. 11.1 Performance monitoring in LTP2
178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the
Penalty Fares information
Penalty Fares information Do you have any questions? For further information about Penalty Fares on Greater Anglia services please contact our Customer Service team: Remember: Buy a ticket before you travel
Development of a Regional (short distance) Transport Model System in Norway
Anne Madslien [email protected] Institute of Transport Economics PO Box 6110 Etterstad, N-0602 Oslo, Norway Telephone No.: +47 22 57 38 00 Telefax No.: +47 22 57 02 90 http://www.toi.no Development of a Regional
Abstract. {tkra, jbin, katha, oan}@transport.dtu.dk. DTU Transport, Technical University of Denmark. * Corresponding author
Using wearable GPS devices in travel surveys: A case study in the Greater Copenhagen Area Thomas Kjær Rasmussen*, Jesper Bláfoss Ingvardson, Katrín Halldórsdóttir, Otto Anker Nielsen {tkra, jbin, katha,
Motility - finding a way to mobility attitude and behavior Aslak Aamot Kjærulff, [email protected] Ph.d. ved Roskilde Universitet
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1603-9696 www.trafikdage.dk/artikelarkiv
Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll Agenda 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
Implementation of Bus Rapid Transit in Copenhagen: A Mesoscopic Model Approach
Denne artikel er publiceret i det elektroniske tidsskrift Udvalgte artikler fra Trafikdage på Aalborg Universitet (Selected Proceedings from the Annual Transport Conference at Aalborg University) ISSN
Scheduling of inspectors for ticket spot checking in urban rail transportation
Scheduling of inspectors for ticket spot checking in urban rail transportation Per Thorlacius and Jens Clausen DSB S-tog, Dept. of Production Planning Kalvebod Brygge 32, 5. DK-156 Copenhagen V, Denmark
Transport planning in the Stockholm Region
Stockholm County Council Office of Regional Planning and Urban Transportation Hans Hede Transport planning in the Stockholm Region METREX/Moscow International workshop June 2006 A region with great potential
Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too
Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too Kristian Wærsted City Hall Chief Engineer (NPRA) Road tolling in Norway Trondheim Bergen (1986) (1991)
The use of GPS and SMS data to investigate travel experiences Reinau, Kristian Hegner; Harder, Henrik; Weber, Michael; Jensen, Anders Sorgenfri
Aalborg Universitet The use of GPS and SMS data to investigate travel experiences Reinau, Kristian Hegner; Harder, Henrik; Weber, Michael; Jensen, Anders Sorgenfri Publication date: 2012 Document Version
GTR (Govia Thameslink Railway)
GTR (Govia Thameslink Railway) The new franchise UK s biggest ever rail franchise; 22% of all passenger train services Thameslink identity restored for services running through central core; Great Northern
Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by
Evergreen Line Rapid Transit Project Business Case Executive Summary February 2008 Reviewed by Recommendation and Executive Summary The business case for the Evergreen Line Rapid Transit Project (the Project)
Overall design of the Danish National transport model
Overall design of the Danish National transport model Jeppe Rich 1 Otto Anker Nielsen Camilla Brems Christian Overgaard Hansen DTU Transport, Bygningstorvet 1, 2800 Kgl. Lyngby, Denmark Abstract The objective
1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture
1st CONFERENCE IN ETHNOMUSICOLOGY AND ANTHROPOLOGY OF MUSIC Methods, approaches and perspectives for the study of music within culture Universitat Autònoma de Barcelona (UAB) 2nd-3rd, July 2015 Barcelona,
Leicestershire County Council Transport Trends in Leicestershire 2014. Transport Data and Intelligence (TDI)
Leicestershire County Council Transport Trends in Leicestershire 2014 Transport Data and Intelligence (TDI) Table of Contents Contents List of Tables... 3 List of Figures... 3 Overview... 5 Traffic Growth...
Capacity at Railway Stations. / Landex, Alex (Invited author). WCRR 2011. 2011. Publication: Research Article in proceedings Annual report year: 2011
Alex Landex - Publications - DTU Orbit (21/12/2015) Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions. / Li, Rui;
INTEGRATION AND REGULATORY STRUCTURES IN PUBLIC TRANSPORT CASE STUDY BRUSSELS CAPITAL REGION
INTEGRATION AND REGULATORY STRUCTURES IN PUBLIC TRANSPORT CASE STUDY BRUSSELS CAPITAL REGION Brussels, July 2003 1- GENERAL INFORMATION ON THE CASE STUDY A/ General statistics on the case study - Area
Planning Workforce Management for Bank Operation Centers with Neural Networks
Plaing Workforce Management for Bank Operation Centers with Neural Networks SEFIK ILKIN SERENGIL Research and Development Center SoftTech A.S. Tuzla Teknoloji ve Operasyon Merkezi, Tuzla 34947, Istanbul
Can I receive Housing Benefit for two homes?
Can I receive Housing Benefit for two homes? Claiming Housing Benefit for two homes Under the Housing Benefit rules, you can usually only receive Housing Benefit for the home you are living in. But, in
MEI Structured Mathematics. Practice Comprehension Task - 2. Do trains run late?
MEI Structured Mathematics Practice Comprehension Task - 2 Do trains run late? There is a popular myth that trains always run late. Actually this is far from the case. All train companies want their trains
The Danish Transport System. Facts and Figures
The Danish Transport System Facts and Figures 2 The Ministry of Transport Udgivet af: Ministry of Transport Frederiksholms Kanal 27 DK-1220 København K Udarbejdet af: Transportministeriet ISBN, trykt version:
Road freight transport across a fixed Fehmarn Belt link
Road freight transport across a fixed Fehmarn Belt link Per Homann Jespersen 1 Draft version Introduction A fixed link between Denmark and Germany was agreed upon by the Danish and German governments on
PUBLIC TRANSPORT IN SMALL TOWNS AN AREA WITH GREAT POTENTIAL
PUBLIC TRANSPORT IN SMALL TOWNS AN AREA WITH GREAT POTENTIAL Andreas Persson Department of Technology and Society, Lund Institute of Technology Sweden 1. INTRODUCTION The project Attractive Public Transport
Time-of-use tariffs in the Eskom Western region
Time-of-use tariffs in the Eskom Western region by D Ramsbottom, Eskom This is a case study into the application of time of use tariffs in the Eskom Western Region undertaken to determine the effect that
VRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
Post-harmonised European National Travel Surveys
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1603-9696 www.trafikdage.dk/artikelarkiv
Introduction to Project Management
L E S S O N 1 Introduction to Project Management Suggested lesson time 50-60 minutes Lesson objectives To be able to identify the steps involved in project planning, you will: a b c Plan a project. You
GTA Cordon Count Program
Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends
3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND
RBC INTERFACE TO CURRENT INTERLOCKINGS IN FINLAND Laura Järvinen, M.Sc (Tech), VR Track Oy Lassi Matikainen, M.Sc. (Tech), VR Track Oy SUMMARY The signalling systems in Finland originate from many decades
The Use of ITS for Improving Bus Priority at Traffic Signals
The Use of ITS for Improving Bus Priority at Traffic Signals Camilla Morellato M.Sc. Student Department of Transport, Technical University of Denmark Mathias Sdun Projects and Infrastructure Movia Traffic
Making Sense of Urban Data
Making Sense of Urban Data Anil Yazici, PhD Camille Kamga, PhD Data Sim @ Hasselt, Belgium July 213 NEW YORK CITY Population, 211 estimate: 8,244,91 Land area in square miles, 21: 32.64 Persons per square
UNIFE World Rail Market Study
UNIFE World Rail Market Study Status quo and outlook 2020 Commissioned by UNIFE, the European Rail Industry And conducted by The Boston Consulting Group 2 1 Executive Summary This is the third "World Rail
Employee Central Payroll Time Sheet
User Guide SAP SuccessFactors Employee Central Document Version: Q3 2016 August 5 PUBLIC Content 1 Payroll Time Sheet for Employees.... 7 1.1 Recording my Time....7 1.2 Payroll Time Sheet - Features &
Social Media Tips & Tools for Customer Engagement and Growth. Jessica Wilkins Byerly PIP Printing and Marketing Services Burlington, NC
Social Media Tips & Tools for Customer Jessica Wilkins Byerly PIP Printing and Marketing Services Burlington, NC Who Is Growth Marketing? Why should your business use social media? Why should your business
Special conditions of MÁV-START for SCIC-NRT applicable from 13 December 2015
Special conditions of MÁV-START for SCIC-NRT applicable from 13 December 2015 The following special conditions of carriage are valid for international railway tickets issued by foreign RUs to Hungary and
Using EMME/2 in environmental studies in the Czech Republic
Using EMME/2 in environmental studies in the Czech Republic Mgr. Jiří Dufek, Mgr. Ivo Dostál [email protected], [email protected] Centrum dopravního výzkumu (Transport Research Centre) www.cdv.cz, http://szp.cdv.cz
Bus Users in Sydney. Transport Data Centre ISSUES PAPER 2002/02 DECEMBER 2002 ISSN 1325-9253 ISBN 0 7313 2821 3
ISSUES PAPER 2002/02 DECEMBER 2002 ISSN 1325-9253 ISBN 0 7313 2821 3 Bus Users in Sydney Bus Users in Sydney presents the latest information on bus travel and bus travellers living in the Sydney Statistical
To open the door of your studio we would like to know your time of arrival at Amsterdam Schiphol Airport or Amsterdam Central Train Station.
Get to Kien Bed & Breakfast Amsterdam To open the door of your studio we would like to know your time of arrival at Amsterdam Schiphol Airport or Amsterdam Central Train Station. Please provide us a flight
ORMSKIRK TENNIS CLUB COACHING PROGRAMME 2015
ORMSKIRK TENNIS LUB OAHING PROGRAMME 2015 YOUR OAHES Head oach hris Anders is an LTA qualified senior Performance coach. He is an ex-professional player who has competed throughout GB and Europe in junior
Overtime Pay. 1. Am I entitled to overtime pay? 2. How do I calculate my overtime pay? YOUR LEGAL RIGHTS
Overtime Pay YOUR LEGAL RIGHTS If you work more than 40 hours a week, more than 8 hours a day, or 7 days in a row, you may be entitled to overtime pay for that additional work. Employees paid by a salary,
English National Concessionary Travel Scheme (Free) Bus Pass General Frequently Asked Questions
English National Concessionary Travel Scheme (Free) Bus Pass General Frequently Asked Questions 1. Who is eligible for a pass? From April 2010, the age of eligibility for concessionary bus travel was brought
Strategic evolution of railway corridor infrastructure: dual approach for assessing capacity investments and M&R strategies
Strategic evolution of railway corridor infrastructure: dual approach for assessing capacity investments and M&R strategies Y. Putallaz & R. Rivier EPFL Swiss Federal Institute of Technology, Lausanne
usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are
TRANSPORT The basic goals of the national transport policy are focused on sustainable development of the road and railway infrastructure of national and international importance, improvement of the transport
Road tolls to pay for the Metro construction in Athens possible way towards free public transport
European Free Public Transport Cities - Networking Seminar Brussels, 6 December 2012 Road tolls to pay for the Metro construction in Athens possible way towards free public transport George Yannis, Associate
Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008
Network Rail Consultation on Traction Electricity Consumption Rates for Train Operating Companies August 2008 2 1 Introduction... 3 Context & background... 3 2 Calculation of The New Electricity Consumption
Demand for Long Distance Travel
Demand for Long Distance Travel April 2011 Demand for long distance travel 1 Structure of this paper 1.1 This paper is structured as follows: Section 2 sets out past trends in the demand for long distance
Applying Schedules and Profiles in HAP
This HAP e-help discusses the importance of properly applying schedules and profiles in HAP. We will also discuss potential misapplications of these user inputs. First, we need to understand the differences
Available online at www.sciencedirect.com. ScienceDirect. Procedia Computer Science 52 (2015 ) 902 907
Available online at www.sciencedirect.com ScienceDirect Procedia Computer Science 52 (2015 ) 902 907 The 4th International Workshop on Agent-based Mobility, Traffic and Transportation Models, Methodologies
NSB AS Service Quality Performance Report for 2012 Passenger Rights regulation 1371/2007
NSB AS Service Quality Performance Report for 2012 Passenger Rights regulation 1371/2007 Contents 1) Information and Tickets 2) Punctuality of services, and general principles to cope with disruption to
Management Incentive Plan Statement
Management Incentive Plan Statement (Effective from 1 April 2009) Management Incentive Plan Statement Page 1 of 10 Contents Management Incentive Plan Statement... 2 Participants 2 Principal terms and underlying
Development in Danish international air traffic
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1603-9696 www.trafikdage.dk/artikelarkiv
Strategic port development: identifying a development approach for small and medium-sized ports
Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1903-1092 www.trafikdage.dk/artikelarkiv
Background to the Norwegian Ministry of Transport and Communications support for the measures
TØI report 738/2004 Author(s): Nils Fearnley and Åse Nossum Oslo 2004, 45 pages, Norwegian language mary: Public transport packages of measures 1996-2000 Economic evaluations Background to the Norwegian
Special conditions of MÁV-START for SCIC-NRT applicable from 13 December 2015
Special conditions of MÁV-START for SCIC-NRT applicable from 13 December 2015 The following special conditions of carriage are valid for international railway tickets issued by foreign RUs to Hungary and
EmerT a web based decision support tool. for Traffic Management
19th ITS World Congress, Vienna, Austria, 22/26 October 2012 EU-00630 EmerT a web based decision support tool for Traffic Management Laura Bieker 1*, Michael Behrisch 1, Sten Ruppe 1 German Aerospace Center
3. Output framework. Key messages in this chapter
3. Output framework Key messages in this chapter The output framework consists of outputs which Network Rail must deliver for the money it receives, indicators which we use for monitoring purposes and
High Speed Rail in India
High Speed Rail in India Selection of corridors and Impacts on energy and emissions* Sarbojit Pal International Transport Forum Roundtable on the Economics of investments in HSR December 18-19 th, 2013
Quality factors in public transport
Kerkko Vanhanen, M.Sc. (Tech.), WSP Finland Ltd Jari Kurri, M.Sc. (Tech.), Helsinki University of Technology Quality factors in public transport The perceptions of passengers on public transport quality
